JPH042271Y2 - - Google Patents

Info

Publication number
JPH042271Y2
JPH042271Y2 JP1984098768U JP9876884U JPH042271Y2 JP H042271 Y2 JPH042271 Y2 JP H042271Y2 JP 1984098768 U JP1984098768 U JP 1984098768U JP 9876884 U JP9876884 U JP 9876884U JP H042271 Y2 JPH042271 Y2 JP H042271Y2
Authority
JP
Japan
Prior art keywords
screw rod
support
formwork
horizontal
horizontal pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP1984098768U
Other languages
Japanese (ja)
Other versions
JPS6113756U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP1984098768U priority Critical patent/JPS6113756U/en
Publication of JPS6113756U publication Critical patent/JPS6113756U/en
Application granted granted Critical
Publication of JPH042271Y2 publication Critical patent/JPH042271Y2/ja
Granted legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

【考案の詳細な説明】 産業上の利用分野 本考案は地中管路築造時に使用する型枠支保工
の改良に関するものである。
[Detailed description of the invention] Industrial application field The present invention relates to an improvement of formwork support used when constructing underground pipelines.

先行技術と問題点 地中管路を築造する場合、通常、第3図A並び
に第3図B(第3図Aにおけるb−b断面図)に
示すように、溝1′を掘削し、溝内両脇に沿い土
留のための矢板21′,22′を打込み、溝内にパ
イプスペーサ3′,……を介してパイプ(例えば、
石綿セメントパイプ)4′,……を布設し、この
布設パイプ群の片側に型枠パネル5′を組立て
(61′,62′は縦スペーサ材、71′,72′は
ベニヤ板)、この型枠パネル5′を型枠支保工材
8′,80′によつて矢板21′に支持し、而るの
ち、型枠パネル5′の内側にコンクリートを打込
んでいる。
Prior Art and Problems When constructing an underground pipeline, normally, as shown in Figures 3A and 3B (bb-b sectional view in Figure 3A), a trench 1' is excavated and a trench is opened. Drive sheet piles 21' and 22' for earth retention along both sides of the groove, and install pipes (for example,
Asbestos cement pipes) 4', ... are laid, and a formwork panel 5' is assembled on one side of this laid pipe group (61' and 62' are vertical spacer materials, 71' and 72' are plywood boards), and this formwork The panel 5' is supported on the sheet pile 21' by formwork supports 8' and 80', and then concrete is poured into the inside of the formwork panel 5'.

従来、上記の型枠支保工材には、木製角材を使
用しているが、第3図Aの8′または第3図Aの
80′で示すように矢板21′の波の位置関係に応
じて保支すべき間隔が異つてくるので、二種類の
支保工材を用意し、これを使い分けしており、頗
るやつかいである。
Conventionally, wooden square timbers have been used for the above-mentioned formwork support materials, but depending on the positional relationship of the waves of the sheet piles 21', as shown at 8' in Figure 3A or 80' in Figure 3A, Since the spacing between the two types of shoring is different, we prepare two types of shoring materials and use them accordingly, and we are very good at it.

考案の目的 本考案の目的はかゝる不利を解消し得る型枠支
保工を提供することにある。
Purpose of the invention The purpose of the invention is to provide a formwork support that can eliminate such disadvantages.

考案の構成 本考案に係る型枠支保工は、中空角柱の一側面
の上下部のそれぞれに水平管を突設し、各水平管
には螺子棒螺挿用金具を介して螺子棒を螺挿し、
各螺子棒の先端にはパツドを回転自在に取付けて
なり、前記中空角柱の上端にはフツクを設けると
共に下端には水抜き孔を設け、前記水平管にはグ
リス注入孔を設けたことを特徴とするものであ
る。
Structure of the invention The formwork support according to the invention has horizontal pipes protruding from the upper and lower parts of one side of a hollow square column, and a screw rod is screwed into each horizontal pipe through a screw rod insertion fitting. ,
A pad is rotatably attached to the tip of each screw rod, a hook is provided at the upper end of the hollow prism, a drain hole is provided at the lower end, and a grease injection hole is provided in the horizontal pipe. That is.

実施例の説明 以下、図面により本考案を説明する。Description of examples The present invention will be explained below with reference to the drawings.

