JPH0342105Y2 - - Google Patents

Info

Publication number
JPH0342105Y2
JPH0342105Y2 JP12931586U JP12931586U JPH0342105Y2 JP H0342105 Y2 JPH0342105 Y2 JP H0342105Y2 JP 12931586 U JP12931586 U JP 12931586U JP 12931586 U JP12931586 U JP 12931586U JP H0342105 Y2 JPH0342105 Y2 JP H0342105Y2
Authority
JP
Japan
Prior art keywords
support
outer tube
tube
column
short
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP12931586U
Other languages
Japanese (ja)
Other versions
JPS6336531U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP12931586U priority Critical patent/JPH0342105Y2/ja
Publication of JPS6336531U publication Critical patent/JPS6336531U/ja
Application granted granted Critical
Publication of JPH0342105Y2 publication Critical patent/JPH0342105Y2/ja
Expired legal-status Critical Current

Links

Description

【考案の詳細な説明】 「産業上の利用分野」 この考案は水中構造物に於ける格点構造に関す
る。
[Detailed description of the invention] "Industrial application field" This invention relates to point structures in underwater structures.

「従来の技術」 シーバース、ドルフイン等の水中構造物に於い
て、水中で構成する格点構造としては当初水中溶
接になるものであつたが、 a 特殊技能を有する溶接工が必要。
``Conventional technology'' In underwater structures such as sea berths and dolphins, underwater welding was initially used to construct underwater structures, but a. Welders with special skills were required.

b 信頼性の高い強度が得られない。b. Highly reliable strength cannot be obtained.

c 工事に長時間を要する。c Construction takes a long time.

等の理由から、又、ボルト結合になるものであつ
たが、 a 繰返して作用する波力によりゆるむ場合が大
い。
Due to the following reasons, bolts were used to connect the bolts, but they often loosen due to the repeated force of waves.

b 特殊な防錆処理をしないとすき間腐食で破断
するおそれがある。
b There is a risk of fracture due to crevice corrosion unless special anti-corrosion treatment is applied.

等の理由から夫々採用され難く、叙上の如き諸難
点のない別異の格点構造として、水中に打設した
支柱(例えば鋼管杭)の水中部分に外挿短管をセ
メントモルタルにより固定して格点(ブレース材
の支点)を形成するとしたものが、例えば特公昭
56−34692号公報、特公昭60−3572号公報、特公
昭60−20528号公報等に提案されている。
For these reasons, it is difficult to adopt each of them, and as a different point structure that does not have the above-mentioned difficulties, an extrapolated short pipe is fixed to the underwater part of a support (for example, a steel pipe pile) cast in the water using cement mortar. For example, the special public works of Sho
It has been proposed in Japanese Patent Publication No. 56-34692, Japanese Patent Publication No. 60-3572, Japanese Patent Publication No. 60-20528, etc.

この格点構造は、外挿短管をワイヤーロープで
吊下げて支柱の途中の所定位置に保持し、この状
態で、支柱と外挿短管との間隙の上下端を、外挿
短管の内周に予めセツトしておいたゴムチユーブ
又は爆接管に圧力空気を送入する又は爆発拡径変
形させることによつてシールした後、前記間隙に
セメントモルタルを注入・充填しており、強固な
格点を確実に形成できる点で優れている。
In this structure, the short outer tube is suspended with a wire rope and held at a predetermined position in the middle of the column, and in this state, the upper and lower ends of the gap between the column and the short tube are After sealing is achieved by supplying pressurized air or explosively expanding the diameter of a rubber tube or explosive welding tube that has been set in advance on the inner periphery, the gap is injected and filled with cement mortar, resulting in a strong structure. It is excellent in that it can form points reliably.

「考案が解決しようとする問題点」 しかるに叙上手段にあつては、外挿短管を支柱
の途中の所定位置にワイヤーロープで保持すると
云う極めて厄介な手間を要すると共にシールが必
要以上に仰々しく、かかる事情からして、コス
ト、施工性において難点がある。
``Problems that the invention seeks to solve'' However, with the method described above, it is extremely troublesome to hold the short extrapolation tube in a predetermined position in the middle of the column with a wire rope, and the sealing process is unnecessarily difficult. Considering these circumstances, there are difficulties in terms of cost and workability.

「問題点を解決するための手段」、「作用」 本案な叙上の事情に鑑みなされたもので、その
要旨とするところは、水中に打設した支柱の適所
に半割り環状の支持体を仮止めし、その上に外挿
短管を載置し、当該載置部に生じる間隙にウエ
ス、砂、砂利等の投入して目詰めし、この状態で
支柱と外挿短管との間隙にセメントモルタルを充
填して外挿短管を支柱に固定するとして、外挿短
管の位置決め保持並びにシールを大巾に簡易化し
て施工性を向上した点にある。
``Means for solving problems'' and ``effects'' This was done in view of the serious circumstances of the case, and its gist is to install half-split annular supports at appropriate locations on pillars cast in water. Temporarily fix it, place the short outer tube on top of it, fill the gap created by the placing part with cloth, sand, gravel, etc. In this state, close the gap between the support and the short outer tube. The short outer tube is fixed to the support by filling it with cement mortar, and the positioning and holding of the short outer tube as well as the sealing are greatly simplified and the workability is improved.

