JPH0352870Y2 - - Google Patents

Info

Publication number
JPH0352870Y2
JPH0352870Y2 JP1982025882U JP2588282U JPH0352870Y2 JP H0352870 Y2 JPH0352870 Y2 JP H0352870Y2 JP 1982025882 U JP1982025882 U JP 1982025882U JP 2588282 U JP2588282 U JP 2588282U JP H0352870 Y2 JPH0352870 Y2 JP H0352870Y2
Authority
JP
Japan
Prior art keywords
toilet
flange
installation hole
protrusion
construction frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP1982025882U
Other languages
Japanese (ja)
Other versions
JPS58129974U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP2588282U priority Critical patent/JPS58129974U/en
Publication of JPS58129974U publication Critical patent/JPS58129974U/en
Application granted granted Critical
Publication of JPH0352870Y2 publication Critical patent/JPH0352870Y2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Sanitary Device For Flush Toilet (AREA)

Description

【考案の詳細な説明】 〈産業上の利用分野〉 本考案は和風便器を取付ける際、床に設置して
便器を支持する施工枠に関する。
[Detailed Description of the Invention] <Industrial Application Field> The present invention relates to a construction frame that is installed on the floor to support the toilet when a Japanese-style toilet is installed.

〈従来の技術〉 従来の水洗式和風便器の設置方法は次のような
手順で行なわれていた。
<Prior Art> The conventional method of installing a Japanese-style flush toilet has been as follows.

イ 床スラブa′を形成するコンクリートを打ち込
む前に板片等で便器据付穴1′に相当する大き
さの型枠を作り、該便器据付用型枠21を、床
スラブa′下面を形成する型枠22の所定位置に
仮固定してコンクリートを打ち込む(第1図)。
B. Before pouring concrete to form floor slab a', make a formwork of a size equivalent to toilet installation hole 1' using board pieces, etc., and use this formwork 21 for toilet installation to form the bottom surface of floor slab a'. The formwork 22 is temporarily fixed at a predetermined position and concrete is poured (Fig. 1).

ロ 上記コンクリートが固化して床スラブa′を形
成した後に、便器据付用型枠21及び型枠22
を取り除く。
(b) After the concrete has solidified to form the floor slab a', the toilet installation form 21 and the form 22 are
remove.

ハ 便器B′の床埋設部外周に緩衝材7′を貼り、
上記便器据付穴1′に挿入する。
C. Attach cushioning material 7' to the outer periphery of the floor-embedded part of toilet bowl B',
Insert into the toilet installation hole 1'.

ニ 便器B′の左右両リム6′下面をL型鋼等の支
持杆23で支持し、水平調整を行なつて便器
B′を仕上げ予定面の高さに仮止めする(第2
図)。
D. Support the lower surfaces of both the left and right rims 6' of the toilet bowl B' with support rods 23 made of L-shaped steel, etc., and adjust the level of the toilet bowl.
Temporarily fix B′ at the height of the surface to be finished (second
figure).

ホ 便器B′の前後のモルタルを詰める。E. Fill the front and back of toilet bowl B' with mortar.

ヘ 上記支持杆23を取り除き、便器B′の周囲
をモルタル24で固定した後、床スラブa′上に
ならしモルタル8′を塗り、更にその上をタイ
ル9′等で仕上げて仕上層b′を形成する(第3
図)。
After removing the support rod 23 and fixing the area around the toilet bowl B' with mortar 24, leveling mortar 8' is applied on the floor slab a', and the top is finished with tiles 9' etc. to form a finishing layer b'. (3rd
figure).

従つて、この方法では支持杆23や、支持杆2
3を水平に調整する機材が必要であると共に、便
器据付工事中に便器B′の姿勢が不安定であつた
り、支持杆23から外れて階下に落下する等の問
題があり施工が面倒であり、しかも仕上層b′や便
所内の内装工事中に便器B′が破損したり、汚損
する虞れがあつた。
Therefore, in this method, the support rod 23 and the support rod 2
In addition to requiring equipment to horizontally adjust the toilet bowl B', the installation process is troublesome as there are problems such as the toilet bowl B' being unstable during toilet installation work, or falling off the support rod 23 and falling downstairs. Moreover, there was a risk that the toilet bowl B' would be damaged or soiled during the finishing layer b' and the toilet interior construction work.

