JPH0221069B2 - - Google Patents
Info
- Publication number
- JPH0221069B2 JPH0221069B2 JP56094797A JP9479781A JPH0221069B2 JP H0221069 B2 JPH0221069 B2 JP H0221069B2 JP 56094797 A JP56094797 A JP 56094797A JP 9479781 A JP9479781 A JP 9479781A JP H0221069 B2 JPH0221069 B2 JP H0221069B2
- Authority
- JP
- Japan
- Prior art keywords
- guide
- tape
- cassette
- rotating arm
- block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- G—PHYSICS
- G11—INFORMATION STORAGE
- G11B—INFORMATION STORAGE BASED ON RELATIVE MOVEMENT BETWEEN RECORD CARRIER AND TRANSDUCER
- G11B15/00—Driving, starting or stopping record carriers of filamentary or web form; Driving both such record carriers and heads; Guiding such record carriers or containers therefor; Control thereof; Control of operating function
- G11B15/60—Guiding record carrier
- G11B15/66—Threading; Loading; Automatic self-loading
- G11B15/665—Threading; Loading; Automatic self-loading by extracting loop of record carrier from container
- G11B15/6653—Threading; Loading; Automatic self-loading by extracting loop of record carrier from container to pull the record carrier against drum
Landscapes
- Automatic Tape Cassette Changers (AREA)
- Replacement Of Web Rolls (AREA)
Description
【発明の詳細な説明】
本発明は前面操作型VTRに用いて好適なカセ
ツト式VTRに関する。
現在市販されている家庭用のカセツト式VTR
は、カセツトをVTR本体の上面部において水平
状態で昇降させる方式が主流である。これはカセ
ツト式VTRにおいてはカセツトのテープ引出口
から引出したテープを回転ヘツドを内蔵せるガイ
ドシリンダに巻付けるローデイング動作の必要性
から、ガイドシリンダをカセツトのテープ引出口
の前方に配置するのが理想的とされているためで
ある。
一方、オーデイオ用テープデツキはカセツトを
垂直に配置した前面操作型が主流である。この前
面操作型デツキは上面スペースが有効に利用で
き、またコンポーネントラツク等の高さの限られ
たラツクに収納することができ、極めて有効であ
るため、カセツト式VTRにおいても、前面操作
型の製品化が望まれている。
しかしながら、前面操作型VTRを実現するに
は前述のローデイング動作を、例えば、カセツト
のテープ引出口からテープを横方向に引出し、カ
セツトの一側に配したガイドシリンダに巻付ける
ことによつて行なわなければならないため、この
ローデイング動作が複雑且つ困難なものとなつて
いた。
本発明は上述の点に鑑みなされたもので前面操
作型VTRのローデイング動作を容易に実現しう
るカセツト式VTRを提供するものである。
以下、本発明を前面操作型カセツト式VTRに
用いた一実施例を図面に従い説明する。
第1図は、VTRの外観斜面図を示し、1は
VTR本体でその高さは極力低くした薄型構造と
なつている。2は前面パネルでその一側部にはカ
セツトホルダ3が取付けられており、カセツト4
はこのカセツトホルダ3により着脱される。この
カセツト4はテープ引出口を下向きとしたいわゆ
る横置き状態で、かつ垂直な状態に装着される。
また前面パネル2には操作ツマミ等が配されてお
り前面より各操作を為すことが可能となつてい
る。
次に第2図及び第3図に従つて各部要素につい
て説明する。5,5はカセツト4の透孔に嵌合し
カセツトの位置決めを行なう位置決めピン、6,
7は供給及び巻取リール台、8はカセツト4の切
欠4a内に位置するキヤプスタン、9は該キヤプ
スタンを駆動するキヤプスタンモータ、10はピ
ンチローラ、11は該ピンチローラを回動自在に
支持し、支軸12に枢支されるピンチローラ支持
レバーであり、前記ピンチローラ10は図示省略
したピンチローラ圧着機構によりキヤプスタン8
に圧着される。また13は前記ピンチローラ支持
レバー11上の先端に配され、テープのピンチロ
ーラ10への巻込み防止用のテープ走行路規制ガ
イドピンである。
14,15はテープが180゜強巻付けられ、カセ
ツト4の一側に配置され、矢印方向に傾斜した上
下ガイドシリンダで回転ヘツドと共に上シリンダ
のみ時計方向に回転する。16はテープ走行を安
定にすべく配されたインピーダンスローラ、17
は該インピーダンスローラを回動可能に支持する
インピーダンスローラ支持レバーで、該レバーは
支軸18に回動可能に支持されトーシヨンバネ1
9により時計方向に付勢されている。20は該イ
ンピーダンスローラ支持レバー上に配された全巾
消去ヘツド、21は該全巾消去ヘツドの近傍に支
持された固定ガイドポストである。
22は音声及びコントロール信号録再ヘツド、
23,24は該録再ヘツドの両側に配された固定
ガイドポストで、これらは録再ヘツド支持ブロツ
ク25に支持されている。
更に、26,27は中間ガイドポストで、シヤ
ーシ前方にL字状に突出する支持板28の内方に
突出して配されている。29は両中間ガイドポス
ト26,27間に配され円筒状の筒体内にセンサ
ーコイルを内蔵するテープエンドセンサーで供給
リール側のテープ終端を検出する。
次に本実施例におけるローデイング機構につい
て説明する。本実施例のローデイング機構はテー
プをカセツト4内より横方向に引出す動作及び引
出したテープをガイドシリンダ14,15に所定
角度巻付ける動作を、3本の回動アームを回動可
能に支持する移動体の直線的移動によりすべて行
なうことを特徴とする。
まず、直線移動機構について第2図、第3図及
び第4図に従つて説明する。30はシヤーシ下方
の水平方向に配置されたウオームギヤで、両端が
軸受31,32により支持されており、該ウオー
ムギヤの一端と軸受31との間には駆動ギヤ33
が設けられている。そして、該駆動ギヤは図示省
略した駆動モータにより駆動される。34は前記
ウオームギヤ30に螺合する移動ブロツクで、そ
の内周面にはウオームホイルの機能に相当するネ
ジ山が切られており、更に両側には断面コ字状の
溝34a,34aが設けられている。34b,3
4cは該移動ブロツク上に設けられ後述の第2、
第3回動アームを係止する係止部材及び板バネで
ある。35,36,37は該移動ブロツクを支持
する支持レールで、該移動ブロツクの両側に対向
して挾持部35a,36a,37aが突出し前記
溝34a,34aに嵌合することにより挾持す
る。該支持レールは3部分より構成され、すなわ
ち、第1の部分35は移動ブロツク34を下方か
ら支持し、水平方向に連続して形成され、移動ブ
ロツク34を上方から支持する支持レールは中央
付近で第2部分36と第3部分37とに分割され
中間で欠除しているが、この欠除部分は移動ブロ
ツク34の全長より短いので移動には何ら支障は
ない。
よつて、ウオームギヤ30の正逆回転により移
