JPH0328436A - Embedding method for construction insert - Google Patents

Embedding method for construction insert

Info

Publication number
JPH0328436A
JPH0328436A JP2129664A JP12966490A JPH0328436A JP H0328436 A JPH0328436 A JP H0328436A JP 2129664 A JP2129664 A JP 2129664A JP 12966490 A JP12966490 A JP 12966490A JP H0328436 A JPH0328436 A JP H0328436A
Authority
JP
Japan
Prior art keywords
insert
formwork
concrete
nails
nail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2129664A
Other languages
Japanese (ja)
Inventor
Hiroto Kanamaru
金丸 博人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
INUI SANGYO KK
Original Assignee
INUI SANGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by INUI SANGYO KK filed Critical INUI SANGYO KK
Priority to JP2129664A priority Critical patent/JPH0328436A/en
Publication of JPH0328436A publication Critical patent/JPH0328436A/en
Pending legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

PURPOSE:To improve the life of a form by removing the form after concrete has been cured, and also by bently removing the projected parts of headless nails driven into the form, so that the driven parts of the headless nails can be remained in the form. CONSTITUTION:The ends of headless nails 5 are abutted on a form A, and then the flange part 6 of a bolt screwing fitting 3 is hammered for fitting an insert 1 to the form A. After concrete has been placed and cured, the form A is removed from the concrete wall surface B while pulling out the headless nails 5 from the holes 13 of the insert body 4. Then, the parts of nails 5 projected from the form A are struck by a hammer or the like, and they are bently removed in the position on the upper surface of the form A.

Description

【発明の詳細な説明】 ( f(.: I tt (7)利川分J’F ]木允
明は、コンクリート建染物のil,i而にI1lj ,
没して人井板や配青゛S・をk持するための構築川イン
サ?トの理設方法に関するものである。
[Detailed description of the invention] (f(.: I tt (7) Icheon-bu J'F) Moki Masaaki is a concrete building dyer il, i and I1lj,
Is it possible to construct a river insert to maintain the human well board and blue layout S? This is related to the method of establishing the

〔従来の技術〕[Conventional technology]

従宋から構築用インサートとしては神々のものが開発さ
れている。例えば、実公11?f57−3313 1 
S;,公報にみられるように、仔意数の挿通孔を゛ウ段
したインサート本体の下面に鉄釘が11〔ぐに脱7tで
きるもの、あるいは実公IW+58−53366号公報
に記載され゛ζいるように支持体の出片からド方に11
+1かって適宜長さ突出させるべく、強化プラスチック
によるイ1゛頭釘の上方部を、1};i記支持体が装青
、支持して、支持体と一体化したもの等がある。
God-like construction inserts have been developed since the Congregational Song Dynasty. For example, Jikko 11? f57-3313 1
S: As seen in the publication, the iron nail can be quickly removed from the bottom surface of the insert body with the insertion holes of the number 11, or as described in the publication IW+58-53366. 11 in the direction from the protruding piece of the support so that
In order to protrude by an appropriate length, the upper part of the nail head is coated with a reinforced plastic support, and is integrated with the support.

そして、このような構築川インサートはその鉄釘をlv
J枠の所望部イ\γに打ち込んだ後、コンクIJ 一ト
を打設してコンクリート出に理設し、コンクリートの■
牛後、ヤl枠を取除くと共に鉄釘の突出部を処111シ
ていろう 〔允明が解決しようとする課題〕 ところが、1,1己に例示した11;i者″のインサー
゜トに}5い゛Cは、公報明細.Ii中から’t’ll
るように、コンクリートの養生後型枠を取り外したとき
型枠側に鉄製の無頭釘が刺さった状態となり、コンクリ
ート壁面には釘が残らないものであるが、囚枠の後処理
として、壁粋の釘を取り除く作業をしなければならず、
地而での作業とはiえこれが極めて千間を要すると同時
に釘を抜き上ったヤ枠には、゛l1然ながら釘穴が残り
、該釘穴から型枠の損傷●腐食の原因となり、反■使川
される1f+枠の寿命を杵しく短くする要因となってい
る。更に又、ヤ枠に残った釘穴は型枠の再使用に当たっ
てコンクリートのノロの滲人が/I:.じ、型枠の損傷
と同B!Iに型枠を取り外したときのコンクリート壁面
は細いl”I t”+が生じるという問題点専をf−F
ずる。
And such construction river inserts lv that iron nail
After pouring into the desired part I\γ of the J frame, pour concrete IJ and set it on the concrete surface, and then
After that, I will remove the frame and remove the protruding part of the iron nail (a problem that Masaaki is trying to solve).However, in the insert of 11; }5 ゛C is 't'll from publication specification.Ii
As shown in Figure 2, when the concrete formwork is removed after curing, iron headless nails are stuck into the formwork side, and no nails remain on the concrete wall surface. I had to work on removing the nails,
Although this work is done in the ground, it takes a very long time and at the same time, when the nails are removed from the frame, nail holes remain, which can cause damage and corrosion to the formwork. This is a factor that drastically shortens the lifespan of the 1F+ frame, which is subject to anti-corrosion. Furthermore, the nail holes left in the formwork are removed by people who soak up concrete slag when reusing the formwork. Same as formwork damage B! f-F
Cheating.

