JPH0411118A - Erecting of pc column on foundation - Google Patents

Erecting of pc column on foundation

Info

Publication number
JPH0411118A
JPH0411118A JP11366390A JP11366390A JPH0411118A JP H0411118 A JPH0411118 A JP H0411118A JP 11366390 A JP11366390 A JP 11366390A JP 11366390 A JP11366390 A JP 11366390A JP H0411118 A JPH0411118 A JP H0411118A
Authority
JP
Japan
Prior art keywords
column
foundation
steel rod
anchor steel
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP11366390A
Other languages
Japanese (ja)
Inventor
Ryohei Kurosawa
亮平 黒沢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kurosawa Construction Co Ltd
Original Assignee
Kurosawa Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kurosawa Construction Co Ltd filed Critical Kurosawa Construction Co Ltd
Priority to JP11366390A priority Critical patent/JPH0411118A/en
Publication of JPH0411118A publication Critical patent/JPH0411118A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To carry out the work safely and easily by horizontally arranging a foundation side board plate on the bottom surface of a recessed groove of the upper surface of the foundation, so as to insert a PC column in the recessed groove, and by stretching and fixing an anchor steel rod on a brattice part, so as to self-stand the PC column. CONSTITUTION:A concrete foundation 21 is built on the upper end of a foundation pile 23 in an integrated manner, and a recessed part 24 is molded on the upper surface thereof. A foundation side board plate 25 is fixed on the bottom surface of the recessed groove 24. An anchor steel rod 26 is inserted in an anchor steel rod inserting hole 29, while the lower end of a PC column 22 is dropped in the recessed groove 24, so as to connect the board plates 25, 30 with each other. A fixing plate and a nut 31 are fitted with each other, and are stretched and fixed on the upper end of the anchor steel rod 26. After the PC column 22 is thus self-stood, a site concrete 32 is placed in the gap in the recessed groove 24, and a brattice part 28 of the lower end of the PC column 22 is buried in the foundation 21.

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は、多階構築物の構築に際し、プレキャストコン
クリート柱(以下PC柱と記す)を基礎上に立設するP
C柱立設方法に関する。
Detailed Description of the Invention (Industrial Field of Application) The present invention provides a method for installing precast concrete columns (hereinafter referred to as PC columns) on a foundation when constructing a multi-story structure.
Regarding the C-pillar erection method.

(従来の技術) 一般にPC柱を使用したビルディング等の多階構築物の
構築には、3階分程度の高さのPC柱を予め製造してお
き、これを現場打のコンクリート基礎上に立設するよう
にしている。その従来の立設方法は第3図に示すように
、コンクリート基礎1の上面に柱嵌入穴2を開口させて
おき、その中にPCC50立てて落し込み、四方がらの
支えワイヤー4によって垂直度を調節した後、柱嵌入穴
2の開口部に楔5を打ち込んで仮り止めし、然る後、柱
嵌入凹部2内の隙間にセメントモルタルやコンクリート
等の充填材6を充填し、これが固化することによってP
CC50基礎1とを一体化させるようにしている。この
場合、柱嵌入穴2の深さがPCC50径の1.5倍以上
ある場合には剛結合となる。
(Prior art) Generally, when constructing a multi-story structure such as a building using PC columns, a PC column with a height of about three stories is manufactured in advance and then erected on a concrete foundation cast on site. I try to do that. As shown in Fig. 3, the conventional method of erection is to open a column insertion hole 2 on the top surface of a concrete foundation 1, place the PCC 50 upright in the hole and drop it into the hole, and use support wires 4 on all sides to maintain verticality. After the adjustment, a wedge 5 is driven into the opening of the column fitting hole 2 to temporarily secure it, and then a filler material 6 such as cement mortar or concrete is filled into the gap in the column fitting recess 2, and this is solidified. by P
We are trying to integrate it with CC50 Basic 1. In this case, if the depth of the pillar insertion hole 2 is 1.5 times or more the diameter of the PCC 50, a rigid connection is achieved.

また、この他第4図に示すように現場打のコンクリート
基礎1内にPC鋼棒10の一端側を埋設固定し、その他
端を基礎1上に突出させておくとともに、PCC50は
PC鋼棒11を長手方向に挿通し、その下端をPCC5
0下端面の凹欠部12内に突出させておき、このPCC
50敷モルタル13を介して基礎1の上面に立て支えワ
イヤー4によって垂直度を調節するとともに、基礎1と
pc柱3のPC鋼棒10.11を凹欠部12内でカプラ
ー14をもって連結し、PC鋼棒11をPCC50上端
にて緊張して定着させ、PCC50締向きのプレストレ
スを導入しつつ自立させ、凹欠部12を後打モルタルに
て埋めるようにした方法がある。
In addition, as shown in FIG. 4, one end of the PC steel bar 10 is buried and fixed in the cast-in-place concrete foundation 1, and the other end is made to protrude above the foundation 1. Insert it in the longitudinal direction and connect the lower end to PCC5
This PCC is made to protrude into the recessed part 12 on the lower end surface.
The verticality is adjusted by the supporting wire 4 on the upper surface of the foundation 1 via the 50-bed mortar 13, and the PC steel rods 10 and 11 of the foundation 1 and the PC pillar 3 are connected with the coupler 14 in the recessed part 12, There is a method in which the PC steel rod 11 is fixed under tension at the upper end of the PCC 50, and made to stand on its own while introducing prestress in the tightening direction of the PCC 50, and the recessed part 12 is filled with post-molded mortar.

(発明が解決しようとする課!!り 上述した従来の方法では、いずれもPC柱の立設に際す
る垂直度の調節は周囲の支えワイヤーの長さを調節する
ことによって行っているところであるが、PC柱が大重
量化すればする程、垂直度調節作業が困難になり、また
、自立するまでに長時間を要し、この間、PC柱周囲に
長い支えワイヤーが斜めに張設されていることとなり、
他の作業の障害となり、作業能率か悪いという問題があ
った。
(Problem to be solved by the invention!) In all of the above-mentioned conventional methods, the verticality of the PC pillar is adjusted by adjusting the length of the surrounding support wire. However, the heavier the PC pillar becomes, the more difficult it becomes to adjust its verticality, and the longer it takes for it to stand on its own, during which time a long support wire is strung diagonally around the PC pillar. There will be
There was a problem in that it interfered with other tasks, resulting in poor work efficiency.

また、前述した基礎中に柱嵌入六を設ける方法では、そ
の穴の周囲の基礎コンクリート強度を大きくしておく必
要があるが、現場打施工であるため、強度発現のための
管理か困難となり、しかも、柱嵌入穴か深いため、穴底
面の水平度を正確に仕上げることが困蛇であるという問
題があった。
In addition, with the above-mentioned method of providing a column insertion hole in the foundation, it is necessary to increase the strength of the foundation concrete around the hole, but since it is cast on site, it is difficult to manage it to develop strength. Moreover, since the hole for inserting the pillar is deep, it is difficult to accurately level the bottom of the hole.

更に、前述したPCa棒によって自立させる方法では、
現場において自立前の長いPC柱の上端にて緊張作業か
必要となり、作業の危険性が高く、また、PC柱下端部
にはPC鋼棒連結作業空間のための凹欠部があるため、
これか柱の断面欠損となり、これを補うためには柱全体
を太くする必要が生じるという問題かあった。
Furthermore, in the method of making it self-supporting using the PCa rod mentioned above,
At the site, tension work is required at the top end of the long PC column before it becomes self-supporting, which is highly dangerous, and there is a recess at the bottom end of the PC column for the work space for connecting the PC steel bars.
Either this would result in a cross-sectional defect in the column, and to compensate for this, the entire column would need to be made thicker.

本発明は上述の如き従来方法の各種の問題点を解決すべ
くなされたものである。
The present invention has been made to solve various problems of the conventional methods as described above.

(課Uを達成するための手段) 上述の如き従来の問題点を解決するための本発明の要旨
とするところは、下端外周面に張出部を一体に有し、該
張出部に上下に向けてアンカー鋼棒挿通孔か貫通開口さ
れ、かつ、底面に柱軸に対して直角な柱側台座プレート
を固着したプレキャストコンクリート柱(以下PC柱と
記す)を使用し、該PC柱が支持されるコンクリート基
礎の構築に際し、該基礎の上面に前記PC柱の下端が挿
入される凹陥部を成形し、該凹陥部の底面よりPC柱固
定用のアンカー鋼棒の上fIAIP!Iを突設するとと
もに、該凹陥部の底面に上面が平らな基礎側台座プレー
トを水平配置に固着しておき、前記PC柱を立てて凹陥
部内に挿入し、アンカー鋼棒を前記アンカー鋼棒挿通孔
内に挿通させて前記両台座プレートを互いに接合させ、
張出部上にアンカー鋼棒を緊張定着させてPC柱を自立
させ、然る後凹陥部内に現場打コンクリートを打設して
PC柱下端をコンクリート基礎内に埋め込むことを特徴
としてなる基礎上へのPC柱立設方法に存する。
(Means for Achieving Section U) The gist of the present invention for solving the conventional problems as described above is to have an overhanging portion integrally on the outer circumferential surface of the lower end, and to A precast concrete column (hereinafter referred to as a PC column) is used, which has an anchor steel rod insertion hole opened through it and a column-side pedestal plate perpendicular to the column axis fixed to the bottom surface, and the PC column supports When constructing a concrete foundation, a recess into which the lower end of the PC column will be inserted is formed on the upper surface of the foundation, and the top of the anchor steel rod for fixing the PC column is inserted from the bottom of the recess. At the same time, a foundation side pedestal plate with a flat upper surface is fixed horizontally to the bottom of the recess, the PC column is erected and inserted into the recess, and the anchor steel rod is inserted into the recess. the two pedestal plates are joined to each other by being inserted into the insertion hole;
An anchor steel rod is fixed under tension on the overhanging part to make the PC column independent, and then cast-in-place concrete is poured into the recessed part to embed the lower end of the PC column in the concrete foundation. The method of installing PC pillars is as follows.

(作用) 本発明方法では、凹陥部底面に固定された基礎側台座プ
レートの水平度を予め正確に調節しておけば、その上面
に柱側台座プレートを重ね合わせてPC柱を立てること
によりPC柱は垂直に立設される。この状態で張出部に
貫通されたアンカー鋼棒を緊張定着させることにより、
PC柱か他に支えなくして自立する。PC柱の下端か現
場打コンクリートにより埋められた後もPC柱にかかる
水平方向の外力はアンカー鋼棒によって受けられ、凹陥
部周囲の基礎コンクリート部分にはせん断力は作用しな
い。
(Function) In the method of the present invention, if the horizontality of the foundation-side pedestal plate fixed to the bottom of the recessed portion is adjusted accurately in advance, the PC column can be installed by superimposing the column-side pedestal plate on the top surface of the foundation-side pedestal plate. The columns are erected vertically. By tension-fixing the anchor steel rod that has passed through the overhang in this state,
Stands on its own without any support from a PC pillar or anything else. Even after the lower end of the PC column is filled with cast-in-place concrete, the external force in the horizontal direction applied to the PC column is received by the anchor steel rod, and no shear force is applied to the foundation concrete around the depression.

(実施例) 次に本発明の実施の一例を第1図、第2図について説明
する。
(Example) Next, an example of implementation of the present invention will be described with reference to FIGS. 1 and 2.

第1図は本発明により施工された基礎に対するPC柱の
立設構造を示している。
FIG. 1 shows a structure in which PC columns are erected on a foundation constructed according to the present invention.

