JPH03287977A JP8830290A JP8830290A JPH03287977A JP H03287977 A JPH03287977 A JP H03287977A JP 8830290 A JP8830290 A JP 8830290A JP 8830290 A JP8830290 A JP 8830290A JP H03287977 A JPH03287977 A JP H03287977A
Authority
JP
Japan
Prior art keywords
formwork
support
board
posts
shoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP8830290A
Other languages
Japanese (ja)
Other versions
JP2821792B2 (en
Inventor
Kohei Onishi
大西 宏平
Shigeyuki Suzuki
鈴木 繁幸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2088302A priority Critical patent/JP2821792B2/en
Publication of JPH03287977A publication Critical patent/JPH03287977A/en
Application granted granted Critical
Publication of JP2821792B2 publication Critical patent/JP2821792B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

PURPOSE:To enhance the working efficiency by providing a beam form having a U-shaped section and posts with screw jacks provided with sleeper seats on the upper ends of them on a truss of the upper part of a beam form shoring into which expansion posts are incorporated. CONSTITUTION:A beam form 19 having a U-shaped section connecting beam side forms 19a to a beam bottom form 19b with a hinge is provided on a truss 18 of the upper part of a beam form shoring 11 into which support type expansion posts 12 are incorporated. Posts 22 with screw jacks provided with sleeper seats 23 on the upper ends of the beam form shoring 11 are provided between rising sections 14a of a horizontal beam 14 and the beam side forms 19a. After that, the ends of a PC plate 30 are mounted on the upper ends of the beam side forms 19a through sealants 31 or battens 32, and they are borne with the posts 22 through a sleeper 33.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、鉄筋コンクリート構造の建物の梁・床を施工
する型枠工法とそれに使用する型枠装置に関する。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a formwork construction method for constructing beams and floors of buildings with reinforced concrete structures, and a formwork apparatus used therein.

〔従来の技術〕[Conventional technology]

従来、ラーメン構造の鉄筋コンクリート構造の梁の施工
としては、梁鉄筋を先に組み、その外周を囲うように梁
型枠を組むことが多い。
Conventionally, when constructing a beam for a reinforced concrete rigid frame structure, the beam reinforcing bars are often assembled first and a beam formwork is constructed to surround the outer periphery.

これは梁型枠としては、梁底型枠を支保工により支持し
、かつ梁側型枠をセパレータにより緊結するものが一般
に使用されていて、これによれば梁型枠成形後において
は、セパレータが突出しているため、鉄筋かごを型枠内
に落し込むことができず、しかもセパレータの緊結作業
には手間がかかり、鉄筋かごを配置後セパレータを緊結
する際にはさらに作業が困難であるとともに、型枠解体
作業も容易でない等の問題があることによる。
This is because the beam formwork that is generally used is one in which the beam bottom formwork is supported by shoring and the beam side formwork is tied together with separators.According to this, after the beam formwork is formed, the separator Because the reinforcing bar cages protrude, it is impossible to drop the reinforcing bar cages into the formwork, and it is time-consuming to tie the separators together, making it even more difficult to tie the separators together after placing the reinforcing bar cages This is due to problems such as the difficulty in dismantling the formwork.

そこで出願人は先に、実願昭50−178452号(実
公昭54−19069号)として、第5図に示すような
梁型枠装置を提案し、権利を取得した。
Therefore, the applicant first proposed a beam formwork device as shown in FIG. 5 as Utility Model Application No. 178452/1982 (Kokoku Publication No. 19069/1981), and obtained the rights thereto.

これは、■対の伸縮自在である支柱1の頂部に架渡され
るもので、横コ字状の受部5を形成した仮設梁2と、受
部5の底部3に梁底型枠6を設置し、梁底型枠6の両側
に梁側型枠7を蝶番等により枢着したものである。
This is built over the tops of a pair of telescopic supports 1, consisting of a temporary beam 2 with a horizontal U-shaped receiving part 5, and a beam bottom formwork 6 attached to the bottom 3 of the receiving part 5. The beam side formwork 7 is pivotally attached to both sides of the beam bottom formwork 6 using hinges or the like.

