JPH03202510A - Constructing method for underground structure - Google Patents

Constructing method for underground structure

Info

Publication number
JPH03202510A
JPH03202510A JP1343071A JP34307189A JPH03202510A JP H03202510 A JPH03202510 A JP H03202510A JP 1343071 A JP1343071 A JP 1343071A JP 34307189 A JP34307189 A JP 34307189A JP H03202510 A JPH03202510 A JP H03202510A
Authority
JP
Japan
Prior art keywords
underground structure
ready
jack
ground
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP1343071A
Other languages
Japanese (ja)
Inventor
Sadao Hattori
貞夫 服部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Concrete Industries Co Ltd
Original Assignee
Nippon Concrete Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Concrete Industries Co Ltd filed Critical Nippon Concrete Industries Co Ltd
Priority to JP1343071A priority Critical patent/JPH03202510A/en
Publication of JPH03202510A publication Critical patent/JPH03202510A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

PURPOSE:To shorten a constructing process by connecting pliers to an underground structure, to excavate ground to the second step pliers and to pull the structure downward with a jack, and by removing the upper step pliers, to repeat the constructing process in order in the same manner and to settle the lower section of the underground structure up to a pile head section. CONSTITUTION:To a prefabricated pile 1, anchor pliers 2 are jointed and are driven into up to a required depth, and a required underground structure 7 with an opened bottom plate section io built. After that, with a jack 9, the anchor pliers 2 are connected to, and ground in the underground structure 7 is excavated up to second step unit pliers 2', and with the jack 9, the underground structure 7 is pulled downward and is settled up to an excavated depth together with its tare weight. Then, the upper unit pliers 2' are removed, and in order, this constructing process is repeated, and the lower section of the underground structure 7 is settled up to the head section of the prefabricated pile 1, and with cast-in-place concrete, the head section of the prefabricated pile 1 is integrally formed to be embedded. As a result, a sufficient tensile reaction force can be obtained at any place.

Description

【発明の詳細な説明】 「産業上の利用分野」 この発明は、地上で造成した地下構造物躯体を、予め地
中に沈設した杭を引張反力として沈設するようにした地
下構造物の構築工法に関するものである。
[Detailed Description of the Invention] "Industrial Application Field" This invention is directed to the construction of an underground structure in which the framework of the underground structure constructed above ground is sunk using the tensile reaction force of piles previously sunk into the ground. It is related to construction methods.

「従来の技術、発明が解決せんとする問題点」従来、シ
ートパイルやH鋼矢板により土留をして掘削した部分に
地下構造物を構築する方法か一般に実施されているが、
近年地上で築造した地下構造物を地盤を掘削しながら自
重によりまたはアースアンカーに引張反力をとることに
より、沈設する方法が採用されつつある。
``Prior art and problems to be solved by the invention'' Conventionally, it has been common practice to use sheet piles or H-steel sheet piles to retain earth and construct an underground structure in the excavated area.
In recent years, a method has been adopted in which underground structures constructed above ground are sunk using their own weight while excavating the ground or by applying a tensile reaction force to an earth anchor.

しかしながら、支持杭な必要とする軟弱地盤においては
、上記アースアンカーによる沈設工法では次のような問
題点かある。
However, in soft ground where support piles are required, the above-mentioned method of sinking using earth anchors has the following problems.

■支持杭とアースアンカーの両方を施工するので、工期
と工費か多く要する。
■Since both support piles and earth anchors are installed, the construction period and cost will be longer.

■軟弱地盤では、必要な耐力を得るには相当長いアンカ
ーを必要とし、基本的に施工の簡易な経済的なアンカー
か使えないため、アンカーによる沈設施工が事実上むず
かしい。
■In soft ground, a fairly long anchor is required to obtain the necessary strength, and basically only economical anchors that are easy to install can be used, making it virtually difficult to use anchors for construction.

■支持杭との併設からアンカーの設置スペースをとるこ
とが困離である。
■It is difficult to take up space to install the anchor due to its installation along with the support pile.

