JPH04306366A - Construction work in rainy weather using tower crane - Google Patents
Construction work in rainy weather using tower craneInfo
- Publication number
- JPH04306366A JPH04306366A JP9500091A JP9500091A JPH04306366A JP H04306366 A JPH04306366 A JP H04306366A JP 9500091 A JP9500091 A JP 9500091A JP 9500091 A JP9500091 A JP 9500091A JP H04306366 A JPH04306366 A JP H04306366A
- Authority
- JP
- Japan
- Prior art keywords
- tent
- crane
- construction work
- tower crane
- opened
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 33
- 238000000034 method Methods 0.000 claims description 3
- 238000005516 engineering process Methods 0.000 description 1
Landscapes
- Tents Or Canopies (AREA)
Abstract
Description
【0001】0001
【産業上の利用分野】この発明はビルなどの建設工事に
関し、特に、タワークレーンを利用した雨天時の建設工
事方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to construction work for buildings, etc., and more particularly to a method for construction work in rainy weather using a tower crane.
【0002】0002
【従来の技術】建設作業の日程が天候により大きく作用
される。梅雨時や冬の雪国では悪天候が続くため、特に
降雨や降雪に直接さらされる最上階での作業がほとんど
行なえず、雨天休業となって作業が順延される。ごく小
規模な建設工事であれば、パイプなどで組立てた簡単な
架構上にシートをかぶせて現場を覆い、雨天でもある程
度工事を進めることができる。しかし、ある程度規模の
大きな建設工事ではこのような簡単な方法では対処する
ことができない。BACKGROUND OF THE INVENTION Construction work schedules are greatly affected by the weather. Due to continuous bad weather during the rainy season and winter in snowy regions, it is almost impossible to carry out any work, especially on the top floor, which is directly exposed to rain and snow, resulting in work being postponed due to rain closures. For very small-scale construction work, the work can be carried out to some extent even in rainy weather by covering the site with a sheet over a simple structure made of pipes and other materials. However, construction work of a relatively large scale cannot be handled using such a simple method.
【0003】雨天でも建設工事を進めることができるよ
うにするための仮設屋根として実開平1−61369号
(E04H 15/28)には、傘のように支柱を中
心として開閉する構造の大きな折畳み式テントが提案さ
れている。複数の折畳み式テントを建設現場に配設し、
これらテントを開いたときに建設現場全体を覆うように
している。[0003] As a temporary roof that allows construction work to proceed even in rainy weather, Utility Model Application Publication No. 1-61369 (E04H 15/28) has a large folding roof structure that opens and closes around a support like an umbrella. Tents are suggested. Multiple foldable tents were set up at the construction site.
These tents are designed to cover the entire construction site when opened.
【0004】0004
【発明が解決しようとする課題】前述の従来技術では、
建物を順次上方へ建設していくのに伴って、前記の折畳
み式テントの支柱を建物に設置し換えて、建物とともに
テントを上方へ迫り上げて行かなければならない。複数
のテントについてこの迫り上げの作業を行なうのは非常
に面倒だという問題があった。また、中規模以上の建物
の建設工事には一般にタワークレーンが使用されるが、
前記の従来技術はタワークレーンの利用については考慮
されておらず、建設中の建物の最上部に複数の折畳み式
テントを取り付けたのでは、タワークレーンと干渉して
しまって工事を行なうことができないという問題がある
。[Problem to be solved by the invention] In the above-mentioned prior art,
As the buildings are successively constructed upward, the supports of the foldable tent must be replaced with the buildings, and the tents must be pushed upward together with the buildings. There was a problem in that it was extremely troublesome to perform this work on raising multiple tents. In addition, tower cranes are generally used for construction work on medium-sized or larger buildings, but
The above-mentioned conventional technology does not take into consideration the use of tower cranes, and if multiple foldable tents are attached to the top of a building under construction, construction work cannot be carried out because they will interfere with the tower crane. There is a problem.
【0005】この発明は前述した従来の問題点に鑑みな
されたものであり、その目的は、タワークレーンを利用
した建設工事において、上記のような折畳み式テントを
利用して雨天でも工事を進められるようにするとともに
、建設の進行に伴ってテントを上方に設置し換える作業
を省力化することにある。[0005] This invention was devised in view of the above-mentioned conventional problems, and its purpose is to enable construction work using a tower crane to proceed even in rainy weather by using the above-mentioned foldable tent. In addition to this, the purpose is to save labor in the work of repositioning the tent upward as construction progresses.
【0006】[0006]
【課題を解決するための手段】そこでこの発明では、工
事に用いるタワークレーンとして水平ブーム式のクレー
ンを選択し、傘のように支柱を中心として開閉する構造
の大きな折畳み式テントの前記支柱をクレーンタワーの
最上部に建設して、クレーン全体の迫り上げてと一体に
前記テントを移動させるようにし、また前記テントを開
いた状態で前記水平ブームの旋回範囲をほぼ覆うように
した。[Means for Solving the Problems] Therefore, in this invention, a horizontal boom type crane is selected as a tower crane used for construction work, and the support of a large foldable tent, which has a structure that opens and closes around the support like an umbrella, is attached to the support by the crane. It is constructed at the top of a tower so that the tent can be moved together with the crane as a whole, and when the tent is opened, it almost covers the swing range of the horizontal boom.
【0007】[0007]
【作用】水平ブーム式タワークレーンでは、ブームが上
方へ回動しないので、クレーンタワーの最上部に連設し
た折畳み式テントとブームとが干渉することがない。こ
の水平ブームの旋回範囲を前記テントで覆うようにして
おけば、建設現場の主要な部分をテントで覆うことがで
きる。またテントがクレーンタワーと一体なので、建設
工事の進行に伴ってクレーン全体を迫り上げれば、同時
にテントも上方へ移動する。[Operation] In the horizontal boom type tower crane, the boom does not rotate upward, so there is no interference between the boom and the folding tent attached to the top of the crane tower. By covering the swing range of the horizontal boom with the tent, the main part of the construction site can be covered with the tent. Additionally, since the tent is integrated with the crane tower, as the entire crane is raised as construction work progresses, the tent will also move upward at the same time.
【0008】[0008]
【実施例】図1にこの発明による建設工事の一実施例を
示している。1は建設中の建物であり、これの中央部分
にクレーンのマスト2が貫通するように立設されている
。このマスト2を上方部分に水平ブーム4を伴ったクレ
ーン旋回部3が組合わされている。このクレーン旋回部
3より上方において、クレーンマスト2の最上部に折畳
み式テント5を連設している。[Embodiment] Fig. 1 shows an embodiment of construction work according to the present invention. 1 is a building under construction, and a crane mast 2 is erected in the center of the building so as to penetrate through the building. A crane swing section 3 with a horizontal boom 4 is combined with the upper part of the mast 2. A folding tent 5 is connected to the top of the crane mast 2 above the crane rotating part 3.
【0009】折畳み式テント5は、前述の実開平1−6
1369号公報のものと同様な構造であり、傘の構造と
同じ折畳み構造で上下逆にした構成である。つまりクレ
ーンマスト2に一体的に支柱6が固定されており、この
支柱6に対して開閉ロッド7が軸方向にスライドするよ
うになっており、固定の支柱6と開閉ロッド7との間に
傘の骨組構造が取り付けられ、その骨組に適当なシート
を張っている。開閉ロッド7を油圧ジャッキなどで駆動
することで、テント5を支柱6を中心にして開閉するこ
とができる。[0009] The folding tent 5 is based on the above-mentioned Japanese Unexamined Utility Model 1-6.
It has a structure similar to that of Publication No. 1369, and has the same folding structure as the umbrella structure, but is turned upside down. In other words, a strut 6 is integrally fixed to the crane mast 2, and an opening/closing rod 7 slides in the axial direction with respect to this strut 6. An umbrella is provided between the fixed strut 6 and the opening/closing rod 7. A frame structure is installed and a suitable sheet is stretched over the frame. By driving the opening/closing rod 7 with a hydraulic jack or the like, the tent 5 can be opened/closed around the pillars 6.
【0010】図のようにテント5を開くと、水平ブーム
4の旋回範囲がほぼ覆われる。したがってクレーンを利
用して建築中の建物1の工事現場をテント5で覆うこと
ができ、雨天などでも工事を進めることができる。晴天
の時や強風の時はテント5を折畳む。建物1の工事の進
行に伴ってクレーンマスト2を上方に迫り上げるが、折
畳み式テント5はクレーンと一体に上方へ移動するので
、テント5の迫り上げには特別に作業を必要としない。When the tent 5 is opened as shown in the figure, the swing range of the horizontal boom 4 is almost covered. Therefore, the construction site of the building 1 under construction can be covered with the tent 5 using a crane, and the construction can proceed even in rainy weather. Fold up tent 5 when the weather is sunny or when there is strong wind. The crane mast 2 is pushed upward as the construction of the building 1 progresses, but since the folding tent 5 moves upward together with the crane, no special work is required to push the tent 5 up.
【0011】[0011]
【発明の効果】この発明によれば、建設工事に利用する
タワークレーンとして水平ブーム式のクレーンを採用し
、このクレーンマストの最上部に折畳み式テントを連設
したので、テントを開いた状態でもクレーンのブームの
動きとテントとがまったく干渉するおそれはない。また
テントでブームの旋回範囲をほぼ覆うようにしたので、
クレーンを利用して行なっている建設工事現場の上方を
ほぼ全体的にテントで覆うことができる。また、建物の
建設の進行に伴ってクレーン全体を迫り上げると、これ
と一体に連設してある折畳み式テントも上方へ移動する
ので、テントの迫り上げについてはまったく作業を行な
う必要がない。[Effects of the Invention] According to the present invention, a horizontal boom type crane is adopted as a tower crane used for construction work, and a folding tent is connected to the top of the crane mast, so even when the tent is open There is no risk of interference between the movement of the crane's boom and the tent. Also, I made the tent cover most of the swing range of the boom, so
Almost the entire area above a construction site being carried out using a crane can be covered with a tent. Furthermore, as the construction of the building progresses, when the entire crane is raised, the collapsible tent attached to it also moves upwards, so there is no need to carry out any work to raise the tent.
【図1】この発明によるタワークレーンを利用した雨天
時の建設工事方法の一実施例を示す概略斜視図である。FIG. 1 is a schematic perspective view showing an embodiment of a construction method in rainy weather using a tower crane according to the present invention.
1 建設中の建物 2 クレーンマスト 3 クレーン旋回部 4 水平ブーム 5 折畳み式テント 6 支柱 7 開閉ロッド 1 Buildings under construction 2 Crane mast 3 Crane rotation part 4 Horizontal boom 5. Foldable tent 6 Pillar 7 Opening/closing rod
Claims (1)
した建設工事において、傘のように支柱を中心として開
閉する構造の大きな折畳み式テントの前記支柱をクレー
ンマストの最上部に連設してクレーン全体の迫り上げと
一体に前記テントを上方へ移動させるようにし、前記テ
ントを開いた状態で前記水平ブームの旋回範囲をほぼ覆
うようにしたことを特徴とするタワークレーンを利用し
た雨天時の建設工事方法。Claim 1: In construction work using a horizontal boom type tower crane, the support of a large folding tent that opens and closes around the support like an umbrella is connected to the top of the crane mast, and the entire crane is Construction work during rainy weather using a tower crane, characterized in that the tent is moved upward together with the raising of the boom, and the swing range of the horizontal boom is almost covered when the tent is opened. Method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP9500091A JPH04306366A (en) | 1991-04-02 | 1991-04-02 | Construction work in rainy weather using tower crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP9500091A JPH04306366A (en) | 1991-04-02 | 1991-04-02 | Construction work in rainy weather using tower crane |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH04306366A true JPH04306366A (en) | 1992-10-29 |
Family
ID=14125586
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP9500091A Pending JPH04306366A (en) | 1991-04-02 | 1991-04-02 | Construction work in rainy weather using tower crane |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH04306366A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2006003207A1 (en) * | 2004-07-07 | 2006-01-12 | Aloys Wobben | Facility used for the production and/or assembly of goods |
US20140190919A1 (en) * | 2012-04-03 | 2014-07-10 | Calisto Oy | Bridge crane assembly and a method for installing the same |
-
1991
- 1991-04-02 JP JP9500091A patent/JPH04306366A/en active Pending
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2006003207A1 (en) * | 2004-07-07 | 2006-01-12 | Aloys Wobben | Facility used for the production and/or assembly of goods |
AU2005259161B2 (en) * | 2004-07-07 | 2008-04-24 | Aloys Wobben | Facility used for the production and/or assembly of goods |
EP2210850A1 (en) | 2004-07-07 | 2010-07-28 | Aloys Wobben | Facility used for the production and/or assembly of goods |
US7845121B2 (en) | 2004-07-07 | 2010-12-07 | Aloys Wobben | Facility used for the production and/or assembly of goods |
US20140190919A1 (en) * | 2012-04-03 | 2014-07-10 | Calisto Oy | Bridge crane assembly and a method for installing the same |
US9102505B2 (en) * | 2012-04-03 | 2015-08-11 | Calisto Oy | Bridge crane assembly and a method for installing the same |
AU2012376340B2 (en) * | 2012-04-03 | 2018-08-02 | Calisto Oy | Bridge crane assembly and a method for installing the same |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6996941B1 (en) | Portable foldable tent and method for erecting same | |
JPH04306366A (en) | Construction work in rainy weather using tower crane | |
CN212176635U (en) | Large-span telescopic awning suitable for improving operation environment of construction site | |
JP2609207B2 (en) | Construction method and equipment for cylindrical underground structures | |
CN220203518U (en) | Multifunctional landscape pavilion | |
JP2000186426A (en) | Temporary roof for building construction | |
JP4167377B2 (en) | Rainfall installation method for unit housing, tent | |
JPH05295897A (en) | Slide type temporary roofing method and temporary roof | |
JP4159714B2 (en) | Ad balloon construction method | |
JPH0673258U (en) | shelter | |
JP3038357B2 (en) | Folding temporary roof | |
KR100318813B1 (en) | Vinyl opening and closing device for vinyl house | |
JP2587352Y2 (en) | Openable temporary tent | |
JPH05156827A (en) | Assembly type shelter | |
JPH0619716Y2 (en) | Folding temporary roof | |
JPH04371667A (en) | Construction of all weather type temporary roof | |
JPH0645003U (en) | Construction parasol | |
JPH0559821A (en) | Foldable temporary roof | |
JPH06136963A (en) | Opening and closing type weatherproof temporary shed | |
JP2819407B2 (en) | Openable cable dome | |
JP2505334Y2 (en) | tent | |
JPH0714033U (en) | Roof opening and closing device for temporary tents | |
JPH0762890A (en) | Tent for building site | |
JPH0666053A (en) | Tent with louver | |
JPH0657986B2 (en) | Retractable roof |