JPH01315230A - Method of monitoring reclosing operation - Google Patents

Method of monitoring reclosing operation

Info

Publication number
JPH01315230A
JPH01315230A JP63146083A JP14608388A JPH01315230A JP H01315230 A JPH01315230 A JP H01315230A JP 63146083 A JP63146083 A JP 63146083A JP 14608388 A JP14608388 A JP 14608388A JP H01315230 A JPH01315230 A JP H01315230A
Authority
JP
Japan
Prior art keywords
reclosing
distribution line
switch
judged
monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP63146083A
Other languages
Japanese (ja)
Inventor
Shigeo Ueno
上野 重夫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Meidensha Corp
Meidensha Electric Manufacturing Co Ltd
Original Assignee
Meidensha Corp
Meidensha Electric Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Meidensha Corp, Meidensha Electric Manufacturing Co Ltd filed Critical Meidensha Corp
Priority to JP63146083A priority Critical patent/JPH01315230A/en
Publication of JPH01315230A publication Critical patent/JPH01315230A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/20Systems supporting electrical power generation, transmission or distribution using protection elements, arrangements or systems

Abstract

PURPOSE:To correctly monitor irrespective of a high speed reclosing by discriminating the success/failure of a reclosing operation by reclosing with a processor provided at the previous stage of a remote monitoring device, a member station, and transmitting only its discriminated result to the centralized monitoring device of a general control place of a host system through a remote monitoring device. CONSTITUTION:If trouble occurs at a power distribution line F1, a process is judged by a processor D with a state change of a protective relay, such as an over-current relay OCR1. That is, whether a switch CB1 is opened or not is discriminated, if it is closed, a sampling discrimination in a member station TCA is repeated, while if the switch CB1 is opened to be judged as an open state, whether a reclusion relay Rec1 is operated or not is judged. If the relay Rec1 is operated, a timer is started, the incremental operation of the timer is started, and the switch CB1 is then closed. Thus, whether it is closed or not is judged. If the switch CB1 is closed, the success of the reclosing is judged, and the judged result is transmitted to a centralized monitoring device S.

Description

【発明の詳細な説明】 A、産業上の利用分野 本発明は電力系統の配電線における瞬時事故発生時の配
電線開閉器の高速度再閉路動作を集中監視する再閉路動
作監視方法に関する。
DETAILED DESCRIPTION OF THE INVENTION A. Field of Industrial Application The present invention relates to a reclosing operation monitoring method for intensively monitoring the high-speed reclosing operation of a distribution line switch when an instantaneous fault occurs in a distribution line of a power system.

B1発明の概要 複数の配電用変電所より配電線開閉器と再閉路継電器に
関する情報を、遠方監視制御装置(遠制装置)を介して
上位系・制御所の集中監視制御装置へ伝送し、配電線事
故発生時における開閉器の再閉路動作を集中監視するも
のにおいて、配電用変電所の遠制装置・子局の前段に処
理装置を設け萌記入力士青報を基に再閉路検出処理を行
い高速度再閉路動作の成功・不成功を判定し、この判定
情報を集中監視装置へ伝送し再閉路動作を監視ケること
によって、伝送路によるおくれ、伝送タイミングのずれ
(同期ずれ)などに原因ケる誤判定を防止するようにし
た再閉路動作監視方法である。
B1 Summary of the Invention Information regarding distribution line breakers and reclosing relays is transmitted from multiple distribution substations to a centralized monitoring and control device in a host system/control center via a remote monitoring and control device (remote control device). In order to centrally monitor the re-closing operation of switches when a power line accident occurs, a processing device is installed in front of the remote control device and slave station of the distribution substation, and the re-closing detection process is performed based on the input operator blue report. By determining the success or failure of high-speed reclosing operation and transmitting this judgment information to a central monitoring device to monitor the reclosing operation, it is possible to detect delays caused by the transmission path, transmission timing deviations (synchronization deviations), etc. This is a re-closing operation monitoring method that prevents false judgments.

