JPH0215712B2 - - Google Patents

Info

Publication number
JPH0215712B2
JPH0215712B2 JP2523481A JP2523481A JPH0215712B2 JP H0215712 B2 JPH0215712 B2 JP H0215712B2 JP 2523481 A JP2523481 A JP 2523481A JP 2523481 A JP2523481 A JP 2523481A JP H0215712 B2 JPH0215712 B2 JP H0215712B2
Authority
JP
Japan
Prior art keywords
mortar
level
ring
base plate
horizontal plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP2523481A
Other languages
Japanese (ja)
Other versions
JPS57140474A (en
Inventor
Hiroto Gomi
Kuniharu Kikuma
Harukatsu Kadoya
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OKABE KK
Original Assignee
OKABE KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OKABE KK filed Critical OKABE KK
Priority to JP2523481A priority Critical patent/JPS57140474A/en
Publication of JPS57140474A publication Critical patent/JPS57140474A/en
Publication of JPH0215712B2 publication Critical patent/JPH0215712B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【発明の詳細な説明】 鉄骨柱建方の基準となる鉄骨柱のベースプレー
トが接触するコンクリート面を一度に水平で平滑
に仕上げることは施工上困難なため、従来、所要
のコンクリート上面の位置よりも25mm〜50mm程度
下りにコンクリートを打止めてその基礎コンクリ
ートの上面を十分目荒しした後、所定の高さまで
モルタルを塗つてその上面を水平で平滑に仕上げ
る方法が用いられている。これは一般にベースモ
ルタルと呼ばれて、その方法には、(1)全面塗り仕
上げ工法と、(2)あと詰め中心塗り工法の2方法が
ある。すなわち、 (1) 全面塗り仕上げ工法は、第11図に示すよう
に打込んだ基礎コンクリートイ上全面にモルタ
ルロを塗つてそのモルタルロの表面を水平で平
滑に仕上げた後、鉄骨柱のベースプレートハの
通孔をアンカーボルトニに嵌合してベースプレ
ートハをモルタルロ上に置き、アンカーボルト
ニのねじに螺合したナツトホによつてベースプ
レートハをモルタルロ上に締付け固定する方
法。
[Detailed Description of the Invention] Since it is difficult in construction to finish the concrete surface in contact with the base plate of a steel column, which is the standard for constructing a steel column, at once to be horizontal and smooth, conventionally, the position of the concrete top surface was The method used is to pour concrete down about 25mm to 50mm, sufficiently roughen the top surface of the foundation concrete, and then apply mortar to a specified height to make the top surface level and smooth. This is generally called base mortar, and there are two methods for doing so: (1) full-surface coating and (2) backfill center coating. In other words, (1) the full-surface coating finishing method involves applying mortar over the entire surface of the poured foundation concrete as shown in Figure 11, finishing the surface of the mortar to be horizontal and smooth, and then applying the mortar to the base plate of the steel column. A method of fitting the through holes to the anchor bolts, placing the base plate on the mortar plate, and tightening and fixing the base plate on the mortar plate using the nuts screwed into the screws of the anchor bolts.

(2) あと詰め中心塗り工法は、第12図に示すよ
うに、打込んだ基礎コンクリートイ上に適当高
さで円形状の通称、モルタルまんじゆうヘを置
き、鉄骨柱のベースプレートハの通孔をアンカ
ーボルトニに嵌合してベースプレートハをモル
タルまんじゆうヘ上に置いた後、そのモルタル
まんじゆうヘを支点として鉄骨柱の建入れ直し
を行うと共に、アンカーボルトニのねじに螺合
したナツトホをベースプレートハに締付けてベ
ースプレートハをアンカーボルトニに固定し、
その後、図示していないが、ベースプレートハ
の周辺部下方の基礎コンクリートイとの間の空
間部内にモルタルを詰込む方法。
(2) As shown in Fig. 12, in the post-filling center coating method, a circular mortar mange (commonly known as a mortar mange) is placed at an appropriate height on top of the poured foundation concrete, and the base plate of the steel column is filled through the base plate. After fitting the holes to the anchor bolts and placing the base plate on top of the mortar grooves, rebuild the steel column using the mortar grooves as a fulcrum, and screw the anchor bolts into the screws. Tighten the nuts to the base plate and fix the base plate to the anchor bolts.
After that, although not shown, mortar is packed into the space between the base plate A and the foundation concrete below the periphery.

である。It is.

ところで、上記(1)の方法においては、鉄骨柱の
建入れのとき、その建入れ直しが困難であるた
め、モルタルロの上面の水平および平滑の仕上げ
に高い精度が要求される。従つて十分な施工管理
が必要になるが、完全にすべてのモルタルロの上
面のレベルを揃えて仕上げることは不可能に近
い。一方、上記(2)の方法においては、鉄骨柱のベ
ースプレートハの周辺部下方がモルタルで仕上げ
らていなく空間になつているので、鉄骨柱の建入
れ直しを容易に行うことができる便利さはある。
しかし、モルタル部が小さくて不安定なために、
鉄骨柱の建入れ直しのときに鉄骨柱の荷重がモル
タルまんじゆうヘの端部に集中し、その荷重によ
つてモルタルまんじゆうヘの端部が崩れ、モルタ
ルまんじゆうヘの破壊を生じて鉄骨柱が転倒する
危険がある。
By the way, in the method (1) above, when a steel column is erected, it is difficult to re-erect it, so high precision is required for horizontal and smooth finishing of the upper surface of the mortar. Therefore, sufficient construction management is required, but it is nearly impossible to finish the top surfaces of all mortar roofs at the same level. On the other hand, in method (2) above, the lower part of the periphery of the base plate of the steel column is not finished with mortar and is open, so it is convenient that the steel column can be easily rebuilt. .
However, because the mortar part is small and unstable,
When a steel column is being reerected, the load of the steel column is concentrated at the end of the mortar ridge, and the end of the mortar ridge collapses due to the load, causing the mortar ridge to break. There is a risk of the steel column falling over.

而して、上記のように、鉄骨柱のベースにはモ
ルタルが主として使用されるが、これはモルタル
の圧縮強度が大である上に、取扱いが簡単で、安
価に施工できることによつている。しかし、従来
の上記(1)(2)の何れの方法においても、最も重要な
レベルを出す作業に大きな労力を伴う上に、作業
が作業者の技量に左右される欠点があつた。
As mentioned above, mortar is mainly used for the base of steel columns because mortar has high compressive strength, is easy to handle, and can be constructed at low cost. However, both of the conventional methods (1) and (2) above have the disadvantage that the work to achieve the most important level requires a large amount of effort and that the work is dependent on the skill of the worker.

そこで本発明は、基礎コンクリート上に水平プ
レートを水平に設置して該水平プレート上には、
2個のリングをねじ嵌合してなるレベルリングを
置き、そのレベルリングの1方のリングを回転し
て簡易にレベルリングの天端位置のレベル調整を
行い、レベル調整後、レベルリング内にモルタル
を充填して該モルタルの上面をレベルリングの天
端と合致するように均らし、そのレベルリング上
に鉄骨柱のベースプレートを置くようにして上記
のベースモルタルの欠点を改良したことを特徴と
する鉄骨柱のベースプレートのレベル出し方法お
よびそのレベル出し金物に係るものである。
Therefore, in the present invention, a horizontal plate is installed horizontally on the foundation concrete, and on the horizontal plate,
Place a level ring made by screwing together two rings, rotate one ring of the level ring to easily adjust the level of the top position of the level ring, and after adjusting the level, place the ring inside the level ring. The above-mentioned drawbacks of the base mortar are improved by filling mortar, leveling the top surface of the mortar so that it matches the top of the level ring, and placing the base plate of the steel column on top of the level ring. The present invention relates to a method for leveling the base plate of a steel column and its leveling hardware.

第1図乃至第10図に示す本発明の一実施態様
についてその構造を説明すれば、aはレベル出し
金物のレベルリングで、鋼管をねじ加工してなる
雄ねじリング1と雌ねじリング2とより成り、そ
の雄ねじリング1を雌ねじリング2に螺合し、雄
ねじリング1の上縁部は、鉄骨柱の荷重によつて
破壊するのを防止するためにフランジ3を設け肉
厚にしてレベルリングaを構成する。4は水平プ
レートで、横長方形鉄板の両側部に開放部が内側
に向かうコ形切目を入れ、その切目内の部分を切
目の内側端から上方へ折曲して支持片5を装設す
ると共に、両側支持片5にレベルリングaの下端
部が嵌合するようになし、鉄板の中央部には数個
のモルタル通孔6を穿設して水平プレート4を作
製する。
To explain the structure of one embodiment of the present invention shown in FIGS. 1 to 10, a is a leveling ring of a leveling hardware, which is composed of a male threaded ring 1 and a female threaded ring 2 made by threading a steel pipe. , the male threaded ring 1 is screwed into the female threaded ring 2, and the upper edge of the male threaded ring 1 is provided with a flange 3 and made thick to prevent it from breaking due to the load of the steel column, and a level ring a is formed. Configure. Reference numeral 4 denotes a horizontal plate, in which a U-shaped cut is made on both sides of a horizontal rectangular iron plate with the open part facing inward, and the part inside the cut is bent upward from the inner end of the cut to install a support piece 5. The horizontal plate 4 is manufactured by fitting the lower ends of the level rings a into the supporting pieces 5 on both sides, and by drilling several mortar holes 6 in the center of the iron plate.

7は打込んだ基礎コンクリート、8はその基礎
コンクリート7内に埋設したアンカーボルト、9
はアンカーボルト8のねじに螺合したナツト、1
0は基礎コンクリート7上に置いたモルタル、1
1はレベルリングa内に充填したモルタル、12
は鉄骨柱のベースプレート、13は全面塗り仕上
げ工法によるベースモルタルである。
7 is the poured foundation concrete, 8 is the anchor bolt buried in the foundation concrete 7, 9
is a nut screwed into the thread of anchor bolt 8, 1
0 is mortar placed on foundation concrete 7, 1
1 is mortar filled in level ring a, 12
13 is the base plate of the steel column, and 13 is the base mortar made using the full coating finishing method.

次にそのレベル出し方法を説明する。 Next, I will explain how to level it up.

(i) 第6図に示すように、数本のアンカーボルト
8の内方のほぼ中央位置において基礎コンクリ
ート7上に適当量のモルタル10を置く。
(i) As shown in FIG. 6, place an appropriate amount of mortar 10 on the foundation concrete 7 at approximately the center position inside several anchor bolts 8.

(ii) 次に、第7図に示すように、モルタル10上
に水平プレート4を置き、該水平プレート4上
に水準器等を置く等して水平プレート4を水平
に設置する。
(ii) Next, as shown in FIG. 7, the horizontal plate 4 is placed on the mortar 10, and a spirit level or the like is placed on the horizontal plate 4 to horizontally install the horizontal plate 4.

その際、モルタル10が水平プレート4の数
個のモルタル通孔6内に入り込み固結して水平
プレート4は基礎コンクリート7上に固定す
る。
At this time, the mortar 10 enters and solidifies into several mortar holes 6 of the horizontal plate 4, and the horizontal plate 4 is fixed on the foundation concrete 7.

(iii) 次いで、第8図に示すように、水平プレート
4の両側支持片5にレベルリングaの下端部を
嵌合させ、水平プレート4上にレベルリングa
を立てて置いた後、適宜にその上方に位置する
雄ねじリング1を一方または他方へ回転し、そ
の雌ねじリング2との螺合により雄ねじリング
1を上昇または下降させてレベルリングaを伸
縮し、該レベルリングaの天端位置のレベル調
整を行つてその天端を所定の位置に配置すれ
ば、該天端は所定高さの位置において水平にな
つている。
(iii) Next, as shown in FIG.
After placing it upright, rotate the male threaded ring 1 located above it to one side or the other as appropriate, raise or lower the male threaded ring 1 by screwing it with the female threaded ring 2, and expand and contract the level ring a, If the level of the top end of the level ring a is adjusted and the top end is placed at a predetermined position, the top end becomes horizontal at a predetermined height.

その際、水平プレート4の両側支持片5とレ
ベルリングaの下端部の接触により、レベルリ
ングaが移動したり、その雌ねじリング2が共
廻りしてレベルリングaが空回転することな
く、雄ねじリング1を回転させてレベルリング
aの天端位置のレベル調整操作を容易に行うこ
とができる。
At this time, due to the contact between the support pieces 5 on both sides of the horizontal plate 4 and the lower end of the level ring a, the level ring a does not move or its female thread ring 2 rotates together, preventing the level ring a from rotating idly. By rotating the ring 1, the level adjustment operation of the top position of the level ring a can be easily performed.

(iv) 次に、第9図に示すように、レベルリングa
内にモルタル11を充填し、そのモルタル11
の上面をこてで均らしてレベルリングaの天端
に合わせる。
(iv) Next, as shown in Figure 9, level ring a
Fill the inside with mortar 11, and the mortar 11
Level the top surface with a trowel and align it with the top of level ring a.

そのとき、モルタル10,11は水平プレー
ト4のモルタル通孔6内を経て互に連結され
る。
At that time, the mortars 10 and 11 are connected to each other through the mortar through holes 6 of the horizontal plate 4.

(1) あと詰め中心塗り工法。 (1) Postfill center coating method.

あと詰め中心塗り工法においては、上記(iv)
の工程の施工が終つた後、第9図に示すよう
に鉄骨柱のベースプレート12の通孔をアン
カーボルト8に嵌合してベースプレート12
をレベルリングaおよびモルタル11上に置
き、その後、そのレベルリングaを支点とし
て鉄骨柱の建入れ直しを行うと共に、アンカ
ーボルト8のねじに螺合したナツト9をベー
スプレート12に締付けてベースプレート1
2をアンカーボルト8に固定し、その後、図
示してないが、ベースプレート12の周辺部
下方の基礎コンクリート7との間の空間部内
にモルタルを詰込んで鉄骨柱の建入れを完了
する。
In the backfill center coating method, the above (iv)
After completing the construction process, as shown in FIG.
is placed on the level ring a and the mortar 11, and then the steel column is reerected using the level ring a as a fulcrum, and the nut 9 screwed into the thread of the anchor bolt 8 is tightened to the base plate 12 to remove the base plate 1.
2 to the anchor bolts 8, and then, although not shown, mortar is filled in the space between the base plate 12 and the foundation concrete 7 below the periphery, completing the erection of the steel frame column.

(2) 全面塗り仕上げ工法においては、上記(iv)の
工程の後、第10図に示すように、レベルリ
ングaの天端を基準としてベースプレート1
2の大きさに合わせ、モルタルにより上面を
レベルリングaの天端と合致させて水平で平
滑に仕上げたベースモルタル13を作製す
る。その後、鉄骨柱のベースプレート12の
通孔をアンカーボルト8に嵌合してベースプ
レート12をベースモルタル13上に置き、
アンカーボルト8のねじに螺合したナツト9
によりベースプレート12をベースモルタル
13上に締付け固定して鉄骨柱の建入れを完
了する。
(2) In the entire surface painting method, after the step (iv) above, as shown in Figure 10, the base plate 1 is
A base mortar 13 is prepared according to the size of the base mortar 13 whose upper surface is made horizontal and smooth by matching the top end of the level ring a with mortar. After that, the anchor bolts 8 are fitted into the through holes of the base plate 12 of the steel column, and the base plate 12 is placed on the base mortar 13.
Nut 9 screwed into the thread of anchor bolt 8
By tightening and fixing the base plate 12 onto the base mortar 13, the erection of the steel column is completed.

なお、上記レベルリングaの雄ねじリング1の
フランジ3は必ずしも設けなくてもよい。
Note that the flange 3 of the male threaded ring 1 of the level ring a does not necessarily need to be provided.

レベルリングaは、上記と上下反対にして使用
しても同様に作用する。
The level ring a works in the same way even if it is used upside down.

レベルリングaの天端または下端、あるいはそ
れらの両端に、半径方向に向う回転操作用の凹溝
を設けたり、レベルリングaの上端部または下端
部、あるいは上下両端部に回転操作杆の挿入孔、
あるいは回転操作用の突片を装設すると、操作杆
を上記凹溝に係合し、または挿入孔に挿入して操
作杆により雄ねじリング1または雌ねじリング2
を回転させ、あるいは手で突片を押して雄ねじリ
ング1または雌ねじリング2を回転させてレベル
リングaの天端位置のレベル調整操作を容易にな
すことができる。
A concave groove for rotating operation in the radial direction may be provided at the top or bottom end of the level ring a, or both ends thereof, or an insertion hole for a rotation control rod may be provided at the top or bottom end of the level ring a, or at both upper and lower ends. ,
Alternatively, if a protrusion for rotational operation is installed, the operating rod can be engaged with the groove or inserted into the insertion hole to operate the male threaded ring 1 or the female threaded ring 2.
The level adjustment operation of the top end position of the level ring a can be easily performed by rotating the male threaded ring 1 or the female threaded ring 2 by rotating the protrusion or pushing the protrusion by hand.

レベルリングaの雄ねじリング1と雌ねじリン
グ2のねじに代え、両リングの対向面に、軸心と
傾斜する数個の突条を適当間隔にそれぞれ装設し
てそれらの突条を互いに接合させ、あるいは、1
方のリングに軸心と傾斜する数個の案内長孔を設
けて他方のリングに装設した数個の突子を上記案
内長孔内にそれぞれ嵌合させる等なし、1方のリ
ングを1方または他方へ回転させることにより、
その1方のリングが平行に上昇または下降するよ
うになしてレベルリングを構成しても上記と同様
に作用する。
Instead of the screws on the male threaded ring 1 and the female threaded ring 2 of the level ring a, several protrusions that are inclined with respect to the axis are installed at appropriate intervals on the opposing surfaces of both rings, and these protrusions are connected to each other. , or 1
One ring is provided with several guide slots that are inclined with respect to the axis, and several protrusions installed on the other ring are fitted into the guide slots. by rotating it towards one side or the other.
Even if the level ring is configured such that one of the rings rises or falls in parallel, the same effect as described above will occur.

レベルリングaの雄ねじリング1および雌ねじ
リング2は、上記鋼管に代え、他の金属や硬質合
成樹脂等によつて作製してもよい。
The male threaded ring 1 and the female threaded ring 2 of the level ring a may be made of other metals, hard synthetic resins, or the like instead of the steel pipes described above.

本発明は鉄骨柱のベースプレートのレベル出し
を上記のように行うから、水平プレートの使用に
よつてその水平プレート上に水準器等が確実に載
るので、水平プレートの水平を出し易い上に、水
平プレートを迅速適確に水平に設置することがで
き、従つてその水平プレート上に置くレベルリン
グの天端も確実に水平になる。
In the present invention, the base plate of the steel column is leveled as described above, so by using the horizontal plate, the spirit level etc. can be surely placed on the horizontal plate, so it is not only easy to level the horizontal plate, but also The plate can be quickly and accurately installed horizontally, and the top end of the level ring placed on the horizontal plate is also ensured to be horizontal.

更にレベルリングを水平プレート上に置いてそ
の一方のリングを1方または他方へ回転させる
と、該リングが上昇または下降してレベルリング
の天端が低下するから、すべての鉄骨柱の建入れ
位置におけるレベルリングをそれぞれ適宜に操作
してその天端位置のレベル調整を行うことによ
り、すべてのレベルリングの天端を適切に同一水
平面上に揃えることができ、その操作が極めて容
易で、迅速且つ円滑微細にレベル調整してすべて
の鉄骨柱を同じ高さに建入れし得る上に、水平プ
レートは水平だけを出せばよく、レベルリングは
高さだけの調整で、水平度と高さの調整が分離し
ているから、操作し易くて確実に調整することが
できる。
Furthermore, if a level ring is placed on a horizontal plate and one of the rings is rotated in one direction or the other, the ring will rise or fall and the top of the level ring will lower, so that the erection position of all steel columns can be adjusted. The tops of all level rings can be properly aligned on the same horizontal plane by appropriately operating the level rings in the table to adjust the level of their top positions, making this operation extremely easy, quick and easy. Not only can all steel columns be erected at the same height by smoothly and finely adjusting the level, but the horizontal plate only needs to be level, and the level ring can only adjust the height, making it possible to adjust the levelness and height. Since they are separated, they are easy to operate and can be adjusted reliably.

その上水平プレートおよびレベルリングは部分
的なものであるために、その芯出しが容易で、安
全に行うことができ、且つあと詰め中心塗り工法
の場合は、レベルリング内に充填したモルタルの
天端均らし作業が簡単に誰にでもでき、素人でも
そのモルタルの上面をレベルリングの天端に合わ
せて水平で平滑になし得る上に、レベルリングが
その内方のモルタルの周面の補強をなしてレベル
リングにより鉄骨柱のベースプレートを堅実に支
承し、従来のモルタルまんじゆうのように鉄骨柱
の荷重によつてモルタルの角部が崩れたり、モル
タル部が破壊することがないため、鉄骨柱の転倒
を防止し、鉄骨柱の建入れ直しを安心して安全に
行い、すべての鉄骨柱を正確に一定高さにおいて
垂直に建入れすることができる。
Furthermore, since the horizontal plate and level ring are partial, centering can be done easily and safely. Anyone can easily level the edges, and even an amateur can align the top surface of the mortar with the top of the level ring to make it level and smooth. The level ring firmly supports the base plate of the steel column, and the mortar corner does not collapse or the mortar part breaks due to the load of the steel column, unlike conventional mortar bundling. It is possible to prevent steel columns from falling over, safely and securely rebuild steel columns, and to precisely erect all steel columns vertically at a constant height.

一方、全面塗り仕上げ工法の場合は、上記と同
様にレベルリングの天端位置のレベル調整を行つ
てその中にモルタルを充填した後、レベルリング
の天端を基準として鉄骨柱のベースプレートの大
きさに合わせ、モルタルにより上面をレベルリン
グの天端と合致させてベースモルタルを水平で平
滑に仕上げると、すべての鉄骨柱の建入れ位置に
おけるベースモルタルの上面を適切に同一水平面
上に揃えて水平に形成できるから、その後鉄骨柱
のベースプレートをベースモルタル上に載せて据
付けると、すべての鉄骨柱を一定の高さにおいて
垂直に建入れすることができ、従つて、鉄骨柱建
入れの基準となるベースモルタルの施工が容易と
なる効果がある。
On the other hand, in the case of the entire surface coating method, after adjusting the level at the top of the level ring and filling it with mortar in the same way as above, the size of the base plate of the steel column is determined based on the top of the level ring. When the top surface of the base mortar is leveled and smoothed by matching the top of the level ring with mortar, the top surface of the base mortar at the erection position of all steel columns will be properly aligned and level on the same horizontal plane. Since it can be formed, if the base plate of the steel column is then placed on the base mortar and installed, all the steel columns can be erected vertically at a certain height, and therefore, it becomes the standard for erecting the steel column. This has the effect of making it easier to apply the base mortar.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明の鉄骨柱のベースプレートのレ
ベル出しに使用する1実施態様のレベル出し金物
のレベルリングの縦断正面図、第2図は同上平面
図、第3図は水平プレートの正断面図、第4図は
平面図、第5図は同上レベル出し金物の分解斜面
図、第6図乃至第10図はそのレベル出し作業の
各工程の説明正断面図で第6図は基礎コンクリー
ト上にモルタルを置いた状態、第7図は水平プレ
ートを設置した状態、第8図は水平プレート上に
レベルリングを置いた状態、第9図はレベルリン
グの天端位置のレベル調整を行つてその中にモル
タルを充填した状態、第10図はモルタルでベー
スモルタルを作製した状態をそれぞれ示す。第1
1図および第12図は従来のレベル出し作業の説
明正断面図で第11図は全面塗り仕上げ工法にお
ける状態、第12図はあと詰め中心塗り工法にお
ける状態をそれぞれ示す。 a……レベルリング、1,2……リング、4…
…水平プレート、7……基礎コンクリート、1
0,11……モルタル、12……ベースプレー
ト。
Fig. 1 is a longitudinal sectional front view of a leveling ring of a leveling hardware according to one embodiment of the present invention used for leveling a base plate of a steel column, Fig. 2 is a plan view of the same, and Fig. 3 is a front sectional view of a horizontal plate. , Fig. 4 is a plan view, Fig. 5 is an exploded slope view of the same leveling hardware, Figs. Figure 7 shows the state with the mortar placed, Figure 7 shows the state with the horizontal plate installed, Figure 8 shows the state with the level ring placed on the horizontal plate, and Figure 9 shows the inside after adjusting the level at the top of the level ring. Fig. 10 shows a state in which a base mortar is prepared using the mortar. 1st
1 and 12 are front cross-sectional views for explaining conventional leveling work, FIG. 11 shows the state in the entire surface coating finishing method, and FIG. 12 shows the state in the backfilling center coating method, respectively. a... Level ring, 1, 2... Ring, 4...
...Horizontal plate, 7...Foundation concrete, 1
0,11...Mortar, 12...Base plate.

Claims (1)

【特許請求の範囲】 1 基礎コンクリート上にモルタルを置いて水平
プレートを水平に設置し、該水平プレート上には
2個のリングをねじ嵌合してなるレベルリングを
立てて置き、その1方のリングを適宜に回転しレ
ベルリングを伸縮して天端位置のレベル調整を行
つた後、レベルリング内にモルタルを充填して該
モルタルの上面をレベルリングの天端と合致する
ように水平に均らし、そのレベルリング上に鉄骨
柱のベースプレートを置くようにしたことを特徴
とする鉄骨柱のベースプレートのレベル出し方
法。 2 両側部上に支持片を装設して中央部にモルタ
ル通孔を設け、且つ基礎コンクリート上に置いて
水平に設置する水平プレートと、2個のリングを
ねじ嵌合し上記水平プレートの両側支持片に下端
部を嵌合させて該水平プレート上に立てて置き、
且つ天端上には鉄骨柱のベースプレートを置くレ
ベルリングとよりなることを特徴とする鉄骨柱の
ベースプレートのレベル出し金物。
[Claims] 1. Mortar is placed on the foundation concrete, a horizontal plate is installed horizontally, and a level ring consisting of two rings screwed together is placed on the horizontal plate, one of which is placed vertically. After adjusting the level of the top position by rotating the ring appropriately and expanding and contracting the level ring, fill the level ring with mortar and level the top surface of the mortar so that it matches the top of the level ring. A method for leveling a base plate of a steel column, characterized in that the base plate of the steel column is leveled and the base plate of the steel column is placed on the leveling ring. 2. A horizontal plate with support pieces installed on both sides and a mortar hole in the center, and installed horizontally on the foundation concrete, and two rings fitted with screws to form a horizontal plate on both sides of the horizontal plate. Fit the lower end to the support piece and place it upright on the horizontal plate,
The hardware for leveling a base plate of a steel frame column is characterized by comprising a leveling ring on the top end of which the base plate of the steel frame column is placed.
JP2523481A 1981-02-23 1981-02-23 Leveling method and leveling metal jig of base plate of iron skeletal pillar Granted JPS57140474A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2523481A JPS57140474A (en) 1981-02-23 1981-02-23 Leveling method and leveling metal jig of base plate of iron skeletal pillar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2523481A JPS57140474A (en) 1981-02-23 1981-02-23 Leveling method and leveling metal jig of base plate of iron skeletal pillar

Publications (2)

Publication Number Publication Date
JPS57140474A JPS57140474A (en) 1982-08-31
JPH0215712B2 true JPH0215712B2 (en) 1990-04-12

Family

ID=12160282

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2523481A Granted JPS57140474A (en) 1981-02-23 1981-02-23 Leveling method and leveling metal jig of base plate of iron skeletal pillar

Country Status (1)

Country Link
JP (1) JPS57140474A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2573132B2 (en) * 1992-12-09 1997-01-22 株式会社永野工業 Apparatus and method for forming base mortar for erecting column

Also Published As

Publication number Publication date
JPS57140474A (en) 1982-08-31

Similar Documents

Publication Publication Date Title
US5561950A (en) Method and apparatus for adjustable pier block
US3289369A (en) Light standard base hold down
US3715851A (en) Anchor bolt assembly
JPH0215712B2 (en)
CN213509726U (en) Construction template adjustable support for construction
CN209457338U (en) The formwork erecting structure of terrace
JP3336367B2 (en) Steel column base structure and construction method of steel column base
JPH0433283Y2 (en)
KR20200001390U (en) Support device for precast concrete panels
JPH019884Y2 (en)
JPS5920489Y2 (en) Anchor bolt mounting structure
CN221702398U (en) Detachable support ground anchor convenient to adjust for prefabricated membrane shell wall
CN216277009U (en) Tool for prefabricated plate base film top support
JPH0355349A (en) Erection construction of handrail post
JP3396812B2 (en) Underground foundation construction material, underground foundation and its construction method
JPH0489927A (en) Block structure for construction of foundation
JPH0245347Y2 (en)
JPH04118465A (en) Positioning jig
JPH09310354A (en) Embedment type column base and its construction
JPH07113238A (en) Adjustment functional anchor bolt and sill mounting construction making use thereof
JPH0345479Y2 (en)
JPH0222182B2 (en)
JPS6041187B2 (en) How to fix the column base of pre-assembled column reinforcement
JP3001901U (en) Anchor bolt stand jig
JPH0128124Y2 (en)