JPH0215635U - - Google Patents
Info
- Publication number
- JPH0215635U JPH0215635U JP9184388U JP9184388U JPH0215635U JP H0215635 U JPH0215635 U JP H0215635U JP 9184388 U JP9184388 U JP 9184388U JP 9184388 U JP9184388 U JP 9184388U JP H0215635 U JPH0215635 U JP H0215635U
- Authority
- JP
- Japan
- Prior art keywords
- sheet pile
- steel pipe
- pipe sheet
- joint
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 29
- 239000010959 steel Substances 0.000 claims description 29
- 238000010276 construction Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Description
第1図は本考案の一実施例にかかる鋼管矢板の
概略斜視図、第2図は直線形鋼矢板の概略平面図
、第3図は直線形鋼矢板と切断線との関係を示す
概略正面図、第4図は本考案の他の実施例にかか
る鋼管矢板の概略正面図、第5図はその平面図、
第6図は本考案のもう一つの実施例にかかる鋼管
矢板の概略正面図、第7図はその平面図、第8図
および第9図は本考案にかかる鋼管矢板の建込み
状況を示す概略平面図、第10図は従来の鉄筋篭
の建込み状況を示す概略平面図、第11図は従来
の鋼管矢板の建込み状況を示す概略平面図、第1
2図はウエブに孔を有する従来の鋼管矢板の部分
概略斜視図、第13図は従来の鋼管矢板の概略平
面図である。
図において、15は鋼管矢板、16は角鋼管か
らなる鋼管矢板本体、17a〜17dは丸棒雄継
手、18a〜18dは継手アーム、19a〜19
dは双腕継手、20は孔、21は直線形鋼矢板、
22a,22bは嵌合継手、23はウエブ、24
は切断線、25は鋼管矢板、26a〜26dは双
腕継手、27a,27bはフランジ部、28は鋼
管矢板、29a,29bは双腕継手、30a,3
0bは双腕継手、31および32は溝、33は鋼
管矢板、34は隙間である。
Fig. 1 is a schematic perspective view of a steel pipe sheet pile according to an embodiment of the present invention, Fig. 2 is a schematic plan view of a linear steel sheet pile, and Fig. 3 is a schematic front view showing the relationship between the linear steel sheet pile and the cutting line. 4 is a schematic front view of a steel pipe sheet pile according to another embodiment of the present invention, and FIG. 5 is a plan view thereof,
FIG. 6 is a schematic front view of a steel pipe sheet pile according to another embodiment of the present invention, FIG. 7 is a plan view thereof, and FIGS. 8 and 9 are schematic diagrams showing the construction status of the steel pipe sheet pile according to the present invention. A plan view, Fig. 10 is a schematic plan view showing the construction situation of a conventional reinforcing bar cage, and Fig. 11 is a schematic plan view showing the construction situation of a conventional steel pipe sheet pile.
FIG. 2 is a partial schematic perspective view of a conventional steel pipe sheet pile having holes in the web, and FIG. 13 is a schematic plan view of the conventional steel pipe sheet pile. In the figure, 15 is a steel pipe sheet pile, 16 is a steel pipe sheet pile main body made of square steel pipes, 17a to 17d are round bar male joints, 18a to 18d are joint arms, 19a to 19
d is a double arm joint, 20 is a hole, 21 is a straight steel sheet pile,
22a, 22b are fitting joints, 23 is a web, 24
is a cutting line, 25 is a steel pipe sheet pile, 26a to 26d are double arm joints, 27a, 27b are flange parts, 28 is a steel pipe sheet pile, 29a, 29b are double arm joints, 30a, 3
0b is a double arm joint, 31 and 32 are grooves, 33 is a steel pipe sheet pile, and 34 is a gap.
Claims (1)
ムからなる双腕継手における鋸歯先端を固着した
鋼管矢板。 (2) 鋼管矢板本体が角鋼管もしくは丸鋼管であ
る請求項1記載の鋼管矢板。 (3) 鋼管矢板本体の両側に、直線形鋼矢板のウ
エブを鋸歯状に半截してなる継手アームからなる
双腕継手における鋸歯先端を固着した鋼管矢板。 (4) 角鋼管からなる鋼管矢板本体の両側フラン
ジ部に、直線形鋼矢板のウエブを鋸歯状に半截し
てなる継手アームからなる双腕継手における鋸歯
先端を固着した鋼管矢板。[Scope of claim for utility model registration] (1) A steel pipe sheet pile in which the serrated tips of a double-arm joint consisting of serrated joint arms are fixed to both sides of the steel pipe sheet pile body. (2) The steel pipe sheet pile according to claim 1, wherein the steel pipe sheet pile body is a square steel pipe or a round steel pipe. (3) A steel pipe sheet pile in which the sawtooth tips of a double-arm joint, which consists of a joint arm made by cutting the web of a straight steel sheet pile in half into a sawtooth shape, are fixed to both sides of the steel pipe sheet pile body. (4) A steel pipe sheet pile in which the sawtooth tips of a double-arm joint consisting of a joint arm made by cutting the web of a straight steel sheet pile in half into a sawtooth shape are fixed to the flanges on both sides of the steel pipe sheet pile main body made of square steel pipes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP9184388U JPH0419076Y2 (en) | 1988-07-13 | 1988-07-13 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP9184388U JPH0419076Y2 (en) | 1988-07-13 | 1988-07-13 |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0215635U true JPH0215635U (en) | 1990-01-31 |
JPH0419076Y2 JPH0419076Y2 (en) | 1992-04-28 |
Family
ID=31316300
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP9184388U Expired JPH0419076Y2 (en) | 1988-07-13 | 1988-07-13 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0419076Y2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05272131A (en) * | 1992-03-25 | 1993-10-19 | Nippon Steel Corp | Underground continuous wall constructing method |
-
1988
- 1988-07-13 JP JP9184388U patent/JPH0419076Y2/ja not_active Expired
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05272131A (en) * | 1992-03-25 | 1993-10-19 | Nippon Steel Corp | Underground continuous wall constructing method |
Also Published As
Publication number | Publication date |
---|---|
JPH0419076Y2 (en) | 1992-04-28 |