JPH04141730A - Software development progress management device - Google Patents

Software development progress management device

Info

Publication number
JPH04141730A
JPH04141730A JP2265732A JP26573290A JPH04141730A JP H04141730 A JPH04141730 A JP H04141730A JP 2265732 A JP2265732 A JP 2265732A JP 26573290 A JP26573290 A JP 26573290A JP H04141730 A JPH04141730 A JP H04141730A
Authority
JP
Japan
Prior art keywords
work
load value
progress
storage area
progress management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2265732A
Other languages
Japanese (ja)
Inventor
Yukio Saito
斎藤 幸男
Sanae Ninomiya
早苗 二宮
Suekichi Chiho
千保 末吉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Corp
Original Assignee
NEC Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Corp filed Critical NEC Corp
Priority to JP2265732A priority Critical patent/JPH04141730A/en
Publication of JPH04141730A publication Critical patent/JPH04141730A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Stored Programmes (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PURPOSE:To execute appropriate progress management and to take appropriate measures by comparing progress results to schedule in objective figures in the course of a work period in each operation of the analysis, design, manufacturing and testing of the software development. CONSTITUTION:The device consists of an external storage device 1-1, a display device 1-2, a data input device 1-3, an operation processing device 1-4 and a progress management storage device 1-5. Each operation of the software development is divided into work items, the working processes of the work items are divided into several stages of sub-work items, the sub-work items are assigned load values, the results of completed work are inputted and recorded in the working processes of each work item, the progress rate of the results by means of the load values is calculated and it is compared with the scheduled progress rate so as to execute the management. Thus, the appropriate progress management can be executed.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、ソフトウェア開発の各開発工程において、グ
ループ別および個人別の詳細な作業項目の実行計画に対
する進捗状況管理装置に関する。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a progress management device for detailed execution plans of work items by group and by individual in each development process of software development.

〔従来の技術〕[Conventional technology]

従来この種の進捗管理装置は、グループ別および個人別
の作業項目について、進捗状況を把握するために、単に
作業項目が完了したか否かを確認し、全体の作業項目数
に対し完成した項目数の割合で進捗率を算出するのが一
般的であり、一部のシステムでは作業項目をさらに作業
工程に分解して工程ごとに進捗率を算出していた。
Conventionally, this type of progress management device simply checks whether or not a work item has been completed in order to grasp the progress status of work items for each group and individual, and calculates the number of completed items relative to the total number of work items. It is common to calculate the progress rate based on a numerical ratio, and in some systems, work items are further broken down into work steps and the progress rate is calculated for each step.

〔発明が解決しようとする課題〕[Problem to be solved by the invention]

上述した従来の一般的な進捗管理装置は、個々の作業項
目の作業過程を表現することが出来す、そのため作業進
捗状況を週間レベルで報告しようとすると、「実績とし
て計数するものがない」という時も多々にしである。単
にどのような作業項目が完了したかという報告にとどま
り、適確な進捗を管理できない。
The conventional general progress management device mentioned above can express the work process of each individual work item, so when trying to report the work progress on a weekly level, it may be said that there is "nothing to count as actual results". There are many times. It simply reports what work items have been completed and cannot accurately manage progress.

また各作業項目がそれぞれどの作業工程の状態にあるか
が分り難く、問題のある作業項目があっても発見しにく
かった。
Furthermore, it was difficult to tell which work process each work item was in, and even if there was a problem with the work item, it was difficult to discover.