この梁側型枠7の上部と受部5の側部間にはターンバッ
クル8等の伸縮自在の止金具が設けられ、仮設梁2の両
側上部には端太材を介して床型枠9が設置される。
A telescopic fastener such as a turnbuckle 8 is provided between the upper part of the beam side formwork 7 and the side part of the receiving part 5, and the floor formwork 9 will be installed.

そして、梁側型枠7と床型枠9上には補助鉄板10が架
渡される。
An auxiliary iron plate 10 is placed over the beam side formwork 7 and the floor formwork 9.

先ず、支柱1を縮めた状態で梁施工位置下方にセットし
、かつターンバックル8を操作して梁側型枠7を所定の
位置にセットする。
First, the column 1 is set in a contracted state below the beam construction position, and the turnbuckle 8 is operated to set the beam side formwork 7 in a predetermined position.

ついで支柱1を伸ばして型枠装置を所定高さにセットす
る。
Next, the support column 1 is extended and the formwork device is set at a predetermined height.

ついで、補助鉄板10を取付けて梁側型枠7と床型枠9
との間隙を塞ぎ、ついで鉄筋の配筋をなし、床および梁
のコンクリートを打設する。
Next, the auxiliary iron plate 10 is attached and the beam side formwork 7 and floor formwork 9 are attached.
Close the gaps between the two, then arrange reinforcing bars, and pour concrete for the floor and beams.

コンクリート硬化後は、ターンバックル8を操作して梁
側型枠7を開いて剥離脱型し、支柱1を下げて型枠装置
を梁下まで下げて移動盛替えする。
After the concrete has hardened, the turnbuckle 8 is operated to open the beam-side formwork 7 for peeling off, and the pillars 1 are lowered and the formwork device is lowered to the bottom of the beam to be moved and replaced.

このようにして、この第5図に示す梁型枠装置によれば
、梁底型枠6や梁側型枠7は外側から受部5の底部とタ
ーンバックル8とで拘束されるので、セパレータで緊結
が不要となり、型枠設置後でも梁配筋用の鉄筋かごを容
易に型枠内に挿入でき、また型枠の組立、脱型も容易な
ものとなる。
In this way, according to the beam formwork apparatus shown in FIG. 5, the beam bottom formwork 6 and the beam side formwork 7 are restrained from the outside by the bottom of the receiving part 5 and the turnbuckle 8, so that the separator This eliminates the need for fastening, and even after the formwork is installed, reinforcing bar cages for beam reinforcement can be easily inserted into the formwork, and the formwork can be easily assembled and demolded.

〔発明が解決しようとする課題〕[Problem to be solved by the invention]

ところで、第5図に示す型枠装置では横コ字状の受部5
を形成した仮設梁2がかなりの巾をとるものであり、支
柱1と仮設梁2はこれを分離して盛替える場合はよいが
、一体として移動するのは全体が大きくなるので困難で
ある。
By the way, in the formwork device shown in FIG.
The temporary beam 2 that forms the support column 1 and the temporary beam 2 take up a considerable width, and although it is possible to separate the support column 1 and the temporary beam 2 and replace them, it is difficult to move them as a unit because the entire structure becomes large.

このように仮設梁2を巾広くとらない場合には、補助鉄
板10が載る梁側型枠7の上端には床配筋やコンクリー
ト打設の荷重が大きくかかり、梁底型枠6の両側に枢着
する梁側型枠7が傾斜したりするおそれがある。
In this way, if the temporary beam 2 is not wide enough, the upper end of the beam side formwork 7 on which the auxiliary steel plate 10 rests will be subject to a large load from floor reinforcement and concrete pouring, and both sides of the beam bottom formwork 6 will be There is a risk that the beam-side formwork 7 to which it is pivoted may tilt.

かかる梁側型枠7の傾斜は、梁自体の施工精度が悪くな
るだけでなく、補助鉄板10と梁側型枠7の上端に隙間
を生じここからコンクリートが洩れ出したりすることに
もなる。
Such an inclination of the beam side formwork 7 not only deteriorates the construction accuracy of the beam itself, but also creates a gap between the auxiliary iron plate 10 and the upper end of the beam side formwork 7, from which concrete may leak.

