JPH031094Y2 - - Google Patents

Info

Publication number
JPH031094Y2
JPH031094Y2 JP20473585U JP20473585U JPH031094Y2 JP H031094 Y2 JPH031094 Y2 JP H031094Y2 JP 20473585 U JP20473585 U JP 20473585U JP 20473585 U JP20473585 U JP 20473585U JP H031094 Y2 JPH031094 Y2 JP H031094Y2
Authority
JP
Japan
Prior art keywords
furnace body
circulation duct
burner
air
duct
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP20473585U
Other languages
Japanese (ja)
Other versions
JPS62109775U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP20473585U priority Critical patent/JPH031094Y2/ja
Publication of JPS62109775U publication Critical patent/JPS62109775U/ja
Application granted granted Critical
Publication of JPH031094Y2 publication Critical patent/JPH031094Y2/ja
Expired legal-status Critical Current

Links

Landscapes

  • Incineration Of Waste (AREA)
  • Drying Of Solid Materials (AREA)
  • Coating Apparatus (AREA)
  • Tunnel Furnaces (AREA)

Description

【考案の詳細な説明】 〔産業上の利用分野〕 本考案は、自動車々体等の被塗装物の表面に形
成された塗装皮膜を焼付・硬化させるに適した直
接加熱方式の塗装乾燥炉に関するものである。
[Detailed description of the invention] [Field of industrial application] The present invention relates to a direct heating type paint drying oven suitable for baking and curing paint films formed on the surfaces of objects to be painted such as automobile bodies. It is something.

〔従来の技術〕[Conventional technology]

従来、自動車々体等の被塗装物の面に形成され
た塗装皮膜を焼付・硬化させる際には、第4図に
示すような直接加熱方式の塗装乾燥炉が利用され
ている。
BACKGROUND ART Conventionally, a direct heating type paint drying oven as shown in FIG. 4 has been used to bake and harden a paint film formed on the surface of an object to be painted, such as an automobile body.

第4図において、50は塗装乾燥炉であつて、
この塗装乾燥炉50は炉体51がトンネル状に形
成され、その一方は入口51aとされており、他
方は出口51bとされている。また、炉体51の
底部中央には炉体51の入口51aから出口51
bの方向に向けてコンベア52が敷設されてお
り、その上面には塗装皮膜が形成された被塗装物
Wを載置して移送する台車53に掛け止めするド
グ54が間隔を有して複数個設けられている。そ
して、このコンベア52の両側方にはレール55
が設けられており、台車53を載置して案内する
ようになつている。
In FIG. 4, 50 is a paint drying oven,
The coating drying furnace 50 has a furnace body 51 formed in the shape of a tunnel, one of which is an inlet 51a, and the other is an outlet 51b. Further, an outlet 51 is provided from the inlet 51a of the furnace body 51 to the center of the bottom of the furnace body 51.
A conveyor 52 is laid in the direction b, and a plurality of dogs 54 are arranged at intervals on the upper surface of the conveyor 52 to be hooked to a trolley 53 on which an object W on which a coating film has been formed is placed and transported. There are several. Rails 55 are provided on both sides of this conveyor 52.
is provided on which a trolley 53 is placed and guided.

また、炉体51の上部外側にはコの字形々状に
形成された循環ダクト56が配設されており、そ
の一端は炉体51の入口51a側に開放され、他
端は炉体51の出口51b側に開放されている。
さらに、この循環ダクト56の外側上流側には加
熱用のバーナ57が設けられており、そのノズル
57aは循環ダクト56内に位置されている。
Further, a circulation duct 56 formed in a U-shape is disposed on the outside of the upper part of the furnace body 51, one end of which is open to the inlet 51a side of the furnace body 51, and the other end of the circulation duct 56 is open to the inlet 51a side of the furnace body 51. It is open to the exit 51b side.
Furthermore, a heating burner 57 is provided on the outer upstream side of the circulation duct 56, and its nozzle 57a is located within the circulation duct 56.

