JPH03287979A - Execution method of concrete construction - Google Patents

Execution method of concrete construction

Info

Publication number
JPH03287979A
JPH03287979A JP8832890A JP8832890A JPH03287979A JP H03287979 A JPH03287979 A JP H03287979A JP 8832890 A JP8832890 A JP 8832890A JP 8832890 A JP8832890 A JP 8832890A JP H03287979 A JPH03287979 A JP H03287979A
Authority
JP
Japan
Prior art keywords
layer
semi
concrete
column
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP8832890A
Other languages
Japanese (ja)
Inventor
Koichi Tamura
幸一 田村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=13939820&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=JPH03287979(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP8832890A priority Critical patent/JPH03287979A/en
Publication of JPH03287979A publication Critical patent/JPH03287979A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To facilitate insulating and curing by erecting steel framed columns making the first framework as two or more layers, erecting successively a semi-PC external wallboard, PC beam and PC floor board after placing one layer portion of column reinforcement, and heating and curing a shielded space. CONSTITUTION:Previously assembled column reinforcing steels for the first layer are placed to steel framed columns 1, and they are connected to column reinforcing steels for the lower floor to arrange a semi-PC external wallboard 3, PC beam 4 and semi-PC floor board 5 for the first layer. After that, column reinforcing steels 2 for the second floor are placed to connect them to the column reinforcing steels for the first layer, and a semi-PC external wallboard 3, PC beam 4 and semi-PC floor board 5 are arranged to place a skeleton concrete 6 for the first layer. Then, the inside of a shielded space partitioned by the skeleton concrete 6 and semi-PC member is heated and cured by a burner, etc. According to the constitution, insulating and curing of concrete can be easily performed.

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明はコンクリート構造物の施工法、特に寒冷地、冬
季の施工に通したコンクリート構造物の施工法に係るも
のである。
DETAILED DESCRIPTION OF THE INVENTION (Field of Industrial Application) The present invention relates to a method of constructing a concrete structure, particularly a method of constructing a concrete structure that can be used in cold regions and during winter.

(従来の技術) 寒冷地における鉄筋コンクリート造、または鉄骨鉄筋コ
ンクリート造の建物の施工は1、冬季において降雪、低
温、労務等の問題があり中断している。
(Prior Art) Construction of reinforced concrete or steel-framed reinforced concrete buildings in cold regions is suspended due to problems such as snowfall, low temperatures, and labor during the winter.

あるいはまた仮設の養生スペースを作る等して、労力を
かけて施工することもある。
Alternatively, it may take a lot of effort to construct a temporary curing space.

(発明が解決しようとする課題) いずれにしても寒冷地における施工は、一般の土地にく
らべて工期が長くなることはやむをえないのが現状であ
る。
(Problems to be Solved by the Invention) In any case, the current situation is that construction in cold regions inevitably requires a longer construction period than in general land.

本発明はこのような実情に鑑みて提案されたもので、そ
の目的とする処は、冬季の施工を可能ならしめるととも
に、労務を削減し、工期の短縮を図ることができるコン
クリート構造物の施工法を提案する点にある。
The present invention was proposed in view of these circumstances, and its purpose is to construct concrete structures that can be constructed in winter, reduce labor, and shorten the construction period. The point is to propose a law.

(課題を解決するための手段) 前記の目的を達成するため、本発明に係るコンクリート
構造物の施工法によれば1節目を2層以上とした鉄骨柱
を立設し、1層分の柱鉄筋を配設したのち半PC外壁板
及びPC梁並に半PC床板1層分を順次建込み、次いで
2層目の柱鉄筋、半PC外壁板及びPC梁並に半PC床
板を前記1層分と同様に建込んだのち、I層目の床、壁
配筋後1層目の躯体コンクリートを打設し、同躯体コン
クリート及び2層目の半PC部材で画成された遮蔽空間
を加熱養生し、2層目以上は前記の工程を繰返すもので
ある。
(Means for Solving the Problems) In order to achieve the above object, according to the method of constructing a concrete structure according to the present invention, a steel column with two or more layers at the first joint is erected, and the column for one layer is erected. After placing the reinforcing bars, one layer of half-PC exterior wall boards, PC beams, and one layer of half-PC floorboards are erected in sequence, and then the second layer of column reinforcement, half-PC exterior wall boards, PC beams, and half-PC floorboards are installed in the first layer. After construction was completed in the same manner as in the previous section, the first layer of concrete for the frame was poured after floor and wall reinforcement was placed for the I layer, and the shielded space defined by the concrete for the frame and the semi-PC members for the second layer was heated. After curing, the above steps are repeated for the second and subsequent layers.

(作用) 本発明によれば前記したように、■節目を2層以上とし
た鉄骨柱を立設し、1層分の柱鉄筋を配設し、外気に接
する半PC外壁板、PC梁、半PC床板を建込み、次い
で2層目の柱鉄筋を配設して1層目の柱鉄筋と継接する
とともに、2層目の半PC外壁板、PC梁、半PC床板
を1層目と同様に建込み、しかるのち1層目の床、壁配
筋後1層目の躯体コンクリートを打設し、同躯体コンク
リート及び2層目の半PC部材で1層目に遮蔽空間を画
威し、同遮蔽空間を加熱養生し、気温の低下によるコン
クリートに対する悪影響を防止する。
(Function) According to the present invention, as described above, ■ a steel column with two or more layers of joints is erected, one layer of column reinforcement is provided, semi-PC exterior wall boards, PC beams, etc. Erect half-PC floor boards, then install the second layer of column reinforcing bars and connect them to the first-layer column reinforcing bars, and connect the second-layer half-PC exterior wall boards, PC beams, and half-PC floor boards to the first layer. Construction was carried out in the same manner, and then the first layer of floor and wall reinforcement was placed, and the first layer of concrete was poured, and the shielded space was defined on the first layer using the same concrete and the second layer of semi-PC members. , the shielded space will be heated and cured to prevent negative effects on the concrete due to a drop in temperature.

2層目以上は前記と同様の工程を反覆し、かくして冬季
寒冷地においてもコンクリート構造物を構築しうるよう
にしたものである。
For the second and subsequent layers, the same process as above is repeated, thus making it possible to construct a concrete structure even in cold winter regions.

(実施例) 以下本発明を図示の実施例について説明する。(Example) The present invention will be described below with reference to the illustrated embodiments.

第1図に示す如く、鉄筋コンクリート造では建方用の柱
内に配置した仮設の柱鉄骨を、また鉄骨鉄筋コンクリー
ト造の場合は本設の柱鉄骨(1)を少なくとも2層分立
設する。
As shown in Figure 1, in the case of reinforced concrete construction, temporary column steel frames are placed within the erection columns, and in the case of steel reinforced concrete construction, permanent column steel frames (1) are erected in at least two layers.

なお仮設の鉄骨柱(1)を、相隣る柱同志を第10図に
示す如く、夫々の強軸が90°づつ偏倚して位置するよ
うに配設し、施工時における地震力、風力等の水平力に
抵抗できるようにするとよい。
In addition, the temporary steel columns (1) are arranged so that the strong axes of the adjacent columns are offset by 90 degrees as shown in Figure 10, so that the earthquake force, wind force, etc. It is better to be able to resist the horizontal force of

次いで前記鉄骨柱(1)に先組された第1層の柱鉄筋(
2)を配設し、下階の柱鉄筋(2′)と継接し、更にP
C板に同板に埋設された鉄筋の一部が突出するように形
成された第1層の半PC外壁板(3)、及びPC梁(4
)並に半PC床板(5)を配設する。(第2図参照) 次いで第2層の柱鉄筋(2)を配設して第1層の柱鉄筋
(2)と継接し、第2層の半pc外壁板(3)、PC梁
(4)、半PC床板(5)を配設する。(第3図参照)
次いで第1層目の残りの現場配筋する床鉄筋0つ、壁鉄
筋00を配筋後第1層目におけるプレキャスト化されて
いない柱のコンクリート、半PC外壁板(3)の内側、
半PC床(5)上にコンクリートを打設し、第1層の躯
体コンクリート(6)を打設する。(第4図参照) かくして前記躯体コンクリート(6)及び2層目の半P
C部材(3)(5)によって画成された遮蔽空間(7)
(7′)内をバーナー等によって加熱養生し、第2層以
上は少なくとも2層建方されている状態で躯体コンクリ
ートを打設してコンクリート構造物を構築する。
Next, the first layer of column reinforcing bars (
2), connect it to the column reinforcing bar (2') on the lower floor, and then
The first layer of semi-PC exterior wall board (3), which is formed so that a part of the reinforcing bars embedded in the same board protrudes from the C board, and the PC beam (4)
) and a half-PC floorboard (5). (See Figure 2) Next, the second layer of column reinforcing bars (2) is installed and connected to the first layer of column reinforcing bars (2), and the second layer of half-PC exterior wall panels (3) and PC beams (4) are installed. ), a semi-PC floorboard (5) is installed. (See Figure 3)
Next, after arranging the remaining 0 floor reinforcing bars and 00 wall reinforcing bars in the first layer on-site, the concrete of the columns that are not precast in the first layer, the inside of the semi-PC exterior wall board (3),
Concrete is poured on the semi-PC floor (5), and the first layer of concrete (6) is poured. (See Figure 4) Thus, the above-mentioned concrete frame (6) and the second layer half P
Shielded space (7) defined by C members (3) and (5)
The inside of (7') is heated and cured using a burner or the like, and the concrete structure is poured with the second and higher layers being constructed in at least two layers to construct a concrete structure.