「問題点を解決するための手段」 この発明は前記従来の課題を解決するために所要数の短
尺な単位ヤットコを着脱自在に接合してなるアンカー用
ヤットコ、または所要数の短尺な単位ロフトを連結して
なるアンカーロフトの下端部を既製杭の頭部に接合して
おき、地上において造成した底板部が開放された所要の
地下構造物にジヤツキを介してアンカー用ヤットコまた
はアンカーロッドを連結した後、地下構造物内の地盤を
2段目の単位ヤットコまたはロッドまで掘削しながら、
ジヤツキを作動して地下構造物を下方に引っ張り、その
引張力と地下構造物の自重により掘削深さまで沈下させ
その後は上段の単位ヤットコまたはロッドを取り外し、
順次同様の工程を繰返して地下構造物の下部を既製杭の
頭部位置まで沈設し、沈設完了後現場打ちコンクリート
により既製杭の頭部を埋設一体止した地下構造物の底部
床板を施工するようにした地下構造物の構築工法を提案
するものである。
"Means for Solving the Problems" In order to solve the above-mentioned conventional problems, the present invention provides an anchor rod made by removably joining a required number of short unit rods, or a required number of short unit lofts. The lower end of the connected anchor loft was connected to the head of a ready-made pile, and the anchor rod or anchor rod was connected via a jack to the required underground structure, which had been constructed on the ground and had an open bottom plate. After that, while excavating the ground inside the underground structure to the second stage unit or rod,
The jack is activated to pull the underground structure downward, and the tensile force and the underground structure's own weight cause it to sink to the excavation depth. After that, the upper unit jack or rod is removed.
The same process is repeated one after another to sink the lower part of the underground structure to the position of the head of the prefabricated pile, and after completion of the sinking, the bottom floor plate of the underground structure is constructed by burying the head of the prefabricated pile and fixing it with cast-in-place concrete. This paper proposes a method for constructing underground structures.

「作用」 地上において造成した地下構造物をその内部を掘削しな
がら沈設する際に、既製杭に一連に接合したアンカー用
ヤットコまたはアンカーロッドを介して既製杭に引張反
力をとりながら沈設する。
``Operation'' When an underground structure created on the ground is sunk while excavating its interior, it is sunk while taking a tensile reaction force to the ready-made piles via a series of anchor rods or anchor rods connected to the ready-made piles.

従って、アースアンカーの設置が不要で、狭小な現場や
軟弱地盤においても充分な引張反力を確保することがで
き、工期も短縮される。
Therefore, there is no need to install an earth anchor, sufficient tensile reaction force can be secured even in a narrow site or on soft ground, and the construction period is shortened.

アンカー用ヤットコまたはアンカーロッドは短尺な単位
ヤットコまたは単位ロッドを着脱自在に連結したもので
、地下構造物の沈下に応じて順次取り外すため、地下構
造物の沈下の障害にはならず、また従来のアースアンカ
ーのように埋め残されることもなく、再利用も可能とな
る。
Anchor rods or anchor rods are short unit rods or unit rods connected together in a detachable manner, and are removed sequentially as the underground structure sinks. Unlike earth anchors, they are not left behind and can be reused.

「実施例」 以下この発明を図面に示す実施例について説明すると、
地下構造物の構築地盤に所要数の既製杭lを地表までは
通常の杭打ち檄などにより打込み、更に地下部分はヤッ
トコを用いて打込み、その頭部を後に構築する地下構造
物の底部床板部分に位置させる。
"Embodiments" Below, embodiments of the present invention shown in the drawings will be described.
Construction of an underground structure The required number of ready-made piles are driven into the ground up to the surface using ordinary pile driving, etc., and the underground part is driven using a Yatco, and the head is used as the bottom floor plate of the underground structure to be constructed later. to be located.

第1図に示す第1発明においては、後に地下構造物を沈
設する引張反力とするのに適当な所要位置の既製杭lの
打込みに、アンカー用ヤットコ2として所要数の短尺な
単位ヤットコ2′をそれらの上下端の継手フランジ3に
おいてボルト4で着脱自在に接合したものを用い、その
下端は所要位置の既製杭lの頭部に接合する。
In the first invention shown in FIG. 1, a required number of short unit rods 2 are used as anchor rods 2 to drive ready-made piles l at appropriate positions to provide a tensile reaction force for later sinking underground structures. ' are removably joined with bolts 4 at the joint flanges 3 at their upper and lower ends, and the lower end is joined to the head of a ready-made pile l at a predetermined position.

第2図に示す第2発明においては、長尺なりットコ2を
用い、後に地下構造物を沈設する引張反力とするのに適
当な所要位置の既製杭1の打込み後にヤットコ2を抜き
取り、この既製杭1の中空部内に地上から、所要数の短
尺な単位ロッド5゛をねし込み式ジヨイントなどのジョ
イントロで連結したアンカーロッド5の先端部を差し込
み、既製杭1の中空部内に注入したセメントくルクなど
の固結材Cで既製杭lと一体に固結する。
In the second invention shown in FIG. 2, a long Nari-tko 2 is used, and after driving a ready-made pile 1 at a required position suitable for providing a tensile reaction force for later sinking an underground structure, the Nari-tko 2 is pulled out. The tips of the anchor rods 5, which are made by connecting the required number of short unit rods 5 with joint rods such as threaded joints, were inserted from the ground into the hollow part of the ready-made pile 1, and the anchor rods were injected into the hollow part of the ready-made pile 1. Consolidate it with the ready-made pile l using a consolidating material C such as cement.

上記施工の完了後、地上において底板部か開放された所
要の地下構造物7を造威し、その内面下部に横向きに突
設した受台8にセンターホールジヤツキ等のジヤツキ9
を設置し、このジヤツキ9にアンカー用ヤットコ2また
はアンカーロッド5を連結する。
After the above construction is completed, the required underground structure 7 with its bottom plate open is built above ground, and a jack 9 such as a center hole jack is mounted on a pedestal 8 projecting horizontally from the lower part of the inner surface.
is installed, and the anchor jack 2 or anchor rod 5 is connected to this jack 9.

アンカー用ヤットコ2に対しては、その上端継手フラン
ジ3に、ワイヤーケーブル等の連結材10の下端に取付
けた連結金物10’をボルト等で止着し、連結材10の
上端をジヤツキ9の伸縮ロッドの止着部9′に連結する
等の連結手段を用い、またアンカーロッド5に対しては
ジヨイント6に連結材10の下端に取付けたねじ造式等
の継手金物11を連結し、連結材10の上端をジヤツキ
9の伸縮ロッドの止着部9゜に連結する等の連結手段を
用いる。
For the anchor Yatco 2, a connecting hardware 10' attached to the lower end of a connecting member 10 such as a wire cable is fixed to the upper end joint flange 3 with a bolt or the like, and the upper end of the connecting member 10 is expanded and contracted with a jack 9. Using a connecting means such as connecting to the fastening part 9' of the rod, and connecting the anchor rod 5 to the joint 6 with a joint metal fitting 11 such as a threaded type attached to the lower end of the connecting member 10, the connecting member A connecting means is used, such as connecting the upper end of the jack 9 to the fixing portion 9° of the telescopic rod of the jack 9.

この状態で地下構造物7内の地盤を2段目の単位ヤット
コ2′または単位ロッド5′まで掘削しながら、ジヤツ
キ9を作動して、受台8を介して地下構造物7を下方に
引っ張り、その引張力と地下構造物7の自重により掘削
深さまで枕下させる。
In this state, while excavating the ground within the underground structure 7 to the second stage unit rod 2' or unit rod 5', operate the jack 9 to pull the underground structure 7 downward via the pedestal 8. , the underground structure 7 is lowered to the excavation depth by its tensile force and its own weight.

そして、1段目の単位ヤットコ2°または単位ロッド5
を取り外し、上記同様に2段目の単位ヤットコ2゛また
は単位ロッド5′にジヤツキ9を連結し、同様に掘削し
ながらジヤツキ9の引張力と地下構造物7の自重により
枕下させその後は同様の施工を繰返して地下構造物7の
下部を既製杭lの頭部位置まで沈下させる。
Then, the first stage unit rod 2° or unit rod 5
, connect the jack 9 to the second unit rod 2' or unit rod 5' in the same way as above, and while excavating in the same way, lower the jack by the tensile force of the jack 9 and the weight of the underground structure 7, and then do the same. Repeat the construction to sink the lower part of the underground structure 7 to the head position of the ready-made pile l.

掘削及び沈設完了後、現場打ちコンクリートにより既製
杭1の頭部を埋設一体止した地下構造物7の底部床板1
2を施工し、地下構造物7を既製杭lに支持させる。
After the completion of excavation and sinking, the bottom floor plate 1 of the underground structure 7 has the head of the ready-made pile 1 buried and fixed with cast-in-place concrete.
2 is constructed, and the underground structure 7 is supported by ready-made piles l.

このようにして沈設された地下構造物7上には、必要に
応じて上層の地上構造物13を一体に構築する。
On the underground structure 7 thus sunk, an upper ground structure 13 is integrally constructed as required.

なお、地下構造物7及び地上構造物13は、最初に地上
で築造した地下構造物7の下部部分上に、沈設・掘削工
程と併行させながら順次上層階部分を連続一体に組み上
げてゆくようにしてもよい。
In addition, the underground structure 7 and the above-ground structure 13 are constructed so that the upper floor parts are successively assembled in a continuous manner on the lower part of the underground structure 7 that was first constructed above ground while paralleling the sinking and excavation process. You can.

「発明の効果」 以上の通りこの発明によれば、既製杭に一連に接合した
アンカー用ヤットコまたはアンカーロッドを介して既製
杭に引張反力をとりながら地下構造物を沈設することが
でき、従来のようなアースアンカーの設置か不要で、極
めて経済的に施工できると共に、狭小な現場や軟弱地盤
においても充分な引張反力を確保することができ、工期
も大幅に短縮することが可能となる。
"Effects of the Invention" As described above, according to the present invention, it is possible to sink an underground structure while applying a tensile reaction force to the ready-made pile through the anchor rods or anchor rods connected in series to the ready-made pile. There is no need to install an earth anchor, making it extremely economical to construct, and also ensuring sufficient tensile reaction force even on narrow sites or on soft ground, making it possible to significantly shorten the construction period. .

アンカー用ヤットコまたはアンカーロッドは短尺な単位
ヤットコまたは単位ロッドを着脱自在に連結し、地下構
造物の沈下に応じて順次取り外すので、地下構造物の沈
下の障害にはならず、また従来のアースアンカーのよう
に埋め残されることもなく、再利用も可能となる。
Anchor Yatco or anchor rod connects short unit Yatco or unit rods in a detachable manner, and is removed sequentially as the underground structure sinks, so it does not become an obstacle to the sinking of the underground structure, and is similar to conventional earth anchors. It can be reused without being left unfilled.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は第1発明の施工態様を示す斜視図、第2図は第
2発明の施工態様を示す斜視図、第3〜5図は第1発明
の施工工程を示す縦断面図第6〜8図は$2発明の施工
工程を示す縦断面図である。 l・・既製杭、2・・アンカー用ヤットコ、2′  ・
単位ヤットコ、3・・継手フランジ、4・・ボルト、5
・・アンカーロッド、5° ・・単位ロッド、6・・ジ
ヨイント、7・・地下構造物、8・・受台、 9・・ジヤツキ、9′  ・止着部、 10・・連結ロッド、lO′ ・・連結金物、11・・
継手金物、12・・底部床板、13・・上部構造物、C
・・固結材。
FIG. 1 is a perspective view showing the construction mode of the first invention, FIG. 2 is a perspective view showing the construction mode of the second invention, and FIGS. 3 to 5 are vertical sectional views showing the construction process of the first invention. FIG. 8 is a longitudinal sectional view showing the construction process of the $2 invention. l... Ready-made pile, 2... Yatco for anchor, 2' ・
Unit: Yatco, 3...Joint flange, 4...Bolt, 5
・・Anchor rod, 5° ・・Unit rod, 6・・Joint, 7・・Underground structure, 8・・Pedestal, 9・・Jacket, 9′・Fixing part, 10・・Connection rod, lO′・・Connected hardware, 11・・
Joint hardware, 12... Bottom floor plate, 13... Upper structure, C
... Consolidation material.

Claims (1)

【特許請求の範囲】 1)所要数の短尺な単位ヤットコを着脱自在に接合して
なるアンカー用ヤットコの下端部を既製杭の頭部に接合
し、このアンカー用ヤットコを介して既製杭を所要深度
まで打込み、この状態で地上において底板部が開放され
た所要の地下構造物を造成し、この地下構造物にジャッ
キを介して前記アンカー用ヤットコを連結した後、地下
構造物内の地盤を2段目の単位ヤットコまで掘削しなが
ら、前記ジャッキを作動して地下構造物を下方に引っ張
り、その引張力と地下構造物の自重により掘削深さまで
沈下させ、その後は上段の単位ヤットコを取り外し、順
次同様の工程を繰返して地下構造物の下部を既製杭の頭
部位置まで沈設し、沈設完了後現場打ちコンクリートに
より既製杭の頭部を埋設一体化した地下構造物の底部床
板を施工することを特徴とする地下構造物の構築工法。 2)ヤットコを用いて所要深度まで既製杭を打込んだ後
にヤットコを抜き取り、この既製杭の中空部内に地上か
ら、所要数の短尺な単位ロッドを連結してなるアンカー
ロッドの下端部を差し込み、既製杭の中空部内に注入し
た固結材で既製杭と一体に固結し、この状態で地上にお
いて底板部が開放された所要の地下構造物を造成し、こ
の地下構造物にジャッキを介して前記アンカーロッドを
連結した後、地下構造物内の地盤を2段目の単位ロッド
まで掘削しながら、前記ジャッキを作動して地下構造物
を下方に引っ張り、その引張力と地下構造物の自重によ
り掘削深さまで沈下させ、その後は上段の単位ロッドを
取り外し、順次同様の工程を繰返して地下構造物の下部
を既製杭の頭部位置まで沈設し、沈設完了後現場打ちコ
ンクリートにより既製杭の頭部を埋設一体化した地下構
造物の底部床板を施工することを特徴とする地下構造物
の構築工法。
[Claims] 1) The lower end of an anchor rod made by removably joining a required number of short unit rods is joined to the head of a ready-made pile, and the ready-made pile is attached via this anchor rod. After driving to a deep depth and creating a required underground structure with an open bottom plate on the ground in this state, and connecting the above-mentioned anchor Yatco to this underground structure via a jack, the ground within the underground structure is While excavating up to the unit yatko of the tier, the jack is operated to pull the underground structure downward, and the tensile force and the underground structure's own weight cause it to sink to the excavation depth.After that, the upper tier unit yatko is removed and The same process is repeated to sink the lower part of the underground structure to the position of the head of the ready-made pile, and after completion of the installation, the bottom floor plate of the underground structure is constructed by burying the head of the ready-made pile with concrete cast on site. A distinctive construction method for underground structures. 2) After driving a ready-made pile to the required depth using a Yatco, remove the Yatco, and insert the lower end of an anchor rod made by connecting the required number of short unit rods into the hollow part of this ready-made pile from the ground, The solidifying material injected into the hollow part of the prefabricated pile is used to solidify the prefabricated pile, and in this state, a required underground structure with an open bottom plate is constructed on the ground, and a jack is inserted into the underground structure. After connecting the anchor rods, while excavating the ground within the underground structure up to the second unit rod, the jack is operated to pull the underground structure downward, and the tensile force and the weight of the underground structure are used to pull the underground structure downward. After sinking to the excavation depth, remove the upper unit rod and repeat the same process to sink the lower part of the underground structure up to the head of the ready-made pile. A construction method for an underground structure characterized by constructing a bottom floor plate of an underground structure that is buried and integrated.
JP1343071A 1989-12-28 1989-12-28 Constructing method for underground structure Pending JPH03202510A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1343071A JPH03202510A (en) 1989-12-28 1989-12-28 Constructing method for underground structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1343071A JPH03202510A (en) 1989-12-28 1989-12-28 Constructing method for underground structure

Publications (1)

Publication Number Publication Date
JPH03202510A true JPH03202510A (en) 1991-09-04

Family

ID=18358716

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1343071A Pending JPH03202510A (en) 1989-12-28 1989-12-28 Constructing method for underground structure

Country Status (1)

Country Link
JP (1) JPH03202510A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007126161A1 (en) * 2006-05-01 2007-11-08 Nihon Shelter System Co., Ltd. Underground shelter
KR100819379B1 (en) * 2007-08-17 2008-04-04 이학곤 Concrete construction using hydraulic system and anti-noise non-vibration manufacturing method of concrete construction
KR100891980B1 (en) * 2008-07-01 2009-04-08 이학곤 Caisson structures for underground soil blocking and manufacturing method of anti-noise non-vibration caisson structures using thereof
JP2012117209A (en) * 2010-11-29 2012-06-21 Kenji Machisuji Caisson method and equipment for caisson method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007126161A1 (en) * 2006-05-01 2007-11-08 Nihon Shelter System Co., Ltd. Underground shelter
JP2007297898A (en) * 2006-05-01 2007-11-15 Nihon Shelter System Co Ltd Underground shelter and method for forming bearing partition wall of underground shelter
US7918056B2 (en) 2006-05-01 2011-04-05 Nihon Shelter System Co., Ltd. Underground shelter
KR100819379B1 (en) * 2007-08-17 2008-04-04 이학곤 Concrete construction using hydraulic system and anti-noise non-vibration manufacturing method of concrete construction
KR100891980B1 (en) * 2008-07-01 2009-04-08 이학곤 Caisson structures for underground soil blocking and manufacturing method of anti-noise non-vibration caisson structures using thereof
JP2012117209A (en) * 2010-11-29 2012-06-21 Kenji Machisuji Caisson method and equipment for caisson method

Similar Documents

Publication Publication Date Title
KR101696916B1 (en) Construction method of permanent wall with retaining wall combined PHC pile and steel pipe
WO1996018001A1 (en) Pile head treating tool for cast-in-place pile, pile head treating method, and cast-in-place piling method
JP4069509B2 (en) Construction method of reverse struts in the outer periphery of underground excavation space
JP4013182B2 (en) Self-supporting mountain retaining wall method and self-supporting mountain retaining wall
JPH03202510A (en) Constructing method for underground structure
JPH02289718A (en) Drilling method of expanded head pile hole, constructing method of expanded head pile and pile hole drill
KR102277470B1 (en) Basement Composite Wall Using Retaing Wall And Method for Constructing the Same
JP2790038B2 (en) Reinforcement method of existing pile foundation building
JPH10317371A (en) Method for erecting pile-column in building using pile as column, and pile-column support band for use therein
KR20190027402A (en) Low part cast in place pile construction method
JP3919852B2 (en) Method for construction of cast-in-place pile
JPH10317374A (en) Method for constructing underground column made of reinforced concrete
JP3172694B2 (en) Embedding method of straight pillar in reverse hitting method
JP3244324B2 (en) Mountain retaining method
JP3705496B2 (en) Building foundation construction method
JP3586839B2 (en) In-situ formed concrete pile and its forming method
JPH0257163B2 (en)
JP2858997B2 (en) Temporary support column used for reverse driving method
JPS63280153A (en) Underground inverted lining method
KR960016755B1 (en) Working method and working apparatus of underground structure
JP4475845B2 (en) Pile construction method
JP2824217B2 (en) Construction method of retaining wall and retaining material for retaining wall
JP5315165B2 (en) Precast pile head assembly and pile head construction method
JP2996113B2 (en) How to build a shaft
JP4589506B2 (en) Pre-installation method of large steel columns for constructing buildings with superstructure structure by the reverse driving method