そこで、実開昭54−22339号公報に開示される
如く、床スラブに開設した便器据付穴の上縁に、
硬質ゴム等からなる施工枠の外周面に設けた鍔部
を係止し、床スラブ上面に防水層及び仕上層を順
次積層して施工枠を固定し、便器のリム下面に形
成した環状凹部にシール材を注入して該環状凹部
を施工枠上端に嵌め込むことにより便器を固定す
るものがある。
Therefore, as disclosed in Japanese Utility Model Application Publication No. 54-22339, at the upper edge of the toilet installation hole opened in the floor slab,
The flange provided on the outer circumferential surface of the construction frame made of hard rubber, etc. is locked, and the construction frame is fixed by sequentially laminating a waterproof layer and a finishing layer on the top surface of the floor slab, and then the construction frame is fixed in the annular recess formed on the bottom surface of the toilet rim. Some toilets are fixed by injecting a sealing material and fitting the annular recess into the upper end of the construction frame.

〈考案が解決しようとする問題点〉 しかし、この実開昭54−22339号公報のものは、
鍔部より下方の施工枠外周を便器据付穴内周と一
致するように形成しているため、便器に接続され
る給排水管等の都合によつて予め床スラブに開穿
した便器据付穴の位置が多少でもずれた場合には
便器の設置位置を変えることができず、改めて便
器据付穴を開け直す必要があるという問題があ
る。
<Problems to be solved by the invention> However, this patent publication No. 54-22339,
Since the outer periphery of the construction frame below the flange is formed to match the inner periphery of the toilet installation hole, the position of the toilet installation hole that is pre-drilled in the floor slab due to the convenience of water supply and drainage pipes connected to the toilet, etc. If the toilet is even slightly shifted, the installation position of the toilet cannot be changed, and there is a problem that the toilet installation hole must be re-drilled.

また、この他に実公昭50−26197号公報に開示
される如く、施工枠の内側に便器の通水路段部を
係止する突出部を、外側に上記便器据付穴より大
径な鍔部を夫々一体形成して、該鍔部を便器据付
穴の上縁に移動自在に載置させることにより便器
の設置位置を調整可能にしたものがあるが、この
実公昭50−26197号公報のものは前記突出部が施
工枠の上方に突出して形成され、床スラブの上方
にて通水路段部を係止するため、便器のリム下面
の設置高さが該突出部の高さ分だけ高くなつて、
その結果床全体の厚さが厚くなつてしまい、特に
床が防水層を設けない所謂乾式の場合には適さな
いという問題がある。
In addition, as disclosed in Japanese Utility Model Publication No. 50-26197, a protruding portion for locking the stepped portion of the toilet water passage is provided on the inside of the construction frame, and a flange portion with a larger diameter than the toilet installation hole is provided on the outside. There is a toilet in which the installation position of the toilet can be adjusted by integrally forming the respective flanges and movably placing the flanges on the upper edge of the toilet installation hole. Since the protrusion is formed to protrude above the construction frame and locks the water passage step above the floor slab, the installation height of the lower surface of the rim of the toilet bowl is increased by the height of the protrusion. ,
As a result, the overall thickness of the floor becomes thicker, which poses a problem that it is not suitable particularly for so-called dry flooring where the floor is not provided with a waterproof layer.

本考案は斯る従来事情に鑑み、突出部の高さ位
置を床スラブ上面より低くして床全体の厚さを薄
くすると共に便器据付穴内での突出部の移動を可
能にして便器の設置位置を調整可能にすることを
目的とする。
In view of such conventional circumstances, the present invention lowers the height of the protruding part from the top surface of the floor slab to reduce the overall thickness of the floor, and also allows the protruding part to move within the toilet installation hole to improve the toilet installation position. The purpose is to make it adjustable.

〈問題点を解決するための手段〉 上記問題点を解決するために本考案が講ずる手
段は、和風便器施工枠における鍔部より下方の外
周を便器据付穴より小さく形成して、該鍔部下方
の外周と便器据付穴の内周との間に突出部の位置
調節用間隙を形成すると共に、上記鍔部の幅を施
工枠の左右に形成される上記位置調節用間隙の和
よりも大きくしたことにある。
<Means for Solving the Problems> The means taken by the present invention to solve the above problems is to form the outer periphery of the Japanese-style toilet construction frame below the flange smaller than the toilet installation hole, and to A gap for position adjustment of the protrusion is formed between the outer periphery of the toilet and the inner periphery of the toilet installation hole, and the width of the flange is made larger than the sum of the position adjustment gaps formed on the left and right sides of the construction frame. There is a particular thing.

〈作用〉 本考案施工枠は、便器据付穴の上縁に鍔部を係
止した状態で、突出部をずらしてその突出部に載
置する便器が正確な位置に設置されるように調整
した後、床スラブの上方に起立部と略同一高さの
仕上層を形成し、然る後突出部に便器を載置する
ものである。
<Function> The construction frame of this invention is adjusted so that the toilet placed on the protrusion is installed in the correct position by shifting the protrusion while the flange is locked to the upper edge of the toilet installation hole. After that, a finishing layer is formed above the floor slab at approximately the same height as the upright portion, and a toilet bowl is placed on the rear protruding portion.

〈実施例〉 以下、本考案の一実施例を図面に基づいて説明
する。
<Example> Hereinafter, an example of the present invention will be described based on the drawings.

この実施例は第4図及び第5図に示すように便
所の床Aが防水層を設けない所謂乾式工法であ
り、この床Aを構成する床スラブaに便器据付用
型枠(図示せず)で、和風便器Bより大き目の便
器据付穴1を開穿し、該穴1に施工枠Cを設置し
て床仕上工事を行なつた後に便器Bを設置するも
のである。
In this embodiment, as shown in Figs. 4 and 5, the floor A of the toilet is constructed using the so-called dry construction method in which no waterproof layer is provided. ), a toilet installation hole 1 larger than the Japanese-style toilet B is drilled, a construction frame C is installed in the hole 1, and after floor finishing work is performed, the toilet B is installed.

施工枠Cはガラス繊維強化コンクリート等の強
度があり、ある程度の耐火性のある材質を用いて
便器Bの床埋設部外周を囲む形状に形成されてお
り、その外周寸法は上記便器据付穴1の内周より
若干小さく形成されている。
The construction frame C is made of a strong and fire-resistant material such as glass fiber reinforced concrete, and is formed in a shape that surrounds the outer periphery of the floor-embedded part of the toilet bowl B, and its outer circumferential dimensions are the same as those of the toilet installation hole 1 above. It is formed slightly smaller than the inner circumference.

施工枠Cの下部には内方に突出する突出部2を
全周或いは一部に形成しており、該突出部2に便
器Bの通水路段部3下面を係止するようになつて
いる。
At the bottom of the construction frame C, a protrusion 2 that protrudes inward is formed all around or partially, and the lower surface of the water passage step 3 of the toilet bowl B is engaged with the protrusion 2. .

また、施工枠Cの上部には外方に突出する鍔部
4を全周に渉つて形成しており、該鍔部4が上記
便器据付穴1の開口縁に係止するようになつてい
る。
Furthermore, a flange 4 that protrudes outward is formed on the upper part of the construction frame C, extending around the entire circumference, and the flange 4 is adapted to be engaged with the opening edge of the toilet installation hole 1. .

そして、この施工枠Cは、上記鍔部4より下方
の外周を便器据付穴1より小さく形成して該鍔部
4下方の外周と便器据付穴1の内周との間に上記
突出部2の位置を調整するための間隙5を形成し
ている。
The construction frame C has an outer periphery below the flange 4 smaller than the toilet installation hole 1, and the protrusion 2 is formed between the outer periphery below the flange 4 and the inner periphery of the toilet installation hole 1. A gap 5 is formed for adjusting the position.

一方、上記鍔部4は施工枠Cを便器据付穴1に
係止した状態において、施工枠Cの突出部2外周
と便器据付穴1内周との間に夫々形成される左右
の上記間隙5の和より大きな幅を有している。
On the other hand, when the construction frame C is locked in the toilet installation hole 1, the flange portion 4 has the left and right gaps 5 formed between the outer periphery of the protrusion 2 of the construction frame C and the inner periphery of the toilet installation hole 1, respectively. has a width greater than the sum of

従つて、施工枠Cは便器据付穴1の一方に片寄
せて配置しても該穴1より階下に落下することが
ない。
Therefore, even if the construction frame C is placed off to one side of the toilet installation hole 1, it will not fall from the hole 1 to the floor below.

また、この施工枠Cは上端全周に渉つて起立部
10を形成しており、施工枠Cの突出部2に便器
Bの通水路段部3を係止した状態において、該起
立部10が便器Bのリム6下面に、固化後ゴム状
になるシリコン等の粘調なシール材11を介して
当接するようになつている。
Furthermore, this construction frame C has an upright portion 10 extending around the entire circumference of the upper end, and when the water passage stepped portion 3 of the toilet bowl B is locked to the protruding portion 2 of the construction frame C, the upright portion 10 is It comes into contact with the lower surface of the rim 6 of the toilet bowl B via a viscous sealing material 11 such as silicone which becomes rubber-like after solidifying.

更に、この施工枠Cの上面或いは内面には便器
Bを係止したとき、便器Bに接続する給排水管の
位置を示す指標(図示せず)が描かれている。
Furthermore, an index (not shown) is drawn on the upper surface or inner surface of the construction frame C to indicate the position of the water supply and drainage pipe connected to the toilet bowl B when the toilet bowl B is locked.

而して、斯る施工枠Cを用いて便器Bを設置す
る際は、先ず便器据付穴1に施工枠Cを載置した
状態で、上記指標により便器Bを正確な位置に調
整する。次に施工枠Cの上端面、即ち、起立部1
0上面に適宜厚さのテープ(図示せず)を貼着
し、該テープ上面と面一になるように、床スラブ
a上にならしモルタル8やタイル9等で仕上層b
を形成する。
When installing the toilet bowl B using such a construction frame C, first, with the construction frame C placed in the toilet installation hole 1, the toilet bowl B is adjusted to an accurate position using the above-mentioned index. Next, the upper end surface of the construction frame C, that is, the upright portion 1
A tape (not shown) of an appropriate thickness is pasted on the top surface of the floor slab a, and a finishing layer b of leveling mortar 8, tiles 9, etc. is applied to the floor slab a so that it is flush with the top surface of the tape.
form.

そして、上記テープを剥がして空間部12を形
成し、該空間部12にシール材11が充填される
ように起立部10上面にシール材11を塗布して
から、便器Bを突出部2に載置する。
Then, the tape is peeled off to form a space 12, and the sealant 11 is applied to the upper surface of the upright part 10 so that the space 12 is filled with the sealant 11, and then the toilet bowl B is placed on the protrusion 2. place

従つて、斯る実施例のものは仕上層bの形成後
に便器Bを載置することができるので、工事中に
便器Bが損傷せず、施工枠Cの上端面にテープを
貼着して仕上層bを形成するので、シール面が工
事中に汚れたり損傷することがなく、しかも便器
Bは突出部2で確実に支持されているので、シー
ル材11に力が加わることがないからシール材1
1が損傷して漏水するようなことがない。
Therefore, in this embodiment, the toilet B can be placed after the finishing layer b is formed, so the toilet B is not damaged during construction, and the tape can be pasted on the upper end surface of the construction frame C. Since the finishing layer b is formed, the sealing surface will not get dirty or damaged during construction, and since the toilet bowl B is reliably supported by the protrusion 2, no force is applied to the sealing material 11, so the sealing Material 1
1 will not be damaged and cause water leakage.

一方、この便器Bはシール材11の部分にナイ
フを入れて上方へ引き抜けば簡単に取り出すこと
ができる。
On the other hand, this toilet bowl B can be easily taken out by inserting a knife into the sealing material 11 and pulling it upward.

〈考案の効果〉 本考案は以上のように、鍔部より下方の外周を
便器据付穴より小さく形成して、該鍔部下方の外
周と便器据付穴の内周との間に突出部の位置調節
用間隙を形成すると共に、上記鍔部の幅を施工枠
の左右に形成される上記位置調節用間隙の和より
も大きくしたので、便器据付穴の位置と給排水管
等の都合による位置とが多少ずれていても、便器
施工枠の突出部をずらせば便器を正確な位置に設
置することができ、しかも、該突出部をずらして
も施工枠の外周に突出する鍔部が便器据付穴に十
分係止されるだけの幅に形成されているので、そ
れによつて該施工枠が便器据付穴より階下に落下
することもない。
<Effects of the invention> As described above, the present invention forms the outer periphery below the flange smaller than the toilet installation hole, and the position of the protrusion between the outer periphery below the flange and the inner periphery of the toilet installation hole. In addition to forming an adjustment gap, the width of the flange is made larger than the sum of the position adjustment gaps formed on the left and right sides of the construction frame, so that the position of the toilet installation hole and the position of the water supply and drainage pipe etc. can be adjusted. Even if it is slightly misaligned, you can install the toilet in the correct position by shifting the protruding part of the toilet installation frame.Moreover, even if you shift the protruding part, the flange protruding from the outer periphery of the toilet frame will not fit into the toilet installation hole. Since it is formed wide enough to be sufficiently locked, the construction frame will not fall downstairs through the toilet installation hole.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図乃至第3図は従来の和風便器の設置方法
の一例を示す断面図、第4図は本考案の和風便器
施工枠を乾式の床に設置した状態を示す縦断正面
図、第5図は同縦断側面図を示す。 A……床、B……和風便器、C……施工枠、a
……床スラブ、b……仕上層、1……便器据付
穴、2……突出部、3……通水路段部、4……鍔
部、5……位置調節用間隙、6……リム、10…
…起立部。
Figures 1 to 3 are cross-sectional views showing an example of a conventional Japanese-style toilet installation method, Figure 4 is a vertical front view showing the Japanese-style toilet construction frame of the present invention installed on a dry floor, and Figure 5 shows a longitudinal side view of the same. A...Floor, B...Japanese-style toilet, C...construction frame, a
... Floor slab, b ... Finishing layer, 1 ... Toilet installation hole, 2 ... Protrusion, 3 ... Water passage step, 4 ... Flange, 5 ... Position adjustment gap, 6 ... Rim , 10...
...Standing part.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 和風便器の床埋設部外周を囲む形状に形成さ
れ、その外側に外方へ突出して床スラブに開穿さ
れる便器据付穴の上縁に係止する鍔部を設けると
共に、内側に和風便器の通水路段部を係止する突
出部を設け、且つ上端全周に渉つて、上記突出部
を便器据付穴内に配置して便器を係止したときの
該便器のリム下面に当接し、該リム下面と床スラ
ブ上面との間に仕上層を形成するための間隔を形
成する起立部を突設した和風便器施工枠におい
て、上記鍔部より下方の外周を便器据付穴より小
さく形成して、該鍔部下方の外周と便器据付穴の
内周との間に上記突出部の位置調節用間隙を形成
すると共に、上記鍔部の幅を施工枠の左右に形成
される上記位置調節用間隙の和よりも大きくした
ことを特徴とする和風便器施工枠。
A flange is formed to surround the outer periphery of the floor-embedded part of the Japanese-style toilet, and a flange is provided on the inside that protrudes outward and locks onto the upper edge of the toilet installation hole drilled in the floor slab. A protrusion is provided for locking the stepped portion of the water passage, and the protrusion extends around the entire circumference of the upper end so that when the protrusion is placed in the toilet installation hole and the toilet is locked, the protrusion comes into contact with the lower surface of the rim of the toilet, and the rim In a Japanese-style toilet construction frame that has a protruding part that forms a gap for forming a finishing layer between the lower surface and the upper surface of the floor slab, the outer periphery below the flange is formed smaller than the toilet installation hole, and the A gap for adjusting the position of the protrusion is formed between the outer periphery of the lower part of the flange and the inner periphery of the toilet installation hole, and the width of the flange is the sum of the gaps for adjusting the position formed on the left and right sides of the construction frame. A Japanese-style toilet construction frame that is characterized by being larger than the original size.
JP2588282U 1982-02-24 1982-02-24 Japanese style toilet construction frame Granted JPS58129974U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2588282U JPS58129974U (en) 1982-02-24 1982-02-24 Japanese style toilet construction frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2588282U JPS58129974U (en) 1982-02-24 1982-02-24 Japanese style toilet construction frame