第5図は半PC外壁板及びPC梁並に半PC床板との関
係を示し、半PC外壁板(3)とその内側に配設された
壁用型枠(8)との間に壁コンクリートを打設し、また
PC梁(4)上に載架された半PC床板(5)上に床コ
ンクリートを打設するものである。図中(9)は上下の
半PC外壁(3)の接続金具、00)は半PC外壁(3
)とPC梁(4)とを接続する止め金具である。
Figure 5 shows the relationship between the semi-PC exterior wall board, the PC beam, and the semi-PC floor board. This involves pouring floor concrete onto the semi-PC floorboards (5) mounted on the PC beams (4). In the figure, (9) is the connection fitting for the upper and lower half-PC outer wall (3), and 00) is the half-PC outer wall (3).
) and the PC beam (4).

第6図は柱鉄骨(1)とPC梁(4)との接合部を示し
、・柱鉄骨(1)に受プレート00を取付け、同受プレ
ート(II)とPC梁(4)より突設した接合プレート
q力とをボルトa粉で接合する。
Figure 6 shows the joint between the column steel frame (1) and the PC beam (4). - The support plate 00 is attached to the column steel frame (1), and the support plate (II) and the PC beam (4) are protruded from each other. The joint plates q and q force are joined using bolts a and powder.

なお前記柱鉄骨(1)のウェブ、フランジ間に接続鉄筋
を貫通しておき、PC梁(4)の梁上端主筋と接続する
ものである。
A connecting reinforcing bar is passed through between the web and flange of the column steel frame (1), and is connected to the main reinforcing bar at the upper end of the PC beam (4).

第7図は後打ちコンクリート内壁の施工状況を示し、P
C梁(4)の下部と床部との間に相対する一双の壁型枠
(2)を配設し、同型枠(2)に設けたコンクリート注
入口14aより内壁コンクリートを圧入するものである
Figure 7 shows the construction status of the post-cast concrete inner wall.
A pair of wall forms (2) facing each other are arranged between the lower part of the C beam (4) and the floor, and the inner wall concrete is press-fitted through the concrete injection port 14a provided in the form (2). .

なお積雪に対しては、予め半PC床板(5)上に養生シ
ードを掩覆しておき、積雪の度毎に雪を払うものである
In addition, in case of snow accumulation, curing seeds are covered in advance on the semi-PC floorboard (5), and the snow is removed every time it snows.

(発明の効果) 本発明によれば前記したように1節目を2層以上とした
鉄骨柱を立設し、1層分の柱鉄筋を配設し、外気に接す
る半PC外壁板、PC梁及び半PC床板を順次建込み、
次いで2層目の柱鉄筋、半PC外壁板、PC粱及び半P
C床板を1層目と同様にして建込んだのち、1層目の床
、壁配筋後1層目の躯体コンクリートを打設し、同躯体
コンクリート及び2層目の半PC部材で画成された外気
と遮断された室間を形成し、同室間を加熱養生するよう
にしたもので・あって、直接コンクリートが外気に接し
ないので雪養生が不用で寒冷地でも通年施工が可能とな
り、コンクリートの保温養生が容易に行なわれる。
(Effects of the Invention) According to the present invention, as described above, a steel column with two or more layers at the first joint is erected, column reinforcing bars for one layer are provided, and semi-PC external wall boards and PC beams are exposed to the outside air. and half-PC floorboards were erected in sequence.
Next, the second layer of column reinforcing bars, half-PC exterior wall boards, PC casings and half-P
After constructing the C floor plate in the same manner as the first layer, pour the first layer of frame concrete after placing the first layer floor and wall reinforcement, and define it with the same frame concrete and the second layer semi-PC members. This system creates a room that is isolated from the outside air and heats and cures the space between the rooms.Since the concrete does not come into direct contact with the outside air, there is no need for snow curing and construction can be performed year-round even in cold regions. Thermal curing of concrete is easily carried out.

