JPH03244740A - Construction method of external wall panel and structure of attachment thereof - Google Patents

Construction method of external wall panel and structure of attachment thereof

Info

Publication number
JPH03244740A
JPH03244740A JP4182590A JP4182590A JPH03244740A JP H03244740 A JPH03244740 A JP H03244740A JP 4182590 A JP4182590 A JP 4182590A JP 4182590 A JP4182590 A JP 4182590A JP H03244740 A JPH03244740 A JP H03244740A
Authority
JP
Japan
Prior art keywords
omnia
external wall
bolt
board
panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP4182590A
Other languages
Japanese (ja)
Other versions
JP2542943B2 (en
Inventor
Nobuyuki Maeda
信之 前田
Koichi Watanabe
宏一 渡辺
Yasushi Samori
佐守 康司
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP2041825A priority Critical patent/JP2542943B2/en
Publication of JPH03244740A publication Critical patent/JPH03244740A/en
Application granted granted Critical
Publication of JP2542943B2 publication Critical patent/JP2542943B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

PURPOSE:To simplify construction of an external wall panel by hanging a concrete omnia floor panel between the cantilever beams of a structure to which the external wall panel is to be attached, and making the omnia floor panel receive the load of the external wall panel. CONSTITUTION:An omnia-floor panel 10 comprises a precast concrete panel using as one part of a main reinforcement an omni-atlas 14 comprising an upper chord member 11, a lower chord member 12 and a diagonal member 13 combined with one another. The floor panel 10 is hanged between cantilever beams 2 and the precast concrete panel 4 is hoisted by a crane to near the end of each beam 2 of a predetermined story. The precast concrete panel 4 is further attached to each cantilever beam 2 by an attachment bolt 20 and a drawing bolt 28. At each beam 2 the level and direction of the precast concrete panel 4 are adjusted by a leveling bolt 18 and a pushing bolt 29, respectively. Thereby an external wall panel is easily attached to an external wall.

Description

【発明の詳細な説明】 一産業上の利用分野」 この発明は、PC板等の外壁板を躯体から離して取り付
ける場合における、外壁板の施工方法およびその取付構
造に関するものである。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a method of constructing an exterior wall board, such as a PC board, and a structure for installing the same, in the case where the exterior wall board, such as a PC board, is installed away from a building frame.

「従来の技術」 従来、外壁板としてPC板を躯体から離して取り付ける
場合には、第5図および第6図に示すように躯体lから
突出する片持ち粱2の先端に小梁3をデツキ方向へ架設
して、この小梁3にPC板4を受けることが多かった。
``Prior Art'' Conventionally, when installing a PC board as an external wall board away from a building frame, a small beam 3 is attached to the tip of a cantilever 2 protruding from the building frame 1, as shown in FIGS. 5 and 6. The PC board 4 was often received on the small beam 3 by constructing the PC board in the direction of the PC board.

そして、片持ち粱2の上面にコンクリートCを打設して
スラブ5を形成する場合には、コンクリートCが先端か
ら流れないように先端にコンクリート止め6を設けてそ
の打設作業を行うようにしていた。
When concrete C is cast on the top surface of the cantilevered tile 2 to form the slab 5, a concrete stopper 6 is provided at the tip so that the concrete C does not flow from the tip. was.

「発明が解決しようとする課題」 しかしながら、上記従来の方法においては、片持ち梁2
の先端に小梁3を取り付ける作業が必要であること、そ
のためコンクリート止めを施す必要があること、コンク
リート打設の際に先端スラブの型枠が必要であること等
の理由から施工コストの上昇原因となり、コスト低減、
施工の合理化が図れなかった。
"Problem to be solved by the invention" However, in the above conventional method, the cantilever beam 2
The construction cost is increased due to the necessity of attaching the small beam 3 to the tip of the slab, the need for concrete fixing, and the need for formwork for the tip slab when pouring concrete. Therefore, cost reduction,
Construction could not be streamlined.

さらには、上記のような点により、片持ち粱2の先端で
の作業が増える結果、作業の安全性が低下すること、先
端の小梁3の存在により設備の収まりが悪く通ること、
等の問題の残っていた。
Furthermore, due to the above-mentioned points, the work at the tip of the cantilever 2 is increased, which reduces the safety of the work, and the presence of the small beam 3 at the tip makes it difficult for equipment to pass through.
Other issues remained.

この発明は、上記事情に鑑みてなされたしので、外壁板
の取付けを容易にすることにより、コスト低減、施工の
合理化を共に図ることのてきる外壁板の施工方法および
その構造を提供することを目的としている。
The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a method for constructing an exterior wall board and its structure, which can reduce costs and streamline construction by making the installation of the exterior wall board easier. It is an object.

「課題を解決するための手段」 この発明に係る外壁板の施工方法は、上弦材、下弦材及
び斜め材を組み合わせたオムニアトラスを主筋の一部と
して使用するコンクリート製のオムニア床板を用いて、
外壁板を取り付けるへき躯体の片持ち梁相互間に、前記
オムニア床板を架け渡しておき、当該オムニア床板に前
記外壁板の荷重を受けさせるようにしたものである。
"Means for Solving the Problems" The method for constructing exterior wall boards according to the present invention uses a concrete Omnia floor board that uses Omnia truss, which is a combination of upper chord members, lower chord members, and diagonal members, as part of the main reinforcement.
The Omnia floorboard is spanned between the cantilevers of the frame frame to which the external wall boards are attached, so that the Omnia floorboard receives the load of the external wall board.

また、この発明(ご係る外壁板の取付構造は、外壁板を
取り付けるべき躯体の片持ち梁相互間に前記外壁板の荷
重を受ける請求項1記載のオムニア床板を架け渡し、前
記外壁板の内面に凸部を設け、この凸部を前記オムニア
床板の端部に乗せろ形で、前記外壁板を前記片持ち梁の
先端相互に取り付けるものである。
In addition, the mounting structure for external wall boards according to the present invention is such that the Omnia floorboard according to claim 1, which receives the load of the external wall board, is spanned between cantilevers of a frame to which the external wall boards are attached, and A convex portion is provided on the cantilever, and the convex portion is placed on the end of the omniar floor plate, and the outer wall board is attached to the ends of the cantilever beam.

「作用 」 この発明は、片持ち梁の先端相互に外壁板の荷重を受け
る小梁を取り付けろ代わりに、片持ち梁相互間に外壁板
の荷重を受けるオムニア床板を架け渡しておくことで、
コンクリート打設の際の先端スラブの型枠、コンクリー
トIEめが不要となる。
``Function'' This invention has the advantage that instead of attaching small beams that receive the load of the exterior wall boards between the ends of the cantilever beams, Omnia floorboards that receive the load of the exterior wall boards are placed between the cantilever beams.
Formwork for the tip slab and concrete IE are unnecessary when pouring concrete.

さらに、外壁板の内面に凸部を設けて、この凸部を前記
オムニア床板の端部に乗せることにより、外壁板の荷重
受は金物の簡略化が可能となる。
Further, by providing a convex portion on the inner surface of the exterior wall board and placing this convex portion on the end of the Omnia floor board, the load receiving part of the exterior wall board can be simplified with hardware.

「実施例」 以下、この発明の実施例について図面を参照して説明す
る。
"Embodiments" Hereinafter, embodiments of the present invention will be described with reference to the drawings.

第1図ないし第4図はこの発明の一実施例を示すもので
、これらの図において符号lは躯体、符号2は片持ち梁
、符号4は外壁板たるPC板をそれぞれ示している。
1 to 4 show an embodiment of the present invention, and in these figures, reference numeral 1 indicates a frame, reference numeral 2 indicates a cantilever beam, and reference numeral 4 indicates a PC board serving as an outer wall plate.

躯体lは、第2図に示すように、柱7及び柱7相互間に
架設される粱8を組み立てて全体が構成されており、躯
体1の最遠部に位置する容性7と梁8との交差部9から
は外方へ向けて片持ち梁2がそれぞれ突出、している。
As shown in FIG. 2, the frame 1 is entirely constructed by assembling columns 7 and beams 8 installed between the columns 7, and the bulkhead 7 and beam 8 located at the farthest part of the frame 1 Cantilevers 2 protrude outward from the intersections 9.

そして、この片持ち梁2の先端相互に対して前記PC板
4が取り付けられるようになっている。
The PC boards 4 are attached to the ends of the cantilever beams 2.

前記片持ち粱2には、PC板4を取り付ける役割の一般
部と、PC板4を取り付けると共に荷重をも受ける役割
の荷重受は部とがあり、第1図は荷重受は部を主に示し
たものである。
The cantilever 2 has a general part that serves to attach the PC board 4, and a load receiver part that serves to attach the PC board 4 and also receives the load. This is what is shown.

第1図に示すように、片持ち梁2の上面相互間にはPC
板4の荷重を受けるためのオムニア床板lOが架け渡さ
れている。
As shown in Figure 1, there is a PC between the upper surfaces of the cantilever beams 2.
An Omnia floor plate 10 for receiving the load of the plate 4 is spanned.

このオムニア床板!0は、第1図に示すように、上弦材
11、下弦材12及び斜め材13を組み合わせたオムニ
アトラス14を主筋の一部として使用するコンクリート
製のプレキャスト板である。
This Omnia floorboard! As shown in FIG. 1, 0 is a concrete precast board that uses an omni truss 14, which is a combination of an upper chord member 11, a lower chord member 12, and a diagonal member 13, as a part of the main reinforcement.

かかるオムニア床板lOは、片持ち梁2の最先端から片
持ち粱2の略全体を覆う大きさを有し、オムニア床板l
Oの最先端には凸形の土手15がデツキ方向へ延びて形
成されている。また、この土手15内には剛性を出すた
めの補強用鉄筋16がデツキ方向へ延びて埋設されてい
る。
The Omnia floor board lO has a size that covers almost the entire cantilever beam 2 from the leading edge of the cantilever beam 2, and the Omnia floor board lO
A convex bank 15 is formed at the tip of the O, extending toward the deck. Furthermore, reinforcing reinforcing bars 16 for providing rigidity are buried in the bank 15 and extending in the direction of the deck.

前記PC板4は、予め工場等において先組みされたプレ
キャスト部材であって、その内面の所定高さにはPC板
4の荷重をオムニア床板lOに伝えろための凸部17が
形成され、凸部17の下面には土手15上面に当接する
レベル出しボルト18の基端が進退自在に埋設されてい
る。
The PC board 4 is a precast member pre-assembled in advance in a factory or the like, and a convex portion 17 is formed at a predetermined height on its inner surface for transmitting the load of the PC board 4 to the Omnia floorboard lO. The base end of a leveling bolt 18 that comes into contact with the upper surface of the embankment 15 is buried in the lower surface of the bolt 17 so as to be movable forward and backward.

かかるPC板4の取付は構造は以下の如くである。The structure of mounting the PC board 4 is as follows.

片持ち梁2の先端下面にはPC板4を取り付けるための
取付ボルト19を保持する1字形のプレート20の水平
部20aが溶接により固定され、プレート20の垂直部
20bには取付ボルト19を挿通するボルト孔21が貫
通している。一方、片持ち梁2の先端に取り付けられる
PC板4の内而には、ボルト孔21に対応する(び置に
、取付1でルh19を螺合するための螺合溝22をri
するボルト受け23か埋設されている。このボルト受け
23は、I’ C板4内に埋設さ2またアンカー筋24
に直接固定されている。なお、このボルト受け23の位
置とレベル出しホルトI8の位置(凸部17下面)との
必要用II!i11は、オムニア仮10の」−丁、15
高さに合ね1士で設計時に調整さt5る。
A horizontal part 20a of a single-shaped plate 20 holding a mounting bolt 19 for mounting the PC board 4 is fixed by welding to the lower surface of the tip of the cantilever 2, and the mounting bolt 19 is inserted into the vertical part 20b of the plate 20. A bolt hole 21 passes through it. On the other hand, inside the PC board 4 attached to the tip of the cantilever beam 2, there is a threaded groove 22 for threading the bolt hole h19 in the mounting 1, corresponding to the bolt hole 21.
A bolt receiver 23 is buried therein. This bolt receiver 23 is embedded in the I'C plate 4 2 and anchor rod 24
is fixed directly to the In addition, the required distance II between the position of this bolt receiver 23 and the position of the leveling hole I8 (lower surface of the convex portion 17)! i11 is Omnia provisional 10'-Ding, 15
Adjust to match the height at the time of design.

したがって、プレート20の外1則から座金25を介し
てホルト孔2Iに挿通された取(tホルト19の先端が
プレート20及′Jr)c仮4間の弾性ゴム26を介し
て−I:ルト受け23の螺合溝22内に蝶合されること
により、この部分にわいてPCC10片持ち粱2に取り
付けらイー、ろようにムっている。そして、前記したP
CC10凸部17下面のレベル出しホルト18の長さを
調節してレベル出しボルト18の先端を土手15に圧接
させ、これによりPCC10荷重をしl\ル出しホルト
18及び土手15を介してオムニア床Vi、10に伝え
ると共に、レベル出しボルト18及び前記取付ボルト1
9によりPCC10垂直に保持しかつ固定している。
Therefore, the bolt is inserted from the outside of the plate 20 through the washer 25 into the hole 2I. By being hinged in the threaded groove 22 of the receiver 23, the PCC 10 can be easily attached to the cantilever holder 2 at this portion. And the above-mentioned P
By adjusting the length of the leveling bolt 18 on the lower surface of the CC10 convex portion 17, the tip of the leveling bolt 18 is brought into pressure contact with the bank 15, thereby applying the PCC10 load to the Omnia floor via the leveling bolt 18 and the bank 15. Vi, 10, and the leveling bolt 18 and the mounting bolt 1.
9 holds and fixes the PCC 10 vertically.

また、PCC10凸部17の近傍に位置してオムニア床
板10の土手15には07字形のプレート27の水平部
27aが固定され、プレート2・7の垂直部27bには
、PCC10垂直面に対する向きを調節するための引き
ボルト28及び押しボルト29を挿通する各ホルト孔3
0.31が貫通している。また、引きボルト28のボル
ト孔30に対応するPCFi、4の内面には、前記引き
ボルト28を螺合するための螺合溝32を有するボルト
受す33がアンカー筋24に固定された形で埋設されて
いる。
Further, a horizontal portion 27a of a 07-shaped plate 27 is fixed to the bank 15 of the Omnia floorboard 10 located near the convex portion 17 of the PCC 10, and a vertical portion 27b of the plates 2 and 7 has a direction with respect to the vertical surface of the PCC 10. Holt holes 3 for inserting pull bolts 28 and push bolts 29 for adjustment
0.31 is passing through. Further, on the inner surface of the PCFi 4 corresponding to the bolt hole 30 of the tension bolt 28, a bolt receiver 33 having a threaded groove 32 for threading the tension bolt 28 is fixed to the anchor bar 24. It is buried.

したがって、プレート27の外画から座金25を介して
ボルト孔30に挿通された引きホルト28の先端がボル
ト受け33の螺合溝32内に螺合されることにより、こ
の部分においてPCN4がオムニア床板10の土手15
に引き寄せる形で取り付けられることになる。また、押
しボルト29がプレート27のボルト孔31に固定した
ナツト34に蝶合され、その先端がPCC10内面を押
ずことにより、PCC10垂直面に対ケる向きか調整さ
れるようになっている。
Therefore, the tip of the pull holder 28 inserted from the outside of the plate 27 into the bolt hole 30 via the washer 25 is screwed into the screw groove 32 of the bolt receiver 33, so that the PCN 4 is connected to the Omnia floorboard in this area. 10 banks 15
It will be attached in such a way that it can be drawn to the In addition, the push bolt 29 is hinged to a nut 34 fixed in a bolt hole 31 of the plate 27, and its tip pushes against the inner surface of the PCC 10, thereby adjusting the direction in which it faces the vertical surface of the PCC 10. .

このように本実施例のPCC10おいては、荷重受は部
の片持ち粱2において、自重を凸部17のレベル出しボ
ルト18を介してオムニア床ffi、10に受けさせる
形て、取付ホルト20および引きボルト28により片持
ち梁2に取り付ける構造とされており、−股部の片持ち
粱2においては単に取り付けるのみの構造とされている
In this way, in the PCC 10 of this embodiment, the load receiver is configured so that its own weight is received by the omni floor ffi, 10 via the leveling bolt 18 of the convex part 17 at the cantilever 2 of the part, and the mounting bolt 20 The structure is such that it is attached to the cantilever beam 2 with a pull bolt 28, and the cantilever beam 2 at the crotch portion is simply attached.

次ぎに、PCC10取り付けて施工する手順およびその
作用を説明する。
Next, the procedure for installing and constructing the PCC 10 and its effects will be explained.

まず、躯体lの各階における6片持ち粱2相互間にデツ
キ方向へオムニア床板lO・・・を架け渡す。そして、
クレーンにより各PC[4を吊り上げ取り付けるべき所
定階の6片持ち粱2先端に近付けると共に、6片持ち梁
2先端部あるいは作業ゴンドラから作業員が取付ボルト
20及び引きボルト28によりPCC106片持ち粱2
に取り付け、一方、荷重受は部の片持ち粱2においてレ
ベル出しボルト18および押しボルト29によりPCC
10レベル調節および向き調節を行う。ムお、レベル調
節後、土手15上面のレベル出しポル118周囲にはモ
ルタルを敷いておく。
First, Omnia floorboards lO... are laid between the six cantilever walls 2 on each floor of the building frame l in the direction of the deck. and,
A crane lifts each PC [4] and brings it close to the tip of the six cantilever beams 2 on the predetermined floor where it is to be attached, and a worker from the tip of the six cantilever beams 2 or the work gondola tightens the mounting bolts 20 and pull bolts 28 to secure the PCC106 cantilever beams 2.
On the other hand, the load receiver is attached to the PCC by the leveling bolt 18 and push bolt 29 at the cantilever 2 of the section.
Make 10 level adjustments and orientation adjustments. After adjusting the level, spread mortar around the leveling port 118 on the top of the bank 15.

このようにして所定のPCC10取付けが終わったら、
粱8相互間にデツキプレート等を敷設して、オムニア床
板10と共にそれらの上にコンクリートを打設し各階の
スラブSを形成する。
Once the specified PCC10 installation is completed in this way,
Deck plates and the like are laid between the rows 8, and concrete is cast thereon together with the omnia floorboards 10 to form the slabs S for each floor.

この場合、オムニア床板10の土手15がコンクリート
止めの役目を果たすことになる。また、片持ち梁2にお
いてはオムニア床板10がコンクリート型枠の役目を果
たすから、この部分におけるスラブ形成用の型枠が不要
となる。
In this case, the bank 15 of the Omnia floorboard 10 will serve as a concrete stopper. Further, since the omniar floor plate 10 serves as a concrete formwork in the cantilever beam 2, a formwork for forming a slab in this portion is not required.

本実施例における外壁板の施工方法によれば、従来のよ
うな先端小梁を用いることなく、PCC10荷重受は用
にオムニア床板10を用いることにより、オムニア床[
10の利点を大いに発揮させることができる。すなわち
、土手15を利用してコンクリート止めが不要となると
共に、先端スラブの型枠が不要で、さらにはPCC10
荷重受け用の金物が不要とムる。このように各施工治具
が不要となるから、施工コストの低減化を図ることがで
きる。
According to the construction method of the exterior wall board in this embodiment, the Omnia floor board 10 is used instead of the PCC10 load receiver without using the tip beam as in the conventional case.
You can make the most of the 10 advantages. In other words, by using the bank 15, there is no need for concrete fixing, there is no need for formwork for the tip slab, and furthermore, the PCC10
There is no need for any hardware to support the load. Since each construction jig becomes unnecessary in this way, construction costs can be reduced.

さらに、片持ち梁2先端での作業が少なくなるから、安
全性が向上すると共に、オムニア床板IOの使用により
施工工程が減少し、これにより施工の合理化が図れると
共に工期短縮を図ることができる。
Furthermore, since there is less work to be done at the tip of the cantilever beam 2, safety is improved, and the use of Omnia floorboard IO reduces the number of construction steps, thereby streamlining construction and shortening the construction period.

また、本実施例における外壁板の取付構造によれば、先
端小梁がむくはる結果、先端設備の納まりが良好になり
、設計プランの自由度が増す利点がある。
Further, according to the mounting structure of the external wall board in this embodiment, as a result of peeling off the tip small beam, the tip equipment can be accommodated better, and there is an advantage that the degree of freedom in the design plan is increased.

「発明の効果」 以上詳細に説明したように、本発明の外壁板の施工方法
は、上弦材、下弦材及び斜め材を組み合わせたオムニア
トラスを主筋の一部として使用するコンクリート製のオ
ムニア床板を用い、外壁板を取り付けるべき躯体の片持
ち梁相互間に、前記オムニア床板を架け渡しておき、当
該オムニア床板に前記外壁板の荷重を受けさせるように
したから、スラブ形成作業等が簡素化されてコストの低
減化が図れると共に、片持ち梁先端での作業が減って施
工の合理化及び工期の短縮化を図ることができる。
"Effects of the Invention" As explained in detail above, the method for constructing an exterior wall board of the present invention is to install a concrete Omnia floor board that uses an Omnia truss, which is a combination of top chord members, bottom chord members, and diagonal members, as part of the main reinforcement. The Omnia floorboards are placed between the cantilever beams of the building frame to which the external wall boards are to be attached, and the Omnia floorboards receive the load of the external wall boards, which simplifies the slab forming work. In addition to reducing costs, the work at the tip of the cantilever beam is reduced, streamlining the construction process and shortening the construction period.

また、本発明の外壁板の取付構造によれば、外壁板を取
り付けるべき躯体の片持ち梁相互間に前記外壁板の荷重
を受ける請求項1紀載のオムニア床板を架け渡し、前記
外壁板の内面に凸部を設け、この凸部を前記オムニア床
板の端部に乗せる形で、前記外壁板を前記片持ち梁の先
端相互に取り付るようにしたから、その横這を簡略化で
きると共に外壁板の取付けが容易であり、さらには片持
ち粱先端における設備等の納まりが良好となる等の効果
を奏する。
Further, according to the mounting structure of the external wall board of the present invention, the Omnia floor board according to claim 1, which receives the load of the external wall board, is spanned between the cantilever beams of the frame to which the external wall board is to be attached, and A convex portion is provided on the inner surface, and this convex portion is placed on the end of the Omnia floor plate, so that the outer wall plates are attached to the tips of the cantilever beams, which simplifies the horizontal installation. It is easy to attach the outer wall board, and furthermore, the installation of equipment at the tip of the cantilever is improved.

【図面の簡単な説明】[Brief explanation of drawings]

第1図ないし4図はこの発明の一実施例を示すもので、
第1図は外壁板の取付図、第2図は片持ち梁を示す躯体
の平面図、第3図は第1図におけるへ部拡大図、第4図
は第1図におけるB方向矢視図、第5図および第6図は
この発明の従来例を示すもので、第5図は外壁板の取付
図、第6図は片持ち梁を示す躯体の平面図である。 ・・・・・・躯体、2・・・・・・片持ち梁、・・・ 
・・・ PC板(外壁板)、 0・・・・・・オムニア床板、 5・・・・・・土手、17・・・・・・凸部、8・・・
・・・レベル出しボルト、 0・・・・・・取付ボルト、 8・・・・・・引きボルト、 9・・・・・・押しボルト。 第4図
Figures 1 to 4 show one embodiment of this invention.
Figure 1 is an installation diagram of the exterior wall panels, Figure 2 is a plan view of the frame showing the cantilever, Figure 3 is an enlarged view of the bottom part in Figure 1, and Figure 4 is a view taken in the direction of arrow B in Figure 1. , 5 and 6 show a conventional example of the present invention, in which FIG. 5 is an installation diagram of an exterior wall board, and FIG. 6 is a plan view of a frame showing a cantilever. ...framework, 2...cantilever beam, ...
... PC board (outer wall board), 0 ... Omnia floor board, 5 ... Bank, 17 ... Convex part, 8 ...
... Leveling bolt, 0 ... Mounting bolt, 8 ... Pull bolt, 9 ... Push bolt. Figure 4

Claims (2)

【特許請求の範囲】[Claims] (1)上弦材、下弦材及び斜め材を組み合わせたオムニ
アトラスを主筋の一部として使用するコンクリート製の
オムニア床板を用いて、外壁板を取り付けるべき躯体の
片持ち梁相互間に、前記オムニア床板を架け渡しておき
、当該オムニア床板に前記外壁板の荷重を受けさせるよ
うにしたことを特徴とする外壁板の施工方法。
(1) Using concrete Omnia floorboards that use Omnia truss, which is a combination of upper chord members, lower chord members, and diagonal members, as part of the main reinforcement, the Omnia floorboards are installed between the cantilevers of the frame to which exterior wall boards are to be attached. 1. A method for constructing an exterior wall board, characterized in that the Omnia floor board is made to bear the load of the exterior wall board.
(2)外壁板を取り付けるべき躯体の片持ち梁相互間に
前記外壁板の荷重を受ける請求項1記載のオムニア床板
が架け渡され、前記外壁板の内面には凸部が設けられ、
この凸部が前記オムニア床板の端部に乗せられる形で、
前記外壁板が前記片持ち梁の先端相互に取り付けられて
いることを特徴とする外壁板の取付構造。
(2) The Omnia floorboard according to claim 1, which receives the load of the external wall board, is spanned between cantilever beams of the frame to which the external wall board is to be attached, and a convex portion is provided on the inner surface of the external wall board,
This convex portion is placed on the end of the Omnia floorboard,
An attachment structure for an exterior wall board, characterized in that the exterior wall boards are attached to the ends of the cantilever beams.
JP2041825A 1990-02-22 1990-02-22 Construction method of outer wall board and its mounting structure Expired - Fee Related JP2542943B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2041825A JP2542943B2 (en) 1990-02-22 1990-02-22 Construction method of outer wall board and its mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2041825A JP2542943B2 (en) 1990-02-22 1990-02-22 Construction method of outer wall board and its mounting structure

Publications (2)

Publication Number Publication Date
JPH03244740A true JPH03244740A (en) 1991-10-31
JP2542943B2 JP2542943B2 (en) 1996-10-09

Family

ID=12619061

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2041825A Expired - Fee Related JP2542943B2 (en) 1990-02-22 1990-02-22 Construction method of outer wall board and its mounting structure

Country Status (1)

Country Link
JP (1) JP2542943B2 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5012892U (en) * 1973-06-06 1975-02-10
JPS61169552A (en) * 1985-01-19 1986-07-31 株式会社竹中工務店 Apparatus for supporting curtain wall

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5012892U (en) * 1973-06-06 1975-02-10
JPS61169552A (en) * 1985-01-19 1986-07-31 株式会社竹中工務店 Apparatus for supporting curtain wall

Also Published As

Publication number Publication date
JP2542943B2 (en) 1996-10-09

Similar Documents

Publication Publication Date Title
CA2017669C (en) Curtain wall for a building
JPH102018A (en) Building unit, unit building, and its constructing method
JP2003328320A (en) Construction method of precast capital part and bridge pier capital part
JPH03244740A (en) Construction method of external wall panel and structure of attachment thereof
JP2931761B2 (en) Fixing device for outer wall material and laminating method for middle and high-rise buildings using the fixing device
JPH0651994B2 (en) Curtain wall support equipment
JP3244102U (en) Steel house foundation structure and anchor set used therein
JP3008051B2 (en) Reinforced preassembly with formwork and reinforced preassembly method with formwork
JP2722121B2 (en) Construction method of reinforced concrete building
RU99118847A (en) METHOD FOR ESTABLISHING MONOLITHIC FRAMES
JPS6343281Y2 (en)
JP2759361B2 (en) Pillar support members for building reinforced concrete buildings
JPH10280331A (en) Form unit for reinforced concrete floor slab and its installation
JP2888913B2 (en) External wall panel mounting method
JP2558889Y2 (en) garage
JPH1046706A (en) Panel anchoring structure and anchoring method therefor regarding building structure made of concrete wall panel
JPH05112983A (en) Construction of reinforced concrete building
JP2724891B2 (en) Construction method of pillar half PCa formwork
JP2002349002A (en) Coupling construction of alc panels and application method for the alc panels
JP2759360B2 (en) Construction method of reinforced concrete building
JP2021173077A (en) Construction method of overhanging slab
JP2989337B2 (en) Pre-assembly method of beam in steel reinforced concrete structure
JP2780055B2 (en) Construction method of reinforced concrete building
JPH05321322A (en) Floor structure for balcony
GB2153875A (en) Building bracket

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees