JPH04259139A - Isdn packet communication test control system and isdn packet communication matching performance test equipment - Google Patents

Isdn packet communication test control system and isdn packet communication matching performance test equipment

Info

Publication number
JPH04259139A
JPH04259139A JP3020604A JP2060491A JPH04259139A JP H04259139 A JPH04259139 A JP H04259139A JP 3020604 A JP3020604 A JP 3020604A JP 2060491 A JP2060491 A JP 2060491A JP H04259139 A JPH04259139 A JP H04259139A
Authority
JP
Japan
Prior art keywords
test
control
packet communication
isdn
call control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP3020604A
Other languages
Japanese (ja)
Inventor
Tatsuo Nakayama
仲山 辰男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujitsu Ltd
Original Assignee
Fujitsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitsu Ltd filed Critical Fujitsu Ltd
Priority to JP3020604A priority Critical patent/JPH04259139A/en
Publication of JPH04259139A publication Critical patent/JPH04259139A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Maintenance And Management Of Digital Transmission (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

PURPOSE:To select an ISDN call control test or a packet communication matching test of a terminal equipment automatically and to test the selected test with respect to the test control system for the terminal equipment implementing packet communication through an ISDN B-channel CONSTITUTION:The above system is provided with an ISDN call control test control means 2 controlling a confirmation test of a call control operation of a tested terminal equipment 1, an ISDN call control test execution means 3 executing the confirmation test of the call control operation of the tested terminal equipment under the control of the means 2, a packet communication test control means 4 controlling the communication matching test of a packet communication terminal equipment, a packet communication test execution means 5 executing the communication matching test of B-channel packet communication to the tested terminal equipment 1 under the control of the means 4, and a test changeover means 6 which selects the control to the packet communication test control means 4 when the ISDN call control test control means 2 confirms the normality of the setup operation of the tested terminal equipment 1 and selects the control to the ISDN call control test control means 2 when the packet communication test control means 4 finishes the communication matching test.

Description

【発明の詳細な説明】[Detailed description of the invention]

【0001】0001

【産業上の利用分野】本発明はISDNのBチャネルに
よりパケット通信を行う端末の試験制御方式及び通信整
合性試験器に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a test control system and a communication consistency tester for a terminal that performs packet communication using an ISDN B channel.

【0002】近年、ISDN(サービス総合ディジタル
通信網)を用いるパケット通信が普及しつつある。IS
DNによるパケット通信にはBチャネルを用いるものと
Dチャネルを用いるものがあるが、Bチャネルによるパ
ケット通信(以下、Bチャネルパケット通信と記す)で
は既存のデータ網との相互接続の整合性を確保するため
に、同一フレーム構造、同一手順(プロトコル)で通信
が行われている。
[0002] In recent years, packet communications using ISDN (Integrated Services Digital Network) are becoming popular. IS
There are two types of packet communication using DN, one using B channel and the other using D channel, but packet communication using B channel (hereinafter referred to as B channel packet communication) ensures consistency of interconnection with existing data networks. In order to achieve this, communication is performed using the same frame structure and the same procedure (protocol).

【0003】一方、ISDNの加入者インタフェースの
S/T点に接続されてパケット通信を行う端末に対して
は、端末がパケット通信の各状態で技術基準に規定され
た状態遷移を行っているか否かを検証するため、通信整
合性試験が行われる。
[0003] On the other hand, for a terminal connected to the S/T point of the ISDN subscriber interface and performing packet communication, it is important to check whether the terminal is performing state transitions specified by technical standards in each state of packet communication. A communication integrity test is conducted to verify that the

【0004】図4は試験を行う場合の接続概念図である
が、図4のプロトコル試験器32はISDN、即ち、I
SDN加入者線を介してISDN交換機(図示省略)に
接続されるNT(Network Terminati
on,網終端装置) の位置においてISDNを擬似す
る形で被試験端末(TE)31を試験する。
FIG. 4 is a conceptual diagram of connections when performing a test. The protocol tester 32 in FIG.
An NT (Network Terminal) connected to an ISDN exchange (not shown) via an SDN subscriber line.
The terminal under test (TE) 31 is tested in a manner simulating ISDN at the location of the terminal (on, network terminal equipment).

【0005】上記の如く、ISDNのBチャネルパケッ
ト通信は既存データ網におけるパケット通信の手順(例
えばX.25手順)が適用されるため、通信整合性の試
験を行う前記プロトコル試験器32には既存データ網用
のパケット通信プロトコル試験器がそのまま適用できる
が、ISDNを使用する端末の場合には、パケット通信
の通信整合性の試験の前後に、被試験端末31がISD
Nの呼制御、即ち、Bチャネルパケット通信を可能とす
る状態を設定する呼設定とBチャネルパケット通信可能
状態を終結させる呼終了の呼制御が正常であることを確
認する必要がある。
[0005] As described above, ISDN B-channel packet communication applies the packet communication procedure in the existing data network (for example, the X.25 procedure), so the protocol tester 32 that tests communication Packet communication protocol testers for data networks can be applied as is, but in the case of terminals using ISDN, the terminal under test 31 is
It is necessary to confirm that the call control of N, that is, the call control for setting a state in which B channel packet communication is possible and the call control for terminating a state in which B channel packet communication is possible, is normal.

【0006】しかし、ISDNの呼制御の確認とパケッ
ト通信の通信整合性試験を結合した試験は従来行われて
おらず、ISDNのBチャネル上でのパケット通信の通
信整合性を試験する場合には被試験端末のISDNの呼
制御における呼設定動作の正常性を確認したのちに通信
整合性試験を行い、試験終了後に再び呼解放動作の正常
性の確認を行う必要があった。
[0006] However, a test that combines ISDN call control confirmation and packet communication communication integrity testing has not been conducted in the past, and when testing the communication integrity of packet communication on the ISDN B channel, After confirming the normality of the call setting operation in the ISDN call control of the terminal under test, a communication integrity test was performed, and after the test was completed, it was necessary to confirm the normality of the call release operation again.