動ブロツク34はシヤーシの左端から右端まで両
方向に移動可能となつている。
次に前記移動ブロツク上に支持される回動アー
ムについて説明する。38,39,40は夫々第
1、第2及び第3回動アームで、シヤーシ面に近
い方から順次重ねられて移動ブロツク34上の支
軸34dに夫々回動可能に軸支される。
第1回動アーム38は先端付近に長孔38a及
び突起38bを有し、その上方に第1スライド板
41及び第1ガイドブロツク42が重ねられ、下
方から第1ガイドフランジ43の係止ピン43a
が第1回動アーム38の長孔38a及び第1スラ
イド板41の透孔41aを連通して第1ガイドブ
ロツク42に嵌合する。また、前記第1回動アー
ム38上の突起38bが第1スライド板41の長
孔41bに遊嵌する。更に、第1回動アーム38
と第1スライド板41との間には発条44,44
が張架されており、第1スライド板41は第1回
動アーム38に対して前方へ突出する方向へ付勢
され係止ピン43a及び突起38bが夫々長孔3
8a,41bの端部に当接して係止される。前記
第1ガイドブロツク42は第1スライド板41に
対して係止ピン43aを中心に回動可能である
が、第1スライド板41上の突起41cが第1ガ
イドブロツク下面に形成された円弧状切欠き(図
示省略)に遊嵌することによつて回動角度が規制
され、更に発条45の時計方向への付勢により通
常状態では係止されている。よつて通常状態では
第1回動アーム38、第1スライド板41及び第
1ガイドブロツク42は一体となつている。ま
た、43bは第1ガイドフランジ43の一部を構
成するフランジ部、43cは同じくガイド突起で
ある。
第2回動アーム39も前記第1回動アーム38
の構造と略同様になつており、若干第1回動アー
ム38より全長が短かくなつている。すなわち、
ネジ46が第2回動アーム39の長孔39a及び
第2スライド板47の透孔47aを連通して第2
ガイドブロツク48の底部に螺合し、第2回動レ
バー39上の突起39bが第2スライド板47の
長孔47bに遊嵌する。そして、第2回動アーム
39と第2スライド板47との間に発条49が張
架され、更に移動ブロツク34との間にも発条5
0が張架される。また、第2回動アーム39下面
には係合ピン39c及び第2ガイドフランジ39
d、側面には突出片39eが突出している。よつ
て第2回動アーム39、第2スライド板47及び
第2ガイドブロツク48も通常状態では一体とな
つて係止されている。
前記第1、第2ガイドブロツク42,48上に
は夫々所定のテープパスを形成する第1、第2ガ
イドピン51,52及び所定角度傾斜したガイド
シリンダ14,15にテープを装架すべく傾斜し
た第1、第2傾斜ピン53,54が配されてい
る。
一方、第3回動アーム40は前記第2回動アー
ム39より更に全長が短く、先端に所定のテープ
パスを形成する第3ガイドピン55及び他端近傍
に係合ピン40aが突出し、該係合ピンと前記支
軸34d間にトーシヨンバネ56が張架される。
40bは前記第3ガイドピンと同軸上に配された
ローラである。
次に前記回動アームをアンローデイング位置か
らローデイング位置まで案内するガイド機構につ
いて第2図及び第3図により説明する。
57はシヤーシ下端よりL字状に突出する第1
ガイド板で、端部に第1、第2カム面57a,5
7bが形成されており、該第1、第2カム面には
前記第3回動アームの係合ピン40aが係合し第
3ガイドピン55を移動ブロツク34の移動に伴
ないカセツト4の切欠4a内から所定経路で案内
する。また該第1ガイド板上には巻取リール側の
テープ終端を検出するテープエンドセンサー58
が配されている。59は第2ガイド板で、凹所5
9a及びこれに連続して第3カム面59bが形成
されており、該凹所及び第3カム面には前記第2
回動アームの係合ピン39cが係合し、移動ブロ
ツク34の移動に伴ない第2ガイドブロツク48
をカセツト切欠き4a内から所定径路で案内す
る。60は前記第1ガイド板57内壁に設けられ
た第3ガイド板で、前記第2回動アームの係合ピ
ン39cと第2ガイド板59との係合解除後、前
記第2回動アームの突出片39eと係合し、連続
して第2回動アーム39を案内する。61は前記
録再ヘツド支持ブロツク25の近傍に設けられた
第4ガイド板であり、ローデイング完了直前で前
記第3回動アームのローラ40bと係合し、該第
3回動アームをローデイング完了位置まで案内す
る。
62は前記第1回動アーム38をアンローデイ
ング位置からローデイング完了位置まで案内する
第1ガイドレールで、略V字状の径路を形成して
おり、始点から最終点まで連続して形成される内
壁62a、始点から中間点(V字状の底部)まで
形成さる外壁62b及び中間点より所定距離隔て
た位置から終点まで形成される挾持壁62cとで
構成される。よつて、始点から中間点までは前記
両壁62a,62bが前記第1ガイドフランジの
ガイド突起43cをシヤーシと水平方向に位置規
制し、中間点から所定距離の間は移動ブロツク3
4の板バネ34cによりガイド突起43cが内壁
62aに圧接し位置規制される。それから終点ま
では、前記挾持壁62cが第1ガイドフランジ4
3のフランジ部43bを挾持しシヤーシと垂直方
向に位置規制すると共に、前記内壁62a及び挾
持壁62cの一部が前記ガイド突起43cをシヤ
ーシと水平方向に位置規制する。63は前記第2
回動アーム39をローデイング完了直前からロー
デイング完了位置まで案内する第2ガイドレール
で、前記第2ガイドフランジ39dを挾持する挾
持壁63aが連続して形成され、圧接されながら
移動する第2回動アーム39を位置規制する。
次に前述の第1及び第2回動アーム上のガイド
ブロツクをローデイング完了位置で固定する固定
ブロツクについて第5図イ,ロに従い説明する。
64は前記第1ガイドレール62の終点に配さ
れ前記第1ガイドブロツク42を所定位置に固定
する第1固定ブロツクで、第1ガイドブロツク4
2先端が嵌合するV字状の切欠き64a及び前記
インピーダンスローラ支持ブロツク17の端部が
当接し該ブロツクの回動規制を為す回動規制部6
4bを有する第1固定片64c、前記第1ガイド
フランジ43の係止ピン43aが嵌合する切欠き
64dを有する第2固定片64e及び第1ガイド
ブロツク42の突出片42aを挾持する挾持片6
4fとで構成される。65は前記第2ガイドレー
ル63の終点に配され前記第2ガイドブロツク4
8を所定位置に固定する第2固定ブロツクで、第
2ガイドブロツク48の先端の2ケ所が嵌合する
V字状の切欠き65a,65aを夫々有する固定
片65b,65b及び第2ガイドブロツク48の
突出片48aを挾持する挾持片65cとで構成さ
れる。66は支軸67に軸支され板バネをα状に
整形した圧接板で、所定角度隔てて第1及び第2
回動片66a,66bが形成されている。該圧接
板は反時計方向に回動付勢されており、常時は第
1回動片66aが前記第2固定ブロツクの切欠6
5a,65aより突出した位置にある。
次に、第2図及び第3図によりバツクテンシヨ
ン機構を説明する。
67は前記ウオームギヤ30に平行して配され
たラツク板で中央部分の長孔67aに遊嵌する支
軸68,69によりスライド可能とされている。
67bは該ラツク板の左端に設けられ前記移動ブ
ロツク34の突起34eに係合する係合片70は
該ラツク板に噛合し支軸71に軸支されたピニオ
ンギヤ、70aは該ピニオンギヤ上に形成された
円弧状切欠き、70bは前記ピニオンギヤと同軸
上に一体成形されたプーリで、シヤーシとの間に
発条72が張架され、ピニオンギヤ70を常時反
時計方向に付勢している。よつて、ラツク板67
は右方へ付勢される。73は前記支軸71に軸支
されたコ字状のバツクテンシヨンレバー、73a
は該レバーの回動端に植立されたバツクテンシヨ
ンピン、73bは前記バツクテンシヨンレバーに
設けられ前記円弧状切欠き70aに遊嵌する折曲
片、74は前記バツクテンシヨンレバーと前記ピ
ニオンギヤ間に張架された発条で、該レバーを該
ピニオンギヤに対して反時計方向に回動付勢して
いる。75はフオトカツプラより成る回動位置検
出装置でバツクテンシヨンレバー73の回動位置
によつて光の遮断量が変化し、この変化量により
供給リール台7の駆動モータ(図示省略)のブレ
ーキ量を制御することによつてテープに一定のテ
ンシヨンを付与する。尚、76はシヤーシの右端
側に設けられ前記ラツク板67の右方へのスライ
ドを規制するストツパである。
また、第2図及び第3図における77は支軸7
8に回動可能に軸支され発条79により反時計方
向に付勢される回動レバーであり、該回動レバー
の回動端には第4ガイドピン80が植立され所定
のテープパスを形成する。77aは該第4ガイド
ピンと同軸上に配され前記第3回動アーム40の
側部に摺接するローラ、81は前記回動レバー7
7の反時計方向への回動を規制するストツパであ
る。
次に以上説明した機構のローデイング及びアン
ローデイング動作についが第3図及び第6〜第1
0図に従い説明する。
まずカセツト4が装着された状態、すなわちア
ンローデイング状態では、第3図に示す如く移動
ブロツク34がウオームギヤ30上の左端に位置
しており、これによつて第1回動アーム38は第
1ガイドレール62の始点に案内され、第2回動
アーム39はその係合ピン39cが第2ガイド板
59の凹所59a係合し、第3回動アーム40は
その係合ピン40aが第1ガイド板57の第1カ
ム面57aの端部に係合している。更に回動レバ
ー77のローラ77aは第3回動アーム40の回
動端付近の側部に係合し、バツクテンシヨンレバ
ー73はラツク板67が左方に位置することによ
つて時計方向に回動した位置にある。
よつて、カセツト4の切欠き4a内には、キヤ
プスタン8、第1及び第2ガイドブロツク42,
48、第3ガイドピン55、バツクテンシヨンピ
ン73a及び第4ガイドピン80が略一列に並ん
で位置する。尚、ピンチローラレバー11は第1
ガイド板57に当接し、時計方向に回動した位置
にあり、キヤプスタン8とピンチローラ10は充
分離間している。
この状態でカセツト検出スイツチ(図示省略)
が閉じられると駆動モータ(図示省略)が正方向
駆動されウオームギヤ30が正方向に回転し始め
る。すると移動ブロツク34が支持レールにそつ
て右方へ移動し各回動アームが移動し始める。こ
れと同時に上ガイドシリンダ14が反時計方向に
回転する。
まず第1回動アーム38は第6図に示す如く先
端が第1ガイドレール62に案内されて切欠き4
a内からテープを引出し斜めに下降して行き第1
ガイドレール62の一側面欠除部分に達すると移
動ブロツク34の板バネ34cにより上方に付勢
され第1ガイドレール62の内壁62a側へ圧接
されながら案内され、第1ガイドブロツク42は
中間ガイドピン26,27と支持板28間の巾狭
部分を通過する。その後挾持壁62cに挾持され
てシヤーシと下ガイドシリンダ15間をもぐりな
がら上昇して第1ガイドブロツク42が第1固定
ブロツク64の切欠き64aに嵌合し、更に移動
ブロツク34の右方への移動により第1回動アー
ム38の先端が上方へ突き上げられるが第4図の
第1ガイドブロツク42と一体となつた第1スラ
イド板41が第1回動アーム38に対してスライ
ドすることにより第1ガイドブロツク42の位置
は変わらない。そして移動ブロツク34が右端に
まで達し検出スイツチ(図示省略)により前記駆
動モータ(図示省略)の駆動が断たれると、移動
ブロツク34が停止し、第1回動アーム38は第
1固定ブロツク64に対して所定のオーバースト
ロークを持つて停止する。よつて、第1ガイドブ
ロツク42は発条44,44の付勢により第1固
定ブロツク64に圧接されたまま位置固定され
る。
次に第2回動アーム39は第7図に示す如く移
動ブロツク34の移動により係合ピン39cが第
2ガイド板59の凹所59aから脱出し、発条5
0により移動ブロツク34側へ付勢されながら第
3カム面59bによつて切欠き4a内からテープ
を引出す。そして、第2ガイドブロツク48は第
1ガイドブロツク42と略同一の軌跡を描いて下
降し、係合ピン39cと第3カム面59bとが離
間すると突出片39eと第3ガイド板60とが係
合し、第2ガイドブロツク48は連続した直線運
動により巾狭部分まで下降する。そして突出片3
9eと第3ガイド板60とが離間した後は移動ブ
ロツク34の係止部材34bに係止され該移動ブ
ロツクと平行な状態で右方へ移動する。よつて、
第1回動アーム38と第2回動アーム39は徐々
に拡開して行く。そして第2回動アーム39は第
2ガイドレール63に圧接されながら案内されて
一部分がシヤーシと下ガイドシリンダ間にもぐり
ながら上昇し、第2ガイドブロツク48は第2固
定ブロツク65に嵌合する寸前で第5図ロに示す
圧接板66の第1回動片66aを押圧し、該圧接
板を反時計方向に回動せしめる。そして、第2ガ
イドブロツク48が切欠き65a,65aに嵌合
すると圧接板66の反時計方向への回動により第
2回動片66bが第2ガイドブロツク48の側部
を切欠き65a,65a側へ圧接する。更に移動
ブロツク34は移動して右端に達すると停止し第
2回動アーム39は第2固定ブロツク65に対し
て所定のオーバーストロークを持つて停止する。
よつて第2ガイドブロツク48は発条49の付勢
により第2固定ブロツク65に圧接される。
ここで第2回動アーム39のオーバーストロー
クは第1回動アーム38のそれより若干小さいた
め圧接力も若干弱いが、前記圧接板66の圧接と
相俟つて十分な圧接力が得られ、第2ガイドブロ
ツク48は位置固定される。
尚、第1及び第2回動アーム38,39の拡開
によりテープはガイドシリンダ14,15に所定
角度巻付けられるのであるが、第1回動アーム3
8は第2回動アーム39より先に第1固定ブロツ
ク64に位置決めされるよう設定されているの
で、テープは第1ガイドブロツク42側から徐々
に巻付けられ、すなわち上ガイドシリンダ14の
回転方向と同一方向に巻付けられるのでテープ装
架が極めてスムースに行なわれる。
次に、第3回動アーム40は第8図に示す如く
係合ピン40aが第1ガイド板57に係合してお
り、移動ブロツク34の移動により第1、第2カ
ム面57a,57bに沿つて案内され、先端の第
3ガイドピン55は前記第1、第2ガイドブロツ
ク42,48と略同一の軌跡を描いてカセツト4
の切欠き4a内からテープを引出す。そして、係
合ピン40aと第1ガイド板57とが離間した後
は、第2回動アーム同様、移動ブロツク34の係
止部材34bに係止され右方へ移動する。更に、
第4ガイド板61にローラ40bが当接すると少
許上昇し、第2回動アーム39と所定角度拡開し
て移動ブロツク34の停止により第4ガイド板6
1上で停止し、トーシヨンバネ56の付勢により
位置固定される。
この第3ガイドピン55により録再ヘツド22
及び固定ガイドポスト23,24にテープが巻付
けられる。
また、第9図に示す如く移動ブロツク34の移
動により、ラツク板67は右方へのスライドを許
容されるため、発条72により付勢されているピ
ニオンギヤ70は反時計方向に回動し、ラツク板
67を右方へスライドせしめる。そして、ピニオ
ンギヤ70に対して反時計方向に付勢されている
バツクテンシヨンレバー73も同方向に回動し始
める。よつて、バツクテンシヨンピン73aは前
記第1、第2ガイドブロツク42,48及び第3
ガイドピン55に先行してテープをカセツト4の
切欠き4aから引出す。回動するバツクテンシヨ
ンピン73aは前記巾狭部分を通過して中間ガイ
ドピン26,27にテープを巻付ける。更に、前
記ラツク板67がスライドしてストツパ76に当
接すると、移動ブロツク34との係合が解除され
る。そして、バツクテンシヨンピン73aは回動
検出装置75に係合し、ピニオンギヤ70の円弧
状切欠き70aに遊嵌する折曲片73bの回動範
囲内で動作し、テープテンシヨンを検出する。
更に、回動レバー77上の第4ガイドピン80
は、ローラ77aが発条79の付勢により第3回
動アーム40の側面に係合していることによつて
カセツト4の切欠き4a内にあるが、第3回動ア
ーム40の移動に伴ないその側面をガイドとして
回動しテープを引出す。そして、前記側面との係
合が解除された後は、ストツパ81に係合し、そ
の位置で規制される。
また、ピンチローラレバー11はピンチローラ
圧着機構(図示省略)によりローデイング完了直
