JPH04237706A - Slab level correcting device - Google Patents
Slab level correcting deviceInfo
- Publication number
- JPH04237706A JPH04237706A JP2046791A JP2046791A JPH04237706A JP H04237706 A JPH04237706 A JP H04237706A JP 2046791 A JP2046791 A JP 2046791A JP 2046791 A JP2046791 A JP 2046791A JP H04237706 A JPH04237706 A JP H04237706A
- Authority
- JP
- Japan
- Prior art keywords
- hole
- piston
- slab
- pipe
- pedestal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000011440 grout Substances 0.000 claims abstract description 28
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 21
- 230000000149 penetrating effect Effects 0.000 claims abstract 2
- 239000000945 filler Substances 0.000 claims description 13
- 238000012986 modification Methods 0.000 claims description 4
- 230000004048 modification Effects 0.000 claims description 4
- 239000004567 concrete Substances 0.000 abstract description 10
- 238000006243 chemical reaction Methods 0.000 abstract description 7
- 239000000463 material Substances 0.000 abstract description 7
- 230000000994 depressogenic effect Effects 0.000 abstract 1
- 230000035515 penetration Effects 0.000 abstract 1
- 229910000831 Steel Inorganic materials 0.000 description 8
- 239000010959 steel Substances 0.000 description 8
- 239000011178 precast concrete Substances 0.000 description 3
- 238000002347 injection Methods 0.000 description 2
- 239000007924 injection Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
Landscapes
- Road Repair (AREA)
Abstract
Description
【0001】0001
【産業上の利用分野】本発明は、プレキャストコンクリ
ート製の舗装版のような構造体のレベル修正手段に関す
る。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a means for leveling structures such as precast concrete paving slabs.
【0002】0002
【従来の技術】プレキャストコンクリート製の舗装版の
不同沈下を修正する方法として例えば図4に示すような
工法が知られている。2. Description of the Related Art As a method for correcting uneven settlement of precast concrete pavement slabs, a method as shown in FIG. 4, for example, is known.
【0003】これは、沈下した舗装版1にボーリング機
で穿孔して路盤2の中に反力用のコンクリート盤4を打
設し、支持手段である支持金具3を介して舗装版1に支
持された油圧ジャッキ5がコンクリート盤4を押圧する
ことにより、その反力で舗装版1を持ち上げ、舗装版1
と路盤2の間に生じた空隙に充填材を注入するものであ
る。[0003] This involves drilling holes in the submerged pavement slab 1 using a boring machine, placing a concrete slab 4 for reaction force in the roadbed 2, and supporting it on the pavement slab 1 via support fittings 3 as supporting means. When the hydraulic jack 5 presses the concrete plate 4, the reaction force lifts the paving slab 1, and the paving slab 1
The filling material is injected into the gap created between the roadbed 2 and the roadbed 2.
【0004】支持金具3はスチールパイプ6、スチール
パイプ6を舗装版1に支持するスチールプレート7、及
びスチールパイプ6の下端に螺合するフランジ状の部材
8からなる。スチールプレート7は扇形に分割して舗装
版1に穿孔した貫通孔1Aから路盤2の掘削部に挿入さ
れ、フランジ状の部材8によりロックピン8Aに係止し
た状態でスチールパイプ6の下端に締め付けられる。ス
チールプレート7と舗装版1の間には同様の扇形に形成
されたゴムパッド12が介装される。The support fitting 3 consists of a steel pipe 6, a steel plate 7 that supports the steel pipe 6 on the paving slab 1, and a flange-like member 8 that is screwed onto the lower end of the steel pipe 6. The steel plate 7 is divided into fan shapes and inserted into the excavated part of the roadbed 2 through a through hole 1A drilled in the pavement slab 1, and is fastened to the lower end of the steel pipe 6 while being locked to a lock pin 8A by a flange-like member 8. It will be done. A similar fan-shaped rubber pad 12 is interposed between the steel plate 7 and the paving slab 1.
