JPH0213240A - Controller/monitor for distribution machinery - Google Patents

Controller/monitor for distribution machinery

Info

Publication number
JPH0213240A
JPH0213240A JP16075188A JP16075188A JPH0213240A JP H0213240 A JPH0213240 A JP H0213240A JP 16075188 A JP16075188 A JP 16075188A JP 16075188 A JP16075188 A JP 16075188A JP H0213240 A JPH0213240 A JP H0213240A
Authority
JP
Japan
Prior art keywords
command
control
monitoring
monitoring device
terminal control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP16075188A
Other languages
Japanese (ja)
Other versions
JPH0832139B2 (en
Inventor
Ichiro Arinobu
有信 一郎
Hirohisa Mizuhara
博久 水原
Morizo Suda
須田 盛三
Keiji Nagamine
永峰 啓二
Masao Masuda
桝田 征男
Katsuya Sakai
勝也 酒井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP63160751A priority Critical patent/JPH0832139B2/en
Publication of JPH0213240A publication Critical patent/JPH0213240A/en
Publication of JPH0832139B2 publication Critical patent/JPH0832139B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

PURPOSE:To perform control without requiring a central controller/monitor or full knowledge of operational sequence or prohibition items by producing a control command from each terminal controller/monitor and transmitting the control command to another terminal controller/monitor thereby filling the role of a central controller/monitor. CONSTITUTION:An input section 3e in a terminal controller/monitor 3A detects the open/close state of the alarm contact of an earth leakage breaker (not shown) and provides open/close data to a monitor information producing section 3f. The monitor information producing section 3f produces monitor information based on the operational sequence of the earth leakage breaker stored in an operational sequence memory section 3s and the alarm open/close data. Furthermore, the monitor information producing section 3f produces a command word representing a 'report command' which is passed, together with the monitor information, to a transmitting/receiving section 3a through a report command producing section 3g and a code producing section 3i. The transmitting/receiving section 3a adds the self address set in a self address setting section 3j to the command word thus producing a transmission signal and interrupting a terminal controller/monitor 30.

Description

【発明の詳細な説明】 [産業上の利用分野コ この発明は、例えば漏電遮断器、ノーヒユーズ遮断器等
の保護機器、電磁開閉器、リモコン制御機器等の制御機
器、及びトランスジューサ、電力量計等の計装機器など
の広範囲にわたる各種の配電機器の個々の制御・監視情
報をネットワークした配電機器制御監視システムを容易
に構成できる配電機器制御監視装置に関するものである
[Detailed Description of the Invention] [Industrial Application Fields] This invention is applicable to, for example, protective devices such as earth leakage circuit breakers and no-fuse circuit breakers, control devices such as electromagnetic switches and remote control devices, transducers, watt-hour meters, etc. The present invention relates to a power distribution equipment control and monitoring device that can easily configure a power distribution equipment control and monitoring system in which individual control and monitoring information of a wide variety of power distribution equipment, such as instrumentation equipment, is networked.

特に、中央制御監視装置を不要にした配電機器制御監視
装置に関するものである。
In particular, the present invention relates to a power distribution equipment control and monitoring device that eliminates the need for a central control and monitoring device.

[従来の技術] 従来例の構成を第14図を参照しながら説明する。[Conventional technology] The configuration of a conventional example will be explained with reference to FIG. 14.

第14図は、例えば特公昭59−29998号公報に示
された従来の配電機器制御監視装置を示すブロック図で
ある。
FIG. 14 is a block diagram showing a conventional power distribution equipment control and monitoring device disclosed in, for example, Japanese Patent Publication No. 59-29998.

第14図において、(1)は中央制御監視装置、(2)
はこの中央制御監視袋W(1)に接続している2本の信
号伝送線、(3,)、・・・、(3n)はそれぞれ信号
伝送線(2)に接続された端末制御監視装置である。
In Fig. 14, (1) is a central control and monitoring device, (2)
are the two signal transmission lines connected to this central control monitoring bag W (1), and (3,), ..., (3n) are terminal control and monitoring devices connected to the signal transmission line (2), respectively. It is.

また、(5)は商用電源、(6)はこの商用電源(5)
に接続している2本の電源線、()+a)、(71b>
、・・・、(7na) 、(7nb)はそれぞれ一方の
電源線(6)に接続された制御接点、(4+a)、(4
+b)、・・・、(4na)、(4nb)はそれぞれ一
方の入力端子が他方の電源線(6)に接続され、かつ他
方の入力端子が制御接点(71a)〜(7nb)に接続
された負荷である。
Also, (5) is a commercial power source, and (6) is this commercial power source (5)
Two power wires connected to, ()+a), (71b>
,..., (7na), (7nb) are control contacts connected to one power line (6), (4+a), (4
+b), ..., (4na), (4nb) each have one input terminal connected to the other power supply line (6), and the other input terminal connected to the control contacts (71a) to (7nb). This is a heavy load.

つぎに、上述した従来例の動作を第15図(a)、(b
)及び(e)を参照しながら説明する。第15図(a)
〜(c)は、従来例の各部の信号波形を示すタイムチャ
ート図である。
Next, the operation of the conventional example described above will be explained in FIGS. 15(a) and 15(b).
) and (e). Figure 15(a)
-(c) are time charts showing signal waveforms of various parts in the conventional example.

第15図において、(a)は伝送信号を示し、Plは伝
送の開始を示す開始パルス、P2は端末制御監視装置(
3,)〜(3n)のアドレスを示す端末アドレスパルス
、P、は端末制御監視装置く3.)〜(3n)の制御を
示す制御パルスである。(b)はアドレス一致信号、(
c)はラッチ信号を示す。
In FIG. 15, (a) shows a transmission signal, Pl is a start pulse indicating the start of transmission, and P2 is a terminal control and monitoring device (
The terminal address pulse, P, indicating the addresses of 3.) to (3n) is the terminal control and monitoring device. ) to (3n) are control pulses showing control. (b) is the address match signal, (
c) shows a latch signal.

まず、制御接点(71a)〜(7nb)をrONJl、
て負荷(’tea)〜(4nb)を動作させる場合、中
央制御監視装置(1)は、信号伝送線(2)を介して端
末制御監視装置(31)〜(3n)に、第15図(a)
に示すような、伝送信号を送る。
First, control contacts (71a) to (7nb) are connected to rONJl,
When operating the loads ('tea) to (4nb), the central control and monitoring device (1) connects the terminal control and monitoring devices (31) to (3n) via the signal transmission line (2) to a)
Send a transmission signal as shown in .

端末制御監視装置(3,)〜(3n)は、伝送信号中の
端末アドレスと自己の端末アドレスとを比較し、両者が
一致したとき、第15図(b)に示すような、アドレス
一致信号を発生する。
The terminal control and monitoring devices (3,) to (3n) compare the terminal address in the transmission signal with their own terminal address, and when they match, send an address matching signal as shown in FIG. 15(b). occurs.

同時に、第15図(c)に示すような、ラッチ信号を制
御接点(7,a)〜(7nb)に出力してそれらの制御
接点(7+a)〜(7nb)を「○N」させ、負荷(4
Ia)〜(4nb)を動作させる。
At the same time, as shown in Fig. 15(c), a latch signal is output to the control contacts (7, a) to (7nb) to turn the control contacts (7+a) to (7nb) into "○N" and the load is (4
Operate Ia) to (4nb).

こうして、中央制御監視袋W(1)は、制御指令に基づ
いて制御動作を行なう端末制御監視装置(31)〜(3
n)を介して、配電機器の1つである制御接点(7+ 
a)〜(7nb)を「○NJ+、ている。
In this way, the central control monitoring bag W(1) controls the terminal control monitoring devices (31) to (3) that perform control operations based on control commands.
n), one of the power distribution devices, a control contact (7+
a) ~ (7nb) as “○NJ+,”

また、中央制御監視装置(1)は、監視指令に基づいて
監視動作を行なう端末制御監視装置(3,)〜(3n)
を介して、図示しない配電機器を監視している。
The central control monitoring device (1) also includes terminal control monitoring devices (3,) to (3n) that perform monitoring operations based on monitoring commands.
Power distribution equipment (not shown) is monitored via the

[発明が解決しようとする課題] 上述したような従来の配電機器制御監視装置では、以下
に述べるような問題点があった。
[Problems to be Solved by the Invention] The conventional power distribution equipment control and monitoring device as described above has the following problems.

くア)、小さいシステムを構築する場合でも中央制御監
視装置が必要なので、システム全体として高価で取付ス
ペースが大きかった。
Even when building a small system, a central control and monitoring device was required, making the system as a whole expensive and requiring a large amount of installation space.

(イ)、中央制御監視装置の帽ト監視手順を準備すると
きに、接続されている全ての配電機器の動作に関する、
膨大かつ煩雑な、動作手順や禁止事項を熟知しなければ
ならなかった。
(b) When preparing the monitoring procedure for the central control and monitoring equipment, it is necessary to
I had to be familiar with a vast and complicated list of operating procedures and prohibitions.

(つ)、制御・監視の最小単位が接点入力やリレー接点
出力等よりなる為に、中央制御監視装置が、ネットワー
クされた各々の配電機器固有の制御・監視手順に従った
アルゴリズムにより制御 監視指令を出力する必要があ
り、従って中央制御監視装置内の制御・監視手順が膨大
となるので、1つの制御・監視指令を完了するまでの処
理時間が長くなり、信号伝送線の使用効率が非常に悪か
った。
(1) Since the minimum unit of control/monitoring consists of contact inputs, relay contact outputs, etc., the central control/monitoring device provides control/monitoring commands using algorithms that follow control/monitoring procedures specific to each networked power distribution device. Therefore, the number of control/monitoring procedures within the central control/monitoring device becomes enormous, which increases the processing time to complete one control/monitoring command, and makes the use of signal transmission lines extremely inefficient. It was bad.

(1)、1種類の端末制御監視装置により各種の配電機
器を制御・監視することができなかった。
(1) It was not possible to control and monitor various power distribution devices using one type of terminal control and monitoring device.

この発明は、上述した問題点を解決するためになされた
もので、中央制御監視装置を不要とし、各種の配電機器
の制御や監視等の動作手順及び禁止事項を熟知すること
なく、かつ簡潔でより高速な制御・監視等ができる配電
機器制御監視装置を得ることを目的とする。
This invention was made to solve the above-mentioned problems, and it eliminates the need for a central control and monitoring device, eliminates the need for familiarity with operating procedures and prohibitions for controlling and monitoring various power distribution equipment, and is simple and simple. The objective is to obtain a power distribution equipment control and monitoring device that can perform faster control and monitoring.

さらに、この発明は、1種類の端末制御監視装置により
各種の配電機器を制御・監視することができる配電機器
制御監視装置を得ることを目的とする。
A further object of the present invention is to obtain a power distribution equipment control and monitoring device that can control and monitor various power distribution equipment using one type of terminal control and monitoring device.

[課題を解決するための手段] この発明に係る配電機器制御監視装置は、以下に述べる
ような構成を備えたものである。
[Means for Solving the Problems] A power distribution equipment control and monitoring device according to the present invention has the configuration described below.

(I)、つぎの構成からなる第1の端末制御監視装置。(I) A first terminal control and monitoring device having the following configuration.

送信系として、 (i)、接続している配電機器の動作状態を検知し検知
信号を生成する入力部。
As a transmission system, (i) an input unit that detects the operating state of connected power distribution equipment and generates a detection signal;

(ii)、上記検知信号に基づいて監視情報又は応答指
令を生成する監視情報生成部。
(ii) A monitoring information generation unit that generates monitoring information or a response command based on the detection signal.

い11)、上記監視情報に基づいて制御指令を生成する
制御指令生成部。
11) A control command generation unit that generates a control command based on the monitoring information.

(iv)、上記制御指令又は応答指令を符号変換する符
号生成部。
(iv) a code generation unit that converts the code of the control command or response command;

(V)、上記符号変換した制御指令又は応答指令を含む
伝送信号を送信する送信部。
(V) A transmitter that transmits a transmission signal including the code-converted control command or response command.

受信系として、 (vi)、上記伝送信号を受信する受信部。As a receiving system, (vi) a receiving unit that receives the transmission signal;

(−ii)、上記伝送信号から上記制御指令又は応答指
令の符号であると解読する符号解読部。
(-ii) a code decoding unit that decodes the transmitted signal as the code of the control command or response command;

(媚)、外部の送信機器から送信された上記配電機器を
動作する動作手順を記憶することができる手順入力記憶
部。
(Amazing) A procedure input storage unit capable of storing an operation procedure for operating the power distribution device transmitted from an external transmitting device.

(ix)、上記動作手順と上記制御指令又は応答指令と
に基づいて制御信号を生成する制御信号生成部。
(ix) A control signal generation unit that generates a control signal based on the operation procedure and the control command or response command.

(×)、上記制御信号に基づいて上記配′:4機器を駆
動する駆動信号を出力する駆動出力部。
(x), a drive output section that outputs a drive signal for driving the four devices in the arrangement based on the control signal;

(■)、上記第1の端末制御監視装置と同一の構成を有
する第2の端末制御監視装置。
(■), a second terminal control and monitoring device having the same configuration as the first terminal control and monitoring device;

また、この発明に係る配電機器制御監視装置は、以下に
述べるような構成を備えたものである。
Further, the power distribution equipment control and monitoring device according to the present invention has the configuration described below.

(I)、つぎの構成からなる第1の端末制御監視装置。(I) A first terminal control and monitoring device having the following configuration.

送信系として、 (i)、接続している配電機器の動作状態を検知し検知
信号を生成する入力部。
As a transmission system, (i) an input unit that detects the operating state of connected power distribution equipment and generates a detection signal;

(ii)、上記検知信号に基づいて監視情報又は応答指
令を生成する監視情報生成部。
(ii) A monitoring information generation unit that generates monitoring information or a response command based on the detection signal.

