JPH03221606A - Jacket pile driving method - Google Patents
Jacket pile driving methodInfo
- Publication number
- JPH03221606A JPH03221606A JP1708590A JP1708590A JPH03221606A JP H03221606 A JPH03221606 A JP H03221606A JP 1708590 A JP1708590 A JP 1708590A JP 1708590 A JP1708590 A JP 1708590A JP H03221606 A JPH03221606 A JP H03221606A
- Authority
- JP
- Japan
- Prior art keywords
- pile
- jacket
- jacket main
- shear
- keys
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims description 7
- 239000004570 mortar (masonry) Substances 0.000 claims abstract description 11
- 230000002093 peripheral effect Effects 0.000 description 3
- 239000000853 adhesive Substances 0.000 description 2
- 230000001070 adhesive effect Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Revetment (AREA)
Abstract
Description
【発明の詳細な説明】
[産業上の利用分野]
本発明は、耐荷性能と打設能率の向上を図ったジャケッ
ト杭打設工法に関するものである。[Detailed Description of the Invention] [Industrial Application Field] The present invention relates to a jacket pile driving method that improves load-bearing performance and driving efficiency.
[従来の技術]
第3図に示すように、ジャケット杭aは、所要の太さの
杭すと、該杭すを囲い且つ前記抗すの外周と適宜の間隙
を形威し得る内径を有するジャケット主柱Cからなり、
該ジャケット主柱C内周と前記抗す外周の間に充填した
モルタルdの付着力とモルタルd自体の剪断抵抗によっ
て結合されている。[Prior Art] As shown in Fig. 3, the jacket pile a has an inner diameter that can surround the pile and form an appropriate gap with the outer periphery of the resistor when the pile is of a required thickness. Consists of jacket main pillar C,
The inner periphery of the jacket main column C and the opposing outer periphery are bonded by the adhesive force of the mortar d filled between them and the shear resistance of the mortar d itself.
[発明が解決しようとする課題]
しかしながら、ジャケット主柱Cに作用する荷重が大き
くなるとモルタルdの平面的な付着力だけては、その荷
重に抵抗できなくなる。そこで杭すの外周とジャケット
主柱Cの内周に突起を設は大きな荷重に抵抗できるよう
にするものが考えられるが、その突起が杭すの打設時に
相互に干渉して損傷を起す可能性かあり、また打設が困
難になる、などの問題がある。[Problems to be Solved by the Invention] However, when the load acting on the jacket main column C increases, the planar adhesion force of the mortar d alone cannot resist the load. Therefore, it is possible to install protrusions on the outer periphery of the pile and the inner periphery of the jacket main column C to resist large loads, but these protrusions may interfere with each other and cause damage when the pile is driven. There are problems such as corrosion and making pouring difficult.
本発明は、上述の実情に鑑み、ジャケット杭の耐荷性能
を向上するとともに、杭゛の打ち込みを容易にする工法
を提供することを目的としてなしたものである。The present invention has been made in view of the above-mentioned circumstances, and aims to provide a construction method that improves the load-bearing performance of jacket piles and facilitates the driving of piles.
[課題を解決するための手段]
本発明は、内周面にシャーキ−を設けたジャケット主柱
を備えた構造物を所定の場所に配置し、ジャケット主社
内にスリーブ管を装入した後、該スリーブ管内に外周面
にシャーキ−を設けた杭を挿入し、該杭を打設後、前記
スリーブ管を引き抜き、次いでジャケット主柱内周と杭
外周の間にモルタルを充填する構成としている。[Means for Solving the Problems] The present invention provides a structure that includes a jacket main column with a shim on its inner circumferential surface, and after placing a structure in a predetermined location and inserting a sleeve pipe into the jacket main column, A pile provided with a seal on the outer peripheral surface is inserted into the sleeve pipe, and after driving the pile, the sleeve pipe is pulled out, and then mortar is filled between the inner periphery of the jacket main column and the outer periphery of the pile.
[作 用]
従って、本発明では、杭の打設に際しジャケット主柱内
周面に設けたシャーキ−と、杭外周面に設けたシャーキ
−が相互に干渉することがなく、またシャーキ−かジャ
ケット主柱及び杭とモルタルとの間の付着力を増大させ
且つジャケット主柱に作用する荷重の一部を負荷する。[Function] Therefore, in the present invention, when driving a pile, the shear keys provided on the inner circumferential surface of the main pillar of the jacket and the shear keys provided on the outer circumferential surface of the pile do not interfere with each other, and the shear keys or the shear keys provided on the outer circumferential surface of the pile do not interfere with each other. It increases the adhesion force between the main column and piles and the mortar, and also applies part of the load acting on the jacket main column.
[実 施 例コ
以下、本発明の実施例を添付図面を参照しつつ説明する
。[Embodiments] Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings.
第1図および第2図は本発明の一実施例であり、内周面
にモルタルの付着面積を増大し該付着面に働く剪断力を
負荷するための突起(以下、シャーキ−1という)を設
けたジャケット主柱2二本を互いに平行に所定の間隔を
隔てて並べ、該ジャケット主柱2の一端にプラットホー
ム3を懸は渡して形成した構造物4を陸上において製作
し、該構造物4を予め整地した海底5に前記プラットホ
ーム3を上方にして立設配置し、前記各ジャケット主柱
2内に該ジャケット主柱・2内径より若干細い所要径を
有し、且つ上端を漏斗状に加工したスリーブ管6を装入
し、該スリーブ管6内に外周面に前記ジャケット主柱2
内周面に設けたものと同様のシャーキ−l゛を設けた杭
7を挿入し、該杭7を適宜打設した後、前記スリーブ管
6を引き抜き、次いでジャケット主柱2内周と杭7外周
の間にモルタル8を充填し、ジャケット主柱2と杭7を
結合している。Figures 1 and 2 show an embodiment of the present invention, in which a protrusion (hereinafter referred to as Sharkey-1) is provided on the inner circumferential surface for increasing the mortar adhesion area and applying shear force acting on the adhesion surface. A structure 4 is manufactured on land by arranging the two provided jacket main columns 2 parallel to each other at a predetermined interval and passing a platform 3 across one end of the jacket main columns 2. The platform 3 is placed upright on a previously leveled seabed 5 with the platform 3 facing upward, and each of the jacket main pillars 2 has a required diameter slightly smaller than the inner diameter of the jacket main pillar 2, and the upper end is shaped into a funnel shape. The jacket main pillar 2 is inserted into the sleeve pipe 6 on the outer peripheral surface.
After inserting a pile 7 provided with a shank similar to the one provided on the inner peripheral surface and driving the pile 7 appropriately, the sleeve pipe 6 is pulled out, and then the inner periphery of the jacket main column 2 and the pile 7 are inserted. Mortar 8 is filled between the outer peripheries to connect the jacket main column 2 and the pile 7.
上述のようなジャケット杭打設工法によれば、杭7は、
ジャケット主柱2内に装入された漏斗状の先端の平滑な
内面を有するスリーブ管6によってガイドされるため、
杭7の外周面に設けられたシャーキ−1′と、ジャケッ
ト主柱2内周面に設けられたシャーキ−1か直接干渉す
ることがなく、容易に杭7を打ち込むことができる。According to the jacket pile driving method as described above, the pile 7 is
Because it is guided by a sleeve tube 6 with a funnel-shaped tip and a smooth inner surface inserted into the jacket main column 2,
The pile 7 can be driven easily without direct interference between the seal 1' provided on the outer circumferential surface of the pile 7 and the seal 1 provided on the inner circumferential surface of the jacket main column 2.
更に、前記のシャーキ−1,toは、ジャケット主柱2
及び杭7とモルタル8との間に付着力を増大させ、また
ジャケット主柱2に作用する荷重の一部を負荷するので
、ジャケット杭の耐荷性能を向上させることができる。Furthermore, the above-mentioned Sharkey-1, to the jacket main column 2
Since the adhesive force between the pile 7 and the mortar 8 is increased and a part of the load acting on the jacket main column 2 is applied, the load-bearing performance of the jacket pile can be improved.
なお、本発明の実施例では、二本のジャケット主柱を備
えた構造物の場合について説明したが、ジャケット主柱
の本数は必要に応じて増減し得ること、また、構造物を
海中に立設する場合について説明したが地上においても
実施し得ること、その他、本発明の要旨を逸脱しない範
囲内において種々変更を加え得ることは勿論である。In the embodiments of the present invention, the case of a structure with two jacket main columns has been explained, but it is understood that the number of jacket main columns can be increased or decreased as necessary, and that the structure can be erected underwater. Although the description has been made for the case where the present invention is installed, it goes without saying that it can also be implemented on the ground, and that various other changes can be made without departing from the gist of the present invention.
[発明の効果]
以上説明したように本発明のジャケット杭打設工法によ
れば、下記のごとき種々のすぐれた効果を奏し得る。[Effects of the Invention] As explained above, according to the jacket pile driving method of the present invention, various excellent effects as described below can be achieved.
(D 杭を打設する時に、杭とジャケット主柱に設けた
シャーキ−か相互に干渉して起こる事故を未然に防止で
きる。(D) When driving piles, it is possible to prevent accidents that may occur due to interference between the pile and the shear keys provided on the main pillar of the jacket.
(II)杭を容易に打ち込むことができるので打設工事
の能率が向上する。(II) Since piles can be driven easily, the efficiency of driving work is improved.
第1図は本発明のジャケット杭打設工法の一実施例図、
第2図は第1図の実施例を構成するジャケット主柱と杭
の縦断面図、第3図は従来のジャケット杭打設工法の一
例図である。
図中、1.1°はシャーキ−12はジャケット主柱、4
は構造物、6はスリーブ管、7は杭、8はモルタルを示
す。Figure 1 is an example of the jacket pile driving method of the present invention.
FIG. 2 is a longitudinal sectional view of the jacket main column and piles constituting the embodiment of FIG. 1, and FIG. 3 is an example of a conventional jacket pile driving method. In the figure, 1.1° is Sharky, 12 is the main jacket pillar, 4
6 indicates the structure, 6 indicates the sleeve pipe, 7 indicates the pile, and 8 indicates the mortar.
Claims (1)
た構造物を所定の場所に配置し、ジャケット主柱内にス
リーブ管を装入した後、該スリーブ管内に外周面にシャ
ーキーを設けた杭を挿入し、該杭を打設後、前記スリー
ブ管を引き抜き、次いでジャケット主柱内周と杭外周と
の間にモルタルを充填することを特徴とするジャケット
杭打設工法。1) A structure equipped with a jacket main column with a shear key provided on the inner circumferential surface is placed at a predetermined location, a sleeve pipe is inserted into the jacket main column, and a shear key is provided on the outer circumferential surface of the sleeve pipe. A jacket pile driving method comprising inserting a pile, pulling out the sleeve pipe after driving the pile, and then filling a space between the inner circumference of the jacket main column and the outer circumference of the pile with mortar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1708590A JP2757519B2 (en) | 1990-01-26 | 1990-01-26 | Jacket pile driving method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1708590A JP2757519B2 (en) | 1990-01-26 | 1990-01-26 | Jacket pile driving method |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH03221606A true JPH03221606A (en) | 1991-09-30 |
JP2757519B2 JP2757519B2 (en) | 1998-05-25 |
Family
ID=11934145
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP1708590A Expired - Lifetime JP2757519B2 (en) | 1990-01-26 | 1990-01-26 | Jacket pile driving method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2757519B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113309240A (en) * | 2021-06-10 | 2021-08-27 | 同济大学 | Grouting sleeve connecting joint with annular shear keys |
-
1990
- 1990-01-26 JP JP1708590A patent/JP2757519B2/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113309240A (en) * | 2021-06-10 | 2021-08-27 | 同济大学 | Grouting sleeve connecting joint with annular shear keys |
Also Published As
Publication number | Publication date |
---|---|
JP2757519B2 (en) | 1998-05-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH03221606A (en) | Jacket pile driving method | |
US4126001A (en) | Method for constructing a soil structure | |
JP2730705B2 (en) | Improvement method for soft ground | |
JP3643571B2 (en) | Pile foundation reinforcement structure | |
JP2816827B2 (en) | Loading fulcrum method on pile side body of precast concrete pile | |
JPH069062Y2 (en) | Prestressed concrete pile | |
JPH09170338A (en) | Base isolation method for existing building | |
JPH01207530A (en) | Vibration-proof pile and construction of vibration-proof pile | |
JPH09170339A (en) | Base isolation method for existing building | |
JP2560602B2 (en) | Composite continuous pile | |
JPH06257143A (en) | Concrete composite pile | |
JPH057357Y2 (en) | ||
JPS62160337A (en) | Unbond filled steel pipe structure | |
JPS62170612A (en) | Packed steel pipe pile | |
JPH06173278A (en) | Foundation structure for building structure | |
JPH06346432A (en) | Liquefaction preventing method of underground structure using steel sheet pile | |
JPS6020720Y2 (en) | PS multilayer beam | |
JPH0437959Y2 (en) | ||
JP2551422Y2 (en) | Pile | |
CN114277782A (en) | Pile-column integrated structure adopting pre-inserting method and construction method thereof | |
JP2020105693A (en) | Reinforcement method of existent structure foundation | |
JPH01250524A (en) | Soil-cement-composited steel pipe pile construction and steel pipe pile used for its construction | |
JP2020190098A (en) | Foundation structure, and foundation construction method | |
JPS6290403A (en) | Bridge pier | |
JPS58110732A (en) | Installation of pipe culvert |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080313 Year of fee payment: 10 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080313 Year of fee payment: 10 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090313 Year of fee payment: 11 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100313 Year of fee payment: 12 |
|
EXPY | Cancellation because of completion of term |