【0005】油圧ジャッキ5はシリンダチューブ22の
内側に収装したピストン23をポート10に供給される
油圧で駆動するものである。シリンダチューブ22はス
チールパイプ6の内周に螺合することで舗装版1に支持
され、外部からポート10に供給される油圧でピストン
23がコンクリート盤4の上に載置した台座9を押圧す
ると、反力でシリンダチューブ22が支持金具3を介し
て舗装版1を押し上げる。そこで、ジャッキアップされ
た舗装版1と路盤2の間に生じる空隙に別に形成したグ
ラウト注入孔から充填材を注入し、舗装版1を上昇位置
に支持するようになっている。なお、ジャッキアップ量
は油圧ジャッキ5に取り付けたスロークセンサ11によ
り検出される。The hydraulic jack 5 drives a piston 23 housed inside a cylinder tube 22 using hydraulic pressure supplied to a port 10. The cylinder tube 22 is supported by the pavement slab 1 by being screwed into the inner circumference of the steel pipe 6, and when the piston 23 presses the base 9 placed on the concrete platen 4 with hydraulic pressure supplied from the outside to the port 10. , the cylinder tube 22 pushes up the paving slab 1 via the support fitting 3 due to the reaction force. Therefore, a filler is injected into the gap created between the jacked up pavement slab 1 and the roadbed 2 through separately formed grout injection holes to support the pavement slab 1 in the raised position. Note that the amount of jacking up is detected by a stroke sensor 11 attached to the hydraulic jack 5.
【0006】[0006]
【発明の課題】しかしながら、支持金具3は構成が複雑
なために貫通孔1Aの下方での組み立作業が容易でなく
、またジャッキアップ作業とグラウト注入作業を行う孔
部を別々に形成する必要があるなど、この工法は作業効
率が充分に高いとは言えなかった。However, since the support fitting 3 has a complicated structure, it is difficult to assemble it below the through hole 1A, and it is necessary to form separate holes for jacking up and grouting. This construction method could not be said to have a sufficiently high work efficiency.
【0007】本発明は、以上の問題点を解決すべくなさ
れたもので、構造が簡単で作業の容易なレベル調整装置
を提供することを目的とする。The present invention has been made to solve the above problems, and an object of the present invention is to provide a level adjustment device that has a simple structure and is easy to operate.
【0008】[0008]
【課題を達成するための手段】本発明は、床版に形成し
た貫通孔に挿入したシリンダチューブを床版に支持する
手段と、外部から供給される油圧に応じてシリンダチュ
ーブの内側を摺動するピストンと、このピストンに押圧
されるべく床版下方の基礎上に載置される台座と、床版
と基礎の間の空隙に充填材を注入するグラウトパイプと
を備えた床版レベルの修正装置において、前記支持手段
をあらかじめ貫通孔に装着したフランジパイプで構成す
るとともに、グラウトパイプをピストンに縦貫させ、台
座にグラウトパイプに連続して床版の下方に開口する孔
部を形成している。[Means for achieving the object] The present invention provides a means for supporting a cylinder tube inserted into a through hole formed in a floor slab on the floor slab, and a means for sliding the inside of the cylinder tube in response to hydraulic pressure supplied from the outside. Modification of the deck level with a piston to press the piston, a pedestal placed on the foundation below the deck to be pressed by the piston, and a grout pipe to inject filler into the gap between the deck and the foundation. In the device, the support means is constituted by a flange pipe installed in a through hole in advance, a grout pipe is passed through the piston vertically, and a hole is formed in the pedestal that is continuous with the grout pipe and opens below the floor slab. .
【0009】また、支持手段を貫通孔に嵌合する円弧状
の横断面と貫通孔の外側へ延伸するフランジ部とを各々
備えた複数の部材で構成するとともに、グラウトパイプ
をピストンに縦貫させ、台座にグラウトパイプに連続し
て床版の下方に開口する孔部を形成している。[0009] Furthermore, the supporting means is constituted by a plurality of members each having an arc-shaped cross section that fits into the through hole and a flange portion extending outside the through hole, and the grout pipe is made to extend vertically through the piston, A hole is formed in the pedestal that connects to the grout pipe and opens below the floor slab.