(iii ) 、上記監視情報に基づいて監視指令を生
成する監視指令生成部。
(iii) A monitoring command generation unit that generates a monitoring command based on the monitoring information.

(iv)、上記監視指令又は応答指令を符号変換する符
号生成部。
(iv) a code generation unit that converts the code of the monitoring command or response command;

(V〉、上記符号変換した制御指令又は応答指令を含む
伝送信号を送信する送信部。
(V>, a transmitter that transmits a transmission signal containing the code-converted control command or response command;

受信系として、 (vi)、上記伝送信号を受信する受信部。As a receiving system, (vi) a receiving unit that receives the transmission signal;

(vii ) 、上記伝送信号から上記制御指令又は応
答指令の符号であると解読する符号解読部。
(vii) a code decoding unit that decodes the transmitted signal as the code of the control command or response command;

(vii)−外部の送信機器から送信された上記配電機
器を動作する動作手順を記憶することができる手順入力
記憶部。
(vii) - A procedure input storage unit capable of storing an operation procedure for operating the power distribution device transmitted from an external transmitting device.

(ix)、上記動作手順と上記応答指令とに基づいて制
御信号を生成する制御信号生成部。
(ix) a control signal generation unit that generates a control signal based on the operation procedure and the response command;

(X)、上記制御信号に基づいて上記配電機器を駆動す
る駆動信号を出力する駆動出力部。
(X) A drive output unit that outputs a drive signal for driving the power distribution equipment based on the control signal.

(II)  上記第1の端末制御監視装置と同一の構成
を有する第2の端末制御監視装置。
(II) A second terminal control and monitoring device having the same configuration as the first terminal control and monitoring device.

さらに、この発明に係る配電機器制御監視装置は、以下
に述べるような構成を備えたものである。
Furthermore, the power distribution equipment control and monitoring device according to the present invention has the following configuration.

(I)、つぎの構成からなる第1の端末制御監視装置。(I) A first terminal control and monitoring device having the following configuration.

送信系として、 (i)、接続している配電機器の状態変化を検知し検知
信号を生成する入力部。
As a transmission system, (i) an input unit that detects changes in the status of connected power distribution equipment and generates a detection signal;

(ii)、外部の送信機器から送信された上記配電機器
の監視情報を生成する動作手順を記憶することができる
手順入力記憶部。
(ii) A procedure input storage unit capable of storing an operation procedure for generating monitoring information of the power distribution equipment transmitted from an external transmitting device.

(iii)、上記動作手順と上記検知信号とに基づいて
監視情報を生成する監視情報生成部。
(iii) a monitoring information generation unit that generates monitoring information based on the operation procedure and the detection signal;

(ii)、上記監視情報に基づいて通報指令を生成する
通報指令生成部。
(ii) A reporting command generation unit that generates a reporting command based on the monitoring information.

(V)、上記通報指令を符号変換する符号生成部。(V) A code generation unit that converts the code of the notification command.

(vi)、上記符号変換した通報指令を含む伝送信号を
送信する送信部。
(vi) A transmitter that transmits a transmission signal including the code-converted reporting command.

受信系として、 (vii ) 、上記伝送信号を受信する受信部。As a receiving system, (vii) A receiving unit that receives the transmission signal.

(vii)、上記伝送信号から上記通報指令の符号であ
ると解読する符号解読部。
(vii) a code decoding unit that decodes the transmitted signal to be the code of the notification command;

(iii > 、上記通報信号に基づいてつぎの動作を
判断する上記監視情報生成部。
(iii> The monitoring information generation unit that determines the next operation based on the notification signal.

(■)、上記第1の端末制御監視装置と同一の構成を有
する第2の端末制御監視装置。
(■), a second terminal control and monitoring device having the same configuration as the first terminal control and monitoring device;

[作用] この発明においては、各端末制御監視装置は、自局の異
常を含む状態変化などの情報に基づいて、自局自身で制
御指令等を生成して、所定の他の端末制御監視装置に送
信し、その指令に対する応答指令が返ってくるまでの間
(あるいはその指令が完了するまでの間)は、自局が中
央制御監視装置としての役目をはたす。
[Operation] In the present invention, each terminal control and monitoring device generates control commands, etc. by itself based on information such as state changes including abnormalities of its own station, and transmits control commands to predetermined other terminal control and monitoring devices. Until a response command is returned (or until the command is completed), the local station functions as a central control and monitoring device.

また、各端末制御監視装置は、所定の他の端末制御監視
装置からの制御指令等を受信した場合は、送信側の他の
端末制御監視装置を中央制御監視装置とみなし、自局は
その端末制御監視装置としての役目をはなす。
In addition, when each terminal control and monitoring device receives a control command etc. from a predetermined other terminal control and monitoring device, it regards the other terminal control and monitoring device on the transmitting side as the central control and monitoring device, and the own terminal It serves as a control and monitoring device.

[実施例コ 実施例の構成を第1図を参照しながら説明する。[Example code] The configuration of the embodiment will be explained with reference to FIG.

第1図は、この発明の一実施例を示すブロック図であり
、〈2)は上記従来装置のものと全く同一である。
FIG. 1 is a block diagram showing an embodiment of the present invention, and item (2) is completely the same as that of the conventional device described above.

第1図において、(30)は第1の端末制御監視装置で
あって、この実施例では(30a)、(30b)、(3
0c)、(30d)、−(30e)、(30F)、(3
0g)、(30h)、(30i )、(30j)、(3
0k)、(30m)、(30n)及び(30s)から構
成された端末制御監視装置である。
In FIG. 1, (30) is a first terminal control and monitoring device, and in this embodiment, (30a), (30b), (3
0c), (30d), -(30e), (30F), (3
0g), (30h), (30i), (30j), (3
0k), (30m), (30n), and (30s).

また、(3^)は第2の端末制御監視装置であって、こ
の実施例では(3a)、(3b)、(3C)、(3d)
、(3C)、(3r)、 (3g)、 (3h)、 (
31)、 (3j)、 (3k)、 (3論)、(3n
)及び(3s)から構成された端末制御監視装置である
Further, (3^) is a second terminal control and monitoring device, and in this embodiment, (3a), (3b), (3C), and (3d)
, (3C), (3r), (3g), (3h), (
31), (3j), (3k), (3 theory), (3n
) and (3s).

(30a)は送信部かつ受信部、(30h)は制御指令
生成部かつ監視指令生成部であって、この実施例では、
(30a)は信号伝送線(2)に接続された送・受信部
、(30b)はこの送・受信部(30a)に接続された
符号解読部、(30c)はこの符号解読部(30b)に
接続された制御信号生成部、(30cl)はこの制御信
号生成部(30c)に接続された駆動出力部、(30e
)はこの駆動出力部<30d)に接続された入力部、(
30f)は符号解読部(3Qb)及び入力部(30e)
に接続された監視情報生成部、(30g>はこの監視情
報生成部(30f)に接続された通報指令生成部、(3
0h)は監視情報生成部(30f)に接続された制御・
監視指令生成部、(30i)は入力側が監視情報生成部
(30f)、通報指令生成部(30g)及び制御・監視
指令生成部(30h)に接続されかつ出力側が送・受信
部(30a)に接続された符号生成部、(30j)は送
・受信部(30a)に接続された自己アドレス設定部、
(30k)は送・受信部(30a)に接続された相手ア
ドレス設定部、(30m)は制御信号生成部<30c)
及び監視情報生成部(30f)に接続された情報処理部
、(3On)はこの情報処理部(30m)に接続された
表示部である。なお、制御信号生成部(30c)は監視
情報生成部(30f)にも接続されている。
(30a) is a transmitting unit and a receiving unit, (30h) is a control command generating unit and a monitoring command generating unit, and in this embodiment,
(30a) is a transmitting/receiving section connected to the signal transmission line (2), (30b) is a code decoding section connected to this transmitting/receiving section (30a), and (30c) is this code decoding section (30b). The control signal generation section (30cl) connected to the control signal generation section (30c) is the drive output section (30e) connected to the control signal generation section (30c).
) is an input connected to this drive output <30d), (
30f) is a code decoding unit (3Qb) and an input unit (30e)
The monitoring information generation unit (30g) connected to the monitoring information generation unit (30f) is the reporting command generation unit (30g) connected to the monitoring information generation unit (30f).
0h) is the control/control unit connected to the monitoring information generation unit (30f).
The monitoring command generation unit (30i) has an input side connected to the monitoring information generation unit (30f), a notification command generation unit (30g), and a control/monitoring command generation unit (30h), and an output side connected to the transmission/reception unit (30a). The connected code generation unit (30j) is a self-address setting unit connected to the transmitting/receiving unit (30a),
(30k) is the destination address setting section connected to the transmitting/receiving section (30a), (30m) is the control signal generating section <30c)
and an information processing section connected to the monitoring information generation section (30f), and (3On) is a display section connected to this information processing section (30m). Note that the control signal generation section (30c) is also connected to the monitoring information generation section (30f).

また、(30s)は入力側が送・受信部(30m)に接
続され、かつ出力側が制御信号生成部(30e)、監視
情報生成部(30f)及び表示部(3On)に接続され
ている動作手順記憶部である。
In addition, (30s) is an operation procedure in which the input side is connected to the transmitting/receiving section (30m), and the output side is connected to the control signal generation section (30e), the monitoring information generation section (30f), and the display section (3On). This is the storage section.

端末制御監視袋!(3^)は、上述した端末制御監視装
置(30)の構成と同一であり、各符号(3a)〜(3
s)は、各符号(30a)〜(30s)に対応している
。なお、駆動出力部(30d)は出力端子(30d、)
、(30d、)、(30d3)及び(30d、)を有し
、入力部(30e)は入力端子(30e l)及び(3
0ez)を有し、駆動出力部(3d)は出力端子(3d
、)及び(3d2)を有し、かつ入力部(3e)は入力
端子(3e、)、(3e2)及び(3ez)を有する。
Terminal control monitoring bag! (3^) is the same as the configuration of the terminal control and monitoring device (30) described above, and each code (3a) to (3
s) corresponds to each code (30a) to (30s). Note that the drive output section (30d) is an output terminal (30d, )
, (30d,), (30d3) and (30d,), and the input section (30e) has input terminals (30e l) and (30d,).
0ez), and the drive output section (3d) has an output terminal (3d
, ) and (3d2), and the input section (3e) has input terminals (3e, ), (3e2) and (3ez).

つぎに、配電機器の構成を第2図及び第3図を参照しな
がら説明する。第2図はこの発明の一実施例に接続され
た配電機器を示すブロック図、第3図は第2図の一部を
示す回路図であり、(5)及び(6)は上記従来装置の
ものと全く同一である。
Next, the configuration of the power distribution equipment will be explained with reference to FIGS. 2 and 3. FIG. 2 is a block diagram showing power distribution equipment connected to an embodiment of the present invention, FIG. 3 is a circuit diagram showing a part of FIG. It is exactly the same as the one.

第2図において、(40)は端末制御監視装置(30)
に接続された制御・監視用電気機械器具であり、端末制
御監視装置(30)の出力端子(3(M、)、(30d
2)、(30ci3)及び(30d、)並びに入力端子
(30el)及び(30e2)に接続されたO N10
 F F表示灯(40a)、過電流・短絡トリップ表示
灯(40b)、漏電トリップ表示灯(40c)、異常表
示灯(40d)、ON操作用スイッチ(40e)及びO
FF操作用スイッチ(40f)が設けられている。
In Figure 2, (40) is the terminal control and monitoring device (30)
It is an electrical mechanical device for control and monitoring connected to the output terminals (3(M,), (30d) of the terminal control and monitoring device (30).
2), (30ci3) and (30d,) and the ON10 connected to the input terminals (30el) and (30e2)
F F indicator light (40a), overcurrent/short circuit trip indicator light (40b), earth leakage trip indicator light (40c), abnormality indicator light (40d), ON operation switch (40e), and O
An FF operation switch (40f) is provided.

(4^)は負荷、(7^)は商用電源(5)と負荷(4
^)との間に接続された漏電遮断器であり、電源線(6
)を介して商用電源(5)に接続された電源端子(7a
)、電源線(6)を介して負荷(4^)に接続された負
荷端子(7c)、T4源端子(7a)と負荷端子(7c
)との間に接続された主回路(7g)、この主回路(7
g)に挿入された開閉装置(7b)、主回路(7g)に
接続された過電流用外し装!(7d)、主回路(7g)
に接続されたZCT(7e)、このZ CT (7e)
に接続された漏電用外し装置(7r)、過電流用外し装
置(7d)内に設けられかつ端末制御監視装置(3^〉
の入力端子(3e+)に接続された警報接点AL、漏電
用外し装置(7f)内に設けられかつ端末制御監視装置
(3^)の入力端子(3e2>に接続された漏電警報接
点EAL、及び開閉装置(7b)に連動しかつ端末制御
監視装置(3^)の入力端子(3e3)に接続された補
助接点AXが設けられている。
(4^) is the load, (7^) is the commercial power supply (5) and the load (4
It is an earth leakage breaker connected between the power line (6
) connected to the commercial power supply (5) via the power terminal (7a
), the load terminal (7c) connected to the load (4^) via the power line (6), the T4 source terminal (7a) and the load terminal (7c
) The main circuit (7g) connected between this main circuit (7g)
g) The switchgear (7b) inserted in the overcurrent enclosure connected to the main circuit (7g)! (7d), main circuit (7g)
ZCT (7e) connected to this Z CT (7e)
installed in the earth leakage disconnection device (7r) and overcurrent disconnection device (7d) connected to the terminal control and monitoring device (3^>
alarm contact AL connected to the input terminal (3e+) of An auxiliary contact AX is provided which is interlocked with the switching device (7b) and connected to the input terminal (3e3) of the terminal control and monitoring device (3^).