Publications (2)

Publication Number Publication Date
JPS58129974U JPS58129974U (en) 1983-09-02
JPH0352870Y2 true JPH0352870Y2 (en) 1991-11-18

Family

ID=30037838

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2588282U Granted JPS58129974U (en) 1982-02-24 1982-02-24 Japanese style toilet construction frame

Country Status (1)

Country Link
JP (1) JPS58129974U (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009256905A (en) * 2008-04-14 2009-11-05 Inax Corp Construction method of japanese style toilet bowl
JP5104519B2 (en) * 2008-04-22 2012-12-19 株式会社Lixil Toilet bowl installation structure and method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5026197U (en) * 1973-07-05 1975-03-26
JPS5422339B2 (en) * 1976-07-16 1979-08-06

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4968851U (en) * 1972-09-25 1974-06-15
JPS507336U (en) * 1973-05-16 1975-01-25
JPS5422339U (en) * 1977-07-18 1979-02-14

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5026197U (en) * 1973-07-05 1975-03-26
JPS5422339B2 (en) * 1976-07-16 1979-08-06

Also Published As

Publication number Publication date
JPS58129974U (en) 1983-09-02

Similar Documents

Publication Publication Date Title
JPH01214636A (en) Execution method for water closet of japanese style
US20100299827A1 (en) Under mud shower pan
JPH0352870Y2 (en)
CN102777033B (en) Method for mounting prefabricated kitchen
JP3738197B2 (en) Sleeve formwork and method for constructing opening for equipment piping using the same
JP2534300B2 (en) Japanese-style toilet construction method
CN102777032A (en) Installation method of prefabricated toilet
JP2006342667A (en) Construction structure and construction method of sanitary earthenware facility
JPH0242771Y2 (en)
JPH07537Y2 (en) Japanese style toilet bowl mounting structure
JP2534301B2 (en) Japanese-style toilet construction method
JPH0542144Y2 (en)
JPS60386Y2 (en) Japanese style toilet installation structure
JPS5833179Y2 (en) Floor drain corner trap
JP2551970B2 (en) Japanese-style toilet construction method
JPH01214633A (en) Execution method for water closet of japanese style
JP2002021325A (en) Slab penetration part water stopper and pipe fixing mortar receiving frame
JPS6022874Y2 (en) bathtub
CN105649331B (en) A kind of interior standpipe water-leakage construction method
JPH01214635A (en) Execution method for water closet of japanese style
JP2534298B2 (en) Japanese-style toilet construction method
JP3671979B2 (en) Sanitary equipment construction structure and construction method
JPH0425874Y2 (en)
JPH0211509Y2 (en)
JP2803539B2 (en) Construction method of double wall underground outer wall