【0007】このため、ISDNのBチャネル上でパケ
ット通信を行う端末のパケット通信の通信整合性の試験
を行うことが可能な試験制御方式及び試験器が必要とな
っている。
[0007] Therefore, there is a need for a test control system and a test device that can test the communication integrity of packet communications of terminals that perform packet communications on the ISDN B channel.

【0008】[0008]

【従来の技術】図5は従来技術による試験方法を説明す
る図、図6はX.25の通信整合性試験の試験シーケン
ス図である。
2. Description of the Related Art FIG. 5 is a diagram illustrating a test method according to the prior art, and FIG. 25 is a test sequence diagram of the No. 25 communication integrity test. FIG.

【0009】既存データ網に使用するパケット端末、例
えばX.25パケット端末の通信整合性を試験するため
にはX.25プロトコル試験器を接続して直接X.25
手順の試験を開始することができるが、従来技術により
ISDNのBチャネルパケット通信を行う端末の試験を
行う場合には、図5に示すような手順で試験する必要が
ある。
Packet terminals used in existing data networks, such as X. In order to test the communication integrity of the X.25 packet terminal, X.25 protocol tester can be connected directly. 25
A procedure test can be started, but when testing a terminal that performs ISDN B channel packet communication using the conventional technology, it is necessary to perform the test using the procedure shown in FIG.

【0010】即ち、先ず図5(1) のように被試験端
末41にISDN呼制御試験器42を接続して被試験端
末41の呼制御におけるBチャネルパケット通信可能状
態の設定が正常であることを確認する。呼設定が正常で
あれば図5(2) のようにISDN呼制御試験器42
にX.25プロトコル試験器43を接続し、X.25プ
ロトコル試験器43により被試験端末41の通信整合性
の試験を実施する。通信整合性の試験を終了すれば、図
5(3) のように再度ISDN呼制御試験器42を用
いて被試験端末41のBチャネルパケット通信可能状態
を解放する呼制御が正常であるか否かを確認する。
That is, first, connect the ISDN call control tester 42 to the terminal under test 41 as shown in FIG. Check. If the call setup is normal, the ISDN call control tester 42 will be activated as shown in Figure 5 (2).
niX. X.25 protocol tester 43 is connected. The communication consistency of the terminal under test 41 is tested using the X.25 protocol tester 43. When the communication integrity test is completed, as shown in FIG. 5(3), the ISDN call control tester 42 is used again to check whether the call control of the terminal under test 41 to release the B channel packet communication enabled state is normal. Check whether

【0011】図6は既存データ網または図5(2) に
おいてX.25プロトコル試験器43により行われるX
.25の通信整合性試験のシーケンスを示している。図
中、i乃至uは各信号を示す記号である。また、DCE
及びDTEは既存データ網に使用される場合の端末制御
装置及びデータ端末を意味し、ISDNではそれぞれT
E及びNTに相当する。試験の場合はTEが被試験端末
、NTがプロトコル試験器となるが、以下においてはT
E及びNTの記号を使用して説明する。
FIG. 6 shows the existing data network or X. 25 protocol tester 43
.. 25 shows a sequence of 25 communication integrity tests. In the figure, i to u are symbols indicating each signal. Also, DCE
and DTE mean terminal control equipment and data terminal when used in existing data networks, respectively in ISDN.
Corresponds to E and NT. In the case of testing, TE is the terminal under test and NT is the protocol tester, but in the following, T
This will be explained using the symbols E and NT.

【0012】初期状態よりNTはiのSABM(Set
 Asynchronous Balanced Mo
de, リンク設定の起動信号)によりX.25のレイ
ヤ2のリンク設定を行い、TEよりjのUA(Unnu
mberd Acknowledge,確認応答)が返
されてリンクの設定が完了する。
From the initial state, NT sets i's SABM (Set
Asynchronous Balanced Mo
X.de, link setting activation signal). 25 layer 2 link settings, and the TE sends the UA (Unnu) of j.
An acknowledgment (acknowledgment) is returned and the link setting is completed.

【0013】リンクの設定が終わると、レイヤ3による
パケットレベルにおける論理的な通信路の設定と試験が
行われる。先ず、kのSI(Restart Indi
cation, リスタート指示) とmのSF(Re
start Confermation, リスタート
確認)によりRESTART即ち、初期化が行われ、次
いでnのCN(Incoming Call,着呼) 
とoのCA(Call Accepted,着呼受付)
 により着呼のパケットリンクが設定される。
[0013] When the link setting is completed, a logical communication path is set and tested at the packet level by layer 3. First, k's SI (Restart Indi
cation, restart instruction) and SF of m (Re
RESTART, that is, initialization is performed by start confirmation (restart confirmation), and then n's CN (Incoming Call)
and o's CA (Call Accepted)
The packet link for the incoming call is set up.

【0014】これにより通信整合性の試験が開始される
が、これはNTよりpのパケットを送り、TEよりqの
応答を返す、と言う形で行われる。p及びqは複数回繰
り返されるが、その中にはNTより故意に不正規のパケ
ットを送り、それに対するTEの応答をチェックするよ
うな試験も含まれる。
[0014] This starts a communication integrity test, which is carried out in such a way that the NT sends p packets and the TE returns a q response. p and q are repeated multiple times, including a test in which the NT intentionally sends an irregular packet and the TE's response to it is checked.

【0015】p,qによる試験が終了すると、r のC
I(Clear Indication, 切断指示)
 とsのCF(Clear Confirmation
, 切断確認) によりパケットリンクの解放が行われ
、次いでtのDISC(Disconnect, 切断
信号) とuのUA(確認応答)によりレイヤ2のリン
ク解放が行われて試験を終了する。
[0015] When the test with p and q is completed, C of r
I (Clear Indication, cutting instruction)
and s CF (Clear Confirmation
, disconnection confirmation), the packet link is released, and then the layer 2 link is released using t's DISC (Disconnect, disconnection signal) and u's UA (acknowledgement), and the test ends.

