Continuous casting method and device

Info

Publication number
JPH04274851A
JPH04274851A JP3270391A JP3270391A JPH04274851A JP H04274851 A JPH04274851 A JP H04274851A JP 3270391 A JP3270391 A JP 3270391A JP 3270391 A JP3270391 A JP 3270391A JP H04274851 A JPH04274851 A JP H04274851A
Authority
JP
Japan
Prior art keywords
dummy
dummy bar
continuous casting
bars
mold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP3270391A
Other languages
Japanese (ja)
Inventor
Susumu Yuhara
油原 晋
Toshitane Matsukawa
松川 敏胤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Original Assignee
Kawasaki Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kawasaki Steel Corp filed Critical Kawasaki Steel Corp
Priority to JP3270391A priority Critical patent/JPH04274851A/en
Publication of JPH04274851A publication Critical patent/JPH04274851A/en
Pending legal-status Critical Current

Links

Landscapes

  • Continuous Casting (AREA)

Abstract

PURPOSE:To save the waste of time from the end of casting before the start of the prepn. for casting and to increase through part by installing two pieces of dummy bars online and alternately charging these dummy bars. CONSTITUTION:Two pieces of the dummy bars A, B are installed online per strand and a supporting device 8 for preventing the fall of a dummy bar 6 on stand-by under a hoisting winch 5 of the dummy bars is provided. The dummy bars A, B are alternately charged. The generation of loss time is prevented in this way.

Description

【発明の詳細な説明】[Detailed description of the invention]

【0001】0001

【産業上の利用分野】本発明は、ダミーバーをモールド
上方より装入する連続鋳造方法及び装置に関するもので
ある。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a continuous casting method and apparatus in which a dummy bar is inserted into a mold from above.

【0002】0002

【従来の技術】ダミーバーをモールド上方より挿入する
方式の連続鋳造装置は、鉄鋼便覧第3版第II巻製銑・
製鋼の第 626頁図12・35、又は特開昭59−1
78156号公報に示されるように公知である。この設
備においては単一のダミーバーを使って、鋳込開始、巻
上げ、次の異鋼種、異幅への切換時に再挿入して鋳込を
開始していくものであり、下部挿入式と比べ、ダミーバ
ー逆送時間を不要とするため生産性が向上する利点を生
じる。
[Prior Art] Continuous casting equipment in which a dummy bar is inserted from above the mold is used in Iron and Steel Handbook, 3rd edition, Volume II.
Figures 12 and 35 on page 626 of Steel Manufacturing, or JP-A-1983-1
This is known as shown in Japanese Patent No. 78156. In this equipment, a single dummy bar is used to start casting, wind up, and reinsert to start casting when switching to the next different steel type or width.Compared to the bottom insertion type, There is an advantage that productivity is improved because there is no need for time for reverse feeding of the dummy bar.

【0003】しかし、従来のダミーバーをモールド上方
より装入する連続鋳造機においては、1ストランドあた
りオンラインに1本のダミーバーしかないので、鍋1杯
分の溶湯のみを鋳造する単発鋳造の時にモールドからダ
ミーバー切離し位置までの距離が短く、かつ単位長さ当
たりの重量が大きい鋳片の際には、タンディッシュから
の鋳造が終了してもダミーバー切離しが行われていない
ために、次の鍋の鋳造のための準備ができない。しいて
は鋳造開始が遅れ、歴時間に対する鋳造時間が少なくな
り、生産量が少なくなる。
However, in a conventional continuous casting machine in which a dummy bar is charged from above the mold, there is only one dummy bar online per strand, so when casting only one pot's worth of molten metal, there is no need to remove the dummy bar from the mold. When the distance to the dummy bar separation position is short and the weight per unit length is large, the dummy bar is not separated even after casting from the tundish is completed, so that the next pot cannot be cast. I can't prepare for it. As a result, the start of casting is delayed, the casting time becomes shorter than the calendar time, and the production amount decreases.

【0004】0004

【発明が解決しようとする課題】本発明の目的は、上述
のような鋳造ができない無駄な時間の発生を防止するこ
とのできる連続鋳造方法及び装置を提案することである
SUMMARY OF THE INVENTION An object of the present invention is to propose a continuous casting method and apparatus that can prevent the above-mentioned wasted time during which casting cannot be performed.

