JPH042451A - Control unit for progress of work - Google Patents

Control unit for progress of work

Info

Publication number
JPH042451A
JPH042451A JP2101060A JP10106090A JPH042451A JP H042451 A JPH042451 A JP H042451A JP 2101060 A JP2101060 A JP 2101060A JP 10106090 A JP10106090 A JP 10106090A JP H042451 A JPH042451 A JP H042451A
Authority
JP
Japan
Prior art keywords
person
charge
time
ability
progress management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2101060A
Other languages
Japanese (ja)
Inventor
Koji Kubo
久保 幸次
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP2101060A priority Critical patent/JPH042451A/en
Publication of JPH042451A publication Critical patent/JPH042451A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Multi-Process Working Machines And Systems (AREA)
  • General Factory Administration (AREA)

Abstract

PURPOSE:To prepare a practical progress control list, by selecting the person having the highest execution ability selectable at the time when selecting a person in charge for a certain process and selecting the process where the execution ability can be displayed most when the process is selected for a certain person in charge. CONSTITUTION:A process information and charging ability information are input by an initial data input means 1 and the schedulings of each process are performed by a scheduling mean 4. Now, the person having ability most among the persons in charge who can undertake a certain process is allocated as the person in charge of the process thereof and the person in charge thereof is allocated for the process where the ability can be displayed most among the processes where the person in charge can undertake in the selection of the process. Also, the data of the start, completion, etc., of each processes are input to the scheduling mean 4 from an actual result data input mean 6 and an ability renewing mean 7 renews the ability information on each processes of each persons in charge.

Description

【発明の詳細な説明】 [発明の目的] (産業上の利用分野) 本発明は、所定の業務を工程に分割し、この工程を管理
する進度管理表の作成および管理を行なう業務進度管理
装置に関する。
[Detailed Description of the Invention] [Object of the Invention] (Industrial Application Field) The present invention is a work progress management device that divides a predetermined work into processes and creates and manages a progress management table for managing the processes. Regarding.

(従来の技術) 従来、設計、製造等の業務を管理する進度管理表は、そ
れを管理すべきプロジェクトのリーダまたはその担当の
人の経験によってスケジュールされ、手書きまたはワー
ドプロセッサ等を用いて作成されていた。
(Prior Art) Conventionally, progress management tables for managing tasks such as design and manufacturing were scheduled based on the experience of the project leader or the person in charge of the project, and were created by hand or using a word processor, etc. Ta.

(発明が解決しようとする課題) このため、各工程の前後関係の調整に手間取ったり、各
工程についてその担当者の能力を考慮に入れないで工数
が全て標準的な値で設定されていた。これにより進度管
理表に正確なりリティカルパスを表現する事が困難であ
り工程遅れの発生など問題が生じていた。
(Problem to be solved by the invention) For this reason, it took time to adjust the context of each process, and the number of man-hours for each process was all set at standard values without taking into account the ability of the person in charge. As a result, it was difficult to accurately represent the critical path in the progress management table, causing problems such as process delays.

本発明はこのような事情に鑑みてなされたものであり、
進度管理表作成者の負担を軽減すると共に実用的な進度
管理表を作成し、その管理を行なう業務進度管理装置を
提供することを目的とする。
The present invention was made in view of these circumstances, and
It is an object of the present invention to provide a work progress management device that reduces the burden on a progress management table creator and creates and manages a practical progress management table.

[発明の構成コ (課題を解決するための手段) 上記課題を解消するために本発明は、所定の業務を構成
する各工程と、その工程の標準時間と、各工程の前後関
係゛情報と、各工程に対する担当者の遂行能力情報を用
いて各工程の進度を管理する進度管理表を作成しその管
理を行う業務進度管理装置において、 ある工程に対し複数の担当者のうちから担当者を決める
ときは、その工程の担当者をその工程の開始時点で担当
可能な者のうちその工程を遂行する能力が最も高い者と
し、複数の工程に対してある担当者が担当する工程を決
めるときは、その担当者が最も遂行能力を発揮できる工
程を担当するものである。
[Configuration of the Invention (Means for Solving the Problems) In order to solve the above problems, the present invention provides information on each step constituting a predetermined business, the standard time of the step, and the context of each step. , a work progress management system that creates and manages a progress management table for managing the progress of each process using performance information of the person in charge of each process. When determining the person in charge of a process, select the person who has the highest ability to carry out the process among the people who can be in charge at the time of the start of the process, and when deciding which process a person will be in charge of for multiple processes. The person in charge is in charge of the process in which the person in charge can best demonstrate his or her ability to perform.