また、作業項目の工程を考慮に入れたシステムにしても
、工程ごとの負荷率の定義に曖昧なものが多く、担当者
により進捗の負荷率のかけ方もまちまちで、従って作業
期間の途中での適確な進捗の状況を把握できず、大まか
な表現での管理に止り、遅れの実態は、当該作業の期限
近くまではつきりしないという欠点がある6 〔課題を解決するための手段〕 本発明は、ソフトウェア開発進捗管理装置において、予
じめ具備した記憶装置に前記ソフトウェアの開発工程別
に付けられた開発工程名毎に共通負荷値を記憶する作業
工程負荷値記憶域と、前記ソフトウェアの作業項目名毎
に前記開発工程別の“′完了”か“不完了パかの進捗状
況を記憶する作業項目記憶域と、前記作業項目全てにつ
いて前記全開発工程の前記共通負荷値を合計した値であ
る総負荷値と前記作業項目全てについて前記“′完了”
状態の前記開発工程の前記共通負荷値を合計した値であ
る実績総負荷値と前記総負荷値に対する前記実績総負荷
値の割合を示す実績進捗率とを記憶する作業用データ記
憶域と、予じめ決めた進捗管理日付と前記日付における
目標進捗率と前記実績進捗率とを記憶する作業進捗管理
データ記憶域とを備え、予じめ具備したデータ入力装置
からの初期データセット指示を受けて前記作業工程負荷
値記憶域に前記開発工程名と前記開発工程名に対応する
前記共通負荷値をセットし前記作業項目記憶域に前記作
業項目名をセットし、前記データ入力装置からの進捗デ
ータ入力指示を受けて前記作業項目記憶域における指示
された前記作業項目名の前記開発工程の前記進捗状況を
前記゛完了パ状態にする進捗管理データ操作部と、前記
データ入力装置からの初期データセット指示を受けて前
記作業進捗管理データ記憶域に前記進捗管理日付と前記
日付における目標進捗率とをセットし、上位ソフトから
の指示により前記作業進捗管理データ記憶域に指示され
た前記日付に対応して前記実績進捗率をセットする進捗
管理表操作部と、上位ソフトからの指示により前記作業
項目記憶域の前記作業項目全てについて前記総負荷値と
前記実績総負荷値と前記実績進捗率とを算出し前記作業
用データ記憶域にセットする進捗率演算部とを有するこ
とを特徴とする。
Furthermore, even in systems that take into account the process of work items, the definition of the load factor for each process is often ambiguous, and the way in which the progress load factor is applied varies depending on the person in charge. The disadvantage is that it is not possible to accurately grasp the progress status of the work, the management is limited to rough expressions, and the actual state of the delay is not known until the work is close to the deadline.6 [Means to solve the problem] The present invention provides a software development progress management device including a work process load value storage area for storing a common load value for each development process name assigned to each development process of the software in a storage device provided in advance; A work item storage area that stores the progress status of "completed" or "uncompleted" for each development process for each work item name, and a value that is the sum of the common load values of all the development processes for all of the work items. The total load value is ``'Complete'' for all of the work items.
a working data storage area for storing an actual total load value which is a sum of the common load values of the development process of the state and an actual progress rate indicating a ratio of the actual total load value to the total load value; It is equipped with a work progress management data storage area for storing a predetermined progress management date, the target progress rate and the actual progress rate for the said date, and receives an initial data set instruction from a data input device provided in advance. Setting the development process name and the common load value corresponding to the development process name in the work process load value storage area, setting the work item name in the work item storage area, and inputting progress data from the data input device. a progress management data operation unit that receives an instruction and changes the progress status of the development process of the specified work item name in the work item storage area to the ``completed''state; and an initial data set instruction from the data input device. and sets the progress management date and the target progress rate for the date in the work progress management data storage area, and sets the progress management date and the target progress rate on the date in the work progress management data storage area, and sets the progress management date and the target progress rate on the date in the work progress management data storage area in response to the date specified in the work progress management data storage area based on the instruction from the host software. A progress management table operation unit that sets the actual progress rate, and calculates the total load value, the actual total load value, and the actual progress rate for all of the work items in the work item storage area based on instructions from the host software. The present invention is characterized by comprising a progress rate calculation unit that sets the work data storage area.

〔実施例〕〔Example〕

次に本発明の詳細な説明する。 Next, the present invention will be explained in detail.

本発明はソフトウェアの各開発工程を作業項目に分割し
、作業項目の作業工程を数段階の項目内作業工程に分割
し、項目内作業工程に負荷値を割り当て、各作業項目の
作業工程別に作業完了の実績を入力し記録して、負荷値
による実績進捗率を算出し、計画進捗率と対比して管理
をする。
The present invention divides each software development process into work items, divides the work process of the work item into several steps of intra-item work processes, assigns a load value to the intra-item work processes, and performs the work according to the work process of each work item. Input and record the completion results, calculate the actual progress rate based on the load value, and manage it by comparing it with the planned progress rate.

次に、本発明について図面を参照して説明する。Next, the present invention will be explained with reference to the drawings.

第1図は本発明の一実施例のブロック構成図である。FIG. 1 is a block diagram of an embodiment of the present invention.

第1図において、1−1は外部記憶装置であり、フロッ
ピィディスクや磁気ディスク等の装置である。進捗管理
したデータ等の内容を保存するため出力する装置であり
、かつ進捗管理表更新時に保存したデータ等の内容を入
力する装置である。
In FIG. 1, 1-1 is an external storage device, such as a floppy disk or a magnetic disk. This is a device that outputs the contents of progress-managed data to save them, and a device that inputs the contents of data and the like saved when updating the progress management table.

1−2は表示装置であり、本発明の動作状況や、負荷値
や、各項目の進捗状況や、進捗率等の表示を行う装置で
ある。
1-2 is a display device that displays the operating status of the present invention, load values, progress status of each item, progress rate, etc.

1−3はデータ入力装置であり、KB(キーボード)装
置等がこれにあたる。作業工程の負荷値や作業項目別の
工程別の進捗状況等の入力に使用する装置である。
1-3 is a data input device, such as a KB (keyboard) device. This is a device used to input work process load values and progress status for each work item and process.

1−4は演算処理装置であり、本発明装置全体の制御や
進捗管理データのセット、加工や進捗率算出等の処理を
行う装置である。
Reference numeral 1-4 denotes an arithmetic processing unit, which performs processing such as controlling the entire apparatus of the present invention, setting progress management data, processing, and calculating progress rate.

