JPH01319831A - Load condition generating system - Google Patents
Load condition generating systemInfo
- Publication number
- JPH01319831A JPH01319831A JP63153295A JP15329588A JPH01319831A JP H01319831 A JPH01319831 A JP H01319831A JP 63153295 A JP63153295 A JP 63153295A JP 15329588 A JP15329588 A JP 15329588A JP H01319831 A JPH01319831 A JP H01319831A
- Authority
- JP
- Japan
- Prior art keywords
- host computer
- subscriber information
- under test
- tested
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000012360 testing method Methods 0.000 claims abstract description 63
- 238000003860 storage Methods 0.000 claims description 18
- 238000000034 method Methods 0.000 claims description 10
- 238000004891 communication Methods 0.000 abstract description 11
- 238000009826 distribution Methods 0.000 description 37
- 238000012545 processing Methods 0.000 description 21
- 238000010586 diagram Methods 0.000 description 4
- 230000005540 biological transmission Effects 0.000 description 3
- 230000004913 activation Effects 0.000 description 1
- 238000013144 data compression Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
Landscapes
- Test And Diagnosis Of Digital Computers (AREA)
Abstract
Description
【発明の詳細な説明】
〔産業上の利用分野〕
本発明はデユープレックスシステムを構成するホストコ
ンピュータの負荷試験時に負荷状態を発生させる負荷状
態発生方式に関する。DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a load state generation method for generating a load state during a load test of a host computer constituting a duplex system.
ファイル転送を行なうオンラインシステムのホストコン
ピュータの負荷試験を行なう場合、ホストコンピュータ
に負荷状態を発生させる必要があり、従来は次のように
している。例えば、第2図に示すように、集配信処理を
行なう集配信処理部32と、主記憶装置に設けられ、加
入者情報が格納される加入者情報部33と、集信ファイ
ル34と、配信ファイル35と、通信制御装置36と、
モデム37とを含むホストコンピュータ31の負荷試験
を行なう場合、従来は、集配信処理部32にマルチ・タ
ーミナル・シミュレータ等の汎用の負荷試験ツール39
を接続し、磁気テープ装置等からなる集配信データ部3
8に格納されている配信データを集配信処理部32に投
入することにより負荷状態を発生させるが、或いは第3
図に示すように、複数の端末40−1〜40−nを実際
にモデム37に接続し、端末40−1〜40−nから大
量のデータを投入することにより負荷状態を発生させる
ようにしている。尚、第3図に於いて第2図と同一符号
は同一部分を表している。When carrying out a load test on a host computer of an online system that transfers files, it is necessary to generate a load state on the host computer, and conventionally this is done as follows. For example, as shown in FIG. 2, a collection and distribution processing section 32 that performs collection and distribution processing, a subscriber information section 33 that is provided in the main storage device and stores subscriber information, a collection file 34, and a distribution processing section 32 that performs collection and distribution processing; A file 35, a communication control device 36,
Conventionally, when performing a load test on the host computer 31 including the modem 37, a general-purpose load test tool 39 such as a multi-terminal simulator is used in the collection and distribution processing section 32.
A collection and distribution data section 3 consisting of a magnetic tape device, etc.
A load state is generated by inputting the distribution data stored in 8 to the collection and distribution processing section 32.
As shown in the figure, a load state is generated by actually connecting a plurality of terminals 40-1 to 40-n to the modem 37 and inputting a large amount of data from the terminals 40-1 to 40-n. There is. In FIG. 3, the same reference numerals as in FIG. 2 represent the same parts.
従来は上述したように汎用の負荷試験ツールを使用する
ことにより、或いは複数の端末を実際に接続することに
より負荷状態を発生させるようにしているが、負荷試験
ツールを使用する方式では通信制御装置36.モデム3
7等のネットワーク構成機器や通信系ソフトウェアの負
荷耐久性を確認することができない問題があると共に環
境設定に多大な時間と手間を要する問題がある。また、
複数の端末を実際に接続する方式では、実際に多数の端
末を接続し、大量のデータを投入しなければならないの
で、膨大な設備と作業量が必要になる問題がある。Conventionally, as mentioned above, load conditions are generated by using a general-purpose load test tool or by actually connecting multiple terminals, but in the method using a load test tool, the communication control device 36. modem 3
There is a problem in that it is not possible to check the load durability of network component devices such as 7 and communication software, and there is also a problem in that environment setting requires a great deal of time and effort. Also,
The method of actually connecting multiple terminals has the problem of requiring a huge amount of equipment and work, as it requires actually connecting a large number of terminals and inputting a large amount of data.
本発明の目的はネットワーク構成機器や通信系ソフトウ
ェアの負荷耐久試験も行なうことができる負荷状態を容
易に発生できるようにすることにある。An object of the present invention is to easily generate a load state that allows load durability testing of network component equipment and communication software.
本発明は上記目的を達成するため、
デユーブレックスシステムを構成する被試験ホストコン
ピュータの負荷試験時に負荷状態を発生させる負荷状態
発生方式に於いて、
デユーブレックスシステムを構成する前記被試験ホスト
コンピュータ以外のホストコンピュータに、
前記被試験ホストコンピュータの負荷試験時に前記被試
験ホストコンピュータに送出するデータを格納する格納
部と、
前記被試験ホストコンピュータに設けられている加入者
情報部と同一の加入者情報が格納されている加入者情報
部とを設け、
前記格納部及び加入者情報部が設けられているホストコ
ンピュータは前記被試験ホストコンピュータの試験時、
前記被試験ホストコンピュータとの間に複数の回線を設
定し、該設定した回線を介して前記格納部に格納されて
いるデータを前記加入者情報部に格納されている加入者
情報に従った形式で送出する。In order to achieve the above object, the present invention provides a load state generation method for generating a load state during a load test of a host computer under test that forms a duplex system. A storage unit that stores data to be sent to the host computer under test during a load test of the host computer under test, and a subscriber information unit that is the same as the subscriber information unit provided in the host computer under test. a subscriber information section in which information is stored, and the host computer provided with the storage section and the subscriber information section, when testing the host computer under test;
A plurality of lines are set up with the host computer under test, and the data stored in the storage unit is transmitted via the set lines in a format according to the subscriber information stored in the subscriber information unit. Send with .
デユーブレックスシステムを構成する被試験ホストコン
ピュータ以外のホストコンピュータには被試験ホストコ
ンピュータの負荷試験を行なう際に送出するデータを格
納する格納部及び被試験ホストコンピュータに設けられ
ている加入者情報部と同一の加入者情報が格納されてい
る加入者情報部が設けられている。格納部及び加入者情
報部が設けられているホストコンピュータは被試験ホス
トコンピュータの負荷試験時、ホストコンピュータとの
間に複数の回線を設定し、設定した回線を介して格納部
に格納されているデータを加入者情報部に格納されてい
る加入者情報に従った形式で送出する。Host computers other than the host computer under test that make up the Duplex system include a storage section for storing data to be sent when performing a load test on the host computer under test, and a subscriber information section provided in the host computer under test. A subscriber information section is provided in which the same subscriber information is stored. During a load test of the host computer under test, multiple lines are set up between the host computer in which the storage unit and the subscriber information unit are installed, and the subscriber information is stored in the storage unit via the set lines. The data is sent in a format according to the subscriber information stored in the subscriber information section.
次に本発明の実施例について図面を参照して詳細に説明
する。Next, embodiments of the present invention will be described in detail with reference to the drawings.
第1図は本発明の実施例のブロック図であり、被試験ホ
ストコンピュータ1と、被試験ホストコンピュータ1と
デユーブレックスシステムを構成する待機系ホストコン
ピュータ2とを含んでいる。FIG. 1 is a block diagram of an embodiment of the present invention, which includes a host computer under test 1 and a standby host computer 2 that constitutes a duplex system with the host computer under test 1.
被試験ホストコンピュータ1は集信、配信処理を行なう
集配信処理部11と、通信制御装置12と、モデム13
と、主記憶装置に設けられ加入者情報が格納される加入
者情報部14と、集信電文が格納される集信ファイル1
5と、配信電文が格納される配信ファイル16とを含み
、待機系ホストコンピュータ2は集信、配信処理を行な
う集配信処理部21と、通信制御装置22と、モデム2
3と、主記憶装置に設けられ被試験ホストコンピュータ
1内の加入者情報部14と同一の加入者情報が格納され
る加入者情報部24と、主記憶装置に設けられ被試験ホ
ストコンビュータ1の負荷試験時に被試験ホストコンピ
ュータ1に送信する電文(メモリ固定電文)が格納され
る配信電文格納部25と、集配信処理部21を起動させ
る集配信起動部26とを含んでいる。The host computer under test 1 includes a collection and distribution processing unit 11 that performs collection and distribution processing, a communication control device 12, and a modem 13.
, a subscriber information section 14 provided in the main storage device in which subscriber information is stored, and a collection file 1 in which collected messages are stored.
5 and a distribution file 16 in which the distribution message is stored, the standby host computer 2 includes a collection and distribution processing unit 21 that performs collection and distribution processing, a communication control device 22, and a modem 2.
3, a subscriber information section 24 which is provided in the main memory and stores the same subscriber information as the subscriber information section 14 in the host computer under test 1; It includes a distribution message storage section 25 in which a message (memory-fixed message) to be transmitted to the host computer 1 under test is stored during a load test, and a collection and distribution starting section 26 that starts up the collection and distribution processing section 21 .
被試験ホストコンピュータ1の負荷試験を行なう場合、
オペレータは待機系ホストコンピュータ2内の集配信起
動部26より被試験ホストコンピュータ1の負荷試験を
行なうことを通知して集配信処理部21を起動させる。When performing a load test on the host computer under test 1,
The operator notifies the host computer under test 1 to perform a load test from the collection and distribution activation section 26 in the standby host computer 2 and activates the collection and distribution processing section 21 .
集配信処理部21は起動がかけられると、先ず、モデム
23に収容されている複数の交換回線11〜/nを被試
験ホストコンピュータ1に接続させ、次いで配信電文格
納部25に格納されているメモリ固定電文を被試験ホス
トコンピュータ1と同一のプロトコルで通信制御装置2
2、モデム23.交換回線11− i nを介して被試
験ホストコンビニーり1へ連続して送出する。尚、集配
信処理部21はメモリ固定電文を各交換回線!1〜in
を介して被試験ホストコンピュータ1へ送出する際、加
入者情報部24(被試験ホストコンピュータ1内の加入
者情報部14と同一の加入者情報が格納されている)を
参照し、被試験ホストコンピュータ1が収容している加
入者から電文が送られた場合と同様な負荷状態を発生さ
せる。その具体的な方法としては、例えば、加入者情報
部24に格納されている加入者情報を順次読込み、最初
に読込んだ加入者情報に示される形式(例えば、データ
圧縮を行なう等)でメモリ固定電文を交換回線11に送
出し、次に読込んだ加入者情報に示される形式でメモリ
固定電文を交換回線β2に送出する方法等が考えられる
。即ち、加入者情報部24の内容により環境設定がされ
ることになる。When activated, the collection and distribution processing section 21 first connects the plurality of switched lines 11 to /n accommodated in the modem 23 to the host computer under test 1, and then connects the plurality of switched lines 11 to /n accommodated in the modem 23 to the host computer under test 1, and then connects the transmission messages stored in the distribution message storage section 25. The memory fixed message is sent to the communication control device 2 using the same protocol as the host computer under test 1.
2. Modem 23. It is continuously sent to the host convenience store 1 to be tested via the switched line 11-in. In addition, the collection and distribution processing unit 21 sends the memory-fixed message to each exchange line! 1~in
When sending data to the host computer under test 1 via A load state similar to that when a message is sent from a subscriber accommodated by the computer 1 is generated. As a specific method, for example, the subscriber information stored in the subscriber information section 24 is sequentially read, and the memory is stored in the format (for example, data compression is performed) indicated by the subscriber information read first. A possible method is to send the fixed message to the exchange line 11, and then send the memory fixed message to the exchange line β2 in the format indicated by the read subscriber information. That is, the environment is set based on the contents of the subscriber information section 24.
被試験ホストコンピュータ1内の集配信処理部11は交
換回線11〜in、モデム132通信制弾装=12を介
して待機系ホストコンピュータ2からメモリ固定電文が
加えられると、メモリ固定電文を集信ファイル15に格
納する。The collection and distribution processing unit 11 in the host computer under test 1 collects the memory fixed message when the memory fixed message is added from the standby host computer 2 via the exchange line 11~in and the modem 132 communication control = 12. Store in file 15.
また、待機系ホストコンピュータ2内の集配信処理部2
1は配信電文格納部25に格納されているメモリ固定電
文を被試験ホストコンビエータ1に送出する処理を所定
時間待なうと、送信処理を終了し、交換回線11−1
nの内の任意の交換回線を介して被試験ホストコンピュ
ータ1へ送信処理を開始することを指示する。In addition, the collection and distribution processing unit 2 in the standby host computer 2
1 waits for a predetermined period of time for the process of sending the memory-fixed message stored in the distribution message storage unit 25 to the host combiator under test 1, ends the sending process, and transfers the message to the switched line 11-1.
This command instructs the host computer 1 under test to start the transmission process via any switched line among the switching lines.
被試験ホストコンピュータ1内の集配信処理部11は交
換回線11〜An、モデム133通信制御装置12を介
して送信処理の開始指示が加えられると、配信ファイル
16に格納されている配信データを通信制御装置12.
モデム13.交換回線121−/nを介して待機系ホス
トコンビエータ2に加える。被試験ホストコンピュータ
1からの配信データはモデム231通信制御装置22を
介して集配信処理部21に加えられるが、集配信処理部
21は加えられた配信データを破棄する。When the collection and distribution processing section 11 in the host computer under test 1 receives an instruction to start transmission processing via the exchange lines 11 to An and the modem 133 and the communication control device 12, it communicates the distribution data stored in the distribution file 16. Control device 12.
Modem 13. It is added to the standby host combiator 2 via the switched line 121-/n. Distribution data from the host computer under test 1 is applied to the collection and distribution processing section 21 via the modem 231 and communication control device 22, but the collection and distribution processing section 21 discards the added distribution data.
以上説明したように、本発明は、デエープレフクスシス
テムを構成するホストコンピュータの内、被試験ホスト
コンピュータ以外のホストコンピュータに、被試験ホス
トコンピュータの試験時に送出するデータを格納した格
納部及び被試験ホストコンピュータに設けられている加
入者情報部と同一の加入者↑り報が格納されている加入
者情報部とを設け、被試験ホストコンピュータの試験時
に被試験ホストコンピュータとの間に複数の回線を設定
し、設定した回線を介して格納部に格納されているデー
タを加入者情報部に格納されている加入者情報に従って
送出するようにしたものであるので、通信制御装置等の
ネットワーク構成機器等の負荷試験を行なうために必要
となる負荷状態も含めた負荷状態を容易に発生できる効
果がある。As explained above, the present invention provides a storage section storing data to be sent to a host computer other than the host computer under test among the host computers constituting the day prefix system, and a storage section storing data to be sent during testing of the host computer under test. A subscriber information section provided in the test host computer and a subscriber information section storing the same subscriber information are provided, and when testing the host computer under test, multiple A line is set up, and the data stored in the storage section is sent out via the set line according to the subscriber information stored in the subscriber information section, so the network configuration of the communication control device, etc. This has the effect of easily generating load conditions including the load conditions necessary for carrying out load tests on equipment, etc.
第1図は本発明の実施例のブロック図、第2図は従来例
のブロック図及び、
第3図は他の従来例のブロック図である。
図に於いて、1・・・被試験ホストコンピュータ、2・
・・待機系ホストコンピュータ、11.21.32・・
・集配信処理部、12.22.36・・・通信制御装置
、13.23゜37・・・モデム、14.24.33・
・・加入者情報部、15.34・・・集信ファイル、1
6.35・・・配信ファイル、25・・・配信電文格納
部、26・・・集配信起動部、31・・・ホストコンピ
ュータ、38・・・集配信データ部、39・・・負荷試
験ツール。FIG. 1 is a block diagram of an embodiment of the present invention, FIG. 2 is a block diagram of a conventional example, and FIG. 3 is a block diagram of another conventional example. In the figure, 1... host computer under test, 2...