すなわち、各工程毎の各担当者の遂行能力情報を作成し
ておき、各工程の担当者を決定するに当たり、その工程
開始時点で担当可能な者のうち、その工程の遂行能力の
最も高い者とするように、またある担当者の担当する工
程を決める場合、その担当者が最も遂行能力を発揮でき
る工程を担当するようにしている。
In other words, information on the ability of each person in charge of each process is created, and when determining the person in charge of each process, the person who has the highest ability to perform that process among the people who can be in charge at the time of the start of that process is selected. Similarly, when deciding which processes a person will be responsible for, we ensure that the person in charge is responsible for the process in which they can best demonstrate their ability to perform.

(作用) 複数の工程をそれぞれの担当者が担当して工程を遂行し
てゆく場合、業務開始時は各工程にその工程を遂行する
能力の最も高い者が選ばれるのが普通であるが、工程の
進捗に従いある工程が終了し次の工程に移る場合、早く
終り待ち時間の長い人から担当することが多い。
(Function) When each person is in charge of multiple processes and the processes are carried out, at the start of work, it is normal for the person with the highest ability to carry out that process to be selected for each process. When a process finishes and moves on to the next process, the person who finishes first and has the longest waiting time is often assigned the task.

これに対して本発明では、待ち時間の長い人がいようと
、今終わったばかりの人がいようと、その中で次に実施
する工程に対し最も遂行能力の高い人を担当者とする。
In contrast, in the present invention, regardless of whether there is a person who has been waiting for a long time or a person who has just finished, the person who has the highest ability to carry out the next process among them is assigned as the person in charge of the next process.

また、ある担当者の担当する工程を決める場合、その担
当者が最も遂行能力を発揮できる工程を担当するように
するので工程の進度が予定通り、又は、さらに改善され
、業務を確実に遂行することができる。
In addition, when deciding which process a person will be responsible for, that person will be assigned to the process where they can best demonstrate their ability to perform, ensuring that the process progresses as planned or is further improved, ensuring that the work is carried out reliably. be able to.

(実施例) 以下本発明の一実施例を第1図〜第4図を用いて説明す
る。
(Example) An example of the present invention will be described below with reference to FIGS. 1 to 4.

第1図は実施例の業務進度管理装置の概略構成を示すブ
ロック図である。この業務進度管理装置は、業務の各工
程、その工程の標準時間、各工程の前後関係情報、各工
程に対する担当者の遂行能力を入力する初期データ入力
手段1と、この初期データ入力手段1から入力された各
工程、その工程の標準時間、各工程の工程の前後関係情
報からなる工程情報を格納する工程情報メモリ2と、各
工程に対する担当者の遂行能力からなる担当者能力情報
を格納する担当者能力情報メモリ3と、工程情報メモリ
2.担当者能力情報メモリ3の情報を基に業務の進度管
理表を作成しその管理を実施するスケジューリング手段
4と、このスケジューリング手段4の作成した管理表デ
ータを格納する進度管理表データメモリ5と、担当者が
その担当者工程を実施した実績データをスケジューリン
グ手段4に入力する実績データ入力手段6と、この実績
データに基づき進度管理を行なうスケジューリング手段
4の出力から各担当者の実績能力を求め前記担当者能力
情報メモリ3の記憶内容を更新する能力更新手段8と、
スケジューリング手段4の作成する進度管理表や能力更
新手段7の更新した能力データを記録するプリンタ8と
から構成されている。
FIG. 1 is a block diagram showing a schematic configuration of a business progress management device according to an embodiment. This work progress management device includes an initial data input means 1 for inputting each work process, the standard time of the process, context information of each process, and the execution ability of the person in charge of each process, and from this initial data input means 1. A process information memory 2 stores process information consisting of each input process, standard time of the process, and context information of each process, and personnel ability information consisting of the execution ability of the person in charge of each process. Person in charge ability information memory 3, process information memory 2. A scheduling means 4 that creates and manages a work progress management table based on the information in the staff ability information memory 3; a progress management table data memory 5 that stores the management table data created by the scheduling means 4; The actual performance ability of each person in charge is determined from the output of the performance data input means 6 which inputs the performance data of the person in charge into the scheduling means 4 and the scheduling means 4 which performs progress management based on this performance data. ability updating means 8 for updating the stored contents of the person-in-charge ability information memory 3;
It is comprised of a printer 8 for recording the progress management table created by the scheduling means 4 and the ability data updated by the ability updating means 7.