【0005】[0005]

【課題を解決するための手段】本発明は、ダミーバーを
モールド上方より装入する連続鋳造方法において、1ス
トランドあたりオンラインに2本のダミーバーを設置し
、交互に装入することを特徴とする連続鋳造方法であり
、また、ダミーバーをモールド上方より装入する連続鋳
造装置において、1ストランドあたりオンラインに2本
のダミーバーを設置し、かつダミーバーの吊り上げウィ
ンチ下に待機中のダミーバーの落下を防止する支持装置
を設けたことを特徴とする連続鋳造装置である。吊り上
げウィンチ下に待機中のダミーバーの落下を防止する支
持装置としては、ダミーバーの幅方向或いは厚み方向に
穿たれた孔を貫通するシャフトと該シャフトを移動させ
るアクチュエータからなるものを用いることができる。 また、鋳型とダミーバー吊り上げウィンチ間に直列に2
台のダミーバーカーを配置し、ダミーバーカー上に常に
次のダミーバーを待機状態にしておくこともできる。
[Means for Solving the Problems] The present invention provides a continuous casting method in which dummy bars are charged from above the mold, in which two dummy bars are installed online per strand and are charged alternately. This is a casting method, and in a continuous casting machine in which dummy bars are charged from above the mold, two dummy bars are installed online per strand, and a support is used to prevent the dummy bars from falling when they are waiting under a dummy bar lifting winch. This is a continuous casting device characterized by being equipped with a device. As a support device for preventing the dummy bar waiting under the lifting winch from falling, it is possible to use a support device consisting of a shaft that passes through a hole drilled in the width direction or thickness direction of the dummy bar and an actuator that moves the shaft. In addition, two parts are connected in series between the mold and the dummy bar lifting winch.
It is also possible to place a dummy barker on the dummy barker and keep the next dummy bar on standby at all times.

【0006】[0006]

【作  用】本発明の連続鋳造装置の一実施例を図1に
示す。モールド2、ピンチロール3によって構成される
ダミーバー上方装入方式の連続鋳造装置1において、連
々鋳造や鋳造をしていない状態では1本のダミーバー7
はダミーバーカー4に積載され、もう1本のダミーバー
6はダミーバー巻き上げ装置5によって吊り下げられて
いる。ワイヤー等による吊り下げ状態では、ワイヤー切
れ等による落下などの安全上の観点から、本発明ではダ
ミーバーの落下を防止するダミーバー支持装置8を設け
ている。
[Operation] An embodiment of the continuous casting apparatus of the present invention is shown in FIG. In a continuous casting device 1 of a dummy bar upward charging type that is composed of a mold 2 and a pinch roll 3, only one dummy bar 7 is used when continuous casting or not casting is performed.
is loaded on a dummy bar car 4, and another dummy bar 6 is suspended by a dummy bar hoisting device 5. When the dummy bar is suspended by a wire or the like, for safety reasons such as the possibility of the dummy bar falling due to wire breakage, the present invention provides a dummy bar support device 8 to prevent the dummy bar from falling.

【0007】図2に本発明が有効に使われる単位長さ当
たりの重量が大きい鋳片9を鍋1杯分の溶湯のみを鋳造
する単発鋳造が終了した状態図を示す。モールド2での
鋳造が終了した鋳片9はピンチロール3で引き抜かれて
いくが、その時鋳片の単重が大きいと鋳片の長さが短く
なり、ボトム側にはダミーバーがついたままである。従
来のダミーバーが1本の場合にはモールド内に鋳片がな
く、次の鍋の鋳造のための準備、とくにダミーバーを装
入しようとしてもダミーバーが切り離れていないため装
入できない。しかし、本発明の場合2本目のダミーバー
で直ちに装入が可能である。
FIG. 2 is a diagram illustrating a state in which the present invention is effectively used after single-shot casting is completed, in which only one ladle's worth of molten metal is cast from a slab 9 having a large weight per unit length. The slab 9 that has been cast in the mold 2 is pulled out by the pinch rolls 3, but at this time, if the unit weight of the slab is large, the length of the slab becomes short, and the dummy bar remains attached to the bottom side. . In the conventional case where there is only one dummy bar, there is no slab in the mold, and even if an attempt is made to prepare for casting the next pot, especially to insert a dummy bar, the dummy bar is not separated and cannot be inserted. However, in the case of the present invention, charging can be performed immediately with the second dummy bar.