本発明の目的は前記従来例の不都合を解消し梁側型枠と
梁底型枠がヒンジ結合となるU状断面の梁型枠を使用し
、梁側型枠の上端にPC板もしくは型枠板端を載せる場
合でも、なるべく梁側型枠に荷重をかけないようにし、
また梁型枠支保工の側方には広い作業空間が取れるよう
にして作業性を向上させることができる型枠工法及び型
枠装置を提供することにある。
The purpose of the present invention is to eliminate the disadvantages of the conventional example, to use a beam formwork with a U-shaped cross section in which the beam side formwork and the beam bottom formwork are hinged, and to attach a PC board or formwork to the upper end of the beam side formwork. Even when placing the end of the board, try to avoid applying loads to the beam side formwork as much as possible.
Another object of the present invention is to provide a formwork construction method and a formwork device that can improve workability by providing a wide working space on the sides of the beam formwork support.

〔課題を解決するための手段〕[Means to solve the problem]

本発明は前記目的を達成するため、サポートタイプの伸
縮支柱を組込んだ梁型枠支保工の上部のトラス上に梁側
型枠と梁底型枠がヒンジ結合となるU状断面の梁型枠と
上端に大引受けを設けたスクリュージヤツキによる支柱
とを並べて設け、PC板もしくは型枠板をその端部をシ
ール材や必要に応して桟木を介在させて梁側型枠の上端
に載せ、またその近傍を大引受けにセットした大引を介
して前記支柱で支承し、配筋後、梁・床コンクリートを
打設することを要旨とするもの士ある。
In order to achieve the above object, the present invention has a beam formwork with a U-shaped cross section in which the beam side formwork and the beam bottom formwork are hingedly connected on the upper truss of a beam formwork shoring structure incorporating support type telescopic columns. Install the frame and a support made of screw jacks with a large support at the upper end side by side, and attach the end of the PC board or formwork board to the upper end of the beam side formwork with a sealant or a crosspiece as necessary. The gist of this method is to place the support on the pillars, and then support the vicinity of the support with the pillars via a large support set in a large support, and after arranging the reinforcement, pour concrete for the beam and floor.

[作用] 本発明によれば、PC板もしくは型枠板はその端部付近
を大引受けを設けたスクリュージヤツキによる支柱で支
承されるので、この支柱が荷重の大部分を引受け、梁側
型枠の上端には大きな荷重がかからない。
[Function] According to the present invention, the PC board or formwork board is supported near its end by a support made of a screw jack with a large support, so this support takes most of the load, and the beam side mold No large load is applied to the top of the frame.

さらに、該支柱は梁型枠と並んで梁型枠支保工の上部の
トラス上に設けられているので、両者のセットが同時に
でき、作業の省力化を図ることができる。
Furthermore, since the supports are provided on the upper truss of the beam formwork alongside the beam formwork, both can be set at the same time, resulting in labor-saving work.

また、前記支柱があるため梁型枠支保工の側方ではすぐ
近くにPC板もしくは型枠板を支えるサポートを立てる
必要がなく、大きな作業空間を確保できる。
Furthermore, because of the presence of the pillars, there is no need to erect supports for supporting the PC boards or formwork boards in the immediate vicinity of the beam form shoring, and a large work space can be secured.

〔実施例〕〔Example〕

以下、図面について本発明の実施例を詳細に説明する。 Embodiments of the present invention will be described in detail below with reference to the drawings.

さきに、本発明工法で使用する型枠装置Bについて説明
する。
First, the formwork device B used in the construction method of the present invention will be explained.

第1図は該型枠装置801例を示す全体の側面図、第2
図は同上要部の側面図で、図中11はサポートタイプの
伸縮支柱12を組込んだ梁型枠支保工である。
FIG. 1 is an overall side view showing an example of the formwork device 801, and FIG.
The figure is a side view of the main parts of the same as above, and numeral 11 in the figure is a beam form support incorporating a support type telescopic column 12.

この梁型枠支保工■1は、施工しようとする梁Aに対し
、梁の長さ方向に延びる仮受は梁材13.13を梁Aの
巾よりも多少大きい巾で平行して並べ、該仮受は梁材1
3.13に直交するように横ビーム14を適宜間隔で仮
受は梁材13.13の下方に組合わせる。
This beam form support ■1 is constructed by arranging beam materials 13 and 13 parallel to the beam A to be constructed with a width slightly larger than the width of the beam A. The temporary support is beam material 1
3.13, the horizontal beams 14 are assembled at appropriate intervals below the beam members 13.13.