図において21はコンクリート基礎であり、22はPC
柱である。コンクリート基礎21は基礎杭23の上端に
一体化させて構築されており、その上面に柱面て込み用
の凹陥部24が成形されている。凹陥部24の底面には
鋼製の基礎側台座プレート25が固着されている。この
台座プレート25は上面が平に成形され、下面にはアン
カー用スタッドボルト25aが突設され、これか基礎コ
ンクリート内に埋設されている。
In the figure, 21 is a concrete foundation, and 22 is a PC
It is a pillar. The concrete foundation 21 is constructed integrally with the upper end of the foundation pile 23, and a recessed part 24 for installing the column surface is formed on the upper surface of the concrete foundation 21. A base-side pedestal plate 25 made of steel is fixed to the bottom surface of the recessed portion 24. The pedestal plate 25 has a flat upper surface, and an anchor stud bolt 25a protrudes from the lower surface, which is buried in the foundation concrete.

凹陥部24の底面には複数のアンカー鋼棒26が突設さ
れている。このアンカー鋼棒26は下端に定着金具27
が固着されて基礎コンクリート内に埋め込まれ、上端側
か台座プレート25を貫通して上方に突出されている。
A plurality of anchor steel rods 26 are provided protruding from the bottom surface of the concave portion 24 . This anchor steel rod 26 has a fixing fitting 27 at its lower end.
is fixed and embedded in the foundation concrete, and projects upward through the pedestal plate 25 on the upper end side.

PC柱22は予め工場等のコンクリート柱製作ヤードに
て成形しておくものであり、必要に応じて1〜3階分の
長さのものを使用する。
The PC columns 22 are formed in advance in a concrete column manufacturing yard such as a factory, and are used to have a length of 1 to 3 floors, if necessary.

PC柱22の下端の両側部には互いに対祢配置に一対の
張出部28か一体成形され、その張出部28に柱軸方向
に向けたアンカー鋼棒挿通孔29が貫通開口されている
。更に、PC柱22の底面には鋼板製の柱側台座プレー
ト30が柱軸に対して直角に固定されている。この台座
プレート30は下面か平らに成形され、上面にアンカー
用スタッドボルト30aか突設され、このスタッドボル
ト30aが柱内に埋め込まれて固定されている。
A pair of overhanging portions 28 are integrally molded on both sides of the lower end of the PC column 22 and are arranged opposite each other, and an anchor steel rod insertion hole 29 is opened through the overhanging portions 28 in the direction of the column axis. . Further, a column-side pedestal plate 30 made of a steel plate is fixed to the bottom surface of the PC column 22 at right angles to the column axis. This pedestal plate 30 has a flat bottom surface, and has an anchor stud bolt 30a protruding from the top surface, and the stud bolt 30a is embedded and fixed in the column.

PC柱22の立設は、アンカー鋼棒挿通孔29内にアン
カー鋼棒26を挿通しながらPC柱22の下端を凹陥部
24内に落とし込み、両台座プレート25.30を接合
させ、アンカー鋼棒26の上端に定着板及びナツト31
を嵌め合わせ緊張定着する。これによってPC柱22か
基礎21上に垂直に自立する。なお、両台座プレート2
5.30間には接着剤(ゼロ目地)を介在させる。
The PC column 22 is erected by inserting the anchor steel rod 26 into the anchor steel rod insertion hole 29, dropping the lower end of the PC column 22 into the recess 24, joining both pedestal plates 25 and 30, and inserting the anchor steel rod 26 into the anchor steel rod insertion hole 29. Fixing plate and nut 31 at the upper end of 26
Fit and tighten. As a result, the PC column 22 stands vertically on the foundation 21. In addition, both pedestal plates 2
5. Adhesive (zero joint) is interposed between 30 and 30.

このようにしてPC柱22を自立させた後、凹陥部24
内の隙間に現場打コンクリート32を打設し、PC柱下
端の張出部28を基礎21内に埋め込む。
After making the PC column 22 independent in this way, the concave portion 24
Cast-in-place concrete 32 is placed in the gap inside, and the overhanging part 28 at the lower end of the PC column is embedded in the foundation 21.

