JPH03279556A - Mounting structure for stone - Google Patents

Mounting structure for stone

Info

Publication number
JPH03279556A
JPH03279556A JP7549190A JP7549190A JPH03279556A JP H03279556 A JPH03279556 A JP H03279556A JP 7549190 A JP7549190 A JP 7549190A JP 7549190 A JP7549190 A JP 7549190A JP H03279556 A JPH03279556 A JP H03279556A
Authority
JP
Japan
Prior art keywords
stone
thick
hole
stones
fittings
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP7549190A
Other languages
Japanese (ja)
Inventor
Teruo Yamamiya
輝夫 山宮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP7549190A priority Critical patent/JPH03279556A/en
Publication of JPH03279556A publication Critical patent/JPH03279556A/en
Pending legal-status Critical Current

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

PURPOSE:To prevent the connection of stones from being damaged by earthquakes by inserting heavy pins which are projected out out of paired upper and lower mounting fittings respectively, into holes provided for the mating faces of an upper and a lower stone respectively, and thereby connecting both of the fittings to a support fitting fixed onto a bed structure. CONSTITUTION:A tube 9 made of rubber is pulled on the heavy pin 8 of a lower mounting fitting 6, and is then inserted into a hole 4 on the mating face of a lower stone 2. Meanwhile, a heavy pin 7 of an upper mount fitting 5 is inserted into a hole 3 on the mating face of an upper stone 1 via soft filling agent 10. And the plates of both of the fittings 5 and 6 are adjusted in position by means of the square and oblong holes of them so that both of the fittings are thereby tightly connected to an angle shaped support fitting 12 fixed onto a bed structure 11 with a bolt 13, a nut 14 and a washer 15.

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は石材の取付構造に係るものである。[Detailed description of the invention] (Industrial application field) The present invention relates to a stone mounting structure.

(従来の技術) 従来の乾式1法による石材の取付は方法としては下記の
方法が行なわれていた。
(Prior Art) The following methods have been used to install stones using the conventional dry method.

(■)  上下の石材WO間を太柄ビン(a)(通し太
柄)で連結し、目地は特に設けない。
(■) Connect the upper and lower stone WOs with a thick-handled bin (a) (thick-handled through), and do not provide any joints.

(ω L型の棒状引き金物ら)を石材(81の接合端面
の孔に挿入固定し、下地構造物(Qに溝型状の取付金物
(d)を介して緊結する。(第7図及び第8図参照) (発明が解決しようとする課題) この場合、石材の重量は下方の石材にあすけられ、石材
同志がせり合っている。
Insert and fix the (ω L-shaped rod-shaped trigger) into the hole in the joint end face of the stone (81), and tighten it to the base structure (Q) via the groove-shaped fitting (d). (Fig. 7 and (See Figure 8) (Problem to be Solved by the Invention) In this case, the weight of the stones is carried by the stones below, and the stones are in contact with each other.

地震時に下地構造物に眉間変位が生したとき、石材同志
は互いにぶつかりあって大きな力が加わる。そして太納
ピン、(通し太柄)L型の棒状引き金物が変形すること
によって、晴間変位に追随するごとになるが、石材が破
損、脱落する危険があり、地震後に石材の位置がずれた
ままとなる。
When an earthquake causes the underlying structure to shift between the eyebrows, the stones collide with each other and a large force is applied. As the Taina pin (thick handle) L-shaped rod-shaped trigger deforms, it follows the displacement of the sun, but there is a risk that the stones will be damaged or fall off, and the position of the stones may shift after an earthquake. It will remain as it is.

本発明は前記従来技術の有する問題点に鑑みて提案され
たもので、その目的とする処は、地震時の層間変形に追
随し、施工性が向上され、経済性の優れた石材の取付は
構造を提供する点にある。
The present invention was proposed in view of the problems of the prior art, and its purpose is to provide an economical method for installing stone that follows interstory deformation during earthquakes, improves workability, and The point is to provide structure.