また外壁及び梁並に上部床部材がプレキャスト化された
ことによって型枠作業が省力化され、労、務の削減が図
られ、工期が短縮され、工費が節減−される。
In addition, by precasting the outer walls, beams, and upper floor members, formwork work is labor-saving, labor and administrative costs are reduced, construction period is shortened, and construction costs are reduced.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図乃至第4図は本発明に係るコンクリート構造物の
施工法の一実施例の工程を示す縦断面図、第5図は柱、
梁、外壁及び床部の施工状況を示す縦断側面図、第6図
ば柱梁接合部を示す平面図、第7図は内壁の施工状態を
示す縦断面図、第8図及び第9図は夫々柱鉄筋の平面開
鎖に側面図、第10図は柱鉄骨の配置図である。 (1)・・・柱鉄骨、(2)・・・柱鉄筋。 (3)・・・半PC外壁板、(4)・・・PC梁(5)
・・・半PC床板、(6)・・・コンクリート(7)・
・・遮蔽空間。
1 to 4 are longitudinal sectional views showing steps of an embodiment of the concrete structure construction method according to the present invention, and FIG. 5 is a column,
Figure 6 is a plan view showing the beam-column joint, Figure 7 is a vertical cross-sectional view showing the construction status of the inner wall, and Figures 8 and 9 are FIG. 10 is a side view of each column reinforcing bar in an open chain plane, and FIG. 10 is a layout diagram of the column steel frame. (1)...Column steel frame, (2)...Column reinforcing bar. (3)...Semi-PC exterior wall board, (4)...PC beam (5)
...Semi-PC floorboard, (6) ...Concrete (7)
...shielded space.

Claims (1)

【特許請求の範囲】[Claims]  1節目を2層以上とした鉄骨柱を立設し、1層分の柱
鉄筋を配設したのち半PC外壁板及びPC梁並に半PC
床板1層分を順次建込み、次いで2層目の柱鉄筋、半P
C外壁板及びPC梁並に半PC床板を前記1層分と同様
に建込んだのち、1層目の床、壁配筋後1層目の躯体コ
ンクリートを打設し、同躯体コンクリート及び2層目の
半PC部材で画成された遮蔽空間を加熱養生し、2層目
以上は前記の工程を繰返すことを特徴とするコンクリー
ト構造物の施工法。
After erecting a steel column with two or more layers at the first joint and placing column reinforcement for one layer, half-PC exterior wall boards, PC beams, and half-PC
Install one layer of floorboards in sequence, then install the second layer of column reinforcement and half-P.
After constructing the C exterior wall boards, PC beams, and semi-PC floor boards in the same manner as for the first layer, the first layer of floor and wall reinforcement was placed, and the first layer of concrete was poured. A method for constructing a concrete structure, characterized by heating and curing a shielded space defined by a layer of semi-PC members, and repeating the above process for the second and higher layers.
JP8832890A 1990-04-04 1990-04-04 Execution method of concrete construction Pending JPH03287979A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8832890A JPH03287979A (en) 1990-04-04 1990-04-04 Execution method of concrete construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8832890A JPH03287979A (en) 1990-04-04 1990-04-04 Execution method of concrete construction

Publications (1)

Publication Number Publication Date
JPH03287979A true JPH03287979A (en) 1991-12-18

Family

ID=13939820

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8832890A Pending JPH03287979A (en) 1990-04-04 1990-04-04 Execution method of concrete construction

Country Status (1)

Country Link
JP (1) JPH03287979A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102505849A (en) * 2011-10-28 2012-06-20 山东万鑫建设有限公司 Construction method of membrane shell ribbed floor formwork supporting system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102505849A (en) * 2011-10-28 2012-06-20 山东万鑫建设有限公司 Construction method of membrane shell ribbed floor formwork supporting system
CN102505849B (en) * 2011-10-28 2013-12-11 山东万鑫建设有限公司 Construction method of membrane shell ribbed floor formwork supporting system

Similar Documents

Publication Publication Date Title
US4398378A (en) Building construction system component parts and method for assembling same
CN105863067B (en) A kind of modularization low layer assembled Special-Shaped Column steel house system
KR101050167B1 (en) Precasted slab module and knock-down type modular construction of use it and method of the same
JPH04202940A (en) Wall construction of building and construction method thereof
JPH03287979A (en) Execution method of concrete construction
RU2323307C2 (en) Construction method for double-sided mutually stressed reinforced concrete wall structure with heat-insulation voids
JPS6314937A (en) Reinforcing bar composite pillar
JPH0334967Y2 (en)
JP2928002B2 (en) Column formwork structure
JPH02120441A (en) Precast concrete wall panel and constructing wall therewith
RU2153561C1 (en) Method of erecting building structures
JPH03279533A (en) Constructing method for rigid-frame type rc super-high building
JPH02167937A (en) Connecting work of steel plate-concrete structure
JP3312945B2 (en) Construction method of concrete structure
KR20230109982A (en) PC half-slab construction method for quick construction of precast concrete apartment house
JPH0261238A (en) Steel plate concrete method
KR20010010692A (en) A Process for Constructing Buildings by Using of Concrete Panels
JPH0428063B2 (en)
JP3582027B2 (en) Construction method for concrete houses, etc.
JPH0470458B2 (en)
JPH04149365A (en) Construction method of beam
JPH04309630A (en) Skeleton construction method using pc member
JPH0349331B2 (en)
JPS58117153A (en) Construction of simple building
JPH0623457B2 (en) Wall type ramen composite structure and its construction method