JPH0336369B2 - - Google Patents

Info

Publication number
JPH0336369B2
JPH0336369B2 JP9792285A JP9792285A JPH0336369B2 JP H0336369 B2 JPH0336369 B2 JP H0336369B2 JP 9792285 A JP9792285 A JP 9792285A JP 9792285 A JP9792285 A JP 9792285A JP H0336369 B2 JPH0336369 B2 JP H0336369B2
Authority
JP
Japan
Prior art keywords
fixed
foundation
pipe
supporting
pipes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP9792285A
Other languages
Japanese (ja)
Other versions
JPS61257538A (en
Inventor
Tsuguhiko Watanabe
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP9792285A priority Critical patent/JPS61257538A/en
Publication of JPS61257538A publication Critical patent/JPS61257538A/en
Publication of JPH0336369B2 publication Critical patent/JPH0336369B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)
  • Support Of Aerials (AREA)

Description

【発明の詳細な説明】 発明の目的 (イ) 産業上の利用分野 本発明は各種地上立設物支持用基礎及びその設
置方法に関するものであり、例えば衛星放送受信
用パラボラアンテナの支柱等を立設するための支
持用基礎である。
[Detailed Description of the Invention] Object of the Invention (a) Industrial Application Field The present invention relates to a foundation for supporting various above-ground structures and a method for installing the same. This is the supporting foundation for the installation.

(ロ) 従来の技術 衛星放送の実用化に伴い放送電波受信用パラボ
ナアンテナの設置が各所で行われているが、この
種のアンテナはその角度、方向共に相当な精度で
固定しなければならないため、第9図に示すよう
に上端にフランジ58を固着した埋設支柱50に
根架51を固設した基礎を使用し、該根架51を
含む埋設支柱50を建て込む大径の穴を掘り下げ
てコンクリート52で固めるものであつた。
(b) Conventional technology With the practical application of satellite broadcasting, parabolic antennas for receiving broadcast radio waves are being installed in various places, but this type of antenna must be fixed with considerable precision in both angle and direction. As shown in FIG. 9, a foundation is used in which a root support 51 is fixed to a buried support 50 with a flange 58 fixed to the upper end, and a large diameter hole is dug into which the buried support 50 including the root support 51 is erected. It was to be hardened with concrete 52.

(ハ) 発明が解決しようとする問題点 上記従来の技術によれば、大径の穴を掘らなけ
ればならないため作業者の労力負担が大きい上、
掘り起こした大量の残土処理も難しい問題であつ
た。
(c) Problems to be solved by the invention According to the above-mentioned conventional technology, it is necessary to dig a large diameter hole, which imposes a large labor burden on the worker.
Disposal of the large amount of excavated soil was also a difficult problem.

又、穴の容積が大きいため高価な速乾性セメン
トの使用は割高になることから一般に生コンが打
ち込まれているが、これが初期支持力を発揮する
ようになるまでは別途支持材で埋設支柱50を支
持しなければならず、作業性の悪さと共に施工期
間が長引くことも重大な問題であつた。
In addition, because the volume of the hole is large, it is expensive to use expensive quick-drying cement, so ready-mixed concrete is generally poured into the hole. This was a serious problem, as it required support, resulting in poor workability and a prolonged construction period.

本発明は上記問題に鑑みてなされたもので、施
工が容易であると共に、小量の速乾性セメントに
より施工完了直後から十分な支持力を発揮する地
上設物支持用基礎及びその設置方法を提供するこ
とを目的とする。
The present invention has been made in view of the above problems, and provides a foundation for supporting above-ground facilities that is easy to construct and exhibits sufficient supporting capacity immediately after construction is completed using a small amount of quick-drying cement, and a method for installing the same. The purpose is to

