JPH0382769U - - Google Patents
Info
- Publication number
- JPH0382769U JPH0382769U JP14450289U JP14450289U JPH0382769U JP H0382769 U JPH0382769 U JP H0382769U JP 14450289 U JP14450289 U JP 14450289U JP 14450289 U JP14450289 U JP 14450289U JP H0382769 U JPH0382769 U JP H0382769U
- Authority
- JP
- Japan
- Prior art keywords
- slab
- required intervals
- hook
- water stop
- stop plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 2
- 239000000463 material Substances 0.000 description 1
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Description
第1図は本考案の実施例を示す斜視図である。
第2図は実施例の使用状態を示す断面図である。 1……支持片、1a……支持片フツク部、1b
……止水板支持部、1c……締め付け具、2……
打継材、A……止水板、B……桟木、C……捨て
鉄筋、D……上位鉄筋、E……コンクリートの流
れ。
第2図は実施例の使用状態を示す断面図である。 1……支持片、1a……支持片フツク部、1b
……止水板支持部、1c……締め付け具、2……
打継材、A……止水板、B……桟木、C……捨て
鉄筋、D……上位鉄筋、E……コンクリートの流
れ。
Claims (1)
- 上部にはスラブの上位鉄筋に掛止するフツク部
を、中央付近には止水板支持部をそれぞれ一体に
設けた支持片を所要間隔に配置し、この各支持片
を連結する打継材を一体的に設けることを特徴と
する。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP14450289U JPH0382769U (ja) | 1989-12-14 | 1989-12-14 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP14450289U JPH0382769U (ja) | 1989-12-14 | 1989-12-14 |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH0382769U true JPH0382769U (ja) | 1991-08-22 |
Family
ID=31691195
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP14450289U Pending JPH0382769U (ja) | 1989-12-14 | 1989-12-14 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0382769U (ja) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2015190146A (ja) * | 2014-03-27 | 2015-11-02 | 株式会社大林組 | 鉄筋コンクリート構造及びその構築方法 |
JP2021088856A (ja) * | 2019-12-04 | 2021-06-10 | 株式会社竹中工務店 | 鉄筋コンクリート構造体のコンクリート打継ぎ工法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6149846B2 (ja) * | 1976-05-21 | 1986-10-31 | Hitachi Ltd | |
JPS6152037B2 (ja) * | 1981-03-09 | 1986-11-11 | Taisei Corp |
-
1989
- 1989-12-14 JP JP14450289U patent/JPH0382769U/ja active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6149846B2 (ja) * | 1976-05-21 | 1986-10-31 | Hitachi Ltd | |
JPS6152037B2 (ja) * | 1981-03-09 | 1986-11-11 | Taisei Corp |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2015190146A (ja) * | 2014-03-27 | 2015-11-02 | 株式会社大林組 | 鉄筋コンクリート構造及びその構築方法 |
JP2021088856A (ja) * | 2019-12-04 | 2021-06-10 | 株式会社竹中工務店 | 鉄筋コンクリート構造体のコンクリート打継ぎ工法 |