次に、このように構成された業務進度管理装置の動作を
説明する。
Next, the operation of the business progress management device configured as described above will be explained.

まず初期データ入力手段1より工程情報と担当能力情報
を入力し、スケジューリング手段4で各工程のスケジュ
ーリングをおこなうが、1つの工程が終了し、次の工程
をどのように決めるかを第2図を用いて説明する。第2
図は各工程の実施順序を定めこの工程の進度を管理する
管理表である。
First, process information and responsible ability information are input through the initial data input means 1, and the scheduling means 4 schedules each process. I will explain using Second
The figure is a management table that determines the order of implementation of each process and manages the progress of this process.

第2図(a)において工程1〜4が終了すると工程5〜
8が開始されるが、残っている工程5〜8のうち工程の
前後関係情報から判断して最も早く着手できる時刻t1
を求める。この場合、時刻1、が工程5の開始時刻であ
る。このようにして求められた時刻t1はあくまで工程
の前後関係からのみ判断したものであって、その時点で
は必ずしもその工程(工程5)に着手できる担当者が存
在するというわけではない。
In FIG. 2(a), when steps 1 to 4 are completed, steps 5 to 4 are completed.
8 is started, but among the remaining steps 5 to 8, the earliest time t1 can be started judging from the context information of the steps.
seek. In this case, time 1 is the start time of step 5. The time t1 obtained in this manner is determined only from the context of the process, and it does not necessarily mean that there is a person in charge who can start the process (process 5) at that time.

次に工程情報メモリ2.担当者能力情報メモリ3に格納
されている工程の標準作業時間と担当者の能力情報を用
いて、担当者全員の中で、現在までの工程の完了が最も
早い工程(工程1)の完了時刻t2を求める。このよう
にして求められた時刻t2はあくまで各担当者の工程の
完了からのみ判断したものであって、その時点では必ず
しも着手できる工程が存在するというわけではない。
Next, process information memory 2. Using the standard working time of the process and the ability information of the person in charge stored in the person in charge ability information memory 3, the completion time of the process (Process 1) that has been completed the earliest to date among all the people in charge. Find t2. The time t2 obtained in this way is determined only from the completion of the process by each person in charge, and it does not necessarily mean that there is a process that can be started at that time.

これは別の見方をすると少なくとも時刻t1と時刻t2
を経過した時点では着手できる工程もその担当者も共に
存在することを意味している。従って時刻t1と時刻t
2を比較し、時刻t、が時刻t2に等しいか又はより大
きければ(1+≧t2)、時刻t、を経過した時点では
少なくともその工程に着手できる担当者が存在するので
、時刻t1でその工程を着手できる担当者(工程1゜2
.4の担当者)のうち最も能力のある人をその工程の担
当者として割り当てる。
From another perspective, this means that at least time t1 and time t2
This means that both the process that can be started and the person in charge of it exist at the point when the process has passed. Therefore, time t1 and time t
2, and if time t is equal to or greater than time t2 (1+≧t2), there is at least a person in charge who can start the process after time t, so the process is started at time t1. Person in charge who can start the process (process 1゜2
.. Assign the most capable person among the persons in charge of step 4 as the person in charge of that process.

逆に、第2図(b)に示すように、時刻t1が時刻t2
より小さい場合(t+<i2)は、時刻t2を経過した
時点では少なくともその担当者(時刻t2で終わった工
程1の担゛当者)は、時刻t2で担当者が着手できる工
程(工程5,7)のうち、最も能力を発揮できる工程に
その担当者を割り当てる。
Conversely, as shown in FIG. 2(b), time t1 becomes time t2.
If it is smaller (t+<i2), after time t2, at least the person in charge (the person in charge of process 1 that ended at time t2) will be able to start the process that the person in charge can start at time t2 (process 5, 7) Assign the person in charge to the process where they can best demonstrate their abilities.