(ニ) 問題点を解決するための手段 本発明は上記目的を達成するため、土砂掘削量
を少なく且つ大きい抵抗力を得る基礎の構造を構
成したもので、水平方向にY字状に等配溶接固着
したパイプ状の支脚の各先端にパイプ状固定管を
垂直方向に固着すると共に、該上記各支脚の固着
部中央上面に透し孔の穿設された支柱接続用フラ
ンジを固設してなる基礎本体と、上記各固定管に
対して内挿自在になると共に上端を該固定管上縁
と係止する係止端とした適宜長さの鉄筋材とから
構成してなるものであり、上記基礎を設置する場
合は、 a 地表面を上記基礎本体が地表下に埋設される
ようにY字状の埋設溝を掘り下げ、各溝端部に
適宜深さの縦孔を穿孔した状態で、上記埋設溝
に基礎本体を載置し、 b 上記基礎本体の各固定管上方から鉄筋材を貫
挿して縦孔内にそれぞれ挿入し、係止端を固定
管の上縁に係合せしめ、 c 然る後、上記各固定管から縦孔内にそれぞれ
速乾性セメントを流入充填し固化せしめて鉄筋
材入り杭体をを構成した上、 d 上記支柱接続用フランジの中央に穿設された
透し孔から緩い粘性の速乾性セメントを流入さ
せ、パイプ状の各支脚内に充填させてこれを固
化せしめ、各支脚の耐屈強度を更に強化して、 e 支柱接続用フランジに支柱をボルト結合固定
し、前記埋設溝を埋め戻してから、支柱にアン
テナ類を取り付けるものである。
(d) Means for Solving the Problems In order to achieve the above object, the present invention has a foundation structure that reduces the amount of earth and sand excavated and obtains a large resistance. A pipe-shaped fixing tube is fixed vertically to each tip of the pipe-shaped supporting legs fixed by welding, and a support column connection flange with a through hole is fixed to the upper surface of the center of the fixed part of each of the above-mentioned supporting legs. and a reinforcing bar of an appropriate length that can be freely inserted into each of the fixed tubes and whose upper end is a locking end that locks with the upper edge of the fixed tube, When installing the above foundation, a. Dig a Y-shaped burial trench on the ground surface so that the main body of the foundation is buried below the ground surface, and drill vertical holes of appropriate depth at the ends of each trench. Place the foundation body in the buried trench, b. Insert reinforcing bars from above each of the fixed tubes of the foundation body and insert them into the respective vertical holes, and engage the locking ends with the upper edges of the fixed tubes; c. After that, quick-drying cement was flowed into the vertical holes from each of the fixed pipes and filled and solidified to form a pile body with reinforcing bars. A quick-drying cement with a loose viscosity is injected into each pipe-shaped support leg and solidified to further strengthen the bending strength of each support leg. , After backfilling the buried trench, the antennas are attached to the pillars.

(ホ) 作 用 上記基礎本体は固定管に内挿した鉄筋材及び固
定管と速乾性セメントの付着により、縦孔を形成
枠として構成される杭体と一体的になり、施工後
短時間で基礎体としての十分な初期支持力を発揮
する。
(E) Function The above foundation body becomes integrated with the pile body, which is composed of vertical holes as a frame, by the adhesion of the reinforcing bars inserted into the fixed pipe and the fixed pipe and quick-drying cement. Demonstrates sufficient initial support capacity as a foundation.

従つて基礎施工後直ちに地上立設物をフランジ
を介して取り付けても安全に支持することができ
る。
Therefore, even if an above-ground structure is attached via the flange immediately after foundation construction, it can be safely supported.

(ヘ) 実施例 以下本発明地上立設物支持用基礎の一実施例を
第1図乃至第3図により説明する。
(F) Embodiment An embodiment of the foundation for supporting above-ground structures according to the present invention will be described below with reference to FIGS. 1 to 3.

図中の1は等長の角パイプからなる3本の支脚
2,2,2の一端を等角度放射状に当接させ、水
平方向のY字状をなすと共に、該当接部上面に、
中央に透し孔4を穿設したフランジ盤3と同部下
面に蓋盤5を溶接固着し、又上記各支脚2,2,
2の端部にそれぞれ短い角パイプからなる固定管
6を鉛直に固設してなる基礎本体である。
1 in the figure is one end of three supporting legs 2, 2, 2 made of square pipes of equal length that are brought into contact in an equiangular radial manner to form a Y-shape in the horizontal direction, and on the upper surface of the corresponding contact part.
A flange board 3 with a through hole 4 drilled in the center and a cover board 5 are welded and fixed to the lower surface of the flange board 3, and each of the supporting legs 2, 2,
The base main body is formed by vertically fixing fixed pipes 6 made of short square pipes at the ends of each of the two ends.

上記フランジ盤3には外周部にボルト挿通孔
7,7,7を配設すると共に、該フランジ盤3の
透し孔4は支脚2,2,2の突き合わせ部を介し
て各支脚2,2,2の中空部8と連通してなる。
Bolt insertion holes 7, 7, 7 are provided on the outer periphery of the flange board 3, and the through holes 4 of the flange board 3 are inserted into each support leg 2, 2 through the abutting portions of the support legs 2, 2, 2. , 2, and communicates with the hollow portion 8 of .

