JPH01213416A - Sending of preliminary roving in fine spinning frame and device therefor - Google Patents

Sending of preliminary roving in fine spinning frame and device therefor

Info

Publication number
JPH01213416A
JPH01213416A JP3791288A JP3791288A JPH01213416A JP H01213416 A JPH01213416 A JP H01213416A JP 3791288 A JP3791288 A JP 3791288A JP 3791288 A JP3791288 A JP 3791288A JP H01213416 A JPH01213416 A JP H01213416A
Authority
JP
Japan
Prior art keywords
roving
preliminary
rail
creel
engagement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP3791288A
Other languages
Japanese (ja)
Other versions
JP2546318B2 (en
Inventor
Katsumi Nakane
中根 克己
Masahiko Kanehara
雅彦 金原
Makoto Tsuzuki
誠 都築
Hiroshi Omori
大森 裕志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Industries Corp
Original Assignee
Toyoda Automatic Loom Works Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyoda Automatic Loom Works Ltd filed Critical Toyoda Automatic Loom Works Ltd
Priority to JP3791288A priority Critical patent/JP2546318B2/en
Publication of JPH01213416A publication Critical patent/JPH01213416A/en
Application granted granted Critical
Publication of JP2546318B2 publication Critical patent/JP2546318B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H9/00Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine
    • D01H9/18Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine for supplying bobbins, cores, receptacles, or completed packages to, or transporting from, paying-out or take-up stations ; Arrangements to prevent unwinding of roving from roving bobbins

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Textile Engineering (AREA)
  • Spinning Or Twisting Of Yarns (AREA)

Abstract

PURPOSE:To smoothly carry out roving changing operation and doffing operation of roving process, by sending a transportation member having hung the same number of preliminary roving packages as one creel line in a specific state to a preliminary roving package rail. CONSTITUTION:Preliminary roving package rails 2 are extended along a creel at both sides of a machine bed 1 of a fine spinning frame having hung roving packages S on the creel in two longitudinal lines and the rails 2 are connected through a branching part 3 a to a main transportation rail 3 continued to a roving process. A transportation member 4 having hung the same number of preliminary roving packages F at given intervals as one creel line is sent in such a way that the stopping position of the transportation member is shifted from that of the last roving changing operation by one pitch of the roving package line of the creel and arrangement position of preliminary roving packages is changed corresponding to roving doffing of odd-numbers lines or even-numbered lines.

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明はクリールに前後2列に粗糸巻を吊下するととも
に、該クリールの前側上方に延設した予備粗糸巻レール
に搬入された予備粗糸巻との粗糸替作業を、粗糸台機に
より精紡機機台長手方向に沿って1列おきに行う精紡機
における予備粗糸搬入方法及び装置に関するものである
Detailed Description of the Invention (Industrial Application Field) The present invention suspends roving windings in two rows, front and rear, from a creel, and also suspends roving windings carried into a preliminary roving rail extending above the front side of the creel. The present invention relates to a method and apparatus for carrying in preliminary roving in a spinning machine, in which a roving exchange operation with a bobbin winder is carried out every other row along the longitudinal direction of the spinning frame using a roving machine.

(従来の技術) 精紡機では高い位置のクリールに吊下された粗糸さから
粗糸を引出し、下方のドラフトバートへ供給するように
している。そして、粗糸のドラフトバートへの供給が進
み、粗糸巻が空ないし空に近づいた時点で新しい粗糸巻
と交換する必要がある。ところが、粗糸巻は作業者の背
丈よりも高いところに吊下され、その小間が近年では3
K(1前後となりしかも精紡機1台あたり400個@後
必要とするため、粗糸付作業は作業者にとって小骨1動
となっている。そこで、粗糸替作業の自動化が提案され
ている。粗糸替機による粗糸替方法のうちクリールの前
列又は後列に同じ大きさの粗糸巻を吊下して紡出作業を
行う場合には、粗糸巻の最大径はクリールのボビンハン
ガーピッチ以下にならざるを得ず、粗糸巻のラージパッ
ケージ化がクリールのボビンハンガーピッチの値によっ
て規制されるという問題がある。この問題を解消する方
法どして例えば特開昭62−62928号公報には第1
1図に示すように、クリールの前後2列のボビンハンガ
ーに1列おきに満粗糸巻と中玉の粗糸巻Sとを吊下した
状態で紡出を開始し、紡出か進んだ後に空に近づいた粗
糸巻Sと、あらかじめ予備粗糸巻レールに搬入された予
備粗糸巻Fとを順次交換する方法が提案されている。
(Prior Art) In a spinning frame, roving is pulled out from a roving thread suspended from a creel at a high position and is supplied to a draft bar located below. Then, as the supply of roving to the draft bar progresses and the roving winding becomes empty or nearly empty, it is necessary to replace it with a new roving winding. However, the rovings are hung higher than the worker's height, and in recent years the booth has been reduced to 3.
K (around 1), and each spinning machine requires 400 pieces, making the roving work a chore for workers.Therefore, automation of the roving changing work has been proposed. In the roving changing method using a roving changing machine, when spinning rovings of the same size are suspended from the front or rear rows of the creel, the maximum diameter of the rovings should be less than or equal to the bobbin hanger pitch of the creel. As a result, there is a problem in that the large packaging of roving is regulated by the value of the creel bobbin hanger pitch.For example, Japanese Patent Laid-Open No. 62-62928 discloses a method for solving this problem. 1
As shown in Figure 1, spinning is started with full roving windings and medium roving windings S suspended in every other row from the two rows of bobbin hangers at the front and rear of the creel, and after the spinning has progressed, the spinning is suspended. A method has been proposed in which the roving winding S that approaches the end of the roving is sequentially replaced with the preliminary roving winding F that has been carried into the preliminary roving winding rail in advance.

(発明が解決しようとする課題) 前記従来の粗糸替方法では、予備粗糸巻レールに吊下さ
れた予備粗糸巻の数がクリール1列に吊下される粗糸巻
の数と同じ場合には第11図(a )、(b)に示すよ
”うに、奇数シ1]の粗糸替時と偶数列の粗糸替114
とで予喝粗糸巻レールに吊1;された予備粗糸巻の配置
位置が1ピッチ分ずれる。そこで、奇数列、偶数列のい
ずれの場合でも対応でさるように、予備粗糸さレールに
クリール1列分の粗糸巻の数より1個多い予(!7^相
糸粗糸準尚す−ることが考えられる。このようにすると
、奇数列の篠替117には第12図の右端に配置された
予備粗糸巻から順に2個ずつ粗糸替が行われ、(1」数
列の粗糸替時には右から2番目の粗糸巻から順に2個ず
つ粗糸替が行われ、奇数例、偶数列のいずれの場合にも
対応できる。ところが、このように予備粗糸巻レールに
クリール1列分の粗糸巻より1個多い予備粗糸巻を搬入
する構成では、精紡工程と粗紡■稈とを搬送レールによ
り直接連結し、粗紡機で玉揚げされた粗糸巻を予備粗糸
巻として直接予備粗糸巻レールに搬入するシステムを採
用する場合、粗糸替時に1本残った予備粗糸巻が粗紡工
程における玉揚げ作業を円滑に行う場合の支障となると
いう問題がある。
(Problems to be Solved by the Invention) In the conventional roving changing method, when the number of preliminary roving turns suspended on the preliminary roving winding rail is the same as the number of roving turns suspended in one row of creels, As shown in FIGS. 11(a) and 11(b), when changing the roving thread in the odd row 1] and when changing the roving thread 114 in the even row
As a result, the position of the preliminary roving winding suspended on the preliminary roving winding rail is shifted by one pitch. Therefore, for both odd and even rows, the number of roving turns on the preliminary roving rail is one more than the number of rovings for one row of creel (! In this way, the rovings 117 in the odd rows are changed two by two in order from the spare roving windings placed at the right end in FIG. When changing rovings, two rovings are changed starting from the second roving winding from the right, and can be used for both odd and even rows. In a configuration in which one more spare roving roll is carried in than the roving roll, the spinning process and the roving culm are directly connected by a conveyor rail, and the roving roll doffed by the roving machine is directly transferred to the spare roving roll as a spare roving roll. When adopting a system in which the roving is carried into the roving, there is a problem in that the one spare roving that remains when the roving is changed becomes a hindrance to smoothly doffing the roving in the roving process.

本発明は前記の問題点を解消するためになされたもので
あって、その目的はクリールに前後2列に粗糸ざを吊下
するとともに予備粗糸巻レールに搬入された予備粗糸巻
との粗糸H作業を1列おきに行う精紡機において、精紡
工程と粗紡工程とを搬送路で連結するとともに粗紡工程
で玉揚げされた粗糸巻を直接予備粗糸巻レールに搬入す
る場合にも、粗糸替作業及び粗紡工程の玉揚げ作業を円
滑に行うことができる予備粗糸搬入方法及び装量を提供
することである。
The present invention has been made to solve the above-mentioned problems, and its purpose is to suspend roving threads in two rows in the front and back from a creel, and to connect the roving threads with the preliminary roving windings carried into the preliminary roving winding rail. In a spinning machine that performs yarn H work on every other row, the spinning process and roving process are connected by a conveyance path, and the roving roll doffed in the roving process is carried directly to the preliminary roving winding rail. It is an object of the present invention to provide a preliminary roving carrying method and loading amount that can smoothly carry out yarn change work and doffing work in a roving process.

(課題を解決するための手段〉 前記の目的を達成するため本発明においては、予備粗糸
巻レール及び該レールに連続する搬送路を移動するとと
もに所定間隔でクリール1列分の粗糸巻と同じ数の予備
粗糸巻を吊下した搬送体を、その停止位置が前回の粗糸
替作業時における停止位置よりクリールの粗糸巻列の1
ピッチ分ずれた位置となるように予備粗糸巻レール内へ
搬入するようにした。
(Means for Solving the Problems) In order to achieve the above-mentioned object, in the present invention, a preliminary roving winding rail and a conveyance path continuous with the rail are moved, and at a predetermined interval, the same number of roving windings as one row of creel is The transport body with the spare roving winding suspended thereon is moved so that its stopping position is one of the creel's roving winding rows from the stopping position at the time of the previous roving change operation.
The roving is carried into the preliminary roving rail so that the position is shifted by the pitch.

又、予備粗糸搬入装置として、前後2列に粗糸巻を吊下
するクリールの前側り方に予備粗糸巻レールを設け、該
レールへの予備粗糸巻の搬入を予備粗糸巻レール及び該
レールに連続する搬送路を移動する搬送体に、所定間隔
でクリール1列分の粗糸巻と同数の予備粗糸巻を吊下し
、該搬送体を接離可能に連結して移動する搬機を使用し
て行い、粗糸替作業を粗糸Vi機により精紡機機台長手
方向に沿って一列おきに行う間Glj 11において、
前記予備粗糸巻レールの搬送体搬入側端部の所定位置に
は該レールに沿って移動可能に配設されるとともに駆動
装置により作用位置と待機位置とに往復動される移動体
を設け、該移動体には前記搬送体の所定位置に設けた係
合部と係合する係合レバーを前記移動体が待機位置に配
置された際には退避位置に移動体の往動時には前記係合
部と係合可能な係合位置にそれぞれ移動配置可能に設け
た。
In addition, as a preliminary roving carrying device, a preliminary roving winding rail is provided on the front side of the creel from which roving windings are hung in two rows, front and rear, and the preliminary roving winding rail is carried in to the rail. A carrier machine is used in which the same number of spare roving windings as the number of roving windings for one row of creels are hung at predetermined intervals on a conveying body that moves on a continuous conveying path, and the conveying body is connected so as to be removable. At Glj 11, while the roving Vi machine performs the roving change operation every other row along the longitudinal direction of the spinning frame frame,
A movable body is provided at a predetermined position at the end of the preliminary roving winding rail on the conveyor loading side, the movable body being movably disposed along the rail and reciprocated between an operating position and a standby position by a drive device. The movable body has an engagement lever that engages with an engagement portion provided at a predetermined position of the conveyance body.When the movable body is placed in a standby position, the engagement lever is placed in a retracted position, and when the movable body moves forward, the engagement lever engages with an engagement portion provided at a predetermined position of the conveyance body. They are each movably arranged in an engagement position where they can be engaged with each other.

(作用) 本発明の予備粗糸搬入方法では、所定開隔でクリール1
列分の粗糸巻と同数の予備粗糸巻を吊下した!!22送
休が、その停止位置が前回の粗糸替作業時における停止
位置より前記クリールの粗糸巻列の1ピッチ分ずれた位
置となるように搬入され、奇数列あるいゆ偶数列の粗糸
替に対応して予備粗糸巻の配置位置が変更される。
(Function) In the preliminary roving carrying method of the present invention, the creel 1 is
I hung the same number of spare rovings as the rows of rovings! ! 22 The roving is carried in so that its stopping position is shifted by one pitch of the roving winding row of the creel from the stopping position during the previous roving change operation, and the roving of odd rows or even rows is transported. The arrangement position of the preliminary roving winding is changed accordingly.

又、第2請求項に記載された発明では、所定間隔Cクリ
ール1列分の粗糸巻と同数の子尚粗糸巻を吊下した搬送
体は、@機により常に予備粗糸巻レールの所定位冒すな
りも奇数列あるいは偶数列のいずれか一方の粗糸替時に
好適な位置に搬入される。そして、当該配置位置から別
の配置位置への移動は前記移動体が駆動装置にJ:り往
動される際に、係合レバーが搬送体の係合部と係合して
搬送体全体をクリールの粗糸巻列の1ピッチ分移動させ
ることにより行われる。
In addition, in the invention described in the second claim, the conveying body suspending the same number of secondary roving windings as the roving windings for one row of C creels at a predetermined interval is always moved to a predetermined position on the preliminary roving winding rail by the @ machine. The rovings are also carried into a suitable position when changing the rovings in either the odd or even rows. Then, when the movable body is moved back and forth by the drive device, the engaging lever engages with the engaging portion of the conveying body to move the entire conveying body from one position to another. This is done by moving the roving winding row of the creel by one pitch.

(実施例1) 以下本発明を具体化した第一の実施例を第1〜5図に従
って説明する。第1図に示すようにクリールに前後2列
に粗糸巻Sを吊下する精紡1m g1台1の左右両側(
片側のみ図示)には予備粗糸巻レール2がクリールに沿
って延設され、予備粗糸巻レール2は粗紡工程(図示ば
ず)に連続する搬送路としての主搬送レール3に分岐部
3aを介して連結されている。各レール2.3はそれぞ
れ断面口状に形成され、予備粗糸巻[あるいは精紡機機
台1で使用された後の粗糸ボビンを吊下して粗紡・精紡
工程間で粗糸ボビンの搬送を行う搬送体4が各レール2
,3上を走行自在に装備されている。
(Example 1) A first example embodying the present invention will be described below with reference to FIGS. 1 to 5. As shown in FIG.
On one side (only one side shown), a preliminary roving winding rail 2 is provided extending along the creel, and the preliminary roving winding rail 2 is connected to a main conveyance rail 3 as a conveyance path continuous to the roving process (not shown) via a branch part 3a. are connected. Each rail 2.3 is formed with an opening in cross section, and is used to suspend the preliminary roving winding [or the roving bobbin after being used in the spinning machine frame 1] and transport the roving bobbin between the roving and spinning processes. The carrier 4 that performs
, 3 so that it can run freely.

搬送体4は特開昭62−110928号公報に開示され
たものとほぼ同様に構成され、第2,4゜5図に示すよ
うに両側面にコロ5が1.上面に係合ローラ6がそれぞ
れ回転自在に取付けられ、下面に1個のボビンハンガー
7が吊下された多数の支持体8をリンク9で連結するこ
とにより構成されている。搬送体4の前端にはフック1
0が設けられている。
The conveyor 4 is constructed almost in the same way as that disclosed in JP-A-62-110928, and has rollers 5 on both sides, as shown in FIGS. 2, 4 and 5. It is constructed by connecting a large number of supports 8 with links 9, each of which has engagement rollers 6 rotatably attached to its upper surface and one bobbin hanger 7 suspended from its lower surface. A hook 1 is attached to the front end of the carrier 4.
0 is set.

前記搬送体4を牽引して主搬送レール3上を走行するl
l11111は昭和62年9月11日出願の特願昭62
−229278号の明aS及び図面に記載したものと同
じ構成であり、第2図に示すように前記搬送体4とほぼ
同様な構成の連結体12が連結され、連結体12の後端
には掛止ピン13が設けられ、前記フック10が掛止さ
れることにより連結体12と搬送体4とが連結されφよ
うになっている。フック10は図示しないばねにより掛
止ピン13との掛止状態が保持されるように回動付勢さ
れている。
l which runs on the main transport rail 3 while towing the transport body 4;
l11111 is a patent application filed on September 11, 1988.
It has the same structure as that described in the AkiraS and drawings of No. 229278, and as shown in FIG. A latching pin 13 is provided, and by latching the hook 10, the connecting body 12 and the conveying body 4 are connected in the shape of φ. The hook 10 is rotatably biased by a spring (not shown) so as to maintain the hooked state with the locking pin 13.

予備粗糸巻レール2の搬送体搬入側の所定位置には搬送
体4を所定位置に保持するとともに、搬送体4と連結体
12との連結を切り離す作用をなta結切離し装置14
が、クリールに吊下される粗糸巻Sの1ピッチ分と等し
く形成された支持体8の1ピッチ分の間隔をおいて2台
配設されている。連結切離しl’1il14は前記特願
昭62−229278号に記載されたものと同様に構成
され、第4図に示すように予備粗糸巻レール2の側方に
おいて該レール2に固定されたプラケッ1−15に対し
て回動軸16が支持されている。第1.3゜5図に示す
ように回動軸16の上部には搬送体4の係合0−ラ6と
係合可能な嵌合凹部17aを有する位置決めレバー17
が一体回動可能にll1Ic′?を固定され、回動軸1
6の下部には係合レバー18及びレバー19が一体回!
I!ll可能に固定されている。
At a predetermined position on the conveyor carry-in side of the preliminary roving winding rail 2, there is provided a tying/disconnecting device 14 that holds the conveyor 4 in a predetermined position and has the function of separating the connection between the conveyor 4 and the connecting body 12.
are arranged at an interval of one pitch of the supports 8, which are formed to be equal to one pitch of the roving winding S suspended from the creel. The connection disconnection l'1il14 is constructed in the same manner as that described in the above-mentioned Japanese Patent Application No. 62-229278, and is attached to a placket 1 fixed to the side of the preliminary roving winding rail 2, as shown in FIG. -15, a rotation shaft 16 is supported. As shown in FIG. 1.3.5, a positioning lever 17 is provided on the upper part of the rotation shaft 16 and has a fitting recess 17a that can be engaged with the engagement roller 6 of the carrier 4.
Is it possible to rotate it as a whole? is fixed and the rotation axis 1
At the bottom of 6, the engagement lever 18 and lever 19 are integrated!
I! Ill possible fixed.

位置決めレバー17は係合レバー18の回動に伴い、位
置決め用の係合部としての係合ロー56と係合する係合
位置と、該ローラ6から離脱した退避位置とに往復回動
されるようになっている。回動軸16は予備粗糸巻レー
ル2に固定されたブロック20をn通する状態に支承さ
れるとどもに、その中間部に前記位置決めレバー17を
係合位置と退避位置とに保持する保持礪構(図示せず)
が設けられている。予備粗糸巻レール2の側方には第1
.3図に示すように、位置決めレバー17が係合ローラ
6との係合位置に回動配置された際、該レバー17が同
位置よりさらに回動するのを阻止するストッパ21が係
合レバー18と係合可能な位置に固定されている。又、
位置決めレバー17が係合位置から退避位置側へ回動さ
れた際、位置決めレバー17が退避位置よりさらに回動
するのを阻止するためのストッパ22が前記レバー19
と係合可能な位置に固定されている。
As the engagement lever 18 rotates, the positioning lever 17 is reciprocated between an engagement position where it engages with an engagement row 56 serving as a positioning engagement portion and a retracted position where it disengages from the roller 6. It looks like this. The rotating shaft 16 is supported so as to pass through a block 20 fixed to the preliminary roving winding rail 2, and has a holding lever in the middle thereof that holds the positioning lever 17 in the engaged position and the retracted position. Structure (not shown)
is provided. On the side of the preliminary roving winding rail 2 there is a first
.. As shown in FIG. 3, when the positioning lever 17 is rotated to the engagement position with the engagement roller 6, a stopper 21 that prevents the lever 17 from rotating further from the same position is attached to the engagement lever 18. is fixed in a position where it can be engaged with. or,
When the positioning lever 17 is rotated from the engagement position to the retracted position, a stopper 22 for preventing the positioning lever 17 from further rotating beyond the retracted position is attached to the lever 19.
is fixed in a position where it can be engaged with.

前記回動軸16の配設位置より主搬送レール3寄りには
支軸23が設けられ、搬送体4と連結体12との連結状
態を解除する切離しレバー24がその塁端において支軸
23に対して回動可能に支持されている。回動軸16の
上端には位置決めレバー17と切離しレバー24とを連
動するためのレバー25が一体回動可能に嵌着され、該
レバー25の先端には切離しレバー24とほぼ平行に延
びるとどもにガイドピン26に対して長孔27aを介し
て支承され、かつその一端に切離しレバー24と係合可
能な係合突部27bを有する作動レバー27の細端が連
結されている。切離しレバー24は位置決めレバー17
が係合ローラ6との係合位置に配置された時点では作動
レバー27の係合突部27bとの係合が解除され、その
自重により下方へ回動されて搬送体4のフック10と係
合し、フック10を開放位置に回動させるようになって
いる。なお、予備粗糸巻レール2には第4図に示すよう
に、位置決めレバー17及び切離しレバー24がレール
内に進入可能な透孔2a、2bが形成されている。
A support shaft 23 is provided closer to the main transport rail 3 than the rotation shaft 16, and a separation lever 24 for releasing the connection between the transport body 4 and the coupling body 12 is attached to the support shaft 23 at the base end thereof. It is rotatably supported. A lever 25 for interlocking the positioning lever 17 and the separation lever 24 is fitted to the upper end of the rotation shaft 16 so as to be integrally rotatable, and a lever 25 extending substantially parallel to the separation lever 24 is attached to the tip of the lever 25. A narrow end of an operating lever 27 is connected to the guide pin 26 through an elongated hole 27a, and has an engaging protrusion 27b at one end thereof that can be engaged with the separation lever 24. The separation lever 24 is the positioning lever 17
When the actuating lever 27 is disposed at the engagement position with the engagement roller 6, the engagement with the engagement protrusion 27b of the operating lever 27 is released, and it is rotated downward by its own weight and engaged with the hook 10 of the conveyor 4. The hook 10 is rotated to the open position. As shown in FIG. 4, the preliminary roving winding rail 2 is formed with through holes 2a and 2b through which the positioning lever 17 and the separation lever 24 can enter into the rail.

精紡機機台1のア1クトJンド側(第1図の左側)には
予備粗糸巻レール2内に搬入された搬送体4を位置決め
レバー17と協働して粗糸替作業に支障を来たさない所
定位置に保持する押圧付9A装置28が配設されている
。押圧付勢装置28は予備粗糸巻レール2の長手方向に
沿って設けられたエアシリンダ29と、そのピストンロ
ット29aの先端に固定された押圧部材30とから構成
され、供給エア圧力を調整することによりその押圧力が
変更可能となっている。
On the active side (left side in Figure 1) of the spinning frame frame 1, the carrier 4 carried into the preliminary roving winding rail 2 is moved in cooperation with a positioning lever 17 to avoid any hindrance to the roving change operation. A 9A device 28 with a press is provided to hold it in a predetermined position so that it does not come. The pressing force device 28 is composed of an air cylinder 29 provided along the longitudinal direction of the preliminary roving winding rail 2, and a pressing member 30 fixed to the tip of the piston rod 29a, and is capable of adjusting the supply air pressure. The pressing force can be changed.

次に前記のように構成された装置を使用した予備粗糸搬
入方法を説明する。奇数列側に吊下された粗糸巻Sの粗
糸替作業を行う場合には、搬機11は搬送体4の搬入を
必要とする予備粗糸巻レール2と対応する分岐部3aを
搬送体4の最後部が通過した後搬機11に装備されたセ
ンサが所定位置に設けられた停止位置表示部材を検知し
て停止した後、第1図(a )に示すように1!1gl
111が後退移動して搬送体4及び連結体12が予備粗
糸巻レール2内に搬入される。搬送体4の搬入開始時に
は連結切離し装置14の位置決めレバー17は係合ロー
ラ6ど係合不能、な退避位置に配置された状態に、又、
切離しレバー24は作動レバー27の係合突部27bと
係合して係合ローラ6の通過を妨げない退避位置に配置
されている。従って搬送体4は搬1f111の後退に伴
い予備粗糸巻レール2内に円滑に搬入される。このとき
連結体12の後部に吊下されたクース31に装備された
ローラ32は係合レバー18と係合不能な退避位置に保
持されており、ローラ32は係合レバー18の下方を通
過する。ローラ32が係合レバー18の下方を通過した
時点でWiIlllが停止して第1図(a )に示す状
態となり、その位置でローラ32が係合レバー18と係
合可能な位置に配置される。次いで111fi11が前
進移動り゛るとローラ32が主搬送レール3寄りに配設
された一方の連結切離し装置14の係合レバー18と係
合し、その状態からさらにm機11が前進移動すること
により該係合レバー18が第1図<a >の状態から時
計方向に回動され、それに伴い位置決めレバー17も一
体的に時計方向に回動される。この時点では連結体12
と搬送体4との連結は解除されていないため搬送体4も
連結体12と一体的に移動する。ローラ32と係合レバ
ー18との係合が解除される地点まで連結体12が移動
した時点で、位置決めレバー17はその嵌合凹部17a
が搬送体4の最後部に設けられた係合[1−ラ6と係合
する状態となる。又、この時切離しレバー24は作動レ
バー27の係合突部27bとの係合が解除されて切離し
レバー24の自重により下方へ回動し、搬送体4の後部
に設けられたフック10と係合してフック10を連結体
12の掛止ピ゛ン13から離脱する位置に回動させる。
Next, a method for introducing a preliminary roving using the apparatus configured as described above will be explained. When performing roving change work on the roving windings S suspended on the odd-numbered row side, the carrier 11 moves the branch section 3a corresponding to the preliminary roving winding rail 2 that requires the transporting body 4 into the conveying body 4. After the last part of the transporter 11 has passed through, a sensor installed in the rear transporter 11 detects a stop position display member provided at a predetermined position and stops, and then the rearmost transporter 11 passes by 1!1gl as shown in Fig. 1(a).
111 moves backward, and the carrier 4 and the connecting body 12 are carried into the preliminary roving rail 2. When the transport body 4 starts to be carried in, the positioning lever 17 of the connection/disconnection device 14 is placed in a retracted position in which the engagement roller 6 cannot be engaged;
The separation lever 24 is disposed at a retracted position where it does not engage with the engagement protrusion 27b of the operating lever 27 and prevent the engagement roller 6 from passing. Therefore, the carrier 4 is smoothly carried into the preliminary roving winding rail 2 as the carrier 1f111 retreats. At this time, the roller 32 mounted on the coos 31 suspended from the rear of the coupling body 12 is held in a retracted position where it cannot engage with the engagement lever 18, and the roller 32 passes below the engagement lever 18. . When the roller 32 passes below the engagement lever 18, the WiIll stops and enters the state shown in FIG. . Next, when the 111fi11 moves forward, the roller 32 engages with the engagement lever 18 of one of the connection and disconnection devices 14 disposed near the main transport rail 3, and from this state, the m machine 11 moves further forward. As a result, the engagement lever 18 is rotated clockwise from the state shown in FIG. 1<a>, and the positioning lever 17 is also integrally rotated clockwise. At this point, the connector 12
Since the connection between the transport body 4 and the transport body 4 is not released, the transport body 4 also moves integrally with the coupling body 12. When the coupling body 12 moves to the point where the engagement between the roller 32 and the engagement lever 18 is released, the positioning lever 17 moves into its fitting recess 17a.
is engaged with the engagement [1-ra 6] provided at the rearmost portion of the conveyor 4. Also, at this time, the separation lever 24 is disengaged from the engagement protrusion 27b of the operating lever 27, rotates downward due to its own weight, and engages with the hook 10 provided at the rear of the carrier 4. At the same time, the hook 10 is rotated to a position where it is released from the locking pin 13 of the connecting body 12.

そして、さらにWi機11が前進することにより第1図
(b )に示すように搬送体4が連結体12から切離さ
れて予備粗糸巻レール2内に残り、搬機11は連結体1
2と共に搬送体4の搬出を必要とする位置へと移動する
Then, as the Wi machine 11 moves further forward, the carrier 4 is separated from the connecting body 12 and remains within the preliminary roving winding rail 2, as shown in FIG.
2 to the position where the transport body 4 needs to be carried out.

連結体12から切離された搬送体4はアウトエンド側に
設けられた押圧付勢装置28によりギヤエンド側へ押圧
付勢されるとともに他端の係合ロー56が位置決めレバ
ー17により所定位置に保持され、奇数列の粗糸台作業
に好適な所定位置に配置される。
The conveyor body 4 separated from the connecting body 12 is pressed and urged toward the gear end side by the pressing and urging device 28 provided on the outer end side, and the engagement row 56 at the other end is held in a predetermined position by the positioning lever 17. and is placed in a predetermined position suitable for odd row roving table operations.

一方、偶数列の粗糸台作業に先立って予嬬粗糸巻Fを搬
入する場合には、搬機11は制[1装置から搬入を必要
とする精紡機機台の予備粗糸巻レール2の位置及び機台
東側への搬入の指示を受けて当該予備粗糸巻レール2と
対応する位置へと移動する。そして、前記と同様にして
搬送体4をその後部側から予備粗糸巻レール2内へと搬
入する。
On the other hand, when carrying in the preliminary roving winding F prior to the work on the even-numbered rows of roving stands, the carrier 11 controls the position of the spare roving winding rail 2 of the spinning machine stand that needs to be carried from the machine Then, upon receiving an instruction to carry the machine to the east side, it moves to a position corresponding to the spare roving winding rail 2. Then, in the same manner as described above, the carrier 4 is carried into the preliminary roving winding rail 2 from its rear side.

そして、ケース31が予備粗糸巻レール2の奥寄りに配
設された他方の連結切離し装置14と対応する位置まで
移動した時点で搬機11が停止し、0−ラ32を係合レ
バー18との係合可能位置に配置した#li搬機11が
前進移動を開始する。そして前記と同様にして11機1
1の前進移動によりO−ラ32と係合レバー18が係合
し、前記と同様に位置決めレバー17が搬送体4の最前
部に設けられた係合ロー56と係合して所定位置に停止
するとともに搬送体4が連結体12から切離され、第1
図(C)に承り状態となる。この状態は搬送体4に吊下
された予備粗糸巻Fが偶数列の粗糸台に好適な位置とな
る。
Then, when the case 31 moves to a position corresponding to the other connection and disconnection device 14 disposed at the back of the preliminary roving winding rail 2, the carrier 11 stops, and the O-ra 32 is connected to the engagement lever 18. The #li carrier 11 placed in the engageable position starts moving forward. Then, in the same way as above, 11 aircraft 1
1, the O-ra 32 and the engagement lever 18 engage with each other, and similarly to the above, the positioning lever 17 engages with the engagement row 56 provided at the forefront of the conveyor 4 and stops at a predetermined position. At the same time, the carrier 4 is separated from the connecting body 12, and the first
Figure (C) shows the acceptance state. In this state, the preliminary roving winding F suspended from the conveyor 4 is in a suitable position for the even-numbered rows of roving stands.

なお、予備粗糸巻レール2内から搬送体4を搬出する場
合には、搬機11が91退移動して連結体12が当該予
備粗糸きレール2内に進入し、連結体12の後端が搬送
体4の前端と当接した状態からさらにm機構1が侵退移
動を続けると、搬送体4が第1図(b)、(C)に示す
位置から左方(予備粗糸巻レール2の奥側)へ移動する
。これにより位置決めレバー17が時計方向へ回動され
、嵌合凹部17aと係合ローラ6との係合が解除される
。一方位置決めレバー17が回動されることにより、レ
バー25を介して作動レバー27が移動されるとともに
その係合突部27bが切離しレバー24と係合して切離
しレバー24をフック10との係合位置から上方へ回動
させ、搬送体4の各係合ローラ6の通過を許容する退避
位置に移動配置させる。これによりフック10が掛止ビ
ン13と係合して連結体12と搬送体4とが連結される
。次いで搬機11が前進移動することにより搬送体4は
予備粗糸巻レール2内から搬出される。
In addition, when carrying out the carrier 4 from the preliminary roving rail 2, the carrier 11 moves backward by 91, the connecting body 12 enters the preliminary roving rail 2, and the rear end of the connecting body 12 When the m mechanism 1 continues to move back and forth from the state in which the m mechanism 1 is in contact with the front end of the carrier 4, the carrier 4 moves to the left (preliminary roving rail 2) from the position shown in FIGS. 1(b) and 1(C). move to the back side). As a result, the positioning lever 17 is rotated clockwise, and the engagement between the fitting recess 17a and the engagement roller 6 is released. On the other hand, when the positioning lever 17 is rotated, the operating lever 27 is moved via the lever 25, and its engagement protrusion 27b engages with the separation lever 24, thereby causing the separation lever 24 to engage with the hook 10. It is rotated upward from this position and moved to a retracted position that allows each engagement roller 6 of the conveyance body 4 to pass therethrough. As a result, the hook 10 engages with the hooking pin 13, and the connecting body 12 and the conveying body 4 are connected. Next, as the carrier 11 moves forward, the carrier 4 is carried out from within the preliminary roving winding rail 2.

(実施例2) 次に第二の実施例を第6〜9図に従って説明する。この
実施例では1lEi機11が搬送体4を常に奇数列の粗
糸台に好適な所定位■に搬入し、偶数列の粗糸台に好適
な位置への移動を別の送り機構により行うようにした点
が前記実施例と大きく異なっている。寸なわら、第9図
(a)、(b)に示すように予備粗糸巻レール2の搬入
側端部所定位置には連結切離し装r1114が1個配設
され、連結切離し装置14の近傍奥寄りに送り装置33
が配設されている。第6,7図に示すように予備粗糸巻
レール2の上面には一対のブラケッt・34a。
(Example 2) Next, a second example will be described according to FIGS. 6 to 9. In this embodiment, the 1lEi machine 11 always transports the carrier 4 to a predetermined position suitable for the roving tables in odd-numbered rows, and moves it to a position suitable for the roving tables in even-numbered rows using another feeding mechanism. This embodiment differs greatly from the previous embodiment in that In addition, as shown in FIGS. 9(a) and 9(b), one connection and disconnection device r1114 is provided at a predetermined position at the end of the carry-in side of the preliminary roving winding rail 2. Nearby feeder 33
is installed. As shown in FIGS. 6 and 7, a pair of brackets t and 34a are provided on the upper surface of the preliminary roving winding rail 2.

34bがその一部がレール2の側方に突出する状態で固
定され、両ブラケット34a 、34b間には支持ロッ
ド35が予備粗糸巻レール2と平行に固定されている。
34b is fixed with a part thereof protruding to the side of the rail 2, and a support rod 35 is fixed parallel to the preliminary roving rail 2 between both brackets 34a and 34b.

支持Oラド35には移動体36が予備粗糸巻レール2に
沿って移動可能に支承されるとともに、ブラケット34
aに固定された駆動@買としてのシリンダ37のピスト
ンロッド37aに対しブラケット38を介して一体移動
可能に固定されている。
A movable body 36 is supported on the support Orad 35 so as to be movable along the preliminary roving winding rail 2, and a bracket 34
It is fixed so as to be integrally movable via a bracket 38 with respect to a piston rod 37a of a cylinder 37 as a drive cylinder 37 fixed to a.

移動体36には支軸39が上下方向に延びる状態でかつ
一部が移動体36の下面から突出するように固定されて
いる。支軸39の突出端には回動部材40を介して係合
レバー41及びレバー42が一体向動可能に支承されて
いる。係合レバー41は予備粗糸巻レール2内に搬入さ
れた搬送体4の係合ローラ6と同じ高さに設置プられる
とと6に、その先端が予備粗糸巻レール2と交差可能な
長さに形成されている。両レバー41.42間にはピン
43が固定され、移動体36の一端下面に突設された掛
止ビン44に一端が掛止されたばね45の他端がビン4
3に掛止され、係合レバー41は予備粗糸巻レール2と
交差する方向(第6図の時計方向)へ付勢されている。
A support shaft 39 is fixed to the movable body 36 so as to extend in the vertical direction and partially protrude from the lower surface of the movable body 36 . An engagement lever 41 and a lever 42 are supported on the protruding end of the support shaft 39 via a rotating member 40 so as to be able to move in one direction. When the engagement lever 41 is installed at the same height as the engagement roller 6 of the conveyor 4 carried into the preliminary roving winding rail 2, it has a length such that its tip can intersect with the preliminary roving winding rail 2. is formed. A pin 43 is fixed between both levers 41 and 42, and the other end of a spring 45 is hooked to a hook pin 44 protruding from the lower surface of one end of the movable body 36.
3, and the engagement lever 41 is biased in a direction intersecting the preliminary roving winding rail 2 (clockwise in FIG. 6).

移動体36の下面にはレバー42と当接してレバー42
及び係合レバー41が予備粗糸巻レール2と直交する位
置より余分に回動されるのをJM制゛りるストッパ46
が突設されている。一方、予備粗糸巻レール2には係合
レバー41と対向する側の側壁上部に係合レバー41が
予備粗糸巻レール2内に進入するのを許容する長孔47
が前記支持ロッド35に沿って形成されている。又、ビ
ス]〜ンロツド37aが没入作動され移動体36が待機
位置(第6図に八で示す位置)に配置された時点にJ3
けるストッパ46より前方(第6図の左方)には係合レ
バー41と係合してその回動を規制する規制ローラ48
がブラケット49を介して取付けられている。
The lower surface of the movable body 36 is in contact with the lever 42 and the lever 42 is in contact with the lever 42.
and a stopper 46 that prevents the engagement lever 41 from being rotated excessively beyond the position perpendicular to the preliminary roving winding rail 2.
is installed protrudingly. On the other hand, in the preliminary roving winding rail 2, there is a long hole 47 in the upper part of the side wall on the side opposite to the engaging lever 41, which allows the engaging lever 41 to enter into the preliminary roving winding rail 2.
is formed along the support rod 35. Also, at the time when the screw-in rod 37a is retracted and the movable body 36 is placed in the standby position (the position indicated by 8 in FIG. 6), the J3
In front of the stopper 46 (to the left in FIG. 6) is a regulating roller 48 that engages with the engagement lever 41 to regulate its rotation.
is attached via a bracket 49.

次に前記のように構成された装置の作用を説明する。送
り装置33は偶数列の粗糸替作業を行う場合以外は移動
体36が第6図にAで示す待機位置に配置された状態に
保持されている。この状態では係合レバー41が規制ロ
ーラ48と当接してばね45による付勢力に抗して先端
が予備粗糸巻レール2内に搬入される搬送体4の係合ロ
ーラ6と係合不能な退避位置に保持されている。この状
態で搬機11が前記実施例と同様にして搬送体4を予備
粗糸巻レール2内に搬入ηる。搬機11は常に搬送体4
の最前部の係合ローラ6が連結切離し装置14の位置決
めレバー17と係合可能な所定位置に搬送体4の搬入を
行う。次いで搬機11の前進により前記と同様にして搬
送体4と連結体12が切1311されるとどちに、搬送
体4は第9図(a )に示す奇数列の粗糸替に好適な位
置に配置される。従って、奇数列の相系の場合には連結
切翻し装置14により11送体4と連結体12との連結
が切離された状態で粗糸替機により粗糸替作業が行われ
る。すなわち、奇数列の粗糸替の場合には送り5A置3
3は何等作動を必要としない。粗糸替作業完了後の搬送
体4の搬出は、前記実施例と同様に行われる。
Next, the operation of the apparatus configured as described above will be explained. In the feeding device 33, the movable body 36 is maintained at the standby position shown by A in FIG. 6, except when performing the roving change operation for even-numbered rows. In this state, the engagement lever 41 comes into contact with the regulation roller 48, resisting the biasing force of the spring 45, and retreats so that the leading end cannot engage with the engagement roller 6 of the conveying body 4 carried into the preliminary roving winding rail 2. held in position. In this state, the carrier 11 carries the carrier 4 into the preliminary roving rail 2 in the same manner as in the previous embodiment. The carrier 11 is always the carrier 4
The transport body 4 is carried into a predetermined position where the engagement roller 6 at the forefront can engage with the positioning lever 17 of the connection/disconnection device 14 . Next, as the carrier 11 moves forward, the carrier 4 and the connecting body 12 are cut 1311 in the same manner as described above, and at the same time, the carrier 4 is cut 1311 in a manner suitable for changing the odd-numbered rows of rovings as shown in FIG. 9(a). placed in position. Therefore, in the case of an odd-numbered phase system, the roving change operation is performed by the roving change machine in a state where the connection between the feeder 4 and the connection body 12 is disconnected by the connection switching device 14. In other words, in the case of changing the roving in an odd row, the feed is 5A and 3.
3 does not require any operation. After the roving change operation is completed, the transport body 4 is carried out in the same manner as in the previous embodiment.

一方、偶数列の粗糸替を必要とする場合には、まず前記
と同様にして搬機11により搬送体4が所定位置に搬入
され、次いで搬機11の前進移動に伴う連結切離し装置
14の作動により、搬送体4が連結体12から切離され
て奇数列の粗糸替に好適な位置に配置される。この状態
で送り装置33が作動を開始りる。シリンダ37が作動
されピストンロッド37aの突出移動に伴い移動体36
が待機位置から支持ロッド35に沿って前進移動(第6
図の左方への移動)する。移動体36の前進移動に伴い
係合レバー41及びレバー42がばね45の弾性力によ
り支軸39を中心に第6図の時a[方向に回動される。
On the other hand, when it is necessary to change the rovings of even rows, the carrier 4 is first carried into a predetermined position by the carrier 11 in the same manner as described above, and then the connection and disconnection device 14 is moved as the carrier 11 moves forward. As a result of the operation, the conveyor 4 is separated from the connecting body 12 and placed in a position suitable for changing the rovings in odd rows. In this state, the feeding device 33 starts operating. As the cylinder 37 is activated and the piston rod 37a protrudes, the movable body 36
moves forward from the standby position along the support rod 35 (sixth
(move to the left in the diagram). As the movable body 36 moves forward, the engagement lever 41 and the lever 42 are rotated about the support shaft 39 in the direction a shown in FIG. 6 by the elastic force of the spring 45.

そして、係合レバー41の先端が長孔47から予備粗糸
巻レール2内に侵入するとともに予備粗糸巻レール2と
直交する位置まで回動した115 ):Aでレバー42
がストッパ46に当接してその回動が規制され、第6図
に実線で示すように係合レバー41は予備粗糸巻レール
2と直交する状態すなわち係合ローラ6と係合可能な位
置に保持される。移動体36がさらに前進移動すること
により係合レバー41とともに係合ローラ6を介して搬
送体4が一体的に予備粗糸巻レール2の奥側へ送り込ま
れる。搬送体4が1ピッチ分移動した時点でシリンダ3
7の作動が停止し、搬送体4は奇数列の粗糸替に好適な
位♂tから1ピッチ分相糸巻レール2の奥側に移動され
た位置すなわら偶数列の粗糸替に好適な位置に配置され
る。搬送体4の後端部はアウトエンド側に配設された押
圧付勢装置28の押圧部材30と当接状態にあるが、ピ
ストンロッド37aの突出時にはエアシリンダ29のエ
ア圧が減尺状態に調整されており、ピストンロッド37
aの突出に伴いビスi・ン0ツド29aが円滑にエアシ
リンダ29内に押し込まれる。な、r′3、送り装置3
3により搬送体4が第9図(a )に示す位置から予備
粗糸巻レール2の奥側へ移動されるにともない、位置決
めレバー17が回動されて第9図(b )に示すように
係合ローラ6と係合不能な退避位置に配置される。搬送
体4が偶数列の粗糸替に好適な位置に配置された後、粗
糸替機により粗糸替作業が行われる。
Then, the tip of the engagement lever 41 entered the preliminary roving winding rail 2 through the elongated hole 47 and rotated to a position perpendicular to the preliminary roving winding rail 2.
comes into contact with the stopper 46 and its rotation is restricted, and the engagement lever 41 is held in a state perpendicular to the preliminary roving winding rail 2, that is, in a position where it can engage with the engagement roller 6, as shown by the solid line in FIG. be done. As the movable body 36 moves further forward, the conveying body 4 is integrally sent to the back side of the preliminary roving winding rail 2 together with the engagement lever 41 via the engagement roller 6. When the carrier 4 moves by one pitch, the cylinder 3
7 stops, and the conveyor 4 is moved from the position ♂t, which is suitable for changing rovings in odd-numbered rows, to the back side of the split-phase bobbin rail 2 by one pitch, which is suitable for changing rovings in even-numbered rows. placed in a suitable position. The rear end of the carrier 4 is in contact with the pressing member 30 of the pressing and urging device 28 disposed on the out-end side, but when the piston rod 37a protrudes, the air pressure in the air cylinder 29 is reduced. It has been adjusted and the piston rod 37
As the screw a protrudes, the screw i/n bolt 29a is smoothly pushed into the air cylinder 29. Na, r'3, feeding device 3
3 moves the conveyor 4 from the position shown in FIG. 9(a) to the back side of the preliminary roving winding rail 2, the positioning lever 17 is rotated and engaged as shown in FIG. 9(b). It is placed at a retracted position where it cannot engage with the matching roller 6. After the conveyor 4 is placed at a position suitable for changing the even-numbered rows of rovings, the roving changing machine performs the roving changing operation.

粗糸台作業完了後、その完了信号に基づき送り装置33
のシリンダ37が作動されてそのピストン0ツド37a
が引込まれ、移動体36が後退移動する。又、シリンダ
37の作動後、押圧イ4勢装置28のエアシリンダ29
のエア+1力が増圧されてピストン0ツド29aが突出
し、押圧部材30を介して搬送体4をギN7 lンド側
l\移wJさせる。
After completing the roving table work, the feed device 33 is activated based on the completion signal.
The cylinder 37 is actuated and its piston 37a is activated.
is pulled in, and the movable body 36 moves backward. Also, after the cylinder 37 is activated, the air cylinder 29 of the four-force pressing device 28 is activated.
The air+1 force is increased, the piston 0 end 29a protrudes, and the conveying body 4 is moved to the gear N7 lnd side l\wJ via the pressing member 30.

移動体36の後退移動に伴い係合レバー41は予備粗糸
巻レール2と直交する状態で第6図の8の位δから右方
へ移動する。そして、規制ローラ48と係合する位置ま
で移動した後は移動体36の移動に伴い係合レバー41
はばね45の弾性ツノに抗して第6図の反時計方向に回
動され、移動体36が待機位置に配v3された時点では
、係合レバー41は予備粗糸巻レール2内から退出して
係合ローラ6と係合不能な退避位置に配置される。その
後、搬送体4が搬4111により搬入された元の位置、
すなわら奇数列の粗糸台に好適な位置に配置される。そ
して、この位置から1lfflllllにより搬送体4
の搬出が行われる。
As the movable body 36 moves backward, the engagement lever 41 moves rightward from position 8 δ in FIG. 6 in a state perpendicular to the preliminary roving winding rail 2. After moving to the position where it engages with the regulation roller 48, the engagement lever 41 moves as the movable body 36 moves.
is rotated counterclockwise in FIG. 6 against the elastic horn of the spring 45, and when the movable body 36 is placed in the standby position v3, the engagement lever 41 is withdrawn from the preliminary roving winding rail 2. and is placed in a retracted position where it cannot engage with the engagement roller 6. After that, the original position where the carrier 4 was brought in by the carrier 4111,
In other words, it is placed at a suitable position on the odd-numbered rows of roving tables. From this position, the carrier 4 is moved by 1lfllllll.
will be carried out.

なお、本発明は前記両実施例に限定されるものではなく
、例えば、機台のアウトエンド側に設けた押圧付勢装置
28としてエアシリンダ29に代えて第10図に示すよ
うに係合部材50とばね51とからなる装置を使用した
り、連結切離し装置として別の構成のものを採用したり
、1M1111による搬入位置を偶数列の粗糸替に好適
な位置とし、送り装flff33により奇数列の粗糸替
に好適な位置に移動させるようにしてもよい。又、第二
実施例の送り装置において移動体36を往復移動させる
手段としてシリンダ37に代えて七−夕とボールねじと
の組合口を採用してもJ:い。この場合モータとして号
−ボモータあるいはステップ[−タ等その回動量の調整
が可能なものを使用した場合には、連結切離し装置によ
る搬送体4と連結体12との切離し位置が必ずしも奇数
列又は偶数列のfl eJに好適な位置ではなくとも、
移動体36の停止位置により搬送体4の配置を正確に決
めることが可能となる。
Note that the present invention is not limited to the above-mentioned embodiments, and for example, an engaging member as shown in FIG. 50 and a spring 51, or adopt a device with a different configuration as a connection/disconnection device, or set the loading position of the 1M1111 to a position suitable for changing even rows of roving, and use the feeding device flff33 to change the rovings of odd rows. The roving may be moved to a suitable position for changing the roving. Further, in the feeding device of the second embodiment, a combination port of a Tanabata and a ball screw may be used instead of the cylinder 37 as a means for reciprocating the movable body 36. In this case, if a motor whose rotation amount can be adjusted, such as a motor or a step motor, is used, the position at which the conveying body 4 and the connecting body 12 are separated by the connecting and disconnecting device is not necessarily an odd number column or an even number column. Even if it is not a suitable position for column fl eJ,
It becomes possible to accurately determine the arrangement of the carrier 4 based on the stop position of the moving body 36.

(発明の効果) 以上詳述したように本発明によれば、予喝粗糸巻レール
に搬入された予備粗糸巻とクリールに吊下された粗糸巻
との粗糸台作業を粗糸替機により一列おきに行う場合に
、粗紡機から玉揚げされた満ボビンをめ接搬送体を介し
て予備粗糸巻レール2へ搬入する場合でも奇数列、偶数
列の粗糸替を支障なくしかも粗紡工程での玉1!11作
業に支障をきたさずに行−うことが可能となる。又、第
2請求項に記載の発明では搬機による搬送体の搬出人位
置が常に一定となるため、精紡i機台の数が多数の場合
にbva機の制御が容易となる。又、搬送体の眼入、搬
出及び送り装置33による送りPl:業は自動で行われ
るが、何等かの理由で搬送体の配置位置がまらがっだ場
合、各機台に設けられた送り装置33の操作により筒型
に搬送体4の配置位置の変更が可能となる。
(Effects of the Invention) As described in detail above, according to the present invention, the roving table work of the preliminary roving winding carried into the preliminary roving winding rail and the roving winding suspended from the creel is carried out by the roving changing machine. When performing every other row, even when full bobbins doffed from the roving machine are transported to the preliminary roving winding rail 2 via the interlocking conveyor, the roving can be changed between odd and even rows without any problem, and even in the roving process. It becomes possible to carry out the ball 1!11 work without hindrance. Furthermore, in the invention as set forth in claim 2, since the position of the person carrying out the conveyor by the carrier is always constant, the control of the BVA machine becomes easy when the number of spinning machines is large. In addition, the loading and unloading of the conveyor and the feeding by the feeding device 33 are performed automatically, but if for some reason the position of the conveyor is mixed up, a By operating the feeding device 33, the arrangement position of the carrier 4 can be changed in a cylindrical manner.

【図面の簡単な説明】[Brief explanation of the drawing]

第1〜5図は本発明を具体化した第一の実施例を示すも
のであって、第1図(a )〜(C)は搬送体の搬入状
態を示す概略平面図、第2図は搬機と搬送体の側面図、
第3図は連結切離し装置の平面図、第4図は連結切離し
装置の正面図、第5図は連結切離し装置の要部斜視図、
第6〜9図は第二実施例を示すものであつ(゛、第6図
は送り装置の平面図、第7図は同じく正面図、第8図は
同じく新面図、第9図(a )は奇数列の粗糸替時の搬
送体の搬入状態を示す概略平面図、第9図(b)は同じ
く偶数列の場合の概略平面図、第10図は抑圧付勢装置
の変更例を示す概略図、第11図(a)、(b)は′Q
a列及び偶数列の粗糸8時における予備粗糸さとクリー
ルのピッチの関係を示す概略図である。 予崗粗糸巻レール2、搬送体4、係合部とじての係合0
−ラ6、m機11 、連RigJtm シ’AH14、
押圧付勢装置28、送り装置33、移動体36゜駆動装
置としてのシリンダ37、係合レバー41、規制ローラ
48゜ 特許出願人   株式会社豊田自動f!機製作所代 理
 人   弁理士  恩1)博實第1O図 第11図 (a) 第11図(6) F−と    ヒ 第8図 し」
1 to 5 show a first embodiment embodying the present invention, and FIGS. 1(a) to 5(C) are schematic plan views showing the transporting state of the conveyor, and FIG. Side view of the carrier and carrier,
FIG. 3 is a plan view of the connection and disconnection device, FIG. 4 is a front view of the connection and disconnection device, and FIG. 5 is a perspective view of the main parts of the connection and disconnection device.
Figures 6 to 9 show the second embodiment (Figure 6 is a plan view of the feeding device, Figure 7 is a front view, Figure 8 is a new view, and Figure 9 is a ) is a schematic plan view showing the loading state of the conveyor when changing the roving for odd-numbered rows, FIG. 9(b) is a schematic plan view for the case of even-numbered rows, and FIG. 10 shows an example of a modification of the suppression biasing device. The schematic diagram shown in Fig. 11 (a) and (b) is 'Q
It is a schematic diagram showing the relationship between the preliminary roving and the pitch of the creel at 8 o'clock of the roving in the a row and the even-numbered row. Pre-grained roving winding rail 2, conveyor 4, engagement at the end of the engagement part 0
-Ra6, m machine 11, Ren RigJtm Shi'AH14,
Pressure biasing device 28, feeding device 33, moving body 36° cylinder 37 as a driving device, engagement lever 41, regulating roller 48° Patent applicant Toyota Automobile Co., Ltd. f! Machine Manufacturing Representative Patent Attorney On 1) Hiromane Figure 1O Figure 11 (a) Figure 11 (6) F- and H Figure 8

Claims (1)

【特許請求の範囲】 1、クリールに前後2列に粗糸巻を吊下するとともに該
クリールの前側を方に延設した予備粗糸巻レールに搬入
された予備粗糸巻との粗糸替作業を粗糸替機により精紡
機機台長手方向に沿って1列おきに行う精紡機において
、予備粗糸巻レール及び該レールに連続する搬送路を移
動するとともに所定間隔でクリール1列分の粗糸巻と同
数の予備粗糸巻を吊下した搬送体を、その停止位置が前
回の粗糸替作業時における停止位置より前記クリールの
粗糸巻列の1ピッチ分ずれた位置となるように予備粗糸
巻レール内へ搬入する精紡機における予備粗糸搬入方法
。 2、前後2列に粗糸巻を吊下するクリールの前側上方に
予備粗糸巻レールを設け、該レールへの予備粗糸巻の搬
入を予備粗糸巻レール及び該レールに連続する搬送路を
移動する搬送体に所定間隔でクリール1列分の粗糸巻と
同数の予備粗糸巻を吊下し、該搬送体を接離可能に連結
して移動する搬機を使用して行い、粗糸替作業を粗糸替
機により精紡機機台長手方向に沿つて1列おきに行う精
紡機において、 前記予備粗糸巻レールの搬送体搬入側端部の所定位置に
は該レールに沿って移動可能に配設されるとともに駆動
装置により作用位置と待機位置とに往復動される移動体
を設け、該移動体には前記搬送体の所定位置に設けた係
合部と係合する係合レバーを前記移動体が待機位置に配
置された際には退避位置に、移動体の往動時には前記係
合部と係合可能な係合位置にそれぞれ移動配置可能に設
けた精紡機における予備粗糸搬入装置。
[Scope of Claims] 1. Roving windings are suspended from the creel in two rows in the front and back, and the roving change operation with the preliminary roving windings carried into the preliminary roving winding rail extending in the front direction of the creel is carried out. In a spinning machine that uses a thread changing machine to wind every other row along the longitudinal direction of the spinning machine frame, a preliminary roving winding rail and a conveying path continuous to the rail are moved, and at a predetermined interval, the same number of rovings as one row of creel are wound. Place the carrier with the spare roving winding suspended therein into the spare roving winding rail so that its stopping position is shifted by one pitch of the roving winding row of the creel from the stopping position during the previous roving change operation. How to carry in the preliminary roving into the spinning machine. 2. A preliminary roving winding rail is provided above the front side of the creel that suspends the roving windings in two rows in the front and back, and the preliminary roving winding rails are transported to the rail by moving through the preliminary roving winding rail and a conveyance path that is continuous with the rail. The same number of spare roving windings as the number of roving windings for one row of creels are suspended from the body at predetermined intervals, and the conveying body is connected so as to be able to come and go. In a spinning machine that uses a thread changing machine to move every other row along the longitudinal direction of the spinning machine frame, a spinning machine is provided at a predetermined position on the conveyor carry-in side end of the preliminary roving winding rail so as to be movable along the rail. and a movable body that is reciprocated between an operating position and a standby position by a drive device, and the movable body has an engagement lever that engages with an engagement portion provided at a predetermined position of the conveyance body. A preliminary roving carrying device for a spinning machine, which is movably arranged in a retracted position when the movable body is placed in a standby position and in an engagement position capable of engaging with the engaging portion when the movable body moves forward.
JP3791288A 1988-02-19 1988-02-19 Method and apparatus for carrying in preliminary roving in a spinning machine Expired - Lifetime JP2546318B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3791288A JP2546318B2 (en) 1988-02-19 1988-02-19 Method and apparatus for carrying in preliminary roving in a spinning machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3791288A JP2546318B2 (en) 1988-02-19 1988-02-19 Method and apparatus for carrying in preliminary roving in a spinning machine

Publications (2)

Publication Number Publication Date
JPH01213416A true JPH01213416A (en) 1989-08-28
JP2546318B2 JP2546318B2 (en) 1996-10-23

Family

ID=12510758

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3791288A Expired - Lifetime JP2546318B2 (en) 1988-02-19 1988-02-19 Method and apparatus for carrying in preliminary roving in a spinning machine

Country Status (1)

Country Link
JP (1) JP2546318B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107723859A (en) * 2017-11-01 2018-02-23 经纬纺织机械股份有限公司 Spinning frame accurately falls pipe counting control system and control method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107723859A (en) * 2017-11-01 2018-02-23 经纬纺织机械股份有限公司 Spinning frame accurately falls pipe counting control system and control method
CN107723859B (en) * 2017-11-01 2023-06-30 经纬智能纺织机械有限公司 Accurate doffing counting control system and method for spinning frame

Also Published As

Publication number Publication date
JP2546318B2 (en) 1996-10-23

Similar Documents

Publication Publication Date Title
US4535944A (en) Spinning machine with a doffing apparatus
JPH02200823A (en) Sliver feeding method and apparatus to spinning part of automatic spinner
JPS606565A (en) Cotton treating machine with multipurpose handling mechanismof bobbin
US3154904A (en) Yarn spinning and winding apparatus
US20070137167A1 (en) Rotor spinning machine
JPH01213416A (en) Sending of preliminary roving in fine spinning frame and device therefor
JPH10182008A (en) Empty bobbin feeder to spinning automatic machine
CN109969861B (en) Yarn winding machine and bobbin supplying method
ITMI950024A1 (en) DEVICE FOR THE CONTROLLED POSITIONING OF THE SPOOLS IN A STATION OF AN AUTOMATIC WINDING MACHINE
JP2001146648A (en) Roving bobbin transporting unit
JP2871027B2 (en) Bobbin transport system in spinning machine
JP2827734B2 (en) Peg open device
JP2519613Y2 (en) Robot for double twister
JPH06104938B2 (en) Preliminary roving winding conveying method between roving and spinning processes
JPH1096127A (en) Empty bobbin take-in device in automated spinning machine
JPS62175390A (en) Package supply device for creel
JPS5915525A (en) Apparatus for intermitently transferring magazine for conveying roving bobbin
JPH11106142A (en) Automatic doffing device of spinning machine
JP2556145B2 (en) Package transport device from draw false twisting machine
JPH10168682A (en) Supply of empty bobbin to automatic machine for spinning machine and apparatus therefor
JPH03249224A (en) Robot for double twister
JPS6144974B2 (en)
JP2876911B2 (en) Yarn delivery device
JP2827731B2 (en) Lifting device of yarn feeder
JPS6014849B2 (en) Transfer device for yarn and empty bobbins between spinning and winding processes