(課題を解決するための手段) 前記の目的を達成するため、本発明に係る石材の取付は
構造は、プレートに太柄ピンを上下に突設した取付金物
における一方の太柄ピンにゴム製のチューブを嵌装して
−あの石材の合端面に穿設された孔に挿入し、他方の太
柄ビンを、前記一方の石材に接合される他りの石材の合
端面に穿設され、且り柔軟性充填材が填装された孔に挿
入し、前記取付金物を下地構造体に固定された支持金物
に接合して構成されている。
(Means for Solving the Problems) In order to achieve the above object, the stone mounting structure according to the present invention is such that one of the thick-handled pins of the mounting hardware in which the thick-handled pins are vertically protruded from the plate is made of rubber. Fit the tube into the hole drilled in the joint end face of that stone, and insert the other thick-handled bottle into the joint end face of the other stone joined to the one stone, The flexible filler is inserted into a hole filled with the flexible filler, and the mounting hardware is joined to a supporting hardware fixed to the base structure.

(作用) 本発明によれば前記したように、プレートに太柄ビンが
上下に突設され、且つ下地構造体に支持金物を介して固
定された取付金物における一方の太柄ピンにはゴム製チ
ューブを嵌装して、−、&の石材の合端面に設けた孔に
挿入し、他方の太柄ビンは他力の石材の合端面に設けた
孔に挿入し、同化に柔軟性充填材を填装したことによっ
て、地震時に前記下地構造体に層間変位を生じて、石材
が同下地構造体の変位に伴ってロッキングを生起した場
合、前記大柄ピンに嵌装されたゴム製チューブ、及び前
記太柄ピンと石材の合端面に設けた孔との間に填装され
た柔軟性充填材が変形することによって、石材が無理な
く下地構造体に追随する。
(Function) According to the present invention, as described above, thick-handled bottles are vertically protruded from the plate, and one thick-handled pin of the mounting hardware fixed to the base structure via the support hardware is made of rubber. Fit the tube and insert it into the hole made on the joint end face of the - and & stones, and insert the other thick-handled bottle into the hole made on the joint end face of the other stone. If the loading of the large pin causes interlayer displacement in the base structure during an earthquake, and the stones lock due to the displacement of the base structure, the rubber tube fitted into the large pin, By deforming the flexible filler inserted between the thick-handled pin and the hole provided in the mating end surface of the stone, the stone follows the base structure without difficulty.

(実施例) 以下本発明を図示の実施例について説明する。(Example) The present invention will be described below with reference to the illustrated embodiments.

(11(2)は上下の石材で、合端面に所定の深さを有
する孔(3) (4)が穿設され、石材(2)の頂面に
おける孔(3)の内側に段差部(2a)が設けられてい
る。
(11 (2) is the upper and lower stones, holes (3) (4) having a predetermined depth are bored on the joint end surface, and a stepped part ( 2a) is provided.

(5) (6)は上下−双の取付金具で、上部取付金具
(5)のプレート端部より上方に、また下部取イ・1金
具(6)のプレート端部より下方に、夫々太柄ピン(7
)(8)が一体に突設されている。
(5) (6) are upper and lower double mounting brackets, with thick handles installed above the plate end of the upper mounting bracket (5) and below the plate end of the lower mounting bracket A/1 (6). Pin (7
)(8) are integrally provided.

前記下部取付金具(6)の太柄ビン(8)にはゴム製チ
ューブ(9)を嵌装して、下部の石材(2)の合端面の
孔(4)に挿入する。
A rubber tube (9) is fitted into the thick-handled bottle (8) of the lower mounting bracket (6) and inserted into the hole (4) in the mating end surface of the lower stone (2).

一方、上部の石材(1)における合端面の孔(3)には
柔軟性充填材(10)を注入しておき、同化(3)に前
記上部底(、J金具(5)の太柄ビン(7)を挿入し、
前記両数(−J金具(5)(6)のプレートの位置を調
整したのち下地構造体(11)に固定されたアングル状
支持金物(12)にボルト(13)、ナツト(14)及
びワッシャー(15)で緊結し′ζ石材の取付を完了す
る。
On the other hand, a flexible filler (10) is injected into the hole (3) on the mating surface of the upper stone (1), and the assimilation (3) is filled with the upper bottom (, the thick-handled bottle of the J metal fitting (5)). Insert (7),
After adjusting the positions of the plates of the two (-J metal fittings (5) and (6)), bolts (13), nuts (14) and washers are attached to the angle-shaped support metal fittings (12) fixed to the base structure (11). Tighten at step (15) to complete the installation of the 'ζ stone.

