JPH02263210A - Instrumentation controller - Google Patents

Instrumentation controller

Info

Publication number
JPH02263210A
JPH02263210A JP1084380A JP8438089A JPH02263210A JP H02263210 A JPH02263210 A JP H02263210A JP 1084380 A JP1084380 A JP 1084380A JP 8438089 A JP8438089 A JP 8438089A JP H02263210 A JPH02263210 A JP H02263210A
Authority
JP
Japan
Prior art keywords
calculation
pid
display
contents
pid arithmetic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP1084380A
Other languages
Japanese (ja)
Inventor
Shinichi Hiramatsu
伸一 平松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP1084380A priority Critical patent/JPH02263210A/en
Publication of JPH02263210A publication Critical patent/JPH02263210A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To always confirm the contents of a PID arithmetic which is under job controlling just with observation of a display part by displaying automatically the contents of the PID arithmetic which is under selection via a display switch means on the display part. CONSTITUTION:An upper limit alarm 14 detects that the measured variable given to one of two PID arithmetic parts 8 and 12 exceeded a prescribed level. Based on the detection signal of the alarm 14, the computing result of one of both parts 8 and 12 is selected and at the same time the computing contents and the name of the selected PID arithmetic are displayed with switching by a display switching means 15. As a result, the computing results of both parts 8 and 12 can be automatically selected in response to the control state. Furthermore a present specific PID arithmetic that is performing the control is automatically displayed at a display part 17.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明はマイクロプロセッサを内蔵しなパネル計器型
の計装制御用1ルーグコントローラに適用し得る計装制
御装置に関するものである。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to an instrumentation control device that can be applied to a panel instrument type 1-rougue controller for instrumentation control without a built-in microprocessor.

〔従来の技術〕[Conventional technology]

第5図哄例えば三菱総合計装制御システムのカタログ’
5E−H211−E(8607−1−0)プロセスコン
トローラMACTUS204/205 ”に示された従
来の計装制御用1ループコントローラとしての計装制御
装置を示す斜視図であり、図において、19はプロセス
測定量(以下PVという)、目標値(以下Svという)
、操作量(以下MVという)等を表示する前面表示部、
20は前面表示部19の表示内容を、並列に行われてい
るPIDI演算及びPID2演算のうちの一方の内容に
表示切換えを行う時に操作するデイスプレィチェンジキ
ーである。
Figure 5: For example, Mitsubishi comprehensive equipment control system catalog.
5E-H211-E (8607-1-0) Process Controller MACTUS204/205'' is a perspective view showing an instrumentation control device as a conventional one-loop controller for instrumentation control, and in the figure, 19 is a process controller. Measured quantity (hereinafter referred to as PV), target value (hereinafter referred to as Sv)
, a front display section that displays the operation amount (hereinafter referred to as MV), etc.;
Reference numeral 20 denotes a display change key that is operated to switch the display content on the front display section 19 to one of the PIDI calculation and PID2 calculation that are being performed in parallel.

次に動作について説明する。計装制御用1ループコント
ローラを運転するオペレータが、前面表示部19の表示
内容をPID 1演算又はPID 2演算の内容に表示
切換えを行いたい時は、デイスプレィチェンジキー20
を手動で1回押すことにより表示が切換えられる。
Next, the operation will be explained. When the operator operating the 1-loop controller for instrumentation control wants to switch the display content on the front display section 19 to the content of PID 1 calculation or PID 2 calculation, press the display change key 20.
The display can be switched by manually pressing once.

〔発明が解決しようとする課題〕[Problem to be solved by the invention]

従来の計装制御装置は以上のように構成さ、れているの
で、道側で演算している2つのPID演算の中から現在
選択されているPID演算の内容を前面表示部19で確
認する際は、側面のデイスプレィチェンジキー20を1
度手で押して切換えなければならず、また、前面表示部
19を1産児ただけでは、どのPID演算が選択されて
制御が行われているかわからないなどの問題点があった
Since the conventional instrumentation control device is configured and operated as described above, the contents of the PID calculation currently selected from the two PID calculations being calculated on the roadside can be confirmed on the front display section 19. When the display change key 20 on the side is
It is necessary to press the switch manually, and there are also problems in that if the front display section 19 is displayed only once, it is not possible to know which PID calculation is being selected and the control is being performed.

この発明は上記のような問題点を解消するためになされ
たもので、道側で演算している2つのPID演算の中か
ら現在選択されているPID演算の内容を自動的に表示
すると共に、現在選択されているPID演算の名称を表
示することができる計装制御装置を得ることを目的とす
る。
This invention was made to solve the above-mentioned problems, and it automatically displays the contents of the PID calculation currently selected from among the two PID calculations being calculated on the roadside. An object of the present invention is to obtain an instrumentation control device capable of displaying the name of a currently selected PID operation.

〔課題を解決するための手段〕[Means to solve the problem]

この発明に係る計装制御装置は、2つのPID演算の一
方に与えられる測定量が所定量を越えたことを検出し、
その検出信号に応じて、2つのPID演算の演算結果の
1つを選択すると共に、演算の内容及び選択されたPI
D演算の名称を表示するようにしたものである。
The instrumentation control device according to the present invention detects that the measured amount given to one of the two PID calculations exceeds a predetermined amount,
According to the detection signal, one of the calculation results of the two PID calculations is selected, and the contents of the calculation and the selected PI
The name of the D operation is displayed.

〔作用〕[Effect]

この発明における計装制御装置は、制御の状態に応じて
2つのPID演算の演算結果が自動的に選択されると共
に、現在どのPID演算による制御が行われているかが
自動的に表示される。
In the instrumentation control device according to the present invention, the calculation results of two PID calculations are automatically selected depending on the control state, and which PID calculation is currently being controlled is automatically displayed.

〔実施例〕〔Example〕

以下、この発明の一実施例を図について説明する。第1
図はポンプの流量制御及び圧力制御を行う場合を示し、
1は制御対象としてのポンプ、2はポンプ1の出力側に
設けられな差圧検出器、3は差圧検出器2の出力側に設
けられた操作弁、4は操作弁3の出力側に設けられた圧
力検出器である。
An embodiment of the present invention will be described below with reference to the drawings. 1st
The figure shows the case of controlling the flow rate and pressure of the pump.
1 is a pump as a controlled object, 2 is a differential pressure detector provided on the output side of the pump 1, 3 is an operating valve provided on the output side of the differential pressure detector 2, and 4 is an operating valve on the output side of the operating valve 3. A pressure sensor is provided.

5は計装制御装置のアプリケージ冒ンソフトウエアが格
納された演算制御部である。演算制御部5において、6
は差圧検出器2の流量検出値に応じて第1の測定量PV
Iを算出する測定量演算部、7は流量の目標値SV1を
設定する目標値設定部、8は上記第1の測定量PV1と
目標値SV1とによル、第1のPID演算を行い演算結
果PIDIを求める。PID1演算部、9は圧力検出器
4の圧力検出値に応じて第2の測定量PV2を算出する
測定量演算部、10は圧力の目標値SV2を設定する目
標値設定部、11は上記第2の測定量PV2と目標値8
V2とによシ、第2のPID演算を行い演算結果PID
2を求めるPID 2演算部、12は上記演算部:* 
PID 1又はPID2を選択する選択手段、13は選
択された演算結果PID1又はPID2に応じて操作量
MYを算出し、操作弁3に与える操作量演算部、14は
第2の測定量PV2が所定の上限値を越°えたことを検
出する検出手段で、この実施例では上限警報器14が用
いられている。15は上限警報器14の検出信号に応じ
て表示内容を切換える表示切換え手段である。
Reference numeral 5 denotes an arithmetic control section in which application software for the instrumentation control device is stored. In the arithmetic control section 5, 6
is the first measured quantity PV according to the flow rate detection value of the differential pressure detector 2.
7 is a target value setting unit that sets a target value SV1 of the flow rate; 8 is a unit that performs a first PID calculation based on the first measured quantity PV1 and target value SV1; Find the result PIDI. A PID1 calculation unit; 9 is a measurement quantity calculation unit that calculates a second measurement quantity PV2 according to the pressure detection value of the pressure detector 4; 10 is a target value setting unit that sets a pressure target value SV2; Measured quantity PV2 of 2 and target value 8
V2 performs the second PID calculation and calculates the calculation result PID
PID 2 calculating section for calculating 2, 12 is the above calculating section: *
Selection means for selecting PID 1 or PID2; 13 is an operation amount calculating unit that calculates the manipulated variable MY according to the selected calculation result PID1 or PID2 and supplies it to the operating valve 3; 14 is a device for determining the second measured value PV2; In this embodiment, an upper limit alarm 14 is used as a detection means for detecting that the upper limit value of . Reference numeral 15 denotes display switching means for switching display contents in accordance with the detection signal of the upper limit alarm 14.

16は計装制御装置の前面に設けられ、選択された演算
結果の演算内容を表示する表示部、1Tは現在選択され
ている演算結果が第1のPID演算によるものか第2の
PID演算によるものかを表示する表示部である。
16 is a display unit provided on the front of the instrumentation control device and displays the calculation details of the selected calculation result, and 1T indicates whether the currently selected calculation result is based on the first PID calculation or the second PID calculation. This is a display section that displays the item.

第2図はこの発明の一実施例による計装制御装置の外観
を示す斜視図であシ、18.17は第1図の同一符号部
分と対応する表示部である。
FIG. 2 is a perspective view showing the external appearance of an instrumentation control device according to an embodiment of the present invention, and 18 and 17 are display portions corresponding to the same reference numerals in FIG. 1.

第3図は表示切換え手段15の動作を示すフローチャー
トである。
FIG. 3 is a flowchart showing the operation of the display switching means 15.

次に動作について説明する。この実施例では、計装制御
装置は通常は流量制御を行い、圧力に異常をきたすと圧
力制御に切換えて制御を行う。その制御内容は演算制御
部5によるアプリケージ冒ンソフトウエアにプログラミ
ングされている。アプリケージ1ンソフトウエアは決め
られた一定周期毎に演算を行う。
Next, the operation will be explained. In this embodiment, the instrumentation control device normally controls the flow rate, and when an abnormality occurs in the pressure, switches to pressure control. The content of the control is programmed into application software by the arithmetic control unit 5. The application software performs calculations at predetermined regular intervals.

先ず、選択手段12は演算結果PID 1を選択する。First, the selection means 12 selects the calculation result PID 1.

PID1演算部8は第1の測定量PV1と目標値SVI
とに基いて第1のPID演算を行う。この演算結果PI
DIは選択手段12を介して操作量演算部13に送られ
、ここで操作量MVが求められる。この操作量MVに応
じて操作弁3が制御されることによシ、流量制御が行わ
れる。このとき、表示部16は表示切換え手段15の制
御によシ第1C)PID演算におけるPVl 、SVl
 、MV等の内容等を表示する。また表示部17は現在
第1のPID演算の演算結果PID 1が選択されて、
流量制御が行われていることを表示する。
The PID1 calculation unit 8 calculates the first measured quantity PV1 and the target value SVI.
A first PID calculation is performed based on. This calculation result PI
DI is sent via the selection means 12 to the manipulated variable calculating section 13, where the manipulated variable MV is determined. Flow rate control is performed by controlling the operation valve 3 according to the operation amount MV. At this time, the display section 16 is controlled by the display switching means 15.1C) PVl, SVl in PID calculation
, the contents of MV, etc. are displayed. In addition, the display unit 17 shows that the calculation result PID 1 of the first PID calculation is currently selected.
Displays that flow rate control is being performed.

一方、この状態では、上限警報器14は圧力の測定量P
V2を監視しておL PV2が所定の上限値を越えると
検出信号を出力して選択手段12を切換えると共に、表
示切換え手段15を制御する。これによってPID2I
D2演算は測定fPV2と目標値SV2とによシ第2の
PID演算を行い、その演算結果PID2は選択手段1
2を介して操作量演算部13に送られる。操作量演算部
13から得られる操作量MYにより操作弁3が制御され
ることにより、圧力制御が行われる。
On the other hand, in this state, the upper limit alarm 14 indicates the measured amount of pressure P.
V2 is monitored, and when LPV2 exceeds a predetermined upper limit value, a detection signal is output to switch the selection means 12 and control the display switching means 15. This allows PID2I
In the D2 calculation, a second PID calculation is performed based on the measured fPV2 and the target value SV2, and the calculation result PID2 is used as the selection means 1.
2 to the manipulated variable calculating section 13. Pressure control is performed by controlling the operation valve 3 using the operation amount MY obtained from the operation amount calculating section 13.

このとき、表示部16は第2のPID演算の内容PV2
 、SV2 、MV等を表示し、表示部1Tは現在第2
のPID演算が選択されて、圧力制御が行われているこ
とを表示する。
At this time, the display unit 16 displays the content PV2 of the second PID calculation.
, SV2, MV, etc., and the display section 1T currently displays the second
It is displayed that PID calculation is selected and pressure control is being performed.

表示切換え手段15の内部動作は、第3図のフローチャ
ートに従って行われる。先ず、ステップ5T(1)で入
力された信号の状態変化を監視し、入力信号が0→1に
変化した時は、ステップ19T(2)に進んで、PID
2演算の内容に切換え表示する。
The internal operation of the display switching means 15 is performed according to the flowchart in FIG. First, in step 5T(1), the state change of the input signal is monitored, and when the input signal changes from 0 to 1, the process proceeds to step 19T(2), and the PID
The contents of the two calculations are switched and displayed.

また、ステップ5T(1)でNOの時はステップ5T(
3)に進み、ここで入力信号が1→Oに変化した時は、
ステップ5T(4)に進んでPID1演算の内容に切換
え表示する。また、それと同時に表示部17には、選択
されたPID演算の名称”5ELECTPID1”又は
”5ELECT PID2”の名称が英数表示によって
表示される。
Also, if NO in step 5T(1), step 5T(
Proceed to step 3), and when the input signal changes from 1 to O,
Proceeding to step 5T(4), the content of the PID1 calculation is switched and displayed. At the same time, the name of the selected PID operation "5ELECT PID1" or "5ELECT PID2" is displayed on the display unit 17 in alphanumeric characters.

なお、上記実施例では選択されたPID演算の名称を表
示するのに、表示部1Tにより英数字表示を行う場合を
示したが、第4図に示すように、LED18を用いた表
示を行うようにしてもよい。その場合は、LED 18
が点灯している方のPIDが選択されていることを示す
In the above embodiment, the name of the selected PID operation is displayed using alphanumeric characters on the display section 1T, but as shown in FIG. You may also do so. In that case, LED 18
This indicates that the PID that is lit is selected.

〔発明の効果〕〔Effect of the invention〕

以上のように、この発明によれば、表示切換え手段によ
シ、現在選択されているPID演算の内容を自動的に表
示部に表示するように構成したので、表示部を観察する
だけで、現在制御を行りているPID演算の内容を常に
確認することができる効果がある。
As described above, according to the present invention, the content of the currently selected PID calculation is automatically displayed on the display section using the display switching means, so that by simply observing the display section, This has the advantage that the contents of the PID calculation currently being controlled can be checked at all times.

【図面の簡単な説明】[Brief explanation of drawings]

第1図はこの発明の一実施例による計装制御装置を示す
構成図、第2図は同装置の斜視図、第3図は同装置の表
示切換え手段の動作を示すフローチャート、第4図はこ
の発明の他の実施例による計装制御装置を示す斜視図、
第5図は従来の計装制御装置を示す斜視図である。 PVlは第1の測定量、PV2は第2の測定量、8はP
ID1ID1演算1はPID2ID2演算2は選択手段
、13は操作量演算部、MYは操作量、14は上限警報
器、15は表示切換え手段、16゜17は表示部。 なお、図中、同一符号は同一、又は相当部分を示す。 18−L日D 2、発明の名称 特願平1−84380号 計装制御装置 6、補正の内容 (1)明細書第5頁第15行、同頁第15行から第16
行、第7頁第7行と第9頁第16行に「上限警報器」と
あるのを「上限警報検出部」と補正する。 (2)別紙の通り第1図を補正する。 7、添付書類の目録 補正後の第1図を記載した書面   1 通3、補正を
する者 事件との関係 特許出願人 住 所    東京都千代田区丸の内二丁目2番3号名
 称  (601)三菱電機株式会社代表者 志岐守哉 以  上 4、代理人 住所 郵便番号 105 東京都港区西新橋1丁目4番10号 5、補正の対象 (1)明細書の発明の詳細な説明の欄
FIG. 1 is a configuration diagram showing an instrumentation control device according to an embodiment of the present invention, FIG. 2 is a perspective view of the device, FIG. 3 is a flowchart showing the operation of the display switching means of the device, and FIG. A perspective view showing an instrumentation control device according to another embodiment of the present invention,
FIG. 5 is a perspective view showing a conventional instrumentation control device. PVl is the first measured quantity, PV2 is the second measured quantity, 8 is P
ID1 ID1 operation 1 is PID2 ID2 operation 2 is selection means, 13 is a manipulated variable calculating section, MY is a manipulated variable, 14 is an upper limit alarm, 15 is a display switching means, 16° 17 is a display section. In addition, in the figures, the same reference numerals indicate the same or equivalent parts. 18-L Day D 2, Title of invention, Patent Application No. 1-84380 Instrumentation and Control Device 6, Contents of Amendment (1) Specification, page 5, line 15, and lines 15 to 16 of the same page
In line 7, page 7, line 7 and page 9, line 16, the words "upper limit alarm" are corrected to read "upper limit alarm detector." (2) Correct Figure 1 as shown in the attached sheet. 7. Document containing Figure 1 after the amendment to the list of attached documents 1 copy 3. Relationship with the case of the person making the amendment Patent applicant address 2-2-3 Marunouchi, Chiyoda-ku, Tokyo Name (601) Mitsubishi Denki Co., Ltd. Representative Moriya Shiki Above 4. Agent Address Postal Code 105 1-4-10-5 Nishi-Shinbashi, Minato-ku, Tokyo Subject of Amendment (1) Detailed Description of the Invention in the Specification

Claims (1)

【特許請求の範囲】[Claims] 第1の測定量による第1のPID演算と第2の測定量に
よる第2のPID演算とが並列に行われる計装制御装置
において、上記第2の測定量が所定量を越えたことを検
出する検出手段と、上記第1及び第2のPID演算の各
演算結果のうちの1つを上記検出手段の検出信号に応じ
て選択する選択手段と、上記選択手段で選択された演算
結果に基づいて操作量を算出する操作量演算部と、上記
選択手段で選択された演算結果が上記第1又は第2のP
ID演算によるものであること及びその演算の内容を表
示する表示部と、上記表示部の表示内容を上記検出信号
に応じて切換え制御する表示切換え手段とを設けたこと
を特徴とする計装制御装置。
In an instrumentation control device in which a first PID calculation using a first measured quantity and a second PID calculation using a second measured quantity are performed in parallel, it is detected that the second measured quantity exceeds a predetermined amount. a detection means for selecting one of the calculation results of the first and second PID calculations according to a detection signal of the detection means; and a selection means for selecting one of the calculation results of the first and second PID calculations based on the calculation result selected by the selection means. a manipulated variable calculation section that calculates the manipulated variable by using the above-mentioned first or second P;
The instrumentation control is characterized in that it is based on ID calculation and is provided with a display section that displays the contents of the calculation, and a display switching means that switches and controls the display contents of the display section according to the detection signal. Device.
JP1084380A 1989-04-03 1989-04-03 Instrumentation controller Pending JPH02263210A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1084380A JPH02263210A (en) 1989-04-03 1989-04-03 Instrumentation controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1084380A JPH02263210A (en) 1989-04-03 1989-04-03 Instrumentation controller

Publications (1)

Publication Number Publication Date
JPH02263210A true JPH02263210A (en) 1990-10-26

Family

ID=13828943

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1084380A Pending JPH02263210A (en) 1989-04-03 1989-04-03 Instrumentation controller

Country Status (1)

Country Link
JP (1) JPH02263210A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008059205A (en) * 2006-08-30 2008-03-13 Toshiba Corp Monitoring control system
JP2008509480A (en) * 2004-08-04 2008-03-27 フィッシャー コントロールズ インターナショナル リミテッド ライアビリティー カンパニー System and method for switching feedback control of a process control device
CN109212967A (en) * 2018-08-22 2019-01-15 浙江大学 A kind of online track smoothing switching method of hydraulic material testing machine control model

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57139802A (en) * 1981-02-24 1982-08-30 Toshiba Corp Switching device
JPS63103302A (en) * 1986-10-20 1988-05-09 Daikin Ind Ltd Feedback controller

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57139802A (en) * 1981-02-24 1982-08-30 Toshiba Corp Switching device
JPS63103302A (en) * 1986-10-20 1988-05-09 Daikin Ind Ltd Feedback controller

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008509480A (en) * 2004-08-04 2008-03-27 フィッシャー コントロールズ インターナショナル リミテッド ライアビリティー カンパニー System and method for switching feedback control of a process control device
JP2008059205A (en) * 2006-08-30 2008-03-13 Toshiba Corp Monitoring control system
CN109212967A (en) * 2018-08-22 2019-01-15 浙江大学 A kind of online track smoothing switching method of hydraulic material testing machine control model

Similar Documents

Publication Publication Date Title
KR19980016407A (en) Depression recognition device and control method of matrix type touch panel
JPH0349119B2 (en)
JPH10301624A (en) Adaptive information display device
JP3950240B2 (en) Detection coordinate processing method and apparatus for analog touch panel
JPS6054018A (en) Process controller
JPH06254931A (en) Controller for molding machine
JPH02263210A (en) Instrumentation controller
JPS6254693B2 (en)
KR20040031195A (en) Touch screen system
JPS6419389A (en) Display system for lithographic display device
JPS6027821A (en) Electronic balance
JPS61136107A (en) One-loop controller
JPH0635645A (en) Intelligent graphic operating panel
JP2003084883A (en) Screen scroll method, and storage medium with program stored by it
JPH01216200A (en) Supervision and control device for cargo handling process
JP2538661B2 (en) Programmable operation control device
JPS62297729A (en) Graphic thermometer
JPH03158999A (en) Plant monitor device
JPH0568993B2 (en)
JPH02216520A (en) System for inputting eye point
JPH05119913A (en) Coordinate input device
JPS56149608A (en) State display device for sequence controller
JPH04301719A (en) Measurement indicating device for material testing machine
JP2556602Y2 (en) Operation display with transparent touch key switch
JPH0350283B2 (en)