1−5は進捗管理記憶装置であり、進捗管理に関する作
業計画データ、作業項目データ、作業工程データ及び算
出した結果である進捗率等のデル夕を記憶する装置であ
る。
Reference numeral 1-5 denotes a progress management storage device, which stores work plan data, work item data, work process data, and data such as progress rate as a calculated result regarding progress management.

第2図は本実施例の動作説明図であり、第2図に基づい
て、プログラム製造・単体テスト工程を例に本発明装置
の演算処理装置1−4および進捗管理記憶装置1−5の
動作説明をする。
FIG. 2 is an explanatory diagram of the operation of this embodiment. Based on FIG. 2, the operation of the arithmetic processing unit 1-4 and progress management storage device 1-5 of the apparatus of the present invention is explained using the program manufacturing/unit testing process as an example. do.

2−1は作業工程負荷表部であり作業工程の工程番号(
例えば1,2.・・・5)と、工程名称と負荷値等を記
憶するところである。
2-1 is the work process load table and the process number of the work process (
For example 1, 2. ...5), the process name, load value, etc. are stored.

2−3は工程名称であり、各作業工程内容を明確に表わ
す任意の名称を使用する。
2-3 is a process name, and any name that clearly represents the content of each work process is used.

2−4は共通負荷値であり、第1工程ないし第5工程の
各作業工程の負荷値であり、Ld、がらLd5はそれぞ
れ第1工程の共通負荷値から第5工程の共通負荷値であ
る。
2-4 is a common load value, which is the load value of each work process from the first process to the fifth process, and Ld and Ld5 are the common load values from the common load value of the first process to the common load value of the fifth process, respectively. .

2−5は作業項目表部であり、作業項目性て構成してい
る。
2-5 is a work item table section, which is composed of work items.

2−6−1ないし2−6−nは作業項目性であり、ソフ
トウェアの各開発工程を作業項目に分割し、管理対象の
作業項目について1作業項目を1作業項目行に割り当て
たものであり、出側ではプログラム1本が1作業項目と
なり、1作業項目行で表わしている。作業項目行は項目
名と、項目別作業工程等を有している。
2-6-1 to 2-6-n are work item characteristics, in which each software development process is divided into work items, and each work item to be managed is assigned to one work item line. , on the output side, one program is one work item, and is represented by one work item line. The work item row has an item name, a work process for each item, and the like.

2−7は項目名であり、作業項目の名称である。当例で
は、プログラム名が項目名である。
2-7 is an item name, which is the name of a work item. In this example, the program name is the item name.

2−8は項目別作業工程であり、第1工程実績P1と、
第2工程実績P2と、第3工程実績P3と、第4工程実
績P4と、第5工程実績P5とを有し、各工程の作業が
未完了であるか完了したかを示す。当例では、空白また
は「0」は未完了、「1」は完了を示す。
2-8 is the work process by item, the first process result P1,
It has a second process result P2, a third process result P3, a fourth process result P4, and a fifth process result P5, and indicates whether the work of each process is incomplete or completed. In this example, a blank or "0" indicates incompleteness, and "1" indicates completion.

2−9は作業用記憶部であり、申開的に演算結果を記憶
するところであり、総負荷値と、実績総負荷値と、進捗
率等を有する。
Reference numeral 2-9 denotes a working storage section, which stores the calculation results, and has a total load value, an actual total load value, a progress rate, and the like.

2−10は総負荷値であり、全ての管理対象作業項目に
ついて全ての作業工程の負荷値の合計をしたものである
2-10 is the total load value, which is the sum of the load values of all work processes for all managed work items.

2−11は実績総負荷値であり、全ての管理対象作業項
目について、完了した作業工程についてのみの負荷値の
合計をしたものである。
2-11 is the actual total load value, which is the sum of the load values only for completed work processes for all managed work items.

2−12は進捗率であり、総負荷値に対する実績総負荷
値の比を百分率で表わしたものであり、作業進捗状況の
百分率である。
2-12 is the progress rate, which is expressed as a percentage of the actual total load value to the total load value, and is the percentage of the work progress status.

2−13は作業進捗管理表部であり、プロジェクトの作
業進捗管理予定時点の日付と、目標進捗率と、実績進捗
率の表を有し、日付と目標進捗率は作業計画時の値であ
り、実績進捗率は進捗率2−12を移したものである。
2-13 is a work progress management table section, which has a table of the scheduled date of project work progress management, target progress rate, and actual progress rate, and the date and target progress rate are values at the time of work planning. , the actual progress rate is the result of moving the progress rate 2-12.

2−14は進捗管理データ操作部であり、作業工程負荷
表部2−1と、作業項目表部2−5のデータのセットを
行う。
Reference numeral 2-14 denotes a progress management data operation section, which sets data in the work process load table section 2-1 and the work item table section 2-5.

2−15は進捗率演算部であり、作業工程負荷表部2−
1と、作業項目表部2−5のデータを基にして、作業の
進捗率を算出する。
2-15 is a progress rate calculating section, and a work process load table section 2-
1 and the data in the work item table section 2-5, the progress rate of the work is calculated.

