JPH0423927Y2 - - Google Patents

Info

Publication number
JPH0423927Y2
JPH0423927Y2 JP1986117252U JP11725286U JPH0423927Y2 JP H0423927 Y2 JPH0423927 Y2 JP H0423927Y2 JP 1986117252 U JP1986117252 U JP 1986117252U JP 11725286 U JP11725286 U JP 11725286U JP H0423927 Y2 JPH0423927 Y2 JP H0423927Y2
Authority
JP
Japan
Prior art keywords
workbench
rail
wire rope
section
viaduct
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP1986117252U
Other languages
Japanese (ja)
Other versions
JPS6323308U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP1986117252U priority Critical patent/JPH0423927Y2/ja
Publication of JPS6323308U publication Critical patent/JPS6323308U/ja
Application granted granted Critical
Publication of JPH0423927Y2 publication Critical patent/JPH0423927Y2/ja
Expired legal-status Critical Current

Links

Description

【考案の詳細な説明】 〔産業上の利用分野〕 この考案は、高速道路等の高架橋において、脚
部の塗装や点検、修理等を行なうための作業装置
に監視、簡易な構成でこれを実現したものであ
る。
[Detailed explanation of the invention] [Industrial application field] This invention realizes this with a simple configuration and monitors work equipment for painting, inspecting, repairing, etc. the legs of elevated bridges on expressways. This is what I did.

〔従来の技術〕[Conventional technology]

高速道路等の高架橋における脚部は、従来コン
クリートを打ち放しの状態で使用していたが、最
近周囲との色彩及び景観が融合しないとのことで
塗装を施すことが進められている。
The legs of viaducts on expressways and other highways have traditionally been made of bare concrete, but recently the legs have been painted, as the color and scenery do not blend in with the surrounding area.

このような高架橋脚部の塗装を行なう場合ある
いはコンクリートのヒビ割れ等の点検、修理等を
行なう場合、従来は高架橋底部に足場板を吊り下
げたり、高架橋脚部の周囲に足場を組んだりして
作業を行なつていた。
When painting such viaduct piers, or when inspecting or repairing cracks in concrete, etc., conventionally, scaffolding boards were hung from the bottom of the viaduct or scaffolding was erected around the viaduct piers. was working.

〔考案が解決しようとする問題点〕[Problem that the invention attempts to solve]

前記従来の足場板を吊り下げたり、足場を組ん
だりする方法では、大がかりとなり、仮設に時間
がかかるとともに、資材を多く必要とする欠点が
あつた。また、大きな足場板を持ち上げる際など
に、下方の道路の交通を一時遮断しなければなら
ず大幅な交通規制を必要としていた。
The conventional methods of suspending scaffolding boards or building scaffolding have the drawbacks of being large-scale, requiring time for temporary construction, and requiring a large amount of materials. Additionally, when lifting large scaffolding boards, traffic on the road below had to be temporarily shut down, necessitating significant traffic restrictions.

この考案は、前記従来の技術における問題点を
解決して、構成が簡単で、仮設に要する時間も短
くて済み、また仮設する際の下方の道理の規制を
最小限にとどめることができる高架橋脚部作業装
置を提供しようとするものである。
This invention solves the problems in the conventional technology and is simple in construction, requires less time for temporary construction, and minimizes the restrictions on the structure of the structure below when temporarily installed. The purpose is to provide a departmental work device.

〔問題点を解決するための手段〕[Means for solving problems]

この考案は、高架橋脚部を挟んでその前後の位
置の橋梁部下部にレールを高架橋の幅方向にそれ
ぞれ設置し、これらレール間に作業台を移動可能
および昇降可能に吊り下げてなり、前記作業台
が、水平部とこの水平部の前後部にそれぞれ着脱
可能に取り付けられた垂直部とにより高架橋脚部
のオーバハング部を収容可能に略々U形状に構成
されたものであることを特徴とするものである。
This idea consists of installing rails in the width direction of the viaduct at the front and rear of the viaduct, sandwiching the viaduct piers, and suspending a work platform between these rails so that it can move and move up and down. The platform is characterized in that it is configured in a substantially U-shape so as to be able to accommodate the overhang part of the viaduct pier by a horizontal part and vertical parts removably attached to the front and rear of the horizontal part. It is something.