【0010】0010
【作用】あらかじめ貫通孔に装着したフランジパイプに
シリンダチューブを支持することにより、シリンダチュ
ーブの床版への支持が容易になるとともに、ピストンに
貫通させたグラウトパイプと台座の孔部を介して充填材
を注入することで充填材の注入をジャッキアップと同一
の貫通孔から行える。[Function] By supporting the cylinder tube on the flange pipe installed in the through hole in advance, the cylinder tube can be easily supported on the floor slab, and it can also be filled through the grout pipe passed through the piston and the hole in the pedestal. By injecting the filler material, it is possible to inject the filler material through the same through hole as the jack-up.
【0011】また、支持手段を貫通孔に嵌合する円弧状
の横断面と貫通孔の外側へ延伸するフランジ部とを各々
備えた複数の部材で構成することにより、既存の床版に
形成した貫通孔への支持手段の装着が容易になる。[0011] Furthermore, by constructing the support means from a plurality of members each having an arcuate cross section that fits into the through hole and a flange portion extending outside the through hole, it is possible to The support means can be easily attached to the through hole.
【0012】0012
【実施例】図1〜図3に本発明の実施例を示す。Embodiments FIGS. 1 to 3 show embodiments of the present invention.
【0013】図1において、舗装版1はプレキャストコ
ンクリート製で、要所にあらかじめ貫通孔1Aが形成さ
れ、両端にフランジ20A、20Bを備えた支持手段と
してのフランジパイプ20がこの貫通孔1Aの内周に装
着されている。また、フランジパイプ20の下方の路盤
2には反力用のコンクリート盤4が打設され、コンクリ
ート盤4の上にプレート21が固設されている。In FIG. 1, a pavement slab 1 is made of precast concrete, and has through holes 1A formed in advance at important points, and a flange pipe 20 as a support means having flanges 20A and 20B at both ends is inserted into the through hole 1A. It is attached around the circumference. Further, a concrete platen 4 for reaction force is placed on the roadbed 2 below the flange pipe 20, and a plate 21 is fixedly installed on the concrete platen 4.
【0014】油圧ジャッキ5はシリンダチューブ22の
内側に中空のピストン23を摺動自由に収装したもので
、シリンダチューブ22の上端に形成したフランジ部2
2Aがフランジパイプ20のフランジ20Aにボルトで
固定される。The hydraulic jack 5 has a hollow piston 23 slidably housed inside a cylinder tube 22, and a flange 2 formed at the upper end of the cylinder tube 22.
2A is fixed to the flange 20A of the flange pipe 20 with bolts.
【0015】ピストン23は油圧導入口24を介して供
給される油圧により下向きに摺動する。32はこのピス
トン23の摺動を案内するためにシリンダチューブ20
の上端に固設したガイドで、中空のピストン23の内周
に摺接する。The piston 23 slides downward by hydraulic pressure supplied through the hydraulic pressure inlet 24. 32 is a cylinder tube 20 for guiding the sliding movement of this piston 23.
A guide fixed to the upper end of the piston slides on the inner periphery of the hollow piston 23.
【0016】ピストン23とシリンダチューブ22の間
には油圧が解放された状態でピストン4を上昇位置に保
持するためのリターンスプリング26が介装される。A return spring 26 is interposed between the piston 23 and the cylinder tube 22 to hold the piston 4 in the raised position in a state where the hydraulic pressure is released.
【0017】ピストン23の下端にはフランジ形の押圧
部材23Aが固着する。また、ピストン23を貫通して
グラウトパイプ27が立設される。グラウトパイプ27
は下端部を押圧部材23Aの内周に螺合し、下方に向け
て開口する。A flange-shaped pressing member 23A is fixed to the lower end of the piston 23. Further, a grout pipe 27 is erected to penetrate the piston 23. grout pipe 27
has its lower end screwed into the inner periphery of the pressing member 23A and opens downward.
【0018】押圧部材23Aはプレート21上に載置さ
れた台座9を押圧する。台座9にはグラウトパイプ27
の下端開口部に相対して上向きに開口する孔部25が形
成される。この孔部25は台座9の内部で90゜に屈折
し、台座9の側面に開口する。31はグラウトパイプ2
7と孔部25の接合部を密閉すべく押圧部材23Aの内
周に取り付けたシール部材である。The pressing member 23A presses the base 9 placed on the plate 21. Grout pipe 27 on pedestal 9
A hole 25 is formed that opens upward facing the lower end opening. This hole 25 is bent at 90 degrees inside the pedestal 9 and opens at the side surface of the pedestal 9. 31 is grout pipe 2
This is a sealing member attached to the inner periphery of the pressing member 23A to seal the joint between the pressing member 7 and the hole 25.
【0019】台座9の側面の孔部25の開口部に相対し
てフランジパイプ20のフランジ20Bとの接合部には
孔部25から吐出された充填材を舗装版1の下方へ導く
ための切欠28が形成される。Opposed to the opening of the hole 25 on the side surface of the pedestal 9, the flange pipe 20 has a notch at the joint with the flange 20B for guiding the filler discharged from the hole 25 downward into the paving slab 1. 28 is formed.
【0020】グラウトパイプ27の上端部は舗装版1の
上方へ突出し、突出部にグラウト導入口29が設けられ
る。また、グラウトパイプ27の上部にはグラウトパイ
プ27と平行にセンシングロッド30が付設される。そ
して、このセンシングロッド30の変位位置を検出する
位置センサ33がシリンダチューブ22に取り付けられ
る。なお、グラウトパイプ27と台座9は充填材が付着
しにくい材料で被覆しておく。The upper end of the grout pipe 27 protrudes above the paving slab 1, and a grout inlet 29 is provided in the protrusion. Further, a sensing rod 30 is attached to the upper part of the grout pipe 27 in parallel with the grout pipe 27. A position sensor 33 that detects the displacement position of the sensing rod 30 is attached to the cylinder tube 22. Incidentally, the grout pipe 27 and the pedestal 9 are covered with a material to which the filler is difficult to adhere.
【0021】次に作用を説明する。常時においては、フ
ランジパイプ20は舗装版1の使用に支障ないように図
示されない蓋で覆われている。Next, the operation will be explained. Normally, the flange pipe 20 is covered with a lid (not shown) so as not to interfere with the use of the paving slab 1.
【0022】舗装版1の沈下を修正する時は修正箇所へ
と油圧ジャッキ5を運搬し、まず蓋を取り外して台座9
をフランジパイプ20の内側に挿入してプレート21の
上に置く。次に、油圧ジャッキ5のフランジ部22Aを
フランジパイプ20のフランジ20Aに重ね、図示され
ないボルトで締め付ける。When correcting the subsidence of the pavement slab 1, the hydraulic jack 5 is transported to the corrected area, the lid is first removed, and the pedestal 9 is
is inserted inside the flange pipe 20 and placed on the plate 21. Next, the flange portion 22A of the hydraulic jack 5 is overlapped with the flange 20A of the flange pipe 20, and tightened with bolts (not shown).
【0023】そして、油圧導入口24に油圧パワーユニ
ットを接続してシリンダチューブ22内に圧油を供給す
る。この油圧でピストン23は下向きに付勢され、押圧
部材23Aが台座9をコンクリート盤4上のプレート2
1に押し付ける。A hydraulic power unit is connected to the hydraulic pressure inlet 24 to supply pressure oil into the cylinder tube 22. The piston 23 is urged downward by this oil pressure, and the pressing member 23A pushes the pedestal 9 onto the plate 2 on the concrete platen 4.
Press it to 1.
【0024】この油圧の供給に対して下方への変位をコ
ンクリート盤4に阻止されたピストン23はそのままの
位置に止まり、逆にシリンダチューブ22が反力で上向
きに変位し、ボルトで結合したフランジパイプ20を介
して舗装版1を引き上げる。The piston 23, which is prevented from being displaced downward by the concrete plate 4 in response to the supply of hydraulic pressure, remains in the same position, while the cylinder tube 22 is displaced upward by the reaction force, and the flange connected with bolts The paving slab 1 is pulled up via the pipe 20.
【0025】舗装版1のジャッキアップ量は位置センサ
33により求められるので、この数値が目標とするレベ
ル修正量に一致するまでジャッキアップすれば良い。Since the amount of jacking up of the pavement slab 1 is determined by the position sensor 33, it is sufficient to jack it up until this value matches the target level correction amount.
【0026】次に、グラウト導入口29にグラウト注入
ユニットを接続し、グラウトパイプ27を通じて充填材
の注入を行う。注入された充填材は台座9の側面に開口
する孔部25から、フランジパイプ20の切欠28を通
って舗装版1と路盤2の間隙に充填される。Next, a grout injection unit is connected to the grout introduction port 29, and filler is injected through the grout pipe 27. The injected filler passes through the hole 25 opened on the side surface of the pedestal 9, passes through the notch 28 of the flange pipe 20, and is filled into the gap between the pavement slab 1 and the roadbed 2.
【0027】注入完了後、充填材が一定強度に達したら
、ボルトを外して油圧ジャッキ5と台座9を撤去し、フ
ランジパイプ20に再び蓋をすれば舗装版1のレベル修
正は完了する。油圧ジャッキ5はフランジパイプ20に
固定されるので設置や撤去が容易であり、また充填材の
注入をジャッキアップと同一の貫通孔1Aで行えるため
、レベル修正作業は短時間で終了する。After the filling is completed and the filler reaches a certain strength, the bolts are removed, the hydraulic jack 5 and the pedestal 9 are removed, and the flange pipe 20 is covered again to complete the level correction of the pavement slab 1. Since the hydraulic jack 5 is fixed to the flange pipe 20, it is easy to install and remove, and since the filling material can be injected through the same through hole 1A as used for jacking up, the level correction work can be completed in a short time.
【0028】図2と3は本発明の別の実施例で、ここで
は支持手段を支持部材34と35で構成し、貫通孔1A
に着脱自在に装着している。支持部材34と35は図3
の左側のセクションAに示されるように貫通孔1Aの外
側に延伸するフランジ部34A(35A)とフランジ部
34B(35B)の間に貫通孔1Aの内周に嵌合する円
弧状断面の中間部34C(35C)を形成したものであ
る。FIGS. 2 and 3 show another embodiment of the invention, in which the support means are comprised of support members 34 and 35, and the through hole 1A
It is removably attached to the. Support members 34 and 35 are shown in FIG.
As shown in section A on the left side of , there is a middle part with an arcuate cross section that fits into the inner periphery of the through hole 1A between the flange part 34A (35A) and the flange part 34B (35B) extending outside the through hole 1A. 34C (35C).
【0029】これらの支持部材34と35は、油圧ジャ
ッキ5を設置する直前に貫通孔1Aにそれぞれ挿入し、
その内側にシリンダチューブ22を挿入してフランジ2
2Aをフランジ部34A,35Aにボルト36で締め付
けることにより貫通孔1Aの壁面に係合してシリンダチ
ューブ22を舗装版1に支持する。These support members 34 and 35 are inserted into the through hole 1A immediately before installing the hydraulic jack 5, and
Insert the cylinder tube 22 inside the flange 2
By tightening the cylinder tube 2A to the flange portions 34A and 35A with bolts 36, the cylinder tube 22 is engaged with the wall surface of the through hole 1A, and the cylinder tube 22 is supported on the pavement slab 1.
【0030】この場合には、レベル修正の必要が生じた
時点で舗装版1に穿孔して貫通孔1Aを形成し、形成し
た貫通孔1Aからコンクリート盤4を打設した後に油圧
ジャッキ5を設置すれば良いので、既設の舗装にも適用
することができる。なお、フランジ部34B(35B)
は図3の右側のセクションBに示すように外径を徐々に
拡大する円錐形としても良い。In this case, when it becomes necessary to correct the level, the pavement slab 1 is drilled to form a through hole 1A, and the hydraulic jack 5 is installed after pouring the concrete plate 4 through the formed through hole 1A. It can also be applied to existing pavements. In addition, the flange portion 34B (35B)
may have a conical shape whose outer diameter gradually increases as shown in section B on the right side of FIG.
【0031】[0031]
【発明の効果】以上のように本発明は、シリンダチュー
ブを床版に支持する手段を貫通孔に装着したフランジパ
イプで構成するとともに、ピストンを縦貫するグラウト
パイプを用いて充填材を注入するようにしたので、レベ
ル修正の必要が生じた時には油圧ジャッキをフランジパ
イプに固定して床版をジャッキアップし、床版と基礎の
間にグラウトパイプから充填材を注入することで床版の
レベルを容易にかつ短時間で修正することができる。Effects of the Invention As described above, in the present invention, the means for supporting the cylinder tube on the floor slab is composed of a flange pipe installed in a through hole, and the filler is injected using a grout pipe that extends vertically through the piston. Therefore, when the level needs to be adjusted, a hydraulic jack is fixed to the flange pipe to jack up the slab, and filler is injected from the grout pipe between the slab and the foundation to adjust the level of the slab. It can be easily and quickly corrected.
【0032】また、支持手段としてフランジ部を備えた
円弧状断面の複数の部材を使用することにより、既設の
床版へも容易に適用することができる。Furthermore, by using a plurality of members having arcuate cross sections each having a flange portion as the support means, it can be easily applied to an existing floor slab.
【図1】本発明の実施例を示すレベル修正装置の縦断面
図である。FIG. 1 is a longitudinal sectional view of a level correction device showing an embodiment of the present invention.
【図2】別の実施例を示す支持部材の平面図である。FIG. 2 is a plan view of a support member showing another embodiment.
【図3】別の実施例を示すレベル修正装置の縦断面図で
ある。FIG. 3 is a longitudinal sectional view of a level correction device showing another embodiment.
【図4】従来例を示すレベル修正装置の縦断面図である
。FIG. 4 is a vertical cross-sectional view of a level correction device showing a conventional example.
1 舗装版 1A 貫通孔 2 路盤 4 コンクリート盤 5 油圧ジャッキ 9 台座 20 フランジパイプ 20A フランジ 20B フランジ 22 シリンダチューブ 23 ピストン 25 孔部 27 グラウトパイプ 34 支持部材 35 支持部材 34A フランジ部 34B フランジ部 35A フランジ部 35B フランジ部 1 Pavement version 1A Through hole 2 Roadbed 4 Concrete board 5 Hydraulic jack 9 Pedestal 20 Flange pipe 20A Flange 20B Flange 22 Cylinder tube 23 Piston 25 Hole 27 Grout pipe 34 Supporting member 35 Supporting member 34A Flange part 34B Flange part 35A Flange part 35B Flange part
Claims (2)
ンダチューブを床版に支持する手段と、外部から供給さ
れる油圧に応じてシリンダチューブの内側を摺動するピ
ストンと、このピストンに押圧されるべく床版下方の基
礎上に載置される台座と、床版と基礎の間の空隙に充填
材を注入するグラウトパイプとを備えた床版レベルの修
正装置において、前記支持手段をあらかじめ貫通孔に装
着したフランジパイプで構成するとともに、グラウトパ
イプをピストンに縦貫させ、台座にグラウトパイプに連
続して床版の下方に開口する孔部を形成したことを特徴
とする床版レベルの修正装置。Claim 1: A means for supporting a cylinder tube inserted into a through hole formed in a floor slab on the floor slab, a piston that slides inside the cylinder tube in response to hydraulic pressure supplied from the outside, and a means for pressing the piston. In a deck level modification device comprising a pedestal that is preferably placed on the foundation below the deck and a grouting pipe for injecting a filler into the gap between the deck and the foundation, the support means are Modification of the floor slab level characterized by consisting of a flange pipe attached to a through hole, a grout pipe passing through the piston vertically, and a hole continuous to the grout pipe and opening below the floor slab formed in the pedestal. Device.
