Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filedfiledCritical
Priority to JP1989000969UpriorityCriticalpatent/JPH0516780Y2/ja
Priority to KR2019900000096Uprioritypatent/KR920008253Y1/ko
Publication of JPH0292270UpublicationCriticalpatent/JPH0292270U/ja
Application grantedgrantedCritical
Publication of JPH0516780Y2publicationCriticalpatent/JPH0516780Y2/ja
H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
H02J7/0042—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries characterised by the mechanical construction
H02J7/0045—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries characterised by the mechanical construction concerning the insertion or the connection of the batteries