C1従来の技術 配電線の事故の多くは、瞬時的な樹木接触や鳥獣接触な
どであり、このため一定時間経過後再送電rることによ
って異常なく送電でき長時間の供給支障がさけられる。
C1 Conventional technology Most accidents on power distribution lines are caused by instantaneous contact with trees or animals, so by retransmitting power after a certain period of time, power can be transmitted without abnormalities and long-term supply interruptions can be avoided.

このため配電用変電所の配電線引出口には再閉路継電器
を設置して供給信頼度の向上をはかっている。
For this reason, reclosing relays are installed at distribution line outlets at distribution substations to improve supply reliability.

最近、これらの再閉路制御の監視を上位系の変電所集中
監視制御装置で行う場合がある。この際、配電用変電所
の配電線開閉器の開閉情報および前記再閉路継電器の動
作情報を個々に該変電所の遠制装置・子局へ入力し、そ
の伝送部にて前記情報を伝送信号に変換し伝送路へ送出
する。この伝送路につながれた上位系・制御所の遠制装
置・親局が前記伝送信号を受信し元の情報に復元した後
、集中監視制御装置へ入力し、この装置にて前記情報の
再閉路検出処理を行い再閉路動作の成功・不成功の監視
を行っている。
Recently, there are cases in which monitoring of these reclosing controls is performed by a substation centralized monitoring and control device in the upper system. At this time, the opening/closing information of the distribution line switch of the distribution substation and the operation information of the re-closing relay are individually input to the remote control device/slave station of the substation, and the transmission section transmits the information to the transmission signal. and send it to the transmission path. The remote control device/master station of the upper system/control center connected to this transmission path receives the transmission signal and restores it to the original information, and then inputs it to the central monitoring and control device, which then recloses the information. Detection processing is performed to monitor the success or failure of re-closing operation.

D8発明が解決しようとぐる課題 しかしながら、個々に検出、伝送する配電線開閉器の開
閉情報および再閉路継電器の情報との間の伝送タイミン
グのずれ(同期ずれ)や伝送路におけるおくれが存在す
るので、高速度再閉路動作を実施させる場合には、第3
図のタイムチャートが示すように遠制装置・親局の伝送
部における情報取込み時のサンプリング時点で当該開閉
器の開閉状態をとらえることができず、集中監視制御装
置による監視が正常に実施できないという問題がおこる
D8 Problems to be solved by the invention However, there is a difference in the transmission timing (synchronization difference) between the switching information of the distribution line switch and the information of the re-closing relay, which are detected and transmitted individually, and there is a delay in the transmission path. , when performing high-speed reclosing operation, the third
As the time chart in the figure shows, the open/closed status of the switch cannot be detected at the time of sampling when the transmission section of the remote control device/master station acquires information, and the centralized monitoring and control device cannot properly monitor the switch. A problem arises.

本発明は、以上に説明したような欠点にかんがみなされ
たもので、前記子局前段に処理装置を設け、再閉路継電
器の動作情報と再閉路対象開閉器の開閉情報に基づき再
閉路動作の成功、不成功の判定処理を行い、判定結果を
上位の集中監視制御装置へ伝送し正確な高速度再閉路動
作の監視を行う方法を提供することを目的とする。
The present invention has been made in view of the above-mentioned drawbacks, and includes a processing device provided in the front stage of the slave station, and is capable of successfully performing a reclosing operation based on operation information of a reclosing relay and opening/closing information of a switch to be reclosed. It is an object of the present invention to provide a method for accurately monitoring a high-speed reclosing operation by performing a failure determination process and transmitting the determination result to a higher-level centralized monitoring and control device.

E1課題を解決するための手段と作用 本発明は、複数の配電用変電所より配電線開閉器および
再閉路継電器に関する情報を遠方監視制御装置(遠制装
置)・子局および上位系・制御所の遠制装置・親局を介
して集中監視制御装置へ伝送し、配電線事故発生時にお
ける配電線開閉器の再閉路動作を集中監視するものにお
いて、前記配電用変電所の遠制装置・子局前段に処理装
置を設け前記配電線開閉器および再閉路継電器情報を入
力し、配電線事故発生時に前記入力情報を基に配電線開
閉器の再閉路検出処理を行い配電線開閉器の高速度再閉
路動作の成功・不成功を判定し、この判定情報を前記子
局より伝送し親局を介して前記集中監視制御装置へ入力
し配電線開閉器の高速度再閉路動作状況を監視する方法
である。
E1 Means and Function for Solving Problems The present invention provides information regarding distribution line breakers and reclosing relays from a plurality of distribution substations to remote monitoring and control devices (remote control devices), slave stations, and host systems/control stations. The remote control device/master station of the distribution substation centrally monitors the reclosing operation of the distribution line switch in the event of a distribution line fault by transmitting data to the central monitoring control device via the remote control device/master station of the distribution substation. A processing device is installed in front of the station to input the distribution line switch and re-closing relay information, and when a distribution line fault occurs, the re-closing detection process of the distribution line switch is performed based on the input information, and the high speed of the distribution line switch is increased. A method of determining the success or failure of a reclosing operation, transmitting this determination information from the slave station and inputting it to the central monitoring and control device via the master station, and monitoring the high-speed reclosing operation status of a distribution line switch. It is.

F、実施例 次に本発明の一実施例を第1図の変電所集中監視制御シ
ステム構成図、第2図の再閉路70−チヤードに基づい
て説明する。
F. Embodiment Next, an embodiment of the present invention will be described based on the block diagram of a substation centralized monitoring and control system shown in FIG. 1 and the reclosing circuit 70-chard shown in FIG.

第1図において、Mは、複数の制御所を集中監視ケる総
合制御所であり、CPUで構成され複数の配電用変電所
を集中監視する変電所集中監視制御装置Sで構成される
。またLは制御所であり情報伝送を行う遠制親局TCM
により構成される。
In FIG. 1, M is a general control center that can centrally monitor a plurality of control centers, and is composed of a substation centralized monitoring and control device S that is configured with a CPU and centrally monitors a plurality of power distribution substations. In addition, L is the control center and remote control master station TCM that transmits information.
Consisted of.

またA、B、Cは夫々配電用変電所である。配電用変電
所Aのり、、L、は系統2回線であり、CBl+CB、
およびDS、、 Dstは各回線り、、L、中に設けら
れた開閉器、新路器である。Ls、、’LS。
Further, A, B, and C are respectively distribution substations. Distribution substation A,,L, has two system lines, CBl+CB,
and DS, , Dst are switches and new line switches installed in each line, L,. Ls,,'LS.

は回線L1.L2を接続するラインスイッチであり、T
A、TB、Tcは2次号線BA、Ba、Beに電力を供
給する変圧器であり、D SA、 D SB、 D S
Cは変圧器2次断路器である。更に、CB、〜CBnお
よびDS、、−DS、l、、DS、2〜DS□は前記2
次母線B^、Be、Beに接続された配電線F、〜F7
に設置された配電線開閉器および断路器である。またC
T、〜CT、は過電流保護継電器OCR。
is line L1. It is a line switch that connects L2, and T
A, TB, and Tc are transformers that supply power to secondary lines BA, Ba, and Be, and D SA, D SB, and D S
C is a transformer secondary disconnector. Furthermore, CB, ~CBn and DS, -DS,l,,DS,2~DS□ are the above-mentioned 2
Distribution lines F, ~F7 connected to the next bus B^, Be, Be
These are distribution line switches and disconnectors installed in Also C
T, ~CT, are overcurrent protection relays OCR.

〜OCR,へ線路電流をとり込む変流器であり、ZCT
、〜ZCT、、は地絡方向継電器DGRI〜DGRnお
よび再閉路継電器RSCl ”’−Rmenを動作させ
る零相電流を検出する零相変流器である。またTCA、
TCB、TCCは各配電用変電所内に設置された情報伝
送用の遠制子局であり、Dは子局前段に設けられた処理
装置であり夫々各変電所内の配電線開閉器CB、〜CB
、の情報および再閉路継電器Rse l ””’ Rm
enの情報を入力し、再閉路検出処理を行い再閉路動作
の成功・不成功を判定する。またL^、La、Lcは前
記遠制・親局TCMと各子局TCA、TCB、TCCを
むすぶ情報伝送路である。
~OCR, is a current transformer that takes in the line current to ZCT
, ~ZCT, are zero-sequence current transformers that detect the zero-sequence current that operates the ground fault direction relays DGRI to DGRn and the recloser relay RSCl "'-Rmen. Also, TCA,
TCB and TCC are remote control slave stations for information transmission installed in each distribution substation, D is a processing device installed before the slave station, and distribution line switches CB and ~CB in each substation, respectively.
, and the information on the recloser relay Rse l ""' Rm
The information of en is input, and the re-closing detection process is performed to determine whether the re-closing operation is successful or unsuccessful. Further, L^, La, and Lc are information transmission paths connecting the remote control/master station TCM and each of the slave stations TCA, TCB, and TCC.

次に、本実施例の作用を第2図の再閉路検出フローチャ
ートを併用して説明する。金品電線Flに事故が発生し
、保護継電器、例えば過電流継電器OCR,の状変発生
によりフローチャートが起動し、処理装置りにおいて処
理判定がおこなわれる。即ちステップSIにおいて当該
開閉器CB。
Next, the operation of this embodiment will be explained with reference to the reclosure detection flowchart of FIG. 2. When an accident occurs in the metal wire Fl and a change in the state of a protective relay, such as an overcurrent relay OCR, occurs, the flowchart is activated and a processing determination is performed in the processing device. That is, the switch CB in step SI.

が開状態か否かを判定し、閉状態にあれば子局TCAに
よるサンプリング判定をくり返し、当該開閉器CB、が
しゃ断され開状態と判定されると、ステップがS、へ移
行し、当該再閉路継電器R*clが動作したか否かを判
定する。当該継電器Ra c Iが不動作の間はフロー
がステップS1→S、とくり返される。ステップS、に
おいて当該再閉路継電器R8,,1が動作すると、ステ
ップs3へ移行しタイマが起動しタイマの歩進が始まり
、その後当該開閉器CB、が投入され閉状態になったか
否かがステップS4において判定される。前記開閉器C
B、が閉状態にあればステップS6において再閉路成功
と判定され、検出動作が終了する。
It is determined whether or not the switch CB is in the open state, and if it is in the closed state, the sampling judgment by the slave station TCA is repeated, and when the relevant switch CB is cut off and determined to be in the open state, the step moves to S, and the relevant repeat It is determined whether the closing relay R*cl has operated. While the relay Rac I is not operating, the flow is repeated from step S1 to step S. When the re-closing relay R8,, 1 operates in step S, the process moves to step s3, the timer is started and the timer starts to advance, and then it is determined in step S3 whether or not the switch CB is turned on and is in the closed state. It is determined in S4. Said switch C
If B is in the closed state, it is determined in step S6 that the re-closing has been successful, and the detection operation ends.

しかしながら、ステップS4において、なお当該開閉器
CB、が投入されずなお開状態にあれば、フローがステ
ップS、へ進む。ステップS、において、タイマがタイ
ムアツプ状態にあれば、ステップ7において再閉路不成
功と判定される。しかしながら、なおステップ5におい
てタイマがタイムアツプしていない場合は、フローがス
テップS。
However, in step S4, if the switch CB is still in the open state without being closed, the flow advances to step S. If the timer is in a time-up state in step S, it is determined in step 7 that the reclosure has failed. However, if the timer has not timed up in step 5, the flow returns to step S.

へ戻り、再びステップS、、S、で判定がくり返され、
夫々における判定結果に基づいて再閉路成功あるいは再
閉路不成功が確定され、これらの情報が当該伝送路LA
を経て制御所りの遠制親局TCMへ伝送され、更に集中
監視制御装置Sへ入力され、各配電用変電所の正確な系
統状態が把握され、高速再閉路にあっても正しく再閉路
動作の監視が可能となる。
The process returns to step S, and the determination is repeated again at step S.
Successful reclosing or failure of reclosing is determined based on the determination results in each case, and this information is transmitted to the transmission line LA.
The data is transmitted to the remote control master station TCM at the control center, and then input to the central monitoring and control device S, where the accurate system status of each distribution substation is grasped and correct reclosing operation is performed even during high-speed reclosing. monitoring becomes possible.

G1発明の効果 以上の説明より明らかなように、本発明は配電用変電所
にて、遠制装置・子局の前段に設けた処理装置にて配電
線開閉器および再閉路継電器入力情報を基に再閉路検出
処理を行い再閉路動作の成功・不成功を判定し、その判
定結果のみ遠制装置を介して、上位系の総合制御所の集
中監視制御装置へ伝送し再閉路動作を監視する方法であ
るので、高速度再閉路にも拘らず、伝送おくれや同期ず
れに基づく誤った判定を行うことがなく、正しい監視を
実施するという極めて有効な効果がある。
Effects of the G1 Invention As is clear from the above explanation, the present invention enables a processing device installed in front of a remote control device/slave station in a distribution substation to process information input to a distribution line switch and a re-closing relay. The reclosing detection process is performed to determine the success or failure of the reclosing operation, and only the determination result is transmitted via the remote control device to the central monitoring and control device of the upper system general control center to monitor the reclosing operation. This method has the extremely effective effect of not making erroneous judgments based on transmission delays or synchronization deviations and performing correct monitoring despite high-speed reclosing.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明の一実施例を示す変電所集中監視制御シ
ステム構成図、第2図は再閉路フローチャート、第3図
は高速度再閉路動作を実施するときのタイムチャートで
ある。 M・・・総合制御所、A、B、C・・・配電用変電所、
S・・・変電所集中監視制御装置、TCMおよびTCA
、TCB、TCC・・・遠制・親局および子局、LI。 1−t・・・系統回線、CB、、CBtおよびD S 
、、D S !・・・回線用開閉器および新路器、LS
、、LS、・・・回線接続用ラインスイッチ、BA、 
BB、 Be・・・2次母線、TA、TB、Tc・・・
変圧器、DSA、DSa。 D S c・・・変圧器2次断路器、F、、Fn・・・
配電線、CB、〜CBnおよびD S +t、 D S
 n+、 D S It〜DS0・・・配電線開閉器お
よび断路器、CTl−CTn・・・変流器、OCR,〜
0CRn・・・過電流保護継電器、ZCT、〜ZCT、
−・・零相変流器、R* eI〜R*cn’・・再閉路
継電器、D・・・処理装置、LA、La、Lc・・・情
報伝送路。 第2図 再閉路フローチャート 第3図 タイムチャート
FIG. 1 is a configuration diagram of a substation centralized monitoring and control system showing an embodiment of the present invention, FIG. 2 is a reclosing flowchart, and FIG. 3 is a time chart when performing a high-speed reclosing operation. M... General control center, A, B, C... Distribution substation,
S...Substation centralized monitoring and control equipment, TCM and TCA
, TCB, TCC... Remote control/master station and slave station, LI. 1-t...System line, CB, CBt and D S
,,DS! ...Line switch and new line switch, LS
,,LS,...Line switch for line connection, BA,
BB, Be...Secondary bus bar, TA, TB, Tc...
Transformer, DSA, DSa. D S c...Transformer secondary disconnector, F,, Fn...
Distribution line, CB, ~CBn and D S +t, D S
n+, D S It ~ DS0... Distribution line switch and disconnector, CTl-CTn... Current transformer, OCR, ~
0CRn...Overcurrent protection relay, ZCT, ~ZCT,
--Zero-phase current transformer, R*eI to R*cn'...Reclosing relay, D...Processing device, LA, La, Lc...Information transmission line. Figure 2: Reclosing flowchart Figure 3: Time chart

Claims (1)