【0016】ISDNのBチャネルにより図6の試験を
実施する場合には、前記のように図6のシーケンスの前
後において呼制御の正常性を確認する必要がある。即ち
、従来技術ではISDNのBチャネルパケット通信の通
信整合性を試験する場合には、試験項目ごとに、図5に
示したような2つの試験器により呼制御と通信整合性の
試験を行う必要がある。
When performing the test shown in FIG. 6 using the ISDN B channel, it is necessary to confirm the normality of call control before and after the sequence shown in FIG. 6, as described above. That is, in the conventional technology, when testing the communication integrity of ISDN B channel packet communication, it is necessary to test call control and communication integrity for each test item using two testers as shown in Figure 5. There is.

【0017】[0017]

【発明が解決しようとする課題】従来技術においては、
ISDNのBチャネルによるパケット通信の通信整合性
試験を行う場合に、ISDNの呼制御の正常性の確認を
パケット通信の通信整合性の試験の前後に個別に行う必
要があり、試験が煩雑となると言う問題を有していた。
[Problem to be solved by the invention] In the prior art,
When performing a communication integrity test of packet communication using the ISDN B channel, it is necessary to check the normality of ISDN call control separately before and after the communication integrity test of packet communication, which makes the test complicated. I had a problem.

【0018】本発明は、端末のISDN呼制御試験とパ
ケット通信整合性試験を自動的に切換えて試験を行うこ
とを可能とすることを目的とする。
An object of the present invention is to make it possible to automatically switch between an ISDN call control test and a packet communication integrity test of a terminal.

【0019】[0019]

【課題を解決するための手段】図1は本発明の原理説明
図である。図中、1は被試験端末で、ISDN用加入者
インタフェースのS/T点に接続し、Bチャネルを用い
てパケット通信を行う端末、2はISDNの呼制御手順
を記憶し、被試験端末1の呼制御動作の確認試験を制御
するISDN呼制御試験制御手段、3は前記ISDN呼
制御試験制御手段2の制御により前記被試験端末1の呼
制御動作の確認試験を実行するISDN呼制御試験実行
手段、4はパケット通信を行う端末の試験手順を記憶し
て被試験端末1の通信整合性試験を制御するパケット通
信試験制御手段、5は前記パケット通信試験制御手段4
の制御により被試験端末1に対してBチャネルによるパ
ケット通信の通信整合性試験を実行するパケット通信試
験実行手段である。
[Means for Solving the Problems] FIG. 1 is a diagram illustrating the principle of the present invention. In the figure, 1 is a terminal under test, which connects to the S/T point of the ISDN subscriber interface and performs packet communication using the B channel; 2 stores ISDN call control procedures; ISDN call control test control means 3 controls a confirmation test of the call control operation of the terminal under test 1 under the control of the ISDN call control test control means 2; 4 is a packet communication test control means for storing a test procedure for a terminal performing packet communication and controlling a communication integrity test of the terminal under test 1; 5 is a packet communication test control means 4;
This is a packet communication test execution means that executes a communication consistency test of packet communication using the B channel on the terminal under test 1 under the control of .

【0020】また、6は前記ISDN呼制御試験制御手
段2より被試験端末1の呼制御における呼設定動作の正
常性を確認した報告を受信したときに被試験端末1に対
する制御を該ISDN呼制御試験制御手段2より前記パ
ケット通信試験制御手段4に切換え、該パケット通信試
験制御手段4より通信整合性試験の終了報告を受信した
ときに制御を該パケット通信試験制御手段4より前記I
SDN呼制御試験制御手段2に切換える試験切換手段で
ある。
Further, when receiving a report confirming the normality of the call setting operation in the call control of the terminal under test 1 from the ISDN call control test control means 2, 6 controls the ISDN call control for the terminal under test 1. The test control means 2 switches to the packet communication test control means 4, and when the communication integrity test completion report is received from the packet communication test control means 4, the control is switched from the packet communication test control means 4 to the packet communication test control means 4.
This is test switching means for switching to SDN call control test control means 2.

【0021】また7は前記ISDN呼制御試験制御手段
2、ISDN呼制御試験実行手段3、パケット通信試験
制御手段4、パケット通信試験実行手段5及び試験切換
手段6を備えたISDNパケット通信整合性試験器であ
る。
Further, 7 is an ISDN packet communication consistency test comprising the ISDN call control test control means 2, ISDN call control test execution means 3, packet communication test control means 4, packet communication test execution means 5, and test switching means 6. It is a vessel.

【0022】[0022]

【作用】図1において、ISDN用加入者インタフェー
スのS/T点に接続し、Bチャネルを用いてパケット通
信を行う端末1を被試験端末として試験を行うものとし
て説明する。なお、ISDNパケット通信試験制御方式
としての作用とISDNパケット通信整合性試験器の作
用は同一であるので一括して説明する。
[Operation] In FIG. 1, the terminal 1 connected to the S/T point of the ISDN subscriber interface and performing packet communication using the B channel will be described as a terminal to be tested. Note that the functions of the ISDN packet communication test control method and the functions of the ISDN packet communication consistency tester are the same, so they will be explained together.

【0023】ISDN呼制御試験制御手段2はISDN
の呼制御手順を記憶しており、被試験端末1の試験を開
始するときに必要な試験項目をISDN呼制御試験実行
手段3に指示する。ISDN呼制御試験実行手段3はI
SDN呼制御試験実行手段3の指示を受けて、例えば被
試験端末1に対してISDNのBチャネルの呼設定処理
を行い、被試験端末1よりの応答が正しいか否かを確認
する。一連の呼設定動作が正常に行われたことを確認す
るとこれをISDN呼制御試験制御手段2に報告する。
ISDN call control test control means 2 is an ISDN
The ISDN call control test execution means 3 stores call control procedures and instructs the ISDN call control test execution means 3 about necessary test items when starting a test of the terminal under test 1. ISDN call control test execution means 3 is I
In response to instructions from the SDN call control test execution means 3, for example, ISDN B channel call setting processing is performed for the terminal under test 1, and it is confirmed whether the response from the terminal under test 1 is correct. When it is confirmed that the series of call setting operations have been carried out normally, this is reported to the ISDN call control test control means 2.

【0024】これを受けてISDN呼制御試験制御手段
2は呼制御における呼設定動作の確認が終了したことを
試験切換手段6に知らせる。試験切換手段6はこれによ
り被試験端末1に対する制御をISDN呼制御試験制御
手段2よりパケット通信試験制御手段4に切換える。
In response to this, the ISDN call control test control means 2 notifies the test switching means 6 that the confirmation of the call setting operation in call control has been completed. The test switching means 6 thereby switches control over the terminal under test 1 from the ISDN call control test control means 2 to the packet communication test control means 4.

【0025】パケット通信試験制御手段4はパケット通
信を行う端末の試験手順を記憶しており、前記により制
御が移されるとパケット通信試験実行手段5に通信整合
性の試験の実行を指示する。パケット通信試験実行手段
5はこれにより被試験端末1に対してパケット通信の通
信整合性を試験するための各種の信号を送り、それぞれ
に対する被試験端末1よりの応答の正否を確認する。一
連の試験を終了するとパケット通信試験実行手段5は試
験の終了をパケット通信試験制御手段4に報告する。
The packet communication test control means 4 stores test procedures for terminals that perform packet communication, and when control is transferred as described above, instructs the packet communication test execution means 5 to execute a communication consistency test. The packet communication test execution means 5 thereby sends various signals to the terminal under test 1 to test the communication integrity of the packet communication, and confirms whether the responses from the terminal under test 1 to each are correct or not. Upon completion of the series of tests, the packet communication test execution means 5 reports the completion of the test to the packet communication test control means 4.

【0026】パケット通信試験制御手段4は通信整合性
の試験の終了報告を受けると試験切換手段6にこれを報
告する。試験切換手段6はこれを受けて被試験端末1に
対する制御を再びISDN呼制御試験制御手段2に切換
え、ISDN呼制御試験制御手段2はISDN呼制御試
験実行手段3に指示して被試験端末1に対する呼制御の
呼解放処理を試験させる。ISDN呼制御試験実行手段
3は被試験端末1に対して呼解放処理の信号を送り、被
試験端末1が正しい応答を返すか否かを確認し、一連の
呼解放処理の正常性が確認されればISDN呼制御試験
制御手段2に報告して試験を終了する。
When the packet communication test control means 4 receives the completion report of the communication consistency test, it reports this to the test switching means 6. In response to this, the test switching means 6 switches control over the terminal under test 1 to the ISDN call control test control means 2 again, and the ISDN call control test control means 2 instructs the ISDN call control test execution means 3 to switch the control over the terminal under test 1 to the ISDN call control test control means 2. test the call release processing of call control. The ISDN call control test execution means 3 sends a call release processing signal to the terminal under test 1, checks whether the terminal under test 1 returns a correct response, and confirms the normality of the series of call release processing. If so, it is reported to the ISDN call control test control means 2 and the test is completed.

【0027】以上のように、本発明においてはISDN
の呼制御試験とパケット通信の通信整合性の試験が自動
的に切換えられ、連続して行われるため、試験が効率よ
く行われる。
As described above, in the present invention, ISDN
Since the call control test and the packet communication integrity test are automatically switched and performed consecutively, the test can be performed efficiently.

【0028】[0028]

【実施例】図2は本発明の実施例の構成図、図3は本発
明の実施例の試験シーケンス図である。図2は請求項1
の原理を実現した一実施例で、請求項2のISDNパケ
ット通信整合性試験器(以下、単に試験器と記す)7の
一実施例を兼ねている。なお、図2及び図3においては
パケット通信の手順としてX.25手順の例を示してい
る。
Embodiment FIG. 2 is a block diagram of an embodiment of the present invention, and FIG. 3 is a test sequence diagram of the embodiment of the present invention. Figure 2 is claim 1
This is an embodiment that realizes the principle of , and also serves as an embodiment of the ISDN packet communication consistency tester (hereinafter simply referred to as the tester) 7 of claim 2. Note that in FIGS. 2 and 3, the packet communication procedure is X. An example of 25 procedures is shown.

【0029】図中、10は試験器、11は被試験ISD
N端末(TE)、12はISDN呼制御試験制御部、1
3はISDN呼制御試験実行部、14はX.25試験制
御部、15はX.25試験実行部、16は試験切換制御
部、17は試験器基本部、18はOS(オペレーティン
グシステム) 、19は試験共通制御部、20はプロト
コル制御部、21は応答判定部、22はタイマ部、23
はX.25メッセージ送信部、24はX.25メッセー
ジ受信部、25はISDN呼制御部、16はISDNメ
ッセージ送信部、27はISDNメッセージ受信部、2
8はディスプレイ、29はキーボード、30は被試験X
.25端末(DTE)である。
In the figure, 10 is a tester, 11 is an ISD to be tested.
N terminal (TE), 12 is ISDN call control test control unit, 1
3 is an ISDN call control test execution unit, and 14 is an X. 25 test control section, 15 X. 25 test execution unit, 16 test switching control unit, 17 tester basic unit, 18 OS (operating system), 19 test common control unit, 20 protocol control unit, 21 response determination unit, 22 timer unit , 23
is X. 25 a message transmitter, 24 an X. 25 a message receiving unit, 25 an ISDN call control unit, 16 an ISDN message transmitting unit, 27 an ISDN message receiving unit, 2
8 is the display, 29 is the keyboard, 30 is the test target
.. 25 terminals (DTE).

【0030】全体的な動作としては、試験器10の試験
器基本部17で試験項目の選択、連続動作などの制御を
行い、ISDN呼制御試験実行部13またはX.25試
験実行部15で各試験項目についてのメッセージの制御
、送信及び受信の処理と応答信号の判定などを行う。ま
た、試験器基本部17では試験全体の制御を試験共通制
御部17がOS18と連携して制御を行い、試験実行上
必要な情報は試験者が操作するキーボード29とディス
プレイ28に入出力する。
As for the overall operation, the tester basic section 17 of the tester 10 controls the selection of test items, continuous operation, etc., and the ISDN call control test execution section 13 or the X. 25 test execution unit 15 performs message control, transmission and reception processing, and judgment of response signals for each test item. Further, in the test device basic section 17, the test common control section 17 controls the entire test in cooperation with the OS 18, and information necessary for executing the test is inputted and outputted to a keyboard 29 and a display 28 operated by the tester.