2−16は進捗管理表操作部であり、計画時点での日付
と、目標進捗率のセット、管理時点での実績進捗率のセ
ット等を行う。
Reference numeral 2-16 is a progress management table operation unit, which sets the date and target progress rate at the time of planning, sets the actual progress rate at the time of management, etc.

次に第2図に基づき運用の流れに沿って機能関連の説明
をする。
Next, functions related to the operation will be explained based on Figure 2.

まず、進捗管理データ操作部2−14により作業工程負
荷表部2−1の工程名称と共通負荷値をセットし、作業
項目表部2−5の項目名等をセットする。共通負荷値は
通常百分率で配分して、第1工程共通負荷値ないし第5
工程共通負荷値の合計が100になるようにして運用す
る。
First, the progress management data operation section 2-14 sets the process name and common load value in the work process load table section 2-1, and sets the item names and the like in the work item table section 2-5. The common load value is usually distributed by percentage, and is divided into 1st process common load value to 5th process common load value.
It is operated so that the total of process common load values becomes 100.

進捗管理表操作部2−16により、作業進捗管理表部2
−13の日付と目標進捗率をセットする。
The work progress management table section 2 is controlled by the progress management table operation section 2-16.
Set the date and target progress rate for -13.

次に、進捗管理データ操作部2−14を介して進捗管理
時点までの作業項目の進捗状況の入力と更新を行い記憶
する。作業項目行2−6−1ないし2−6−nのうち、
当該作業項目行を選択し、当該作業項目行の項目別作業
工程2−8に対して、第1工程が完了していたらP、を
「1」に第2工程が完了していたらP2を「1」に、第
3工程が完了していたらP、を「1」に、第4工程が完
了していたらP4を「1」に、第5工程が完了していた
らP5を「1」にする。
Next, the progress status of the work item up to the time of progress management is input and updated via the progress management data operation unit 2-14, and is stored. Among work item rows 2-6-1 to 2-6-n,
Select the relevant work item row, and for the item-specific work process 2-8 of the relevant work item row, set P to "1" if the first step has been completed, and set P2 to "1" if the second step has been completed. If the third step is completed, P4 is set to "1", if the fourth step is completed, P4 is set to "1", and if the fifth step is completed, P5 is set to "1". .

進捗率演算部2−15では、作業工程負荷表部2−1と
、作業項目表部2−5のデータを基に進捗率を算出する
。全ての作業項目行2−6−1ないし2−6−nに対し
て、全ての作業工程の負荷値を合計して総負荷値2−1
0を算出し、全ての作業項目行2−6−1ないし2−6
−nに対して各作業項目行の作業工程が完了したものに
ついての負荷値の合計を算出する。つまり項目別作業工
程2−8のPlが「1」なら第1工程の共通負荷値Ld
lをP2が「1」なら第2工程の共通負荷値Ld2を同
様にP5が「1」なら第5工程の共通負荷Ld、を合計
して実績総負荷値2−11を算出し、総負荷値2−10
に対する実績総負荷値2−11の比を百分率で進捗率2
−12として算出する。
The progress rate calculating section 2-15 calculates the progress rate based on the data in the work process load table section 2-1 and the work item table section 2-5. For all work item rows 2-6-1 to 2-6-n, the load values of all work processes are summed to obtain a total load value 2-1.
0 and all work item rows 2-6-1 to 2-6
-n, calculate the total load value for completed work steps in each work item row. In other words, if Pl of item-specific work process 2-8 is "1", the common load value Ld of the first process
If P2 is "1", the common load value Ld2 of the second process, and similarly, if P5 is "1", the common load Ld of the fifth process is summed to calculate the actual total load value 2-11, and the total load value 2-10
Ratio of actual total load value 2-11 to progress rate 2 as a percentage
-12.

進捗管理表操作部2−16では、日付を管理する上位ソ
フト(図示せず)より起動されると進捗率2−12を作
業進捗管理表部2−13の、当該日付の実績進捗率の欄
へ移す。
When the progress management table operation unit 2-16 is started from the host software (not shown) that manages dates, the progress rate 2-12 is displayed in the column of the actual progress rate for the date in the work progress management table unit 2-13. Move to.

当例では項目的作業工程の数は便宜上5工程で説明した
が、5工程以上でも以下でもよい。
In this example, the number of itemized work steps is explained as five steps for convenience, but it may be more than five steps or less than five steps.

第3図は本実施例の作業項目に負荷の差がある場合の動
作説明図である。第3図に基づいて、各作業項目に対し
て既定値となる共通負荷値と、作業項目個有の負荷値と
の指定、および進捗率算出等について説明する。
FIG. 3 is an explanatory diagram of the operation in the case where there is a difference in load between work items in this embodiment. Based on FIG. 3, the designation of a common load value serving as a default value for each work item and a load value unique to each work item, calculation of progress rate, etc. will be explained.

3−1は作業項目表部であり、作業項目性で構成してい
る。3−2−1ないし3−2−nは作業項目性であり1
作業項目を1作業項目行に割り当てたものであり、F(
フラグ)と、項目別作業工程と、個別負荷値等を有して
いる。
3-1 is a work item table section, which is composed of work item characteristics. 3-2-1 to 3-2-n are work item characteristics and are 1
Work items are assigned to one work item row, and F(
flags), work processes for each item, individual load values, etc.

3−3はF(フラグ)であり、空白または「0」の当該
作業項目性は進捗管理の対象としない。[IJは当該作
業項目性を進捗管理の対象にして負荷値として共通負荷
値2−4を使用し、r2jは当該作業項目性を進捗管理
の対象にして負荷値として個別負荷値3−5を使用する
ことを意味する。
3-3 is F (flag), and blank or "0" work item properties are not subject to progress management. [IJ uses the common load value 2-4 as the load value with the work item property as the target of progress management, and r2j uses the individual load value 3-5 as the load value with the work item property as the target of progress management. means to use.

3−4は項目別作業工程であり項目別作業工程2−8と
同じである。
3-4 is an item-based work process, which is the same as item-based work process 2-8.

3−5は個別負荷値であり、当該作業項目性の個別負荷
値を各作業工程毎に、LT)+は第1工程の個別負荷値
を、L’P2は第2工程の個別負荷値を、LT)3は第
3工程の個別負荷値を、Lp4は第4工程の個別負荷値
を、Ll)sは第5工程の個別負荷値を定義するところ
である。
3-5 is the individual load value, where the individual load value of the relevant work item is determined for each work process, LT)+ is the individual load value of the first process, and L'P2 is the individual load value of the second process. , LT)3 defines the individual load value of the third process, Lp4 defines the individual load value of the fourth process, and Ll)s defines the individual load value of the fifth process.

3−14は進捗管理データ操作部であり、作業工程負荷
表部2−1と、作業項目表部3−1をセットまたは修正
をする。
3-14 is a progress management data operation section, which sets or modifies the work process load table section 2-1 and the work item table section 3-1.

3−15は進捗率演算部であり、作業工程負荷表部2−
1と、作業項目表部3−1のデータを基にして、作業の
進捗率を算出する。
3-15 is a progress rate calculating section, and work process load table section 2-
1 and the data in the work item table section 3-1, the progress rate of the work is calculated.

次に、第3図に基づいて運用の流れに沿って、機能関連
を説明する。
Next, functional relationships will be explained along the flow of operation based on FIG.

まず進捗管理データ操作部3−14は作業工程負荷表部
2−1と、作業項目表部3−1のセットを行う等進捗管
理データ操作部2−14と同じ機能を有し、そのほかに
F(フラグ)3−3のセットと、個別負荷値3−5のセ
ットを行う。
First, the progress management data operation section 3-14 has the same functions as the progress management data operation section 2-14, such as setting the work process load table section 2-1 and the work item table section 3-1. (Flag) 3-3 is set and individual load value 3-5 is set.

次に進捗管理表操作部2−16により作業進捗管理表部
2−13の日付と目標進捗率をセットする。
Next, the date and target progress rate are set in the work progress management table section 2-13 using the progress management table operation section 2-16.

進捗率演算部3−15では、作業工程負荷部21と、作
業項目表部3−1のデータを基に、進捗率を算出する。
The progress rate calculation section 3-15 calculates the progress rate based on the data in the work process load section 21 and the work item table section 3-1.

作業項目性について、3−21ないし3−2−nについ
て、F(フラグ)33が「1」またはr2.の項目行の
みを選択して、F3−3が「1」の場合は共通負荷値2
−4のLd、からLd5を第1工程から第5工程の負荷
値として採用し、F(フラグ)3−3が「2」の時は個
別負荷値3−5のLp+からLp5を第1工程から第5
工程の負荷値として採用し、第1工程ないし第5工程ま
での全ての工程の負荷値を合計し総負荷値を算出する。
Regarding the work item nature, for 3-21 to 3-2-n, F (flag) 33 is "1" or r2. Select only the item row, and if F3-3 is "1", common load value 2
-4 Ld, to Ld5 are adopted as the load values for the first to fifth processes, and when F (flag) 3-3 is "2", the individual load values 3-5 Lp+ to Lp5 are used for the first process. to 5th
This is adopted as the load value of the process, and the load values of all processes from the first process to the fifth process are summed to calculate the total load value.