なお前記各取付金具(5) (6)には出入方向調整の
ため方形状孔(5a)及び長孔(6a)が穿設され、ま
たアングル状支持金物(12)には左右方向調整のため
の長孔(12a)が穿設されている。
Each of the mounting brackets (5) and (6) has a rectangular hole (5a) and a long hole (6a) for adjusting the entrance/exit direction, and the angular support bracket (12) has a rectangular hole (5a) and a long hole (6a) for adjusting the lateral direction. A long hole (12a) is bored.

更に上下の石材(1)(2)の孔(31(4)の位置に
ずれが生しるときのために、上部石材(1)の孔(3)
は、取付誤差を見込んで、太柄ビン(7)の径より大径
に形成される。
Furthermore, in case the positions of the holes (31 and 4) in the upper and lower stones (1) and (2) are misaligned, the hole (3) in the upper stone (1)
is formed to have a diameter larger than that of the thick-handled bottle (7), taking into account installation errors.

図示の実施例は前記したように構成されているのご、地
震時に前記下地構造体(11)に層間変位を生起して、
上下の石材(5)(6)がロッキングを生起した場合、
前記下部取付金具(6)の太柄ビン(8)に嵌装された
ゴム製チューブ(9)、及び上部取付金具(5)の太柄
ビン(7)と上部石材(1)の孔(3)との間に充填さ
れた柔軟性充填材(10)が変形するごとによって、石
材(1)(2)が互いに干渉しあうことなく、石材重量
が各取付金物毎に負担され、無理なく下地構造体(11
)の層間変位に追随し、地震による破損、脱落が防止さ
れる。
The illustrated embodiment is configured as described above, and causes interstory displacement in the base structure (11) during an earthquake.
If the upper and lower stones (5) and (6) cause rocking,
A rubber tube (9) fitted into the thick-handled bottle (8) of the lower mounting bracket (6), and a hole (3) in the thick-handled bottle (7) of the upper mounting bracket (5) and the upper stone (1). ) As the flexible filler (10) is deformed, the weight of the stones (1) and (2) is borne by each mounting hardware without interference with each other, and the weight of the stones is borne by each mounting hardware, allowing the stones to be easily attached to the base. Structure (11
) to prevent damage and falling off due to earthquakes.

また前記石材(1) (2)の加工場においては、石材
の穿孔加工と、合端面に段差をつける加工が行なわれる
のみであっ′ζ、加工量が少なくて済み、更に太柄ピン
、取付金物の数量が少なくて済み、取付けが筒車である
In addition, in the processing plants for stones (1) and (2), only the drilling of the stones and the processing of adding steps to the mating surfaces are carried out, so the amount of processing is small, and in addition, thick-handled pins and mounting The amount of hardware required is small, and the installation is done using a hour wheel.

前記実施例においては、上部取付金具(5) (61に
夫々太柄ピン(7) (8)が突設され°Cいるので、
石材(1)(2)の孔(3) (4)の位置に相当の誤
差があった場合も、前記各取付金具(51(61の太柄
ピン(7] (8)を各別に前記孔(3) (4)に嵌
入するごとによっ゛C1同孔(3) (4)の位置に誤
差に追随して石材(IO2) 第4図乃至第6図は本発明の他の実施例を示し、太柄ピ
ン(7′)は単一の取付金具(5′)に同金具(5′)
を縦貫するように取付けられ、単一の取(=J全金具石
材(1)(2)を接合することができるようにして経済
性の向上をも図ったものである。
In the above embodiment, thick handle pins (7) and (8) are provided protruding from the upper mounting brackets (5) and (61), respectively.
Even if there is a considerable error in the position of holes (3) and (4) in stones (1) and (2), each of the mounting brackets (51 (61) with thick handle pins (7) and (8) (3) Each time it is inserted into (4), the stone (IO2) is placed in the same hole (3) in (4) according to the error. Figures 4 to 6 show other embodiments of the present invention. The thick pin (7') is attached to a single mounting bracket (5').
It is installed so as to run vertically through the walls, and it also aims to improve economic efficiency by making it possible to join a single dori (= J Zenkaku Stone (1), (2)).

口中前記実施例と均等部分には同一符号が附されている
Portions in the mouth that are equivalent to those in the previous embodiment are given the same reference numerals.

(発明の効果) 本発明によれば、プレートに太柄ピンを上下に突設した
取付金物における一方の太柄ピンにゴム製のチューブを
嵌装して−hの石材の合端面に穿設された孔に挿入し、
他力の太柄ピンを他力の石材の合端面に穿設され、且つ
柔軟性充填材が填装された孔に挿入するとともに、前記
取付金物を下地構造体に固定された支持金物に接合した
ごとによって、地震時の層間変形に石材が無理なく追随
して、地震による破損、脱落を防止するとともに、層間
変形設計値に対して自由度を持たせるものである。
(Effects of the Invention) According to the present invention, in a mounting hardware in which thick-handled pins are vertically protruded from a plate, a rubber tube is fitted to one of the thick-handled pins, and the tube is bored into the joint end face of the -h stone. Insert the hole into the
Insert a thick-handled pin into a hole drilled in the mating surface of the free-standing stone and filled with a flexible filler, and connect the mounting hardware to the supporting hardware fixed to the underlying structure. As a result, the stones will easily follow the deformation between the stories during an earthquake, preventing them from being damaged or falling off due to an earthquake, and providing a degree of freedom regarding the design values for the deformation between the stories.

また石材の上下2層を同一金具で固定できるため、施工
性が向上され、経済性が改善されるものごある。
Furthermore, since the upper and lower layers of stone can be fixed with the same metal fittings, construction efficiency and economic efficiency are improved.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明に係る石材の取付は構造の一実施例を示
す縦断側面図、第2図はその横断平面図、第3図は取付
金具の斜視図、第4図は本発明の他の実施例を示す縦断
側面図、第5図はその横断平面図、第6図は下部石材の
部分斜視図、第7図は従来の石材の取イ」け構造を示す
斜視図、第8図はその部分側面図である。 (1)・・・石材、 (3)・・・孔、 (5)・・・上部底イ]金具、 (6)・・・下部取(・1金具、 (7′)・・・太柄ビン、 (9)・・・ゴム製チューブ、 (11)・・・下地構造体、 (13)・・・ボルト、 (15)・・・ワッシャー (2)−・石材、 (4)・・・孔、 (51・・・取1.J金具、 (7)・・・太柄ピン、 (8)・・・太柄ビン、 (10)・・・柔軟性充填材、 (12)−・・支持金物、 (14)・・・ナツト、
Fig. 1 is a vertical sectional side view showing one embodiment of the structure for installing stone materials according to the present invention, Fig. 2 is a cross-sectional plan view thereof, Fig. 3 is a perspective view of the mounting bracket, and Fig. 4 is a structure other than the one according to the present invention. Fig. 5 is a cross-sectional plan view thereof, Fig. 6 is a partial perspective view of the lower stone, Fig. 7 is a perspective view showing a conventional stone removal structure, Fig. 8 is a partial side view thereof. (1)...stone, (3)...hole, (5)...upper bottom a] metal fitting, (6)...lower mounting (・1 metal fitting, (7')...thick handle Bottle, (9)...Rubber tube, (11)...Base structure, (13)...Bolt, (15)...Washer (2)--stone, (4)... Hole, (51... Take 1. J bracket, (7)... Thick handle pin, (8)... Thick handle bottle, (10)... Flexible filler, (12)... Support hardware, (14)...nuts,

Claims (1)

【特許請求の範囲】[Claims] プレートに太■ピンを上下に突設した取付金物における
一方の太■ピンにゴム製のチューブを嵌装して一方の石
材の合端面に穿設された孔に挿入し、他方の太■ピンを
、前記一方の石材に接合される他方の石材の合端面に穿
設され、且つ柔軟性充填材が填装された孔に挿入し、前
記取付金物を下地構造体に固定された支持金物に接合し
てなることを特徴とする石材の取付け構造。
In a mounting hardware with thick pins protruding from the top and bottom of the plate, fit a rubber tube to one of the thick pins, insert it into a hole drilled in the joint end of one of the stones, and insert the other thick pin. is inserted into a hole drilled in the joint end face of the other stone to be joined to the one stone and filled with a flexible filler, and the mounting hardware is attached to the support hardware fixed to the underlying structure. A stone mounting structure characterized by being joined together.
JP7549190A 1990-03-27 1990-03-27 Mounting structure for stone Pending JPH03279556A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7549190A JPH03279556A (en) 1990-03-27 1990-03-27 Mounting structure for stone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7549190A JPH03279556A (en) 1990-03-27 1990-03-27 Mounting structure for stone

Publications (1)

Publication Number Publication Date
JPH03279556A true JPH03279556A (en) 1991-12-10

Family

ID=13577805

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7549190A Pending JPH03279556A (en) 1990-03-27 1990-03-27 Mounting structure for stone

Country Status (1)

Country Link
JP (1) JPH03279556A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009030245A (en) * 2007-07-24 2009-02-12 Asahi Kasei Construction Materials Co Ltd Construction method for covering material, and supporting implement for use in it
US20120125646A1 (en) * 2010-09-09 2012-05-24 Michael Hatzinikolas Self-releasing structural assembly
US20120192504A1 (en) * 2010-09-09 2012-08-02 Michael Hatzinikolas Self-releasing structural assembly
US20120279143A1 (en) * 2011-05-02 2012-11-08 Fero Corporation Break away firewall connection system and a method for construction
US9234344B2 (en) 2012-02-28 2016-01-12 Michael Hatzinikolas Self-releasing structural assembly

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009030245A (en) * 2007-07-24 2009-02-12 Asahi Kasei Construction Materials Co Ltd Construction method for covering material, and supporting implement for use in it
US20120125646A1 (en) * 2010-09-09 2012-05-24 Michael Hatzinikolas Self-releasing structural assembly
US20120192504A1 (en) * 2010-09-09 2012-08-02 Michael Hatzinikolas Self-releasing structural assembly
US8490341B2 (en) * 2010-09-09 2013-07-23 Michael Hatzinikolas Self-releasing structural assembly
US8490340B2 (en) * 2010-09-09 2013-07-23 Michael Hatzinikolas Self-releasing structural assembly
US20120279143A1 (en) * 2011-05-02 2012-11-08 Fero Corporation Break away firewall connection system and a method for construction
US8955263B2 (en) * 2011-05-02 2015-02-17 Fero Corporation Break away firewall connection system and a method for construction
US9234344B2 (en) 2012-02-28 2016-01-12 Michael Hatzinikolas Self-releasing structural assembly

Similar Documents

Publication Publication Date Title
JPH03279556A (en) Mounting structure for stone
US6009674A (en) Method and apparatus for providing earthquake resistant modular structures
MXPA06011271A (en) Support and skirting system for factory built structures.
US5970668A (en) Chimney reinforcement device
JPH04315645A (en) Connecting device for stone structure
JPH0514061B2 (en)
JP2500798Y2 (en) Joint structure of building members
US5125761A (en) Seismic hold down device
JPH0623642Y2 (en) Panel support leg device for free access floor
JPH044080Y2 (en)
JPH07247602A (en) Connection method and tool for concrete products
JPH09158322A (en) Connecting fitting and connecting structure of column and foundation by using connecting fitting thereof
JP3024468U (en) Rigid joint structure of beam in weak axis direction of H-shaped steel column
JP2951445B2 (en) Panel mounting structure
JP2873193B2 (en) Base plate
JP2694431B2 (en) Construction method of anchor bolt
JPH0113104Y2 (en)
JP2003193692A (en) Connecting structure between waterproof pan and wall substrate unit
JP3556028B2 (en) Steel tube beam equipment
JP2004150092A (en) Column-beam connection method for steel frame structure using plate in combination with filler
JP3031032U (en) Connecting metal fittings for wooden construction
JPH07100976B2 (en) Transportation jig for building unit
JP3111105B2 (en) Curtain wall mounting method
JPH0571171A (en) Joining construction for wall panel
JPH0932125A (en) Connecting fitting for wooden building