9は鉄筋を屈折させ、上記固定管6に内挿する
ようにした鉄筋材であり、固定管6の矩形孔10
の対角内幅に相当する横杆部11の両端を上方に
それぞれ直交屈折させて平行な縦杆部12,12
を形成すると共に、該縦杆部12,12の各上端
を外方に屈折させて係止端13,13としたもの
であり、各固定管6に対して該矩形孔10の2箇
の対角線を交差するように一対の鉄筋材9,9を
挿入する。
Reference numeral 9 denotes a reinforcing bar made by bending a reinforcing bar and inserting it into the fixed pipe 6, and the rectangular hole 10 of the fixed pipe 6.
Both ends of the horizontal rod portion 11 corresponding to the diagonal inner width of are bent upward orthogonally to form parallel vertical rod portions 12, 12.
At the same time, the upper ends of the vertical rod portions 12, 12 are bent outward to form locking ends 13, 13, and two diagonal lines of the rectangular hole 10 are formed with respect to each fixed tube 6. A pair of reinforcing bars 9, 9 are inserted so as to intersect.

つぎに上記構成の地上立設物支持用基礎の設置
施工方法を第4図乃至第8図により説明する。
Next, a method of installing the foundation for supporting an above-ground structure having the above structure will be explained with reference to FIGS. 4 to 8.

a 先ず、第4図に示すように地表面を基礎本体
1の略平面形状に、該基礎本体1が地表下に埋
設されるように掘り下げて埋設溝20を形成
し、該埋設溝20の3箇所の端部に前記鉄筋材
9の縦杆部12の長さより僅かに深い縦孔2
1,21,21をハンドオーガー等の掘削ドリ
ルで穿孔する。
a First, as shown in FIG. 4, the ground surface is dug into the substantially planar shape of the foundation body 1, and a burial trench 20 is formed so that the foundation body 1 is buried below the ground surface, and three of the burial trenches 20 are A vertical hole 2 slightly deeper than the length of the vertical rod portion 12 of the reinforcing bar 9 is provided at the end of the location.
Holes 1, 21, and 21 are drilled using a drilling drill such as a hand auger.

b つぎに上記埋設溝20内に基礎本体1を載置
(第5図)した後、3箇の固定管6,6,6を
介して縦孔21,21,21に各1対ずつ鉄筋
材9を内挿するもので、第6図に示すように各
鉄筋材9は固定管6の矩形孔10に対して対角
方向に内挿し、係止端13,13を内角部上縁
と係止する。
b Next, after placing the foundation body 1 in the buried trench 20 (Fig. 5), one pair of reinforcing bars are inserted into the vertical holes 21, 21, 21 through the three fixed pipes 6, 6, 6. As shown in FIG. 6, each reinforcing bar 9 is inserted diagonally into the rectangular hole 10 of the fixed pipe 6, and the locking ends 13 are engaged with the upper edge of the inner corner. Stop.

c この状態から縦孔21,21,21に速乾性
セメント14を流入充填して鉄筋材入り杭体1
5を構成する。
c From this state, the vertical holes 21, 21, 21 are filled with quick-drying cement 14 to form the pile body 1 with reinforcing bars.
5.

この充填作業は固定管6の矩形孔10から行
なうことができるものであり、該矩形孔10内
及び固定管6と縦孔21間にも充填する(第7
図)。
This filling operation can be performed from the rectangular hole 10 of the fixed tube 6, and the filling is also carried out in the rectangular hole 10 and between the fixed tube 6 and the vertical hole 21 (the seventh
figure).

更に、緩い粘性の速乾性セメント14をフラ
ジン盤3の透し孔4から各支脚2,2,2の中
空部8内に流入充填して、支脚2の耐屈強度を
より強化するが、この作業工程だけは基礎本体
1を埋設溝20に載置する以前に実施されてい
ても全く問題はない。
Furthermore, a quick-drying cement 14 with a loose viscosity is flowed and filled into the hollow part 8 of each support leg 2, 2, 2 from the through hole 4 of the flange disk 3 to further strengthen the bending strength of the support leg 2. There is no problem at all even if the work process is carried out before the foundation body 1 is placed in the burial trench 20.

埋設溝20を埋め戻して基礎の設置は完了す
る。
The burial trench 20 is backfilled and the installation of the foundation is completed.

d 上記のように設置した基礎に対して各種柱状
体23を立設する場合は、第8図のようにフラ
ンジ盤3の各ボルト挿通孔7に挿通したボル
ト・ナツト24を柱状体23の下端に固着した
フランジ25と締結固定することにより地上立
設物を支持することができる。
d When installing various columnar bodies 23 upright on the foundation installed as described above, insert the bolts and nuts 24 inserted into each bolt insertion hole 7 of the flange board 3 into the lower end of the columnar body 23 as shown in Fig. 8. By fastening and fixing the flange 25 to the flange 25, it is possible to support an object erected on the ground.

上記工法によれば基礎本体1に対して鉄筋材9
入り杭対15が速乾性セメント14の固化と同時
に一体化され且つ土中に対して十分な支持力を発
揮する構造になるため、施工後直ちに地上立設物
支持力を得ることができる。
According to the above construction method, there are 9 reinforcing bars for the foundation body 1.
Since the pile pile pairs 15 are integrated at the same time as the quick-drying cement 14 hardens, and have a structure that exhibits sufficient support force in the soil, the support force for above-ground structures can be obtained immediately after construction.

(ト) 発明の効果 以上説明のように本発明の地上立設物支持用基
礎は、大径の穴を必要としないため作業の労力負
担が極めて軽徴である上、土砂の掘削量も少ない
ため残土対策が有利に処理し得るようになつた。
(g) Effects of the invention As explained above, the foundation for supporting above-ground structures of the present invention does not require large diameter holes, so the labor burden of the work is extremely light, and the amount of excavation of earth and sand is also small. Therefore, countermeasures against remaining soil have become advantageous.

又、速乾性セメントを標準的に使用できるた
め、施工後短時間で十分な支持力が得られること
から支柱等の建込み及びアンテナ類の取り付けも
僅かな時間内で処理できるようになつた。高価な
速乾性セメントも限定された小量ですむため、コ
スト増を避けることもできる等さまざまな特徴を
有する本発明実施後の実用効果は極めて大きい。
In addition, since quick-drying cement can be used as standard, sufficient supporting force can be obtained within a short period of time after construction, making it possible to erect pillars and install antennas within a short period of time. Since only a limited amount of expensive quick-drying cement is required, an increase in costs can be avoided, and the practical effects of implementing the present invention are extremely large.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は本発明の一実施例を示すもので、第1図
は基礎本体の平面図、第2図は同じく平面図であ
り、第3図は鉄筋材の正面図である。第4図乃至
第8図は基礎の設置方法を工程順に示す説明図で
あり、第9図は従来の基礎を示す正面図である。 記、1:基礎本体、2:支脚、3:フランジ
盤、6:固定管、9:鉄筋材、13:係止端、1
4:速乾性セメント、15:杭体、20:埋設
溝、21:縦孔、24:ボルト・ナツト。
The drawings show one embodiment of the present invention; FIG. 1 is a plan view of the basic body, FIG. 2 is a plan view of the same, and FIG. 3 is a front view of reinforcing bars. 4 to 8 are explanatory diagrams showing the method of installing a foundation in the order of steps, and FIG. 9 is a front view showing a conventional foundation. Description, 1: Foundation body, 2: Support leg, 3: Flange board, 6: Fixed pipe, 9: Reinforcement material, 13: Locking end, 1
4: Quick-drying cement, 15: Pile body, 20: Buried trench, 21: Vertical hole, 24: Bolt/nut.

Claims (1)