・方、後者の発明においては、釘の処理は容呂にできる
ものの、釘はインサート本体側に残り、天井而’:sの
高い拉置にあって、その折損作業は著しく因難性を伴う
と同時に大変な労力を饗し、このため釘の処P社作業に
lNf間を要する問題が存する。
- On the other hand, in the latter invention, although the nails can be easily disposed of, the nails remain on the insert body side and the nails are placed at a high ceiling, making the work of breaking them extremely difficult. At the same time, there is a problem in that it requires a great deal of labor and therefore requires 1Nf hours for the nail shop P's work.

又前者同様型枠には釘穴が残り、これがコンクリー!・
のノロの滲人、11傷●腐食の蟹因となっていることも
+)ij a同様である。
Also, like the former, there are nail holes left in the formwork, and this is concrete!・
The same goes for 11 scratches and corrosion caused by slag.

本発明はこれらの両者の問題点を−挙に解決し得る構築
用インサートの坪設方法を提供するものである。
The present invention provides a method for installing a construction insert that can solve both of these problems at once.

〔課題を解決するための手段〕[Means to solve the problem]

上記11的をイf効に達するために本発明の構築用イン
サートのi′lI!設方法は、ボルト螺合川会具を合成
樹脂からなるインサート本体に内設すると共に、該イン
サート本体に強化プラスチ.ソクで形成した複数本の無
頭釘を引抜きrjl能に該本体の下面から突出するよう
に設けてなる構築用インサートを、そのド161から突
出した前記無卯釘を撃枠に打ち込み、コンクリ−1・の
打設、養生後、前記無頭釘をインサート本体から引き抜
きながら該無頭釘を打ち込んでいる前記や枠を取外し、
このヤ枠から突出した無頭釘の突出部を折除して型枠に
m頭31の打ち込み部を残7?.させることを特徴とす
るものである。
In order to achieve the above 11 objectives, the construction insert of the present invention is used! The installation method is to install the bolt screw fitting inside the insert body made of synthetic resin, and to inject reinforced plastic into the insert body. Pull out a plurality of headless nails formed with a screwdriver, insert a construction insert provided so as to protrude from the bottom surface of the main body, and drive the headless nails protruding from the head 161 into the concrete frame. After the driving and curing of step 1, remove the headless nail and frame into which the headless nail is driven while pulling it out from the insert body,
Break off the protruding part of the headless nail that protruded from the frame, leaving 7 m-headed nails to be driven into the formwork. .. It is characterized by allowing

〔作   用〕[For production]

インサート本体から突出した強化ブラスチノク製の無頭
釘を型枠に打ち込んで、該インサート本体を聖枠の所定
位置に固定する。そしてコンクリートの打設、養生後、
上.妃型枠をコンクリート壁面から取り外すとL記無頭
釘は、型枠と八にインサート本体から引き抜かれて型枠
に突き刺さった状態となる。この取り外された型枠は地
面で突出している釘を鎚等で打叩すれば容易に折損して
取り除き処理することができ、lイ枠には折川した釦の
残りの部分が突き刺さった状態となっているため、該壓
枠には釘穴が空くといったことがない。
Headless nails made of reinforced Blastinok protruding from the insert body are driven into the formwork to fix the insert body at a predetermined position in the sacred frame. After concrete is poured and cured,
Up. When the formwork is removed from the concrete wall surface, the L-headed nails are pulled out from the insert body and stuck into the formwork. This removed formwork can be easily broken and removed by hitting the protruding nails on the ground with a hammer, etc., and the remaining part of the folded button is stuck in the formwork. Therefore, there will be no nail holes in the bottle frame.

〔実 施 例〕〔Example〕

以下、本発明の実施例を図にJ^づいて説明する。 Embodiments of the present invention will be described below with reference to the drawings.

第1図〜第41閾に示すように(1)は本発明に使用す
る構築用インサートの一例を示すものであって、該イン
サート(l)は螺r孔(2)を形成したボルト螺合川金
具(3)と、該金具(3)を内設したインサート本体(
4)と、強化プラスチックで形成した無頭釘(5)とに
よって構成されている。より具体的に説明すると、L記
ボルト螺合川金具(3)は、鍔部(8)と胴部(7)と
からなり、.:会114部(7)の一端に1洟鍔部(G
)が一体的に形成されている。また該胴部の軸心に沿っ
て螺子孔(2)が他端から鍔部(6)近傍まで形戚され
ている。
As shown in FIGS. 1 to 41, (1) shows an example of a construction insert used in the present invention, and the insert (l) is a bolt threaded hole formed with a threaded hole (2). A metal fitting (3) and an insert body with the metal fitting (3) inside (
4) and a headless nail (5) made of reinforced plastic. To explain more specifically, the L bolt screw fitting (3) consists of a collar part (8) and a body part (7). : At one end of the 114th part (7) of the meeting, there is 1 Katsutsuba (G
) are integrally formed. Further, a screw hole (2) is formed along the axis of the body from the other end to the vicinity of the collar (6).

しかして、−l;記ボルト螺合川金具(3)を嵌着する
インサート本体(4)は、本体胸部(8)と該胴部(8
)のL端に形成された鍔受部(9)、及び該胴部(8)
のド端に形成された鍔部(10)、Jr<びに該胴部(
8)の側部に対向するように形成されたリプ部(II)
とからなり、これらは合成樹脂によって一体的に形成さ
れ、インサート本体(4)を構成している。
Therefore, the insert main body (4) into which the bolt screw metal fitting (3) described -l; is fitted has a main body chest (8) and a body part (8
) and the body (8).
The collar portion (10) formed at the end of the Jr. and the body portion (
8) Lip part (II) formed to face the side part of
These are integrally formed of synthetic resin and constitute the insert body (4).

また−L記本体胴部(8)の長さは、前記ボルト螺合川
金具(3)の胴部《7》長さより僅かに長く形成されて
いて、中心部には上記金具(3)の胴部(7)を嵌人で
きるようにn通孔(l2)が形成されている。
In addition, the length of the main body body part (8) indicated by L is formed to be slightly longer than the length of the body part (7) of the bolt threaded metal fitting (3), and the body part (8) of the above-mentioned bolt screw fitting (3) is formed in the center. N through-holes (12) are formed so that the part (7) can be inserted.

このrt通孔(+2)にL,k!胴部(7)を嵌大した
とき、ボルト螺合川金具《3》の鍔部(8)はインサー
ト本体(4)の1;記鍔受部(9)に当接するようにな
る。
L, k! to this rt hole (+2)! When the body (7) is fitted, the flange (8) of the bolt screw fitting (3) comes into contact with the flange receiving part (9) of the insert body (4).

また、1,記インサート本体(4)の鍔部(10)から
谷リブ部(1口)にかけて、該リブ部00の中問{11
,まで孔(13)が形成されていて、強化プラスチック
からなる無ガ1釘(5)+T”引佐きi′−II能に1
1人されている。
In addition, from the flange part (10) of the insert body (4) described in 1. to the valley rib part (1 mouth), the middle part of the rib part 00 {11
A hole (13) is formed up to , and a nail (5) made of reinforced plastic + T"
There is one person.

1・記孔(13)に胤萌釘(5)をJF人したとき、該
釘(5)の先端は、インサート本体(4)の下面(14
)から外方に突出するようになっている。また1一記無
如釘(5)を形成する強化プラスチックとしては、合或
樹脂にガラス繊紺、アスベスト、フッ素樹脂’5の無機
質を混含したものが使川されている。
1. When inserting the tanemoe nail (5) into the marking hole (13), the tip of the nail (5) will touch the bottom surface (14) of the insert body (4).
) and protrudes outward from it. In addition, as the reinforced plastic for forming the No. 11 Mujyo nail (5), a mixture of synthetic resin and inorganic materials such as glass fiber, asbestos, and fluororesin '5 is used.

このように構成した構築用で冫サートをコンクリート壁
体内に坪設するには、第5図(a)〜(c)に小すよう
に、型枠(A)の所定位置に無頭釘(5)の先端を゛j
接させ、ボルト螺合金!↓(3)の鍔部(6)を打叩し
て護インサート(l)を■J枠(A)に取付ける。そし
てコンクリートの打設、東生後、この型枠(^)をコン
クリート壁面(B)から取り外す、このとき、インサー
ト本体(4)及びボルト螺合金呉(3)はコンクリート
内に理設された状態となり、この金1!(3)の螺r孔
(2)にボルト(図示省路)を螺首して人井板や配管等
を該ボルトに取り付ける。 ・ノハコンクリ−1・幇而
(B)から取り外したべ″j枠(A)には、インサート
本体(4)の孔(I3)から引き抜かれた無題力(5)
が該型秤(A)に突き刺さった状態となっている。この
突き刺さった7HH( yl釘(5)の1(り枠(A)
から突出した部分を鎚雪゛で+71111し、該J’9
1枠(A)の1二而侍1dから折1束される。 むお,
L記失施例では2木の無頭釘(5)(5)を小している
が、2本以上であってもよい。
In order to install the thus constructed construction insert into the concrete wall, headless nails ( 5) Turn the tip of
Contact, bolt screw alloy! ↓ Tap the flange (6) of (3) and attach the protective insert (l) to ■J frame (A). After pouring the concrete, the formwork (^) is removed from the concrete wall (B). At this time, the insert body (4) and the bolt screw alloy (3) are placed in the concrete. , this money 1! (3) Screw a bolt (not shown) into the threaded hole (2) and attach a board, piping, etc. to the bolt.・In the frame (A) that was removed from the Noha Concrete 1.
is stuck in the mold scale (A). This pierced 7HH (yl nail (5) 1 (frame (A)
Add +71111 to the protruding part with a hammer and make the J'9
One bundle is folded from one frame (A) of 12 Samurai 1d. Muo,
In the L-notation example, two wooden headless nails (5) (5) are small, but two or more may be used.

〔発明の効果〕〔Effect of the invention〕

以L1叙述のように本発明の構築用インサートのlqj
設方法によれば、鎚″S:で打叩することによって折l
)Lする強化プラスチック製の無頭釘をインサート本体
に引抜きriJ能に、かつ該本体のド面から突出するよ
うに設けているインサートをjZリ枠に4′1ち付け、
コンクリートのi1設、在生後に1・.記型枠をコンク
リート壁面から取り外すので、該型枠とノ(に無頭釘を
インサート本体から引き挾くことができ、しかも取り外
した型枠から突出している該無頭釘は地面で折派作業を
することができるので、従宋に比べて,Jl常に作裟1
’l゛が真<、迅速に作業を逗めることができる。また
、折除した無リfI釘の先端部分を1(11枠内に11
1設秋態で桟7rさぜるので、J%4J枠に釘穴が辛く
といったことがなく、そのため従束のように釘穴からコ
ンクリートのノロの滲人がなくなり、史に型枠のtij
傷●腐食専の原因となる釘穴をなくしてJul枠のlt
命を長くし、長期に亙って反覆して使川することができ
る。また本発明に他用の釘は強化プラス千,ソク製であ
るので、コンクリート壁面に錆が流出し、壁面を?lj
すといったこともなく、使用した型枠はL記のよ・)に
釘穴が辛くことがないので、リ枠を反■使用する場合に
もコンクリート打設したときコンクリートが釘穴に流れ
込んでコンクリート望而に細かい門,l1+を牛じさせ
るといったこともない。
lqj of the construction insert of the present invention as described in L1 below.
According to the installation method, the folding is done by hitting it with a hammer "S:".
) Pull out the headless nail made of reinforced plastic into the insert body, and attach the insert, which is provided so as to protrude from the do surface of the body, to the frame 4'1,
Concrete i1 installation, 1.. Since the formwork is removed from the concrete wall surface, the formwork and headless nails can be pulled out from the insert body, and the headless nails protruding from the removed formwork can be removed on the ground for breaking work. Compared to the Congo Song Dynasty, Jl always made 1
'l゛is true<, you can start working quickly. Also, place the tip of the broken fI nail into 1 (11 in the 11 frame)
Since the crosspiece 7r is stirred in the first stage of construction, the nail holes in the J%4J frame will not be harsh, and as a result, there will be no concrete slag seeping out of the nail holes as in the case of a subordinate, and the formwork's tij
Eliminates nail holes that cause scratches and corrosion, making the Jul frame LT
It prolongs life and can be used repeatedly over a long period of time. Also, since the nails used for other purposes in this invention are made of reinforced plus 1,000 ml, rust may leak onto the concrete wall and cause the wall surface to become damaged. lj
The formwork I used is as described in L.), so the nail holes are not hard, so even when using the reframe, when concrete is poured, the concrete flows into the nail holes and the concrete is damaged. There is no such thing as an extremely detailed gate, or one that makes l1+ feel like a cow.

このように本発明によれば、釘の折損作文が容躬に行え
るとノ(に欅l枠の寿命を向Lさせ、そしてコンクリー
ト壁面を滑らかに形成できる専、多人な効果を奏するも
のである。
As described above, according to the present invention, it is possible to easily fix broken nails, extend the life of the keyframe frame, and have the advantage of being able to form a smooth concrete wall surface. be.

4.図1f11の簡11jな説明 弟1図は本発明に使用するインサートのl臼fiirK
I、第2図は甲in1図、菊3Mは弟2図のX−X断而
図、弟4図は第2図のY−Y断而図、第5図(a)〜(
C)は本発明方法の説明図である。
4. A simple explanation of Fig. 1f11. The younger brother 1 shows the l mill fiir K of the insert used in the present invention.
I, Figure 2 is the first figure of Koin1, Kiku 3M is the X-X Danji diagram of the younger brother 2, younger brother 4 is the Y-Y Danji diagram of Figure 2, Figures 5 (a) to (
C) is an explanatory diagram of the method of the present invention.

0)・・・構築用インサート、(3)・・・ボルト螺合
川金只、(4)・・・インサート本体、(5)・・・無
顕釘。
0)...Insert for construction, (3)...Bolt screw, (4)...Insert body, (5)...Unseen nail.

Claims (1)

【特許請求の範囲】[Claims] (1)ボルト螺合用金具を合成樹脂からなるインサート
本体に内設すると共に、該インサート本体に強化プラス
チックで形成した複数本の無頭釘を引抜き可能に該本体
の下面から突出するように設けてなる構築用インサート
を、その下面から突出した前記無頭釘を型枠に打ち込み
、コンクリートの打設、養生後、前記無頭釘をインサー
ト本体から引き抜きながら該無頭釘を打ち込んでいる前
記型枠を取外し、この型枠から突出した無頭釘の突出部
を折除して型枠に無頭釘の打ち込み部を残存させること
を特徴とする構築用インサートの埋設方法。
(1) A metal fitting for bolt threading is installed inside the insert body made of synthetic resin, and a plurality of headless nails made of reinforced plastic are provided in the insert body so as to protrude from the bottom surface of the body so that they can be pulled out. The headless nail protruding from the lower surface of the construction insert is driven into the formwork, and after concrete is poured and cured, the headless nail is driven into the formwork while being pulled out from the insert body. A method for embedding a construction insert, characterized by removing the headless nail from the formwork, breaking off the protruding part of the headless nail protruding from the formwork, and leaving the driving part of the headless nail in the formwork.
JP2129664A 1990-05-18 1990-05-18 Embedding method for construction insert Pending JPH0328436A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2129664A JPH0328436A (en) 1990-05-18 1990-05-18 Embedding method for construction insert

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2129664A JPH0328436A (en) 1990-05-18 1990-05-18 Embedding method for construction insert

Publications (1)

Publication Number Publication Date
JPH0328436A true JPH0328436A (en) 1991-02-06

Family

ID=15015100

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2129664A Pending JPH0328436A (en) 1990-05-18 1990-05-18 Embedding method for construction insert

Country Status (1)

Country Link
JP (1) JPH0328436A (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5733131U (en) * 1980-08-01 1982-02-22

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5733131U (en) * 1980-08-01 1982-02-22

Similar Documents

Publication Publication Date Title
US3348801A (en) Cantilever deck form
US5437431A (en) Mold for forming pilot anchor holes in concrete
US2181740A (en) Insert for concrete constructions
US1386509A (en) Insert for concrete construction
JPH0328436A (en) Embedding method for construction insert
CN208310221U (en) A kind of fixed device of side mode
US2268883A (en) Concrete form tie
US7600352B2 (en) Slab saver form attachment device
KR101020641B1 (en) Appliance fixing electric cable box in the reinforced concrete
US1429682A (en) Method of securing facings and the like to walis and the like
JPS6051260A (en) Construction of ceiling insert metal fittings
JPS586963Y2 (en) Exposed insert for buildings
CN108547447A (en) A kind of side mould fixing means, device and building main body construction method
JPH10245896A (en) Insert for ceiling
JPS5912327Y2 (en) building mounts
US7549617B1 (en) Slab saver form attachment device
JPS6316773Y2 (en)
JP2005155091A (en) Lid and lid structure for sleeve for slab
KR200284292Y1 (en) Nail for Construction Mold
TWM625025U (en) Embedded screw
KR100255764B1 (en) Fixed nail for slab insulant
JPS644276Y2 (en)
KR20090096964A (en) Separation device of a mold for a pipe through sleeve
JPH0718859A (en) Method for constructing concrete skeleton
CN111236646A (en) Drawknot embedded bolt