【0008】次に本発明のダミーバー支持装置8の一例
を図3に示す。支持装置8はダミーバーの重量を支持し
得る強度をもったシャフト13とこのシャフト13を移
動させるアクチュエータ14からなる。ピン10とリン
ク11によって構成されるダミーバーにはその厚み方向
或いはその幅方向に保持装置のシャフトが貫通し得る孔
12を設ける。これら装置によって2本のオンラインダ
ミーバーはダミーバーカー上とダミーバー支持装置によ
って吊り上げられた状態で安全に格納される。このよう
な吊り上げられた状態のダミーバー支持装置としては、
ダミーバー両サイドより機械的に把持する方式や、その
他種々の方式がとり得る。
Next, an example of the dummy bar support device 8 of the present invention is shown in FIG. The support device 8 includes a shaft 13 having a strength capable of supporting the weight of the dummy bar, and an actuator 14 for moving the shaft 13. The dummy bar constituted by the pin 10 and the link 11 is provided with a hole 12 in its thickness direction or width direction through which the shaft of the holding device can pass. With these devices, the two online dummy bars are safely stored on the dummy barker and suspended by the dummy bar support device. As a dummy bar support device in such a suspended state,
A method of mechanically gripping the dummy bar from both sides, and various other methods can be used.

【0009】図4に本発明の他の連続装置の実施例を示
す。この図ではダミーバーカーを2基有し、一方のダミ
ーバーカー4−1は装入用、他方のダミーバーカー4−
2は受取り用として用いている。図4(a)においてダ
ミーバー6は鋳型にダミーバーカー4−1よりまさに装
入されようとしており、一方ダミーバー7は吊り上げウ
ィンチ5よりダミーバーカー4−2に受取られようとし
ている。ダミーバー6を装入後は、(b)に示すように
ダミーバー7がダミーバーカー4−2上に受け入れられ
ている。そして連続鋳造している間に、(c)に示すよ
うにダミーバーカー4−1側或いはダミーバーカー4−
2側いずれかが片側のダミーバーカーに近接して、両者
の無限軌道を駆動してダミーバーカー4−2から4−1
にダミーバーを引渡し、(d)に示す状態で次回の鋳造
まで待機させておく。
FIG. 4 shows an embodiment of another continuous device of the present invention. In this figure, there are two dummy barkers; one dummy barker 4-1 is for charging, and the other dummy barker 4-1 is for charging.
2 is used for receiving. In FIG. 4(a), the dummy bar 6 is about to be loaded into the mold from the dummy barker 4-1, while the dummy bar 7 is about to be received by the dummy barker 4-2 from the lifting winch 5. After the dummy bar 6 is inserted, the dummy bar 7 is received on the dummy barker 4-2 as shown in (b). During continuous casting, as shown in (c), the dummy barker 4-1 side or the dummy barker 4-
Either of the two sides approaches the dummy barker on one side and drives the endless tracks of both to move the dummy barkers 4-2 to 4-1.
The dummy bar is delivered to the customer and left in the state shown in (d) on standby until the next casting.

【0010】次に具体的実施例に基づいて本発明をより
詳細に説明する。
Next, the present invention will be explained in more detail based on specific examples.

【0011】[0011]

【実施例】機長45m、モールドからダミーバー切り離
し位置までの距離が50m、オンラインダミーバーが1
本の2ストランドのダミーバー上方装入式のスラブ連鋳
機において、鍋容量 300tの溶鋼を 260mm厚
み×2000mm幅の鋳片を鋳造速度 1.9m/mi
n で単発鋳造した際には、モールドで鋳造が終了した
時ダミーバーのヘッドの位置はモールドから37mの位
置にあり、モールドでは次の鋳造準備が可能にもかかわ
らず、ダミーバー切離しまでの所要時間7分と、切離し
からダミーバーを巻き上げてダミーバーカーに載せ、モ
ールドへ装入するまでの所要時間10分とを合わせた1
7分が無駄時間として発生していた。
[Example] Machine length: 45m, distance from mold to dummy bar separation position: 50m, online dummy bar: 1
In this two-strand dummy bar top-charging slab continuous caster, a ladle capacity of 300 tons of molten steel was cast into slabs with a thickness of 260 mm and a width of 2000 mm at a speed of 1.9 m/mi.
When performing single-shot casting with n, the head of the dummy bar was located 37 m from the mold when casting was completed, and although the mold was ready for the next casting, the time required to separate the dummy bar was 7. 1 minute plus the 10 minutes required from cutting it off to winding up the dummy bar, placing it on the dummy bar car, and charging it into the mold.
Seven minutes occurred as wasted time.