前に反時計方向に回動しピンチローラ10をキヤ
プスタン8に圧着せしめる。
以上説明した如くローデイングが完了すると、
第9図に示す如く、第1回動アーム38はウオー
ムギヤ30に対して略直交に配置され、第3回動
アーム40は略平行に配され、第2回動アーム3
9は略45゜の傾斜で配される。また、各回動アー
ムの回動中心である支軸34dは、ガイドシリン
ダ14,15の軸心よりも水平方向に関してカセ
ツト4寄りに位置している。すなわち、ガイドシ
リンダ14,15に巻付けられたテープの中心点
が前記ガイドシリンダの軸心よりもカセツト4寄
りに位置している。
これによつて、第10図に示す様なテープパス
を形成する。すなわち、供給リールから繰り出さ
れたテープはまず中間ガイドポスト26,27に
より略180゜径路が変更されカセツト4との接触を
避けた後、バツクテンシヨンピン73aによりテ
ープテンシヨンが検出され、固定ガイドポスト2
1全巾消去ヘツド20、インピーダンスローラ1
6に接触する。
尚、第9図に示すインピーダンスローラ支持ブ
ロツク17は前記第1固定ガイドブロツク64の
回動規制部64bに係合するため、ガイドシリン
ダ14,15に接触することはない。そして、イ
ンピーダンスローラ16を経たテープは第1ガイ
ドピン51に案内された後、第1傾斜ガイドピン
53に所定角度巻付くことによつて、カセツト4
面に対して所定角度傾斜し、ガイドシリンダ1
4,15に案内され180゜強巻付いた後、再び第2
傾斜ガイドピン54に所定角度巻付くことによつ
て、前述のテープの傾斜が補正され第2ガイドピ
ン52を経た後、固定ガイドポスト23、録再ヘ
ツド22及び固定ガイドポスト24に接触し、略
垂直に案内され、第3ガイドピン55により略
90゜径路が変更された後、シヤーシに略平行に案
内され中間ガイドポスト26,27と支持板28
との間を通つて第4ガイドピン80に接触する。
その後、テープ走行路規制ガイドピン13を通つ
てピンチローラ10への巻込みを防止されたピン
チローラ10とキヤプスタン8間を径路て巻取リ
ールに巻取られる。
尚、このローデイング状態で記録若しくは再生
操作が為されるとキヤプスタン8及びリール台が
駆動されテープが走行され回転ヘツドにより所望
の記録、再生が行なわれるが、早送り若しくは巻
戻し操作が為されると、駆動モータ(図示省略)
の逆回転により、移動ブロツク34が第11図に
示す位置、すなわち、テープがガイドシリンダ1
4,15から離間した位置まで移動し、テープパ
スが短縮された状態で早送り、巻戻しが行なわれ
る。そして、再び記録若しくは再生操作が為され
ると前述のローデイング状態に復帰する。
また、このローデイング状態からアンローデイ
ング操作が為されるとローデイング時とは全く逆
の動作でテープがカセツト4内に収納される。
上述の如く本発明に依れば、前面操作型VTR
において、テープガイドによりテープをカセツト
内から横方向に引出しガイドシリンダに巻付ける
動作を、いわゆるMローデイングにより行ない、
且つ前記テープガイドを夫々回動アーム上に載置
し、前述の動作を各回動アームの拡開により行な
うため、テープパスを極力短かくすることがで
き、ローデイング機構が簡単となる。
また、各回動アームをカセツトに対して横方向
に移動する移動体上に軸支し、この移動体の移動
に連動して適当な案内手段により各テープガイド
を所定経路で案内することにより限られたスペー
ス内でローデイング動作を行なうこともできるた
め、コンパクトな前面操作型VTRを実現できる。 DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a cassette-type VTR suitable for use as a front-operated VTR. Household cassette-type VTRs currently on the market
The mainstream method is to raise and lower the cassette horizontally on the top of the VTR body. This is because in a cassette-type VTR, it is necessary to perform a loading operation in which the tape pulled out from the tape outlet of the cassette is wrapped around a guide cylinder containing a rotating head, so it is ideal to place the guide cylinder in front of the tape outlet of the cassette. This is because it is considered a target. On the other hand, most audio tape decks are of the front-operated type with vertically arranged cassettes. This front-operated deck makes effective use of the top space and can be stored in racks with limited height, such as component racks, making it extremely effective. It is hoped that the However, in order to realize a front-operated VTR, the loading operation described above must be performed by, for example, pulling out the tape laterally from the tape outlet of the cassette and wrapping it around a guide cylinder placed on one side of the cassette. Therefore, this loading operation has become complicated and difficult. The present invention has been devised in view of the above-mentioned points, and it is an object of the present invention to provide a cassette-type VTR that can easily realize the loading operation of a front-operated VTR. An embodiment in which the present invention is applied to a front-operated cassette type VTR will be described below with reference to the drawings. Figure 1 shows an external perspective view of the VTR, and 1 is
The VTR body has a thin structure with the height as low as possible. 2 is a front panel with a cassette holder 3 attached to one side thereof, and a cassette 4
are attached and detached using this cassette holder 3. The cassette 4 is installed in a so-called horizontal position with the tape outlet facing downward, and in a vertical position.