次に作業項目性32−1ないし3−2−nについて、前
述の総負荷値の算出の場合と同じ規則で項目行の選択を
し、かつ同し規則て第1工程ないし第5工程の各工程の
負荷値を採用し、即ちF3−3が「1」の場合、項目別
作業工程3−4のPlが「1」なら第1工程の負荷値を
、P2が「1」なら第2工程の負荷値を、P3が「1」
なら第3工程の負荷値をP4が「1」なら第4工程の負
荷値を、P5が「1」なら第5工程の負荷値を合計し、
F3−3が「2」の場合は、個別負荷値3−5のLP+
からLp5の欄に示された値を合計し実績総負荷値を算
出する。次に総負荷値に対する実績総負荷値の百分率を
進捗率2−12として算出する。
Next, for work item properties 32-1 to 3-2-n, select item rows using the same rules as in the calculation of the total load value described above, and use the same rules to select each item row for each of the first to fifth steps. If the load value of the process is adopted, that is, if F3-3 is "1", if Pl of the itemized work process 3-4 is "1", the load value of the first process is adopted, and if P2 is "1", the load value of the second process is adopted. The load value of P3 is "1"
Then, add the load value of the third process, if P4 is "1", add the load value of the fourth process, and if P5 is "1", add the load value of the fifth process,
If F3-3 is "2", LP+ with individual load value 3-5
The actual total load value is calculated by summing the values shown in the Lp5 column. Next, the percentage of the actual total load value to the total load value is calculated as the progress rate 2-12.

最後に進捗管理表操作部2−16では、日付を管理する
上位ソフト(図示せず)からの指示で進捗率2−12を
作業進捗管理表部2−13の当該日付の実績進捗率I\
移す。
Finally, the progress management table operation unit 2-16 converts the progress rate 2-12 into the actual progress rate I\ for the relevant date in the work progress management table unit 2-13 based on instructions from the higher-level software (not shown) that manages dates.
Move.

第4図は本発明装置による開発工程別の帳票例を示す図
であり、4−1は概要設計計画表であり、概要設計開発
工程の進捗管理の1例であり、4−2は詳細(プログラ
ム)設計計画表であり、詳細設計開発工程進捗管理の1
例である。
FIG. 4 is a diagram showing an example of a form for each development process by the apparatus of the present invention, 4-1 is an outline design planning table, which is an example of progress management of the outline design and development process, and 4-2 is a detailed ( Program) Design planning table, one of the detailed design development process progress management
This is an example.

〔発明の効果〕〔Effect of the invention〕

以上説明したように、本発明をソフトウェア開発の分析
・設計・製造・テスト等の各工程において作業計画と進
捗管理のために使用することによ、す、計画に対しての
作業期間途中での客観的な数字による進捗実績の比較が
容易になり、全体の状態や特定のプログラムの作業進捗
の遅れとか、特定の工程での遅れの状態が明確になり、
問題のある作業項目や作業工程が発見しやすくなり、適
切な進捗管理や適切な対策を講じることができる効果が
ある。
As explained above, by using the present invention for work planning and progress management in each process of software development, such as analysis, design, manufacturing, and testing, it is possible to It becomes easier to compare progress results using objective numbers, and the overall status, delays in the progress of specific programs, and delays in specific processes become clear.
This has the effect of making it easier to discover problematic work items and work processes, allowing appropriate progress management and appropriate countermeasures to be taken.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明の一実施例のブロック構成図、第2図、
第3図は動作説明図、第4図は進捗管理の帳表例を示す
図である。 1−1・・・外部記憶装置、1−2・・・表示装置、1
−3・・・データ入力装置、1−4・・・演算処理装置
、1−5・・・進捗管理記憶装置、2−1・・・作業工
程負荷表部、2−2・・・工程番号、2−3・・・工程
名称、2−4・・・共通負荷値、2−5・・作業項目表
部、26−1〜2−6−n・・作業項目行、2−7・・
・項目名、2−8・・・項目別作業工程、2−9・・作
業用記憶部、2−10・・・総負荷値、2−11・・・
実績総負荷値、2−12・・・進捗率、2−13・・・
作業進捗管理表部、2−14・・・進捗管理データ操作
部、2−15・・・進捗率演算部、2−16・・・進捗
管理表操作部、3−1・・・作業項目表部、3−2−1
〜3−2−n・・・作業項目行、3−3・・・F(フラ
グ)、3−4・・・項目別作業工程、3−5・・・個別
負荷値、3−14・・・進捗管理データ操作部、3−1
5・・・進捗管理演算部、4−1・・概要設計計画表、
4−2・・・詳細(プログラム)設計計画表。
FIG. 1 is a block diagram of an embodiment of the present invention, FIG.
FIG. 3 is an explanatory diagram of the operation, and FIG. 4 is a diagram showing an example of a progress management ledger. 1-1...External storage device, 1-2...Display device, 1
-3...Data input device, 1-4...Arithmetic processing device, 1-5...Progress management storage device, 2-1...Work process load table section, 2-2...Process number , 2-3...Process name, 2-4...Common load value, 2-5...Work item table section, 26-1 to 2-6-n...Work item row, 2-7...
・Item name, 2-8...Work process by item, 2-9...Work memory, 2-10...Total load value, 2-11...
Actual total load value, 2-12...Progress rate, 2-13...
Work progress management table section, 2-14... Progress management data operation section, 2-15... Progress rate calculation section, 2-16... Progress management table operation section, 3-1... Work item table Section, 3-2-1
~3-2-n...Work item line, 3-3...F (flag), 3-4...Work process by item, 3-5...Individual load value, 3-14...・Progress management data operation section, 3-1
5...Progress management calculation section, 4-1...Outline design plan table,
4-2...Detailed (program) design plan.