【特許請求の範囲】[Claims] (1)複数の配電用変電所より配電線開閉器および再閉
路継電器に関する情報を遠方監視制御装置・子局および
上位系・制御所の親局を介して、総合制御所の集中監視
制御装置へ伝送し、配電線事故発生時に配電線開閉器の
再閉路動作を集中監視するものにおいて、前記配電用変
電所の遠方監視制御装置・子局の前段に処理装置を設け
前記配電線開閉器および再閉路継電器情報を入力し配電
線事故発生時に前記入力情報を基に該配電線開閉器の再
閉路検出処理を行い配電線開閉器の高速再閉路動作の成
功・不成功を判定し該判定情報を前記子局より伝送し前
記親局を介して前記集中監視制御装置へ入力し配電線開
閉器の再閉路動作状況を監視することを特徴とした再閉
路動作監視方法。
(1) Information regarding distribution line switches and reclosing relays from multiple distribution substations is sent to the centralized monitoring and control equipment of the general control center via the remote monitoring and control equipment/slave stations and the upper system/control center's master station. In a device that centrally monitors the re-closing operation of a distribution line switch in the event of a distribution line fault, a processing device is installed before the remote monitoring control device/slave station of the distribution substation to monitor the distribution line switch and re-closing operation. Closing relay information is input, and when a distribution line accident occurs, reclosing detection processing of the distribution line switch is performed based on the input information, and the success or failure of the high-speed reclosing operation of the distribution line switch is determined, and the determination information is A reclosing operation monitoring method characterized in that the reclosing operation status of a distribution line switch is monitored by transmitting it from the slave station and inputting it to the central monitoring and control device via the master station.
JP63146083A 1988-06-14 1988-06-14 Method of monitoring reclosing operation Pending JPH01315230A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63146083A JPH01315230A (en) 1988-06-14 1988-06-14 Method of monitoring reclosing operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63146083A JPH01315230A (en) 1988-06-14 1988-06-14 Method of monitoring reclosing operation

Publications (1)

Publication Number Publication Date
JPH01315230A true JPH01315230A (en) 1989-12-20

Family

ID=15399735

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63146083A Pending JPH01315230A (en) 1988-06-14 1988-06-14 Method of monitoring reclosing operation

Country Status (1)

Country Link
JP (1) JPH01315230A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2709867A1 (en) * 1993-09-08 1995-03-17 Bensadoun Michel Method and device for resetting a circuit breaker
CN102623969A (en) * 2012-03-22 2012-08-01 上海市电力公司 Microcomputer protecting and controlling type remote control retreating reclosure system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2709867A1 (en) * 1993-09-08 1995-03-17 Bensadoun Michel Method and device for resetting a circuit breaker
CN102623969A (en) * 2012-03-22 2012-08-01 上海市电力公司 Microcomputer protecting and controlling type remote control retreating reclosure system

Similar Documents

Publication Publication Date Title
US6275366B1 (en) Apparatus and method for distributing electrical power
US6963793B2 (en) Distribution network monitoring and control system
CN101641849A (en) Fuse saving power distribution system fault protection
US5574611A (en) Service interruption minimizing system for power distribution line
CN102005819A (en) Fault isolation method of electric distribution network
US5262679A (en) Polarizing potential transfer switch circuit for use with power transmission lines
JPH01315230A (en) Method of monitoring reclosing operation
US5579195A (en) Power stoppage minimizing systems for distribution lines and methods of using a distribution line
CN107611939B (en) Regional power supply looped network fault quick isolation and load transfer method
CN108512203A (en) A kind of distribution network protection device and method
Roberts et al. Trip and restore distribution circuits at transmission speeds
Teo A computer aided system to automate the restoration of electrical power supply
KR19990033784A (en) Power system accident spread prevention device
CN110867960B (en) Power supply recovery protection method suitable for distributed feeder automation power distribution terminal
JP2002369375A (en) Distribution line supervisory control device
JPH0479737A (en) Automatic recovery device for from accident at electric station
JPH04331416A (en) Ground fault protection system for distribution line
JP2856543B2 (en) Distribution line automation
JPH0347056B2 (en)
JPS598426Y2 (en) System monitoring display check device
Genji et al. Development of a high-speed switching system for distribution networks
JP2827464B2 (en) Trip test equipment for ring system protection equipment
JP2547647B2 (en) Failure zone detector
JPH10201082A (en) Automatic section switch for distribution line
CN117060569A (en) Control method and control system for transformer substation