「実施例」 以下、これを図に基づいて詳細に説明する。"Example" This will be explained in detail below based on the drawings.

第1図は本案により格点を形成した水中構造物
の全体図であつて、図中、1は支柱、2はブレー
ス材、3は支持体、5は外挿短管である。
FIG. 1 is an overall view of an underwater structure in which a fixed point is formed according to the present invention, and in the figure, 1 is a column, 2 is a brace material, 3 is a support, and 5 is an extrapolated short pipe.

本案では、まず、予め水中に打設されている支
柱1の所定箇所に支持体3を仮止めするが、この
支持体3は支柱1に容易に取付けることができる
ように半割り環状に形成されている。
In this case, first, the support 3 is temporarily fixed to a predetermined location of the support 1 that has been cast in the water in advance, but the support 3 is formed into a half ring shape so that it can be easily attached to the support 1. ing.

すなわち、第2図は支持体3の平面図であり、
又第3図では支持体3を正面から視ており、支持
体3は、裏面は半径方向のリブ6を突設した半割
りプレート7,7の一側をヒンジ8で結合し、他
側をボルト9で止めるようになつているが、他側
をボルト止めでなく打込み金具で挟んで止めるよ
うにしてもよく、また、一側をヒンジ結合しない
で他側と同様にボルト等で止めるようにしても構
わない。
That is, FIG. 2 is a plan view of the support 3,
Further, in FIG. 3, the support body 3 is viewed from the front, and the support body 3 has half plates 7, 7 having radial ribs 6 protruding from the back surface, and one side of which is joined by a hinge 8, and the other side is connected by a hinge 8. Although it is designed to be fastened with bolt 9, the other side may be fastened by clamping it with a drive-in metal fitting instead of being fastened with a bolt, or one side may not be hinged and fastened with a bolt, etc. in the same way as the other side. I don't mind.

支持体3の仮止めは、支柱1の外径より僅かに
小さい内径の支持体3を支柱1の外周に締付けて
固定すれば確実であるが、これに限るわけではな
く、例えば支柱1がらせ杭の場合に、杭の外径よ
り僅かに大きい内径の支持体3を杭に外挿して下
降させ、所定位置で支持体3を傾けそのリブ6を
杭の外周に摩擦係合させて止めるようにしてもよ
い。
Temporary fixing of the support 3 can be ensured by tightening and fixing the support 3 having an inner diameter slightly smaller than the outside diameter of the support 1 to the outer periphery of the support 1, but this is not limited to this. In the case of a pile, the support 3 having an inner diameter slightly larger than the outside diameter of the pile is extrapolated onto the pile and lowered, and the support 3 is tilted at a predetermined position so that its rib 6 frictionally engages with the outer periphery of the pile and stops. You can also do this.

前述の締付け固定の場合は潜水夫を使うことに
なるが、仮止め作業の所要時間が短いので費用は
大して掛からない。
In the case of the above-mentioned tightening and fixing, a diver will be used, but since the time required for temporary fixing is short, the cost will not be very high.

支持体3を支柱1の外周に仮止めした後、その
上に第3図に示される如く外挿短管5を載置す
る。
After the support 3 is temporarily fixed to the outer periphery of the support 1, the short outer tube 5 is placed thereon as shown in FIG.

これにより支持体3がストツパーとなつて外挿
管5の支柱1に対する位置決め保持がなされるこ
ととなる。
As a result, the support body 3 acts as a stopper, and the external intubation tube 5 is positioned and held relative to the support column 1.

第3図に於いて、a図は外挿管5が直胴管の場
合で、b図は上下フランジ付管の場合で夫々示し
ている。
In FIG. 3, figure a shows the case where the external tube 5 is a straight body tube, and figure b shows the case where the outer tube 5 is a tube with upper and lower flanges.

図示の如く、本案では外挿管5の上端は開口し
たままとして、外挿管5の上端よりのセメントモ
ルタルの溢れ出しについては許容している。
As shown in the figure, in the present invention, the upper end of the outer tube 5 is left open, and cement mortar is allowed to overflow from the upper end of the outer tube 5.

それは、充填用のセメントモルタルには膨脹材
を混入したいわゆる膨脹性モルタルを用いるの
で、所定の固定効果は充分な発現するからで、上
端のシールは省略して差し支えないためである。
This is because so-called expandable mortar mixed with an expansion material is used as the cement mortar for filling, so the desired fixing effect is sufficiently achieved, and the seal at the upper end can be omitted.

但し、下端のシールについては、事情が違うの
で、シール措置を施こす。
However, the situation is different regarding the seal at the lower end, so sealing measures will be taken.

すなわち、載置外挿管5の底にウエス、砂、砂
利等の投入による目詰め層4を形成させる。
That is, the packing layer 4 is formed at the bottom of the mounting tube 5 by adding rags, sand, gravel, etc.

この層高を予め考慮して外挿管5は約10cm程長
めに作製するを良しとする。
Taking this layer height into consideration in advance, it is recommended that the external intubation tube 5 be made approximately 10 cm longer.

しかして、外挿短管5の下端がシールされるか
ら、この状態で支柱1と外挿短管5との間隙に膨
脹性セメントモルタル10を注入・充填し、外挿
短管5を支柱1に固定する。
Thus, the lower end of the short outer tube 5 is sealed, and in this state, expandable cement mortar 10 is injected and filled into the gap between the column 1 and the short outer tube 5, and the short outer tube 5 is connected to the column 1. Fixed to.

「考案の効果」 上述の本案の格点構造にあつては、外挿管5の
位置決め保持並びにシール措置が極めて簡易化さ
れたので、従来のものに比し、施工が遥かに簡単
であり、工事費も節減できる。
``Effect of the invention'' In the above-mentioned case structure of the present invention, the positioning and holding of the external intubation tube 5 and the sealing measures are extremely simplified, so the construction is much simpler than the conventional one, and the construction work is much easier. Costs can also be reduced.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本案により格点を形成した水中構造物
の全体正面図、第2図は支持体の平面図、第3図
a,bは本案の格点構造の縦断図である。 1……支柱、2……ブレース材、3……支持
体、4……目詰め層、5……外挿短管、6……リ
ブ、7……半割りプレート、8……ヒンジ、9…
…ボルト、10……膨脹性セメントモルタル。
FIG. 1 is an overall front view of an underwater structure in which case points are formed according to the present invention, FIG. 2 is a plan view of a support, and FIGS. 3 a and 3 b are longitudinal sectional views of the case point structure of the present invention. DESCRIPTION OF SYMBOLS 1... Strut, 2... Brace material, 3... Support body, 4... Filling layer, 5... Outer short tube, 6... Rib, 7... Half plate, 8... Hinge, 9 …
...Bolt, 10...Expansible cement mortar.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 水中に打設した支柱の適所に半割り環状の支持
体を仮止めし、その上に外挿短管を載置し、当該
載置部に生じる間隙にウエス、砂、砂利等を投入
して目詰めし、この状態で支柱と外挿短管との間
隙にセメントモルタルを充填して外挿短管を支柱
に固定するとしてなることを特徴とする水中構造
物に於ける格点構造。
Temporarily fix a half-split annular support at the appropriate location of the support that has been cast in the water, place the short outer pipe on top of it, and pour rags, sand, gravel, etc. into the gap created in the place where it is placed. A point structure in an underwater structure characterized in that the space between the column and the short outer tube is filled with cement mortar, and the short outer tube is fixed to the column.
JP12931586U 1986-08-25 1986-08-25 Expired JPH0342105Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12931586U JPH0342105Y2 (en) 1986-08-25 1986-08-25

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12931586U JPH0342105Y2 (en) 1986-08-25 1986-08-25

Publications (2)

Publication Number Publication Date
JPS6336531U JPS6336531U (en) 1988-03-09
JPH0342105Y2 true JPH0342105Y2 (en) 1991-09-04

Family

ID=31025784

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12931586U Expired JPH0342105Y2 (en) 1986-08-25 1986-08-25

Country Status (1)

Country Link
JP (1) JPH0342105Y2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4966748B2 (en) * 2007-05-31 2012-07-04 五洋建設株式会社 Underwater structure and method for reinforcing the same

Also Published As

Publication number Publication date
JPS6336531U (en) 1988-03-09

Similar Documents

Publication Publication Date Title
US4785593A (en) Structural building system
JP2007327244A (en) Method and structure for temporarily coffering underwater structure
JPH0342105Y2 (en)
JP2000257065A (en) Driving method of steel pipe sheet pile
CN105863130A (en) External wall panel mounting joint
JPH11323948A (en) Cofferdam construction method in bridge pier steel plate winding reinforcing work executed in underwater part
JPH0139780Y2 (en)
JP2567352B2 (en) Method for embedding resin pipe and pipe support used in the method
JPH037762B2 (en)
JPS6211133B2 (en)
JPH06306832A (en) Revetment structure formed by using steel sheet pile
JPH027974Y2 (en)
JPS5849261Y2 (en) Corrosion protection cover for steel piles
JPS5925969Y2 (en) basic hardware
JPH052770B2 (en)
JPS5864976A (en) Tank
JPS5953416B2 (en) How to install anti-corrosion formwork for steel sheet pile structures
JPH0348281Y2 (en)
JP2002088777A (en) Method for connecting jacket structure to pile, and pipe expanding apparatus for use in the method
JPH0421863Y2 (en)
JPS5853637B2 (en) Concrete floating structure
JPH0132335B2 (en)
JPS60258334A (en) Device for reinforcing work of submerged steel pipe strut
JPS6210338A (en) Fitting of timbering work for covered steel tubular pile
JPH072718Y2 (en) Anticorrosion structure of steel pipe sheet pile