【特許請求の範囲】 1 水平方向にY字状に等配溶接固着した支脚の
各先端にパイプ状固定管を垂直方向に固着すると
共に、該上記各支脚の固着部中央上面に透し孔の
穿設された支柱接続用フランジを固設してなる基
礎本体と上記各固定管に対して内挿自在になると
共に上端を該固定管上縁と係止する係止端とした
適宜長さの鉄筋材とから構成してなることを特徴
とする地上立設物支持用基礎。 2 水平方向にY字状に等配溶接固着した支脚の
各先端にパイプ状固定管を垂直方向に固着すると
共に該上記各支脚の固着部中央上面に透し孔の穿
設された支柱接続用フランジを固設してなる基礎
本体と上記各固定管に対して内挿自在になると共
に上端を該固定管上縁と係止する係止端とした適
宜長さの鉄筋材とから構成してなる地上立設物支
持用基礎に於いて、 a 土砂表面を上記基礎本体が地表下に埋設する
ようにY字状の埋設溝を掘り下げ、各溝端部に
適宜深さの縦孔を穿孔した状態で、上記埋設溝
に基礎本体を載置し、 b 上記基礎本体の各固定管上方から鉄筋材を貫
挿して縦孔内にそれぞれ挿入し、係止端を固定
管の上縁と係合せしめ、 c 然る後、上記各固定管から縦孔内にそれぞれ
速乾性セメントを充填固化して鉄筋材入り抗体
を構成し、 d 上記支柱接続用フランジの中央に穿設された
透し孔から速乾性セメントを上記Y字状の支脚
内に充填固化して、該支脚を強化してなる地上
立設物支持用基礎の設置方法。
[Scope of Claims] 1. A pipe-shaped fixing tube is fixed in the vertical direction to each end of the support legs fixed by welding at equal intervals in a Y-shape in the horizontal direction, and a through hole is provided in the upper surface of the center of the fixed part of each of the above-mentioned support legs. A base body formed by fixing a drilled column connecting flange, and a base body of an appropriate length that can be freely inserted into each of the above fixed pipes and has a locking end that locks the upper end of the fixed pipe with the upper edge of the fixed pipe. A foundation for supporting above-ground structures, characterized by being made of reinforcing steel. 2 A pipe-shaped fixing tube is fixed in the vertical direction to each end of the supporting legs that are welded and fixed in a Y-shape in the horizontal direction, and a through hole is drilled in the center upper surface of the fixed part of each of the above-mentioned supporting legs for connection to the pillar. It consists of a basic body with a fixed flange and a reinforcing bar of an appropriate length that can be inserted into each of the fixed pipes and whose upper end is a locking end that locks with the upper edge of the fixed pipe. In the foundation for supporting above-ground structures, a. A Y-shaped burial trench is dug in the soil surface so that the foundation body is buried below the ground surface, and vertical holes of appropriate depth are drilled at the ends of each trench. Then, place the foundation body in the buried groove, b. Insert reinforcing bars from above each of the fixed pipes of the foundation body and insert them into the respective vertical holes, and engage the locking ends with the upper edges of the fixed pipes. , c. After that, quick-drying cement is filled and solidified into the vertical holes from each of the above-mentioned fixed pipes to form a reinforcing steel-containing body, and d. A method for installing a foundation for supporting an above-ground structure, comprising filling and solidifying dry cement into the Y-shaped support leg to strengthen the support leg.
JP9792285A 1985-05-10 1985-05-10 Foundation for supporting structure on land and its setting Granted JPS61257538A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9792285A JPS61257538A (en) 1985-05-10 1985-05-10 Foundation for supporting structure on land and its setting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9792285A JPS61257538A (en) 1985-05-10 1985-05-10 Foundation for supporting structure on land and its setting

Publications (2)

Publication Number Publication Date
JPS61257538A JPS61257538A (en) 1986-11-15
JPH0336369B2 true JPH0336369B2 (en) 1991-05-31

Family

ID=14205182

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9792285A Granted JPS61257538A (en) 1985-05-10 1985-05-10 Foundation for supporting structure on land and its setting

Country Status (1)

Country Link
JP (1) JPS61257538A (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2302101A (en) * 1999-11-30 2001-06-12 Brosnihan, Gail Anne Foundation structure and erection of towers
JP6284262B2 (en) * 2013-07-01 2018-02-28 株式会社三工社 Railway equipment foundation and installation method
CN109811785B (en) * 2019-03-18 2024-06-21 邓祥海 Detachable foundation cage

Also Published As

Publication number Publication date
JPS61257538A (en) 1986-11-15

Similar Documents

Publication Publication Date Title
EP0070659A1 (en) Retaining wall and in situ method of construction
CN111894040A (en) Construction method of assembled working well
JPH0559719A (en) Constructing method for combined foundation with ground solidification
JP2008101467A (en) Rockfall preventive fence
JP3095376B2 (en) Construction method of building foundation
KR100673475B1 (en) A pc girder member for frame of underground layer and assembling structure of frame of underground by using of it and the method therof
JP2899463B2 (en) Material
JP2011163009A (en) Subsidence prevention structure of foundation steel pipe
JP3129676B2 (en) Piling columns in building structures using piles as pillars
JPH0336369B2 (en)
JP2006057442A (en) Anti-falling rock fence
JPH10152985A (en) Constructing method of retaining wall
KR20180112453A (en) Soil Retaining Wall using PHC Pile and Construction Method
JPH0327079Y2 (en)
JP3234833B2 (en) How to build a well-founded well foundation
JPH09151463A (en) Column-integrated column base anchoring foundation structire and work execution method therefor
JP2000257088A (en) Earth retaining wall and its construction method
JP3705496B2 (en) Building foundation construction method
KR100322623B1 (en) An accessory for concrete block attachment
JPH0721196B2 (en) Reverse construction method of underground structure
JPH0324673Y2 (en)
KR20000063983A (en) The structure timbering of cut with separating wale and the construction method thereof
JPS61102911A (en) Steel cell
JPH04366229A (en) Temporary corresponding standard used for method of reverse driving construction
KR102078794B1 (en) An Earth Retaining Wall with Underground Buttresses and A Method of Constructing the same