JPH0261545U - - Google Patents

Info

Publication number
JPH0261545U
JPH0261545U JP13958688U JP13958688U JPH0261545U JP H0261545 U JPH0261545 U JP H0261545U JP 13958688 U JP13958688 U JP 13958688U JP 13958688 U JP13958688 U JP 13958688U JP H0261545 U JPH0261545 U JP H0261545U
Authority
JP
Japan
Prior art keywords
delivery
jig
receiving
positioning body
pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP13958688U
Other languages
Japanese (ja)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP13958688U priority Critical patent/JPH0261545U/ja
Publication of JPH0261545U publication Critical patent/JPH0261545U/ja
Pending legal-status Critical Current

Links

Landscapes

  • Feeding Of Workpieces (AREA)
  • Intermediate Stations On Conveyors (AREA)
  • Specific Conveyance Elements (AREA)

Description

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本装置をオーバーヘツド式搬路の途中
に設けた場合を示す全般の概要図、第2図は本装
置を示し、A図が第1図の―方向から見た背
面図、B図が側面図、第3図は第2―B図の―
方向から見た拡大正面図、第4図は第3図の
―から見た平面的な要部図、第5図は受渡し部
の拡大平面図、第6図は第5図の―方向から
の側面図、第7図は受取り部を示す拡大断面図で
ある。 尚、図面中、1は収納台車、2は搬送コンベア
、3はオーバーヘツド式搬送路、4はボブ盤、4
aは加工部、5は無端軌道、6は治具、11は受
渡し兼受取り装置、12は基柱、13は受渡し部
、14は位置決め体、15は受渡し体、24は位
置決めプレート、26は案内ピン、27は昇降シ
リンダユニツト、35はクランプ体、42は案内
ピンガイド部、53は受取部、59はクランプ体
、Wはワークを示す。
Fig. 1 is a general schematic diagram showing the case where this device is installed in the middle of an overhead conveyance path, Fig. 2 shows this device, and Fig. A is a rear view as seen from the - direction in Fig. 1, and B The figure is a side view, and Figure 3 is that of Figure 2-B.
Figure 4 is an enlarged front view of the delivery section as seen from the - direction of Figure 3, Figure 5 is an enlarged plan view of the delivery section, and Figure 6 is an enlarged front view of the delivery section as seen from the - direction of Figure 5. The side view and FIG. 7 are enlarged sectional views showing the receiving portion. In addition, in the drawing, 1 is a storage cart, 2 is a conveyor, 3 is an overhead type conveyance path, 4 is a bob machine, 4
a is a processing section, 5 is an endless track, 6 is a jig, 11 is a delivery and receiving device, 12 is a base column, 13 is a delivery section, 14 is a positioning body, 15 is a delivery body, 24 is a positioning plate, and 26 is a guide 27 is a lifting cylinder unit, 35 is a clamp body, 42 is a guide pin guide portion, 53 is a receiving portion, 59 is a clamp body, and W is a workpiece.

Claims (1)

【実用新案登録請求の範囲】 (1) 工作機械の加工部を循環する無端軌道上の
複数の素材保持用の治具との間で、未加工の素材
の受渡しと加工済みの素材の受取りを同時に行な
うようにしたワークの受渡し兼受取り装置におい
て、 この装置は、素材を治具に受渡す受渡し部に、
素材と治具の位置整合機構を備えるとともに、治
具から素材を受取る受取り部に、素材の高さ変化
に対応し得る受取り機構を備えたことを特徴とす
るワークの受渡し兼受取り装置。 (2) 前記受渡し部の位置整合機構は、治具係合
部と案内ピンを有し且つ偏位可能な位置決め体と
、ピン係合部を有し且つ偏位可能な受渡し体とか
らなり、位置決め体の治具係合部を治具に係合さ
せて位置決め体の位置を決定するとともに、この
位置決め体の案内ピンに前記受渡し体のピン係合
部を係合せしめることによつて治具と受渡し体の
位置整合を図るよう構成したことを特徴とする請
求項1に記載のワークの受渡し兼受取り装置。
[Scope of claim for utility model registration] (1) Transfer of unprocessed materials and receipt of processed materials between multiple material holding jigs on an endless track that circulates through the processing section of a machine tool. In a device for delivering and receiving workpieces at the same time, this device has a delivery section that delivers materials to a jig,
A workpiece delivery/receiving device is provided with a position alignment mechanism for a material and a jig, and a receiving section that receives the material from the jig has a receiving mechanism capable of responding to changes in the height of the material. (2) The position alignment mechanism of the delivery part includes a positioning body that has a jig engagement part and a guide pin and is deflectable, and a delivery body that has a pin engagement part and is deflectable, The position of the positioning body is determined by engaging the jig engaging portion of the positioning body with the jig, and the pin engaging portion of the delivery body is engaged with the guide pin of the positioning body to determine the position of the jig. 2. The workpiece delivery and receiving device according to claim 1, wherein the workpiece delivery and receiving device is configured to align the positions of the delivery body and the delivery body.
JP13958688U 1988-10-26 1988-10-26 Pending JPH0261545U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13958688U JPH0261545U (en) 1988-10-26 1988-10-26

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13958688U JPH0261545U (en) 1988-10-26 1988-10-26

Publications (1)

Publication Number Publication Date
JPH0261545U true JPH0261545U (en) 1990-05-08

Family

ID=31402982

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13958688U Pending JPH0261545U (en) 1988-10-26 1988-10-26

Country Status (1)

Country Link
JP (1) JPH0261545U (en)

Similar Documents

Publication Publication Date Title
JPH0261545U (en)
JPH027927U (en)
JPS623294U (en)
JPS62123844U (en)
JPS6332731U (en)
JPS61206406U (en)
JPS61117384U (en)
JPH0476345U (en)
JPS645719U (en)
JPH0368746U (en)
JPH01151997U (en)
JPH0473439U (en)
JPH0160850U (en)
JPH0368984U (en)
JPH0476346U (en)
JPH0486145U (en)
JPS60165137U (en) Work position setting device for conveyor device
JPS62104837U (en)
JPH0319603U (en)
JPS6196616U (en)
JPS6150644U (en)
JPH0286930U (en)
JPS61120425U (en)
JPH0211671U (en)
JPS62161115U (en)