【0012】同じ連鋳機において、本発明の鋳造方法で
あるダミーバー2本をオンラインに持ち、ダミーバー保
持装置を設置することにより、先の鋳造状態においても
鋳造終了後もう一方のダミーバーを装入することに無駄
時間17分をなくすことができた。以上のような鋳造が
20回/月にあったが、本発明を採用することによって
約5000t/月の増産が可能となった。
In the same continuous casting machine, by having two dummy bars online according to the casting method of the present invention and installing a dummy bar holding device, the other dummy bar can be inserted after the completion of casting even in the previous casting state. In particular, I was able to eliminate 17 minutes of wasted time. The above-mentioned casting was performed 20 times a month, but by adopting the present invention, it became possible to increase production by about 5000 tons/month.

【0013】[0013]

【発明の効果】本発明は、ダミーバーをモールド上方よ
り装入する方式の連続鋳造機において、2本のオンライ
ンダミーバーを持つことで、鋳造終了から鋳造準備開始
までの無駄時間を省略できるようになった。その結果生
産量を大きくすることができるようになった。
[Effects of the Invention] The present invention has two online dummy bars in a continuous casting machine that charges dummy bars from above the mold, thereby making it possible to eliminate wasted time from the end of casting to the start of casting preparation. Ta. As a result, it became possible to increase production volume.

【図面の簡単な説明】[Brief explanation of the drawing]

【図1】本発明を採用したダミーバー上方連続鋳造装置
の側面図である。
FIG. 1 is a side view of a dummy bar upward continuous casting apparatus employing the present invention.

【図2】本発明の2本ダミーバーを使用している時の連
続鋳造装置の側面図である。
FIG. 2 is a side view of the continuous casting apparatus when using the two dummy bars of the present invention.

【図3】本発明のダミーバー支持装置の説明図である。FIG. 3 is an explanatory diagram of the dummy bar support device of the present invention.

【図4】本発明装置の他の実施例を示す説明図である。FIG. 4 is an explanatory diagram showing another embodiment of the device of the present invention.

【符号の説明】[Explanation of symbols]

1  ダミーバー上方装入式連続鋳造機2  モールド 3  ピンチロール 4  ダミーバーカー 5  ダミーバー巻き上げ装置 6  ダミーバーA 7  ダミーバーB 8  ダミーバー保持装置 9  鋳片 10  ダミーバーピン 11  ダミーバーリンク 12  保持装置シャフト装入孔 13  保持装置シャフト 14  保持装置アクチュエータ 1 Dummy bar top-loading continuous casting machine 2 Mold 3 Pinch roll 4 Dummy barker 5 Dummy bar hoisting device 6 Dummy bar A 7 Dummy bar B 8 Dummy bar holding device 9 Slab 10 Dummy bar pin 11 Dummy bar link 12 Holding device shaft insertion hole 13 Holding device shaft 14 Holding device actuator

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】  ダミーバーをモールド上方より装入す
る連続鋳造方法において、1ストランドあたりオンライ
ンに2本のダミーバーを設置し、交互に装入することを
特徴とする連続鋳造方法。
1. A continuous casting method in which dummy bars are charged from above the mold, characterized in that two dummy bars are installed online per strand and are charged alternately.
【請求項2】  ダミーバーをモールド上方より装入す
る連続鋳造装置において、1ストランドあたりオンライ
ンに2本のダミーバーを設置し、かつダミーバーの吊り
上げウィンチ下に待機中のダミーバーの落下を防止する
支持装置を設けたことを特徴とする連続鋳造装置。
Claim 2: In a continuous casting device in which dummy bars are charged from above the mold, two dummy bars are installed online per strand, and a support device is provided below the dummy bar lifting winch to prevent the waiting dummy bars from falling. A continuous casting device characterized by:
【請求項3】  支持装置が、ダミーバーの幅方向或い
は厚み方向に穿たれた孔を貫通するシャフトと該シャフ
トを移動させるアクチュエータからなることを特徴とす
る請求項2記載の連続鋳造装置。
3. The continuous casting apparatus according to claim 2, wherein the support device comprises a shaft passing through a hole bored in the width direction or thickness direction of the dummy bar, and an actuator for moving the shaft.
【請求項4】  ダミーバーをモールド上方より装入す
る連続鋳造装置において、1ストランドあたりオンライ
ンに2本のダミーバーを設置し、かつ鋳型とダミーバー
吊り上げウィンチ間に直列に2台のダミーバーカーを配
置したことを特徴とする連続鋳造装置。
Claim 4: In a continuous casting device in which dummy bars are charged from above the mold, two dummy bars are installed online per strand, and two dummy barkers are arranged in series between the mold and a dummy bar lifting winch. Continuous casting equipment featuring:
JP3270391A 1991-02-27 1991-02-27 Continuous casting method and device Pending JPH04274851A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3270391A JPH04274851A (en) 1991-02-27 1991-02-27 Continuous casting method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3270391A JPH04274851A (en) 1991-02-27 1991-02-27 Continuous casting method and device

Publications (1)

Publication Number Publication Date
JPH04274851A true JPH04274851A (en) 1992-09-30

Family

ID=12366212

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3270391A Pending JPH04274851A (en) 1991-02-27 1991-02-27 Continuous casting method and device

Country Status (1)

Country Link
JP (1) JPH04274851A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101016447B1 (en) * 2003-06-09 2011-02-21 주식회사 포스코 device for prevention of falling of dummy bar

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59107753A (en) * 1982-12-09 1984-06-22 Nippon Steel Corp Continuous casting method and dummy bar housing device

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59107753A (en) * 1982-12-09 1984-06-22 Nippon Steel Corp Continuous casting method and dummy bar housing device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101016447B1 (en) * 2003-06-09 2011-02-21 주식회사 포스코 device for prevention of falling of dummy bar

Similar Documents

Publication Publication Date Title
JPS585741B2 (en) Dummy bar storage device for continuous casting equipment
US3814169A (en) Dummy bar handling system
JPH04274851A (en) Continuous casting method and device
US3762462A (en) Apparatus for storing and positioning the leader of an ingot in a continuous casting apparatus
JP4447922B2 (en) Method for endless rolling of metal strands, in particular steel strands, formed with a casting speed, dimensioned as thin slabs in cross-section, and the continuous casting machine to which they belong
CN1078183A (en) The method and apparatus of direct casting of continous metal strip
JPS63199058A (en) Method for controlling pinch rolls in continuous casting machine for round section cast billet
JP2820317B2 (en) Continuous sheet casting equipment and its operation method
CN212688148U (en) Device for preventing steel billet from sticking steel for steel pushing type heating furnace
JP4250008B2 (en) Manufacturing method of steel for strip steel
JP2621995B2 (en) Operating method of continuous caster
KR100458943B1 (en) Method of foundry ending and withdrawalling thin salb in case of emergency
T Urie BSc Addition of Alloying Elements to Steel Ingots During Teeming
JPH0337459B2 (en)
JP3323671B2 (en) Continuous casting method
JP2024002517A (en) Method for preventing fall of cast slab in continuous casting machine and jig
JP2013071144A (en) Method for drawing out dummy bar in continuous casting facility
KR20190074583A (en) extracting device of short strip in continuous casting facilities and extracting method using the same
JPH0457422B2 (en)
JPH07112599B2 (en) Casting start method and dummy bar device of belt type continuous casting machine
JP2663126B2 (en) Two-way drawing type horizontal continuous casting method
JP2920059B2 (en) Dummy bar storage device for continuous casting equipment
JPS56122648A (en) Continuous multicasting method for steel
JPS59107753A (en) Continuous casting method and dummy bar housing device
JPH08174161A (en) Method for controlling continuous casting