ンダチューブを床版に支持する手段と、外部から供給さ
れる油圧に応じてシリンダチューブの内側を摺動するピ
ストンと、このピストンに押圧されるべく床版下方の基
礎上に載置される台座と、床版と基礎の間の空隙に充填
材を注入するグラウトパイプとを備えた床版レベルの修
正装置において、前記支持手段を貫通孔に嵌合する円弧
状の横断面と貫通孔の外側へ延伸するフランジ部とを各
々備えた複数の部材で構成するとともに、グラウトパイ
プをピストンに縦貫させ、台座にグラウトパイプに連続
して床版の下方に開口する孔部を形成したことを特徴と
する床版レベルの修正装置。2. Means for supporting a cylinder tube inserted into a through hole formed in a floor slab on the floor slab, a piston that slides inside the cylinder tube in response to hydraulic pressure supplied from the outside, and a means for pressing the piston. A deck level modification device comprising a pedestal, preferably placed on the foundation below the deck, and a grouting pipe for injecting filler into the gap between the deck and the foundation, penetrating said support means. It is composed of a plurality of members each having an arc-shaped cross section that fits into the hole and a flange extending outside the through hole, and a grout pipe is passed vertically through the piston, and a floor is connected to the pedestal and connected to the grout pipe. A floor slab level correction device characterized by forming a hole opening at the bottom of the slab.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2046791A JP2908888B2 (en) | 1991-01-21 | 1991-01-21 | Floor slab level correction device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2046791A JP2908888B2 (en) | 1991-01-21 | 1991-01-21 | Floor slab level correction device |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH04237706A true JPH04237706A (en) | 1992-08-26 |
JP2908888B2 JP2908888B2 (en) | 1999-06-21 |
Family
ID=12027901
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2046791A Expired - Lifetime JP2908888B2 (en) | 1991-01-21 | 1991-01-21 | Floor slab level correction device |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2908888B2 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007327288A (en) * | 2006-06-09 | 2007-12-20 | Ps Mitsubishi Construction Co Ltd | Concrete slab height adjusting device and height adjusting method |
CN117266023A (en) * | 2023-11-21 | 2023-12-22 | 北京城建信捷轨道交通工程咨询有限公司 | Paving structure and paving method of rail steel bridge deck |
-
1991
- 1991-01-21 JP JP2046791A patent/JP2908888B2/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007327288A (en) * | 2006-06-09 | 2007-12-20 | Ps Mitsubishi Construction Co Ltd | Concrete slab height adjusting device and height adjusting method |
CN117266023A (en) * | 2023-11-21 | 2023-12-22 | 北京城建信捷轨道交通工程咨询有限公司 | Paving structure and paving method of rail steel bridge deck |
CN117266023B (en) * | 2023-11-21 | 2024-02-06 | 北京城建信捷轨道交通工程咨询有限公司 | Paving structure and paving method of rail steel bridge deck |
Also Published As
Publication number | Publication date |
---|---|
JP2908888B2 (en) | 1999-06-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6503024B2 (en) | Concrete foundation pierhead and method of lifting a foundation using a jack assembly | |
US7108458B1 (en) | Interlocking slab leveling system | |
EP0648296B1 (en) | Prestressed caisson bearing pier and structural foundation device | |
AU696435B2 (en) | Method and apparatus for consolidating earth and anchor setting device | |
US8221034B2 (en) | Methods of providing a support column | |
US7909541B1 (en) | Apparatus and method for improved grout containment in post-grouting applications | |
US6659692B1 (en) | Apparatus and method for supporting a structure with a pier and helix | |
US6872031B2 (en) | Apparatus and method of supporting a structure with a pier | |
KR20160089215A (en) | Non-abutment bridge structure using precast concrete retaining wall and pile, and method for constructing this same | |
US4906140A (en) | Method and apparatus for raising and supporting a foundation | |
US7044686B2 (en) | Apparatus and method for supporting a structure with a pier | |
US4787779A (en) | Method and apparatus for raising and supporting a foundation | |
US4092832A (en) | Method of correcting the height level of a foundation | |
US4338047A (en) | System for pier underpinning of settling foundation | |
JPH04237706A (en) | Slab level correcting device | |
KR101919608B1 (en) | Ground reinforcement method using jacked pile and grouting | |
EA000773B1 (en) | Method for founding of a building or plant construction and apparatus for the use of the method | |
GB2541043A (en) | Formers | |
JP2991831B2 (en) | Structure level correction device | |
EP1792019B1 (en) | Method of raising a building structure, in particular a building structure subject to flooding | |
US3920182A (en) | Heavy duty rail track assemblies | |
JPH08277536A (en) | Constructing method for concrete manufacture, concrete manufacture, and insert to be buried therein | |
JP4122924B2 (en) | Seismic isolation method for existing structures | |
US11866902B2 (en) | Underpinning pile assembly for supporting structure upon the earth | |
KR102113117B1 (en) | Structure construction method using guide wall |