この横ビーム14は、仮受は梁材13.13との交差位
置より外側に左右端部が多少張出し、該張出端を直角に
立上げて立上げ部14aとした横コ字形のものである。
This horizontal beam 14 has a horizontal U-shape in which the left and right ends of the temporary support are slightly overhanging outside the intersection with the beam members 13.13, and the overhanging ends are raised at right angles to form a raised portion 14a. be.

前記伸縮支柱12は、外管である上柱12aとこの中に
挿入されるスライドパイプである下柱12bとその下端
に挿入するジヤツキベース12cとからなり、この伸縮
支柱12のうち上柱12aは仮受は梁材13や横ビーム
14とその上端部が結合するとともに下端部は仮受は梁
材13に平行する下梁材15と横ビーム14に平行する
下横材16と結合し、かつ適宜に筋違い17.17 ’
を仮受は梁材13と下梁材15間や、横ビーム14と下
横材16間に配設して梁型枠支保工■1の上部をライト
トラス18とした。
The telescopic column 12 is composed of an upper column 12a that is an outer tube, a lower column 12b that is a slide pipe inserted into the upper column 12b, and a jack base 12c that is inserted into the lower end of the upper column 12a. The upper end of the support is connected to the beam 13 and the horizontal beam 14, and the lower end of the temporary support is connected to the lower beam 15 parallel to the beam 13 and the lower cross member 16 parallel to the horizontal beam 14, and as appropriate. 17.17'
The temporary support was placed between the beam 13 and the lower beam 15, or between the horizontal beam 14 and the lower horizontal beam 16, and the upper part of the beam form support ■1 was made into a light truss 18.

図中19は型枠とて常用されるメタルフオームを使用し
た梁側型枠19aと梁底型枠19bがヒンジ結合となる
U状断面の梁型枠であり、梁底型枠19bを横ビーム1
4に固定することで、該横ビーム14の内方に設置され
る。
Reference numeral 19 in the figure is a beam formwork with a U-shaped cross section in which a beam side formwork 19a and a beam bottom formwork 19b are hinged together, using a metal form commonly used as formwork, and the beam bottom formwork 19b is used as a horizontal beam. 1
4, it is installed inside the horizontal beam 14.

この梁型枠19は、第3図に示すように梁側型枠19a
と梁底型枠19bとの内側に連続する鋼板製の面板20
を張設して、コーナー19cがこの面板20で接続する
ことで前記ヒンジ結合をなすようにしたが、通常の蝶番
を使用してヒンジ結合とすることも考えられる。
As shown in FIG. 3, this beam formwork 19 includes beam side formwork 19a
and a face plate 20 made of a steel plate that is continuous inside the beam bottom formwork 19b.
Although the corner 19c is connected by the face plate 20 to form the hinge connection, it is also possible to use a normal hinge to form the hinge connection.

前記横ビーム14の立上げ部14aと梁側型枠19aと
にターンバックル21等の伸縮自在の止金具を掛渡し、
また梁型枠支保工11の上面で仮受は梁材13上に適宜
間隔でスクリュージヤツキによる支柱22を横ビーム1
4の立上げ部14aと梁側型枠19aとの間にこれらと
平行するように立上げ、その先端に大引受け23を取付
ける。
A retractable fastener such as a turnbuckle 21 is hung between the rising portion 14a of the horizontal beam 14 and the beam side formwork 19a,
In addition, on the upper surface of the beam formwork support 11, temporary supports 22 are attached to the horizontal beam 1 using screw jacks at appropriate intervals on the beam material 13.
4 is raised parallel to the raised part 14a and the beam side formwork 19a, and a large underwriter 23 is attached to the tip thereof.

次に、このような型枠装置を使用して行う本発明の施工
法について説明する。
Next, a construction method of the present invention using such a formwork device will be explained.

