JPH02112547A - Structuring reinforced concrete column - Google Patents

Structuring reinforced concrete column

Info

Publication number
JPH02112547A
JPH02112547A JP26290088A JP26290088A JPH02112547A JP H02112547 A JPH02112547 A JP H02112547A JP 26290088 A JP26290088 A JP 26290088A JP 26290088 A JP26290088 A JP 26290088A JP H02112547 A JPH02112547 A JP H02112547A
Authority
JP
Japan
Prior art keywords
main reinforcements
column
reinforcements
main
corner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP26290088A
Other languages
Japanese (ja)
Other versions
JP2577069B2 (en
Inventor
Kenzo Yoshioka
吉岡 研三
Yasutoshi Nagai
永井 康淑
Yasuo Inoue
康夫 井上
Tatsuya Wakizaka
脇坂 達也
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP63262900A priority Critical patent/JP2577069B2/en
Publication of JPH02112547A publication Critical patent/JPH02112547A/en
Application granted granted Critical
Publication of JP2577069B2 publication Critical patent/JP2577069B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

PURPOSE:To facilitate the arrangement of shear-resistant reinforcing bars by a method wherein some internal main reinforcement of column main reinforcements, other than corner main reinforcements, are arranged on the inside of the arrangement lines demarcated by the positions of the corner main reinforcements, and the internal main reinforcements are bound being surrounded by shear reinforcing bars. CONSTITUTION:Corner main reinforcements 2 are arranged at corners demarcating a square that is defining an internal shape of a precast concrete PC manufacturing member 1. Internal main reinforcements 3, other than the corner main reinforcements 2, are arranged on the inside of the arrangement square shape of the corner main reinforcements 2, and a space in a dimension larger than that equivalent to the outer diameter of a shear resistant reinforcing bar 4 is provided between the internal main reinforcements 3 and internal peripheral surface 1a of the PC manufacturing member 1. Each one of the two pairs of the main reinforcements 3, facing each other, is bound with tie-hoops made from the shear resistant reinforcing bars 4, in a way that they are surrounding the main reinforcements 3 from the outside. The PC manufacturing members 1 are then inserted and installed, surrounding the outside of the corner main reinforcements 2 and after this, concrete is placed to the inside of the PC manufacturing members 1.

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は、柱主筋が内部に配設され柱の外殻を区画形成
する中空筒体状のプレキャストコンクリド部材内にコン
クリートを打設して鉄筋コンクリート柱を構築する方法
に関するものである。
Detailed Description of the Invention (Field of Industrial Application) The present invention involves pouring concrete into a hollow cylindrical precast concrete member in which a column main reinforcement is arranged and which defines the outer shell of the column. This paper relates to a method for constructing reinforced concrete columns.

(従来の技術) 従来、プレキャストコンクリート部材(以下、10部材
という)を利用して鉄筋コンクリート柱(以下、RC柱
という)を構築する提案としては、「鉄筋コンクリート
柱構築用外郭体」 (特公昭61−31261号公報)
や「コンクリート柱構築用プレキャストコンクリート部
材」 (実開昭62−10190′9号公報)等がなさ
れている。これらは、まず施工現場において柱主筋、必
要な場合には柱主筋を取り囲むようにしてフープ筋や円
形スパイラルフープ筋等の剪断補強筋を配筋し、その後
この配筋された柱主筋等に被せるようにして中空筒体状
の10部材を設置し、そして最後にPC部材内部にコン
クリートを打設してRC柱を構築するようになっている
(Prior Art) Conventionally, as a proposal for constructing reinforced concrete columns (hereinafter referred to as RC columns) using precast concrete members (hereinafter referred to as 10 members), there was a proposal called "Outer body for constructing reinforced concrete columns" (Special Publication No. 61-1983). Publication No. 31261)
and ``Precast Concrete Member for Constructing Concrete Columns'' (Utility Model Application Publication No. 10190'9/1983). First, at the construction site, the main column reinforcement, and if necessary, shear reinforcing reinforcement such as hoop reinforcement or circular spiral hoop reinforcement are arranged to surround the main column reinforcement, and then the reinforcement is placed over the arranged main reinforcement of the column. In this way, 10 hollow cylindrical members are installed, and finally, concrete is poured inside the PC members to construct an RC column.