【0031】図2の試験器10は既存のデータ網用のX
.25端末の試験を行うことも可能であるように構成し
た例を示している。被試験X.25端末30(以下、端
末30と略記する) を試験する場合は直接X.25手
順の通信整合性を試験するが、被試験ISDN端末11
 (以下、端末11と略記する) の試験との差を明確
にするため、最初に端末30に対する試験について説明
する。
The tester 10 in FIG. 2 is an X
.. This example shows a configuration in which it is possible to test 25 terminals. Tested X. When testing X.25 terminal 30 (hereinafter abbreviated as terminal 30), directly test X. The communication integrity of the 25 procedures is tested, but the ISDN terminal under test 11
(hereinafter abbreviated as terminal 11) In order to clarify the difference from the test for terminal 30, the test for terminal 30 will be explained first.

【0032】端末30の試験を開始する際は、キーボー
ド29より入力された指示に従って試験共通制御部19
が試験の管理を行い、X.25試験制御部14に試験の
制御を開始させる。X.25試験制御部14は試験項目
及び試験順序などをプロトコル制御部20に指示すると
、プロトコル制御部20はメッセージの生成と時間管理
を行いながらX.25メッセージ送信部23を介して端
末30にメッセージフレームを送信する。
When starting the test of the terminal 30, the test common control section 19
administered the test, and X. 25 causes the test control unit 14 to start controlling the test. X. When the X.25 test control section 14 instructs the protocol control section 20 about test items, test order, etc., the protocol control section 20 generates messages and manages time while executing the X.25 test control section 14. 25 sends a message frame to the terminal 30 via the message sending unit 23.

【0033】端末30よりの応答はX.25メッセージ
受信部24を介して応答判定部21に送られ、指定され
た応答であるか否かが判定されてX.25試験制御部1
4に報告される。この間のメッセージと応答の内容は図
6に示したものと基本的には同じである。また、この間
、タイマ部はプロトコル制御部20よりのメッセージ送
信から応答判定部21の応答信号受信までの時間を監視
して試験実施中の応答時間の異常を検出し、異常があれ
ば基本部に知らせる。
The response from the terminal 30 is X. The X.25 message is sent to the response determining section 21 via the message receiving section 24, and it is determined whether or not it is the specified response. 25 Test control section 1
4 will be reported. The contents of the message and response during this period are basically the same as those shown in FIG. During this period, the timer section monitors the time from the message transmission from the protocol control section 20 to the reception of the response signal from the response determination section 21 to detect any abnormalities in the response time during the test. Inform.

【0034】次に、ISDNのBチャネルによりパケッ
ト通信を行う端末の試験について説明する。ISDN端
末の試験の場合は試験共通制御部19を介してISDN
呼制御試験制御部12が起動され、ISDN呼制御試験
制御部12よりISDN呼制御部25に試験の実行を指
示する。 ISDN呼制御部25はメッセージの生成と時間管理を
行いながら、呼制御における呼設定のメッセージをIS
DNメッセージ送信部26を介してISDNの加入者イ
ンタフェースのS/T点(図示省略)に接続された端末
11に送信する。
Next, a test of a terminal that performs packet communication using the ISDN B channel will be explained. In the case of an ISDN terminal test, the ISDN terminal is
The call control test control section 12 is activated, and the ISDN call control test control section 12 instructs the ISDN call control section 25 to execute the test. ISDN call control unit 25 generates messages and manages time, and transmits call setup messages in call control to ISDN.
The message is transmitted via the DN message transmitter 26 to the terminal 11 connected to the S/T point (not shown) of the ISDN subscriber interface.

【0035】端末11がこれに応答すると、応答信号は
ISDN呼制御部25に送られ、該ISDN呼制御部2
5において応答の正否がチェックされる。すべての応答
が正常な状態で信号の送受信が終了した場合はBチャネ
ルパケット通信が可能な状態となったことを意味するの
で、ISDN呼制御部25はこれをISDN呼制御試験
制御部12に報告する。ISDN呼制御試験制御部12
はこれにより呼制御における呼設定が正常に終了したこ
とを確認し、試験切換制御部16にその旨を通知する。 試験切換制御部16はこの通知によりX.25試験制御
部14に制御を切換える。
When the terminal 11 responds to this, a response signal is sent to the ISDN call control section 25, and the ISDN call control section 2
In step 5, the correctness of the response is checked. If all responses are normal and signal transmission/reception is completed, this means that B channel packet communication is possible, so the ISDN call control unit 25 reports this to the ISDN call control test control unit 12. do. ISDN call control test control section 12
This confirms that the call setting in the call control has been completed normally, and notifies the test switching control section 16 of this fact. Based on this notification, the test switching control unit 16 performs X. 25, the control is switched to the test control section 14.

【0036】これによりX.25試験制御部14が起動
し、端末11に対してX.25手順によるパケット通信
の通信整合性試験が開始される。X.25試験制御部1
4は端末30に対すると同様、プロトコル制御部20に
メッセージの生成と時間管理を行うが、端末11に対す
る場合はX.25メッセージ送信部23に対する代わり
にISDNメッセージ送信部26にメッセージを送出す
る。
[0036] As a result, X. The X.25 test control unit 14 starts up and sends the X.25 test control unit 14 to the terminal 11. A communication consistency test of packet communication using the 25 procedure is started. X. 25 Test control section 1
4 performs message generation and time management in the protocol control unit 20 as in the case of the terminal 30, but in the case of the terminal 11, X. The message is sent to the ISDN message transmitter 26 instead of to the No. 25 message transmitter 23.

【0037】前記メッセージは端末11に送られ、端末
11が応答を返すと、この応答信号はISDNメッセー
ジ受信部27を介して応答判定部21に送られ、応答の
正否が判定される。判定結果はX.25試験制御部14
に報告されるが、一連の通信整合性の試験が終了し、正
常性が確認されるとX.25試験制御部14より試験切
換制御部16に対して試験の終了が通知される。
The message is sent to the terminal 11, and when the terminal 11 returns a response, this response signal is sent to the response determining section 21 via the ISDN message receiving section 27, and it is determined whether the response is correct or not. The judgment result is X. 25 Test control section 14
However, once a series of communication integrity tests are completed and normality is confirmed, X. 25 The test control section 14 notifies the test switching control section 16 of the end of the test.