先行して柱鉄筋をジゴイントしその外周に柱型枠をセッ
トして該柱型枠の梁下端まで柱コンクリートをポンプ打
ちやパケット打ちで打設し、柱部分を施工する。
First, the column reinforcing bars are zigointed, a column formwork is set around the outer periphery, and column concrete is poured by pumping or packet casting to the bottom end of the beam of the column formwork to construct the column part.

そして、この柱間に本発明の型枠装置Bをセットする。Then, the formwork device B of the present invention is set between the pillars.

ついで、合成床用薄肉PC板30を敷き込むが、このP
CC32O敷込みは、第1図、第2図に示すようにその
端部をシール材31や必要に応じて桟木32を介在させ
て梁側型枠19aの上端に載せ、またその近傍をスクリ
ュージヤツキによる支柱22で大引受け23にセットし
た大引33を介して支承するようにして行われる。
Next, a thin PC board 30 for synthetic flooring is laid, but this P
When laying CC32O, as shown in Figs. 1 and 2, its end is placed on the upper end of the beam side formwork 19a with a sealing material 31 and crosspieces 32 interposed as necessary, and the vicinity thereof is placed on the upper end of the beam side formwork 19a, and the vicinity thereof is placed on the upper end of the beam side formwork 19a. This is done by supporting the pillar 22 via a large support 33 set in a large support 23.

また、合成床用薄肉PC板30の他所は適宜にサポート
を立てて支承する。
Further, other parts of the thin PC board 30 for synthetic flooring are supported by appropriately erecting supports.

以後、このPCC32O作業足場として利用できる。From now on, this PCC32O can be used as a work scaffold.

図示は省略するが、U状断面の梁型枠19の上部開口よ
りプレハブ鉄筋による梁鉄筋を内部にセットする。
Although not shown, prefabricated beam reinforcing bars are set inside the upper opening of the beam formwork 19 having a U-shaped cross section.

そして、合成床用薄肉PC板30上に床設備埋込み配管
を配設したり床上筋を配筋したりしてから、梁・床、パ
ネルゾーンコンクリート41を打設する。
Then, after arranging the floor equipment embedded piping and arranging reinforcement on the floor on the thin PC board 30 for the synthetic floor, the beam/floor and panel zone concrete 41 are poured.

そしてコンクリート41の硬化後に、ターンバックル2
1を操作して梁側型枠19aを開いて剥離脱型し、支柱
12を下げて型枠装置Bを梁下まで下げて移動盛替えす
る。
After the concrete 41 hardens, the turnbuckle 2
1 to open the beam-side formwork 19a for peeling and removal, lower the support 12, lower the formwork device B to the bottom of the beam, and move and replace it.

また、型枠装WBはジヤツキベース12cをキャスター
38に取替えで移動させるが、脱型した型枠装置を他の
階へ移動させるには第4図に示すように新路39と張出
ステージ40を設けて、この張出ステージ40まで型枠
装置を移動させ、クレーンで吊上げて他の階へ収める。
In addition, the formwork assembly WB is moved by replacing the jack base 12c with casters 38, but in order to move the demolded formwork apparatus to another floor, the new path 39 and the overhanging stage 40 are used as shown in FIG. The formwork device is moved to this overhanging stage 40, lifted up by a crane, and stored on another floor.