〔作用〕[Effect]

この考案の前記解決手段によれば、作業台に人
が乗つてレールに沿つて移動および昇降させるこ
とにより、T型等の形状を有する高架橋脚部につ
いて塗装、点検、修理等の作業を行なうことがで
きる。
According to the above-mentioned solution of this invention, work such as painting, inspection, repair, etc. is performed on the elevated bridge pier having a T-shape or the like by having a person sit on a workbench and move it along the rail and raise and lower it. I can do it.

これによれば、高架橋下部や脚部の周囲全体に
足場を組む必要がなくなるので、設置や取外しに
要する時間が短くて済み、交通規制が少なくて済
むとともに、資材も少なくて済む。
According to this, there is no need to erect scaffolding all around the lower part of the viaduct and the legs, so the time required for installation and removal is shortened, fewer traffic regulations are required, and less materials are required.

また、この考案によれば、作業台を水平部とこ
の水平部の前後部にそれぞれ着脱可能に取り付け
られた垂直部とにより高架橋脚部のオーバハング
部を収容可能に略々U形状に構成したので、オー
バハング部の側面および下面についての作業を容
易に行なうことができる。また、水平部を外して
垂直部のみを使用して柱部の前後側面について作
業を行なうことができる。
Further, according to this invention, the workbench is configured in a substantially U-shape so that the overhang part of the elevated bridge pier can be accommodated by the horizontal part and the vertical parts removably attached to the front and rear of the horizontal part. , the side and bottom surfaces of the overhang can be easily worked on. Further, it is possible to remove the horizontal part and use only the vertical part to work on the front and rear sides of the pillar part.

なお、レールに作業台の移動用のトロリを設置
し、このトロリからワイヤロープを吊り下げると
ともに、作業台に巻上機を設置し、この巻上機を
駆動して前記ワイヤロープの下端部を巻回すこと
により、作業台を容易に昇降させることができ
る。
A trolley for moving the workbench is installed on the rail, and the wire rope is suspended from the trolley. A hoist is installed on the workbench, and the hoist is driven to lift the lower end of the wire rope. By winding it, the workbench can be easily raised and lowered.

また、橋梁部からワイヤロープを吊り下げると
ともに、レール上には複数台の巻上機を設置し、
この巻上機を駆動してワイヤロープの下端部を巻
回してレールを上昇させることにより橋梁部の下
部に容易にレールを設置することができる。
In addition, wire ropes were suspended from the bridge, and multiple hoisting machines were installed on the rails.
By driving this hoist to wind the lower end of the wire rope and raise the rail, the rail can be easily installed at the lower part of the bridge section.

また、作業台の垂直部に複数階の床を設けるこ
とにより、オーバハング部の側面について容易に
作業することができる。
Further, by providing multiple floors on the vertical portion of the workbench, it is possible to easily work on the side surfaces of the overhang portion.

また、レールを分割構造とすれば、レールの設
置や取外しが容易となるとともに、レールを上げ
下ろしする際の交通規制も少なくて済むようにな
る。
Furthermore, if the rails are of a split structure, it becomes easier to install and remove the rails, and fewer traffic regulations are required when raising and lowering the rails.

〔実施例〕〔Example〕

この考案の一実施例を第1図に示す。これは高
架橋の脚部を正面から見た図で、高架橋は紙面に
直角な方向に伸びている。
An embodiment of this invention is shown in FIG. This is a front view of the legs of the viaduct, with the viaduct extending perpendicular to the page.

脚部10は、鉄筋コンクリートで構成され、中
央の柱部13とその上部左右に水平に伸びたオー
バハング部12a,12bとで略T字状に構成さ
れている。脚部10の上部には、橋梁部が載置支
持されている。橋梁部14は、I型鋼で構成され
た梁16を等間隔かつ平行に高架橋の長手方向に
配して高架橋に強度を与えている。
The leg portion 10 is made of reinforced concrete and has a substantially T-shape including a central column portion 13 and overhang portions 12a and 12b extending horizontally from the left and right at the top thereof. A bridge section is mounted and supported on the upper part of the leg section 10. The bridge section 14 provides strength to the viaduct by arranging beams 16 made of I-beam steel at equal intervals and parallel to each other in the longitudinal direction of the viaduct.

橋梁部14の下部には、脚部10を挟んでその
手前の部分と背後の部分にレール18が高架橋の
幅方向にそれぞれ設置されている。各レール18
は橋梁部14に対して取付けあるいは取外すため
に昇降させる際に、下方の交通を全面的に遮断し
なくて済むように3分割程度に分割されている。
各分割部分は、橋梁部14に取付後連結材17に
よつて相互に連結され、橋梁部14から取外す際
に再び切り離される。
At the lower part of the bridge part 14, rails 18 are installed in the width direction of the viaduct at the front part and the rear part with the leg part 10 in between. Each rail 18
is divided into about three parts so that it is not necessary to completely block the traffic below when raising and lowering the bridge for attachment to or removal from the bridge section 14.
After being attached to the bridge section 14, the divided sections are interconnected by a connecting member 17, and are separated again when being removed from the bridge section 14.

橋梁部14に対するレール18の取付構造の一
例を第2図(正面図)および第3図(側面図)に
示す。ここでは、各梁16に対応してレール18
に逆L字状のブラケツト22をスライド可能に2
個づつ対向して取り付け、このブラケツト22,
22をスライドさせて梁16の下部フランジ16
a,16aを両側から挟んでレール18の取付け
を行なう。ブラケツト22,22でフランジ16
a,16aを両側から挟み込んだら、これらに開
設された孔24,26に止めピン28を通して止
める。なお、レール18の孔24は、梁16の配
置間隔やフランジ16aの長さの違いに対応でき
るように複数個開設されている。
An example of the mounting structure of the rail 18 to the bridge section 14 is shown in FIG. 2 (front view) and FIG. 3 (side view). Here, the rail 18 corresponds to each beam 16.
The inverted L-shaped bracket 22 can be slid into the
Install these brackets 22, facing each other one by one.
22 to the lower flange 16 of the beam 16.
The rail 18 is attached by sandwiching the rails 16a and 16a from both sides. Flange 16 with brackets 22, 22
After sandwiching a and 16a from both sides, a fixing pin 28 is passed through the holes 24 and 26 formed in these and fixed. Note that a plurality of holes 24 in the rail 18 are provided so as to correspond to differences in the arrangement intervals of the beams 16 and the lengths of the flanges 16a.

第1図において、レール18の上部には、この
レール18を橋梁部14の下部に取付けあるいは
取り外す際に昇降させるための巻上機30が各分
割されたレール18の左右端部にそれぞれ固定さ
れている。巻上機30のワイヤロープ32の一端
は、橋梁部14に掛けられている。
In FIG. 1, on the upper part of the rail 18, a hoist 30 is fixed to the left and right ends of each divided rail 18 for raising and lowering the rail 18 when attaching or removing the rail 18 to the lower part of the bridge section 14. ing. One end of the wire rope 32 of the hoist 30 is hung on the bridge section 14.

また、前後各レール18には作業台32をレー
ル18に沿つて移動させるための2個のトロリー
34が連結バー64で相互に連結して設置されて
いる。これら合計4個のトロリー34には作業台
32を吊り下げるためのワイヤロープ36が連結
されている。
Further, two trolleys 34 for moving the workbench 32 along the rails 18 are installed on each of the front and rear rails 18 and are connected to each other by a connecting bar 64. A wire rope 36 for suspending the workbench 32 is connected to these four trolleys 34 in total.

なお、4個のトロリー34のうち34′で示し
た1個はギアードトロリーであり、これに掛けら
れたチエーン35を作業台32に乗つた作業者が
回すことにより、作業台32をレール18に沿つ
て移動させることができる。他の3個のトロリー
はプレーントロリである。
Note that one of the four trolleys 34, indicated by 34', is a geared trolley, and a worker on the workbench 32 rotates a chain 35 hooked thereon to move the workbench 32 onto the rail 18. can be moved along. The other three trolleys are plain trolleys.

作業台32は、オーバハング部12a,12b
を下方から収容するように略々U形状に構成され
ている。作業台32は四隅に配設された4本のワ
イヤロープ36によつてトロリー34から取り下
げられている。各ワイヤロープ36は作業台32
に設置された巻上機38により巻回されて、作業
台32の昇降を行なう。巻上機38の制御は作業
台32に乗つている作業者が行なうことができ
る。
The workbench 32 has overhang parts 12a and 12b.
It is configured in a substantially U-shape so as to accommodate the space from below. The workbench 32 is lowered from the trolley 34 by four wire ropes 36 placed at the four corners. Each wire rope 36 connects to the workbench 32
The work table 32 is raised and lowered by being wound by a hoist 38 installed in the work table 32 . The hoist 38 can be controlled by a worker sitting on the workbench 32.