(8)はa1遮断器(7^)に結合されかつ端末制御監
視装置く3^)に接続された電気操作装置である。
(8) is an electrical operating device coupled to the a1 circuit breaker (7^) and connected to the terminal control and monitoring device (3^).

第3図において、電気操作装置(8)には、サージ吸収
用バリスタを含むダイオードブリッジ回路〈8a)及び
(8C)、ダイオードブリッジ回路(8a)に接続され
たON用操作コイル(8b)、ダイオードブリッジ回路
(8c)に接続されたOFF用操作コイル(8d)、端
子(8e、)、(8et)、(8e−)及び(8e、)
が設けられた操作用接続端子(8e)、端子(8e、)
を介してダイオードブリッジ回路(8a)及び(8c)
の一端に接続された操作用電源端子(8h)、端子(8
es)を介してダイオードブリッジ回路(8a)の他端
に接続されたON操作スイッチ(8f)、端子(8e4
)を介してダイオードブリッジ回路(8c)の他端に接
続されたOFF操作スイッチ(811)、並びにON操
作スイッチ(8f)及びOFF操作スイッチ(8g)に
接続された操作用電源端子(81)が設けられている。
In Fig. 3, the electrical operation device (8) includes diode bridge circuits (8a) and (8C) including a surge absorption varistor, an ON operation coil (8b) connected to the diode bridge circuit (8a), and a diode. OFF operation coil (8d), terminals (8e,), (8et), (8e-) and (8e,) connected to the bridge circuit (8c)
Operation connection terminal (8e), terminal (8e,) provided with
diode bridge circuits (8a) and (8c) through
The operating power terminal (8h) connected to one end of the
ON operation switch (8f) and terminal (8e4) connected to the other end of the diode bridge circuit (8a) via
) is connected to the other end of the diode bridge circuit (8c), and the operation power terminal (81) is connected to the ON operation switch (8f) and the OFF operation switch (8g). It is provided.

なお、端子(8e+)は接地されている。Note that the terminal (8e+) is grounded.

さらに、配電機器制御監視システムの構成を第4図及び
第5図を参照しながら説明する。第4図はこの発明の一
実施例をネットワークした配電機器制御監視システムを
示す概略ブロック図、第5図は他の配電機器制御監視シ
ステムを示す概略ブロック図である。
Furthermore, the configuration of the power distribution equipment control and monitoring system will be explained with reference to FIGS. 4 and 5. FIG. 4 is a schematic block diagram showing a networked power distribution equipment control and monitoring system according to an embodiment of the present invention, and FIG. 5 is a schematic block diagram showing another power distribution equipment control and monitoring system.

第4図において、負荷(4^)、(4^、)、・・・、
(4^n)はそれぞれ漏電遮断器()^)、配電機器(
7^1)、・・・(7八n)に接続され、漏電遮断器(
7^)、制御・監視用電気機械器具(40)、配電機器
(7^、)、帽ト監視用電気機械器具(401)、・・
・ ・・・、配電機器(7^n)、及び制御・監視用電
気機械器具(40n)はそれぞれ端末制御監視装置(3
^)、(30)、(3^1)、(301)、・・・・・
・、(3^n)及び(30n)に接続され、これら端末
制御監視装ff(3^)〜(30n>どうしは信号伝送
線(2)により接続されている。なお、負R(4^、)
、配電機器(7^、)、制御・監視用電気機械器具<4
01)、端末制御監視装!(3^l)及び(301)は
図示していない。
In Figure 4, load (4^), (4^,),...
(4^n) are earth leakage circuit breakers ()^) and power distribution equipment (
7^1), ... (78n), and the earth leakage breaker (
7^), electrical machinery and equipment for control and monitoring (40), power distribution equipment (7^,), electrical machinery and equipment for monitoring (401),...
・ ..., power distribution equipment (7^n), and control/monitoring electrical equipment (40n) are each connected to terminal control and monitoring equipment (3
^), (30), (3^1), (301),...
, (3^n) and (30n), and these terminal control and monitoring devices ff(3^) to (30n) are connected to each other by a signal transmission line (2). ,)
, power distribution equipment (7^,), electrical machinery and equipment for control and monitoring <4
01), terminal control and monitoring equipment! (3^l) and (301) are not shown.

第5図において、負荷(4^、)、(4^2)、・・・
、(4^輸)はそれぞれ配電機器()^1)、()^2
)、・・・、(7^−)に接続され、これら配電機器(
7^1)〜(7^端)はそれぞれ端末1liIIflI
監視装置(3A+)、(3^2)、・・・、(3^−)
に接続され、これら端末制御監視装置(3^、)〜(3
^耐どうしは信号伝送線(2)により接続されている。
In Figure 5, loads (4^,), (4^2),...
, (4^transport) are power distribution equipment ()^1) and ()^2, respectively.
), ..., (7^-), and these power distribution equipment (
7^1) to (7^ end) are respectively terminals 1liIIflI
Monitoring device (3A+), (3^2),..., (3^-)
These terminal control and monitoring devices (3^,) to (3
The resistors are connected by a signal transmission line (2).

また、端末制御監視装置の外観を第6図を参照しながら
説明する。第6図は漏電遮断器用の端末制御監視装置(
3B)を示す斜視図である。
Further, the appearance of the terminal control and monitoring device will be explained with reference to FIG. Figure 6 shows terminal control and monitoring equipment for earth leakage circuit breakers (
3B).

第6図において、(3d、)、(3c12)、(3d、
)及び(3d、)は出力端子、(3e、)、(3ez)
、(3e、)及び<3e4)は入力端子、(3jk)は
自己アドレス・相手アドレス設定スイッチ、(3n)は
液晶表示部、(3z)はボディーである。
In FIG. 6, (3d, ), (3c12), (3d,
) and (3d,) are output terminals, (3e,), (3ez)
, (3e,) and <3e4) are input terminals, (3jk) is a self address/destination address setting switch, (3n) is a liquid crystal display section, and (3z) is a body.

ここで、伝送信号の構成を第7図を参照しながら説明す
る。第7図は伝送信号のフレーム構成を示す構成図であ
る。
Here, the structure of the transmission signal will be explained with reference to FIG. FIG. 7 is a block diagram showing the frame structure of a transmission signal.

第7図において、伝送信号の1フレームは、自己アドレ
スSA、相手アドレスDA、コマンド・ワードCW、デ
ータ数BC、データDT及びフレームチエツクコードF
CCから構成されている。
In FIG. 7, one frame of the transmission signal includes a self address SA, a partner address DA, a command word CW, a data count BC, data DT, and a frame check code F.
It is composed of CC.

自己アドレスSAは送信元の端末制御監視装置自身のア
ドレス、相手アドレスDAは、送信先の他の端末vIm
監視装置のアドレス、コマンド・ワードCWは例えば制
御指令であるrONコマンド」やrOFFコマンド」、
監視指令である[監視コマンド」等、通報指令である[
通報コマンド」等、応答指令である「応答コマンド」等
のコマンドの種類、データ数BCはつぎのデータDTの
ブロック数、データDTはコマンド・ワードCWに付随
するデータ、フレームチエツクコードFCCはフレーム
全体の整合性を表わすコードを示す。
The self address SA is the address of the terminal control and monitoring device itself that is the source, and the destination address DA is the other terminal vIm of the destination.
The address of the monitoring device and the command word CW are control commands such as "rON command" and "rOFF command",
[Monitoring command] which is a monitoring command, etc., which is a reporting command [
Types of commands such as "report command" and "response command" which are response commands, data number BC is the number of blocks of the next data DT, data DT is the data accompanying the command word CW, and frame check code FCC is the number of blocks of the entire frame. Shows the code that represents consistency.

つづいて、上述した実施例の動作を代表的な制御指令、
監視指令及び通報指令について順に説明する。
Next, the operation of the above-mentioned embodiment will be explained using typical control commands.
The monitoring command and reporting command will be explained in order.

システム立ちあげ時又は必要に応じてシステム稼動時、
端末制御監視装置(30)及び(3^)は、自己アドレ
ス設定部(30i)及び(3j)並びに相手アドレス設
定部(30k)及び(3k)により、自己アドレス及び
相手アドレスが設定される0例えば、端末制御監視装!
(30)は、自己アドレスとして適当な自局のアドレス
及び相手アドレスとして端末制御監視装置(3^)のア
ドレスが設定される。
When starting up the system or when operating the system as necessary,
The terminal control and monitoring devices (30) and (3^) have their own address and the other party's address set by the own address setting sections (30i) and (3j) and the other party's address setting sections (30k) and (3k). , terminal control and monitoring equipment!
In (30), an appropriate address of the own station is set as the own address, and an address of the terminal control and monitoring device (3^) is set as the other party's address.

また、システム立ちあげ時、端末制御監視装置(30)
及び(3^)は、所定の他の端末制御監視装置から例え
ば初期コマンドを受信し、接続されている配電機器の動
作手順(制御信号生成手順や監視情報生成手順)をダウ
ンロードして、動作手順記憶部(30s)及び(3s)
に記憶する。これら手順記憶部(30g>及び(3s)
に記憶された動作手順は、表示部(30n)及び(3n
)に表示させることによって確認することができる。
In addition, when starting up the system, the terminal control monitoring device (30)
and (3^) receives, for example, an initial command from a predetermined other terminal control/monitoring device, downloads the operation procedure (control signal generation procedure and monitoring information generation procedure) of the connected power distribution equipment, and executes the operation procedure. Storage part (30s) and (3s)
to be memorized. These procedure storage units (30g> and (3s)
The operating procedures stored in the display section (30n) and (3n
) can be confirmed.

すなわち、送 受信部(30a)及び〈3a)は、信号
伝送線(2)上の伝送信号を受取り、そのフレームチエ
ツクコードFCCをチエツクし正常であれば、その相手
アドレスDAが自己アドレス設定部<30i)及び(3
j)で設定された自局のアドレスかどうかを判別する。
That is, the transmitting/receiving section (30a) and <3a) receive the transmission signal on the signal transmission line (2), check the frame check code FCC, and if it is normal, the other party's address DA is set to the self address setting section. 30i) and (3
Determine whether it is the address of the own station set in step j).

相手アドレスDAが自局のアドレスの場合、データDT
から例えば漏電遮断器(7^)を「ON」、rOFFJ
させる制御手順や漏電遮断器(7^)の状態変化を監視
する監視手順を取り出して、動作手順記憶部(30s)
及び(3s)に記憶する。
If the other party's address DA is your own address, the data DT
For example, turn on the earth leakage breaker (7^), rOFFJ
The control procedure for monitoring the changes in the status of the earth leakage circuit breaker (7^) is retrieved and stored in the operation procedure storage unit (30s).
and (3s).

第1番目に、漏電遮断器(7^)をrONJさせる制御
、つまり制御指令の動作を説明する。
First, the control for rONJing the earth leakage breaker (7^), that is, the operation of the control command will be explained.

最初に、端末制御監視装置(30)側のrONコマンド
」の送信動作及び「応答コマンド」の受信動作を第8U
:jiを参照しながら説明する。第8図は「ONコマン
ド」及び「応答コマンド」の動作の流れを示す概略動作
フローチャート図である。
First, the transmission operation of the "rON command" and the reception operation of the "response command" on the terminal control and monitoring device (30) side are performed on the 8th U.
This will be explained with reference to :ji. FIG. 8 is a schematic operational flowchart showing the flow of operations of the "ON command" and the "response command".

ステップ(50)において、端末制御監視装置(30)
は動作を開始する。
In step (50), the terminal control monitoring device (30)
starts working.

ステップ(51)において、端末制御監視装置(30)
は、rONコマンド」を生成して、端末制御監視装置(
3^)に送信する。
In step (51), the terminal control monitoring device (30)
generates the "rON command" and sends the terminal control and monitoring device (
Send to 3^).

すなわち、入力部(30e)は、入力端子(30e、)
を介して、帽1監視用電気機械器具(40)のON操作
用スイッチ(40e)のrON、操作を検知し、検知信
号を生成して監視情報生成部(30f)に出力する。
That is, the input section (30e) is an input terminal (30e, )
It detects rON and operation of the ON operation switch (40e) of the cap 1 monitoring electric mechanical device (40), generates a detection signal, and outputs it to the monitoring information generation section (30f).

監視情報生成部(30f)は、検知信号に基づいて「O
NコマンドJを表わすコマンド・ワードCWを生成して
制御・監視指令生成部(30h)に渡す。
The monitoring information generation unit (30f) generates “O” based on the detection signal.
A command word CW representing the N command J is generated and passed to the control/monitoring command generation section (30h).

帽I監視指令生成部(30h)は、コマンド・ワードC
Wに基づいて付随するデータDT及びそのデータ数BC
を生成し、コマンド・ワードCWとともに符号生成部(
30i)に渡す。
The cap I monitoring command generation unit (30h) generates command word C.
Accompanying data DT and the number of data BC based on W
is generated, and the code generator (
30i).

符号生成部(30i )は、コマンド・ワードCW、デ
ータ数BC及びデータDTを符号変換し送・受信部(3
0m)に渡す。
The code generation unit (30i) converts the code of the command word CW, the number of data BC and the data DT, and sends the code to the transmission/reception unit (30i).
0m).

送・受信部(30a)は、自己アドレス設定部(30j
)で設定された自局の自己アドレスSA、相手アドレス
設定部(30k>で設定された端末制御監視装置(3^
)のアドレスである相手アドレスDA及びフレームチエ
ツクコードFCCを追加して伝送信号のフレームを構成
する。そして、その伝送信号を信号伝送&l(2>に載
せる。
The transmitting/receiving unit (30a) has a self-address setting unit (30j
) and the terminal control and monitoring device (3^) set in the remote address setting section (30k>).
) and a frame check code FCC are added to form a transmission signal frame. Then, the transmission signal is placed on signal transmission &l(2>).

また、監視情報生成部(30f)は、上述した検知信号
に基づいた情報等を情報処理部(30論)に渡し、この
情報処理部(30m)を動作させる。
Further, the monitoring information generation section (30f) passes information based on the above-mentioned detection signal to the information processing section (30), and operates the information processing section (30m).

情報処理部(30m)は、上述した情報等に基づいて表
示部(30n)を駆動し、端末制御監視装置(30)の
動作状態及び制御・監視用電気機械器具(40)の動作
状態等を例えば液晶で表示する。
The information processing section (30m) drives the display section (30n) based on the above-mentioned information, etc., and displays the operating state of the terminal control and monitoring device (30) and the electrical mechanical appliance for control/monitoring (40). For example, display it on a liquid crystal.

ステップ(52)において、端末制御監視装置(30)
は、「応答コマンド」を端末制御監視装置(3^)から
受信する。
In step (52), the terminal control monitoring device (30)
receives a "response command" from the terminal control and monitoring device (3^).

すなわち、送・受信部(30a)は、信号伝送線(2)
上の伝送信号を受取り、そのフレームチエツクコードF
CCをチエツクし正常であれば、その相手アドレスDA
が自己アドレス設定部(30j)で設定された自局のア
ドレスかどうかを判別する。相手アドレスDAが自局の
アドレスの場合、コマンド・ワードCW、データ数BC
及びデータDTを符号解読部(30b)に渡す。
That is, the transmitting/receiving section (30a) is connected to the signal transmission line (2)
Receives the above transmission signal and checks its frame check code F.
Check the CC and if it is normal, the other party's address DA
It is determined whether or not it is the address of the own station set by the own address setting section (30j). If the other party's address DA is your own address, command word CW, data count BC
and passes the data DT to the code decoder (30b).

符号解読部(30b)は、コマンド・ワードCWが「応
答コマンド」であるかどうかを判別する。「応答コマン
ド」の場合、コマンド・ワードCW、データ数BC及び
データDTを制御信号生成部(30e)に渡して、この
制御信号生成部(30c)を動作させる。
The code decoder (30b) determines whether the command word CW is a "response command". In the case of a "response command," the command word CW, data count BC, and data DT are passed to the control signal generation section (30e) to operate the control signal generation section (30c).

制御信号生成部(30c)は、動作手順記憶部(30s
)に記憶された制御・監視用電気機械器具(40)の動
作手順、コマンド・ワードCW、データ数BC及びデー
タDTに基づいて、制御・監視用電気機械器具(40)
を動作させる制御信号を生成し、駆動出力部(30d)
に出力する0例えば、漏電遮断器(7^)が、正常にr
ONjl、た場合には制御・監視電気機械器具(40)
のON10 F F表示灯(40a)を点灯させる制御
信号を生成する。
The control signal generation unit (30c) includes an operation procedure storage unit (30s
), the control/monitoring electrical mechanical appliance (40) is based on the operating procedure of the controlling/monitoring electrical mechanical appliance (40), the command word CW, the number of data BC, and the data DT.
The drive output section (30d) generates a control signal to operate the
For example, if the earth leakage breaker (7^) outputs 0 to
ONjl, control/monitoring electrical machinery and equipment (40)
A control signal is generated to turn on the ON10 FF indicator light (40a).

駆動出力部(30d)は、出力端子(30d、)を介し
て、上述した制御信号により帽I監視用電気機械器具(
40)の○N10 F F表示灯(40m)を点灯する
The drive output unit (30d) outputs the cap I monitoring electric mechanical device (
40) ○N10 FF Turn on the F indicator light (40m).

また、制御信号生成部(30e)は、上述したコマンド
・ワードC前等を情報処理部(30m>に渡し、この情
報処理部(30m)を動作させる。
Further, the control signal generation section (30e) passes the above-mentioned command word C, etc. to the information processing section (30m), and operates the information processing section (30m).

情報処理部(30m)は、上述したコマンド・ワードC
前等に基づいて表示部(30n)を駆動し、端末制御監
視装置(30)の動作状態等を例えば液晶で表示する。
The information processing section (30m) uses the above-mentioned command word C.
The display unit (30n) is driven based on the above, and the operating status of the terminal control/monitoring device (30) is displayed on, for example, a liquid crystal display.

ステップ(53)において、端末制御監視装置(30)
は動作を終了する。
In step (53), the terminal control monitoring device (30)
ends the operation.

つぎに、端末制御監視装置(3^)側のrONコマンド
Jの受信動作及び「応答コマンド」の送信動作を説明す
る。
Next, the operation of receiving the rON command J and the operation of transmitting the "response command" on the terminal control and monitoring device (3^) side will be explained.

ステップ(60)において、端末制御監視装置(3^)
は動作を開始する。
In step (60), the terminal control monitoring device (3^)
starts working.

ステップ(61)において、端末制御監視装置(3^)
は、rONコマンド」を端末制御監視装置(30)から
受信する。
In step (61), the terminal control monitoring device (3^)
receives the "rON command" from the terminal control and monitoring device (30).

すなわち、送・受信部(3a)は、信号伝送線(2)上
の伝送信号を受取り、そのフレームチエツクコードFC
Cをチエツクし正常であれば、その相手アドレスDAが
自己アドレス設定部(3j)で設定された自局のアドレ
スかどうかを判別する。相手アドレスDAが自局のアド
レスの場合、コマンド・ワードCW、デ・−少数BC及
びデータDTを符号解読部(3b)に渡す。
That is, the transmitter/receiver (3a) receives the transmission signal on the signal transmission line (2), and checks the frame check code FC.
C is checked, and if it is normal, it is determined whether the other party's address DA is the address of the own station set by the own address setting section (3j). If the other party's address DA is the address of the local station, the command word CW, de-minor BC and data DT are passed to the code decoder (3b).

符号解読部(3b)は、コマンド・ワードCWが「ON
コマンド」であるかどうかを判別する。rONコマンド
」の場合、コマンド・ワードCW、データ数BC及びデ
ータDTをWii御信号生成部(3c)に渡して、この
制御信号生成部(3c)を動作させる。
The code decoder (3b) detects that the command word CW is “ON”.
command". In the case of "rON command," the command word CW, data count BC, and data DT are passed to the Wii control signal generation section (3c) to operate this control signal generation section (3c).

ステップ(62)において、端末制御監視装置(3^)
はrONコマンドJを実行する。
In step (62), the terminal control monitoring device (3^)
executes rON command J.

すなわち、制御信号生成部(3c)は、動作手順記憶部
(3s)に記憶された漏電遮断器(7^)の動作手順、
コマンド・ワードCW、データ数BC及びデータDTに
基づいて、漏電遮断器(7^)を「ON」させる制御信
号を生成し、駆動出力部(3d)に出力する。
That is, the control signal generation unit (3c) generates the operating procedure of the earth leakage breaker (7^) stored in the operating procedure storage unit (3s),
Based on the command word CW, the number of data BC, and the data DT, a control signal for turning on the earth leakage breaker (7^) is generated and output to the drive output section (3d).

駆動出力部(3d)は、出力端子(3d、)を介して、
上述した制御信号により電気操作装置(8)のON操作
スイッチ(8「)を閉じる。
The drive output section (3d), via the output terminal (3d,),
The ON operation switch (8'') of the electric operation device (8) is closed by the above-mentioned control signal.

こうして、ON操作スイッチ(8f)が閉じることによ
りON用操作コイル(8b)が励磁され、開閉装置(7
b)が閉じる。つまり漏電遮断器(7^)がrON4す
ることになる。
In this way, when the ON operation switch (8f) is closed, the ON operation coil (8b) is excited, and the switching device (7
b) closes. In other words, the earth leakage breaker (7^) is turned on to rON4.

また、制御信号生成部(3c)は、上述したコマンド・
ワードCW等を情報処理部(3m)に渡し、この情報処
理部(3謔)を動作させる。
The control signal generation unit (3c) also includes the above-mentioned command/
The word CW etc. are passed to the information processing section (3m) and the information processing section (3m) is operated.

情報処理部(3輪)は、上述したコマンド・ワードCW
等に基づいて表示部(3n)を駆動し、端末制御監視装
置(3^)の動作状態等を例えば液晶で表示する。
The information processing unit (three wheels) uses the above-mentioned command word CW.
The display unit (3n) is driven based on the above information, and the operating status of the terminal control/monitoring device (3^) is displayed on, for example, a liquid crystal display.

ステップ(63)において、端末制御監視装置(3^)
は、「応答コマンド」を生成して、端末制御監視装置(
30)に送信する。
In step (63), the terminal control monitoring device (3^)
generates a "response command" and sends it to the terminal control and monitoring device (
30).

すなわち、監視情報生成部(3r)は、入力部(3e)
が検知した検知信号に基づいて、漏電遮断器(7^)が
正常にrONJj、なかを判別する。また、検知信号に
基づいて「応答コマンド」を表わすコマンド・ワードC
Wを生成し、その判別結果であるデータDT及びそのデ
ータ数BCを生成してコマンド・ワードCWとともに符
号生成部(31)に渡す。
That is, the monitoring information generation section (3r) is the input section (3e)
Based on the detection signal detected by the earth leakage breaker (7^), the earth leakage breaker (7^) normally determines whether the rONJj is inside. Also, a command word C representing a "response command" based on the detection signal.
W, and the data DT and the number of data BC which are the discrimination results are generated and passed to the code generation unit (31) together with the command word CW.

符号生成部(31)は、コマンド・ワードCW、データ
数BC及びデータDTを符号変換し送・受信部(3aン
に渡す。
The code generation unit (31) converts the code of the command word CW, the number of data BC, and the data DT and passes the code to the transmission/reception unit (3a).

送・受信部(3a)は、自己アドレス設定部(3j)で
設定された自局の自己アドレスSA、相手アドレス設定
部(3k)で設定された端末制御監視装置(30)のア
ドレスである相手アドレスDA及びフレームチエツクコ
ードFCCを追加して伝送信号のフレームを構成する。
The transmitting/receiving unit (3a) sets the own address SA of the own station set in the own address setting unit (3j) and the other party's address which is the address of the terminal control and monitoring device (30) set in the other party address setting unit (3k). Address DA and frame check code FCC are added to configure the frame of the transmission signal.

そして、その伝送信号を信号伝送線(2ンに載せる。Then, the transmission signal is placed on the signal transmission line (2).

また、監視情報生成部(3f)は、上述した検知信号に
基づいた情報等を情報処理部(3m>に渡し、この情報
処理部(3−)を動作させる。
Further, the monitoring information generation section (3f) passes information based on the above-mentioned detection signal to the information processing section (3m>), and causes the information processing section (3-) to operate.

情報処理部(3−)は、上述した情報等に基づいて表示
部(3n)を駆動し、端末制御監視装W(3^)の動作
状態及び漏電遮断器(7^)のON10 F F状態、
過電流・短絡トリップ状態、漏電トリップ状態等を例え
ば液晶で表示する。
The information processing section (3-) drives the display section (3n) based on the above-mentioned information, etc., and displays the operating state of the terminal control monitoring device W (3^) and the ON10 FF state of the earth leakage circuit breaker (7^). ,
Overcurrent/short circuit trip status, earth leakage trip status, etc. are displayed on, for example, a liquid crystal display.

ステップ(64)において、端末制御監視装置(3^)
は動作を終了する。
In step (64), the terminal control monitoring device (3^)
ends the operation.

ここで、上述した漏電遮断器()^)をrONJさせる
制御手順を第9図を参照しながら説明する。第9図は漏
電遮断器(7^)をrONJさせる制御手順を示すフロ
ーチャート図である。
Here, a control procedure for turning on the earth leakage circuit breaker ()^) described above will be explained with reference to FIG. 9. FIG. 9 is a flowchart showing a control procedure for rONJing the earth leakage breaker (7^).

最初に、動作手順記憶部(3s)に記憶された漏電遮断
器(7^)をrON、させる制御手順が制御信号生成部
(3c)に渡される。
First, a control procedure for turning on the earth leakage breaker (7^) stored in the operation procedure storage section (3s) is passed to the control signal generation section (3c).

ステップ(70)において、制御信号生成部(3c)は
、コマンド・ワードCWがrONコマンド」の場合、符
号解読部(3b)により動作が開始され、つぎのステッ
プ(71)に進む。
In step (70), if the command word CW is "rON command", the control signal generating section (3c) is started to operate by the code decoding section (3b) and proceeds to the next step (71).

ステップ(71)において、制御信号生成部(3c)は
、入力部(3e)及び監視情報生成部(3f)を介して
検知された漏電遮断器(7八)の警報接点ALの開閉状
態に基づいて、過電流、短絡又は漏電によって漏電遮断
器(7^)がトリップしているかどうかを判別する。ト
リップしていない場合(NO)はつぎのステップ(72
)に進む、また、トリップしている場合(YES)はス
テップ(75)へ進む。
In step (71), the control signal generation section (3c) is configured based on the open/closed state of the alarm contact AL of the earth leakage breaker (78) detected via the input section (3e) and the monitoring information generation section (3f). Then, it is determined whether the earth leakage breaker (7^) has tripped due to overcurrent, short circuit, or leakage. If it has not tripped (NO), proceed to the next step (72
), or if tripped (YES), proceed to step (75).

ステップ()2)において、制御信号生成部(3C)は
、駆動出力部(3d)を介して電気操作装置(8)のO
N操作スイッチ(8r)を所定時間開じた後、つぎのス
テップ(73)に進む。
In step ()2), the control signal generation unit (3C) outputs the output voltage of the electric operating device (8) via the drive output unit (3d).
After opening the N operation switch (8r) for a predetermined period of time, proceed to the next step (73).

ステップ(73)において、制御信号生成部(3C)は
、入力部(3e)及び監視情報生成部(3r)を介して
検知された漏電遮断器(7^)の補助接点AXの開閉状
態に基づいて、漏電遮断器(7^)が「ON」している
かどうかを判別する。rON」I、ている場合(YES
)はつぎのステップ(74)へ進む、また、rONJl
、ていない場合(No)はステップ(77)へ進む。
In step (73), the control signal generation section (3C) generates a signal based on the open/closed state of the auxiliary contact AX of the earth leakage breaker (7^) detected via the input section (3e) and the monitoring information generation section (3r). Then, determine whether the earth leakage breaker (7^) is turned on. rON” I, if yes (YES
) proceeds to the next step (74), and rONJl
, if not (No), proceed to step (77).

ステップ(74)において、制御信号生成部(3C)は
動作を終了する。
In step (74), the control signal generation section (3C) ends its operation.

ステップ(75)において、制御信号生成部(3C)は
、漏電遮断器(7^)のトリップ状態を解除するために
、警報接点ALをリセット(OFFAして、つぎのステ
ップ(7日)に進む。
In step (75), the control signal generation unit (3C) resets (OFFA) the alarm contact AL in order to release the trip state of the earth leakage breaker (7^), and proceeds to the next step (7th day). .

ステップ(76)において、制御信号生成部(3c)は
、漏電遮断器(7^)の警報接点ALがリセットしてい
るかどうかを判別する。リセットしている場合(YES
)はステップ(72)へ戻る。また、リセットしていな
い場合(NO)はつぎのステップ(77)に進む。
In step (76), the control signal generation unit (3c) determines whether the alarm contact AL of the earth leakage breaker (7^) has been reset. If it has been reset (YES
) returns to step (72). If the reset has not been performed (NO), the process proceeds to the next step (77).

ステップ(77)において、過電流・短絡トリップ等の
エラー処理をして、ステップ(ア4)へ戻る。
In step (77), errors such as overcurrent and short circuit trip are handled, and the process returns to step (a4).

第2番目に、漏電遮断器(7^)をrOFF、させる制
御、つまり他の制御指令の動作を説明する。なお、rO
Nコマンド」の動作と対応しているので詳細な説明は省
略する。
Second, the control to turn off the earth leakage breaker (7^), that is, the operation of other control commands will be explained. In addition, rO
Since this corresponds to the operation of "N command", a detailed explanation will be omitted.

まず、端末制御監視装置(30)は、制御・監視用電気
機械器具(40)のOFF操作用スイッチ(40f)が
押されると、ro F Fコマンド」を生成して、端末
制御監視装置く3^)に送信する。
First, when the OFF operation switch (40f) of the control/monitoring electrical equipment (40) is pressed, the terminal control/monitoring device (30) generates a "ro F F command" and sends the terminal control/monitoring device 3 Send to ^).

一方、端末制御監視装置(3^)は、ro F Fコマ
ンド」を受信して、実行する。
On the other hand, the terminal control and monitoring device (3^) receives and executes the ro FF command.

すなわち、制御信号生成部(3c)は、動作手順記憶部
(3s)に記憶された漏電遮断器(7^)の動作手順、
コマンド・ワードCW、データ数BC及びデータDTに
基づいて、漏電遮断器(7^)をrOFF、させる制御
信号を生成し、駆動出力部(3d)に出力する。
That is, the control signal generation unit (3c) generates the operating procedure of the earth leakage breaker (7^) stored in the operating procedure storage unit (3s),
Based on the command word CW, data count BC, and data DT, a control signal for turning off the earth leakage breaker (7^) is generated and output to the drive output section (3d).

駆動出力部(3d)は、出力端子(3clt>を介して
、上述した制御信号により電気操作装置(8)のOFF
操作スイッチ(8g)を閉じる。
The drive output section (3d) turns off the electric operating device (8) by the above-mentioned control signal via the output terminal (3clt).
Close the operation switch (8g).

こうして、OFF操作スイッチ(8g)が閘じることに
よりOFF用操作コイル(8d)が励磁され、開閉装置
(7b)が開く、つまり漏電遮断器(7^)が「0FF
Jすることになる。
In this way, when the OFF operation switch (8g) is closed, the OFF operation coil (8d) is excited, and the switchgear (7b) is opened, that is, the earth leakage breaker (7^) is set to "0FF".
I will be doing J.

その後、端末制御監視装置(3^)は、「応答コマンド
」を生成して、端末制御監視装置(30)に送信する。
Thereafter, the terminal control and monitoring device (3^) generates a "response command" and transmits it to the terminal control and monitoring device (30).

そして、端末制御監視装置(30)は、「応答コマンド
」を受信して、動作を終了する。
Then, the terminal control and monitoring device (30) receives the "response command" and ends its operation.

ここで、上述した漏電遮断器(7^)をrOFFJさせ
る制御手順を第10図を参照しながら説明する。
Here, a control procedure for turning off the earth leakage breaker (7^) described above will be explained with reference to FIG. 10.

第10図は漏電遮断器(7^)をrOFPJさせる制御
手順を示すフローチャート図である。
FIG. 10 is a flowchart showing a control procedure for causing the earth leakage breaker (7^) to rOFPJ.

最初に、動作手順記憶部(3s)に記憶された漏電遮断
器(7^)をrOFF、させる制御手順が制御信号生成
部(3c)に渡される。
First, a control procedure for turning off the earth leakage breaker (7^) stored in the operation procedure storage section (3s) is passed to the control signal generation section (3c).

ステップ(80)において、制御信号生成部(3C)は
、コマンド・ワードCWがrOFFコマンド」の場合、
符号解読部(3b)により動作が開始され、つぎのステ
ップ(81)に進む。
In step (80), if the command word CW is "rOFF command", the control signal generation unit (3C)
The code decoder (3b) starts the operation and proceeds to the next step (81).

ステップ(81)において、制御信号生成部(3c)は
、入力部(3e)及び監視情報生成部(3f)を介して
検知された漏電遮断器(7^)の警報接点ALの開閉状
態に基づいて、過電流、短絡又は漏電によって漏電遮断
器(7^)がトリップしているかどうかを判別する。ト
リップしていない場合(NO)はつぎのステップ(82
)に進む、また、トリップしている場合(YES)はス
テップ(85)へ進む。
In step (81), the control signal generation unit (3c) is configured based on the open/closed state of the alarm contact AL of the earth leakage breaker (7^) detected via the input unit (3e) and the monitoring information generation unit (3f). Then, it is determined whether the earth leakage breaker (7^) has tripped due to overcurrent, short circuit, or leakage. If it has not tripped (NO), proceed to the next step (82
), or if tripped (YES), proceed to step (85).

ステップ(82)において、制御信号生成部(3C)は
、駆動出力部(3d)を介して電気操作装置(8)の○
FF操乍スイッチ(8g)を所定時間開じた後、つぎの
ステップ(83)に進む。
In step (82), the control signal generation unit (3C) controls the electrical operation device (8) via the drive output unit (3d).
After opening the FF operation switch (8g) for a predetermined period of time, proceed to the next step (83).

ステップ(83)において、制御信号生成部(3C)は
、入力部(3e)及び監視情報生成部(3f)を介して
検知された漏電遮断器(7^)の補助接点AXの開閉状
1に基づいて、漏電遮断器(7^)が「○FFJしてい
るかどうかを判別する。rOFF、+している場合(Y
ES)はつぎのステップ(84)へ進む、また、「OF
F」していない場合(NO)はステップ(87)へ進む
In step (83), the control signal generation unit (3C) changes the opening/closing state 1 of the auxiliary contact AX of the earth leakage breaker (7^) detected via the input unit (3e) and the monitoring information generation unit (3f). Based on this, determine whether the earth leakage breaker (7^) is ``○FFJ.'' If rOFF, + (Y
ES) proceeds to the next step (84), and also ``OF
If not (NO), proceed to step (87).

ステップ(84)において、制御信号生成部(3C)は
動作を終了する。
In step (84), the control signal generation section (3C) ends its operation.

ステップ(85)において、制御信号生成部(3C)は
、漏電遮断器(7^)のトリップ状態を解除するために
、警報接点ALをリセット(OFF)して、つぎのステ
ップ〈86)に進む。
In step (85), the control signal generation unit (3C) resets (turns OFF) the alarm contact AL in order to release the trip state of the earth leakage breaker (7^), and proceeds to the next step (86). .

ステップ(86)において、制御信号生成部(3C)は
、漏電遮断器(7^)の警報接点ALがリセットしてい
るかどうかを判別する。リセットしている場合(YES
)はステップ(82)へ戻る。また、リセットしていな
い場合(No)はつぎのステップ(87)に進む。
In step (86), the control signal generation unit (3C) determines whether the alarm contact AL of the earth leakage breaker (7^) has been reset. If it has been reset (YES
) returns to step (82). If the reset has not been performed (No), the process proceeds to the next step (87).

ステップ(87)において、過電流・短絡トリップ等の
エラー処理をして、ステップ(84)へ戻る。
In step (87), errors such as overcurrent and short circuit trip are handled, and the process returns to step (84).

第3番目に、漏電遮断器(7八)の動作状態の監視、つ
まり監視指令の動作を説明する。なお、制御指令の動作
と同一のところは詳細な説明を省略する。
Thirdly, the operation of monitoring the operating state of the earth leakage breaker (78), that is, the operation of the monitoring command, will be explained. Note that detailed explanations of the same operations as those of the control commands will be omitted.

最初に、端末制御監視装置(30)側の「監視コマンド
」の送信動作及び「応答コマンド」の受信動作を第11
図を参照しながら説明する。第11図は「監視コマンド
」及び「応答コマンド」の動作の流れを示す概略動作フ
ローチャート図である。
First, the sending operation of the "monitoring command" and the receiving operation of the "response command" on the terminal control monitoring device (30) side are performed in the 11th
This will be explained with reference to the figures. FIG. 11 is a schematic operational flowchart showing the flow of operations of the "monitoring command" and the "response command".

ステップ(90)において、端末制御監視装置く30)
は動作を開始する。
In step (90), the terminal control monitoring device 30)
starts working.

ステップ(91)において、端末制御監視装置(30)
は、「ONコマンド」の場合と同一の手順で「監視コマ
ンド」を生成して、端末制御監視装置(3^)に送信す
る。
In step (91), the terminal control monitoring device (30)
generates a "monitoring command" using the same procedure as for the "ON command" and transmits it to the terminal control and monitoring device (3^).

すなわち、入力部(30e)は、制御・監視用電気機械
器具(40)の図示しない監視スイッチの操作を検知す
る。
That is, the input unit (30e) detects the operation of a monitoring switch (not shown) of the control/monitoring electric mechanical device (40).

ステップ(92)において、端末制御監視装置(30)
は、「応答コマンド」を端末制御監視装置(3^)から
受信し、その「応答コマンド」に基づいて制御・監視用
電気機械器具(40)を駆動する。
In step (92), the terminal control monitoring device (30)
receives the "response command" from the terminal control/monitoring device (3^), and drives the control/monitoring electric mechanical appliance (40) based on the "response command".

すなわち、端末制御監視装置(30)は、「応答コマン
ド」に基づいて制御・監視用電気機械器具(40)のO
N10 F F表示灯(40a)、過電流・短絡トリッ
プ表示灯(40b)、漏電トリップ表示灯(40c)又
は異常表示灯(40d)を点灯又は点滅する0例えば、
漏電遮断器〈7^)が過電流・短絡トリップ動作状態で
あると応答された場合は、制御・監視用電気機械器具(
40)の過電流・短絡トリップ表示灯(40b)を点滅
させる。
That is, the terminal control/monitoring device (30) controls the O/O of the control/monitoring electrical equipment (40) based on the "response command".
N10 FF Lights up or blinks the F indicator light (40a), overcurrent/short circuit trip indicator light (40b), earth leakage trip indicator light (40c), or abnormality indicator light (40d)0 For example,
If the earth leakage breaker (7^) responds that it is in an overcurrent/short circuit trip state, the control/monitoring electrical equipment (
40) makes the overcurrent/short circuit trip indicator light (40b) blink.

ステップ(93)において、端末制御監視装置(30)
は動作を終了する。
In step (93), the terminal control monitoring device (30)
ends the operation.

つぎに、端末制御監視装置(3^)側の「監視コマンド
」の受信動作及び「応答コマンド」の送信動作を第11
図及び第12図を参照しながら説明する。第12図は漏
電遮断器()^)の監視情報を示す説明図である。
Next, the receiving operation of the "monitoring command" and the transmitting operation of the "response command" on the terminal control and monitoring device (3^) side are explained in the 11th step.
This will be explained with reference to the drawings and FIG. 12. FIG. 12 is an explanatory diagram showing monitoring information of the earth leakage breaker ()^).

ステップ(100)において、端末制御監視装置(3^
)は動作を開始する。
In step (100), the terminal control monitoring device (3^
) starts working.

ステップ(101)において、端末制御監視装置(3^
)は、「監視コマンド」を端末制御監視装置(30〉か
ら受信する。
In step (101), the terminal control and monitoring device (3^
) receives a "monitoring command" from the terminal control monitoring device (30>).

すなわち、送・受信部(3a)は、信号伝送線(2)上
の伝送信号を受取り、そのフレームチエツクコードFC
Cをチエツクし正常であれば、その相手アドレスDAが
自己アドレス設定部(3j)で設定された自局のアドレ
スかどうかを判別する。相手アドレスDAが自局のアド
レスの場合、コマンド・ワードCW、データ数BC及び
データDTを符号解読部(3b)に渡す。
That is, the transmitter/receiver (3a) receives the transmission signal on the signal transmission line (2), and checks the frame check code FC.
C is checked, and if it is normal, it is determined whether the other party's address DA is the address of the own station set by the own address setting section (3j). If the other party's address DA is the address of the local station, the command word CW, data count BC and data DT are passed to the code decoder (3b).

符号解読部(3b)は、コマンド・ワードCWが「監視
コマンド」であるかどうかを判別する。「監視コマンド
」の場合、コマンド・ワードCW、データ数BC及びデ
ータDTを監視情報生成部(3f)に渡して、この監視
情報生成部(3f)を動作させる。
The code decoder (3b) determines whether the command word CW is a "monitoring command". In the case of a "monitoring command", the command word CW, data count BC and data DT are passed to the monitoring information generating section (3f) to operate the monitoring information generating section (3f).

ステップ(102)において、端末制御監視装置(3^
)は、監視情報を生成する。
In step (102), the terminal control monitoring device (3^
) generates monitoring information.

すなわち、監視情報生成部(3f)は、動作手順記憶部
(38)に記憶された漏電遮断器(7^)の動作手順、
コマンド・ワードCW、データ数BC及びデータDTに
基づいて、入力部(3e)を介して検知した、漏電遮断
器(7八)の補助接点AX、警報接点AL及び漏電警報
接点EALの開閉データを入力し、これらに基づいて例
えば第12図に示すような7種類の監視情報を生成する
That is, the monitoring information generation unit (3f) generates the operation procedure of the earth leakage breaker (7^) stored in the operation procedure storage unit (38),
Based on the command word CW, data count BC, and data DT, the opening/closing data of the auxiliary contact AX, alarm contact AL, and earth leakage alarm contact EAL of the earth leakage breaker (78) detected through the input part (3e) is Based on these inputs, for example, seven types of monitoring information as shown in FIG. 12 are generated.

正常動作モードとして、補助接点AX、警報接点AL及
び漏電警報接点EALが全て「開」の場合は「漏′:4
遮断器(7^)のOFF状態」、「閉」、「開」及び「
開」の場合は「漏電遮断器(7^)のON状態」、「開
」、「閉」及び「開」の場合は「過電流・短絡トリップ
動作状態」、「開」、「閉J及び「閏」の場合は「漏電
トリップ動作状態Jの監視情報生成部 また、異常動作モードとして、補助接点AX、警報接点
AL及び漏電警報接点EALが「閉」、「閉」及び「開
」の場合は「過電流・短絡トリップ動作異常」、「閉j
、「開」(又は「閉」)及び「閉」の場合は「漏電トリ
ップ動作異常」、補助接点AX、警報接点AL及び漏電
警報接点EALの開閉データが上記以外の組合せの場合
は「その他の異常」の監視情報を生成する。
In the normal operation mode, if the auxiliary contact AX, alarm contact AL, and earth leakage alarm contact EAL are all "open", "leakage": 4
The OFF state of the circuit breaker (7^), "closed,""open," and "
"Open" means "ON state of earth leakage breaker (7^)", "Open", "Closed" and "Open" means "overcurrent/short circuit trip operation state", "Open", "Closed J and In the case of "leap", "monitoring information generation unit of earth leakage trip operation status J". Also, as abnormal operation mode, when auxiliary contact AX, alarm contact AL, and earth leakage alarm contact EAL are "closed", "closed", and "open""Overcurrent/short circuit trip operation abnormality", "Closed j
, "Open" (or "closed") and "closed" indicate "earth leakage trip operation abnormality", and when the opening/closing data of auxiliary contact AX, alarm contact AL, and earth leakage alarm contact EAL are combinations other than those listed above, "other Generates "abnormal" monitoring information.

ステップ(103)において、端末11i制御監視装置
(3^)は、「応答コマンド」を生成して、端末制御監
視装置く30)へ送信する。
In step (103), the terminal 11i control and monitoring device (3^) generates a "response command" and transmits it to the terminal control and monitoring device (30).

すなわち、監視情報生成部(3f)は、「応答コマンド
」を表わすコマンド・ワードCWを生成し、上述した監
視情報であるデータDT及びそのデータ数BCを生成し
てコマンド・ワードcwとともに符号生成部(31)に
渡す。
That is, the monitoring information generating section (3f) generates a command word CW representing a "response command", generates the data DT which is the above-mentioned monitoring information, and the number of data BC, and sends the same to the code generating section along with the command word CW. Give it to (31).

符号生成部(31)は、コマンド・ワードcw、データ
数BC及びデータDTを符号変換し送・受信部(3a)
に渡す。
The code generation unit (31) converts the code of the command word cw, the number of data BC and the data DT, and sends the code to the transmission/reception unit (3a).
give it to

送・受信部(3a)は、自己アドレス設定部(3j)で
設定された自局の自己アドレスSA、相手アドレス設定
部(3k)で設定された端末制御監視装置(3o)のア
ドレスである相手アドレスDA及びフレームチエツクコ
ードFCCを追加して伝送信号のフレームを構成する。
The transmitting/receiving unit (3a) sets the own address SA of the own station set by the own address setting unit (3j), and the other party which is the address of the terminal control and monitoring device (3o) set by the other party address setting unit (3k). Address DA and frame check code FCC are added to configure the frame of the transmission signal.

そして、その伝送信号を信号伝送線(2)に載せる。Then, the transmission signal is placed on the signal transmission line (2).

また、監視情報生成部(3f)は、上述した監視情報等
を情報処理部(3−)に渡し、この情報処理部(:(+
)を動作させる。
Further, the monitoring information generation unit (3f) passes the above-mentioned monitoring information etc. to the information processing unit (3-), and this information processing unit (:(+
) to work.

情報処理部(3m)は、上述した監視情報等に基づいて
表示部(3n)を駆動し、端末制御監視装置く3^)の
動作状態及び漏電遮断器(7^)のON10 F F状
態、過電流・短絡トリップ状態、漏電トリップ状官等を
例えば液晶で表示する。
The information processing unit (3m) drives the display unit (3n) based on the above-mentioned monitoring information, etc., and displays the operating state of the terminal control and monitoring device (3^) and the ON10 FF state of the earth leakage breaker (7^), Overcurrent/short circuit trip status, earth leakage trip status, etc. are displayed on, for example, a liquid crystal display.

ステップ(104)において、端末制御監視装置(3^
)は動作を終了する。
In step (104), the terminal control monitoring device (3^
) ends the operation.

第4番目に、漏電遮断器(7^)の異常及び状態変化に
基づいた動作、つまり通報指令の動作並びに第3の端末
IIJ御監視装置への制御指令及び監視指令の動作を説
明する。なお、rONコマンドJの動作と同一のところ
は詳細な説明を省略する。
Fourth, the operations based on abnormalities and state changes of the earth leakage breaker (7^), that is, the operations of notification commands and the operations of control commands and monitoring commands to the third terminal IIJ control and monitoring device will be explained. Note that the detailed explanation of the operations that are the same as those of the rON command J will be omitted.

最初に、端末制御監視装置(3^)側の「通報コマンド
」並びに「制御コマンド」及び「監視コマンド」の送信
動作を第13図を参照しながら説明する。第13図は「
通報コマンド」並びに漏電遮断器(7^)の異常及び状
態変化に基づいた「制御コマンド」及びr監視コマンド
」の動作の流れを示す機略動作フローチャート図である
First, the transmission operation of the "report command", "control command" and "monitoring command" on the terminal control and monitoring device (3^) side will be explained with reference to FIG. Figure 13 shows “
It is a strategic operation flowchart diagram showing the flow of operations of the "report command" and the "control command" and r monitoring command based on the abnormality and state change of the earth leakage circuit breaker (7^).

ステップ(ito)において、端末制御監視装置(3^
)は動作を開始する。
In step (ito), the terminal control and monitoring device (3^
) starts working.

ステップ(111)において、端末制御監視装置(3^
)は、漏電遮断器()八〉の開閉データを入力する。
In step (111), the terminal control monitoring device (3^
) inputs the opening/closing data of the earth leakage breaker ()8〉.

すなわち、入力部(3e)は、入力端子(3e、)、(
3ez)及び<3e、)を介して、漏電遮断器(7^)
の警報接点AL、漏電警報接点EAL及び補助接点AX
の開閉状態を検知し、検知信号(開閉データ)を生成し
て監視情報生成部(3f)に出力する。
That is, the input unit (3e) has input terminals (3e, ), (
3ez) and <3e,), earth leakage circuit breaker (7^)
Alarm contact AL, earth leakage alarm contact EAL and auxiliary contact AX
detects the open/close state of the switch, generates a detection signal (open/close data), and outputs it to the monitoring information generation section (3f).

ステップ(112)において、端末制御監視装置(3^
)は、漏電遮断器(7^)の動作状態が変化したかどう
かを判別する。動作状態が変化した場合(YES)はつ
ぎのステップ(113)に進む、動作状態が変化しない
場合(No>は最終のステップ(116)へ進む。
In step (112), the terminal control and monitoring device (3^
) determines whether the operating state of the earth leakage breaker (7^) has changed. If the operating state has changed (YES), proceed to the next step (113); if the operating state has not changed (No>), proceed to the final step (116).

すなわち、監視情報生成部(3f)は、動作手順記憶部
(3s)に記憶された漏電遮断器()^)の動作手順に
基づいて、警報接点AL、漏電警報接点EAL及び補助
接点AXの開閉データが変化したかどうかを判別する。
That is, the monitoring information generation unit (3f) opens and closes the alarm contact AL, the earth leakage alarm contact EAL, and the auxiliary contact AX based on the operating procedure of the earth leakage breaker ()^) stored in the operating procedure storage unit (3s). Determine whether the data has changed.

ステップ(113)において、端末制御監視装置(3八
)は、開閉データに基づいて監視情報を生成する。
In step (113), the terminal control and monitoring device (38) generates monitoring information based on the opening/closing data.

すなわち、監視情報生成部(3「)は、動作手順記憧部
(3S)に記憶された漏電遮断器〈7^)の動作手順と
警報接点AL、漏電警報接点EAL及び補助接点AXの
開閉データとに基づいて、「監視コマンド」の動作で説
明した監視情報を生成する。
That is, the monitoring information generation unit (3'') generates the operation procedure of the earth leakage breaker <7^) and the opening/closing data of the alarm contact AL, the earth leakage alarm contact EAL, and the auxiliary contact AX, which are stored in the operation procedure recording unit (3S). Based on this, the monitoring information described in the operation of the "monitoring command" is generated.

また、監視情報生成部(3r)は、上述した監視情報等
を情報処理部(3m)に渡し、この情報処理部(3糟)
を動作させる。
Further, the monitoring information generation unit (3r) passes the above-mentioned monitoring information etc. to the information processing unit (3m).
make it work.

情報処理部(3m)は、上述した監視情報等に基づいて
表示部(3n)を駆動し、端末制御監視装置(3^)の
動作状態及び漏電遮断器(7^)の0N10FF状悪、
過電流・短絡トリップ状態、漏電トリップ状態等を例え
ば液晶で表示する。
The information processing unit (3m) drives the display unit (3n) based on the above-mentioned monitoring information, etc., and displays the operating status of the terminal control monitoring device (3^) and the 0N10FF status of the earth leakage circuit breaker (7^).
Overcurrent/short circuit trip status, earth leakage trip status, etc. are displayed on, for example, a liquid crystal display.

ステップ(114)において、端末制御監視装置(3^
)は、監視情報に基づいて通報するかどうかを判別する
。通報する場合(YES)はステップ(117)へ進む
In step (114), the terminal control monitoring device (3^
) determines whether to report based on the monitoring information. If the notification is to be made (YES), the process advances to step (117).

また、通報しない場合(No)はつぎのステップ(,1
15)に進む。
Also, if you do not want to report (No), proceed to the next step (,1
Proceed to step 15).

すなわち、監視情報生成部(3f)は、監視情報に基づ
いて通報するかどうかを判別する0通報する場合(YE
S)は、「通報コマンド」を表わすコマンド・ワードC
Wを生成して、監視情報とともに通報指令生成部(38
)に渡す。
That is, the monitoring information generation unit (3f) determines whether to report based on the monitoring information.
S) is a command word C representing "report command"
W and sends it to the reporting command generation unit (38) together with the monitoring information.
).

ステップ(115)において、端末制御監視装置(3^
)は、監視情報に基づいて「制御コマンド」又は「監視
コマンド」を出すかどうかを判別する。「制御コマンド
」又は「監視コマンド」を出す場合(YES)はステッ
プ(118)へ進む、「制御コマンド」又は「監視コマ
ンド」を出さない場合(No)はつぎの最終ステップ(
116)に進む。
In step (115), the terminal control monitoring device (3^
) determines whether to issue a "control command" or a "monitoring command" based on the monitoring information. If a "control command" or "monitoring command" is issued (YES), proceed to step (118); if a "control command" or "monitoring command" is not issued (No), proceed to the next final step (
116).

すなわち、監視情報生成部(3f)は、監視情報に基づ
いて「制御コマンド」又は「監視コマンド」を出すかど
うかを判別する。「制御コマンド」又は「監視コマンド
Jを出す場合(YES)は、「制御コマンドJ又は「監
視コマンド」を表わすコマンド・ワードCWを生成して
、監視情報とともに制御・監視指令生成部(3h)に渡
す。
That is, the monitoring information generation unit (3f) determines whether to issue a "control command" or a "monitoring command" based on the monitoring information. When issuing a “control command” or “monitoring command J” (YES), a command word CW representing the “control command J” or “monitoring command” is generated and sent to the control/monitoring command generation unit (3h) along with the monitoring information. hand over.

ステップ(116)において、端末制御監視装置<3八
)は動作を終了する。
In step (116), the terminal control and monitoring device <38) ends its operation.

ステップ(117)において、端末制御監視装置(3^
)は、「通報コマンド」を生成して、端末制御監視装置
<30)へ送信する。その後、ステップ(115)に進
む。
In step (117), the terminal control monitoring device (3^
) generates a "report command" and sends it to the terminal control and monitoring device <30). Thereafter, the process proceeds to step (115).

すなわち、通報指令生成部(3g)は、監視情報及びコ
マンド・ワードCWに基づいて付随するデータDT及び
そのデータ数BCを生成し、コマンド・ワードCWとと
もに符号生成部(31)に渡す。
That is, the reporting command generation section (3g) generates the accompanying data DT and the number of data BC based on the monitoring information and the command word CW, and passes the generated data together with the command word CW to the code generation section (31).

符号生成部(31)は、コマンド・ワードCW、データ
数BC及びデータDTを符号変換し送・受信部(3a)
に渡す。
The code generation unit (31) converts the code of the command word CW, the number of data BC and the data DT, and sends the code to the transmission/reception unit (3a).
give it to

送・受信部(3a)は、自己アドレス設定部(3j)で
設定された自局の自己アドレスSA、相手アドレス設定
部(3k)で設定された端末制御監視装置く30)のア
ドレスである相手アドレスDA及びフレームチエツクコ
ードFCCを追加して伝送信号のフレームを構成する。
The transmitting/receiving unit (3a) transmits the self-address SA of the own station set by the self-address setting unit (3j) and the address of the terminal control/monitoring device (30) set by the other party address setting unit (3k). Address DA and frame check code FCC are added to configure the frame of the transmission signal.

そして、その伝送信号を信号伝送線(2)に載せて、端
末制御監視装置(30)へ割込をかける。
Then, the transmission signal is placed on the signal transmission line (2) and interrupts the terminal control and monitoring device (30).

ステップ(118)において、端末制御監視装置(3^
)は、「制御コマンド」又は「監視コマンド」を生成し
て、第3の端末制御監視装!に送信する。その後、最終
ステップ(116)に進む。
In step (118), the terminal control monitoring device (3^
) generates a "control command" or "monitoring command" and controls the third terminal control and monitoring device! Send to. Thereafter, proceed to the final step (116).

すなわち、制御・監視指令生成部(3h)は、監視情報
及びコマンド・ワードCWに基づいて付随するデータD
T及びそのデータ数BCを生成し、コマンド・ワードC
Wとともに符号生成部(31)に渡す。
That is, the control/monitoring command generation unit (3h) generates the accompanying data D based on the monitoring information and the command word CW.
T and its data number BC, and command word C
It is passed along with W to the code generation unit (31).

符号生成部(31)は、コマンド・ワードCW、データ
数BC及びデータDTを符号変換し送・受信部(3a)
に渡す。
The code generation unit (31) converts the code of the command word CW, the number of data BC and the data DT, and sends the code to the transmission/reception unit (3a).
give it to

送・受信部(3a)は、自己アドレス設定部(3j)で
設定された自局の自己アドレスS A、相手アドレス設
定部(3k)で設定された第3の端末制御監視装置のア
ドレスである相手アドレスDA及びフレームチエツクコ
ードFCCを追加して伝送信号のフレームを構成する。
The transmitting/receiving unit (3a) has its own address S A set by the own address setting unit (3j), and the address of the third terminal control and monitoring device set by the other party address setting unit (3k). A destination address DA and a frame check code FCC are added to form a transmission signal frame.

そして、その伝送信号を信号伝送線(2)に載せる。Then, the transmission signal is placed on the signal transmission line (2).

つぎに、端末制御監視装置(30)側の「通報コマンド
」の受信動作を第13図を参照しながら説明する。
Next, the reception operation of the "report command" on the terminal control and monitoring device (30) side will be explained with reference to FIG.

ステップ(120)において、端末制御監視装置(30
)は動作を開始する。
In step (120), the terminal control monitoring device (30
) starts working.

ステップ(121)において、端末制御監視装置(30
)は、「通報コマンド」を端末制御監視装置!(3八)
から受信したかどうかを判別する。受信した場合(YE
S)はつぎのステップ(122)に進む、受信しない場
合(NO)はステップ(124)へ進む。
In step (121), the terminal control monitoring device (30
) is a terminal control monitoring device that uses "report commands"! (38)
Determine whether it has been received from. If received (YE
S), proceed to the next step (122); if not received (NO), proceed to step (124).

すなわち、送・受信部(30m)は、割込があった場合
は信号伝送線(2)上の伝送信号を受取り、そのフレー
ムチエツクコードFCCをチエツクし正常であれば、そ
の相手アドレスDAが自己アドレス設定部(30j)で
設定された自局のアドレスかどうかを判別する。相手ア
ドレスDAが自局のアドレスの場合、コマンド・ワード
CW、データ数BC及びデータDTを符号解読部(30
b)に渡す。
That is, the transmitting/receiving section (30m) receives the transmission signal on the signal transmission line (2) when there is an interrupt, checks the frame check code FCC, and if it is normal, the other party's address DA is the self. It is determined whether the address of the own station is set by the address setting section (30j). When the other party's address DA is the own address, the command word CW, data number BC and data DT are sent to the code decoder (30
b).

符号解読部(30b)は、コマンド・ワードCWが「通
報コマンド」であるかどうかを判別する。「通報コマン
ドJの場合、コマンド・ワードCW、データ数BC及び
データDTを監視情報生成部<3Of>に渡して、この
監視情報生成部(30f)を動作させる。
The code decoder (30b) determines whether the command word CW is a "report command". “In the case of notification command J, the command word CW, data count BC, and data DT are passed to the monitoring information generation unit <3Of>, and the monitoring information generation unit (30f) is operated.

ステップ(122)において、端末制御監視装置(30
)は、「通報コマンド」を解読し、つぎのステップ(1
23)に進む。
In step (122), the terminal control monitoring device (30
) decodes the “report command” and executes the next step (1
Proceed to 23).

すなわち、監視情報生成部(30f)は、コマンド・ワ
ードCW、データ数BC及びデータDTを解読する。
That is, the monitoring information generation unit (30f) decodes the command word CW, the number of data BC, and the data DT.

ステップ(123)において、端末制御監視装置(30
)は、「通報コマンド」に基づ(処理をして、ステップ
(124)に進む。
In step (123), the terminal control monitoring device (30
) performs (processing) based on the "report command" and proceeds to step (124).

すなわち、監視情報生成部(30f)は、動作手順記憶
部(30s)に記憶された動作手順、コマンド・ワード
CW、データ数BC及びデータDT基づいて、必要があ
る場合は第3の端末制御監視装置への新たな「通報コマ
ンド」、「制御コマンド」又は「監視コマンドJを表わ
すコマンド・ワードCWを生成して、通報指令生成部(
30g)又は制御・監視指令生成部(30h)に渡す。
That is, the monitoring information generation unit (30f) performs third terminal control monitoring, if necessary, based on the operation procedure, command word CW, data count BC, and data DT stored in the operation procedure storage unit (30s). A command word CW representing a new "report command", "control command" or "monitoring command J" to the device is generated, and the report command generation unit (
30g) or the control/monitoring command generation unit (30h).

通報指令生成部(30g>又は制御・監視指令生成部(
30h)は、コマンド・ワードC界等に基づいて付随す
るデータDT及びデータ数BCを生成し、コマンド・ワ
ードCWとともに符号生成部(30i )に渡す。
Notification command generation unit (30g>) or control/monitoring command generation unit (
30h) generates accompanying data DT and data count BC based on the command word C field, etc., and passes them along with the command word CW to the code generator (30i).

符号生成部(30i )は、コマンド・ワードCW、デ
ータ数BC及びデータDTを符号変換して送・受信部(
30a)に渡す。
The code generation unit (30i) converts the code of the command word CW, the number of data BC, and the data DT and sends the code to the transmission/reception unit (30i).
30a).

送・受信部(30a)は、自己アドレス設定部(30j
)で設定された自局の自己アドレスSA、相手アドレス
設定部(30k>で設定された第3の端末制御監視装置
のアドレスである相手アドレスDA及びフレームチエツ
クコードFCCを追加して伝送信号のフレームを構成す
る。そして、その伝送信号を信号伝送線(2)に載せる
The transmitting/receiving unit (30a) has a self-address setting unit (30j
), the other party's address DA, which is the address of the third terminal control and monitoring device set in the other party's address setting section (30k>), and the frame check code FCC are added to create a frame of the transmission signal. The transmission signal is then placed on the signal transmission line (2).

また、監視情報生成部(3Of)は、上述したコマンド
・ワードC界等を情報処理部(30n>に渡し、この情
報処理部(30m)を動作させる。
Further, the monitoring information generating section (3Of) passes the above-mentioned command word C field, etc. to the information processing section (30n>), and operates this information processing section (30m).

情報処理部(3m)は、上述したコマンド・ワードC界
等に基づいて表示部〈3n)を駆動し、端末制御監視装
置(30)の動作状態等を液晶で表示する。
The information processing section (3m) drives the display section (3n) based on the above-mentioned command/word C field, etc., and displays the operating status of the terminal control/monitoring device (30), etc. on the liquid crystal.

ステップ(124)において、端末制御監視装置(30
)は動作を終了する。
In step (124), the terminal control monitoring device (30
) ends the operation.

なお、この発明は、特に伝送方式にこだわる必要はなく
、各制御コマンド、監視コマンド等に対応する接点入力
等を相手の端末制御監視装置に送信してもよく、専用信
号線を用いたり、電力線搬送を用いたり、あるいは各種
多重伝送技術を応用した伝送方式でも実現できる。
Note that this invention does not need to be particular about the transmission method, and contact inputs, etc. corresponding to each control command, monitoring command, etc. may be transmitted to the terminal control and monitoring device of the other party, and a dedicated signal line or a power line may be used. This can be achieved by using a carrier or by a transmission system that applies various multiplex transmission techniques.

ところで、上記実施例では相手アドレス設定部で設定で
きるアドレスが1個であるが、複数個(2〜N)として
も同様の動作を期待でき、この場合は複数の端末制御監
視装置に制御指令等を送信することができる。
By the way, in the above embodiment, the number of addresses that can be set in the destination address setting section is one, but the same operation can be expected even if there are multiple addresses (2 to N). In this case, control commands, etc. can be sent to multiple terminal control and monitoring devices. can be sent.

また、上記実施例では自己アドレス設定部及び相手アド
レス設定部を個別に設けたが、第6図に示したように切
り換えスイッチを設けた1個の設定部で兼用しても同様
の動作を期待できる。
In addition, in the above embodiment, the self-address setting section and the other party's address setting section were provided separately, but the same operation can be expected even if a single setting section provided with a changeover switch is used for both purposes, as shown in Fig. 6. can.

さらに、上記実施例では表示部として液晶を設けて接続
された配電機器等の動作状態を目視できるようにしたが
、LED等の他の表示手段でもよい またさらに、上記実施例では情報の出力手段として表示
部を設けたが、音声による出力部を設けてもよい。
Furthermore, in the above embodiments, a liquid crystal is provided as a display unit so that the operating status of the connected power distribution equipment etc. can be visually checked, but other display means such as LEDs may also be used. Although a display unit is provided as an example, an audio output unit may also be provided.

またさらに、上記実施例では、システムの立ちあげ時に
他の端末制御監視装置から送信された、初期コマンドか
ら制御信号生成手順や監視情報生成手順等の動作手順を
ダウンロードして、動作手順記憶部に記憶しているが、
制御指令である「ONコマンド」等と同時に動作手順を
送信し、その都度最適な動作手順を送信することも可能
である。
Furthermore, in the above embodiment, operating procedures such as control signal generation procedures and monitoring information generation procedures are downloaded from initial commands sent from other terminal control and monitoring devices when the system is started up, and are stored in the operation procedure storage unit. I remember, but
It is also possible to transmit the operating procedure at the same time as the "ON command", which is a control command, and to transmit the optimal operating procedure each time.

[発明の効果] この発明は、以上説明したように構成されているので、
以下に記載されるような効果を奏する。
[Effect of the invention] Since this invention is configured as explained above,
This produces the effects described below.

システムを構築する場合、中央制御監視装置が不要なの
で、システム全体として安価で取付スペースが節約でき
る。
When constructing the system, there is no need for a central control and monitoring device, so the overall system is inexpensive and saves installation space.

また、接続されている全ての配電機器の動作に関する、
膨大かつ煩雑な、動作手順や禁止事項を熟知する必要が
ない。
In addition, regarding the operation of all connected power distribution equipment,
There is no need to be familiar with vast and complicated operating procedures and prohibitions.

さらに、制御・監視の最小単位がマクロ的な制御指令や
監視指令なので、1つの制御・監視指令を完了するまで
の処理時間が短くなり、信号伝送線の使用効率が非常に
良くなった。
Furthermore, since the minimum unit of control/monitoring is a macroscopic control command or monitoring command, the processing time required to complete one control/monitoring command is shortened, and the efficiency of use of signal transmission lines is greatly improved.

またさらに、接続された配電機器に最適な動作手Jll
ftを他の端末制御監視装置から入力することができる
ので、1種類の端末制御監視装置により各種の配電機器
を制御・監視することができ、端末制御監視装置として
自由度が高くなり、かつ接続された配を機器を変更して
もシステムの構成を変更することなく、変更された配電
機器に最適な動作手順を実施できるシステムを提供でき
る。
Furthermore, the optimum operating method for the connected power distribution equipment
ft can be input from other terminal control and monitoring devices, it is possible to control and monitor various power distribution equipment with one type of terminal control and monitoring device, and the degree of freedom as a terminal control and monitoring device is increased. It is possible to provide a system that can implement the optimal operation procedure for the changed power distribution equipment without changing the configuration of the system even if the equipment is changed.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図はこの発明の一実施例を示すブロック図、第2図
はこの発明の一実施例に接続された配電機器を示すブロ
ック図、第3図は第2図の一部を示す回路図、第4図は
この発明の一実施例をネットワークした配電機器制御監
視システム示す概略ブロック図、第5図は他の配電機器
制御監視システム示す概略ブロック図、第6図は漏電遮
断器用の端末制御監視装置を示す斜視図、第7図は伝送
信号のフレーム構成を示す構成図、第8図はrONコマ
ンド」及び「応答コマンド」の動作の流れを示す概略動
作フローチャート図、第9図は漏電遮断器をrONJさ
せる制御手順を示すフローチャート図、第10図は漏電
遮断器をrOFF、させる制御手順を示すフローチャー
ト図、第11図はrONコマンドJ及び「応答コマンド
」の動作の流れを示す概略動作フローチャート図、第1
2図は漏電遮断器の監視情報を示す説明図、第13図は
「通報コマンド」、並びに漏電遮断器の異常及び状態変
化に基づいた「制御コマンド」及び「監視コマンド」の
動作の流れを示す概略動作フローチャート図、第14図
は従来の配電機器制御監視装置を示すブロック図、第1
5図(a)〜(e)は従来例の各部の信号波形を示すタ
イムチャート図である。 図において、 (3^)、(30)  ・・− (3&)、(30a)  ・・・ (3b)、(30b)  ・・・ (3c)、(30c)  ・・・ (3d)、(30d)  ・・・ (3e)、 (30e)   ・・・ 端末制御監視装置、 送・受信部、 符号解読部、 制御信号生成部、 駆動出力部、 入力部、 (30r) (30g) (30h) (30i) (30s) (3f  、 (3g  、 (3h 。 (3; 。 (3g  、 (7^ ある。 なお、 示す。 監視情報生成部、 通報指令生成部、 帽1監視指令生成部、 符号生戒部、 動作手順記憶部、 漏電遮断器、 帽1監視用電気機械器具で
Fig. 1 is a block diagram showing an embodiment of the present invention, Fig. 2 is a block diagram showing power distribution equipment connected to an embodiment of the invention, and Fig. 3 is a circuit diagram showing a part of Fig. 2. , Fig. 4 is a schematic block diagram showing a networked power distribution equipment control and monitoring system according to an embodiment of the present invention, Fig. 5 is a schematic block diagram showing another power distribution equipment control and monitoring system, and Fig. 6 is a terminal control for an earth leakage circuit breaker. A perspective view showing the monitoring device, Fig. 7 is a configuration diagram showing the frame structure of the transmission signal, Fig. 8 is a schematic operation flowchart showing the flow of operations of "rON command" and "response command", and Fig. 9 is an earth leakage cutoff. 10 is a flowchart showing the control procedure to turn the earth leakage breaker rOFF, and FIG. 11 is a schematic operation flowchart showing the flow of the rON command J and "response command". Figure, 1st
Figure 2 is an explanatory diagram showing the monitoring information of the earth leakage breaker, and Figure 13 shows the flow of operations of the "report command" and the "control command" and "monitoring command" based on abnormalities and status changes of the earth leakage breaker. A schematic operation flowchart, FIG. 14 is a block diagram showing a conventional power distribution equipment control and monitoring device,
FIGS. 5(a) to 5(e) are time charts showing signal waveforms of various parts in the conventional example. In the figure, (3^), (30) ... - (3&), (30a) ... (3b), (30b) ... (3c), (30c) ... (3d), (30d ) ... (3e), (30e) ... Terminal control and monitoring device, transmitting/receiving section, code decoding section, control signal generation section, drive output section, input section, (30r) (30g) (30h) ( 30i) (30s) (3f, (3g, (3h. section, operating procedure storage section, earth leakage breaker, cap 1 monitoring electrical and mechanical equipment.

Claims (3)

【特許請求の範囲】[Claims] (1)接続している配電機器の動作状態を検知し検知信
号を生成する入力部、上記検知信号に基づいて監視情報
又は応答指令を生成する監視情報生成部、上記監視情報
に基づいて制御指令を生成する制御指令生成部、上記制
御指令又は応答指令を符号変換する符号生成部、及び上
記符号変換した制御指令又は応答指令を含む伝送信号を
送信する送信部から送信系を構成し、かつ上記伝送信号
を受信する受信部、上記伝送信号から上記制御指令又は
応答指令の符号であると解読する符号解読部、外部の送
信機器から送信された上記配電機器を動作する動作手順
を記憶することができる動作手順記憶部、上記動作手順
と上記制御指令又は応答指令とに基づいて制御信号を生
成する制御信号生成部、及び上記制御信号に基づいて上
記配電機器を駆動する駆動信号を出力する駆動出力部か
ら受信系を構成する第1の端末制御監視装置、並びにこ
の第1の端末制御監視装置と同一の構成を有する第2の
端末制御監視装置を備え、上記第1の端末制御監視装置
又は第2の端末制御監視装置が上記制御指令を送信する
ときは上記第2の端末制御監視装置又は第1の端末制御
監視装置が上記応答指令を送信することを特徴とする配
電機器制御監視装置。
(1) An input unit that detects the operating state of connected power distribution equipment and generates a detection signal, a monitoring information generation unit that generates monitoring information or response commands based on the detection signal, and a control command based on the monitoring information. A transmission system includes a control command generation unit that generates a control command, a code generation unit that converts the code of the control command or response command, and a transmission unit that transmits a transmission signal including the code-converted control command or response command, and A receiving unit that receives a transmission signal, a code decoding unit that decodes the transmission signal as a code of the control command or response command, and a code decoding unit that stores an operation procedure for operating the power distribution equipment transmitted from an external transmission device. a control signal generation section that generates a control signal based on the operation procedure and the control command or response command; and a drive output that outputs a drive signal that drives the power distribution equipment based on the control signal. a first terminal control and monitoring device constituting a reception system from the section, and a second terminal control and monitoring device having the same configuration as the first terminal control and monitoring device, A power distribution equipment control and monitoring device characterized in that when the second terminal control and monitoring device transmits the control command, the second terminal control and monitoring device or the first terminal control and monitoring device transmits the response command.
(2)接続している配電機器の動作状態を検知し検知信
号を生成する入力部、上記検知信号に基づいて監視情報
又は応答指令を生成する監視情報生成部、上記監視情報
に基づいて監視指令を生成する監視指令生成部、上記監
視指令又は応答指令を符号変換する符号生成部、及び上
記符号変換した制御指令又は応答指令を含む伝送信号を
送信する送信部から送信系を構成し、かつ上記伝送信号
を受信する受信部、上記伝送信号から上記監視指令又は
応答指令の符号であると解読する符号解読部、外部の送
信機器から送信された上記配電機器を動作する動作手順
を記憶することができる動作手順記憶部、上記動作手順
と上記応答指令とに基づいて制御信号を生成する制御信
号生成部、及び上記制御信号に基づいて上記配電機器を
駆動する駆動信号を出力する駆動出力部から受信系を構
成する第1の端末制御監視装置、並びにこの第1の端末
制御監視装置と同一の構成を有する第2の端末制御監視
装置を備え、上記第1の端末制御監視装置又は第2の端
末制御監視装置が上記監視指令を送信するときは上記第
2の端末制御監視装置又は第1の端末制御監視装置が上
記応答指令を送信することを特徴とする配電機器制御監
視装置。
(2) An input unit that detects the operating state of connected power distribution equipment and generates a detection signal, a monitoring information generation unit that generates monitoring information or response commands based on the detection signal, and a monitoring command based on the monitoring information. A transmission system includes a monitoring command generation unit that generates the monitoring command or the response command, a code generation unit that converts the code of the monitoring command or the response command, and a transmission unit that transmits a transmission signal containing the code-converted control command or response command, and A receiving unit that receives a transmission signal, a code decoding unit that decodes the transmission signal as a code of the monitoring command or response command, and a code decoding unit that stores an operation procedure for operating the power distribution equipment transmitted from an external transmitting device. a control signal generation unit that generates a control signal based on the operation procedure and the response command; and a drive output unit that outputs a drive signal that drives the power distribution equipment based on the control signal. A first terminal control and monitoring device constituting the system, and a second terminal control and monitoring device having the same configuration as the first terminal control and monitoring device, the first terminal control and monitoring device or the second terminal A power distribution equipment control and monitoring device characterized in that when the control and monitoring device transmits the monitoring command, the second terminal control and monitoring device or the first terminal control and monitoring device transmits the response command.
(3)接続している配電機器の状態変化を検知し検知信
号を生成する入力部、外部の送信機器から送信された上
記配電機器の監視情報を生成する動作手順を記憶するこ
とができる動作手順記憶部、上記動作手順と上記検知信
号とに基づいて監視情報を生成する監視情報生成部、上
記監視情報に基づいて通報指令を生成する通報指令生成
部、上記通報指令を符号変換する符号生成部、及び上記
符号変換した通報指令を含む伝送信号を送信する送信部
から送信系を構成し、かつ上記伝送信号を受信する受信
部、上記伝送信号から上記通報指令の符号であると解読
する符号解読部、及び上記通報信号に基づいてつぎの動
作を判断する上記監視情報生成部から受信系を構成する
第1の端末制御監視装置、並びにこの第1の端末制御監
視装置と同一の構成を有する第2の端末制御監視装置を
備え、上記第1の端末制御監視装置又は第2の端末制御
監視装置が上記通報指令を送信するときは上記第2の端
末制御監視装置又は第1の端末制御監視装置が上記通報
指令を受信することを特徴とする配電機器制御監視装置
(3) An input unit that detects changes in the state of connected power distribution equipment and generates a detection signal, and an operation procedure that can store the operation procedure for generating monitoring information of the power distribution equipment transmitted from an external transmitting device. a storage unit, a monitoring information generation unit that generates monitoring information based on the operating procedure and the detection signal, a notification command generation unit that generates a notification command based on the monitoring information, a code generation unit that converts the code of the notification command. , and a transmitting unit configured to transmit a transmission signal including the code-converted notification command, a receiving unit receiving the transmission signal, and a code decoder to decode the transmission signal as the code of the notification command. and a first terminal control and monitoring device that constitutes a receiving system from the monitoring information generation section that determines the next operation based on the notification signal, and a first terminal control and monitoring device that has the same configuration as the first terminal control and monitoring device. 2 terminal control and monitoring devices, and when the first terminal control and monitoring device or the second terminal control and monitoring device transmits the notification command, the second terminal control and monitoring device or the first terminal control and monitoring device A power distribution equipment control and monitoring device, characterized in that the device receives the notification command.
JP63160751A 1988-06-30 1988-06-30 Distribution equipment control and monitoring device Expired - Lifetime JPH0832139B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63160751A JPH0832139B2 (en) 1988-06-30 1988-06-30 Distribution equipment control and monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63160751A JPH0832139B2 (en) 1988-06-30 1988-06-30 Distribution equipment control and monitoring device

Publications (2)

Publication Number Publication Date
JPH0213240A true JPH0213240A (en) 1990-01-17
JPH0832139B2 JPH0832139B2 (en) 1996-03-27

Family

ID=15721675

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63160751A Expired - Lifetime JPH0832139B2 (en) 1988-06-30 1988-06-30 Distribution equipment control and monitoring device

Country Status (1)

Country Link
JP (1) JPH0832139B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6070940A (en) * 1983-09-26 1985-04-22 松下電工株式会社 Indoor wiring system
JPS6184936A (en) * 1984-10-03 1986-04-30 Toshiba Corp Remote supervisory control system
JPS6250905A (en) * 1985-08-30 1987-03-05 Mitsubishi Electric Corp Remote program system for program controller
JPS62207033A (en) * 1986-03-07 1987-09-11 Matsushita Electric Ind Co Ltd Power line carrier communication equipment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6070940A (en) * 1983-09-26 1985-04-22 松下電工株式会社 Indoor wiring system
JPS6184936A (en) * 1984-10-03 1986-04-30 Toshiba Corp Remote supervisory control system
JPS6250905A (en) * 1985-08-30 1987-03-05 Mitsubishi Electric Corp Remote program system for program controller
JPS62207033A (en) * 1986-03-07 1987-09-11 Matsushita Electric Ind Co Ltd Power line carrier communication equipment

Also Published As

Publication number Publication date
JPH0832139B2 (en) 1996-03-27

Similar Documents

Publication Publication Date Title
JP2001095263A (en) Inverter control system, inverter, and system control apparatus
CN102324790A (en) Intelligent management terminal of circuit breaker
KR102063861B1 (en) Control network system with motor control function using smart switch
JPH0213240A (en) Controller/monitor for distribution machinery
CN201138365Y (en) CVT on-line monitoring terminal
CN208835837U (en) Long-range involution equipment and system
JPH0213236A (en) Controller/monitor for distribution machinery
JPH0213239A (en) Controller/monitor for distribution machinery
JPH0213237A (en) Controller/monitor for distribution machinery
JPH0213241A (en) Controller/monitor for distribution machinery
CN208655483U (en) The connection locking system of multiterminal flexible direct current system bus rod isolation switch
JPH0213235A (en) Controller/monitor for distribution machinery
JPH0213238A (en) Controller/monitor for distribution machinery
CN106469943A (en) Based on the intelligent system connecting distribution loop using communication through cross-connecting box of operation post
CN217588240U (en) Intelligent remote alarm circuit, device and automatic production line thereof
CN202206192U (en) Intelligent management terminal of circuit breaker
CN217333420U (en) Vending machine shipment detection device based on opto-coupler and micro-gap switch
CN214429477U (en) Multi-equipment control device for operation protection of driving motor
CN213782862U (en) Split type motor comprehensive protection controller
CN218630098U (en) Intelligent fuse for street lamp
JPH01274630A (en) Controller/monitor for distribution machinery
JP2560444B2 (en) Distribution equipment control and monitoring device
KR101890679B1 (en) Digital electrical measuring instrument and a system for monitering power
JPS6245252A (en) Remote fault control system
JPH01274629A (en) Controller/monitor for distribution machinery