第1図において、1は断面四角形の中空角柱で
あり、上端には手持用フツク11を取付け、下端
には水抜き穴12を設けてある。2aは中空角柱
1の一側面の上部に溶接により突設した水平鋼
管、2bは同一側面の下部に溶接により突設した
水平鋼管であり、各水平管にはグリス注入孔21
を設け、各水平管の先端には、螺子棒螺挿用金具
3を溶接してある。31は螺挿孔、32は螺子溝
である。4,4は螺子棒であり、鋼管外面に螺子
溝を切削したものを使用できる。5はパツド(例
えば、鋼製)であり、螺子棒4の先端に回転自在
に取付けてある。41は螺子棒4に設けたハンド
ル貫通孔である。
In FIG. 1, numeral 1 is a hollow prism with a rectangular cross section, and a handheld hook 11 is attached to the upper end, and a drain hole 12 is provided at the lower end. 2a is a horizontal steel pipe protruding from the upper part of one side of the hollow prism 1 by welding, 2b is a horizontal steel pipe protruding from the lower part of the same side by welding, and each horizontal pipe has a grease injection hole 21.
A metal fitting 3 for inserting a screw rod is welded to the tip of each horizontal pipe. 31 is a screw insertion hole, and 32 is a screw groove. Reference numerals 4 and 4 indicate screw rods, which can be made by cutting a screw groove on the outer surface of a steel pipe. Reference numeral 5 denotes a pad (for example, made of steel), which is rotatably attached to the tip of the screw rod 4. 41 is a handle through hole provided in the screw rod 4.

第2図A並びに第2図Bはそれぞれ本考案支保
工の使用状態を示しており、第2図Aは型枠パネ
ルPの継目の支保状態を示し、第2図Bは、型枠
パネル中間の支保状態を示している。aは矢板で
ある。
Fig. 2A and Fig. 2B respectively show the usage state of the shoring of the present invention, Fig. 2A shows the support state of the joint of the formwork panel P, and Fig. 2B shows the state of support of the joint of the formwork panel P. It shows the support status of a is a sheet pile.

何れの場合も、螺子棒4のハンドル貫通孔41
にハンドルを貫通し、このハンドルにより螺子棒
を回転させることによつて支保間隔を任意に設定
できる。螺子棒4の回転時、グリス注入孔21か
らグリスを注入すれば、その回転を極めて円滑に
行い得る。また、使用中に地下水が侵入しても、
水抜き穴(第1図の12)から水を抜いたうえで
保管することができ、錆化を防止できる。
In either case, the handle through hole 41 of the screw rod 4
The support spacing can be arbitrarily set by rotating the threaded rod through the handle. When the screw rod 4 rotates, if grease is injected from the grease injection hole 21, the rotation can be performed extremely smoothly. Also, even if groundwater intrudes during use,
It can be stored after draining water from the drain hole (12 in Figure 1), and rusting can be prevented.

考案の効果 上述した通り、本考案に係る型枠支保工は、中
空角柱の一側面上下部に水平管を突設して、この
水平管に螺子棒を螺挿する構成としたから、螺子
棒を進退させることにより支保間隔を任意に設定
できる。しかも、螺子棒先端に設けるパツドは螺
子棒に対し回転自在に取付けてあるから、螺子棒
回転の影響を受けることがない。従つて、本考案
の型枠支保工によれば、矢板の位置に応じてその
支保間隔を自由に調整することができるため、一
種類の支保工で充分対応でき、その支保間隔調節
作業も頗るスムースになし得る。
Effects of the invention As mentioned above, the formwork shoring according to the invention has a structure in which a horizontal pipe is provided protruding from the top and bottom of one side of the hollow prism, and a screw rod is screwed into this horizontal pipe. The support spacing can be set arbitrarily by advancing and retracting the support. Moreover, since the pad provided at the tip of the screw rod is rotatably attached to the screw rod, it is not affected by the rotation of the screw rod. Therefore, according to the formwork shoring of the present invention, the support spacing can be freely adjusted according to the position of the sheet piles, so one type of shoring is sufficient, and the work of adjusting the support spacing is also easy. It can be done smoothly.

また、本考案における水平管を、第1図に図示
したように中空角柱内に入り込むように設ければ
水平管の突出長さをそれだけ小さくでき、よりコ
ンパクトに構成できるという利点もある。
Furthermore, if the horizontal tube of the present invention is provided so as to fit inside the hollow prism as shown in FIG. 1, the protruding length of the horizontal tube can be reduced accordingly, which has the advantage of making the structure more compact.

殊に、本考案の型枠支保工においては、水平管
にグリス注入孔を設けているから、この注入孔よ
りグリスを注入しておけば、使用時における螺子
棒の円滑回転はもとより保管時の錆化防止に有効
である。
In particular, in the formwork support of the present invention, a grease injection hole is provided in the horizontal pipe, so if grease is injected through this injection hole, the threaded rod will not only rotate smoothly during use but also during storage. Effective in preventing rust.

更には、中空角柱の下端には水抜き孔を設けた
から、使用中に水侵入があつても使用後に中空角
柱の上端に設けたフツクを引つ掛け支持させてお
けば完全に水抜きでき(この場合、水平管に設け
たグリス注入孔が水抜きの補助をするから、型枠
支保工を振り回して水抜きする必要はない)、錆
化を充分防止することができ保管上有利である。
従つて、本考案の型枠支保工は長期間の使用・保
管によく耐え経済的でもある。
Furthermore, since a drainage hole is provided at the bottom end of the hollow prismatic column, even if water gets in during use, the water can be completely drained by hooking the hook provided at the top end of the hollow prismatic column to support it after use. In this case, since the grease injection hole provided in the horizontal pipe assists in draining water, there is no need to swing the form support to drain water), and rusting can be sufficiently prevented, which is advantageous in terms of storage.
Therefore, the formwork support of the present invention can withstand long-term use and storage, and is also economical.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本考案に係る型枠支保工を示す説明
図、第2図A並びに第2図Bはそれぞれ本考案支
保工の使用状態を示す説明図、第3図Aは公知の
地中管路築造方法を示す説明図、第3図Bは第3
図Aにおけるb−b断面説明図である。 図において、1は中空角柱、2a,2bは水平
管、4,4は螺子棒、5,5はパツドである。
Figure 1 is an explanatory diagram showing the formwork support according to the present invention, Figures 2A and 2B are explanatory diagrams showing the usage state of the present invention support, and Figure 3A is a known underground pipe. An explanatory diagram showing the road construction method, Figure 3B is the third
It is a bb cross-sectional explanatory diagram in FIG. A. In the figure, 1 is a hollow prism, 2a and 2b are horizontal pipes, 4 and 4 are screw rods, and 5 and 5 are pads.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 中空角柱の一側面の上下部のそれぞれに水平管
を突設し、各水平管には螺子棒螺挿用金具を介し
て螺子棒を螺挿し、各螺子棒の先端にはパツドを
回転自在に取付けてなり、前記中空角柱の上端に
はフツクを設けると共に下端には水抜き孔を設
け、前記水平管にはグリス注入孔を設けたことを
特徴とする型枠支保工。
Horizontal pipes are provided protruding from the upper and lower parts of one side of the hollow prism, and a screw rod is screwed into each horizontal pipe via a screw rod insertion fitting, and a pad is rotatably attached to the tip of each screw rod. 1. A formwork support, characterized in that a hook is provided at the upper end of the hollow prism, a drain hole is provided at the lower end, and a grease injection hole is provided in the horizontal pipe.
JP1984098768U 1984-06-29 1984-06-29 Formwork shoring Granted JPS6113756U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1984098768U JPS6113756U (en) 1984-06-29 1984-06-29 Formwork shoring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1984098768U JPS6113756U (en) 1984-06-29 1984-06-29 Formwork shoring

Publications (2)

Publication Number Publication Date
JPS6113756U JPS6113756U (en) 1986-01-27
JPH042271Y2 true JPH042271Y2 (en) 1992-01-27

Family

ID=30658291

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1984098768U Granted JPS6113756U (en) 1984-06-29 1984-06-29 Formwork shoring

Country Status (1)

Country Link
JP (1) JPS6113756U (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63140189U (en) * 1987-03-06 1988-09-14

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5217246Y2 (en) * 1972-10-21 1977-04-19

Also Published As

Publication number Publication date
JPS6113756U (en) 1986-01-27

Similar Documents

Publication Publication Date Title
US5836115A (en) Foundation waterproofing and drainage system
CN106759439B (en) Tower crane foundation for foundation pit and construction method thereof
JPH042271Y2 (en)
CN206308810U (en) Connect wall locking notch pipe water sealing structure
JPH01198920A (en) Reinforcing method for underground earth guarding wall by earth anchor
CN218060417U (en) Concrete pouring and tamping structure for vertical structure of underground structure constructed by reverse construction method
JPS59192145A (en) Fixing of iron pillar
CN216515750U (en) Combined device for accurately fixing water stop of box culvert by adopting U-shaped clamp
CN113684837B (en) Pile wall type foundation pit supporting and water stopping integrated structure and construction method thereof
JPS61254716A (en) Setting of in-place concrete pile
CN216515734U (en) Box culvert structure for underneath passing existing railway engineering
JP2001164559A (en) Construction method of continuous underground wall guide wall making use of l-type precast member
CN210218911U (en) Integral base of rain sewage pipe prefabrication assembly
JPH0421382Y2 (en)
JPH0467533B2 (en)
JPS6043495B2 (en) How to build a retaining wall
JPS5841227Y2 (en) Element for mountain retainer
CN113404088A (en) Concrete pouring and tamping method for underground structure vertical structure constructed by reverse construction method
CN207362850U (en) The job platform being vertically unearthed for large-span deep foundation pit
JPH0442355Y2 (en)
JPS6124625Y2 (en)
JP2584324Y2 (en) Permeation storage tank
JPH0444674Y2 (en)
JPS6040694Y2 (en) Gutters on soft ground
JPS607398Y2 (en) Anchor device for underground wall construction