【0038】試験切換制御部16はこの通知により端末
11に対する制御を再びISDN呼制御試験制御部12
に切換え、ISDN呼制御試験制御部12は呼制御にお
ける呼解放の試験を開始する。この呼解放の試験はIS
DN呼制御部25により実行されるが、呼制御信号はI
SDNメッセージ送信部26より端末11に送信され、
端末11よりの応答はISDNメッセージ受信部27を
介してISDN呼制御部25に送られる。
Based on this notification, the test switching control section 16 reverts control over the terminal 11 to the ISDN call control test control section 12.
Then, the ISDN call control test control unit 12 starts a call release test in call control. This call release test is
The call control signal is executed by the DN call control unit 25, but the call control signal is
Sent from the SDN message transmitter 26 to the terminal 11,
The response from the terminal 11 is sent to the ISDN call control section 25 via the ISDN message receiving section 27.

【0039】応答の正否はISDN呼制御部25におい
てチェックされ、一連の応答が正常であればISDN呼
制御部25よりISDN呼制御試験制御部12に対して
報告がなされ、試験が正常に終了したことが確認される
。試験結果は必要に応じ、試験共通制御部19及びOS
18を介してディスプレイ28に表示される。なお、以
上の動作を通じ、タイマ部22はX.25試験実行部1
5におけると同様にISDN呼制御部25の時間監視を
行い、異常があれば試験器基本部14に通知する。
The correctness of the responses is checked in the ISDN call control section 25, and if the series of responses is normal, the ISDN call control section 25 reports to the ISDN call control test control section 12, indicating that the test has ended normally. This is confirmed. The test results are sent to the test common control unit 19 and the OS as necessary.
It is displayed on the display 28 via 18. Note that through the above operations, the timer section 22 performs X. 25 Test Execution Department 1
5, the time of the ISDN call control section 25 is monitored, and if there is an abnormality, the tester basic section 14 is notified.

【0040】図3は上記におけるISDN呼制御試験実
行部13及びX.25試験実行部15と端末11との間
において行われる信号授受のシーケンスを図示したもの
であるが、以下、図2を前提に図3について説明する。 なお、a乃至zは各ステップを示す記号である。
FIG. 3 shows the ISDN call control test execution unit 13 and X. 3 is a diagram illustrating a sequence of signal exchange performed between the X.25 test execution unit 15 and the terminal 11. Hereinafter, FIG. 3 will be described based on FIG. 2. Note that a to z are symbols indicating each step.

【0041】先ず、ISDN呼制御試験実行部13より
呼制御試験が行われるが、図3はISDNのBチャネル
より端末11に着呼があった状態の呼制御を試験する例
を示している。なお、呼制御の信号はすべてISDNの
Dチャネルにより授受される。
First, a call control test is performed by the ISDN call control test execution unit 13, and FIG. 3 shows an example of testing the call control in a state where an incoming call is received from the ISDN B channel to the terminal 11. Note that all call control signals are sent and received through the ISDN D channel.

【0042】先ず、試験器10のISDN呼制御部25
において生成された図3のaに示すUISETUP(U
nnumberd Information SETU
P, 呼設定要求) が端末11に送られるが、これは
Bチャネルより端末11に対して着呼が行われたことを
示している。これに対して端末11はbのID  RE
Q(ID Request,ID要求) によってID
の割当てを要求し、ISDN呼制御部25よりcのID
  ASS(ID Assign,ID割当て)を返送
してIDの設定を終了する。次に端末11よりdのSA
BME(SABMExtended) と試験器10よ
りのeのUAによりDチャネルのレイヤ2のリンク設定
が行われる。
First, the ISDN call control section 25 of the tester 10
UISETUP (U
nnumber Information SETU
P, call setup request) is sent to the terminal 11, which indicates that an incoming call has been made to the terminal 11 from the B channel. On the other hand, terminal 11 uses ID RE of b.
ID by Q (ID Request, ID request)
The ISDN call control unit 25 requests the assignment of the ID of c.
ASS (ID Assign, ID assignment) is returned to complete the ID setting. Next, from terminal 11, SA of d
BME (SABMExtended) and the e UA from the tester 10 perform link setting for layer 2 of the D channel.

【0043】次に端末11において呼出しが行われると
fのALERTにより呼出中信号がISDN呼制御部2
5に送られ、端末11が応答状態になると引続いてgの
CONN(Connect)が応答信号として送られる
。ISDN呼制御部25ではこのCONNの受信により
端末11が正規の呼制御を行ったと判定し、hのCON
NACK(CONNAck.) により応答信号の受信
確認を知らせるとともに呼制御の試験が終了したことを
ISDN呼制御試験制御部12に報告する。
Next, when a call is made at the terminal 11, a calling signal is sent to the ISDN call control unit 2 by the ALERT of f.
5, and when the terminal 11 enters the response state, CONN (Connect) of g is subsequently sent as a response signal. Upon receiving this CONN, the ISDN call control unit 25 determines that the terminal 11 has performed normal call control, and changes the CONN of h.
NACK (CONNAck.) notifies reception confirmation of the response signal and reports to the ISDN call control test control unit 12 that the call control test has been completed.

【0044】ISDN呼制御試験制御部12がこれを試
験切換制御部16に通知すると、前記のように制御はX
.25試験制御部14に切換えられる。X.25試験制
御部14はプロトコル制御部20に指示してX.25手
順によるパケット通信の通信整合性試験を行わせるが、
この試験のシーケンスは図6に示したものと同一であり
、図3上ではi乃至uとして詳細は略記されている。
When the ISDN call control test control section 12 notifies the test switching control section 16 of this, the control is performed as described above.
.. 25 test control section 14. X. The X.25 test control section 14 instructs the protocol control section 20 to perform the X.25 test control section 14. A communication integrity test of packet communication is performed using the 25 procedure.
The sequence of this test is the same as that shown in FIG. 6, and the details are abbreviated as i to u in FIG.