〔発明の効果〕〔Effect of the invention〕

以上述べたように本発明の型枠工法及び型枠装置は、梁
側型枠と梁底型枠がヒンジ結合となるU状断面の梁型枠
を使用し、梁側型枠の上端にPC板もしくは型枠板端を
載せる場合でも、なるべく梁側型枠に荷重をかけないよ
うにし、また梁型枠支保工の側方には広い作業空間が取
れるようにして作業性を向上させることができるもので
ある。
As described above, the formwork construction method and formwork apparatus of the present invention use a beam formwork with a U-shaped cross section in which the beam side formwork and the beam bottom formwork are hinged, and the upper end of the beam side formwork is Even when placing plates or formwork plate ends, it is important to avoid applying loads to the beam side formwork as much as possible, and to improve work efficiency by leaving a large work space on the side of the beam formwork support. It is possible.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明の型枠工法及び型枠装置のl実施例を示
す全体の側面図、第2図は同上要部の側面図、第3図は
梁型枠の要部の縦断側面図、第4図は型枠盛替え時の側
面図、第5図は従来例を示す側面図である。 1・・−支柱 3・・・底部 5・・・受部 7・・・梁側型枠 9・・・床型枠 11−・・梁型枠支保工 12a・・・上柱 2・・・仮設梁 4・・・側部 6・・・梁底型枠 8・・・ターンバックル 10・・・補助鉄板 12・・・支柱 12b・・・下柱 12c・・・ジヤツキベース 14・・・横ビーム I5−・・下梁材 17、17’・・・筋違い 19−・・梁型枠 19b・・・梁底型枠 20−・・面板 22・・・支柱 30・−・PC板 31−・・シール材 33・・・大引 39・・・新路 41・・・コンクリート 13・・・仮受は梁材 14a・・・立上げ部 16・・・下横材 18・・・トラス 19a・・・梁側型枠 19c・・・コーナー 21・・・ターンバックル 23・・・大引受け 32・・・桟木 38・・・キャスター 40・・・張出ステージ
Fig. 1 is an overall side view showing an embodiment of the formwork construction method and formwork apparatus of the present invention, Fig. 2 is a side view of the main parts of the same, and Fig. 3 is a vertical sectional side view of the main parts of the beam formwork. , FIG. 4 is a side view when the formwork is replaced, and FIG. 5 is a side view showing a conventional example. 1...-Column 3...Bottom part 5...Receiving part 7...Beam side formwork 9...Floor formwork 11-...Beam formwork support 12a...Upper column 2... Temporary beam 4... Side part 6... Beam bottom formwork 8... Turnbuckle 10... Auxiliary iron plate 12... Support column 12b... Lower column 12c... Jacket base 14... Horizontal beam I5--Lower beam material 17, 17'...Brace 19--Beam form 19b...Beam bottom form 20--Face plate 22...Strut 30--PC board 31-- Sealing material 33...Oihiki 39...New road 41...Concrete 13...Temporary support is beam material 14a...Rising part 16...Lower horizontal member 18...Truss 19a...・Beam side formwork 19c... Corner 21... Turnbuckle 23... Large undercarriage 32... Pier 38... Caster 40... Overhanging stage

Claims (2)

【特許請求の範囲】[Claims] (1)サポートタイプの伸縮支柱を組込んだ梁型枠支保
工の上部のトラス上に梁側型枠と梁底型枠がヒンジ結合
となるU状断面の梁型枠と上端に大引受けを設けたスク
リュージャッキによる支柱とを並べて設け、PC板もし
くは型枠板をその端部をシール材や必要に応じて桟木を
介在させて梁側型枠の上端に載せ、またその近傍を大引
受けにセットした大引を介して前記支柱で支承し、配筋
後、梁・床コンクリートを打設することを特徴とする型
枠工法。
(1) A beam formwork with a U-shaped cross section in which the beam side formwork and the beam bottom formwork are hinged together on the upper truss of a beam formwork shoring system incorporating support type telescopic columns, and a large support at the upper end. Place the PC board or formwork board on the upper end of the beam side formwork with a sealing material or a crosspiece as necessary, and place the PC board or formwork board on the upper end of the beam side formwork with a sealing material or a crosspiece as necessary. A formwork construction method characterized by supporting the above-mentioned pillars via the set tensioners, and placing beams and floor concrete after reinforcing.
(2)サポートタイプの伸縮支柱を組込んだ梁型枠支保
工の上部のトラス上に、梁側型枠と梁底型枠がヒンジ結
合となるU状断面の梁型枠と上端に大引受けを設けたス
クリュージャッキによる支柱とを並べて設けたことを特
徴とする型枠装置。
(2) On the upper truss of the beam form shoring incorporating support type telescopic columns, the beam side formwork and the beam bottom formwork are hinged together, and the beam formwork has a U-shaped cross section, and a large support is placed on the upper end. A formwork device characterized by having screw jack supports installed side by side.
JP2088302A 1990-04-04 1990-04-04 Formwork equipment Expired - Fee Related JP2821792B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2088302A JP2821792B2 (en) 1990-04-04 1990-04-04 Formwork equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2088302A JP2821792B2 (en) 1990-04-04 1990-04-04 Formwork equipment

Publications (2)