これらの処理を担当者の決定していない工程が無くなる
まで繰り返し行ない、その進度管理表をプリンタ8より
出力する。また、各工程の着手。
These processes are repeated until there are no more processes for which a person in charge has not been determined, and a progress management table is output from the printer 8. Also, start each process.

完了等のデータを実績データ入力手段6よりスケジュー
リング手段4に入力して処理し、このデータを用いて能
力更新手段7は、各工程の標準作業時間と能力情報より
求めた予定作業時間と実績作業時間から以下に示す関係
式を用いて各担当者の各工程毎の能力情報を更新し、担
当者能力情報メモリ3の記憶内容を更新し、プリンタ8
にも出力し、次回の進度管理表作成時の担当者能力とす
る。
Data such as completion is input to the scheduling means 4 from the performance data input means 6 and processed. Using this data, the ability updating means 7 calculates the scheduled work time and actual work obtained from the standard work time and ability information of each process. The ability information for each process of each person in charge is updated using the relational expression shown below from the time, the stored contents of the person in charge ability information memory 3 are updated, and the printer 8
It is also output to the person in charge's ability when creating the next progress management table.

P、++ −f (P、、Y、J)  −−−(1)P
ail:ある担当者のある工程についての次回の能力情
報 Po  :ある担当者のある工程についての今回の能力
情報 Y  二ある担当者のある工程についての今回の作業予
定時間 J  :ある担当者のある工程についての今回の作業実
績時間 またf (P、、Y、J)は能力評価関数であり、今回
の実績をどのくらいの割り合で次回の能力情報に反映す
るかを決定する関数である。この関数は、本装置のユー
ザが自分たちの担当するプロジェクトの性格に適合した
ものを設定する。
P, ++ -f (P,,Y,J) ---(1)P
ail: Next ability information for a certain process of a certain person in charge Po: Current ability information for a certain process of a certain person in charge Y 2 Current scheduled work time for a certain process of a certain person in charge J: A certain person in charge The current work performance time for the process or f (P, , Y, J) is a capability evaluation function, and is a function that determines the proportion of the current performance to be reflected in the next capability information. This function is set by the users of this device to suit the nature of the project they are in charge of.

次に具体的なデータを用いて説明する。工程に1〜に6
の標準作業時間T1〜T6は次の通りである。
Next, explanation will be given using specific data. 1 to 6 in the process
The standard working times T1 to T6 are as follows.

KI  K2  K3  K4  K5  K6TI 
 T2  T3  T4  T5  T6また、工程の
前後関係情報は次の通りとする。
KI K2 K3 K4 K5 K6TI
T2 T3 T4 T5 T6 In addition, the context information of the process is as follows.

(Klは無条件に着手できる) K2−K  1 (K2はに1が完了すれば着手できる)3−KI CK3はに1が完了すれば着手できる)K4−に1 (K4はに1が完了すれば着手できる)K5−に2 0
RK3 (K5は、K2かに3の少なくともいずれか一方が完了
すれば着手できる) K6−に4  AND  K5 CK6は、K4とに3とが共に完了すれば着手できる) 以上の関係を第3図に示す。
(Kl can start unconditionally) K2-K 1 (K2 can start when 1 is completed) 3-KI CK3 can start when 1 is completed) K4-1 (K4 can start when 1 is completed) ) K5- to 20
RK3 (K5 can be started if at least either K2 or 3 is completed) K6-4 AND K5 CK6 can be started if both K4 and 3 are completed) The above relationship is shown in Figure 3. Shown below.

担当者Ml、M2の工程に1〜に6別能力情報は次の通
りである に1 K2  K3  K4  K5  K6Ml  
1.0 0.8 0.8 0.8 1.0 1.0M2
 1.2 1.0 1.(11,00゜81,2ここで
0.8とは標準作業時間の80%の時間で該当する工程
を終了する事を表す。
The ability information for the processes 1 to 6 of the person in charge of M1 and M2 is as follows: 1 K2 K3 K4 K5 K6Ml
1.0 0.8 0.8 0.8 1.0 1.0M2
1.2 1.0 1. (11,00°81,2 Here, 0.8 means that the corresponding process is completed in 80% of the standard working time.

上記のデータから第4図に示す流れ図に従って進度管理
表を作成してゆく。まずS(ステップ)0では全ての工
程(Kl〜に6)が残っているので、個々の工程につい
て工程の前後関係情報から判断して、着手できる時刻t
−を求めると、K1については無条件に着手できるので
時刻tt+”=0となり、K2.に3およびに4につい
てはに1がまだ進度管理表に出現していないので計算で
きない。このため時刻i、、woo9時刻i、、smo
o1時刻i、4wooとなる。またに5についてもに2
.に3が進度管理表に出現していないので時刻tk5−
■となり、K6についてもに4.に5.がまだ進度管理
表に出現していないので時刻j、6sa(Klとなる。
A progress management table is created from the above data according to the flowchart shown in FIG. First, in S (step) 0, all processes (6 in Kl~) remain, so judging from the context information of each process, the time t when it can be started
When calculating -, K1 can be started unconditionally, so time tt+''=0, and K2., 3 and 4 cannot be calculated because 1 has not yet appeared in the progress management table. Therefore, time i ,,woo9 time i,,smo
o1 time i, 4woo. Also about 5 and 2
.. 3 does not appear in the progress management table, so time tk5-
■It becomes 4. for K6 as well. 5. Since has not yet appeared in the progress management table, time j, 6sa (Kl).

そしてこの各時刻tk1〜tk6の中で最も早い時刻t
1を求めると、K1が時刻t1−0において着手出来る
ことが分かる。
And the earliest time t among these times tk1 to tk6
1, it is found that K1 can start at time t1-0.

次に81にて、個々の担当者について進度管理表から判
断して現在までの工程が全て完了する時刻tMfiを求
めると、MlとM2は共に進度管理表にはまだ工程が出
現していないのですぐに着手可能であるからそれぞれ時
刻tM、−0、時刻t M2=0となる。そしてこの各
時刻tMl〜tM2の中で最も早い時刻t2を求めると
、MlとM2が共に時刻t2−0において現在までの工
程が完了している(実際には現在までの工程は無い)こ
とが解る。
Next, in step 81, when determining the time tMfi for each person in charge to complete all processes to date based on the progress management table, both Ml and M2 find that no processes have appeared in the progress management table yet. Since it is possible to start immediately, the time tM is -0 and the time tM2 is 0, respectively. Then, when finding the earliest time t2 among these times tMl to tM2, it is found that both Ml and M2 have completed their processes up to the present at time t2-0 (in fact, there are no processes up to the present). I understand.

そしてS2で時刻t1と時刻t2とを比較した結果、時
刻t1が時刻t2に等しい、又は、より大きい(1+≧
t2)条件が成立するので、S3へ進む。
Then, as a result of comparing time t1 and time t2 in S2, time t1 is equal to or greater than time t2 (1+≧
t2) Since the condition is satisfied, proceed to S3.

S3では、時刻t1にてに1に着手できる担当者はMl
とM2であるので、それぞれの担当者のに1についての
能力情報を見るとMlは1,0であり、M2は1.2で
ある。つまり、時刻t、にてに1に着手すべき担当者は
Mlであり、本処理ではに1の最適任者をMlと判断し
、進度管理表に表現する。もし、S2にて時刻t1が時
刻t2より小さければS4へ進む。S4では、時刻t2
にてM、が着手できる工程がKmとKnであれば、Ml
のKIIIとKnについての能力情報を見て、それが最
も小さい工程が時刻t2にてMlが着手できる工程の中
で最も能力を発揮できる工程であり、本処理ではその工
程をMnが担当すべき最適工程と判断し、進度管理表に
表現する。なお、作業予定時間を求める関係式は以下の
通りである。
In S3, the person in charge who can start work 1 at time t1 is Ml.
and M2, so looking at the ability information for each person in charge of 1, M1 is 1.0 and M2 is 1.2. That is, the person in charge of 1 at time t is Ml, and in this process, the optimal person for 1 is determined to be Ml, and this is expressed in the progress management table. If time t1 is smaller than time t2 in S2, the process advances to S4. In S4, time t2
If the processes that M can start at are Km and Kn, then Ml
Looking at the capability information for KIII and Kn, it is determined that the process with the smallest capacity is the one in which Ml can demonstrate its capabilities the most among the processes that Ml can start at time t2, and that Mn should be in charge of that process in this process. Determine the process to be optimal and express it in a progress management table. The relational expression for calculating the scheduled work time is as follows.

(作業予定時間)−(標準作業時間) ×(その担当者のその工程についての能力情報)・・・
(2) この(2)式を用いてMlのに1についての作業予定時
間を求めると、 (Mlのに1についての作業予定時間)−T I Xl
、0−’T I  ・・・(3)となる。以下同様に全
工程についてスケジューリングして進度管理表を作成す
る。そして、各工程についての作業実績時間を入力し、
その作業予定時間と作業実績時間から担当者の能力情報
を更新する。尚、この実施例では、 関数f (Pn 、Y、J)に以下の関数を採用するこ
とにする。
(Scheduled work time) - (Standard work time) × (Ability information of the person in charge for that process)...
(2) Using this formula (2) to find the scheduled work time for 1 in Ml, (scheduled work time for 1 in Ml) - T I Xl
, 0-'T I (3). In the same manner, all processes are scheduled and a progress management table is created. Then, enter the actual work time for each process,
The ability information of the person in charge is updated based on the scheduled work time and actual work time. In this embodiment, the following function is adopted as the function f (Pn, Y, J).

例えば、K1の作業実績時間が0.8XT1であったと
すれば、Mlのに1についての次回の能力情報は以下の
ようになる。
For example, if K1's actual work time is 0.8XT1, the next ability information for M1's 1 will be as follows.

(Mlのに1についての次回の能力情報)−0,98・
・・ (5) 以下同様に他の能力情報についても更新する。
(Next ability information about Ml 1) -0,98・
... (5) Other ability information will be updated in the same manner below.

このように、この実施例においては、ある工程の着手可
能条件は、その前工程の完了の有無に左右されることと
、各担当者は各工程毎に能力の違いがあり、その能力は
変化するということに着目し、それらの情報に基づいで
ある工程について、最適任者を選び出して担当者として
割り当て、また今回の作業実績から各担当者の各工程毎
の能力情報を更新して次回の進度管理表作成時に反映す
ることができ、適切な進度管理を行うことができる。
In this way, in this example, the conditions for starting a certain process depend on the completion of the previous process, and each person in charge has different abilities for each process, and their abilities change. Based on this information, we select the most suitable person for a certain process and assign it as the person in charge.We also update the ability information of each person in charge for each process based on the current work performance to update the ability information for each process for the next time. This can be reflected when creating a progress management table, allowing for appropriate progress management.

[発明の効果] 以上説明したように本発明の業務進度管理装置によれば
、ある工程に対して担当者を選ぶときはその時点で選択
可能なその工程の遂行能力の最も高い者を選び、ある担
当者に対して担当する工程を選ぶときは、その担当者が
最も遂行能力を発揮できる工程を選ぶようにしたので、
進度管理を適切に行うことができる。
[Effects of the Invention] As explained above, according to the work progress management device of the present invention, when selecting a person in charge of a certain process, the person with the highest ability to perform the process selectable at that time is selected, When choosing a process for a person in charge, I chose the process in which that person can best demonstrate their ability to perform.
Able to appropriately manage progress.

【図面の簡単な説明】 図は本発明の一実施例に係わる業務進度管理装置を示す
ものであり、第1図は実施例装置の概略構成を示すブロ
ック図、第2図は工程が終了したとき次の工程の担当者
を選ぶ場合と工程を終了した担当者が次の工程を選ぶ場
合を説明する図、第3図は工程の前後関係情報を説明す
る図、第4図は動作を示す流れ図である。 1・・・初期データ入力手段、2・・・工程情報メモリ
、3・・・担当者能力情報メモリ、4・・・スケジュー
リング手段、5・・・進度管理表データメモリ、6・・
・実績データ入力手段、7・・・能力更新手段、8・・
・プリンタ。 出願人代理人 弁理士 鈴江武彦 (a) 第2図
[BRIEF DESCRIPTION OF THE DRAWINGS] The figure shows a work progress management device according to an embodiment of the present invention, and FIG. 1 is a block diagram showing the schematic configuration of the embodiment device, and FIG. Figure 3 is a diagram explaining the context information of the process, and Figure 4 is the operation. This is a flowchart. DESCRIPTION OF SYMBOLS 1... Initial data input means, 2... Process information memory, 3... Person in charge ability information memory, 4... Scheduling means, 5... Progress management table data memory, 6...
- Achievement data input means, 7... Ability update means, 8...
・Printer. Applicant's agent Patent attorney Takehiko Suzue (a) Figure 2

Claims (1)

【特許請求の範囲】 所定の業務を構成する各工程と、その工程の標準時間と
、各工程の前後関係情報と、各工程に対する担当者の遂
行能力情報とを用いて各工程の進度を管理する進度管理
表を作成しその管理を行う業務進度管理装置において、 ある工程に対し複数の担当者のうちから担当者を決める
ときは、その工程の担当者をその工程の開始時点で担当
可能な者のうちその工程を遂行する能力が最も高い者と
し、複数の工程に対してある担当者が担当する工程を決
めるときは、その担当者が最も遂行能力を発揮できる工
程を担当することを特徴とする業務進度管理装置。
[Scope of Claims] The progress of each process is managed using each process that constitutes a predetermined work, the standard time of that process, the context information of each process, and the execution ability information of the person in charge of each process. In a work progress management system that creates and manages a progress management table, when deciding who is in charge of a certain process from among multiple people, it is necessary to select the person in charge of that process from among those who are available at the start of the process. The person in charge is the person who has the highest ability to carry out the process among the people involved in the process, and when deciding which process to be in charge of for multiple processes, the person in charge is in charge of the process where the person in charge can best demonstrate their ability to perform. A business progress management device.
JP2101060A 1990-04-17 1990-04-17 Control unit for progress of work Pending JPH042451A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2101060A JPH042451A (en) 1990-04-17 1990-04-17 Control unit for progress of work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2101060A JPH042451A (en) 1990-04-17 1990-04-17 Control unit for progress of work

Publications (1)

Publication Number Publication Date
JPH042451A true JPH042451A (en) 1992-01-07

Family

ID=14290573

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2101060A Pending JPH042451A (en) 1990-04-17 1990-04-17 Control unit for progress of work

Country Status (1)

Country Link
JP (1) JPH042451A (en)

Similar Documents

Publication Publication Date Title
US6603489B1 (en) Electronic calendaring system that automatically predicts calendar entries based upon previous activities
US20030074090A1 (en) System and method for improving operational efficiency through process automation
MX2007014945A (en) Facilitating automated meeting scheduling.
WO2001067291A2 (en) Method, process and system for optimized outcome driven workflow synthesis and reduction
JP2002525715A (en) Product development planning method by computer
JP4275102B2 (en) Work man-hour estimation and personnel allocation system and method
JP2009535739A (en) Project resource plan
CN109508843A (en) A kind of intelligent Service implementation method and device
JP2019117454A (en) Production planning support system
Lima et al. Project management under uncertainty: resource flexibility visualization in the schedule
Ceschia et al. Solving a real-world nurse rostering problem by simulated annealing
JPS59214964A (en) Conversational scheduling system
JP4268973B2 (en) Method and computer program for automatically creating a travel plan using a mixed integer programming problem
CN112561756A (en) Medical treatment progress display method and device
JPH042451A (en) Control unit for progress of work
JP7032750B1 (en) Processing equipment, systems, processing methods and programs
Van de Vrugt et al. Integrated scheduling of tasks and gynecologists to improve patient appointment scheduling; a case study
JP3867858B2 (en) Workflow support system
JPH1086044A (en) Worker&#39;s discretion utilization schedule planning method and device therefor
JP2005202870A (en) Method, device, and program for selecting person in charge of work
CN107148637A (en) Information processor, information processing method and program
CN111476478A (en) Method and device for processing art plan task
CN112598386B (en) Task reminding method, device, equipment and storage medium
Pinedo et al. Machine Scheduling and Job Shop Scheduling
JP2013066330A (en) Power usage schedule adjusting device, power usage schedule adjusting method, and program