【0045】通信整合性試験が正常に終了すると、試験
器10よりBチャネル上のレイヤ2のリンクを切断する
信号としてtのDISCが端末11に送られ、端末11
からはその受信確認信号としてuのUAが返送される(
詳細は図6参照)。tのDISCに対するuのUAの受
信はパケット手順によるパケットの通信整合性試験が正
常に終了したことを意味するため、プロトコル制御部2
0はこれをX.25試験制御部14に報告する。
When the communication integrity test is completed normally, the tester 10 sends a DISC of t to the terminal 11 as a signal to disconnect the layer 2 link on the B channel, and the terminal 11
sends back the UA of u as a reception confirmation signal (
(See Figure 6 for details). The reception of the UA of u for the DISC of t means that the packet communication integrity test according to the packet procedure has been successfully completed, so the protocol control unit 2
0 is this 25 report to the test control section 14.

【0046】X.25試験制御部14がこれを試験切換
制御部16に通知すると、制御は再びISDN呼制御試
験制御部12に切換えられ、ISDN呼制御部25を介
して呼制御における呼解放処理が試験される。
X. When the T.25 test control section 14 notifies the test switching control section 16 of this, control is again switched to the ISDN call control test control section 12, and the call release process in the call control is tested via the ISDN call control section 25.

【0047】呼解放処理は試験器11よりBチャネルパ
ケット通信可能状態を解放する指示としてvのDISC
を送信することにより開始されるが、以後の信号はすべ
てDチャネルにより授受される。vのDISCを受信し
た端末11はwのRELを返すし、これに対して試験器
11がxのRELCOMPを返送することにより呼制御
が解放される。次いで試験器11よりyのDISCを送
り、端末11よりzのUAを返送することによりDチャ
ネルのレイヤ2が解放され、すべての試験を終了する。 試験の終了はISDN呼制御部25よりISDN呼制御
試験制御部12に報告され、以下試験共通制御部19を
経て必要な処理が行われる。
In the call release process, the tester 11 sends the DISC of v as an instruction to release the B channel packet communicable state.
All subsequent signals are sent and received through the D channel. The terminal 11 that has received the DISC of v returns the REL of w, and in response, the tester 11 returns the RELCOMP of x, thereby releasing call control. Next, the tester 11 sends a DISC of y, and the terminal 11 returns a UA of z, thereby releasing layer 2 of the D channel and completing all tests. The end of the test is reported from the ISDN call control section 25 to the ISDN call control test control section 12, and then necessary processing is performed via the test common control section 19.

【0048】以上のように、本発明ではISDNのDチ
ャネルを使用して行われる呼制御の試験とBチャネルを
使用して行われるパケット通信(X.25手順などによ
る)の通信整合性が連続して行われるため、ISDNの
Bチャネル上のパケット通信の通信整合性の試験を効率
良く行うことができる。
As described above, in the present invention, the communication integrity of the call control test performed using the ISDN D channel and the packet communication (based on the X.25 procedure, etc.) performed using the B channel are continuous. Therefore, it is possible to efficiently test the communication integrity of packet communication on the ISDN B channel.

【0049】以上、図2及び図3により本発明の実施例
を説明したが、図2及び図3はあくまで本発明の一実施
例に過ぎず、構成及びシーケンスが図2及び図3に限定
されないことは当然である。例えば試験器基本部17の
構成は図2に示されたもの以外に種々の構成があり得る
ものであり、また、ISDN呼制御試験制御部12とI
SDN呼制御部25の処理分担或いはX.25試験制御
部14とプロトコル制御部20の処理分担が図2に示さ
れたものに限定されないことは勿論である。またタイマ
部22が試験器基本部14内に設けられても本発明の効
果が変わらないことは明らかである。
Although the embodiment of the present invention has been described above with reference to FIGS. 2 and 3, FIGS. 2 and 3 are only one embodiment of the present invention, and the configuration and sequence are not limited to those shown in FIGS. 2 and 3. Of course. For example, the configuration of the tester basic section 17 may have various configurations other than that shown in FIG.
Processing assignment of the SDN call control unit 25 or X. It goes without saying that the processing division between the X.25 test control section 14 and the protocol control section 20 is not limited to that shown in FIG. Furthermore, it is clear that the effects of the present invention do not change even if the timer section 22 is provided within the tester basic section 14.

【0050】[0050]

【発明の効果】以上説明したように、本発明によれば、
ISDNのBチャネルを用いてパケット通信を行う端末
のISDN呼制御の試験とパケット通信の通信整合性の
試験が自動的に切換えられ、連続して試験を行うことが
可能となるため、かかるISDN端末のBチャネルパケ
ット通信の通信整合性の試験の効率が著しく向上する。
[Effects of the Invention] As explained above, according to the present invention,
ISDN call control tests and packet communication communication integrity tests for terminals that perform packet communications using the ISDN B channel are automatically switched, making it possible to perform the tests continuously. The efficiency of testing the communication integrity of B-channel packet communications is significantly improved.

【図面の簡単な説明】[Brief explanation of the drawing]

【図1】  本発明の原理説明図[Figure 1] Diagram explaining the principle of the present invention

【図2】  本発明の実施例構成図[Figure 2] Embodiment configuration diagram of the present invention

【図3】  本発明の実施例試験シーケンス図[Figure 3] Example test sequence diagram of the present invention

【図4】
  試験の接続概念図
[Figure 4]
Test connection conceptual diagram

【図5】  従来技術による試験方法説明図[Figure 5] Diagram explaining the test method using conventional technology

【図6】 
 X.25通信整合性試験シーケンス図
[Figure 6]
X. 25 Communication integrity test sequence diagram

【符号の説明】[Explanation of symbols]

1  被試験端末 2  ISDN呼制御試験制御手段 3  ISDN呼制御試験実行手段 4  パケット通信試験制御手段 5  パケット通信試験実行手段 6  試験切換手段 1 Terminal under test 2 ISDN call control test control means 3 ISDN call control test execution means 4 Packet communication test control means 5 Packet communication test execution means 6 Test switching means