作業台32の詳細図を第4図(正面図)、第5
図(側面図)、第6図(平面図)に示す。
Detailed views of the workbench 32 are shown in Figure 4 (front view) and Figure 5.
(side view) and FIG. 6 (plan view).

作業台32は、水平部32aと水平部32aの
前後部にそれぞれ設けられた垂直部32bとで構
成されている(第4図)。水平部32aは、作業
者が載つて作業を行なう床部40と、その周縁部
に設けられた手すり42とを具えている。手すり
42の下部にはネツト44が張られている。垂直
部36bは、1階の床46と2階の床48とを具
えた2層構造となつており、1階の床46と2階
の床48とははしご等で昇り降りできるようにな
つている。(第4図)また、1階と2階には周囲
に手すり50,52が設けられ、それらの下部に
はネツト54,56が張られている。1階には昇
降用ワイヤ36の巻上機38と昇降制御用の制御
盤58が設置されている。
The workbench 32 is composed of a horizontal portion 32a and vertical portions 32b provided at the front and rear of the horizontal portion 32a (FIG. 4). The horizontal section 32a includes a floor section 40 on which a worker stands and performs work, and a handrail 42 provided at the periphery of the floor section 40. A net 44 is stretched under the handrail 42. The vertical portion 36b has a two-layer structure including a first floor floor 46 and a second floor floor 48, and the first floor floor 46 and the second floor floor 48 can be ascended and descended using a ladder or the like. ing. (Fig. 4) Furthermore, handrails 50, 52 are provided around the first and second floors, and nets 54, 56 are stretched below them. A hoist 38 for the lifting wire 36 and a control panel 58 for controlling the lifting and lowering are installed on the first floor.

作業台32の水平部32aと垂直部32bはボ
ルト等によつて着脱自在に連結されている。高架
橋脚部12のオーバハング部12a,12bおよ
び柱部13の左右側面について作業を行なうとき
は連結した状態で使用し、柱部13の前後側面に
ついて作業を行なうときは水平部32aを外し
て、垂直部32bのみにて作業を行なう。
The horizontal portion 32a and the vertical portion 32b of the workbench 32 are removably connected by bolts or the like. When working on the overhang parts 12a, 12b of the viaduct pier 12 and the left and right sides of the column 13, they are used in a connected state, and when working on the front and rear sides of the column 13, the horizontal part 32a is removed and the vertical Work is performed only on section 32b.

なお、作業台32の底面には地上を移動するた
めのキヤスタ60が取り付けられている。また、
作業台垂直部32bの上端部には、作業台32が
上昇する際の上限用リミツトスイツチ52が取り
付けられており、ギアードトロリ34′から吊り
下げられたワイヤロープ36の上部に取り付けら
られたゴムおもり62により作動されて、作業台
32の上昇を停止させる。
Note that casters 60 for moving on the ground are attached to the bottom surface of the workbench 32. Also,
A limit switch 52 for the upper limit when the workbench 32 ascends is attached to the upper end of the workbench vertical section 32b, and a rubber weight attached to the top of the wire rope 36 suspended from the geared trolley 34'. 62 to stop the lifting of the work platform 32.

次に、以上説明した高架脚部作業装置により脚
部10の塗装や点検、修理等を行なう場合の操作
例を説明する。
Next, an example of operation for painting, inspecting, repairing, etc. the leg 10 using the above-described elevated leg working device will be described.

(1) レール18の取付 作業者がオーバハング部12に登つてレール昇
降用のワイヤロープ32の上端部を橋梁部14に
引つ掛ける。そして、ワイヤロープ32の下端部
をレール18上に設置された巻上機30に巻回
し、地上からの操作で巻上機30を操作してレー
ル18を水平状態に維持しながら引上げていく。
レール18にはあらかじめトロリ34を設置し
て、ワイヤ36を垂らしておく。また、ブラケツ
ト22がスライド可能に設置されている。なお、
このレール18の引上げの際下方の交通を全面的
に遮断しないようにレール18を例えば分割(2
分割、3分割等)して順番に行なう。この場合ワ
イヤロープ32および巻上機30は各分割部分に
ついて2組ずつ設ける。
(1) Installing the rail 18 A worker climbs onto the overhang portion 12 and hooks the upper end of the wire rope 32 for raising and lowering the rail onto the bridge portion 14 . Then, the lower end of the wire rope 32 is wound around a hoist 30 installed on the rail 18, and the hoist 30 is operated from the ground to raise the rail 18 while maintaining it in a horizontal state.
A trolley 34 is installed in advance on the rail 18, and a wire 36 is hung thereon. Further, a bracket 22 is slidably installed. In addition,
When the rail 18 is pulled up, the rail 18 is divided (2
(divide, divide into 3, etc.) and perform in order. In this case, two sets of wire ropes 32 and hoisting machines 30 are provided for each divided portion.

レール18が橋梁部14の底面部に達したら引
上げを停止する。そして、各梁16の下部フラン
ジ16aに両側からブラケツト22をスライドさ
せて挟み込む。挟み込んだらブラケツト22を止
めピン28によつてレール18に固定する。これ
により、レール18は橋梁部14の下部に取付け
られる。
When the rail 18 reaches the bottom of the bridge section 14, the pulling up is stopped. Then, the brackets 22 are slid and sandwiched between the lower flanges 16a of each beam 16 from both sides. Once clamped, the bracket 22 is fixed to the rail 18 with the stop pin 28. Thereby, the rail 18 is attached to the lower part of the bridge section 14.

(2) 作業台の取付け 脚部10の手前側、背後側に平行にレール18
を取り付け終わつたら、今度は作業台32の取付
を行なう。この作業台32の取付は、作業台32
をトラツク等に載せてトロリ34の下方に位置さ
せ、ワイヤロープ36の下端部を巻上機38に掛
ける。そして、4本のワイヤロープ36が全て掛
けられたら、作業者が作業台32に乗つて操作盤
58を操作して巻上機38を駆動し、作業台32
を上昇させる。この作業台32の取付は、下方の
交通のじやまにならない位置(例えば柱部13寄
りの部分あるいは端の部分)で行なう。
(2) Installing the workbench Install the rails 18 parallel to the front and rear sides of the legs 10.
After completing the installation, it is time to install the workbench 32. The installation of this workbench 32 is
is placed on a truck or the like and positioned below the trolley 34, and the lower end of the wire rope 36 is hung on the hoist 38. When all four wire ropes 36 are hung, the worker gets on the workbench 32 and operates the operation panel 58 to drive the hoisting machine 38.
to rise. The workbench 32 is installed at a location that does not obstruct traffic below (for example, at a location near the column 13 or at an end).

(3) 作業 オーバハング部12aについて作業(塗装、点
検、修理等)を行なう場合は、側面については垂
直部32bの1階または2階に乗つて作業を行な
う。また、オーバハング部の下面については、水
平部32aに乗つて作業を行なう。このとき、操
作盤58を操作して、作業台32の横行、昇降を
制御する。
(3) Work When performing work (painting, inspection, repair, etc.) on the overhang portion 12a, perform the work on the first or second floor of the vertical portion 32b for the side surfaces. Further, as for the lower surface of the overhang part, work is carried out while riding on the horizontal part 32a. At this time, the operation panel 58 is operated to control the movement and elevation of the workbench 32.

柱部13の左右両側面について作業を行なう場
合は、水平部32bに乗つて作業台32を昇降さ
せて行なう。柱部13の前後両側面について作業
を行なう場合は水平部32bを外して、垂直部3
2bの乗って作業を行なう。
When working on both the left and right sides of the column part 13, the work table 32 is raised and lowered while riding on the horizontal part 32b. When working on both the front and rear sides of the column part 13, remove the horizontal part 32b and remove the vertical part 3.
2b rides and performs the work.

左側のオーバハング部12について作業を行な
う場合は、再び水平部32aを取り付けて、作業
を行なう。
When working on the left overhang part 12, the horizontal part 32a is attached again and the work is carried out.

(4) 取外し 作業を終了して作業装置を取外す場合は、作業
台32を交通のじやまにならない位置まで移動
し、下降させて、その下に待機しているトラツク
に載せる。そして、ワイヤロープ36を作業台3
2から外す。
(4) Removal When the work is finished and the work equipment is to be removed, move the work platform 32 to a position where it will not interfere with traffic, lower it, and place it on the truck waiting below. Then, attach the wire rope 36 to the workbench 3.
Remove from 2.

作業台32を外したら、作業者が脚部10に登
つて、ブラケツト22をスライドさせて梁16の
フランジ16aから外す。そして、巻上機30を
操作して、レール18を1本ずつ降ろしていく。
レール18が降されたら作業者がワイヤロープ3
2を橋梁部14から外して全作業を終了する。
After removing the workbench 32, the operator climbs onto the legs 10, slides the bracket 22, and removes it from the flange 16a of the beam 16. Then, the hoisting machine 30 is operated to lower the rails 18 one by one.
When the rail 18 is lowered, the worker lifts the wire rope 3
2 from the bridge section 14 to complete the entire work.

なお、前記実施例に示したものは、橋梁部14
の下部であれば脚部10の付近に限らずどの位置
でも取付けることができるので、高架橋橋梁部全
体について各種作業が可能である。
In addition, what is shown in the above embodiment is the bridge part 14.
Since it can be attached at any position below the leg section 10, it is possible to perform various operations on the entire viaduct section.

〔考案の効果〕[Effect of idea]

以上説明したように、この考案によれば、高架
橋下部や脚部の周囲全体に足場を組む必要がなく
なるので、設置や取外しに要する時間が短くて済
み、交通規制が少なくて済むとともに、資材も少
なくて済む。
As explained above, this invention eliminates the need to erect scaffolding all around the lower part of the viaduct and the legs, so the time required for installation and removal is shortened, traffic regulations are reduced, and materials are also saved. Less is enough.

また、この考案によれば、作業台を水平部とこ
の水平部の前後部にそれぞれ着脱可能に取り付け
られた垂直部とにより高架橋脚部のオーバハング
部を収容可能に略々U形状に構成したので、オー
バハング部の側面および下面についての作業を容
易に行なうことができる。また、水平部を外して
垂直部のみを使用して柱部の前後側面について作
業を行なうことができる。
Further, according to this invention, the workbench is configured in a substantially U-shape so that the overhang part of the elevated bridge pier can be accommodated by the horizontal part and the vertical parts removably attached to the front and rear of the horizontal part. , the side and bottom surfaces of the overhang can be easily worked on. Further, it is possible to remove the horizontal part and use only the vertical part to work on the front and rear sides of the pillar part.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は、この考案の一実施例を示す正面図で
ある。第2図は、第1図における梁16に対する
レール18の取付構造を示す正面図である。第3
図は、第2図のものの側面図である。第4図は、
第1図の作業台32の正面図である。第5図は、
同作業台32の側面図である。第6図は、同作業
台32の平面図である。 10……脚部、12……オーバハング部、13
……柱部、14……橋梁部、16……梁、16a
……フランジ、22……ブラケツト、32……作
業台。
FIG. 1 is a front view showing an embodiment of this invention. FIG. 2 is a front view showing the mounting structure of the rail 18 to the beam 16 in FIG. 1. Third
The figure is a side view of that of FIG. 2. Figure 4 shows
2 is a front view of the workbench 32 of FIG. 1. FIG. Figure 5 shows
It is a side view of the same workbench 32. FIG. 6 is a plan view of the workbench 32. 10... Leg part, 12... Overhang part, 13
...Column part, 14...Bridge part, 16...Beam, 16a
...Flange, 22...Bracket, 32...Workbench.

Claims (1)

