JPH03217517A - Construction of water-shield film wall - Google Patents

Construction of water-shield film wall

Info

Publication number
JPH03217517A
JPH03217517A JP1193790A JP1193790A JPH03217517A JP H03217517 A JPH03217517 A JP H03217517A JP 1193790 A JP1193790 A JP 1193790A JP 1193790 A JP1193790 A JP 1193790A JP H03217517 A JPH03217517 A JP H03217517A
Authority
JP
Japan
Prior art keywords
water
sheet
trench
shaped groove
band
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP1193790A
Other languages
Japanese (ja)
Other versions
JPH0718170B2 (en
Inventor
Tadashi Yoshikawa
正 吉川
Nobuyuki Matsui
信行 松井
Noboru Sakata
昇 坂田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP1193790A priority Critical patent/JPH0718170B2/en
Publication of JPH03217517A publication Critical patent/JPH03217517A/en
Publication of JPH0718170B2 publication Critical patent/JPH0718170B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PURPOSE:To obtain a water-shield wall of high accuracy by a method in which weights with hooks are fixed at an adequate interval to a banded trench bottom and dragged with the lopes of a water-shield sheet to draw the water-shield sheet into the banded trench. CONSTITUTION:A water-shield film wall is formed by tensely setting a water- shield sheet 2 in a banded trench 1. In this case, the banded trench 1 is excavated, weights 5 with hooks 4 are set at an adequate interval on the bottom of the trench 1, and the foots of the weight 5 are fixed with concrete 7. A cable 6 such as rope, piano wire, etc., is provided to the lower end of the sheet 2 and pulled through the hooks 4 in the trench 1 to draw the lower end of the sheet 2 into the bottom of the trench 1 tensely. The sheet 2 can thus be inserted with high accuracy to a given depth into the trench 1 for constructing a water- shield film wall.

Description

【発明の詳細な説明】 (産業上の利用分野] 本発明は、地下ダム、廃棄物処理場の遮水壁、ダムの遮
氷壁等の施工で、遮水シートを使用する遮水膜壁の施工
法に関する。
Detailed Description of the Invention (Industrial Field of Application) The present invention is applicable to the construction of underground dams, impermeable walls of waste treatment plants, ice-blocking walls of dams, etc. Regarding construction methods.

〔従来の技術] 遮氷壁の構築には従来、薬液注入工法、コンクリート置
換工法、原位置撹拌混合工法などが用いられる。
[Prior Art] Conventionally, chemical injection methods, concrete replacement methods, in-situ stirring and mixing methods, etc. have been used to construct ice walls.

しかし、薬液注入工法や原位置攪拌混合工法等ではその
構築面積(容積)が広くなるため、施工性やコスト面で
不利であり、コンクリート置換工法にしてもひび割れ等
を考慮してやはりその構築面積を広くする必要がある。
However, chemical injection methods, in-situ stirring and mixing methods, etc. require a large construction area (volume), which is disadvantageous in terms of workability and cost, and even if concrete replacement methods are used, cracks, etc. must be taken into consideration. need to be widened.

この問題を解決するものとして、近年では遮水シートを
溝に挿入して遮水壁を構築する遮水膜璧工法が行われて
いる。この工法によれば、遮水シートにより、構築面積
を小さくしても高い遮水性を確保できる。
In order to solve this problem, in recent years, a water-shielding membrane construction method has been used in which a water-shielding sheet is inserted into a groove to construct a water-shielding wall. According to this construction method, high water-blocking properties can be ensured by using the water-blocking sheet even if the construction area is small.

第8図はかかる遮水膜璧工法の概要を示すもので、チェ
ーンソウ等の掘削機でトレンチ掘削して帯状溝1を形成
し、この帯状溝1内に遮水シート2を挿入し、その隙間
にモルタル等の充填材3を流し込む。
Fig. 8 shows an outline of such a water-blocking membrane construction method, in which a trench is excavated with an excavator such as a chainsaw to form a band-shaped groove 1, a water-blocking sheet 2 is inserted into the band-shaped groove 1, and A filling material 3 such as mortar is poured into the gap.

該遮水シート2としては、不繊布を芯材としてこれにコ
ムアスファルトをコーティングした数柵厚さのシートか
最適であり、図示のごとくロール状になっている状態か
ら帯状溝1に引き出していく。
The most suitable water-blocking sheet 2 is a sheet made of non-woven fabric as a core material and coated with comb asphalt, which has a thickness of several bars, and is rolled out into the strip groove 1 as shown in the figure. .

また、図示は省略するが、モルタル等の充填材3の充填
はトレミー管等で行えばよい。
Further, although not shown, the filling material 3 such as mortar may be filled with a tremie tube or the like.

〔発明が解決しようとする課題〕[Problem to be solved by the invention]

ところで、遮水シー1・2は深度の浅い場合においては
棒状のガイトローラに沿って繰り出すようCこしており
、図示は省略するが、深度が深くなると下端に沿って鋼
材バー等の重りを平行に取り付けて降すようにしている
By the way, when the water-shielding seams 1 and 2 are shallow, they are curved so that they are drawn out along rod-shaped guide rollers, and although not shown, when the depth is deep, a weight such as a steel bar is placed in parallel along the lower end. I am trying to install it and take it down.

しかし、帯状溝1は幅の狭いものであり、かつ深度が大
きくなると曲がりなども生し易いので、シート2の先端
が溝1の孔壁に接触したり、あるいは水平方向にずれた
りして精度よく挿入できない さらに、遮水シート2は水平方向に連続性を持たせるた
めに継手部2aを設け、これら継手部2a同士を接合す
る必要があるが、この継手部2aのランプ幅の確保や管
理が困難となる。
However, the band-shaped groove 1 is narrow and tends to bend as the depth increases, so the tip of the sheet 2 may come into contact with the hole wall of the groove 1 or shift in the horizontal direction, resulting in poor accuracy. In addition, the water-shielding sheet 2 must be provided with joints 2a to provide continuity in the horizontal direction, and these joints 2a must be joined together, but it is difficult to secure and manage the ramp width of the joints 2a. becomes difficult.

本発明の目的は前記従来例の不都合を解消し、遮水シー
トを帯状溝の所定の深さまでスムーズにかつ精度良《挿
入できる遮水膜壁工法を提供することにある。
SUMMARY OF THE INVENTION An object of the present invention is to provide a water-shielding membrane wall construction method that eliminates the disadvantages of the conventional example and allows a water-shielding sheet to be inserted smoothly and accurately to a predetermined depth in a band-shaped groove.

[課題を解決するための手段〕 本発明は前記目的を達成するため、帯状溝内に遮水シー
トを挿入し、その周囲隙間に充填材を充填する遮水膜壁
の施工法において、帯状溝の底部に上部にフックまたは
滑車を有する重りを置き、かつコンクリートを帯状溝の
底部に打設して該フックまたは滑車が顕出する状態でこ
の重りを根固めし、遮水シート下端に連結した索条を前
記フノクまたは滑屯に挿通して、該索条の牽引で遮水シ
ート下端を帯状溝底部に引き込むことを要旨とするもの
である。
[Means for Solving the Problems] In order to achieve the above object, the present invention provides a method for constructing a water-blocking membrane wall in which a water-blocking sheet is inserted into a strip-shaped groove and a filling material is filled in a gap around the strip-shaped groove. A weight with a hook or pulley on the top was placed at the bottom of the trench, concrete was poured at the bottom of the gutter, the hook or pulley was exposed, and the weight was hardened and connected to the lower end of the water-shielding sheet. The gist of this method is to insert a cable through the hook or trough and pull the lower end of the water-blocking sheet into the bottom of the band-shaped groove by pulling the cable.

[作用] 本発明によれば、索条を牽引することにより、遮水シー
ト端は帯状溝の底部のフックまたは滑車を反力として下
方に引かれ、そのまま帯状溝底部まで引き込む゛ことが
できる。
[Function] According to the present invention, by pulling the cable, the end of the water-blocking sheet is pulled downward using the hook or pulley at the bottom of the band-shaped groove as a reaction force, and can be drawn directly to the bottom of the band-shaped groove.

また、この遮水シートの引込みはフックまたは滑車で左
右位置も規制されるので、遮水シート継手部のラノプも
確実に行うことができる。
In addition, since the retraction of the water-shielding sheet is also regulated by hooks or pulleys in the left and right positions, it is possible to reliably perform the lancing of the water-shielding sheet joint.

1実施例] 以下、図面について本発明の実施例を詳細に説明する。1 Example] Embodiments of the present invention will be described in detail below with reference to the drawings.

第1図〜第5図は本発明の遮水膜壁工法の1実施例を示
す側面図である。
FIGS. 1 to 5 are side views showing one embodiment of the water-blocking membrane wall construction method of the present invention.

先ず、地盤に従来と同しくチェーンソウ等の掘削機でト
レンチ堀削して帯状溝lを不透水層(透水層と不透水層
の境界α以下)まで形成するが、後述の遮水シート2の
挿入に先立ち、第6図に示ずような上部にフソク4を設
けた重り5を帯状溝1の底部に置く。この場合重り5の
フンク4には予め索条6の途中を挿通しておき、そのま
ま吊り降すようにしてもよい。
First, a trench is excavated in the ground using an excavator such as a chainsaw as in the conventional method to form a band-shaped groove l up to the impermeable layer (below the boundary α between the permeable layer and the impermeable layer). Prior to insertion, a weight 5 having a hook 4 on the top as shown in FIG. 6 is placed at the bottom of the strip groove 1. In this case, the cable 6 may be inserted in the middle of the hook 4 of the weight 5 in advance and suspended as it is.

なお、重り5は帯状溝lの底部に適宜間隔に配置するが
、その位置が遮水シート2の継手部2aがくるべき個所
の場合はこの位置に合わせるものとする。
Note that the weights 5 are placed at appropriate intervals at the bottom of the band-shaped groove 1, but if the weights 5 are located where the joint portion 2a of the water-blocking sheet 2 should be, they should be aligned with this position.

このように重り5を配設してから、第2図に示すように
帯状溝1の底部に根固め用のコンクリート7を打設し、
該重り5をフソク4が顕出する状態でこのコンクリート
7中に埋め込み固定する。
After arranging the weights 5 in this way, concrete 7 for foot protection is placed at the bottom of the strip groove 1 as shown in FIG.
The weight 5 is embedded and fixed in this concrete 7 in a state in which the weight 4 is exposed.

次いで第3図に示すように遮水シート2を帯状溝1内に
挿入するが、その際、遮水シート2の下端に、ローブ、
ピアノ線、ワイヤー等の索条6の一端を結合し、この索
条6の途中をフソク4に挿通した状態で索条6の他の端
を地上で牽引する。
Next, as shown in FIG.
One end of a cable 6 such as a piano wire or wire is connected, and the other end of the cable 6 is towed on the ground with the middle of the cable 6 inserted through a fusoku 4.

フソク4は重り5がコンクリート7で固定されているの
で、該索条6の引込みはこのフンク4を反力として行う
ことができ、第4図に示すように遮水冫−ト2の下端を
そのまま帯状溝[の底部まで引き込むことができる。
Since the weight 5 of the hook 4 is fixed with concrete 7, the cable 6 can be retracted using the hook 4 as a reaction force, and as shown in FIG. It can be pulled directly to the bottom of the band-shaped groove.

このようにして、先行する遮水ノート2を帯状溝1に吊
り降したならば、次いで第5図に示すようにこの遮水シ
ート2に接合する隣の遮水シート2゛を同様に帯状溝1
に吊り込む。
In this way, once the preceding water-shielding notebook 2 is suspended in the belt-shaped groove 1, the next water-shielding sheet 2' to be joined to this water-shielding sheet 2 is similarly suspended in the belt-shaped groove 1, as shown in FIG. 1
hang it in.

その際、遮水シート2と2“の隣接個所の引き込みは同
一のフノク4を使用するようにすれば、あとは索条6の
遮水シート2“八の結合個所を選定するだけで、継手部
2aのラノプを確実にすることかできる。
At that time, if you use the same hook 4 to pull in the adjacent parts of the water-shielding sheets 2 and 2", all you need to do is select the joints of the water-shielding sheets 2" and 8 on the rope 6, and the joints will be connected. It is possible to ensure that the lantern in part 2a is correct.

さらに、他の実施例として第7図に示すように重り5の
上部に設けるものをフンク4に代えて滑車8とすること
もできる。
Further, as another embodiment, as shown in FIG. 7, a pulley 8 may be provided in place of the hook 4 on the upper part of the weight 5.

このようCこ滑車8にすればこれに途中を巻回する索条
6の引込みは該滑車8との摩擦抵抗が少なく、スムーズ
に行なえる。
By using the C-shaped pulley 8 in this manner, the cable 6 that is partially wound around the C-shaped pulley 8 can be pulled in smoothly with less frictional resistance with the pulley 8.

なお、このように遮水シート2,2“をセソ卜し、かつ
継手部2a同士を相互に遮水シート22゛の外周と帯状
溝1との隙間にモルタル等の充填{オ3を充填するのは
前記従来例と同しである。
In addition, the water-shielding sheets 2, 2'' are separated in this way, and the gaps between the outer periphery of the water-shielding sheets 22' and the strip groove 1 are filled with mortar or the like (3) between the joint parts 2a. is the same as the conventional example.

〔発明の効果] 以上述へたように本発明の遮水膜壁工法は、帯状溝内に
遮水ソー1−を挿入し、その周囲隙間をモルタル等の充
填材で充填する場合において、遮水シートを帯状溝の所
定の深さまで簡単かつスムーズにしかも適正位置に精度
良く挿入できるものである。
[Effects of the Invention] As described above, the water-shielding membrane wall construction method of the present invention is effective when inserting the water-shielding saw 1- into a strip groove and filling the surrounding gap with a filling material such as mortar. To easily and smoothly insert a water sheet into a band-shaped groove to a predetermined depth and at a proper position with high precision.

【図面の簡単な説明】[Brief explanation of drawings]

第1図〜第5図は本発明の遮水膜壁工法の1実施例を示
す各工程の側面図、第6図は使用するフック付き重りの
斜視図、第7図は本発明の他の実施例で使用する滑車付
き重りの斜視図、第8図は従来例を示す斜視図である。 1・・・帯状溝 2,2″・・・遮水シー}  2a・・・継手部3・・
・充填材      4・・・フノク5・・・重り  
     6・・・索条7・・・コンクリート   8
・・・滑車第2図 7(つシつりーリ 7 第4 図 2 第5 図 第8図 20
Figures 1 to 5 are side views of each process showing one embodiment of the water-blocking membrane wall construction method of the present invention, Figure 6 is a perspective view of a weight with a hook used, and Figure 7 is a side view of each process showing one embodiment of the water-blocking membrane wall construction method of the present invention. A perspective view of a weight with a pulley used in the embodiment, and FIG. 8 is a perspective view showing a conventional example. 1... Belt-shaped groove 2, 2''... Water-shielding sea} 2a... Joint part 3...
・Filling material 4... Funoku 5... Weight
6... Cable 7... Concrete 8
...Pulley Fig. 2 7 (Tsushi pulley 7 Fig. 4 Fig. 2 Fig. 5 Fig. 8 20)

Claims (2)

【特許請求の範囲】[Claims] (1)帯状溝内に遮水シートを挿入し、その周囲隙間に
充填材を充填する遮水膜壁の施工法において、帯状溝の
底部に上部にフックを有する重りを置き、かつコンクリ
ートを帯状溝の底部に打設して該フックが顕出する状態
でこの重りを根固めし、遮水シート端に連結した索条を
前記フックに挿通して、該索条の牽引で遮水シートを帯
状溝底部に引き込むことを特徴とする遮水膜壁の施工法
(1) In the method of constructing a water-blocking membrane wall in which a water-blocking sheet is inserted into a band-shaped groove and the surrounding gap is filled with filler, a weight with a hook at the top is placed at the bottom of the band-shaped groove, and concrete is placed in a band-shaped groove. This weight is cast at the bottom of the groove and the hooks are exposed, and the cables connected to the ends of the water-blocking sheet are inserted through the hooks, and the water-blocking sheet is pulled by the cables. A method of constructing a water-blocking membrane wall that is characterized by being drawn into the bottom of a band-shaped groove.
(2)帯状溝内に遮水シートを挿入し、その周囲隙間に
充填材を充填する遮水膜壁の施工法において、帯状溝の
底部に上部に滑車を有する重りを置き、かつコンクリー
トを帯状溝の底部に打設して該滑車が顕出する状態でこ
の重りを根固めし、遮水シート端に連結した索条を前記
滑車に巻回して、該索条の牽引で遮水シートを帯状溝底
部に引き込むことを特徴とする遮水膜壁の施工法。
(2) In the method of constructing a water-blocking membrane wall in which a water-blocking sheet is inserted into a band-shaped groove and the surrounding gap is filled with filler, a weight with a pulley on the top is placed at the bottom of the band-shaped groove, and concrete is placed in the band-shaped groove. This weight is cast at the bottom of the trench and the pulley is exposed, and the weight is hardened, and the rope connected to the end of the water-shielding sheet is wound around the pulley, and the water-shielding sheet is pulled by the rope. A method of constructing a water-blocking membrane wall that is characterized by being drawn into the bottom of a band-shaped groove.
JP1193790A 1990-01-23 1990-01-23 Construction method of impermeable membrane wall Expired - Fee Related JPH0718170B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1193790A JPH0718170B2 (en) 1990-01-23 1990-01-23 Construction method of impermeable membrane wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1193790A JPH0718170B2 (en) 1990-01-23 1990-01-23 Construction method of impermeable membrane wall

Publications (2)

Publication Number Publication Date
JPH03217517A true JPH03217517A (en) 1991-09-25
JPH0718170B2 JPH0718170B2 (en) 1995-03-01

Family

ID=11791571

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1193790A Expired - Fee Related JPH0718170B2 (en) 1990-01-23 1990-01-23 Construction method of impermeable membrane wall

Country Status (1)

Country Link
JP (1) JPH0718170B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11350469A (en) * 1998-06-03 1999-12-21 Nishimatsu Constr Co Ltd Inserting method and inserting device for water stop sheet
WO2012176059A1 (en) * 2011-06-22 2012-12-27 Poch Figueroa Pablo Method for reinforcing the levees of rivers, lagoons and lakes and controlling seepage therethrough

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11350469A (en) * 1998-06-03 1999-12-21 Nishimatsu Constr Co Ltd Inserting method and inserting device for water stop sheet
WO2012176059A1 (en) * 2011-06-22 2012-12-27 Poch Figueroa Pablo Method for reinforcing the levees of rivers, lagoons and lakes and controlling seepage therethrough

Also Published As

Publication number Publication date
JPH0718170B2 (en) 1995-03-01

Similar Documents

Publication Publication Date Title
JP2004523791A (en) Laying under the surface of fiber optic cable network
KR100328621B1 (en) Constructing Method of Reinforcement For Precast Concrete Facing Panel
JPH03217517A (en) Construction of water-shield film wall
JP3508875B2 (en) Continuous wall method
TW200930863A (en) Construction method for T-shaped interface connecting case of diaphragm wall and buttress wall or cross wall
JPH0194109A (en) Wall pile and its setting work
JPS6043478B2 (en) Corrosion prevention treatment method for cables
JP3434011B2 (en) Wall construction method
JP2709433B2 (en) Horizontal embedding method of strip-shaped sheet material in the ground
JP2721444B2 (en) Underwater formwork construction method
JPS6138022A (en) Driving and removing of pile and structure of pile
TWM585281U (en) Water stopping device of continuous wall unit joint
JPS6058330B2 (en) Waterproof sheet installation method
TR201807421T4 (en) Method and system for clamping the waterproofing primer of a hydraulic structure to concrete curb stones.
JPH03208919A (en) Execution method for water impermeable wall for greater depth
JPS5712721A (en) Method for water cut off and shoring work
JPH0696862B2 (en) Water-stopping material and water-stopping method using the same
JP3395995B2 (en) Wall construction method
RU1810706C (en) Method of laying pipeline of flooded regions
GB2106968A (en) Anti-erosion device
SU1013689A2 (en) Method of laying underground pipeline
JPH07127050A (en) Water stopping construction of underground continuous wall
JP2003082686A (en) Device for winding sheet for reducing skin friction of caisson
JPS63300107A (en) Underground draining material and its manufacture and setting work
JPS6058331B2 (en) Waterproof sheet installation method

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees