JPH02292429A - Joining construciton of pc post-girder - Google Patents

Joining construciton of pc post-girder

Info

Publication number
JPH02292429A
JPH02292429A JP11200389A JP11200389A JPH02292429A JP H02292429 A JPH02292429 A JP H02292429A JP 11200389 A JP11200389 A JP 11200389A JP 11200389 A JP11200389 A JP 11200389A JP H02292429 A JPH02292429 A JP H02292429A
Authority
JP
Japan
Prior art keywords
girder
post
main reinforcement
capital
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP11200389A
Other languages
Japanese (ja)
Inventor
Mineao Motojima
本島 峯青
Takeo Seguchi
瀬口 健夫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP11200389A priority Critical patent/JPH02292429A/en
Publication of JPH02292429A publication Critical patent/JPH02292429A/en
Pending legal-status Critical Current

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

PURPOSE:To join the lower-end main reinforcement of a PC girder accurately by placing the end sections of oppositely faced PC girders onto the capital of a PC post, projecting the main reinforcement of one PC girder in long size and joining the lower-end main reinforcement with the girder lower-end section of the other PC girder projected in short size. CONSTITUTION:A shearing reinforcing bar 3 is arranged onto the outer circum ference of the post main reinforcement 2 of a PC post A with a hollow section. A capital section 4 is installed integrally to the post capital section of the PC post A. Oppositely faced PC girders B are laid onto the capital section 4 of the PC post A. The girder lower-end main reinforcement 6 of one PC girder B is projected outside a post main reinforcement 1 while crossing a post-girder joining space, and joined on the capital 4 with the end section of a girder lower-end main reinforcement 6 projected in short size from the end face of the other PC girder B through gas pressure welding, etc., and concrete is placed. Accordingly, the girder reinforcement of the PC post-girder can be cemented accurately, thus increasing the rigidity and strength of joining sections.

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は構造物のPC柱梁の接合工法に係るものである
. (従来の技術) 従来この種の接合工法においては、PC柱の柱頭に載架
されたPC梁の主筋の突出端部を柱梁接合空間内に臨む
ように曲成して、同空間内に定着させる等、梁主筋のア
ンカ一定着のための種々の提案がなされている。
[Detailed Description of the Invention] (Field of Industrial Application) The present invention relates to a method for joining PC columns and beams in structures. (Prior art) Conventionally, in this type of joint construction method, the protruding end of the main reinforcement of a PC beam mounted on the capital of a PC column is bent so as to face into the column-beam joint space, and Various proposals have been made to secure the anchor of the main beam reinforcement.

(発明が解決しようとする課題) しかしながら前記工法においては柱梁の主筋、及び接合
空間内の剪断補強筋が複雑に交錯して著しく作業条件を
悪化せしめ、主筋の接合精度が確保されないままコンク
リートが打設されるため、鉄筋に対するコンクリートの
付着性能が低下して、構造上の欠陥を生起する場合があ
る。
(Problem to be solved by the invention) However, in the above construction method, the main reinforcement of the column and beam and the shear reinforcing reinforcement in the joint space are intertwined in a complicated manner, significantly worsening the working conditions, and the concrete is broken without ensuring the joint accuracy of the main reinforcement. Because concrete is poured into concrete, the adhesion performance of concrete to reinforcing bars may deteriorate, resulting in structural defects.

本発明は前記従来技術の有する問題点に鑑みて提案され
たもので、その目的とする処は、PC柱梁の接合空間に
おける梁筋の接合が精度よく確実に行なわれるとともに
、コンクリートの打設、充填が容易に、しかも確実に行
なわれ、接合部の剛性と強度が向上されるPC柱梁の接
合工法を提供する点にある。
The present invention has been proposed in view of the problems of the prior art, and its purpose is to accurately and reliably join beam reinforcements in the joining space of PC columns and beams, and to prevent concrete pouring. Another object of the present invention is to provide a method for joining PC columns and beams in which filling is performed easily and reliably, and the rigidity and strength of the joint are improved.

(課題を解決するための手段) 前記の目的を達成するため、本発明に係るPC柱梁の接
合工法は、PC柱のキャビタル上に載架された同柱を挟
んで相対するPC梁のうち、一方のPC梁の下端主筋を
柱梁接合空間を超えて突出せしめ、他方のPC梁の下端
主筋の突出端部に前記キャピタル上における柱主筋と他
方のPC梁の端面との間で接合し、キャピタル上部全体
に補強筋を配設したのち、前記柱梁接合空間内にコンク
リートを打設するように構成されている。
(Means for Solving the Problems) In order to achieve the above-mentioned object, the PC column beam joining method according to the present invention provides a PC column beam joining method that connects two PC beams that are placed on the cavity of a PC column and that are opposed to each other across the same column. , the lower end main reinforcement of one PC beam is made to protrude beyond the column-beam joint space, and is connected to the protruding end of the lower end main reinforcement of the other PC beam between the column main reinforcement on the capital and the end face of the other PC beam. After reinforcing bars are placed over the entire upper part of the capital, concrete is poured into the column-beam joint space.

(作用) 本発明によれば前記したように、PC柱のキャピタル上
にPC梁の端部を載架し、PC柱を挟んで相対するPC
梁のうち、一方のPC梁の端面から長く突出している下
端主筋を、柱梁接合空間を超えて外側に突出させ、同下
端主筋と、他方のPC梁の端面から短かく突出している
梁下端筋とを、前記キャピタル上において、柱主筋の外
側と粱端面との間で柱筋等と干渉することなく容易に、
且つ確実に精度よく接合しうるものである。
(Function) According to the present invention, as described above, the ends of the PC beams are mounted on the capitals of the PC columns, and the PC beams facing each other across the PC columns are
Among the beams, the lower end main reinforcement that protrudes long from the end face of one PC beam is made to protrude outward beyond the column-beam joint space, and the lower end main reinforcement and the lower end of the beam that protrudes short from the end face of the other PC beam. easily on the capital between the outside of the main column reinforcement and the end face of the column without interfering with the column reinforcement, etc.
Moreover, it is possible to reliably join with high precision.

更に本発明によればキャピタル上部全体に補強筋を配筋
し、柱梁接合空間内にコンクリートを打設し、パネルゾ
ーンを拡大形成し、架橋の剛性を高め構造強度を増大す
るものである。
Further, according to the present invention, reinforcing bars are arranged throughout the upper part of the capital, concrete is placed in the column-beam joint space, and the panel zone is expanded to increase the rigidity of the bridge and increase the structural strength.

(実施例) 以下本発明を図示の実施例について説明する。(Example) The present invention will be described below with reference to the illustrated embodiments.

囚は中空部(1)を有するPC柱で、柱主筋(2)の外
周に剪断補強筋(3)が配筋されている.更に前記PC
柱囚の柱頭部にはキャビタル(4)が一体に突設されて
いる。図中(5)はキャピタル(4)の補強筋である。
The column is a PC column with a hollow part (1), and shear reinforcing bars (3) are arranged around the outer periphery of the main column reinforcement (2). Furthermore, the PC
A cavity (4) is integrally protruded from the head of the pillar prisoner. In the figure (5) is the reinforcing bar of the capital (4).

前記PC柱囚のキャビタル(4)上にPC梁eを載架す
る。図中(6)はPC梁(Blの梁下端主筋、(7)は
肋筋で、同肋筋(7)の上端部がスラブに等しい厚さ欠
截されたPC梁(Blの上端面より突設されている。
A PC beam e is mounted on the cavity (4) of the PC pillar. In the figure, (6) is the main reinforcement at the lower end of the PC beam (Bl), (7) is the rib, and the upper end of the rib (7) is a PC beam with a thickness equal to that of the slab (from the upper end surface of Bl). It is installed protrudingly.

而してPC柱囚を挟んで相対するPC梁+B)のうち、
一方のPC梁《印の梁下端主筋(6)を柱梁接合空間を
超えて柱主筋(1)の外側に突出せしめ、他方のPC梁
《aの端面より短かく突出した梁下端主筋(6)の端部
に、ガス圧接、エンクローズ溶接、或いはスプライスス
リーブ(8)等を介して、前記キャビタル(4)上にお
ける社主筋(1)と他方のPC梁(印の端面との間で接
合する. この場合、前記相対する一双のPC梁(B1の梁下端主
筋(6)の接合は、第4図または第5図のいずれの方法
によってもよい. 次いで柱梁パネルゾーンの補強筋(2’l 、補強肋筋
(9)、剪断補強筋00)(10’lを配筋するととも
に、梁上端筋(10を配筋する。
Therefore, among the PC beams + B) facing each other across the PC pillars,
The beam lower end main reinforcement (6) of one PC beam 《marked is made to protrude beyond the column-beam joint space to the outside of the column main reinforcement (1), and the beam lower end main reinforcement (6) that is shorter and protrudes from the end face of the other PC beam 《a ) is connected between the main reinforcement (1) on the caval (4) and the end face of the other PC beam (marked) via gas pressure welding, enclosure welding, or splice sleeve (8). In this case, the lower end main reinforcement bars (6) of the pair of opposing PC beams (B1) may be joined by either method shown in Figure 4 or Figure 5. Next, the reinforcing bars (2 'l, reinforcing ribs (9), shear reinforcing bars 00) (10'l), and beam top end reinforcements (10).

次いで柱中空部(1)のコンクリート01,キャビタル
(4)上のパネルゾーン型枠021内コンクリート(1
3’)及び梁上端と床スラブのコンクリート(13’l
を打設ずる。
Next, the concrete 01 in the column hollow part (1) and the concrete in the panel zone formwork 021 on the cavity (4) (1
3') and concrete of the upper end of the beam and floor slab (13'l)
Pour the concrete.

次いで上階のPC柱(A′)を立設し、以下前記同様の
手順を繰返して骨組を構築する。
Next, the PC columns (A') on the upper floor are erected, and the same procedure as described above is repeated to construct the frame.

なお前記PC柱囚は第6図に示すように円形断面の中空
部(1)を有する中空角柱の他第7図に示す方形断面の
中空部(1)を有する中空角柱、第8図に示す環状断面
の中空柱に形成されてもよい。また第9図及び第10図
並に第ll図は前記第6図及び第7図並に第8図に示す
中空柱囚に柱主筋挿貫用シース04)を配設した場合を
示す。
The PC pillars include hollow prismatic pillars having a hollow part (1) of circular cross section as shown in Fig. 6, hollow prismatic pillars having a hollow part (1) of square cross section as shown in Fig. 7, and hollow prismatic pillars having a hollow part (1) of square cross section as shown in Fig. 8. It may be formed into a hollow column with an annular cross section. Moreover, FIGS. 9, 10, and 11 show the case where a sheath 04) for inserting the column main reinforcement is disposed in the hollow column shown in FIGS. 6, 7, and 8.

(発明の効果) 本発明によれば前゜記したように、PC柱のキャピタル
上に載架した間柱を挟んで相対するPC梁のうち、一方
のPC梁の下端主筋を柱梁接合空間を超えて突出せしめ
、他方のPC梁の下端主筋の突出端部に、前記キャビタ
ル上における社主筋と他方のPC梁との間で接合するよ
うにしたので、柱のキャピタル上において、社主筋とP
C梁端部との間に確保された十分なスペースにおいてP
C梁の梁筋相互の結合が容易に、しかも確実に精度よく
行なわれ、コンクリートの打設も容易且つ確実に行なわ
れ柱梁接合部における鉄筋に対するコンクリートの付着
性が向上される。
(Effects of the Invention) According to the present invention, as described above, among the PC beams facing each other across the studs mounted on the capital of the PC column, the main reinforcement at the lower end of one of the PC beams is connected to the column-beam joint space. The main reinforcement at the lower end of the other PC beam is connected to the protruding end of the main reinforcement at the lower end of the other PC beam, so that the main reinforcement and the P
P in sufficient space secured between C beam end.
The beam reinforcements of the C-beam can be easily and reliably connected to each other with high accuracy, concrete can be placed easily and reliably, and the adhesion of concrete to the reinforcement at the column-beam joint is improved.

しかも本発明によればキャビタル上部全体に捕強筋を配
筋したのち、前記柱梁接合空間にコンクリートを打設す
るのでに接合部の剛性が高くなり、また強度が増大する
Furthermore, according to the present invention, reinforcement reinforcement is placed over the entire upper part of the cavity and then concrete is poured into the column-beam joint space, so the rigidity and strength of the joint increases.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明の方法によって施工されたPC柱梁の接
合部を示す縦断面図、第2図は第1図の矢視■一■図、
第3図は第1図の矢視■−■図、第4図及び第5図は夫
々相対するPC梁における梁下端筋の接合部を示す平面
図、第6図乃至第11図は夫々PC柱の横断平面図であ
る。 囚−PC柱、     ts+−PC梁、(1)−一一
中空部、    (4)一 キャピタル、(6)−一一
梁下端主筋、  (8)一 スプライススリーブ、(9
)一パネルゾーンの補強肋筋、 (lffl(lO’l  −・パネルゾーンの剪断補強
筋、Q3)(13’) (13“)一 コンクリート。 代理人 弁理士 岡 本 重 文 外1名 第1図
Fig. 1 is a vertical cross-sectional view showing the joint of PC columns and beams constructed by the method of the present invention, Fig. 2 is a view taken in the direction of the arrows 1 and 2 in Fig. 1,
Figure 3 is a view taken along arrows ■-■ in Figure 1, Figures 4 and 5 are plan views showing the joints of the lower end reinforcements of the opposing PC beams, and Figures 6 to 11 are the PC beams. FIG. 3 is a cross-sectional plan view of the pillar. - PC column, ts + - PC beam, (1) - 11 hollow section, (4) 1 capital, (6) - 11 beam lower end main bar, (8) 1 splice sleeve, (9
)1 Reinforcement reinforcement of panel zone, (lffl(lO'l - Shear reinforcement of panel zone, Q3) (13') (13")1 Concrete. Agent Patent attorney Shige Okamoto 1 extra person No. 1 figure

Claims (1)

【特許請求の範囲】[Claims] PC柱のキヤピタル上に載架された同柱を挟んで相対す
るPC梁のうち、一方のPC梁の下端主筋を柱梁接合空
間を超えて突出せしめ、他方のPC梁の下端主筋の突出
端部に前記キヤピタル上における柱主筋と他方のPC梁
の端面との間で接合し、キヤピタル上部全体に補強筋を
配設したのち、前記柱梁接合空間内にコンクリートを打
設することを特徴とするPC柱梁の接合工法。
Among the PC beams facing each other across the same column mounted on the capital of the PC column, the lower end main reinforcement of one of the PC beams is made to protrude beyond the column-beam joint space, and the protruding end of the lower end main reinforcement of the other PC beam The main column reinforcement on the capital is connected to the end face of the other PC beam in the section, reinforcing bars are placed over the entire upper part of the capital, and then concrete is poured into the column-beam joint space. A method for joining PC columns and beams.
JP11200389A 1989-05-02 1989-05-02 Joining construciton of pc post-girder Pending JPH02292429A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11200389A JPH02292429A (en) 1989-05-02 1989-05-02 Joining construciton of pc post-girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11200389A JPH02292429A (en) 1989-05-02 1989-05-02 Joining construciton of pc post-girder

Publications (1)

Publication Number Publication Date
JPH02292429A true JPH02292429A (en) 1990-12-03

Family

ID=14575524

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11200389A Pending JPH02292429A (en) 1989-05-02 1989-05-02 Joining construciton of pc post-girder

Country Status (1)

Country Link
JP (1) JPH02292429A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296705A (en) * 2011-06-17 2011-12-28 清华大学 Composite steel pipe concrete column and steel beam connecting node

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5634835A (en) * 1979-08-31 1981-04-07 Kajima Corp Method of coupling pillar to beam

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5634835A (en) * 1979-08-31 1981-04-07 Kajima Corp Method of coupling pillar to beam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296705A (en) * 2011-06-17 2011-12-28 清华大学 Composite steel pipe concrete column and steel beam connecting node

Similar Documents

Publication Publication Date Title
JP2001342679A (en) CONNECTING METHOD FOR PCa BEAM MEMBER AT COLUMN/BEAM JUNCTION AND PCa BEAM MEMBER FOR IT
JPH02292429A (en) Joining construciton of pc post-girder
JPH1181452A (en) Main reinforcement joint structure for pc beam
JP2002146720A (en) Joint construction between column and beam
JPH02221535A (en) Connecting structure for pillar and beam
JPH1150538A (en) Building and method for constructing the same
JP2000034780A (en) Column structure
JPH10280541A (en) Frame of mixed structure and constructing method of the frame
JP2890983B2 (en) Beam connection structure of PC column
JPH03275839A (en) Connection construction of reinforced concrete column and steel beam
JPH0459426B2 (en)
JPH06306931A (en) Construction of steel frame reinforced concrete structure
JPH06995B2 (en) Method for joining columns and PC beams
JPS6198870A (en) Construction method of precast reinforced concrete earthquake-proof wall
JPH079921Y2 (en) Joint structure between reinforced concrete column and steel beam
JPH06220869A (en) Drop-in type steel frame bridge pier and process of construction thereof
JPH02274938A (en) Combining method for src column
JP2726554B2 (en) Construction method and positioning device for composite pier
JPH0531622B2 (en)
JPH08209630A (en) Reinforcing method for structure such as pillar, beam, or girder made of reinforced concrete
JP2716634B2 (en) Column-beam joint structure
JPH02236328A (en) Construction method for super-highrice building
JPH04353149A (en) Precast reinforced concrete beam and its jointment
JPH0366852A (en) Construction method for complex structure of precast reinforced concrete column and steel beam
JPH07252882A (en) Connecting method for building frame