【実用新案登録請求の範囲】 (1) 高架橋脚部10を挟んでその前後の位置の橋
梁部14の下部にレール18を高架橋の幅方向
にそれぞれ設置し、これらレール18間に作業
台32を移動可能および昇降可能に吊り下げて
なり、 前記作業台32が、水平部32aとこの水平
部32aの前後部にそれぞれ着脱可能に取り付
けられた垂直部32bとにより高架橋脚部10
のオーバハング部12aを収容可能に略々U形
状に構成されたものであることを特徴とする高
架橋脚部作業装置。 (2) 前記レール18に作業台32の移動用のトロ
リ34が設置され、このトロリ34からワイヤ
ロープ36が吊り下げられており、前記作業台
32には巻上機38が設置され、この巻上機3
8を駆動して前記ワイヤロープ36の下端部を
巻回することにより、前記作業台32を昇降さ
せることを特徴とする実用新案登録請求の範囲
第1項に記載の高架橋脚部作業装置。 (3) 前記橋梁部14からワイヤロープ32が吊り
下げられており、前記レール18上には複数台
の巻上機30が設置され、この巻上機30を駆
動して前記ワイヤロープ32の下端部を巻回し
て前記レール18を上昇させることにより、前
記橋梁部14の下部にレール18を設置するこ
とを特徴とする実用新案登録請求の範囲第1項
または第2項に記載の高架橋脚部作業装置。 (4) 前記作業台32の垂直部32bが複数階の床
46,48を具備してなる実用新案登録請求の
範囲第1項〜第3項のいずれかに記載の高架橋
脚部作業装置。 (5) 前記レール18が分割構造であることを特徴
とする実用新案登録請求の範囲第1項乃至第4
項のいずれかに記載の高架橋脚部作業装置。
[Claims for Utility Model Registration] (1) Rails 18 are installed in the width direction of the viaduct at the lower part of the bridge section 14 at the front and rear positions across the viaduct pier section 10, and a work platform 32 is installed between these rails 18. The workbench 32 is suspended movably and vertically, and the workbench 32 is connected to the viaduct pier 10 by a horizontal portion 32a and vertical portions 32b removably attached to the front and rear portions of the horizontal portion 32a.
An elevated bridge pier working device characterized in that it is configured in a substantially U-shape so as to be able to accommodate an overhang portion 12a of the elevated bridge pier. (2) A trolley 34 for moving the workbench 32 is installed on the rail 18, a wire rope 36 is suspended from the trolley 34, and a hoist 38 is installed on the workbench 32 to move the workbench 32. Upper machine 3
8. The elevated bridge pier working device according to claim 1, wherein the working platform 32 is raised and lowered by driving the wire rope 8 and winding the lower end of the wire rope 36. (3) A wire rope 32 is suspended from the bridge section 14, and a plurality of hoisting machines 30 are installed on the rail 18, and the hoisting machines 30 are driven to remove the lower end of the wire rope 32. The elevated bridge pier according to claim 1 or 2, wherein the rail 18 is installed at the lower part of the bridge section 14 by winding the section and raising the rail 18. working equipment. (4) The elevated bridge pier working device according to any one of claims 1 to 3, wherein the vertical portion 32b of the workbench 32 has multiple floors 46, 48. (5) Utility model registration claims 1 to 4, characterized in that the rail 18 has a split structure.
Elevated bridge pier working device according to any of paragraphs.
JP1986117252U 1986-07-30 1986-07-30 Expired JPH0423927Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1986117252U JPH0423927Y2 (en) 1986-07-30 1986-07-30

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1986117252U JPH0423927Y2 (en) 1986-07-30 1986-07-30

Publications (2)

Publication Number Publication Date
JPS6323308U JPS6323308U (en) 1988-02-16
JPH0423927Y2 true JPH0423927Y2 (en) 1992-06-04

Family

ID=31002593

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1986117252U Expired JPH0423927Y2 (en) 1986-07-30 1986-07-30

Country Status (1)

Country Link
JP (1) JPH0423927Y2 (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57174517U (en) * 1981-04-28 1982-11-04

Also Published As

Publication number Publication date
JPS6323308U (en) 1988-02-16

Similar Documents

Publication Publication Date Title
US3550723A (en) Bridge scaffold
EP1111135A2 (en) Method of building viaducts
JP2000145129A (en) Staging provided with load lifter
JPH0423927Y2 (en)
JP3314180B2 (en) Work cage lifting device
CN212835507U (en) Concrete reinforcement cage ligature and conversion equipment
JPH09195227A (en) Built-up trestle for bridge pier reinforcing work and using method thereof
CN113175201A (en) A operation platform that rises that slides for elevartor shaft construction
JP3841242B2 (en) Elevator parking elevating work table and construction method using it
JP4011722B2 (en) Hanging stairs
JPH06193017A (en) Bridge laying device
JPH0667511U (en) Electric automatic special support lifting device
CN114104939B (en) Steel framework hoisting process, hoisting equipment and auxiliary device
JPH1088787A (en) Knocked-down gondola in elevatable parking device
JP7393814B2 (en) How to build a suspended scaffold
CN116181041B (en) Building machine of multilayer quick construction
CN215107202U (en) A operation platform that rises that slides for elevartor shaft construction
JPH026906B2 (en)
JPH09296610A (en) Outside curing unit
CN117468691A (en) Assembled self-lifting operation platform in elevator shaft and application method thereof
JPH028098B2 (en)
JPH0755777B2 (en) Elevator installation method and installation work floor equipment
JPS59170308A (en) Assembling of suspended scaffold
JP2002356813A (en) Movable scaffolding device and construction method thereof
JP3786385B2 (en) Elevating work table and assembly method of parking equipment using it