また、バーナ57には燃料供給源(図示せず)
に通ずる供給管58と燃焼用空気を取り入れる供
給ダクト59とが接続されており、供給ダクト5
9の途中にはブロア60が設けられ、先端部には
フイルタ61が設けられている。
The burner 57 also includes a fuel supply source (not shown).
A supply pipe 58 leading to the combustion air is connected to a supply duct 59 that takes in combustion air.
A blower 60 is provided in the middle of the tube 9, and a filter 61 is provided at the tip.

また、循環ダクト56のバーナ57の下流側に
はフイルタ62と循環フアン63が順次設けられ
ており、その下流側には途中にダンパ64が設け
られている排気ダクト65が接続されている。
Further, a filter 62 and a circulation fan 63 are sequentially provided on the downstream side of the burner 57 of the circulation duct 56, and an exhaust duct 65, which is provided with a damper 64 in the middle thereof, is connected to the downstream side thereof.

そして、コンベア52によつて移送されてくる
台車53上の被塗装物Wに形成された塗装皮膜を
焼付・硬化させる際には、供給管58と供給ダク
ト59からバーナ57に所定量の燃料と空気を供
給して燃焼させ、得られた加熱空気を循環フアン
63によつて循環ダクト56から炉体51内に供
給するとともに、炉体51内の空気を循環ダクト
56内に供給して加熱空気と混合して再び炉体5
1内に供給・循環させて所定の温度に維持する。
この状態で、台車53上の被塗装物Wを炉体51
内に通過させて塗装皮膜を焼付・硬化させるよう
になつている。
When baking and curing the coating film formed on the workpiece W on the trolley 53 transported by the conveyor 52, a predetermined amount of fuel is supplied to the burner 57 from the supply pipe 58 and the supply duct 59. Air is supplied to cause combustion, and the obtained heated air is supplied into the furnace body 51 from the circulation duct 56 by the circulation fan 63, and the air in the furnace body 51 is supplied into the circulation duct 56 to generate heated air. Mix with the furnace body 5 again.
1 and maintain it at a predetermined temperature.
In this state, the workpiece W on the cart 53 is moved to the furnace body 51.
It is designed to bake and harden the paint film by passing it through the interior.

〔考案が解決しようとする問題点〕[Problem that the invention attempts to solve]

しかしながら、このような塗装乾燥炉において
は、被塗装物Wに形成された塗装皮膜を焼付・硬
化する際に、塗装皮膜の中の低分子化した樹脂お
よび溶剤が蒸発して炉体51内および循環ダクト
56内を循環する。このため、低分子化した樹脂
および溶剤が循環中にバーナ57の火炎に接触し
て酸化されて酸化物として生成する。そして、こ
の酸化物は被塗装物に形成された塗装皮膜に吸収
されやすい性質を有しているために塗装皮膜を変
色させることはもとより、酸化物が炉体51およ
び循環ダクト56の壁面に付着して飛散し、これ
が塗装皮膜に付着してブツ等の塗装不良を発生さ
せる不具合がある。
However, in such a paint drying furnace, when baking and curing the paint film formed on the object W to be painted, the low-molecular resin and solvent in the paint film evaporate and cause damage inside the furnace body 51 and It circulates in the circulation duct 56. Therefore, the low-molecular resin and solvent come into contact with the flame of the burner 57 during circulation and are oxidized to form oxides. Since this oxide has the property of being easily absorbed into the paint film formed on the object to be painted, it not only discolors the paint film but also adheres to the wall surface of the furnace body 51 and the circulation duct 56. There is a problem in that the particles scatter and adhere to the paint film, causing coating defects such as spots.

従つて、この考案は、上記の不具合を解消する
ためになされたもので、循環ダクトにバーナの火
炎の周囲を囲むようにエアカーテンを形成するエ
ア噴射手段を設けることによつて、低分子化した
樹脂および溶剤がバーナの火炎に接触するのを防
ぎ、酸化物の生成を防止するとともに、変色、ブ
ツ等の塗装不良の発生を防止することにある。
Therefore, this invention was made to solve the above-mentioned problems, and by providing an air injection means in the circulation duct to form an air curtain surrounding the flame of the burner, it is possible to reduce the molecular weight. The purpose of this method is to prevent the resin and solvent used in the process from coming into contact with the flame of the burner, thereby preventing the formation of oxides, and also preventing the occurrence of coating defects such as discoloration and spots.

〔問題点を解決するための手段〕[Means for solving problems]

すなわち、この考案に係る直接加熱方式の塗装
乾燥炉においては、両端が開放された炉体の外側
に、両端が炉体内に開放する循環ダクトを設ける
とともに、この循環ダクトの途中に加熱用のバー
ナを設け、この加熱用のバーナで得られた加熱空
気を炉体内および循環ダクトに循環させて被塗装
物の塗装皮膜を焼付・硬化させる直接加熱方式の
塗装乾燥炉であつて、前記循環ダクトに加熱用の
バーナの火炎の周囲を囲むようにエアカーテンを
形成するエア噴射手段を設けたものである。
That is, in the direct heating type paint drying oven according to this invention, a circulation duct with both ends open inside the furnace body is provided outside the furnace body with both ends open, and a heating burner is installed in the middle of this circulation duct. It is a direct heating type paint drying furnace in which the heated air obtained by the heating burner is circulated through the furnace body and the circulation duct to bake and harden the paint film of the object to be painted. Air injection means is provided to form an air curtain surrounding the flame of the heating burner.

〔作用〕[Effect]

かかる、直接加熱方式の塗装乾燥炉において、
被塗装物に形成された塗装皮膜を焼付・硬化させ
る際には、加熱用のバーナによつて得られた加熱
空気を循環ダクトから炉体内に供給・循環させる
とともに、エア噴射手段を作動させてバーナの火
炎をエアカーテンによつて周囲を囲む。そして、
加熱空気の循環によつて炉体内が所定の温度に維
持されたところで、塗装皮膜の形成された被塗装
物を炉体内に通過させて、その塗装皮膜を焼付・
硬化させる。
In such a direct heating type paint drying oven,
When baking and curing the paint film formed on the object to be painted, heated air obtained by a heating burner is supplied and circulated into the furnace body from a circulation duct, and an air injection means is operated. Surround the burner flame with an air curtain. and,
When the inside of the furnace body is maintained at a predetermined temperature by circulating heated air, the object to be coated on which the paint film has been formed is passed through the furnace body to bake and bake the paint film.
Let it harden.

その際、塗装皮膜中から低分子化した樹脂およ
び溶剤が蒸発して炉体内および循環ダクト内を循
環するが、加熱用のバーナの火炎の周囲にはエア
カーテンが形成されているので、加熱空気ととも
に循環する低分子化した樹脂および溶剤が遮ら
れ、バーナの火炎に接触すくことが抑制されて酸
化物の生成が防止される。これによつて、被塗装
物に形成されている塗装皮膜の変色、ブツ等の塗
装不良の発生も防止される。
At this time, low-molecular resins and solvents in the paint film evaporate and circulate inside the furnace and circulation duct, but since an air curtain is formed around the flame of the heating burner, heated air is Low-molecular resins and solvents that circulate together are blocked and prevented from coming into contact with the burner flame, thereby preventing the formation of oxides. This also prevents the occurrence of coating defects such as discoloration and spots on the coating film formed on the object to be coated.

〔実施例〕〔Example〕

以下、本考案の一実施例を図面に基づいて詳細
に説明する。
Hereinafter, one embodiment of the present invention will be described in detail based on the drawings.

第1図は本考案に係る直接加熱方式の塗装乾燥
炉を説明する一部破断正面図、第2図は第1図の
−線に沿つた断面図、第3図は第2図の−
線に沿つた断面図である。
Fig. 1 is a partially cutaway front view illustrating a direct heating type paint drying oven according to the present invention, Fig. 2 is a sectional view taken along the - line of Fig. 1, and Fig. 3 is a - of Fig. 2.
It is a sectional view along a line.

第1図および第3図において、1は塗装乾燥炉
であつて、この塗装乾燥炉1は炉体2がトンネル
状に形成されており、その両端は開放されてい
る。そして、その一方は入口2aとされており、
他方は出口2bとされている。
In FIGS. 1 and 3, reference numeral 1 denotes a paint drying furnace, and the paint drying furnace 1 has a furnace body 2 formed in the shape of a tunnel, and both ends of the furnace body 2 are open. One side is designated as entrance 2a,
The other side is designated as the exit 2b.

また、炉体2の底部中央には炉体2の入口2a
から出口2bの方向に向けてコンベア3が敷設さ
れており、その上面にはドグ4が間隔を有して複
数個設けられれている。そして、このドグ4は塗
装皮膜の形成された被塗装物Wを載置する台車5
の後部に掛け止めして移送させるようになつてい
る。さらに、コンベア3の両側方にはコンベア3
と間隔を有してレール6が敷設されており、台車
5を載置して案内するようになつている。
Further, an inlet 2a of the furnace body 2 is provided at the bottom center of the furnace body 2.
A conveyor 3 is laid toward the exit 2b, and a plurality of dogs 4 are provided at intervals on the upper surface of the conveyor 3. This dog 4 is connected to a trolley 5 on which the object W on which the paint film is formed is placed.
It is designed to be latched onto the rear of the vehicle and transported. Furthermore, conveyor 3 is provided on both sides of conveyor 3.
Rails 6 are laid with a gap between them, on which the trolley 5 is placed and guided.

また、炉体1の上部外側にはコの字形々状に形
成された循環ダクト7が配設されており、その一
端は炉体2の入口2a側に開放され、他端は炉体
2の出口2b側に開放されている。さらに、この
循環ダクト7の外側上流側には加熱用のバーナ8
が設けられており、そのノズル8aは循環ダクト
7側に向けられている。
Further, a circulation duct 7 formed in a U-shape is arranged on the outside of the upper part of the furnace body 1, one end of which is open to the inlet 2a side of the furnace body 2, and the other end of the circulation duct 7 of the furnace body 2. It is open to the exit 2b side. Furthermore, a heating burner 8 is provided on the outer upstream side of the circulation duct 7.
is provided, and its nozzle 8a is directed toward the circulation duct 7 side.

また、バーナ8にはガス、重油等の燃料供給源
(図示せず)に通ずる供給管9と燃焼用空気を取
り入れる供給ダクト10とが接続されており、供
給ダクト10の途中には空気供給用のブロア11
が設けられ、先端部にはフイルタ12が設けられ
ている。そして、空気供給用のブロア11が作動
した際に、フイルタ12を通過した清浄な燃焼用
空気がバーナ8に供給されるとともに、供給管9
から燃料がバーナ8に供給されて燃焼される。こ
れによつて、加熱空気が循環ダクト7に供給され
るようになつている。
Further, the burner 8 is connected to a supply pipe 9 that leads to a fuel supply source (not shown) such as gas or heavy oil, and a supply duct 10 that takes in air for combustion. Blower 11
is provided, and a filter 12 is provided at the tip. When the air supply blower 11 operates, clean combustion air that has passed through the filter 12 is supplied to the burner 8, and the supply pipe 9
Fuel is supplied to the burner 8 and burned. Thereby, heated air is supplied to the circulation duct 7.

また、循環ダクト7の下流側にはフイルタ13
および循環フアン14が間隔を有して順次設けら
れており、その下流側には途中にダンパ15が設
けられている排気ダクト16が接続されている。
そして、循環フアン14が作動した際に、循環ダ
クト7に供給された加熱空気と炉体2内の空気が
炉体2内および循環ダクト7内を循環して、炉体
2内が所定の温度に維持されるようになつてい
る。
In addition, a filter 13 is installed on the downstream side of the circulation duct 7.
A circulation fan 14 and a circulation fan 14 are sequentially provided at intervals, and an exhaust duct 16 having a damper 15 disposed in the middle thereof is connected to the downstream side thereof.
When the circulation fan 14 is operated, the heated air supplied to the circulation duct 7 and the air inside the furnace body 2 are circulated within the furnace body 2 and the circulation duct 7, so that the inside of the furnace body 2 reaches a predetermined temperature. It is now being maintained.

また、循環ダクト7のバーナ8の前部にはバー
ナ8からの火炎Hの周囲を囲むように円形に形成
されたパイプ17が設けられており、その前部に
はパイプ17の円周方向にスリツト状の噴射口1
7aが形成されている。そして、このパイプ17
は金属材料、セラミツクス等によつて形成されて
おり、バーナ8の火炎Hの高温に耐えるようにな
つている。
Further, a circular pipe 17 is provided at the front of the burner 8 of the circulation duct 7 so as to surround the flame H from the burner 8. Slit-shaped injection port 1
7a is formed. And this pipe 17
is made of a metal material, ceramics, etc., and is designed to withstand the high temperature of the flame H of the burner 8.

また、パイプ17の頂部には循環ダクト7を貫
通して上方に延びるL字形の供給管18が接続さ
れており、その途中には空気供給用のブロア19
が設けられ、先端部にはフイルタ20が設けられ
ている。そして、ブロア19が作動した際に、フ
イルタ20を通過した清浄な空気が供給管18か
らパイプ17に供給され、噴射口17aから噴射
されてバーナ8の火炎Hの周囲を囲むようにエア
カーテンYが形成されるようになつている。
Further, an L-shaped supply pipe 18 is connected to the top of the pipe 17 and extends upward through the circulation duct 7, and a blower 19 for air supply is connected to the top of the pipe 17.
is provided, and a filter 20 is provided at the tip. When the blower 19 operates, clean air that has passed through the filter 20 is supplied from the supply pipe 18 to the pipe 17, and is injected from the injection port 17a to form an air curtain Y so as to surround the flame H of the burner 8. is beginning to form.

そして、エアカーテンYの流量は循環ダクト7
に設けられている循環フアン14で循環ダクト7
および炉体2内を循環する加熱空気の流量よりも
少なくすることが望ましく、過剰となつた空気は
排気ダクト16に設けられているダンパ15の開
閉度合を調整して系外に放出する。
The flow rate of the air curtain Y is the circulation duct 7.
The circulation fan 14 installed in the circulation duct 7
It is desirable that the flow rate be lower than the flow rate of the heated air circulating in the furnace body 2, and excess air is discharged outside the system by adjusting the opening/closing degree of the damper 15 provided in the exhaust duct 16.

上記のように構成された塗装乾燥炉1におい
て、被塗装物Wに形成された塗装皮膜を焼付・硬
化させる際には、供給管9および供給ダクト10
からバーナ8に所定量の燃料と空気を供給して燃
焼させ、得られた加熱空気を循環フアン14によ
つて循環ダクト7から炉体2内に供給するととも
に、炉体2内の空気を循環ダクト7内に供給して
加熱空気と混合して再び炉体2内に供給する。そ
して、炉体1および循環ダクト7の加熱空気を循
環させ、炉体1内を所定の温度に維持する。
In the coating drying oven 1 configured as described above, when baking and curing the coating film formed on the object W to be coated, the supply pipe 9 and the supply duct 10
A predetermined amount of fuel and air are supplied to the burner 8 for combustion, and the obtained heated air is supplied into the furnace body 2 from the circulation duct 7 by the circulation fan 14, and the air inside the furnace body 2 is circulated. It is supplied into the duct 7, mixed with heated air, and then supplied into the furnace body 2 again. Then, the heated air in the furnace body 1 and the circulation duct 7 is circulated to maintain the inside of the furnace body 1 at a predetermined temperature.

また、バーナ8への燃料と空気の供給と同時
に、ブロア19を作動させ、フイルタ20で清浄
化した空気を供給管18からパイプ17に供給す
るとともに、噴射口17aから噴出させてバーナ
8の火炎Hの周囲にエアカーテンYを形成する。
At the same time as fuel and air are supplied to the burner 8, the blower 19 is operated to supply air purified by the filter 20 from the supply pipe 18 to the pipe 17, and the air is ejected from the injection port 17a to cause the flame of the burner 8 to flow. An air curtain Y is formed around H.

この状態で、塗装皮膜の形成された被塗装物W
を台車5に載置してコンベア3で炉体2内に通過
させて、塗装皮膜を焼付・硬化させる。
In this state, the object to be painted W on which the paint film has been formed
is placed on a trolley 5 and passed through the furnace body 2 by the conveyor 3 to bake and harden the coating film.

その際、塗装皮膜中から低分子化した樹脂およ
び溶剤が蒸発して炉体2内および循環ダクト7内
を循環するが、加熱用のバーナ8の火炎Hの周囲
にはエアカーテンYが形成されているので、循環
する加熱空気とともに循環する低分子化した樹脂
および溶剤が遮られ、バーナ8の火炎Hに接触す
ることが抑制されて酸化物の生成が防止される。
これによつて、被塗装物Wに形成されている塗装
皮膜の変色・ブツ等の塗装不良の発生も防止され
る。
At this time, low-molecular resin and solvent evaporate from the paint film and circulate within the furnace body 2 and circulation duct 7, but an air curtain Y is formed around the flame H of the heating burner 8. Therefore, the low-molecular resin and solvent circulating together with the circulating heated air are blocked, and contact with the flame H of the burner 8 is suppressed, thereby preventing the generation of oxides.
This also prevents the occurrence of coating defects such as discoloration and spots on the coating film formed on the object W to be coated.

〔考案の効果〕[Effect of idea]

以上説明したように、本考案に係る直接加熱方
式の塗装乾燥炉においては、循環ダクトにバーナ
の火炎の周囲を囲むようにエアカーテンを形成す
るエア噴射手段を循環ダクトに設けたから、低分
子化した樹脂および溶剤がバーナの火炎に接触す
ることがないので、塗装皮膜に悪影響をおよぼす
酸化物の生成を防止することができる効果があ
る。
As explained above, in the direct heating type paint drying oven according to the present invention, since the circulation duct is provided with an air injection means that forms an air curtain surrounding the burner flame, low molecular weight Since the resin and solvent do not come into contact with the flame of the burner, it is possible to prevent the formation of oxides that would adversely affect the paint film.

また、本考案に係る直接加熱方式の塗装乾燥炉
においては、酸化物の生成が防止されることによ
つて、塗装皮膜の変色、ブツ等の塗装不良の発生
を防止することができる効果がある。
In addition, the direct heating type paint drying oven of the present invention has the effect of preventing discoloration of the paint film and the occurrence of paint defects such as spots by preventing the formation of oxides. .

また、本考案に係る直接加熱方式の塗装乾燥炉
においては、塗装皮膜の変色、ブツ等の原因とな
る酸化物の量を少なくするために、炉体内から多
量の高温空気を系外に排気していたが、これを少
なくすることができ、排気熱の損失を大幅に低減
することができる効果がある。
In addition, in the direct heating type paint drying furnace of the present invention, a large amount of high-temperature air is exhausted from the furnace body to the outside of the system in order to reduce the amount of oxides that cause discoloration and spots on the paint film. However, this can be reduced, which has the effect of significantly reducing exhaust heat loss.

また、本考案に係る直接加熱方式の塗装乾燥炉
においては、排気熱の損失を大幅に低減すること
ができることによつて、塗装皮膜の焼付・硬化す
るためのコストを低減することができる効果があ
る。
In addition, the direct heating type paint drying oven according to the present invention has the effect of reducing the cost of baking and curing the paint film by significantly reducing the loss of exhaust heat. be.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本考案に係る直接加熱方式の塗装乾燥
炉を説明する一部破断正面図である。第2図は第
1図の−線に沿つた拡大断面図である。第3
図は第2図の−線に沿つた断面図である。第
4図は従来の直接加熱方式の塗装乾燥炉を説明す
る一部破断正面図である。 1……塗装乾燥炉、2……炉体、7……循環ダ
クト、8……バーナ、9……供給管、10……供
給ダクト、13……フイルタ、14……循環フア
ン、17……パイプ、19……ブロア、20……
フイルタ。
FIG. 1 is a partially cutaway front view illustrating a direct heating type paint drying oven according to the present invention. FIG. 2 is an enlarged sectional view taken along the - line in FIG. 1. Third
The figure is a sectional view taken along the - line in FIG. 2. FIG. 4 is a partially cutaway front view illustrating a conventional direct heating type paint drying oven. 1... Paint drying oven, 2... Furnace body, 7... Circulation duct, 8... Burner, 9... Supply pipe, 10... Supply duct, 13... Filter, 14... Circulation fan, 17... Pipe, 19... Blower, 20...
filter.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 両端が開放された炉体の外側に、両端が炉体内
に開放する循環ダクトを設けるとともに、この循
環ダクトの途中に加熱用のバーナを設け、この加
熱用のバーナで得られた加熱空気を炉体内および
循環ダクトに循環させて被塗装物の塗装皮膜を焼
付・硬化させる直接加熱方式の塗装乾燥炉であつ
て、前記循環ダクトに加熱用のバーナの火炎の周
囲を囲むようにエアカーテンを形成するエア噴射
手段を設けたことを特徴とする直接加熱方式の塗
装乾燥炉。
A circulation duct with both ends open inside the furnace body is provided outside the furnace body with both ends open, and a heating burner is installed in the middle of this circulation duct, and the heated air obtained by this heating burner is transferred to the furnace. A direct heating type paint drying oven that bakes and hardens the paint film of the object to be coated by circulating it inside the body and through a circulation duct, wherein an air curtain is formed in the circulation duct so as to surround the flame of a heating burner. A direct heating type paint drying oven characterized by being equipped with an air injection means.
JP20473585U 1985-12-27 1985-12-27 Expired JPH031094Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20473585U JPH031094Y2 (en) 1985-12-27 1985-12-27

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20473585U JPH031094Y2 (en) 1985-12-27 1985-12-27

Publications (2)

Publication Number Publication Date
JPS62109775U JPS62109775U (en) 1987-07-13
JPH031094Y2 true JPH031094Y2 (en) 1991-01-14

Family

ID=31170729

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20473585U Expired JPH031094Y2 (en) 1985-12-27 1985-12-27

Country Status (1)

Country Link
JP (1) JPH031094Y2 (en)

Also Published As

Publication number Publication date
JPS62109775U (en) 1987-07-13

Similar Documents

Publication Publication Date Title
US4761894A (en) Drying furnace for use in coating drying
CA2167815A1 (en) Process and hot air drier for drying coated surfaces
JPS61185359A (en) Method for heating drying oven for painting
JPH031094Y2 (en)
JP3249478B2 (en) Paint drying method and paint drying furnace
JPH0319962Y2 (en)
JPH0317974Y2 (en)
JP7499578B2 (en) drying furnace
JPS61174967A (en) Drying furnace of coated product
JP2000070822A (en) Coating drying furnace
JPS607816Y2 (en) Paint drying oven
JPS6327809Y2 (en)
JPH081019Y2 (en) Radiant drying oven for automobile bodies
JPH0545413Y2 (en)
JPS607814Y2 (en) Baking furnace for painting
JPH0450945Y2 (en)
JPH062779Y2 (en) Drying oven for painting
JPS63242370A (en) Method and apparatus for baking and drying paint
JPH01210076A (en) Coating material drying oven
JPH0529107Y2 (en)
JPH0685068U (en) Paint baking drying using far infrared effect
JPH084144Y2 (en) Indirect hot air drying oven temperature controller
JPH0227905Y2 (en)
JPH084147Y2 (en) Baking oven for painting
JPS6158233B2 (en)