Further, the front panel 2 is provided with operation knobs and the like, so that various operations can be performed from the front. Next, each component will be explained according to FIGS. 2 and 3. 5, 5 are positioning pins that fit into the through holes of the cassette 4 and position the cassette; 6,
7 is a supply and take-up reel stand, 8 is a capstan located in the notch 4a of the cassette 4, 9 is a capstan motor that drives the capstan, 10 is a pinch roller, and 11 is a rotatable support for the pinch roller. This is a pinch roller support lever pivotally supported on a support shaft 12, and the pinch roller 10 is attached to the capstan 8 by a pinch roller pressure bonding mechanism (not shown).
is crimped. Reference numeral 13 designates a tape running path regulating guide pin disposed at the tip of the pinch roller support lever 11 to prevent the tape from being caught in the pinch roller 10. Reference numerals 14 and 15 have upper and lower guide cylinders around which a tape is wound for more than 180 degrees, and which are arranged on one side of the cassette 4 and are inclined in the direction of the arrow, so that only the upper cylinder rotates clockwise together with the rotary head. 16 is an impedance roller arranged to stabilize tape running, 17
is an impedance roller support lever that rotatably supports the impedance roller, and this lever is rotatably supported by a support shaft 18 and is supported by a torsion spring 1.
9, it is biased clockwise. 20 is a full-width erasing head disposed on the impedance roller support lever, and 21 is a fixed guide post supported near the full-width erasing head. 22 is an audio and control signal recording/reproducing head;
Fixed guide posts 23 and 24 are arranged on both sides of the recording/reproducing head, and these are supported by a recording/reproducing head support block 25. Furthermore, intermediate guide posts 26 and 27 are disposed to protrude inward of a support plate 28 that protrudes in an L-shape in front of the chassis. A tape end sensor 29 is disposed between the intermediate guide posts 26 and 27 and has a sensor coil built into a cylindrical body, and detects the end of the tape on the supply reel side. Next, the loading mechanism in this embodiment will be explained. The loading mechanism of this embodiment performs the operation of pulling out the tape laterally from inside the cassette 4 and the operation of winding the pulled out tape around the guide cylinders 14 and 15 at a predetermined angle. It is characterized by being performed entirely by linear movement of the body. First, the linear movement mechanism will be explained with reference to FIGS. 2, 3, and 4. A worm gear 30 is disposed horizontally below the chassis, and both ends are supported by bearings 31 and 32. A drive gear 33 is disposed between one end of the worm gear and the bearing 31.
is provided. The drive gear is driven by a drive motor (not shown). Reference numeral 34 designates a moving block that is screwed into the worm gear 30, and has a screw thread cut on its inner peripheral surface corresponding to the function of a worm wheel, and grooves 34a, 34a having a U-shaped cross section are provided on both sides. ing. 34b,3
4c is provided on the moving block and includes a second
These are a locking member and a leaf spring that lock the third rotating arm. Support rails 35 , 36 , and 37 support the moving block, and clamping portions 35a, 36a, and 37a protrude from opposite sides of the moving block and are clamped by fitting into the grooves 34a and 34a. The support rail is composed of three parts, namely, the first part 35 supports the moving block 34 from below and is formed continuously in the horizontal direction, and the support rail supporting the moving block 34 from above is located near the center. Although it is divided into a second portion 36 and a third portion 37 and is cut out in the middle, this cutout portion is shorter than the entire length of the moving block 34 , so there is no problem with movement. Therefore, the moving block 34 can be moved in both directions from the left end to the right end of the chassis by the forward and reverse rotation of the worm gear 30. Next, the rotating arm supported on the moving block will be explained. Reference numerals 38 , 39 , and 40 designate first, second, and third rotating arms, which are stacked one on top of the other in order from the one closest to the chassis surface and are rotatably supported on a support shaft 34d on the moving block 34 , respectively. The first rotating arm 38 has an elongated hole 38a and a protrusion 38b near its tip, and a first slide plate 41 and a first guide block 42 are stacked above it, and a locking pin 43a of the first guide flange 43 is inserted from below.
connects the elongated hole 38a of the first rotating arm 38 and the through hole 41a of the first slide plate 41, and fits into the first guide block 42. Further, the protrusion 38b on the first rotating arm 38 loosely fits into the elongated hole 41b of the first slide plate 41 . Furthermore, the first rotating arm 38
There are springs 44, 44 between the and the first slide plate 41 .
is stretched, and the first slide plate 41 is urged in a direction to protrude forward with respect to the first rotating arm 38 , and the locking pin 43a and the protrusion 38b are respectively inserted into the elongated hole 3.
It abuts and is locked against the ends of 8a and 41b. The first guide block 42 is rotatable about the locking pin 43a relative to the first slide plate 41 , and the protrusion 41c on the first slide plate 41 has an arc shape formed on the lower surface of the first guide block. By loosely fitting into a notch (not shown), the rotation angle is regulated, and furthermore, it is locked in the normal state by biasing the spring 45 in the clockwise direction. Therefore, in the normal state, the first rotating arm 38 , the first slide plate 41 , and the first guide block 42 are integrated. Further, 43b is a flange portion forming a part of the first guide flange 43 , and 43c is a guide protrusion. The second rotating arm 39 also includes the first rotating arm 38 .
The structure is substantially the same as that of the first rotating arm 38, and the overall length is slightly shorter than that of the first rotating arm 38 . That is,
The screw 46 connects the elongated hole 39a of the second rotation arm 39 and the through hole 47a of the second slide plate 47 to connect the second
It is screwed into the bottom of the guide block 48, and the protrusion 39b on the second rotating lever 39 is loosely fitted into the elongated hole 47b of the second slide plate 47 . A spring 49 is stretched between the second rotating arm 39 and the second slide plate 47 , and a spring 49 is also stretched between the second rotating arm 39 and the second slide plate 47.
0 is displayed. Further, an engagement pin 39c and a second guide flange 39 are provided on the lower surface of the second rotating arm 39.
d. A protruding piece 39e protrudes from the side surface. Therefore, the second rotating arm 39 , the second slide plate 47 , and the second guide block 48 are also locked together in the normal state. On the first and second guide blocks 42 and 48, there are first and second guide pins 51 and 52, respectively, which form a predetermined tape path, and guide cylinders 14 and 15 which are inclined at a predetermined angle and which are inclined to load the tape. First and second inclined pins 53 and 54 are arranged. On the other hand, the third rotating arm 40 has a shorter overall length than the second rotating arm 39 , has a third guide pin 55 forming a predetermined tape path at its tip, and an engagement pin 40a protruding near the other end. A torsion spring 56 is stretched between the dowel pin and the support shaft 34d.
40b is a roller arranged coaxially with the third guide pin. Next, a guide mechanism for guiding the rotating arm from the unloading position to the loading position will be explained with reference to FIGS. 2 and 3. 57 is a first L-shaped part that protrudes from the bottom end of the chassis.
The guide plate has first and second cam surfaces 57a and 5 at its ends.
7b is formed, and the engaging pin 40a of the third rotating arm engages with the first and second cam surfaces, and as the moving block 34 moves, the third guide pin 55 is inserted into the notch of the cassette 4. Guidance will be given along a predetermined route from within 4a. Also, on the first guide plate is a tape end sensor 58 for detecting the end of the tape on the take-up reel side.
are arranged. 59 is the second guide plate, and the recess 5
9a and a third cam surface 59b continuous thereto, and the second cam surface 59b is formed in the recess and the third cam surface.
The engagement pin 39c of the rotating arm engages with the second guide block 48 as the moving block 34 moves.
is guided along a predetermined path from inside the cassette notch 4a. Reference numeral 60 denotes a third guide plate provided on the inner wall of the first guide plate 57 , and after the engagement pin 39c of the second rotating arm and the second guide plate 59 are disengaged, the second rotating arm is rotated. It engages with the protruding piece 39e and continuously guides the second rotating arm 39 . Reference numeral 61 denotes a fourth guide plate provided in the vicinity of the pre-recording/re-head support block 25, which engages with the roller 40b of the third rotating arm just before loading is completed, and moves the third rotating arm to the loading completion position. I will guide you to. Reference numeral 62 denotes a first guide rail that guides the first rotating arm 38 from the unloading position to the loading completion position, which forms a substantially V-shaped path, and has an inner wall that is continuously formed from the starting point to the final point. 62a, an outer wall 62b formed from the starting point to the middle point (the bottom of the V-shape), and a clamping wall 62c formed from a position separated by a predetermined distance from the middle point to the ending point. Therefore, from the starting point to the intermediate point, the walls 62a and 62b position the guide protrusion 43c of the first guide flange horizontally with the chassis, and for a predetermined distance from the intermediate point, the moving block 3
The guide protrusion 43c is brought into pressure contact with the inner wall 62a by the leaf spring 34c of No. 4, and its position is regulated. From then on to the end point, the clamping wall 62c is connected to the first guide flange 4.
The inner wall 62a and a portion of the clamping wall 62c clamp the flange portion 43b of No. 3 to restrict the position in the direction perpendicular to the chassis, and a portion of the inner wall 62a and the clamping wall 62c restrict the position of the guide projection 43c in the horizontal direction to the chassis. 63 is the second
A second guide rail that guides the rotating arm 39 from just before the loading completion position to the loading completion position, and a holding wall 63a that clamps the second guide flange 39d is continuously formed, and the second rotating arm moves while being pressed against it. Regulate the position of 39 . Next, the fixing block for fixing the guide blocks on the first and second rotating arms mentioned above at the loading completion position will be explained with reference to FIGS. 5A and 5B. A first fixing block 64 is disposed at the end point of the first guide rail 62 and fixes the first guide block 42 in a predetermined position.
A V-shaped notch 64a into which the two ends fit, and a rotation restriction portion 6 in which the end of the impedance roller support block 17 contacts and restricts rotation of the block.
4b, a second fixing piece 64e having a notch 64d into which the locking pin 43a of the first guide flange 43 fits, and a clamping piece 6 that clamps the protruding piece 42a of the first guide block 42.
4f. 65 is disposed at the end point of the second guide rail 63 and is connected to the second guide block 4.
The second fixing block fixes the second guide block 8 in a predetermined position, and includes fixing pieces 65b, 65b and the second guide block 48, each having V-shaped notches 65a, 65a into which the two ends of the second guide block 48 fit. and a clamping piece 65c that clamps the protruding piece 48a. Reference numeral 66 denotes a press-contact plate which is rotatably supported by a support shaft 67 and has a plate spring shaped into an α-shape.
Rotating pieces 66a and 66b are formed. The pressure contact plate is urged to rotate counterclockwise, and normally the first rotating piece 66a is in the notch 6 of the second fixed block.
It is located at a position that protrudes from 5a and 65a. Next, the back tension mechanism will be explained with reference to FIGS. 2 and 3. Reference numeral 67 denotes a rack plate arranged parallel to the worm gear 30, and is slidable by support shafts 68 and 69 which are loosely fitted into elongated holes 67a in the central portion.
67b is a pinion gear provided at the left end of the rack plate and engaged with the protrusion 34e of the moving block 34. An engagement piece 70 is engaged with the rack plate and is pivotally supported by a support shaft 71, and 70a is a pinion gear formed on the pinion gear. The arcuate notch 70b is a pulley integrally formed coaxially with the pinion gear, and a spring 72 is stretched between it and the chassis to constantly bias the pinion gear 70 in the counterclockwise direction. Therefore, the rack board 67
is forced to the right. Reference numeral 73 denotes a U-shaped back tension lever 73a that is pivotally supported on the support shaft 71.
73b is a bent piece provided on the back tension lever and loosely fits into the arcuate notch 70a; 74 is a back tension pin installed at the pivot end of the lever; A spring stretched between the pinion gears urges the lever to rotate counterclockwise with respect to the pinion gears. Reference numeral 75 is a rotational position detection device consisting of a photo coupler, and the amount of light cutoff changes depending on the rotational position of the back tension lever 73 , and this amount of change determines the amount of braking of the drive motor (not shown) for the supply reel stand 7. A certain tension is applied to the tape by controlling the tension. Incidentally, reference numeral 76 is a stopper provided on the right end side of the chassis to restrict the sliding of the rack plate 67 to the right. In addition, 77 in FIGS. 2 and 3 is the support shaft 7.
A fourth guide pin 80 is installed at the rotating end of the rotating lever to guide a predetermined tape path. Form. 77a is a roller disposed coaxially with the fourth guide pin and slides on the side of the third rotating arm 40 ; 81 is the rotating lever 7;
This is a stopper that restricts the rotation of 7 in the counterclockwise direction. Next, the loading and unloading operations of the mechanism explained above are explained in Figures 3 and 6 to 1.
This will be explained according to Figure 0. First, in the state in which the cassette 4 is installed, that is, in the unloading state, the moving block 34 is located at the left end on the worm gear 30 , as shown in FIG. Guided to the starting point of the rail 62 , the second rotation arm 39 has its engagement pin 39c engaged with the recess 59a of the second guide plate 59, and the third rotation arm 40 has its engagement pin 40a engaged with the first guide. It engages with the end of the first cam surface 57a of the plate 57 . Further, the roller 77a of the rotating lever 77 engages with the side near the rotating end of the third rotating arm 40 , and the back tension lever 73 is moved clockwise by the rack plate 67 being positioned on the left. It is in a rotated position. Therefore, in the notch 4a of the cassette 4 , the capstan 8, the first and second guide blocks 42,
48, the third guide pin 55, the back tension pin 73a, and the fourth guide pin 80 are located substantially in a line. Note that the pinch roller lever 11 is the first
The capstan 8 and the pinch roller 10 are in a position where they are in contact with the guide plate 57 and rotated clockwise, and there is a sufficient distance between the capstan 8 and the pinch roller 10. In this state, turn on the cassette detection switch (not shown).
When closed, the drive motor (not shown) is driven in the forward direction, and the worm gear 30 begins to rotate in the forward direction. The moving block 34 then moves to the right along the support rail and each pivot arm begins to move. At the same time, the upper guide cylinder 14 rotates counterclockwise. First, the tip of the first rotating arm 38 is guided by the first guide rail 62 as shown in FIG.
Pull out the tape from inside a and lower it diagonally until the first
When the guide rail 62 reaches the missing part on one side, it is urged upward by the plate spring 34c of the moving block 34 and guided while being pressed against the inner wall 62a side of the first guide rail 62 , and the first guide block 42 is guided by the intermediate guide pin. It passes through the narrow part between 26, 27 and the support plate 28. Thereafter, the first guide block 42 is held by the holding wall 62c and moves upward while passing between the chassis and the lower guide cylinder 15, and the first guide block 42 fits into the notch 64a of the first fixed block 64 , and further moves the moving block 34 to the right. Due to the movement, the tip of the first rotating arm 38 is pushed upward, but the first slide plate 41 integrated with the first guide block 42 in FIG. The position of the 1 guide block 42 remains unchanged. When the moving block 34 reaches the right end and the drive of the drive motor (not shown) is cut off by a detection switch (not shown), the moving block 34 stops and the first rotating arm 38 moves toward the first fixed block 64. It stops after having a predetermined overstroke. Therefore, the first guide block 42 is fixed in position while being pressed against the first fixing block 64 by the urging force of the springs 44, 44. Next, as shown in FIG. 7, in the second rotating arm 39 , the engagement pin 39c escapes from the recess 59a of the second guide plate 59 due to the movement of the moving block 34 , and the spring 5
The tape is pulled out from within the notch 4a by the third cam surface 59b while being urged toward the moving block 34 by the third cam surface 59b. Then, the second guide block 48 descends in substantially the same trajectory as the first guide block 42, and when the engagement pin 39c and the third cam surface 59b are separated, the protruding piece 39e and the third guide plate 60 are engaged with each other. Then, the second guide block 48 descends to the narrow portion by continuous linear movement. and protruding piece 3
After the third guide plate 9e and the third guide plate 60 are separated, the third guide plate 60 is locked by the locking member 34b of the moving block 34 and moves to the right in parallel with the moving block. Then,
The first rotating arm 38 and the second rotating arm 39 gradually expand. Then, the second rotating arm 39 is guided while being pressed against the second guide rail 63 , and a part of it goes up between the chassis and the lower guide cylinder, and the second guide block 48 is just about to fit into the second fixed block 65. Then, the first rotating piece 66a of the pressure contact plate 66 shown in FIG. 5B is pressed to rotate the pressure contact plate counterclockwise. Then, when the second guide block 48 is fitted into the notches 65a, 65a, the second rotating piece 66b cuts out the side part of the second guide block 48 by rotating the pressure contact plate 66 in the counterclockwise direction. Press to the side. The moving block 34 further moves and stops when it reaches the right end, and the second rotating arm 39 stops after having a predetermined overstroke with respect to the second fixed block 65 .
Therefore, the second guide block 48 is pressed against the second fixed block 65 by the biasing force of the spring 49. Here, the overstroke of the second rotating arm 39 is slightly smaller than that of the first rotating arm 38 , so the pressure contact force is also slightly weaker, but together with the pressure contact of the pressure contact plate 66 , a sufficient pressure contact force is obtained, and the second The guide block 48 is fixed in position. The tape is wound around the guide cylinders 14 and 15 at a predetermined angle by expanding the first and second rotating arms 38 and 39 .
8 is set to be positioned on the first fixed block 64 before the second rotating arm 39 , the tape is gradually wound from the first guide block 42 side, that is, in the rotation direction of the upper guide cylinder 14. Since the tape is wound in the same direction as the tape, loading the tape is extremely smooth. Next, as shown in FIG. 8, the third rotating arm 40 has the engaging pin 40a engaged with the first guide plate 57 , and the movement of the moving block 34 causes the third rotating arm 40 to engage with the first and second cam surfaces 57a and 57b. The third guide pin 55 at the tip follows the same trajectory as the first and second guide blocks 42 and 48 to guide the cassette 4.
Pull out the tape from inside the notch 4a. After the engagement pin 40a and the first guide plate 57 are separated, the second rotating arm is engaged with the engagement member 34b of the moving block 34 and moved to the right. Furthermore,
When the roller 40b comes into contact with the fourth guide plate 61, it rises a little, expands at a predetermined angle with the second rotation arm 39 , and when the moving block 34 stops, the fourth guide plate 6
1, and is fixed in position by the bias of the torsion spring 56. By this third guide pin 55, the recording/reproducing head 22
A tape is then wrapped around the fixed guide posts 23 and 24. Further, as shown in FIG. 9, the movement of the moving block 34 allows the rack plate 67 to slide to the right, so the pinion gear 70 , which is biased by the spring 72, rotates counterclockwise and the rack plate 67 is allowed to slide to the right. Slide the plate 67 to the right. Then, the back tension lever 73 , which is biased counterclockwise with respect to the pinion gear 70 , also begins to rotate in the same direction. Therefore, the back tension pin 73a is connected to the first and second guide blocks 42, 48 and the third guide block.
The tape is pulled out from the notch 4a of the cassette 4 in advance of the guide pin 55. The rotating back tension pin 73a passes through the narrow portion and wraps the tape around the intermediate guide pins 26, 27. Further, when the rack plate 67 slides and comes into contact with the stopper 76 , the engagement with the moving block 34 is released. Then, the back tension pin 73a engages with the rotation detection device 75, operates within the rotation range of the bent piece 73b loosely fitted into the arcuate notch 70a of the pinion gear 70, and detects tape tension. Furthermore, the fourth guide pin 80 on the rotation lever 77
is located within the notch 4a of the cassette 4 because the roller 77a is engaged with the side surface of the third rotating arm 40 due to the urging force of the spring 79, but as the third rotating arm 40 moves, Use that side as a guide to rotate and pull out the tape. After the engagement with the side surface is released, it engages with the stopper 81 and is regulated at that position. Further, the pinch roller lever 11 is rotated counterclockwise by a pinch roller pressure bonding mechanism (not shown) just before loading is completed to press the pinch roller 10 to the capstan 8. When loading is completed as explained above,
As shown in FIG. 9, the first rotating arm 38 is arranged substantially perpendicular to the worm gear 30, the third rotating arm 40 is arranged substantially parallel to the worm gear 30, and the second rotating arm 38 is disposed substantially perpendicular to the worm gear 30 .
9 is arranged at an angle of approximately 45°. Further, the support shaft 34d, which is the rotation center of each rotation arm, is located closer to the cassette 4 than the axes of the guide cylinders 14 and 15 in the horizontal direction. That is, the center point of the tape wound around the guide cylinders 14, 15 is located closer to the cassette 4 than the axis of the guide cylinder. As a result, a tape path as shown in FIG. 10 is formed. That is, the tape fed out from the supply reel is first changed in its path by approximately 180 degrees by the intermediate guide posts 26 and 27 to avoid contact with the cassette 4 , and then the tape tension is detected by the back tension pin 73a and the tape is moved to the fixed guide. post 2
1 full width erase head 20, impedance roller 1
Contact 6. Incidentally, since the impedance roller support block 17 shown in FIG. 9 engages with the rotation restricting portion 64b of the first fixed guide block 64 , it does not come into contact with the guide cylinders 14, 15. After passing through the impedance roller 16, the tape is guided by the first guide pin 51, and then wrapped around the first inclined guide pin 53 at a predetermined angle, so that the tape is wrapped around the cassette 4.
The guide cylinder 1 is inclined at a predetermined angle with respect to the surface.
4, 15 and wrapped around 180 degrees, then the second
By wrapping the tape around the inclined guide pin 54 at a predetermined angle, the above-mentioned inclination of the tape is corrected, and after passing through the second guide pin 52, it comes into contact with the fixed guide post 23, the recording/reproducing head 22, and the fixed guide post 24, and is approximately It is guided vertically, and approximately by the third guide pin 55.
After the 90° path has been changed, the intermediate guide posts 26, 27 and the support plate 28 are guided approximately parallel to the chassis.
It comes into contact with the fourth guide pin 80 through the gap.
Thereafter, the tape passes through the tape traveling path regulating guide pin 13, passes between the pinch roller 10, which is prevented from being wound into the pinch roller 10, and the capstan 8, and is wound onto the take-up reel. Note that when a recording or reproducing operation is performed in this loading state, the capstan 8 and reel stand are driven, the tape is run, and the desired recording or reproducing is performed by the rotary head. However, when a fast forward or rewind operation is performed, , drive motor (not shown)
11 , the tape moves to the position shown in FIG.
4 and 15, and fast forwarding and rewinding are performed with the tape path shortened. Then, when a recording or reproducing operation is performed again, the above-mentioned loading state is returned. Further, when an unloading operation is performed from this loading state, the tape is stored in the cassette 4 by an operation completely opposite to that during loading. As described above, according to the present invention, a front-operated VTR
In this method, the tape is pulled out from inside the cassette in the lateral direction by the tape guide and wound around the guide cylinder by so-called M loading.
In addition, since the tape guides are placed on respective rotary arms and the above-mentioned operation is performed by expanding each rotary arm, the tape path can be made as short as possible, and the loading mechanism can be simplified. In addition, each rotating arm is pivotally supported on a movable body that moves laterally with respect to the cassette, and each tape guide is guided along a predetermined path by an appropriate guide means in conjunction with the movement of this movable body. Since the loading operation can be performed within a small space, a compact front-operated VTR can be realized.
図面はいずれも本発明の一実施例を示し、第1
図は外観斜視図、第2図は要部分解斜視図、第3
図はアンローデイング時の平面図、第4図は移動
ブロツク及び回動アームの分解斜視図、第5図
イ,ロは夫々、第1及び第2固定ブロツクの斜視
図、第6図は第1回動アームの動作説明図、第7
図は第2回動アームの動作説明図、第8図は第3
回動アームの動作説明図、第9図はローデイング
時の平面図、第10図はローデイング時のテープ
パスの説明図、第11図は巻戻し及び早送り時の
テーパーパスの説明図である。
主な図番の説明 4…カセツト、14,15…
上下ガイドシリンダ、42,48…第1、第2ガ
イドブロツク、55…第3ガイドピン、38,3
9,40…第1、第2、第3回動アーム、64,
65…第1、第2固定ブロツク。
Each of the drawings shows one embodiment of the present invention.
The figure is an external perspective view, Figure 2 is an exploded perspective view of main parts, and Figure 3 is an exploded perspective view of the main parts.
The figure is a plan view during unloading, Figure 4 is an exploded perspective view of the moving block and rotating arm, Figures 5A and 5B are perspective views of the first and second fixed blocks, respectively, and Figure 6 is the first Diagram explaining the operation of the rotating arm, No. 7
The figure is an explanatory diagram of the operation of the second rotating arm, and Figure 8 is an illustration of the operation of the third rotating arm.
FIG. 9 is an explanatory diagram of the operation of the rotating arm, FIG. 9 is a plan view during loading, FIG. 10 is an explanatory diagram of the tape path during loading, and FIG. 11 is an explanatory diagram of the tapered path during rewinding and fast forwarding. Explanation of main drawing numbers 4 ...Cassette, 14, 15...
Upper and lower guide cylinders, 42, 48...first and second guide blocks, 55...third guide pin, 38 , 3
9, 40 ...first, second, and third rotating arms, 64 ,
65...First and second fixed blocks.
Claims (1)
直交する方向における該カセツトの一側部にガイ
ドシリンダを配してなるカセツト式VTRにおい
て、前記カセツト内よりテープを引出す少なくと
も第1、第2及び第3のテープガイドと、該第
1、第2及び第3のテープガイドを夫々支持する
第1、第2、及び第3の回動アームとを備え、テ
ープ非装架状態において前記各テープガイドは前
記カセツトに設けられた切欠き内に位置し、テー
プ装架状態において、前記第1及び第2回動アー
ムの拡開によりテープを前記ガイドシリンダに所
定角度巻付けると共に前記第1及び第2回動アー
ムに対する前記第3回動アームの拡開により所定
のテープ走行経路を形成することを特徴とするカ
セツト式VTR。1. In a cassette-type VTR in which a guide cylinder is disposed on one side of the cassette in a direction substantially perpendicular to the direction in which the tape is pulled out from the cassette, at least first, second, and third guide cylinders are arranged for pulling out the tape from inside the cassette. a tape guide, and first, second, and third rotating arms that support the first, second, and third tape guides, respectively, and each of the tape guides is provided with a It is located in a notch provided in the cassette, and when the tape is loaded, the first and second rotating arms are expanded to wrap the tape around the guide cylinder at a predetermined angle, and the first and second rotating arms A cassette type VTR characterized in that a predetermined tape running path is formed by expanding the third rotating arm relative to the arm.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP56094797A JPS57208661A (en) | 1981-06-18 | 1981-06-18 | Cassette type vtr |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP56094797A JPS57208661A (en) | 1981-06-18 | 1981-06-18 | Cassette type vtr |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS57208661A JPS57208661A (en) | 1982-12-21 |
| JPH0221069B2 true JPH0221069B2 (en) | 1990-05-11 |
Family
ID=14120055
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP56094797A Granted JPS57208661A (en) | 1981-06-18 | 1981-06-18 | Cassette type vtr |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS57208661A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH05208650A (en) * | 1991-08-08 | 1993-08-20 | Trw Vehicle Safety Syst Inc | Air bag |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5487512A (en) * | 1977-12-24 | 1979-07-12 | Sony Corp | Cassette type vtr |
-
1981
- 1981-06-18 JP JP56094797A patent/JPS57208661A/en active Granted
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH05208650A (en) * | 1991-08-08 | 1993-08-20 | Trw Vehicle Safety Syst Inc | Air bag |
Also Published As
| Publication number | Publication date |
|---|---|
| JPS57208661A (en) | 1982-12-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2548992B2 (en) | Magnetic tape recording / playback device | |
| EP0068313B1 (en) | Video tape recorder | |
| US5291352A (en) | Mechanism for loading and unloading a cassette tape | |
| JPS63108552A (en) | Leader block guiding device | |
| JPH061584B2 (en) | Magnetic recording / reproducing device | |
| JPH0221069B2 (en) | ||
| JPS6341640Y2 (en) | ||
| US5021899A (en) | Tape loading apparatus for cassette tape player | |
| JPH0235377B2 (en) | ||
| US5196971A (en) | Tape loading mechanism for use in magnetic recording/reproducing apparatus having tape control features for preventing damage to tape | |
| JPH02177048A (en) | Tape guide device | |
| JP2986318B2 (en) | Magnetic recording / reproducing device | |
| JP3417185B2 (en) | Recording and playback device | |
| JP3353433B2 (en) | Tape pull-out guide mechanism | |
| JP2893987B2 (en) | Tape player | |
| JP3044809B2 (en) | Tape player | |
| JPS5823349A (en) | High speed transfer mode setting mechanism for video tape recorder | |
| EP0376242B1 (en) | Tape-loading mechanism for use in magnetic recording/reproducing apparatus | |
| JPH01125753A (en) | Magnetic recording/reproducing device | |
| JPH0810865Y2 (en) | Magnetic tape recording / playback device | |
| JPS59218658A (en) | Loading mechanism of vtr | |
| JPS6235160Y2 (en) | ||
| JPH0366742B2 (en) | ||
| JP2529494Y2 (en) | Tape pull-out mechanism in tape recorder | |
| JPH0664803B2 (en) | Magnetic recording / reproducing device |