...Standby host computer, 11.21.32...
・Collection and distribution processing unit, 12.22.36...Communication control device, 13.23°37...Modem, 14.24.33.
...Subscriber Information Department, 15.34...Collection File, 1
6.35...Distribution file, 25...Distribution message storage section, 26...Collection and distribution startup section, 31...Host computer, 38...Collection and distribution data section, 39...Load test tool .
Claims (1)
ピュータの負荷試験時に負荷状態を発生させる負荷状態
発生方式に於いて、 デュープレックスシステムを構成する前記被試験ホスト
コンピュータ以外のホストコンピュータに、 前記被試験ホストコンピュータの負荷試験時に前記被試
験ホストコンピュータに送出するデータを格納する格納
部と、 前記被試験ホストコンピュータに設けられている加入者
情報部と同一の加入者情報が格納されている加入者情報
部とを設け、 前記格納部及び加入者情報部が設けられているホストコ
ンピュータは前記被試験ホストコンピュータの試験時、
前記被試験ホストコンピュータとの間に複数の回線を設
定し、該設定した回線を介して前記格納部に格納されて
いるデータを前記加入者情報部に格納されている加入者
情報に従った形式で送出することを特徴とする負荷状態
発生方式。[Claims] In a load state generation method that generates a load state during a load test of a host computer under test constituting a duplex system, the host computer other than the host computer under test constituting the duplex system is a storage unit for storing data to be sent to the host computer under test during a load test of the test host computer; and a subscriber unit storing the same subscriber information as the subscriber information unit provided in the host computer under test. an information section, and the host computer provided with the storage section and the subscriber information section, when testing the host computer under test,
A plurality of lines are set up with the host computer under test, and the data stored in the storage unit is transmitted via the set lines in a format according to the subscriber information stored in the subscriber information unit. A load state generation method characterized by sending out data.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP63153295A JPH0731612B2 (en) | 1988-06-21 | 1988-06-21 | Load condition generation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP63153295A JPH0731612B2 (en) | 1988-06-21 | 1988-06-21 | Load condition generation method |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH01319831A true JPH01319831A (en) | 1989-12-26 |
JPH0731612B2 JPH0731612B2 (en) | 1995-04-10 |
Family
ID=15559351
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP63153295A Expired - Lifetime JPH0731612B2 (en) | 1988-06-21 | 1988-06-21 | Load condition generation method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0731612B2 (en) |
-
1988
- 1988-06-21 JP JP63153295A patent/JPH0731612B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH0731612B2 (en) | 1995-04-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107341039A (en) | Method, main frame and the system being managed under a kind of virtual environment to USB device | |
CN112272325A (en) | Method for synchronizing mobile terminal and webpage terminal materials in real time in online video production | |
JPH02143306A (en) | Numerical controller | |
JPH01319831A (en) | Load condition generating system | |
JP3190668B2 (en) | Network type education system | |
JPS6320541A (en) | Communication system between virtual computers | |
JPS5960655A (en) | System for testing inter-computer communication processing program | |
JPH04160546A (en) | Address dynamic change system for line concentrator | |
JPH0477143A (en) | Isdn terminal message display system | |
CN117150169A (en) | Multi-browser UI automatic recording method, system, equipment and medium | |
JP2912046B2 (en) | File server control method | |
JP2000357130A (en) | Peripheral control processor, and system and method for holding fault analytic information | |
CN116346765A (en) | Virtual machine IP distribution method, system, equipment and storage medium | |
JPH03155245A (en) | Protocol analyzer system | |
CN117850793A (en) | Relay protection wave recording file acquisition method, system, terminal and storage medium | |
JPH04205536A (en) | File transfer device | |
JPS60190054A (en) | Communication processing device | |
JPH0784911A (en) | Evaluation system for performance of on-line system | |
JPS63276141A (en) | Back-up device for general test of software in autonomous decentralized system | |
JPS593531A (en) | Terminal output processing system | |
JPH0652074A (en) | Test device for communication interface board | |
JPH0318788B2 (en) | ||
JPH05304547A (en) | Simulated terminal equipment | |
JPH0670054A (en) | Facsimile adapter equipment | |
JPS6337434A (en) | Terminal simulator |