Claims (1)

【特許請求の範囲】 1、ソフトウェア開発進捗管理装置において、予じめ具
備した記憶装置に前記ソフトウェアの開発工程別に付け
られた開発工程名毎に共通負荷値を記憶する作業工程負
荷値記憶域と、前記ソフトウェアの作業項目名毎に前記
開発工程別の“完了”か“不完了”かの進捗状況を記憶
する作業項目記憶域と、前記作業項目全てについて前記
全開発工程の前記共通負荷値を合計した値である総負荷
値と前記作業項目全てについて前記“完了”状態の前記
開発工程の前記共通負荷値を合計した値である実績総負
荷値と前記総負荷値に対する前記実績総負荷値の割合を
示す実績進捗率とを記憶する作業用データ記憶域と、予
じめ決めた進捗管理日付と前記日付における目標進捗率
と前記実績進捗率とを記憶する作業進捗管理データ記憶
域とを備え、予じめ具備したデータ入力装置からの初期
データセット指示を受けて前記作業工程負荷値記憶域に
前記開発工程名と前記開発工程名に対応する前記共通負
荷値をセットし前記作業項目記憶域に前記作業項目名を
セットし、前記データ入力装置からの進捗データ入力指
示を受けて前記作業項目記憶域における指示された前記
作業項目名の前記開発工程の前記進捗状況を前記“完了
”状態にする進捗管理データ操作部と、前記データ入力
装置からの初期データセット指示を受けて前記作業進捗
管理データ記憶域に前記進捗管理日付と前記日付におけ
る目標進捗率とをセットし、上位ソフトからの指示によ
り前記作業進捗管理データ記憶域に指示された前記日付
に対応して前記実績進捗率をセットする進捗管理表操作
部と、上位ソフトからの指示により前記作業項目記憶域
の前記作業項目全てについて前記総負荷値と前記実績総
負荷値と前記実績進捗率とを算出し前記作業用データ記
憶域にセットする進捗率演算部とを有することを特徴と
するソフトウェア開発進捗管理装置。 2、ソフトウェア開発進捗管理装置において、予じめ具
備した記憶装置に前記ソフトウェアの開発工程別に付け
られた開発工程名毎に共通負荷値を記憶する作業工程負
荷値記憶域と、前記ソフトウェアの作業項目名毎に前記
開発工程別の“完了”か“不完了”かの進捗状況と前記
開発工程別の個別負荷値と前記共通負荷値か前記個別負
荷値のどちらを使用するかを示す識別情報であるフラグ
を記憶する作業項目記憶域と、前記作業項目全ての前記
全開発工程について前記フラグの指示に応じて前記共通
負荷値又は前記個別負荷値を合計した値である総負荷値
と前記作業項目全ての前記“完了”状態の前記開発工程
について前記フラグの指示に応じて前記共通負荷値又は
前記個別負荷値を合計した値である実績総負荷値と前記
総負荷値に対する前記実績総負荷値の割合を示す実績進
捗率とを記憶する作業用データ記憶域と、予じめ決めら
れた進捗管理日付と前記日付における目標進捗率と前記
実績進捗率とを記憶する作業進捗管理データ記憶域とを
備え、予じめ具備したデータ入力装置からの初期データ
セット指示を受けて前記作業工程負荷値記憶域に前記開
発工程名と前記開発工程名に対応する前記共通負荷値を
セットし前記作業項目記憶域に前記作業項目名と前記作
業項目名に対応する前記フラグ及び前記個別負荷値とを
セットし、前記データ入力装置からの進捗データ入力指
示を受けて前記作業項目記憶域における指示された前記
作業項目名の前記開発工程の前記進捗状況を前記“完了
”状態にする進捗管理データ操作部と、前記データ入力
装置からの初期データセット指示を受けて前記作業進捗
管理データ記憶域に前記進捗管理日付と前記日付におけ
る目標進捗率とをセットし、上位ソフトからの指示によ
り前記作業進捗管理データ記憶域に指示された前記日付
に対応して前記実績進捗率をセットする進捗管理表操作
部と、上位ソフトからの指示により前記作業項目記憶域
の前記作業項目全てについて前記総負荷値と前記実績総
負荷値と前記実績進捗とを算出し前記作業用データ記憶
域にセットする進捗率演算部とを有することを特徴とす
るソフトウェア開発進捗管理装置。
[Claims] 1. In a software development progress management device, a work process load value storage area for storing a common load value for each development process name assigned to each software development process in a storage device provided in advance; , a work item storage area for storing the progress status of "completed" or "incomplete" for each of the development steps for each work item name of the software, and a common load value of all the development steps for all of the work items. A total load value that is a summation value, an actual total load value that is a total value of the common load value of the development process in the "completed" state for all of the work items, and the actual total load value for the total load value. A work data storage area for storing an actual progress rate indicating a percentage, and a work progress management data storage area for storing a predetermined progress management date, a target progress rate at the date, and the actual progress rate. , receiving an initial data set instruction from a data input device provided in advance, sets the development process name and the common load value corresponding to the development process name in the work process load value storage area, and sets the development process name and the common load value corresponding to the development process name in the work item storage area. setting the work item name to the "completed" state in response to a progress data input instruction from the data input device, and setting the progress status of the development process of the designated work item name in the work item storage area to the "completed" state. a progress management data operation unit that receives an initial data set instruction from the data input device, sets the progress management date and the target progress rate at the date in the work progress management data storage area, and receives an instruction from the host software. a progress management table operating unit that sets the actual progress rate in accordance with the date specified in the work progress management data storage area; A software development progress management device characterized by comprising a progress rate calculation unit that calculates a total load value, the actual total load value, and the actual progress rate and sets them in the work data storage area. 2. In a software development progress management device, a work process load value storage area for storing a common load value for each development process name assigned to each development process of the software in a storage device provided in advance, and a work item of the software. For each name, the progress status of each development process is "completed" or "incomplete", the individual load value for each development process, and identification information indicating whether to use the common load value or the individual load value. a work item storage area for storing a certain flag; a total load value that is a sum of the common load value or the individual load value for all the development processes of all the work items according to the instructions of the flag; and the work item. The actual total load value, which is the sum of the common load value or the individual load value, for all the development processes in the "completed" state, and the actual total load value relative to the total load value, according to the instruction of the flag. a work data storage area for storing an actual progress rate indicating a percentage; and a work progress management data storage area for storing a predetermined progress management date, a target progress rate at the date, and the actual progress rate. and setting the development process name and the common load value corresponding to the development process name in the work process load value storage area upon receiving an initial data set instruction from a data input device provided in advance, and storing the work item. The work item name, the flag corresponding to the work item name, and the individual load value are set in the work item storage area, and upon receiving a progress data input instruction from the data input device, the specified work is performed in the work item storage area. A progress management data operation unit that changes the progress status of the development step of the item name to the “completed” state, and receives an initial data set instruction from the data input device and stores the progress management date in the work progress management data storage area. and a target progress rate for the date, and sets the actual progress rate in accordance with the date specified in the work progress management data storage area according to an instruction from the host software; and a progress rate calculation unit that calculates the total load value, the actual total load value, and the actual progress for all of the work items in the work item storage area according to instructions from software, and sets them in the work data storage area. A software development progress management device characterized by:
JP2265732A 1990-10-03 1990-10-03 Software development progress management device Pending JPH04141730A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2265732A JPH04141730A (en) 1990-10-03 1990-10-03 Software development progress management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2265732A JPH04141730A (en) 1990-10-03 1990-10-03 Software development progress management device

Publications (1)

Publication Number Publication Date
JPH04141730A true JPH04141730A (en) 1992-05-15

Family

ID=17421230

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2265732A Pending JPH04141730A (en) 1990-10-03 1990-10-03 Software development progress management device

Country Status (1)

Country Link
JP (1) JPH04141730A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8028294B2 (en) * 2004-08-31 2011-09-27 International Business Machines Corporation Progress management for projects

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8028294B2 (en) * 2004-08-31 2011-09-27 International Business Machines Corporation Progress management for projects

Similar Documents

Publication Publication Date Title
Talluri et al. A cone-ratio DEA approach for AMT justification
Prajogo et al. Transitioning from total quality management to total innovation management: an Australian case
US4887207A (en) Automated system for evaluating the sensitivity of inventory costs due to fluctuations in customer demand
Locher Value stream mapping for lean development: a how-to guide for streamlining time to market
Humphreys et al. An expert system for evaluating the make or buy decision
JPH03136751A (en) Automatic system for preparation of remachining shop order schedule
GB2245395A (en) Method and system for supporting decision making
McKay et al. The human factor in planning and scheduling
JP2004054358A (en) Capital investment evaluation system
JPH05324778A (en) Manufacturing facilities designing device
JPH04141730A (en) Software development progress management device
Sassani Industrial engineering foundations: Bridging the gap between engineering and management
JP4239767B2 (en) Design change support system, design change method, design change support program, and recording medium recording the same
Lackman Controlling the Project Development Cycle: Part 3--Tools for Successful Project Management
JP2006209444A (en) Strategy planning support device
Owens et al. Project cost control tools and techniques
JPH07271864A (en) Production control method
JPH01196664A (en) Automatic system for estimating impact on inventory cost by technical alteration of part
JPH08320855A (en) Method and system for evaluating system introduction effect
Chitongo et al. Engineering consultant project cash flow controls: An empirically-supported system dynamics conceptual model
Farag Essentials of Project Management
JP2001318714A (en) Object development type production management system
YANCH et al. Task assignment optimization in photoanalysis process: comparative analysis of semi-automated and manual task management
Pakdil et al. Analyze Phase: Other Data Analysis Tools
Jones et al. Introducing computer integrated manufacturing