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】  ISDN用加入者インタフェースのS
/T点に接続し、Bチャネルを用いてパケット通信を行
う端末の試験制御方式であって、ISDNの呼制御手順
を記憶し、被試験端末(1) の呼制御動作の確認試験
を制御するISDN呼制御試験制御手段(2) と、前
記ISDN呼制御試験制御手段(2) の制御により前
記被試験端末(1) の呼制御動作の確認試験を実行す
るISDN呼制御試験実行手段(3) と、パケット通
信を行う端末の試験手順を記憶して被試験端末(1) 
の通信整合性試験を制御するパケット通信試験制御手段
(4) と、前記パケット通信試験制御手段(4) の
制御により被試験端末(1) に対してBチャネルによ
るパケット通信の通信整合性試験を実行するパケット通
信試験実行手段(5) と、前記ISDN呼制御試験制
御手段(2) より被試験端末(1) の呼制御におけ
る呼設定動作の正常性を確認した報告を受信したときに
被試験端末(1)に対する制御を該ISDN呼制御試験
制御手段(2) より前記パケット通信試験制御手段(
4) に切換え、該パケット通信試験制御手段(4)よ
り通信整合性試験の終了報告を受信したときに制御を該
パケット通信試験制御手段(4) より前記ISDN呼
制御試験制御手段(2) に切換える試験切換手段(6
) を備えたことを特徴とするISDNパケット通信試
験制御方式。
[Claim 1] S of ISDN subscriber interface
A test control method for terminals connected to /T point and performing packet communication using the B channel, which stores ISDN call control procedures and controls confirmation tests of call control operations of the terminal under test (1). ISDN call control test control means (2); and ISDN call control test execution means (3) for executing a confirmation test of the call control operation of the terminal under test (1) under the control of the ISDN call control test control means (2). Terminal under test (1) by memorizing the test procedure for a terminal that performs packet communication.
A packet communication test control means (4) for controlling the communication integrity test of the terminal under test (1) under the control of the packet communication test control means (4). When receiving a report confirming the normality of the call setting operation in the call control of the terminal under test (1) from the packet communication test execution means (5) to be executed and the ISDN call control test control means (2), Control over the terminal (1) is performed by the ISDN call control test control means (2) and the packet communication test control means (
4) When a communication integrity test completion report is received from the packet communication test control means (4), control is transferred from the packet communication test control means (4) to the ISDN call control test control means (2). Test switching means (6
) ISDN packet communication test control method characterized by comprising:
【請求項2】  請求項1記載のISDN呼制御試験制
御手段(2) 、ISDN呼制御試験実行手段(3) 
、パケット通信試験制御手段(4) 、パケット通信試
験実行手段(5) 及び試験切換手段(6) を備え、
ISDN用加入者インタフェースのS/T点においてB
チャネルを用いてパケット通信を行う端末に対してIS
DNの呼制御試験とパケット通信の通信整合性試験を自
動的に切換えて試験を行うことを特徴とするISDNパ
ケット通信整合性試験器。
[Claim 2] ISDN call control test control means (2) and ISDN call control test execution means (3) according to claim 1.
, packet communication test control means (4), packet communication test execution means (5), and test switching means (6),
B at the S/T point of the ISDN subscriber interface
IS for terminals that perform packet communication using channels.
An ISDN packet communication consistency tester characterized in that the test is performed by automatically switching between a DN call control test and a packet communication communication consistency test.
JP3020604A 1991-02-14 1991-02-14 Isdn packet communication test control system and isdn packet communication matching performance test equipment Withdrawn JPH04259139A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3020604A JPH04259139A (en) 1991-02-14 1991-02-14 Isdn packet communication test control system and isdn packet communication matching performance test equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3020604A JPH04259139A (en) 1991-02-14 1991-02-14 Isdn packet communication test control system and isdn packet communication matching performance test equipment

Publications (1)

Publication Number Publication Date
JPH04259139A true JPH04259139A (en) 1992-09-14

Family

ID=12031875

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3020604A Withdrawn JPH04259139A (en) 1991-02-14 1991-02-14 Isdn packet communication test control system and isdn packet communication matching performance test equipment

Country Status (1)

Country Link
JP (1) JPH04259139A (en)

Similar Documents

Publication Publication Date Title
JPH09162802A (en) Cell testing method in cell type telecommunication network
US4736402A (en) Signaling arrangement
JPH04259139A (en) Isdn packet communication test control system and isdn packet communication matching performance test equipment
KR100444819B1 (en) Apparatus and method for measuring load of RAN in wireless telecommunication system
KR0127086B1 (en) Method for testing space switch on the fixed path of packet in isdn
JP4028139B2 (en) Communications system
JP2705606B2 (en) Packet terminal test method and device
KR100247417B1 (en) Testing method and apparatus for an electronic switching system
JP2970801B2 (en) ISDN exchange and line test system and test method
JPS63276949A (en) Subscriber line test equipment
JP2814497B2 (en) Signal link control device
JP2755139B2 (en) Test method for ISDN switching system
JPH05136782A (en) Isdn packet communication matching propriety testing system for isdn packet communication
KR100261296B1 (en) Internet subscriber loop back test method
JP3542036B2 (en) S / T point and U point folding test equipment
KR100478833B1 (en) A method and a device of testing data transmission path for exchanger
KR0131852B1 (en) Testing method for packet fixed path at time switch of isdn
KR960014689B1 (en) Estimation method for packet handing module in switching system
JP2000196595A (en) Isdn line connecting device
KR100285341B1 (en) Subscriber Line Processor Test Method at Exchange
JPS63232558A (en) System for testing digital subscriber's line equipment
JPH05244268A (en) Exchange system monitoring device
JPH09233073A (en) Test diagnosis connection control system for on-demand connection data communication
JPH0272788A (en) Automatic test device for speech path
JPH04170839A (en) Communication adaptability testing system for isdn terminal

Legal Events

Date Code Title Description
A300 Application deemed to be withdrawn because no request for examination was validly filed

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 19980514