(発明の効果) 上述したように本発明方法では、コンクリート基礎に対
してアンカー鋼棒によってPC柱を固着するものである
なめ、基礎の凹陥部を深くせすとも充分な結合か得られ
、このため凹陥部の底面の水平度を容易に正確なものと
なすことができ、また、アンカー鋼棒をPC柱の下端外
周の張出部に貫通させて定着させるものであるため、そ
の定着作業は安全かつ、容易なものとなる。
(Effects of the Invention) As mentioned above, in the method of the present invention, since the PC column is fixed to the concrete foundation by the anchor steel rod, sufficient bonding can be obtained even if the recessed part of the foundation is deepened. Therefore, the horizontality of the bottom surface of the concave part can be easily and accurately made, and since the anchor steel rod is fixed by passing it through the overhanging part on the outer circumference of the lower end of the PC column, the fixing work is easy. It will be safe and easy.

更に、本発明ではPC柱側、及び基礎側に予め台座プレ
ートを必要な角度に固着しているため、PC柱を立て込
み、両台座プレートを互いに接合させるのみでPC柱の
必要な垂直度か得られることとなり、現場におけるPC
柱の垂直度調整作業が不要になるとともに、支えワイヤ
ーも不要となり、作業現場を広く使用できる等の効果か
ある。
Furthermore, in the present invention, the pedestal plate is fixed to the PC column side and the foundation side at the required angle in advance, so the required verticality of the PC column can be adjusted simply by erecting the PC column and joining both pedestal plates to each other. As a result, PCs in the field
This eliminates the need to adjust the verticality of columns and also eliminates the need for support wires, which has the effect of allowing a wider range of work sites to be used.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明により立設されたPC柱と基礎との結合
部分の一例の断面図、第2図は同結合部分の現場打コン
クリート打設前の平面図、第3図第4図はそれぞれそ別
々の従来例の断面図である。 21・・・・・・コンクリート基礎、22・・・・・・
PC柱、23・・・・・・基礎杭、24・・・・・・凹
陥部、25・・・・・・基礎側台座プレート、6・・・
・・・アンカー鋼棒、27・・・・・・定着金具、8・
・・・・・張出部、29・・・・・・アンカー鋼棒挿通
孔、0・・・・・・柱側台座プレート、31・・・・・
・ナツト、2・・・・・・現場打コンクリート。
Figure 1 is a cross-sectional view of an example of the joint between a PC column and foundation erected according to the present invention, Figure 2 is a plan view of the joint before pouring concrete on site, Figure 3 and Figure 4 are They are sectional views of separate conventional examples. 21... Concrete foundation, 22...
PC column, 23...Foundation pile, 24...Concave portion, 25...Foundation side pedestal plate, 6...
... Anchor steel rod, 27 ... Fixture fitting, 8.
...Protrusion, 29...Anchor steel rod insertion hole, 0...Column side pedestal plate, 31...
・Natsuto, 2...Cast-place concrete.

Claims (1)

