JPH0138923B2 - - Google Patents

Info

Publication number
JPH0138923B2
JPH0138923B2 JP13944782A JP13944782A JPH0138923B2 JP H0138923 B2 JPH0138923 B2 JP H0138923B2 JP 13944782 A JP13944782 A JP 13944782A JP 13944782 A JP13944782 A JP 13944782A JP H0138923 B2 JPH0138923 B2 JP H0138923B2
Authority
JP
Japan
Prior art keywords
side wall
viaduct
members
base frame
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP13944782A
Other languages
Japanese (ja)
Other versions
JPS5931303A (en
Inventor
Hiroyuki Shimazaki
Hisashi Kusama
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHINKO KENZAI KOGYO KK
Original Assignee
SHINKO KENZAI KOGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHINKO KENZAI KOGYO KK filed Critical SHINKO KENZAI KOGYO KK
Priority to JP13944782A priority Critical patent/JPS5931303A/en
Publication of JPS5931303A publication Critical patent/JPS5931303A/en
Publication of JPH0138923B2 publication Critical patent/JPH0138923B2/ja
Granted legal-status Critical Current

Links

Description

【発明の詳細な説明】 本発明は高架橋側壁の改装装置に係り、旧側壁
を手数簡素かつ構成簡素に改装すること等を目的
とした装置の提供に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to an apparatus for renovating a side wall of a viaduct, and more particularly, to providing an apparatus for renovating an old side wall with simple steps and a simple configuration.

従来、鉄道や高速道路の高架橋は、車輌走行時
の防音や、石飛び事故の防止のために、その上面
端部にコンクリート製側壁を有している。該側壁
は、コンクリート製で、高架橋の長手方向に沿つ
て離間配置される柱部材と、これら柱部材に架設
される〓部材と、これら高架橋上面、柱部材及び
〓部材で囲繞される空間部を閉塞するブロツク部
材とで構成される。
Conventionally, elevated railway and expressway bridges have concrete side walls at their upper ends in order to provide soundproofing during vehicle travel and to prevent accidents caused by flying stones. The side wall is made of concrete and includes column members spaced apart along the longitudinal direction of the viaduct, bottom members installed on these column members, and a space surrounded by the top surface of the viaduct, the column members, and the bottom members. It consists of a block member that closes.

而して、長期にわたる高架橋の使用において、
近時、特に海岸地帯の路線部におけるブロツク部
材の劣化が激しく、度々補修工事を行つている。
Therefore, in the long-term use of elevated bridges,
Recently, the deterioration of block members, especially in the coastal areas, has been severe, and repair work is being carried out frequently.

然し乍ら、この補修工事は、コンクリートのブ
ロツク部材を撤去して行う等、手数煩雑のあるた
め、この旧側壁を手数簡素かつ構成簡素に改装す
るための装置の提供が望まれていた。
However, since this repair work is complicated and requires removing concrete block members, it has been desired to provide a device for renovating the old side wall in a simple and simple manner.

本発明は、かかる従来の要望に鑑み、鋭意創成
されたもので、従つてその特徴とするところは、
高架橋上面端部に設けられるコンクリート製旧側
壁が、高架橋の長手方向に沿つて離間配置された
柱部材と、これら柱部材上に架設された〓部材と
これら高架橋上面、柱部材及び〓部材で囲繞され
た空間部を閉塞するブロツク部材とで構成された
ものにおいて、上記柱及び〓部材にアンカーボル
トが固着され、該アンカーボルトに下地フレーム
が溶着され、側壁内外面を覆うべく下地フレーム
に固定具を介しスパンドレルが張設された点にあ
る。
The present invention has been devised in light of such conventional demands, and its characteristics are as follows:
The old concrete side wall installed at the end of the upper surface of the viaduct is surrounded by column members spaced apart along the longitudinal direction of the viaduct, outer members installed on these column members, and the upper surface of the viaduct, column members, and outer members. An anchor bolt is fixed to the column and the bottom member, a base frame is welded to the anchor bolt, and fixing devices are attached to the base frame to cover the inner and outer surfaces of the side wall. It is at the point where the spandrels are strung through.