(発明が解決しようとする課題) ところで20部材1が被せられてその内部に配置される
柱主筋2,3は第6図に示すように、中空筒体状のPC
0部材の内周面aにほぼ接するようにその内面形状に沿
って配置されるのが一般的である。図示した断面角型の
PC0部材を例にとれば、内面形状の角型を画定する四
隅の隅主筋2が柱主筋2,3全体の配置外形を画定し、
その他の隅主筋2以外の中央部主筋3はこの配置外形に
沿ってPC0部材の内周面aに接するように配置される
。このことはPC0部材の内面形状がいかなる形状であ
っても基本的には同様であり、換言すればPC0部材の
内面形状に応じて決定される隅主筋2位置を基準として
、中央部主筋3は隅主筋2の配置によって画定された配
置外形に沿って隅主筋2間を埋めるように配置されるこ
とになる。
(Problem to be Solved by the Invention) By the way, the column main reinforcements 2 and 3 placed inside the 20 members 1 are hollow cylindrical PCs as shown in FIG.
It is generally arranged along the inner surface shape of the 0 member so as to be substantially in contact with the inner peripheral surface a of the member. Taking the illustrated PC0 member with a square cross section as an example, the main corner reinforcements 2 at the four corners that define the square shape of the inner surface define the overall arrangement outline of the column main reinforcements 2 and 3,
The center main reinforcements 3 other than the corner main reinforcements 2 are arranged along this arrangement outline so as to be in contact with the inner circumferential surface a of the PC0 member. This is basically the same regardless of the shape of the inner surface of the PC0 member. In other words, the central main reinforcement 3 is The main corner reinforcements 2 are arranged so as to fill the space between the main corner reinforcements 2 along the arrangement outline defined by the arrangement of the main corner reinforcements 2.

ここに第6図または第7図に示すように、このような柱
主筋2,3の配置に対して、中央部主筋3を拘束すべく
これらを外側から取り囲んでタイ筋や円形スパイラルフ
ープ等の剪断補強筋すを配筋しようとする場合、中央部
主筋3とPC0部材の内周面aとが殆ど密接状態である
ため施工が困難であった。
As shown in FIG. 6 or 7, for the arrangement of the column main reinforcements 2 and 3, tie bars, circular spiral hoops, etc. are placed around the center main reinforcements 3 from the outside in order to restrain them. When trying to arrange shear reinforcing bars, it was difficult to install them because the central main bar 3 and the inner circumferential surface a of the PC0 member were almost in close contact with each other.

(課題を解決するための手段と作用) 柱主筋が内部に配設され柱の外殻を区画形成する中空筒
体状のPC部材内にコンクリートを打設してRC柱を構
築する方法において、柱主筋を配筋する際、これら柱主
筋の内、柱主筋の配置外形を画定する隅主筋位置に対し
て、これら隅主筋以外の一部の中央部主筋を配置外形よ
りも内方に配置すると共に、これら一部の中央部主筋を
外側から取り囲んで剪断補強筋を配筋し、その後柱主筋
の外側を囲繞させてPC部材を挿入設置するようにして
RC柱を構築するようになっている。
(Means and operations for solving the problem) In a method of constructing an RC column by pouring concrete into a hollow cylindrical PC member in which a column main reinforcement is arranged inside and defines the outer shell of the column, When arranging column main reinforcements, some center main reinforcements other than these corner main reinforcements are placed inward from the placement outline of the corner main reinforcements that define the placement outline of the column main reinforcements. At the same time, RC columns are constructed by surrounding some of these central main reinforcements from the outside and placing shear reinforcing bars, and then surrounding the outside of the column main reinforcements and inserting and installing PC members. .

(実 施 例) 以下に、本発明の好適な実施例を添付図面に従って詳述
する。
(Example) Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

第1図には、中空筒体状のPC0部材の平面図が示され
ており、施工現場に配設された柱主筋2゜3の外側を囲
繞させてRC柱の外殻を区画形成して型枠として機能す
る。
Figure 1 shows a plan view of a hollow cylindrical PC0 member, which surrounds the outside of the main column reinforcement 2゜3 installed at the construction site to form the outer shell of the RC column. Acts as formwork.

そして特に本発明にあっては、PC部材1内に配置され
る柱主筋2,3が、柱主筋2,3の配置外形を画定する
隅主筋位置2に対して、これら隅主筋2間を埋める隅主
筋2以外の中央部主筋3が配置外形よりも内方に位置ズ
レされて配置され、PC0部材の内周面1aから若干の
間隔を隔てて配置される。この若干の間隔は、剪断補強
筋4の外径にほぼ等しく設定される。
In particular, in the present invention, the column main reinforcements 2 and 3 arranged in the PC member 1 fill the space between these corner main reinforcements 2 with respect to the corner main reinforcement positions 2 that define the arrangement outline of the column main reinforcements 2 and 3. The center main reinforcements 3 other than the corner main reinforcements 2 are arranged to be shifted inward from the arrangement outline, and are arranged at a slight distance from the inner circumferential surface 1a of the PC0 member. This slight interval is set approximately equal to the outer diameter of the shear reinforcing bars 4.

本実施例では、断面角型のPC0部材が例示されており
、隅主筋2はPC0部材の内面形状である角型を画定す
る隅部に配置されて配置外形の基準となっているのに対
し、中央部主筋3はそのPC0部材の内面形状に沿う配
置外形よりも内側に配置される。これにより、中央部主
筋3はPC0部材の内周面1aから適当な間隔が隔てら
れるように構成される。そしてこのように構築された柱
主筋2,3に対して、タイ筋や円形スパイラルフープ等
の剪断補強筋4が配筋されることになる。
In this example, a PC0 member with a square cross section is exemplified, and the main corner reinforcements 2 are placed at corners that define the square shape of the inner surface of the PC0 member, and serve as a reference for the outer shape of the arrangement. , the central main reinforcement 3 is arranged inside the arrangement outline along the inner surface shape of the PC0 member. Thereby, the center main reinforcement 3 is configured to be separated from the inner circumferential surface 1a of the PC0 member by an appropriate distance. Shear reinforcing bars 4 such as tie bars and circular spiral hoops are arranged on the column main bars 2 and 3 constructed in this manner.

第1図に示したものは、相対向する各辺の中央部主筋3
を1セツトとしてこれら中央部主筋3を外側から取り囲
むようにタイ筋4を配筋した例であり、第2図に示すも
のは、中央部主筋3全部を円形スパイラルフープ4でP
C0部材の内周面1aに沿って外側から取り囲むように
したものである。いずれの例にあっても、中央部主筋3
とPC0部材の内周面1aとの間には、剪断補強筋4の
外径に和尚する以上隙間が確保されているため、柱主筋
2,3及び剪断補強筋4の配筋後における、PC0部材
の挿入設置作業を円滑に行なうことができる。
What is shown in Figure 1 is the central main reinforcement 3 on each opposing side.
This is an example in which tie reinforcements 4 are arranged so as to surround these center main reinforcements 3 from the outside as one set, and in the example shown in Fig. 2, all the center main reinforcements 3 are connected to P
It surrounds the C0 member from the outside along the inner circumferential surface 1a. In either example, central main reinforcement 3
Since a gap is secured between the inner circumferential surface 1a of the PC0 member and the outer diameter of the shear reinforcing bar 4, the PC0 The work of inserting and installing members can be performed smoothly.

そしてその後PC部材1内にコンクリートを打設するこ
とにより、RC柱の構築を完了することになる。
Thereafter, by pouring concrete into the PC member 1, construction of the RC column is completed.

以上のようにしてRC柱を構築するようにしたので、型
枠となるPC部材1内での剪断補強筋4の配筋を容易か
つ適切に行なうことができる。また社主筋23配筋後に
おけるPC0部材の挿入設置を簡単に行なうことができ
、省力化を図り1)る。尚、実施例では中央部主筋3の
全部の外側を剪断補強筋4で囲繞したものについて説明
したが、主筋3の配筋の状態によっては、囲繞しなくて
も良い。
Since the RC column is constructed as described above, the shear reinforcing bars 4 can be easily and appropriately arranged within the PC member 1 serving as the formwork. In addition, the PC0 member can be easily inserted and installed after the main reinforcement 23 has been arranged, resulting in labor savings (1). In the embodiment, a case has been described in which the entire outside of the center main reinforcement 3 is surrounded by the shear reinforcing reinforcement 4, but depending on the state of the reinforcement of the main reinforcement 3, it may not be necessary to surround it.

第3図〜第5図には、20部材1における配筋例が示さ
れている。この実施例では、20部材1の上端及び下端
となる部分において、向い合う中央部主筋3a、3aを
仮り固定5する。この状態でフープ筋6を、隅部2aの
外周と中央部主筋3aの内周を通るように配筋している
。このようにすれば第4図に示すように、フープ筋6が
外側へ脹らもうとする性質を抑えることができる。
3 to 5 show examples of reinforcement in the 20 members 1. In this embodiment, opposing center main reinforcements 3a, 3a are temporarily fixed 5 at the upper and lower ends of the 20 member 1. In this state, the hoop reinforcements 6 are arranged so as to pass through the outer periphery of the corner portion 2a and the inner periphery of the central main reinforcement 3a. In this way, as shown in FIG. 4, the tendency of the hoop muscle 6 to swell outward can be suppressed.

(発明の効果) 以上要するに本発明によれば、次のような優れた効果を
発揮する。
(Effects of the Invention) In summary, according to the present invention, the following excellent effects are achieved.

柱主筋を配筋する際、これら柱主筋の内、柱主筋の配置
外形を画定する隅主筋位置に対して、これら隅主筋以外
の一部の中央部主筋を配置外形よりも内方に配置するよ
うにしてRC柱を構築するようにしたので、20部材の
内周面と一部の中央部主筋との間に剪断補強筋の配筋ス
ペースを確保でき、型枠となるPC部月内での剪断補強
筋の配筋を容易かつ適切に行なうことができると共に、
柱主筋配筋後における20部材の挿入設置を簡単に行な
うことができ、省力化を図り得る。
When arranging column main reinforcements, some center main reinforcements other than these corner main reinforcements are placed inward from the placement outline of the corner main reinforcements that define the placement outline of the column main reinforcements. By constructing the RC columns in this way, we were able to secure a reinforcement space for shear reinforcement between the inner circumferential surface of the 20 members and some central main reinforcements, and within the PC section that served as the formwork. Shear reinforcing bars can be easily and appropriately arranged, and
The 20 members can be easily inserted and installed after the column main reinforcement is arranged, and labor can be saved.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明の好適な実施例を示す平面図、第2図は
本発明の他の好適な実施例を示す平面図、第3図はPC
部材内の配筋例を示す平面図、第4図はフープ筋の脹ら
み傾向を説明する平面図、第5図はPC部材内の中央部
主筋を内側に固定している状態を示す斜視図、第6図及
び第7図は従来例を示す平面図である。
FIG. 1 is a plan view showing a preferred embodiment of the present invention, FIG. 2 is a plan view showing another preferred embodiment of the present invention, and FIG. 3 is a PC
Fig. 4 is a plan view showing an example of reinforcing reinforcement in a member, Fig. 4 is a plan view illustrating the tendency of hoop reinforcement to swell, and Fig. 5 is a perspective view showing a state in which the central main reinforcement in a PC member is fixed inside. 6 and 7 are plan views showing conventional examples.

Claims (1)

【特許請求の範囲】[Claims] 柱主筋が内部に配設され柱の外殻を区画形成する中空筒
体状のプレキャストコンクリート部材内にコンクリート
を打設して鉄筋コンクリート柱を構築する方法において
、上記柱主筋を配筋する際、これら柱主筋の内、柱主筋
の配置外形を画定する隅主筋位置に対して、これら隅主
筋以外の一部の中央部主筋を該配置外形よりも内方に配
置すると共に、これら一部の中央部主筋を外側から取り
囲んで剪断補強筋を配筋し、その後柱主筋の外側を囲繞
させて上記プレキャストコンクリート部材を挿入設置す
るようにしたことを特徴とする鉄筋コンクリート柱の構
築方法。
In the method of constructing a reinforced concrete column by pouring concrete into a hollow cylindrical precast concrete member in which the column main reinforcement is arranged inside and defines the outer shell of the column, when arranging the column main reinforcement, these Among the column main reinforcements, with respect to the corner main reinforcement positions that define the arrangement outline of the column main reinforcements, some center main reinforcements other than these corner main reinforcements are placed inward from the arrangement outline, and the central part of these part A method for constructing a reinforced concrete column, characterized in that shear reinforcing bars are arranged surrounding the main reinforcement from the outside, and then the precast concrete member is inserted and installed surrounding the main reinforcement of the column from the outside.
JP63262900A 1988-10-20 1988-10-20 How to build reinforced concrete columns Expired - Lifetime JP2577069B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63262900A JP2577069B2 (en) 1988-10-20 1988-10-20 How to build reinforced concrete columns

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63262900A JP2577069B2 (en) 1988-10-20 1988-10-20 How to build reinforced concrete columns

Publications (2)

Publication Number Publication Date
JPH02112547A true JPH02112547A (en) 1990-04-25
JP2577069B2 JP2577069B2 (en) 1997-01-29

Family

ID=17382173

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63262900A Expired - Lifetime JP2577069B2 (en) 1988-10-20 1988-10-20 How to build reinforced concrete columns

Country Status (1)

Country Link
JP (1) JP2577069B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005320734A (en) * 2004-05-07 2005-11-17 Okumura Corp Design method of outer shell pca column

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5155380B2 (en) * 2010-12-13 2013-03-06 株式会社フジタ Method for manufacturing reinforced concrete member

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57180013U (en) * 1982-03-23 1982-11-15
JPS6131261A (en) * 1984-07-23 1986-02-13 Ricoh Co Ltd Setting method of flow rate in ink jet recorder

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57180013U (en) * 1982-03-23 1982-11-15
JPS6131261A (en) * 1984-07-23 1986-02-13 Ricoh Co Ltd Setting method of flow rate in ink jet recorder

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005320734A (en) * 2004-05-07 2005-11-17 Okumura Corp Design method of outer shell pca column
JP4503350B2 (en) * 2004-05-07 2010-07-14 株式会社奥村組 Outer shell PCa column design method

Also Published As

Publication number Publication date
JP2577069B2 (en) 1997-01-29

Similar Documents

Publication Publication Date Title
JPH02112547A (en) Structuring reinforced concrete column
JP2002129653A (en) Reinforced concrete column and joint part structure of the column and steel beam
JPH0470436A (en) Mold form for precast concrete pillar
JP4401739B2 (en) Manufacturing method of outer shell PCa member
JP2000320057A (en) Flat slab using steel pipe concrete column and construction for the slab
JP3167165B2 (en) Method of manufacturing precast reinforced concrete columns or beam members
JP2575921B2 (en) Method for constructing top slab of containment vessel and containment vessel
JPH02200944A (en) Hollow pca column
JP2569020Y2 (en) Half precast members for columns
JPS63130838A (en) Hollow pillar made of precast concrete
JPH06346508A (en) Precast concrete pillar and its construction method
JPH08284321A (en) Reinforcement positioning spacer
JPH10196047A (en) Cast iron plate and post construction method using it
JPH0197744A (en) Shearing reinforcing structure of shear head section in flat plate building
JP2625564B2 (en) How to build reinforced concrete columns
JPH0442411Y2 (en)
JPH01203522A (en) Exposed type fixed column base
JPH0448136B2 (en)
JPS61290136A (en) Construction of reinforced concrete pillar
JPS62117938A (en) Concrete structure and its construction
JPS637452A (en) Mortar filling type reinforcing bar joint sleeve
JPS6286253A (en) Pillar structure
JP2772811B2 (en) Construction method of base concrete
JPH0118706Y2 (en)
JP2002038712A (en) Form structure