JPH02188682A - Device for controlling operation of pump of cooling water feeding device - Google Patents

Device for controlling operation of pump of cooling water feeding device

Info

Publication number
JPH02188682A
JPH02188682A JP730389A JP730389A JPH02188682A JP H02188682 A JPH02188682 A JP H02188682A JP 730389 A JP730389 A JP 730389A JP 730389 A JP730389 A JP 730389A JP H02188682 A JPH02188682 A JP H02188682A
Authority
JP
Japan
Prior art keywords
pump
cooling water
pumps
normal
started
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP730389A
Other languages
Japanese (ja)
Inventor
Yoshitsugu Oka
岡 吉嗣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuji Electric Co Ltd
Original Assignee
Fuji Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuji Electric Co Ltd filed Critical Fuji Electric Co Ltd
Priority to JP730389A priority Critical patent/JPH02188682A/en
Publication of JPH02188682A publication Critical patent/JPH02188682A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To improve the reliability by starting both of each pair of two pumps at the time of operating a system of heat loads and switching over to a pump on standby at the time of abnormality of an ordinally operating pump. CONSTITUTION:At the time of starting a system, a pump P00 is started and judged whether in a normal condition or not. The pump is judged normal when the flow rate switch SW on a circulating passage is operated. At the time of a normal condition, a pump P01 on standby is started whereas, at the time of abnormal condition, the pump P01 is started after carrying out the indication of abnormality. Then, it is judged whether the pump P01 is normal or not and, when judged abnormal, the pump P01 is stopped. When judged normal, a pump P10 is started and the procedure of the same program as above is followed on a pair of pumps P10 and P11 and, after finishing procedures up to pumps P50 and P51, fans F0-F5 are started. Thereby, both of each pair of pumps can be checked without fail.

Description

【発明の詳細な説明】 [産業上の利用分野] この発明は、例えば冷却すべき負荷としての電算機等の
ように高信頼性を要求される熱負荷に冷却水等の冷却媒
体を熱交換器を介して供給する冷却水供給装置のポンプ
運転制御装置に関する。
[Detailed Description of the Invention] [Industrial Application Field] This invention is a method for exchanging heat with a cooling medium such as cooling water for a heat load that requires high reliability, such as a computer as a load to be cooled. The present invention relates to a pump operation control device for a cooling water supply device that supplies water through a cooling water container.

[従来の技術] この種の冷却水供給装置のポンプ運転制御装置として従
来、待機冗長しているポンプは、他方の起動しているポ
ンプが異常となったか、あるいはある一定時間ごとにし
か起動しないようになっていた。
[Prior Art] Conventionally, as a pump operation control device for this type of cooling water supply system, a pump that is on standby redundancy is activated only when the other activated pump becomes abnormal or only at certain intervals. It was like that.

[発明が解決しようとする課題] ところが従来の装置において、待機冗長しているポンプ
は起動しているポンプが異常になった場合、速やかに切
り替わり電算機等のシステム全体は運転を続行しなけれ
ばならない。しかし上記システムを起動させるとき特に
問題のない限り、待機冗長しているポンプは起動しない
ようになっていた。
[Problem to be solved by the invention] However, in conventional equipment, if the pump that is on standby becomes abnormal, the pump that is running is quickly switched over, and the entire system such as the computer must continue to operate. It won't happen. However, when starting up the system, the redundant pumps on standby were not started unless there was a particular problem.

それでも従来は一定時間ごとに強制的に待機冗長のポン
プを起動させ正常動作チエツクを行えるようになってい
た。
However, in the past, it was possible to forcibly start the standby redundant pump at regular intervals to check for normal operation.

しかし一定時間ごとの交互運転と言っても発停回数の関
係で頻繁に交/Z運転することが出来ないので−月ごと
位の某互運転が晋通であった。
However, even though it is called alternating operation at regular intervals, frequent alternating/Z-operation is not possible due to the number of starts and stops, so Shintsu has been doing alternating operation every month or so.

コノように待機冗長のポンプは正常動作のチエツクされ
るための起動の機会が少ないという問題があった。
A problem with standby redundant pumps like this one is that there are few opportunities to start them up to check whether they are operating normally.

この発明は、上記の問題を除去し、システムを稼働する
とき、すなわち例えば夜間停止していた電算機をONし
て稼働状態にするとき待機冗長のポンプの正常動作のチ
エツクを行うようにする冷却水供給装置のポンプ運転制
御装置を提供することを目的とする。
The present invention eliminates the above-mentioned problems, and when the system is operated, for example, when a computer that has been stopped at night is turned on and put into operation, the normal operation of the standby redundant pump is checked. An object of the present invention is to provide a pump operation control device for a water supply device.

[課題を解決するための手段] この発明は、熱負荷に冷却水を循環供給する循環路と、
この循環路を通して冷却水を供給ために常時運転のポン
プと待機冗長のポンプの対からなる複数台のポンプと、
冷却水が前記熱負荷から奪った熱を交換する熱交換器と
を備えてなる冷却水供給装置において、前記熱負荷に供
給される冷却水の異常を検出する冷却水異常検出装置と
、前記熱負荷であるシステムを稼働するとき前記常時運
転のポンプと前記待機冗長のポンプとを起動させる制御
手段とを備えてなるものとする。
[Means for Solving the Problems] The present invention includes a circulation path for circulating and supplying cooling water to a heat load;
In order to supply cooling water through this circulation path, a plurality of pumps consisting of a pair of constantly operating pumps and a standby redundant pump,
A cooling water supply device comprising: a heat exchanger for exchanging heat taken by cooling water from the heat load; a cooling water abnormality detection device for detecting an abnormality in the cooling water supplied to the heat load; The pump is provided with a control means for starting the always-operating pump and the standby redundant pump when operating the system as a load.

[作用] この発明によれば、いまシステムを起動させると、まず
ポンプP00を起動しついでポンプPOOが正常か否か
判別する。この判別は各循環路に取付けられた流量スイ
ッチが動作すれば正常とする。正常であれば、待機冗長
のポンプPOIを起動させ、正常でないときは異常表示
を行った少待機冗長のポンプP01を起動させる。つい
で待機冗長のポンプPotが正常か判別し正常でなけれ
ばポンプPO1を停止ヒする。正常であれば次にポンプ
PIOを起動する。ポンプPIOとポンプP11の対に
ついて、に記と回−のプログラムを行い、ついでP2O
,P21、P2O,P31、P2O。
[Operation] According to the present invention, when the system is started now, the pump P00 is started first, and then it is determined whether the pump POO is normal or not. This determination is determined to be normal if the flow rate switch attached to each circulation path operates. If it is normal, the standby redundant pump POI is started, and if it is not normal, the low standby redundant pump P01 that displayed the abnormality display is started. Next, it is determined whether the standby redundant pump Pot is normal or not, and if it is not normal, the pump PO1 is stopped. If normal, pump PIO is started next. For the pair of pump PIO and pump P11, perform the program described in and again, and then
, P21, P2O, P31, P2O.

P41、P2O,P51はそれぞれ2台対になって、循
環路L2〜L6に設けられている冷却水循環用ポンプP
20とP21、P2OとP31、P2OとP41、P2
OとP51について上記と同一のプログラムを行い、終
了した後ファンFO〜F5を起動させる。
P41, P2O, and P51 each form a pair of cooling water circulation pumps P provided in the circulation paths L2 to L6.
20 and P21, P2O and P31, P2O and P41, P2
The same program as above is performed for O and P51, and after completion, fans FO to F5 are started.

このようにシステムを稼働させるときには各対の2台の
ポンプの双方を必ず起動させ、双方のポンプが正常か否
かチエツクする◎ [実施例] 第1図はこの発明の実施例を示す配管系の構成図である
。また第2図は第1図に対する制御系のブロック図であ
り、第1図において10〜15は電算機等高度の信頼性
が要求されている熱負荷、L1〜L6はそれぞれこの各
熱負荷lO〜15へ供給される冷却媒体である冷却水の
循環路、20〜25は熱交換器、POO,POIは2台
対になって循環路Ll内に設けられた冷却水循環用ポン
プであり、PIO,pH、P2O,P21、P2O、P
31、P2O,P41、およびP2O。
When operating the system in this way, be sure to start both of the two pumps in each pair and check whether both pumps are normal. [Example] Figure 1 shows a piping system showing an example of this invention. FIG. Fig. 2 is a block diagram of the control system for Fig. 1. In Fig. 1, 10 to 15 are heat loads such as computers that require a high degree of reliability, and L1 to L6 are each heat load lO 20 to 25 are heat exchangers, POO and POI are two pairs of pumps for circulating cooling water installed in the circulation path Ll, and PIO , pH, P2O, P21, P2O, P
31, P2O, P41, and P2O.

P51はそれぞれ2台対になって、循環路L2〜L6に
設けられている冷却水循環用ポンプであり、この対のポ
ンプ内の1台が常時運転され、他方のものが冗長のもの
として待機状態にある。
P51 is a pair of cooling water circulation pumps that are installed in the circulation paths L2 to L6, and one of the pumps in this pair is always operated, and the other is on standby as a redundant pump. It is in.

FO〜F5は前記熱交換器20〜25を風冷するための
ファンであり、SWI〜SW5は異常検知のためにそれ
ぞれ各循環路に設けられた流にスイッチである。そして
30はタンクである。
FO to F5 are fans for air cooling the heat exchangers 20 to 25, and SWI to SW5 are flow switches provided in each circulation path for abnormality detection. And 30 is a tank.

第2図において31はポンプPOO,POI。In FIG. 2, 31 are pumps POO and POI.

PIO,pH,P2O,P21.P2O,P31、P2
O,P41、P2OおよびP51と、ファンFO〜F5
を制御する制御部である。
PIO, pH, P2O, P21. P2O, P31, P2
O, P41, P2O and P51, and fans FO to F5
This is a control unit that controls the

以下第3図のフローチャートを参照しながら第1図、第
2図に示す装置の作用を説明する。
The operation of the apparatus shown in FIGS. 1 and 2 will be explained below with reference to the flowchart shown in FIG.

このような構成において、いまシステムが起動すると、
まずステップ1でポンプP00を起動しついでステップ
2でポンプP00が正常か否か判別する。この判別は各
循環路に取付けられた流量スイッチが動作すれば正常と
する。正常であれば、ステップ3において待機冗長のポ
ンプP01を起動させ、正常でないときはステップ4に
おいて異常表示を行った後ステップ3で待機冗長のポン
プPOIを起動させる。ついでステップ5において待機
冗長のポンプPOIが正常か否か判別し、正常でなけれ
ばステップ6においてポンプPOIを停止する。
In this configuration, when the system starts up,
First, in step 1, the pump P00 is started, and in step 2, it is determined whether the pump P00 is normal. This determination is determined to be normal if the flow rate switch attached to each circulation path operates. If it is normal, the standby redundant pump P01 is started in step 3, and if it is not normal, an abnormality is displayed in step 4, and then the standby redundant pump POI is started in step 3. Next, in step 5, it is determined whether the standby redundant pump POI is normal or not, and if it is not normal, the pump POI is stopped in step 6.

正常であれば、ステップ11においてポンプP10を起
動してポンプPIOとポンプpHの対について上記ステ
ップ1からステップ6と同一のプログラムのステップ1
1からステップ16を行い、ついでそれぞれ2台対にな
って循環路L2〜L6に設けられている冷却水循環用ポ
ンプP20とP21、P2OとP31、P2OとP41
、・P2OとP51について上記ステップ1からステッ
プ6と同一のプログラムのステップ21からステップ2
6と、ステップ31からステップ36と、ステップ41
からステップ46とを行い終−rした後ファンFO〜F
5を起動させる。
If normal, start pump P10 in step 11, and perform step 1 of the same program as steps 1 to 6 above for the pair of pump PIO and pump pH.
1 to step 16, and then the cooling water circulation pumps P20 and P21, P2O and P31, and P2O and P41, which are provided in pairs in the circulation paths L2 to L6, respectively.
, ・Steps 21 to 2 of the same program as steps 1 to 6 above for P2O and P51
6, step 31 to step 36, and step 41
After performing step 46 and finishing -r, the fans FO~F
5.

このようにすることによりシステムを稼働させるときに
は各対の2台のポンプの双方を必ず起動させて正常かチ
エツクすることができる。
By doing this, when operating the system, both of the two pumps in each pair can be started without fail to check whether they are normal.

[発明の効果] この発明によれば、熱負荷となるシステムを稼働させる
ときに各対の2台のポンプの双方を必ず起動させ、双方
のポンプが正常か否かチエツクするので、常時運転のポ
ンプが異常になったとき、確実に待機冗長のポンプに明
り替わるか否かが事前に確認でき、より信頼性のあるシ
ステムを構成することができる。
[Effects of the Invention] According to the present invention, when operating a system that is a heat load, both of the two pumps in each pair are always started and a check is made to see if both pumps are normal, thereby reducing constant operation. When a pump becomes abnormal, it can be confirmed in advance whether or not a standby redundant pump will reliably be used, making it possible to configure a more reliable system.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図はこの発明の実施例を示す配管系の構成図、第2
図は第1図に対する制御系のブロック図、第3図はこの
発明のプログラムを示すフローチャートである。 10〜15・・・熱負荷、20〜25・・・熱交換器、
31・・・制御部、POO,Pot、PIO,pH。 P2O,P21.P2O,P31.P2O,P41、P
2O,P51・・・冷却水循環用ポンプ、SWI〜SW
5・・・流晴スイッチ、L1〜L6・・・循I:n O
りoフF2 第2因
Fig. 1 is a configuration diagram of a piping system showing an embodiment of this invention;
This figure is a block diagram of the control system for FIG. 1, and FIG. 3 is a flowchart showing the program of the present invention. 10-15...Heat load, 20-25...Heat exchanger,
31...Control unit, POO, Pot, PIO, pH. P2O, P21. P2O, P31. P2O, P41, P
2O, P51...Cooling water circulation pump, SWI~SW
5... Sunny switch, L1-L6... Circulation I: n O
RiofF2 2nd cause

Claims (1)

【特許請求の範囲】[Claims] 1)熱負荷に冷却水を循環供給する循環路と、この循環
路を通して冷却水を供給ために常時運転のポンプと待機
冗長のポンプの対からなる複数台のポンプと、冷却水が
前記熱負荷から奪った熱を交換する熱交換器とを備えて
なる冷却水供給装置において、前記熱負荷に供給される
冷却水の異常を検出する冷却水異常検出装置と、前記熱
負荷であるシステムを稼働するとき前記常時運転のポン
プと前記待機冗長のポンプとを起動させる制御手段とを
備えてなることを特徴とする冷却水供給装置のポンプ運
転制御装置。
1) A circulation path that circulates and supplies cooling water to the heat load, a plurality of pumps consisting of a pair of constantly operating pumps and a standby redundant pump to supply cooling water through this circulation path, and a plurality of pumps that supply the cooling water to the heat load. A cooling water supply device comprising a heat exchanger for exchanging heat taken from the heat load, a cooling water abnormality detection device for detecting an abnormality in the cooling water supplied to the heat load, and a system operating the heat load. 1. A pump operation control device for a cooling water supply device, comprising: control means for starting the constantly operating pump and the standby redundant pump.
JP730389A 1989-01-13 1989-01-13 Device for controlling operation of pump of cooling water feeding device Pending JPH02188682A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP730389A JPH02188682A (en) 1989-01-13 1989-01-13 Device for controlling operation of pump of cooling water feeding device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP730389A JPH02188682A (en) 1989-01-13 1989-01-13 Device for controlling operation of pump of cooling water feeding device

Publications (1)

Publication Number Publication Date
JPH02188682A true JPH02188682A (en) 1990-07-24

Family

ID=11662251

Family Applications (1)

Application Number Title Priority Date Filing Date
JP730389A Pending JPH02188682A (en) 1989-01-13 1989-01-13 Device for controlling operation of pump of cooling water feeding device

Country Status (1)

Country Link
JP (1) JPH02188682A (en)

Similar Documents

Publication Publication Date Title
JP5593838B2 (en) Computer room air conditioning system, redundant controller
EP1988442A1 (en) Maintenance guidance display device, maintenance guidance display method, and maintenance guidance display program
JPH02188682A (en) Device for controlling operation of pump of cooling water feeding device
KR100279204B1 (en) Dual Controlling Method of Local Controller for An Automatic Control System and an Equipment thereof
JPH0944203A (en) Redundancy control system
CN115342492A (en) Method and device for controlling multi-split air conditioner and multi-split air conditioner
JP3473336B2 (en) Air conditioner
JPH04299720A (en) Electronic computer containing working environment securing function
JPH02204809A (en) Centralized cooling control method for complex heat load
JPH0612154A (en) Battery backup system
JPS61112534A (en) Control system of power supply
JPS61125634A (en) System for monitoring and controlling abnormality
JPS62281781A (en) Monitoring method for accident information
JPH1026429A (en) Air conditioner
JP2000347758A (en) Information processor
JPH04153810A (en) Abnormality processing system
JPS62222794A (en) Centralized controller
JPH08314578A (en) Electronic device of multiprocessor
JPH11191016A (en) Degenerative switching method for multiple processors
JPH01123973A (en) Redundancy device for distributed loop type refrigerant feeder
JP2941286B2 (en) Power control method
CN117113835A (en) Information prediction method, device and equipment of thermodynamic system and storage medium
JPH04183982A (en) Redundant pump switching system
CN115978715A (en) Emergency control method and device for exhaust temperature sensor fault and air conditioner
JPS5822469A (en) Central monitoring controller