以下、本発明の実施例を図に従い説明すると、
例えば鉄道用として示される高架橋1上面には左
右に鉄道レール2,2が敷設され、同両端部には
基台3を介しコンクリート製旧側壁4,4が設け
られる。該側壁4は、高架橋1の長手方向に沿つ
て離間配置された柱部材5と、これら柱部材5上
に架設された〓部材6と、これら高架橋1上面、
柱部材5及び〓部材6で囲繞された空間部7を閉
塞するブロツク部材8とで構成される。
Examples of the present invention will be described below with reference to the drawings.
For example, railway rails 2, 2 are laid on the left and right sides of the upper surface of a viaduct 1 shown for railway use, and old concrete side walls 4, 4 are provided at both ends with a base 3 interposed therebetween. The side wall 4 includes column members 5 spaced apart along the longitudinal direction of the viaduct 1, bottom members 6 installed on these column members 5, and the upper surface of the viaduct 1.
It is composed of a pillar member 5 and a block member 8 that closes a space 7 surrounded by a bottom member 6.

打込式の第1アンカーボルト9が〓部材6の内
外面に夫々固着され、該アンカーボルト9は〓部
材6の長手方向に離間配置されている。また、打
込式の第2アンカーボルト10が柱部材5の上下
方向略等間隔に固着され、側壁4の外面側で、こ
れらアンカーボルト9,10の突出端に横フレー
ム11と縦フレーム12で格子枠状に形成された
下地フレーム13が溶着される。縦フレーム12
の下端はアングル形状の取付片13′と第3アン
カーボルト14を介して基台3上面に固着され
る。横フレーム11は縦フレーム12の外側に位
置して設けられ、該横フレーム11の外側面に固
定具15を介しスパンドレル16が張設されて側
壁4外面が覆われる。
Driving-type first anchor bolts 9 are fixed to the inner and outer surfaces of the outer member 6, respectively, and the anchor bolts 9 are spaced apart from each other in the longitudinal direction of the outer member 6. Further, second drive-in anchor bolts 10 are fixed to the column member 5 at approximately equal intervals in the vertical direction, and a horizontal frame 11 and a vertical frame 12 are attached to the protruding ends of these anchor bolts 9 and 10 on the outer surface side of the side wall 4. A base frame 13 formed in the shape of a lattice frame is welded. Vertical frame 12
The lower end is fixed to the upper surface of the base 3 via an angled mounting piece 13' and a third anchor bolt 14. The horizontal frame 11 is provided outside the vertical frame 12, and a spandrel 16 is stretched on the outer surface of the horizontal frame 11 via a fixture 15 to cover the outer surface of the side wall 4.

一方、側壁4の内面側で、上記アンカーボルト
9,10の突出端に横フレーム11で形成された
下地フレーム13が溶着され、該横フレーム11
の外側面に固定具15を介しスパンドレル16が
張設されて側壁4内面が覆われる。
On the other hand, on the inner surface of the side wall 4, a base frame 13 formed of a horizontal frame 11 is welded to the protruding ends of the anchor bolts 9, 10.
A spandrel 16 is stretched on the outer surface of the side wall 4 via a fixture 15 to cover the inner surface of the side wall 4.

通しボルト等の支持杆17は、ブロツク部材8
を内外に貫通して設けられ、この支持杆17の両
突出端は側壁4内外における下地フレーム13,
13に夫々溶着され、これら両下地フレーム1
3,13を連結一体化する。
A support rod 17 such as a through bolt is connected to a block member 8.
Both protruding ends of this support rod 17 penetrate the base frame 13 inside and outside the side wall 4,
13, and these two base frames 1
Connect and integrate 3 and 13.

図例では、下地フレーム13は鉄製等のアング
ル材で構成されているが、チヤンネル材等のもの
でもよい。
In the illustrated example, the base frame 13 is made of angle material such as iron, but it may also be made of channel material or the like.

上記スパンドレル16は、縦長のアルミ合金部
材で、高架橋1の長手方向に一端に係合突起18
を有し、他端に係合凹部19を有し、相隣るスパ
ンドレル16,16はこれら係合突起18と係合
凹部19の嵌合により隙なく連設され、スパンド
レル16,16の連結部がブラインドリベツトや
ビスにて下地フレーム13に固着される。この場
合、スパンドレル16は上下方向に複数のパネル
で構成されるものでもよい。
The spandrel 16 is a vertically elongated aluminum alloy member, and has an engaging protrusion 18 at one end in the longitudinal direction of the viaduct 1.
It has an engaging recess 19 at the other end, and the adjacent spandrels 16, 16 are connected without a gap by fitting the engaging protrusions 18 and the engaging recess 19, and the connecting portion of the spandrels 16, 16 is fixed to the base frame 13 with blind rivets or screws. In this case, the spandrel 16 may be constructed of a plurality of panels in the vertical direction.

側壁4、下地フレーム13,13及びスパンド
レル16,16の上部はアルミ合金製の笠木20
で覆われ、該笠木20は側壁4内外の下地フレー
ム13,13に架設される。また、笠木20の幅
方向両端下部に形成される嵌合溝21,21にス
パンドレル16,16上端が夫々嵌合されて、ス
パンドレル16,16と笠木20で囲繞される空
間への雨水の侵入が防止される。
The side walls 4, the base frames 13, 13, and the upper parts of the spandrels 16, 16 are made of aluminum alloy caps 20.
The cap 20 is installed on base frames 13, 13 inside and outside the side wall 4. In addition, the upper ends of the spandrels 16, 16 are fitted into the fitting grooves 21, 21 formed at the bottom of both widthwise ends of the cap 20, respectively, thereby preventing rainwater from entering the space surrounded by the spandrels 16, 16 and the cap 20. Prevented.

スパンドレル16,16下部にアルミ合金製の
水切部材21,21が固着され、側壁4下部が覆
われる。
Aluminum alloy drainage members 21, 21 are fixed to the lower portions of the spandrels 16, 16, and the lower portions of the side walls 4 are covered.

次に、上記高架橋側壁の改装装置の施工手順を
説明すると、まず、柱部材5や〓部材6にアンカ
ーボルトア9,10を打込等により固着し、該ア
ンカーボルト9,10に下地フレーム13を溶着
する。この場合、下地フレーム13を溶着した後
に、更に柱部材5や〓部材6の所要箇所にアンカ
ーボルト9,10を固着して下地フレーム13と
溶着してもよい。上記いずれかの段階で、支持杆
17をブロツク部材8に貫通させ、この支持杆1
7を両突出端を下地フレーム13,13に夫々溶
着する。次に、スパンドレル16を、係合突起1
8と係合凹部19を嵌合させ、固定具15を介し
順次下地フレーム13に固着張設する。笠木20
はスパンドレル16の張設前後のいずれかの時期
に下地フレーム13,13上部に架設する。
Next, the construction procedure of the above-mentioned elevated bridge side wall renovation equipment will be explained. First, anchor bolts 9 and 10 are fixed to the column members 5 and the bottom member 6 by driving etc., and the base frame 13 is attached to the anchor bolts 9 and 10. weld. In this case, after the base frame 13 is welded, anchor bolts 9 and 10 may be further fixed to required locations on the column member 5 and the bottom member 6 to be welded to the base frame 13. At any of the above steps, the support rod 17 is passed through the block member 8, and the support rod 1
Both protruding ends of 7 are welded to base frames 13, 13, respectively. Next, the spandrel 16 is attached to the engaging protrusion 1
8 and the engagement recess 19, and are sequentially fixed and stretched to the base frame 13 via the fixture 15. Kasagi 20
is installed on the base frames 13, 13 either before or after the spandrels 16 are stretched.

本発明によれば、高架橋1上の側壁4を改装す
る場合、この旧側壁4のブロツク部材8を撤去す
ることなく、スパンドレル16を下地フレーム1
3を介し設けることで、側壁4が覆被改装される
こととなり、従つてブロツク部材を撤去していた
ことに比し、この改装作業が手数簡素に達成され
るのであり有益である。また、下地フレーム13
は堅牢な柱部材5や〓部材6に固着のアンカーボ
ルト9,10に溶着されるため、この下地フレー
ム13に固着されるスパンドレル16は堅固に側
壁4に支持されるのであり、かつ、これが構成簡
素に達成されることからも有用性極めて大なる発
明である。
According to the present invention, when the side wall 4 on the viaduct 1 is renovated, the spandrel 16 can be attached to the base frame 1 without removing the block member 8 of the old side wall 4.
3, the side wall 4 can be re-covered and renovated, and this refurbishment work can be accomplished more easily than if the block member had been removed, which is advantageous. In addition, the base frame 13
are welded to the anchor bolts 9 and 10 fixed to the sturdy column member 5 and the bottom member 6, so the spandrel 16 fixed to the base frame 13 is firmly supported by the side wall 4, and this structure This is an extremely useful invention because it can be achieved simply.

【図面の簡単な説明】[Brief explanation of drawings]

図は本発明の実施例を示し、第1図は全体縦断
面図、第2図は第1図の要部拡大図、第3図は第
2図の矢視図、第4図は第2図の矢視図、第
5図は第2図の−線矢視平面図である。 1……高架橋、4……側壁、5……柱部材、6
……〓部材、7……空間部、8……ブロツク部
材、9,10……アンカーボルト、13……下地
フレーム、15……固定具、16……スパンドレ
ル、17……支持杆、20……笠木。
The drawings show an embodiment of the present invention, in which Fig. 1 is an overall vertical sectional view, Fig. 2 is an enlarged view of the main part of Fig. 1, Fig. 3 is a view taken in the direction of the arrows in Fig. FIG. 5 is a plan view taken along the - line in FIG. 2. 1... Viaduct, 4... Side wall, 5... Column member, 6
... member, 7 ... space, 8 ... block member, 9, 10 ... anchor bolt, 13 ... base frame, 15 ... fixture, 16 ... spandrel, 17 ... support rod, 20 ... ...Kasagi.

Claims (1)

【特許請求の範囲】[Claims] 1 高架橋上面端部に設けられるコンクリート製
旧側壁が、高架橋の長手方向に沿つて離間配置さ
れた柱部材と、これら柱部材上に架設された〓部
材と、これら高架橋上面、柱部材及び〓部材で囲
繞された空間部を閉塞するブロツク部材とで構成
されたものにおいて、上記柱及び〓部材にアンカ
ーボルトが固着され、該アンカーボルトに下地フ
レームが溶着され、側壁内外面を覆うべく下地フ
レームに固定具を介しスパンドレルが張設された
ことを特徴とする高架橋側壁の改装装置。
1. The old concrete side wall installed at the end of the upper surface of the viaduct includes column members spaced apart along the longitudinal direction of the viaduct, 〓 members constructed on these column members, and these upper surface of the viaduct, pillar members, and 〓 members. An anchor bolt is fixed to the column and the bottom member, a base frame is welded to the anchor bolt, and a block member is attached to the base frame to cover the inner and outer surfaces of the side wall. A device for renovating a side wall of a viaduct, characterized by spandrels being stretched through fixing devices.
JP13944782A 1982-08-10 1982-08-10 Apparatus for remodeling side wall of high bridge Granted JPS5931303A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13944782A JPS5931303A (en) 1982-08-10 1982-08-10 Apparatus for remodeling side wall of high bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13944782A JPS5931303A (en) 1982-08-10 1982-08-10 Apparatus for remodeling side wall of high bridge

Publications (2)

Publication Number Publication Date
JPS5931303A JPS5931303A (en) 1984-02-20
JPH0138923B2 true JPH0138923B2 (en) 1989-08-17

Family

ID=15245412

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13944782A Granted JPS5931303A (en) 1982-08-10 1982-08-10 Apparatus for remodeling side wall of high bridge

Country Status (1)

Country Link
JP (1) JPS5931303A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7005474B2 (en) * 2018-11-28 2022-01-21 株式会社栗本鐵工所 Repair of the outer surface of the balustrade

Also Published As

Publication number Publication date
JPS5931303A (en) 1984-02-20

Similar Documents

Publication Publication Date Title
DE3923427A1 (en) BODY SOUND INSULATING MAT
KR102123412B1 (en) A Expansion Joint Apparatus for Bridge Structure with a Adjusting Height and Presetting
HU212217B (en) Balkony-construction
JPH0138923B2 (en)
JPH0544202A (en) Scaffold structure for repairing bridge handrail and hanging metal structure therefor
JPH0428888Y2 (en)
JPH0428889Y2 (en)
JP3295483B2 (en) Brace support system
DE19837950C2 (en) Process for producing a slab track for rail-bound traffic and device for carrying out the process
JP3440439B2 (en) Wall structure
JPH02147595A (en) Bottom plate structure of escalator and assembly thereof
DE3823633A1 (en) Portable bridge construction for a conveyor, in particular belt conveyor
JPH0415845Y2 (en)
KR950006148A (en) Mobile club for concrete slab of steel bridge
JP2526657Y2 (en) Slope movable scaffold
JP2630620B2 (en) Apartment corridor replacement method
JPS5911002B2 (en) Construction method for balustrade supports
KR200215934Y1 (en) A safety fence for construction
JPS5910167Y2 (en) Guard cable terminal support device
JPS624563Y2 (en)
JPH06146220A (en) Road bridge
JPS6138066A (en) Assembling of suspension scaffold
JP3013770U (en) Handrail connection structure
JPH0446449Y2 (en)
JPS621284Y2 (en)