【特許請求の範囲】[Claims] 下端外周面に張出部を一体に有し、該張出部に上下に向
けてアンカー鋼棒挿通孔が貫通開口され、かつ、底面に
柱軸に対して直角な柱側台座プレートを固着したプレキ
ャストコンクリート柱(以下PC柱と記す)を使用し、
該PC柱が支持されるコンクリート基礎の構築に際し、
該基礎の上面に前記PC柱の下端が挿入される凹陥部を
成形し、該凹陥部の底面よりPC柱固定用のアンカー鋼
棒の上端側を突設するとともに、該凹陥部の底面に上面
が平らな基礎側台座プレートを水平配置に固着しておき
、前記PC柱を立てて凹陥部内に挿入し、アンカー鋼棒
を前記アンカー鋼棒挿通孔内に挿通させて前記両台座プ
レートを互いに接合させ、張出部上にアンカー鋼棒を緊
張定着させてPC柱を自立させ、然る後凹陥部内に現場
打コンクリートを打設してPC柱下端をコンクリート基
礎内に埋め込むことを特徴としてなる基礎上へのPC柱
立設方法。
An overhang is integrally formed on the outer peripheral surface of the lower end, an anchor steel rod insertion hole is opened vertically in the overhang, and a column side pedestal plate perpendicular to the column axis is fixed to the bottom surface. Using precast concrete columns (hereinafter referred to as PC columns),
When constructing the concrete foundation on which the PC column is supported,
A recess into which the lower end of the PC column is inserted is formed on the upper surface of the foundation, and the upper end side of an anchor steel rod for fixing the PC column is protruded from the bottom of the recess, and the upper end of the anchor steel rod is provided on the bottom of the recess. The foundation side pedestal plate, which is flat, is fixed in a horizontal position, the PC column is erected and inserted into the recessed part, and the anchor steel rod is inserted into the anchor steel rod insertion hole to join the two pedestal plates to each other. The PC column is made to stand on its own by fixing an anchor steel rod under tension on the overhanging part, and then pouring cast-in-place concrete into the recessed part and embedding the lower end of the PC column in the concrete foundation. How to erect a PC pillar on top.
JP11366390A 1990-04-27 1990-04-27 Erecting of pc column on foundation Pending JPH0411118A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11366390A JPH0411118A (en) 1990-04-27 1990-04-27 Erecting of pc column on foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11366390A JPH0411118A (en) 1990-04-27 1990-04-27 Erecting of pc column on foundation

Publications (1)

Publication Number Publication Date
JPH0411118A true JPH0411118A (en) 1992-01-16

Family

ID=14618005

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11366390A Pending JPH0411118A (en) 1990-04-27 1990-04-27 Erecting of pc column on foundation

Country Status (1)

Country Link
JP (1) JPH0411118A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535495A (en) * 2012-02-07 2012-07-04 万华节能建材股份有限公司 U-shaped groove base for prefabricated building and construction method thereof
JP2018159178A (en) * 2017-03-22 2018-10-11 大和ハウス工業株式会社 Pile foundation structure and construction method thereof

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5030923A (en) * 1973-07-18 1975-03-27

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5030923A (en) * 1973-07-18 1975-03-27

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535495A (en) * 2012-02-07 2012-07-04 万华节能建材股份有限公司 U-shaped groove base for prefabricated building and construction method thereof
CN102535495B (en) * 2012-02-07 2015-02-25 万华节能科技集团股份有限公司 U-shaped groove base for prefabricated building and construction method thereof
JP2018159178A (en) * 2017-03-22 2018-10-11 大和ハウス工業株式会社 Pile foundation structure and construction method thereof

Similar Documents

Publication Publication Date Title
US4378664A (en) System for constructing a building
US3999735A (en) Concrete pouring forms for uniting building units
JPH0411118A (en) Erecting of pc column on foundation
JPH045330A (en) Erecting method for pc pillar of multistory structure
JPH0411119A (en) Erecting of pc column on foundation
JPS61233131A (en) Foundation structure of pole
JP2003161044A (en) Method for installing base-isolation device in existing column
JPH0925637A (en) Method of connected construction of pile head and beam
JPH10331255A (en) Method for erecting pc column on foundation
JP2021063340A (en) Pile foundation structure
JPH11172964A (en) Tower-shaped structure construction method
JPH0684686B2 (en) Standing method for precast concrete columns
JP2981691B2 (en) Joint method and joint structure of box-shaped column in steel frame construction
JP6932348B2 (en) Cloth foundation, cloth foundation construction method, solid foundation construction method, and formwork used for the construction method
JPH02164933A (en) Architecture foundation construction method
JPH09158327A (en) Extension method of unit type building and extending building unit thereof
JP2893406B2 (en) Precast concrete beam-column joining method
JPH0841985A (en) Method of binding precast beam to column
JP2000336747A (en) Execution method of beam-column connection
JPH0459978B2 (en)
JPH077386Y2 (en) Foundation structure for building columns
JPH02194227A (en) Jointing method for precast concrete pillar with pillar beam
JPH028466A (en) Fixed structure of concrete plate
JPH09112084A (en) Column foundation member and installing method of fence by using column foundation member thereof
JPH0548351B2 (en)