Publication Number Publication Date
JPH03287977A true JPH03287977A (en) 1991-12-18
JP2821792B2 JP2821792B2 (en) 1998-11-05

Family

ID=13939133

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2088302A Expired - Fee Related JP2821792B2 (en) 1990-04-04 1990-04-04 Formwork equipment

Country Status (1)

Country Link
JP (1) JP2821792B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8873636B2 (en) 2011-08-17 2014-10-28 Square Enix Holdings Co., Ltd. Moving image distribution server, moving image reproduction apparatus, control method, program, and recording medium
US8897373B2 (en) 2012-04-12 2014-11-25 Square Enix Holdings Co., Ltd. Moving image distribution server, moving image reproduction apparatus, control method, and recording medium
US8988501B2 (en) 2012-02-23 2015-03-24 Square Enix Holdings Co., Ltd. Moving image distribution server, moving image playback apparatus, control method, and recording medium
CN110761555A (en) * 2019-10-16 2020-02-07 北京城建集团有限责任公司 Construction method for large-span folded beam in orderly hall

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6198136U (en) * 1984-12-04 1986-06-24
JPS61290164A (en) * 1985-06-18 1986-12-20 日綜産業株式会社 Method and apparatus for supporting beam and slab
JPH0198858U (en) * 1987-12-23 1989-07-03

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6198136U (en) * 1984-12-04 1986-06-24
JPS61290164A (en) * 1985-06-18 1986-12-20 日綜産業株式会社 Method and apparatus for supporting beam and slab
JPH0198858U (en) * 1987-12-23 1989-07-03

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8873636B2 (en) 2011-08-17 2014-10-28 Square Enix Holdings Co., Ltd. Moving image distribution server, moving image reproduction apparatus, control method, program, and recording medium
US9008187B2 (en) 2011-08-17 2015-04-14 Square Enix Holdings Co., Ltd. Moving image distribution server, moving image reproduction apparatus, control method, program, and recording medium
US8988501B2 (en) 2012-02-23 2015-03-24 Square Enix Holdings Co., Ltd. Moving image distribution server, moving image playback apparatus, control method, and recording medium
US8897373B2 (en) 2012-04-12 2014-11-25 Square Enix Holdings Co., Ltd. Moving image distribution server, moving image reproduction apparatus, control method, and recording medium
CN110761555A (en) * 2019-10-16 2020-02-07 北京城建集团有限责任公司 Construction method for large-span folded beam in orderly hall

Also Published As

Publication number Publication date
JP2821792B2 (en) 1998-11-05

Similar Documents

Publication Publication Date Title
JP5047680B2 (en) Construction method of continuous viaduct
JP5405337B2 (en) Construction method of railway RC ramen structure viaduct
CN113638304B (en) Concrete beam type bridge hidden cover beam structure system and construction method thereof
CN102277835A (en) Method for constructing single-column bent cap by adopting hoop and A-frame composite system
JPH03287977A (en) Form method and form device
CN217028064U (en) Post-cast strip galvanized steel pipe support frame
WO2015051551A1 (en) Building and construction method thereof
JP3197234B2 (en) Moving scaffold for floor slab assembly
JPH09195227A (en) Built-up trestle for bridge pier reinforcing work and using method thereof
JP2992882B2 (en) Beam formwork device
JPH03287974A (en) Form construction and form device
JP4027170B2 (en) External scaffold device and construction method of external scaffold device
JPH05302431A (en) Movable formwork apparatus and formwork execution method
RU2078884C1 (en) Method of monolithic building erection and movable framework for its realization
JP2534009B2 (en) Form support for overhang
JPH03287975A (en) Form device
JPS61109827A (en) Construction of basement
CN218933127U (en) Ultra-deep foundation pit permanent-facing combined supporting frame beam-ring frame plate construction device
CN214531897U (en) Supporting system for construction of assembled prestressed hollow slab floor
JPH03287976A (en) Form device
JP2011208364A (en) Method for demolishing and removing support member in construction process of railroad rc rigid frame structure viaduct
JPH0332678Y2 (en)
JP3690463B2 (en) Construction method of viaduct
JPH05239810A (en) Constructing method for reinforced concrete arch bridge
JP3254509B2 (en) Beam unit formwork

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees