JP7309973B2 - Particle beam therapy system, construction method of particle beam therapy system, and particle beam therapy device - Google Patents

Particle beam therapy system, construction method of particle beam therapy system, and particle beam therapy device Download PDF

Info

Publication number
JP7309973B2
JP7309973B2 JP2022092649A JP2022092649A JP7309973B2 JP 7309973 B2 JP7309973 B2 JP 7309973B2 JP 2022092649 A JP2022092649 A JP 2022092649A JP 2022092649 A JP2022092649 A JP 2022092649A JP 7309973 B2 JP7309973 B2 JP 7309973B2
Authority
JP
Japan
Prior art keywords
transport line
shielding wall
beam transport
radiation
circular accelerator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022092649A
Other languages
Japanese (ja)
Other versions
JP2022111250A (en
Inventor
義史 長本
芳治 金井
孝 矢澤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Toshiba Energy Systems and Solutions Corp
Original Assignee
Toshiba Corp
Toshiba Energy Systems and Solutions Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from JP2018082245A external-priority patent/JP7118720B2/en
Application filed by Toshiba Corp, Toshiba Energy Systems and Solutions Corp filed Critical Toshiba Corp
Priority to JP2022092649A priority Critical patent/JP7309973B2/en
Publication of JP2022111250A publication Critical patent/JP2022111250A/en
Application granted granted Critical
Publication of JP7309973B2 publication Critical patent/JP7309973B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Description

本発明の実施形態は、粒子線治療システム、粒子線治療システムの構築方法および粒子線治療装置に関する。 TECHNICAL FIELD Embodiments of the present invention relate to a particle beam therapy system, a method for constructing a particle beam therapy system, and a particle beam therapy apparatus.

従来、粒子線ビームを患者の患部(がん)に照射して治療を行う粒子線治療システムがある。このような粒子線治療システムでは、システムの更新を行う際に、新たな治療室を設けるようにし、この新しい治療室と既設の治療室とを交互に運転することで、治療を継続しつつ、システムの更新を行うようにしている。 Conventionally, there is a particle beam therapy system that treats a patient's diseased part (cancer) by irradiating it with a particle beam. In such a particle beam therapy system, when the system is updated, a new treatment room is installed, and the new treatment room and the existing treatment room are operated alternately to continue treatment. I am trying to update the system.

特開2018-38628号公報Japanese Patent Application Laid-Open No. 2018-38628

粒子線治療システムでは、加速器が配置される放射線管理区域の周囲に放射線を遮蔽する厚い遮蔽壁が設けられており、予め建屋内に設けられた未整備の治療室以外でシステムの更新を行う際には、この遮蔽壁の一部を取り壊して、加速器を延長するための経路を構築しなければならない。そのため、遮蔽壁の取り壊し工事に時間がかかり、治療が中断される期間が長くなってしまい、システムの稼働率が低下してしまうという課題がある。 In the particle beam therapy system, a thick shielding wall is installed around the radiation controlled area where the accelerator is placed to shield radiation. In the future, part of this shielding wall must be demolished to build a path to extend the accelerator. Therefore, there is a problem that the demolition work of the shielding wall takes time, the treatment is interrupted for a long period of time, and the operating rate of the system decreases.

本発明の実施形態は、このような事情を考慮してなされたもので、工事を行う際に治療が中断される期間を短くして稼働率を向上させることができる粒子線治療システムの構築技術を提供することを目的とする。 The embodiment of the present invention has been made in consideration of such circumstances, and is a technology for constructing a particle beam therapy system that can shorten the period during which treatment is interrupted during construction work and improve the operating rate. intended to provide

本発明の実施形態に係る粒子線治療システムは、荷電粒子を加速する円形加速器と、前記円形加速器で加速された前記荷電粒子を照射室に導くビーム輸送ラインと、前記円形加速器および前記ビーム輸送ラインが配置される放射線管理区域の周囲にあって、前記円形加速器および前記ビーム輸送ラインから生じる放射線を遮蔽する遮蔽壁と、前記遮蔽壁における外と前記放射線管理区域とを隔てる位置に設けられ、前記照射室の増設用開口部を形成可能な特定部と、前記特定部を閉塞し、この特定部を通過する前記放射線を遮蔽する閉塞部と、を備え、前記ビーム輸送ラインは、前記円形加速器から延びるメイン輸送ラインと、前記メイン輸送ラインから前記照射室まで延びるサブ輸送ラインとから成り、前記特定部は、前記メイン輸送ラインを輸送方向の下流に延長した場合の仮想線と前記遮蔽壁との交点を含む位置に設けられており、前記特定部は、前記ビーム輸送ラインを前記遮蔽壁の一方の面から他方の面まで延ばすための前記増設用開口部を形成可能である。 A particle beam therapy system according to an embodiment of the present invention includes a circular accelerator that accelerates charged particles, a beam transport line that guides the charged particles accelerated by the circular accelerator to an irradiation chamber, the circular accelerator and the beam transport line. is located around the radiation controlled area, and is provided at a shielding wall that shields radiation generated from the circular accelerator and the beam transport line, and at a position that separates the outside of the shielding wall from the radiation controlled area, A specific part capable of forming an opening for extension of the irradiation chamber, and a blocking part that closes the specific part and shields the radiation passing through the specific part, wherein the beam transport line extends from the circular accelerator. and a sub-transport line extending from the main transport line to the irradiation chamber. Provided at a position including an intersection point, the specific portion can form the extension opening for extending the beam transport line from one surface of the shielding wall to the other surface thereof.

本発明の実施形態により、工事を行う際に治療が中断される期間を短くして稼働率を向上させることができる粒子線治療システムの構築技術が提供される。 An embodiment of the present invention provides a technology for constructing a particle beam therapy system capable of shortening the period during which treatment is interrupted during construction and improving the operating rate.

第1実施形態の新設時の粒子線治療システムを示す平面図。FIG. 2 is a plan view showing a newly installed particle beam therapy system according to the first embodiment; 第1実施形態の増設時の粒子線治療システムを示す平面図。FIG. 2 is a plan view showing the particle beam therapy system when the first embodiment is expanded; 第1実施形態の特定部と閉塞部を示す平面図。FIG. 4 is a plan view showing the specifying portion and the closing portion of the first embodiment; 第1実施形態の特定部と閉塞部を示す側面図。FIG. 2 is a side view showing a specifying portion and a closing portion of the first embodiment; 電磁石装置を示す平面図。The top view which shows an electromagnet apparatus. 新設時の粒子線治療システムの構築方法を示すフローチャート。Flowchart showing a method for constructing a new particle beam therapy system. 増設時の粒子線治療システムの構築方法を示すフローチャート。A flow chart showing a construction method of a particle beam therapy system at the time of expansion. 第2実施形態の特定部と閉塞部を示す平面図。The top view which shows the specific|specification part and closure part of 2nd Embodiment. 第3実施形態の特定部と閉塞部を示す平面図。The top view which shows the specific|specification part and closure part of 3rd Embodiment. 第3実施形態の特定部と閉塞部を示す側面図。The side view which shows the specific|specification part and closure part of 3rd Embodiment. 第4実施形態の特定部と床基準部を示す斜視図。The perspective view which shows the specific|specification part and floor reference|standard part of 4th Embodiment.

(第1実施形態)
以下、本実施形態を添付図面に基づいて説明する。まず、第1実施形態の粒子線治療システムについて図1から図7を用いて説明する。図1の符号1は、粒子線治療システムである。この粒子線治療システム1では、炭素イオンなどの粒子線ビームを被検体としての患者の病巣組織(がん)に照射して治療を行う。
(First embodiment)
The present embodiment will be described below with reference to the accompanying drawings. First, the particle beam therapy system of the first embodiment will be described with reference to FIGS. 1 to 7. FIG. Reference numeral 1 in FIG. 1 denotes a particle beam therapy system. In this particle beam therapy system 1, a beam of particle beams such as carbon ions is irradiated to a lesion tissue (cancer) of a patient as a subject for treatment.

粒子線治療システム1を用いた放射線治療技術は、重粒子線がん治療技術などとも称される。この技術は、がん病巣(患部)を炭素イオンがピンポイントで狙い撃ちし、がん病巣にダメージを与えながら、正常細胞へのダメージを最小限に抑えることが可能とされる。なお、粒子線とは、放射線のなかでも電子より重いものと定義され、陽子線、重粒子線などが含まれる。このうち重粒子線は、ヘリウム原子より重いものと定義される。 Radiation therapy technology using the particle beam therapy system 1 is also called heavy particle beam cancer therapy technology. With this technology, carbon ions are pinpointed at cancer lesions (affected areas), and it is possible to minimize damage to normal cells while damaging cancer lesions. Particle beams are defined as radiation heavier than electrons, and include proton beams, heavy particle beams, and the like. Heavy ions are defined as heavier than helium atoms.

重粒子線を用いるがん治療では、従来のエックス線、ガンマ線、陽子線を用いたがん治療と比較してがん病巣を殺傷する能力が高く、患者の体の表面では放射線量が弱く、がん病巣において放射線量がピークになる特性を有している。そのため、照射回数と副作用を少なくすることができ、治療期間をより短くすることができる。 Cancer treatment using heavy ion beams has a higher ability to kill cancer lesions than conventional cancer treatments using X-rays, gamma rays, and proton beams. It has the characteristic that the radiation dose peaks at cancer lesions. Therefore, the number of times of irradiation and side effects can be reduced, and the treatment period can be shortened.

図1に示すように、粒子線治療システム1は、荷電粒子である炭素イオンを生成するイオン源2と、炭素イオンを加速して粒子線ビームとするリング状の円形加速器3と、粒子線ビームを輸送するビーム輸送ライン4と、粒子線ビームが照射される患者が配置される回転ガントリ5とを備える。 As shown in FIG. 1, a particle beam therapy system 1 includes an ion source 2 that generates carbon ions, which are charged particles, a ring-shaped circular accelerator 3 that accelerates the carbon ions into a particle beam, and a particle beam and a rotating gantry 5 on which a patient to be irradiated with a particle beam is placed.

まず、イオン源2で生成された炭素イオンは、円形加速器3に入射される。この炭素イオンは、円形加速器3を約百万回周回する間に光速の約70%まで加速され、粒子線ビームとなる。そして、この粒子線ビームがビーム輸送ライン4を介して2つの回転ガントリ5まで導かれる。 First, carbon ions generated by the ion source 2 enter the circular accelerator 3 . The carbon ions are accelerated to about 70% of the speed of light while circling the circular accelerator 3 about one million times to form a particle beam. This particle beam is then guided to two rotating gantry 5 via beam transport line 4 .

円形加速器3は、磁場と加速電場の周波数を制御することで炭素イオンを加速する高周波加速空洞と、イオン源2から円形加速器3に炭素イオンを入射させる入射装置と、円形加速器3からビーム輸送ライン4に炭素イオンの粒子線ビームを出射させる出射装置とを備える。 The circular accelerator 3 includes a high-frequency acceleration cavity that accelerates carbon ions by controlling the frequencies of the magnetic field and the accelerating electric field, an injection device that injects carbon ions from the ion source 2 into the circular accelerator 3, and a beam transport line from the circular accelerator 3. 4, an emission device for emitting a particle beam of carbon ions.

円形加速器3およびビーム輸送ライン4は、内部が真空にされる真空ダクト6~9(ビームパイプ)を備える(図5参照)。これらの真空ダクト6~9の内部を粒子線ビームが進行する。円形加速器3およびビーム輸送ライン4が有する真空ダクト6~9が一体となり、粒子線ビームを回転ガントリ5まで導く輸送経路を構成する。つまり、真空ダクト6~9は、粒子線ビームを通過させるのに充分な真空度を有する密閉された連続空間である。 The circular accelerator 3 and the beam transport line 4 are equipped with vacuum ducts 6-9 (beam pipes) inside which are evacuated (see FIG. 5). A particle beam travels through these vacuum ducts 6-9. The circular accelerator 3 and the vacuum ducts 6 to 9 of the beam transport line 4 are integrated to form a transport path that guides the particle beam to the rotating gantry 5 . That is, the vacuum ducts 6 to 9 are closed continuous spaces having a degree of vacuum sufficient to pass the particle beam.

円形加速器3およびビーム輸送ライン4は、粒子線ビームを制御する電磁石装置10~12を備える(図2および図5参照)。それぞれの電磁石装置10~12は、真空ダクト6~9の外周を囲むように配置される。また、複数の電磁石装置10~12が、真空ダクト6~9が延びる方向に沿って並んでいる。 The circular accelerator 3 and the beam transport line 4 are provided with electromagnet devices 10-12 for controlling the particle beam (see FIGS. 2 and 5). Each electromagnet device 10-12 is arranged to surround the outer circumference of the vacuum ducts 6-9. A plurality of electromagnet devices 10-12 are arranged along the direction in which the vacuum ducts 6-9 extend.

これらの電磁石装置10~12には、様々な種類のものが用いられる。例えば、円形加速器3に用いられる偏向電磁石装置10、ビーム輸送ライン4に用いられる粒子線ビームの収束および発散を制御する制御用の四極電磁石装置11、粒子線ビームの進行方向の変更に用いられる偏向電磁石装置12などである。 Various types of electromagnet devices 10 to 12 are used. For example, a bending electromagnet device 10 used in the circular accelerator 3, a control quadrupole electromagnet device 11 for controlling the convergence and divergence of the particle beam used in the beam transport line 4, and a deflection device used to change the traveling direction of the particle beam. For example, the electromagnet device 12 .

回転ガントリ5は、円筒形状を成す大型の装置である。この回転ガントリ5は、その円筒の中心軸が水平方向を向くように設置される。そして、この軸を中心として回転ガントリ5が回転可能となっている。なお、回転ガントリ5には、ビーム輸送ライン4から延長された真空ダクトおよび電磁石装置が取り付けられる。回転ガントリ5において、真空ダクトは、まず、回転ガントリ5の中心軸に沿って導かれ、回転ガントリ5の円筒外周側へ向けて一旦延びた後に、再び回転ガントリ5の内周側に向けて延びる。 The rotating gantry 5 is a large cylindrical device. This rotating gantry 5 is installed so that the central axis of the cylinder is oriented in the horizontal direction. The rotating gantry 5 is rotatable around this axis. A vacuum duct extending from the beam transport line 4 and an electromagnet device are attached to the rotating gantry 5 . In the rotating gantry 5 , the vacuum duct is first guided along the central axis of the rotating gantry 5 , once extended toward the cylindrical outer peripheral side of the rotating gantry 5 , and then extended again toward the inner peripheral side of the rotating gantry 5 . .

回転ガントリ5には、ビーム輸送ライン4により導かれた粒子線ビームを患者に向けて照射する照射部が設けられる。この粒子線ビームは、照射部からビーム進行方向に対して直交する2方向に走査され照射される。なお、患者は、回転ガントリ5の内部に設けられたベッドに載置される。このベッドは、患者を載置した状態で移動可能となっている。このベッドの移動によって患者を粒子線ビームの照射位置に移動させて位置合わせを行うことができる。そのため、患者の病巣組織に最適な精度で粒子線ビームを照射することができる。 The rotating gantry 5 is provided with an irradiation unit that irradiates the patient with the particle beam guided by the beam transport line 4 . The particle beam is scanned and irradiated from the irradiation unit in two directions orthogonal to the beam traveling direction. The patient is placed on a bed provided inside the rotating gantry 5 . This bed is movable with the patient placed thereon. By moving the bed, the patient can be moved to the particle beam irradiation position and positioned. Therefore, the lesion tissue of the patient can be irradiated with the particle beam with optimum accuracy.

また、回転ガントリ5を回転させることで、患者を中心として照射部を回転させることができる。そして、患者の周囲のいずれの方向からも粒子線ビームを照射することができる。つまり、回転ガントリ5は、ビーム輸送ライン4により導かれた荷電粒子の患者に対する照射方向を変更可能な装置である。そのため、患者の負担を軽減しつつ、最適な方向から粒子線ビームを正確に患部に照射することができる。 Further, by rotating the rotating gantry 5, the irradiation unit can be rotated around the patient. Then, the particle beam can be applied from any direction around the patient. In other words, the rotating gantry 5 is a device capable of changing the irradiation direction of the charged particles guided by the beam transport line 4 toward the patient. Therefore, it is possible to accurately irradiate the affected area with the particle beam from the optimum direction while reducing the burden on the patient.

粒子線ビームは、患者の体内を通過する際に運動エネルギーを失って速度が低下するとともに、速度の二乗にほぼ反比例する抵抗を受け、ある一定の速度まで低下すると急激に停止する。そして、粒子線ビームの停止点近傍では、ブラッグピークと呼ばれる高エネルギーが放出される。粒子線治療システム1は、このブラッグピークを患者の病巣組織(患部)の位置に合わせることにより、正常組織のダメージを抑えつつ、病巣組織のみを死滅させることができる。 The particle beam loses its kinetic energy when passing through the patient's body, slows down, and receives resistance that is approximately inversely proportional to the square of the velocity. A high energy called a Bragg peak is emitted in the vicinity of the stopping point of the particle beam. By aligning this Bragg peak with the position of the patient's lesion tissue (affected area), the particle beam therapy system 1 can kill only the lesion tissue while suppressing damage to normal tissue.

図1に示すように、粒子線治療システム1は、円形加速器3とビーム輸送ライン4と回転ガントリ5を収容する主建屋15を備える。主建屋15は、鉄筋コンクリートなどで形成された堅牢な建築物である。第1実施形態では、円形加速器3とビーム輸送ライン4と回転ガントリ5がすべて同一階層に設置される主建屋15を例示している。 As shown in FIG. 1 , the particle beam therapy system 1 includes a main building 15 housing a circular accelerator 3 , a beam transport line 4 and a rotating gantry 5 . The main building 15 is a robust building made of reinforced concrete or the like. The first embodiment exemplifies the main building 15 in which the circular accelerator 3, the beam transport line 4, and the rotating gantry 5 are all installed on the same floor.

主建屋15の内部は、円形加速器3が設置される加速器室をはじめとする放射線管理区域16とそれ以外の通常区域とに分けられる。放射線管理区域16とは、人が放射線の不必要な被ばくを防ぐため、放射線量が一定以上ある場所を明確に区分けし、人の不必要な立ち入りを防止するために設けられる区域である。この放射線管理区域16の設置は、法令により取り決められている。 The interior of the main building 15 is divided into a radiation controlled area 16 including an accelerator room in which the circular accelerator 3 is installed and a normal area other than that. The radiation controlled area 16 is an area set up to clearly demarcate a place where the radiation dose exceeds a certain level and to prevent unnecessary entry of people in order to prevent unnecessary exposure of people to radiation. The establishment of this radiation controlled area 16 is stipulated by law.

円形加速器3とビーム輸送ライン4と回転ガントリ5は、運転中に放射線を放射する機器であるため、放射線管理区域16に設けられている。なお、主建屋15の放射線管理区域16には、2つの回転ガントリ5が設けられている。これらの回転ガントリ5がそれぞれ配置される第1治療室17と第2治療室18とが設けられる。これら治療室17,18が荷電粒子の照射が行われる照射室となっている。 The circular accelerator 3, the beam transport line 4, and the rotating gantry 5 are provided in the radiation controlled area 16 because they are devices that emit radiation during operation. Two rotating gantries 5 are provided in the radiation controlled area 16 of the main building 15 . A first treatment room 17 and a second treatment room 18 are provided in which these rotating gantry 5 are respectively arranged. These treatment rooms 17 and 18 are irradiation rooms in which charged particles are irradiated.

ビーム輸送ライン4は、円形加速器3から延びるメイン輸送ライン20と、このメイン輸送ライン20から分岐されて治療室17,18まで延びるサブ輸送ライン21,22とから成る。メイン輸送ライン20に対してサブ輸送ライン21,22が接続される部分には、粒子線ビームの進行方向を変更可能な偏向電磁石装置12が設けられる。 The beam transport line 4 consists of a main transport line 20 extending from the circular accelerator 3 and sub-transport lines 21 and 22 branched from the main transport line 20 and extending to the treatment rooms 17 and 18 . A bending electromagnet device 12 capable of changing the traveling direction of the particle beam is provided at a portion where the sub-transport lines 21 and 22 are connected to the main transport line 20 .

主建屋15は、放射線管理区域16の周囲を仕切り、放射線を遮蔽する遮蔽壁23と、通常区域にて用いられ、放射線の遮蔽を想定していない通常壁24とを備える。 The main building 15 partitions the periphery of the radiation controlled area 16 and includes a shielding wall 23 that shields radiation, and a normal wall 24 that is used in the normal area and is not supposed to shield radiation.

遮蔽壁23により放射線管理区域16の外部に放射線が漏れないようになっている。この遮蔽壁23の厚さTは、1~2m以上となっている。なお、遮蔽壁23の内部に鉛または鉄などの金属板を設けた場合には、遮蔽壁23の厚さTが1m未満であっても良い。放射線管理区域16の天井部分は、コンクリートで形成した所定の厚みを有する天井板で覆われる。 The shielding wall 23 prevents radiation from leaking outside the radiation controlled area 16 . The thickness T of this shielding wall 23 is 1 to 2 m or more. In addition, when a metal plate such as lead or iron is provided inside the shielding wall 23, the thickness T of the shielding wall 23 may be less than 1 m. The ceiling portion of the radiation controlled area 16 is covered with a concrete ceiling plate having a predetermined thickness.

放射線は、主にビームの偏向部並びに停止部(消失部)で発生し、特にビーム偏向時に接線方向に向かって発生するため、円形加速器3またはビーム輸送ライン4を水平に配置する場合は、水平方向に対し充分な遮蔽能力を有する構造とする。そのため、遮蔽壁23は、天井板に比較して大きな遮蔽能力を持つ。 Radiation is generated mainly at the deflecting and stopping portions (vanishing portions) of the beam, especially in the tangential direction during beam deflection. The structure should have sufficient shielding ability in all directions. Therefore, the shielding wall 23 has a greater shielding ability than the ceiling plate.

なお、主建屋15の内部において、ロビー25、廊下26、診察室27、スタッフ室28、患者の待機室29などの施設は、通常区域に設けられる。患者の待機室29から治療室17,18までの人の進入経路は、遮蔽壁23で形成され、かつ平面視で屈曲されたクランク状に形成されている。そのため、治療室17,18から患者の待機室29に向かって放射線が漏れることがない。 In the interior of the main building 15, facilities such as a lobby 25, a corridor 26, an examination room 27, a staff room 28, and a waiting room 29 for patients are provided in normal areas. A person's entrance path from the patient's waiting room 29 to the treatment rooms 17 and 18 is formed by the shielding wall 23 and is formed in a bent crank shape in a plan view. Therefore, radiation does not leak from the treatment rooms 17 and 18 to the waiting room 29 for the patient.

なお、本実施形態では、円形加速器3、ビーム輸送ライン4、回転ガントリ5を制御する制御装置50が主建屋15に設けられている。この制御装置50は、所定の安全条件を満たすか否かを常に監視し、所定の安全条件を満たさない場合に円形加速器3の運転を禁止し、運転中であれば緊急停止するインターロック51を備える。 In this embodiment, a controller 50 for controlling the circular accelerator 3, the beam transport line 4, and the rotating gantry 5 is provided in the main building 15. As shown in FIG. This control device 50 always monitors whether or not a predetermined safety condition is satisfied, prohibits the operation of the circular accelerator 3 when the predetermined safety condition is not satisfied, and provides an interlock 51 for emergency stop if the accelerator is in operation. Prepare.

粒子線治療システム1を建設するためには、多額の予算を必要とする。そのため、粒子線治療システム1を新設するときには、初期コストを抑えるため、治療室17,18などの設備の数を抑えておく。そして、運営を開始して数年後に経営が安定したところで増設工事を行い、設備の数を増やすようにする。本実施形態では、主建屋15に隣接して増設用敷地30が予め確保されている。 A large amount of budget is required to construct the particle beam therapy system 1 . Therefore, when newly installing the particle beam therapy system 1, the number of facilities such as the treatment rooms 17 and 18 is suppressed in order to suppress the initial cost. After a few years from the start of operation, when the management stabilizes, expansion work will be carried out to increase the number of facilities. In this embodiment, an extension site 30 is secured in advance adjacent to the main building 15 .

図2に示すように、増設用建屋31には、1つの回転ガントリ5が設けられている。この回転ガントリ5に対応する第3治療室19が設けられている。この治療室19が荷電粒子の照射が行われる照射室となっている。この第3治療室19の増設に伴い、患者の待機室29などの他の施設も増設される。 As shown in FIG. 2, one rotating gantry 5 is provided in the expansion building 31 . A third treatment room 19 corresponding to this rotating gantry 5 is provided. This treatment room 19 is an irradiation room in which charged particles are irradiated. Along with the expansion of the third treatment room 19, other facilities such as a waiting room 29 for patients are also expanded.

増設用建屋31は、主建屋15と一体となるように建てられる。つまり、増設用建屋31は、主建屋15と同じ階層に回転ガントリ5を設置する建築物となっている。また、増設用建屋31の床面の高さは、主建屋15の床面の高さと同じになっている。 The expansion building 31 is built so as to be integrated with the main building 15 . In other words, the expansion building 31 is a building in which the rotating gantry 5 is installed on the same floor as the main building 15 . The height of the floor of the expansion building 31 is the same as the height of the floor of the main building 15 .

このようにすれば、粒子線治療システム1の新設時に、最もコストが嵩む装置である回転ガントリ5の設置数を抑えて新設時のコストを低減させつつ、その後に回転ガントリ5を増設して稼働率を向上させることができる。 In this way, when the particle beam therapy system 1 is newly installed, the number of installed rotating gantry 5, which is the most costly device, can be suppressed to reduce the cost at the time of new installation, and then the rotating gantry 5 is added and operated. rate can be improved.

増設用建屋31の内部は、放射線管理区域16とそれ以外の通常区域とに分けられる。増設用建屋31の放射線管理区域16は、主建屋15から拡張される。また、増設用建屋31は、放射線管理区域16の周囲を仕切る増設用遮蔽壁32と、通常区域にて用いられる増設用通常壁33とを備える。 The interior of the expansion building 31 is divided into a radiation controlled area 16 and other normal areas. The radiation controlled area 16 of the expansion building 31 is extended from the main building 15 . Further, the expansion building 31 includes an expansion shielding wall 32 that partitions the periphery of the radiation controlled area 16, and an expansion normal wall 33 that is used in the normal area.

増設用建屋31には、円形加速器3が設けられていないので、主建屋15から増設用建屋31までビーム輸送ライン4が延長される。ビーム輸送ライン4は、主建屋15の遮蔽壁23に設けられた増設用開口部である特定部34を介して延長される。延長は、主建屋15内のビーム輸送ライン4と増設用建屋31内に設ける増設用ビーム輸送ライン4とを接続して行う。本実施形態では、主建屋15の新設時に特定部34が予め設けられる。 Since the expansion building 31 is not provided with the circular accelerator 3 , the beam transport line 4 is extended from the main building 15 to the expansion building 31 . The beam transport line 4 is extended through a specific portion 34 which is an extension opening provided in the shielding wall 23 of the main building 15 . The extension is performed by connecting the beam transport line 4 in the main building 15 and the extension beam transport line 4 provided in the extension building 31 . In this embodiment, the identification unit 34 is provided in advance when the main building 15 is newly constructed.

以下、図1および図2の紙面左側を建屋15,31の西側とし、紙面右側を建屋15,31の東側とし、紙面上側を建屋15,31の北側とし、紙面下側を建屋15,31の南側として説明する。 1 and 2 are the west side of buildings 15 and 31, the right side of the paper is the east side of buildings 15 and 31, the upper side of the paper is the north side of buildings 15 and 31, and the lower side of the paper is the building 15 and 31. Described as the south side.

図1に示すように、主建屋15の新設時において、遮蔽壁23に特定部34が設けられる。この特定部34は、遮蔽壁23を貫通する開口部である。つまり、特定部34は、主建屋15から増設用建屋31まで連通される連通部である。また、特定部34を閉塞し、この特定部34を通過する放射線を遮蔽する閉塞部35が設けられる。第1実施形態では、閉塞部35が放射線を遮蔽する遮蔽扉である。 As shown in FIG. 1, when the main building 15 is newly constructed, the shielding wall 23 is provided with the specifying portion 34 . This specific portion 34 is an opening penetrating through the shielding wall 23 . In other words, the specifying section 34 is a communicating section that communicates from the main building 15 to the expansion building 31 . Also, a closing portion 35 that closes the identifying portion 34 and shields radiation passing through the identifying portion 34 is provided. In the first embodiment, the blocking part 35 is a shielding door that shields radiation.

本実施形態の「外」として屋根が設けられていない屋外を例示する。特定部34は、遮蔽壁23における屋外と放射線管理区域16とを隔てる位置に設けられる。例えば、図1の主建屋15では、遮蔽壁23の西側と北側と東側の壁面は、屋外に面している。これに対して遮蔽壁23の南側の壁面は、患者の待機室29などの屋内に面している。そこで、特定部34を遮蔽壁23の東側の位置に設けるようにする。 The outdoors without a roof is exemplified as "outside" in this embodiment. The identification unit 34 is provided at a position on the shielding wall 23 that separates the outdoors from the radiation controlled area 16 . For example, in the main building 15 of FIG. 1, the walls on the west, north, and east sides of the shielding wall 23 face the outdoors. On the other hand, the wall surface on the south side of the shielding wall 23 faces indoors such as the patient's waiting room 29 . Therefore, the specifying portion 34 is provided at the position on the east side of the shielding wall 23 .

なお、本実施形態の「外」は、必ずしも屋外でなくても良く、放射線管理区域16の外であれば、屋根が設けられた屋内であっても良い。例えば、特定部34が設けられる位置が、容易に撤去可能な通常壁24で囲まれた屋内と放射線管理区域16とを隔てる位置であっても良い。 It should be noted that "outside" in this embodiment does not necessarily have to be outdoors, and may be indoors with a roof as long as it is outside the radiation controlled area 16 . For example, the position where the specifying part 34 is provided may be a position separating the radiation controlled area 16 from the indoors surrounded by the easily removable normal wall 24 .

また、特定部34は、遮蔽壁23における円形加速器3から遠い側の位置に設けられる。例えば、図1の主建屋15では、放射線管理区域16内の西側に偏って円形加速器3が設けられている。そこで、遮蔽壁23の屋外と面している壁面のうち、東側の位置に特定部34を設けるようにする。これは、放射線管理区域16の図心Zと円形加速器3の中心Cを結ぶ線と直交し、図心Zを通る線を境界Kとしたときに、この境界Kに対して、円形加速器3の中心Cが位置する領域(西側の領域)と反対側の領域(東側の領域)の位置といえる。つまり、平面視における放射線管理区域16の図心Zに対して円形加速器3の中心Cが位置する領域と反対側の位置に特定部34を設けるようにする。 Further, the specifying unit 34 is provided at a position on the side of the shielding wall 23 farther from the circular accelerator 3 . For example, in the main building 15 of FIG. 1, the circular accelerator 3 is installed in the west side of the radiation controlled area 16. Therefore, of the walls of the shielding wall 23 facing the outdoors, the specifying portion 34 is provided at the east side position. This is perpendicular to the line connecting the centroid Z of the radiation controlled area 16 and the center C of the circular accelerator 3, and when the line passing through the centroid Z is defined as the boundary K, the boundary K of the circular accelerator 3 is It can be said that this is the position of the area opposite to the area where the center C is located (west area) (east side area). That is, the specifying unit 34 is provided at a position opposite to the area where the center C of the circular accelerator 3 is located with respect to the centroid Z of the radiation controlled area 16 in plan view.

なお、本実施形態の「図心」とは、図形の重心位置のことであり、その位置を支点にしたときに、図形が釣り合う点のことである。例えば、図形が長方形である場合に、その図心は、長方形の対角線の交点となる。 The "center of gravity" in this embodiment means the position of the center of gravity of the graphic, and is the point at which the graphic is balanced when that position is used as the fulcrum. For example, if the figure is a rectangle, its centroid is the intersection of the diagonals of the rectangle.

放射線管理区域16内には、円形加速器3と治療室17,18が設けられており、円形加速器3が一方に偏って設けられている場合は、他方に治療室17,18が設けられる。よって、このようにすれば、治療室19を治療室17,18に近接して増設する際に、特定部34を介して主建屋15から増設用建屋31まで短い距離でビーム輸送ライン4を延長できる。 A circular accelerator 3 and treatment rooms 17 and 18 are provided in the radiation controlled area 16, and when the circular accelerator 3 is provided on one side, the treatment rooms 17 and 18 are provided on the other side. Therefore, in this way, when the treatment room 19 is added close to the treatment rooms 17 and 18, the beam transport line 4 can be extended from the main building 15 to the expansion building 31 via the specifying unit 34 in a short distance. can.

また、特定部34は、メイン輸送ライン20が延びる方向のさらに先の位置に設けられる。図1の主建屋15では、西側の円形加速器3から東側に向かってメイン輸送ライン20が延び、粒子線ビームは、西側から東側に向かって輸送される。そこで、特定部34を、メイン輸送ライン20を輸送方向の下流に延長した場合の仮想線Vと遮蔽壁23とが交わる位置に設けるようにする。このようにすれば、第3治療室19を増設するときに、主建屋15内で追加の偏向電磁石装置12を設けることなく増設用建屋31までビーム輸送ライン4を延長できる。 In addition, the specifying section 34 is provided at a further position in the direction in which the main transportation line 20 extends. In the main building 15 of FIG. 1, the main transport line 20 extends from the circular accelerator 3 on the west side to the east side, and the particle beam is transported from the west side to the east side. Therefore, the identifying portion 34 is provided at a position where the shielding wall 23 intersects with the imaginary line V when the main transport line 20 is extended downstream in the transport direction. In this way, when expanding the third treatment room 19 , the beam transport line 4 can be extended to the expansion building 31 without installing an additional bending electromagnet device 12 in the main building 15 .

なお、メイン輸送ライン20の端部には、円形加速器3から最も離れた位置にある第2治療室18に延びるサブ輸送ライン22が設けられている。このサブ輸送ライン22とメイン輸送ライン20との接続部には、偏向電磁石装置12bが設けられる。この偏向電磁石装置12bの近傍に特定部34を設けるようにしても良い。 At the end of the main transport line 20, a sub-transport line 22 extending to the second treatment room 18 located farthest from the circular accelerator 3 is provided. A connecting portion between the sub transport line 22 and the main transport line 20 is provided with a bending electromagnet device 12b. A specifying unit 34 may be provided in the vicinity of the bending electromagnet device 12b.

また、特定部34は、遮蔽壁23における第3治療室19の増設用敷地30と放射線管理区域16とを隔てる位置に設けられる。図1の主建屋15では、主建屋15の東側に増設用敷地30が設けられている。そこで、特定部34は、遮蔽壁23の東側の位置に設けるようにする。このようにすれば、第3治療室19の増設用敷地30に近接して増設用開口部を設けることができるので、ビーム輸送ライン4の延長経路を最短にすることができる。 Further, the specifying unit 34 is provided at a position on the shielding wall 23 separating the expansion site 30 of the third treatment room 19 and the radiation controlled area 16 . In the main building 15 shown in FIG. 1, an extension site 30 is provided on the east side of the main building 15 . Therefore, the specifying part 34 is provided at the position on the east side of the shielding wall 23 . In this way, the extension opening can be provided close to the extension site 30 of the third treatment room 19, so that the extension route of the beam transport line 4 can be made the shortest.

図3および図4に示すように、特定部34は、側面視で長方形状を成す開口部である。この特定部34は、主建屋15の新設時に、遮蔽壁23が水平方向に貫通されることで形成される。また、特定部34を閉塞する閉塞部35は、その内部に鉛または鉄などの金属板36を設けた遮蔽扉である。この閉塞部35により特定部34を閉塞することで、放射線管理区域16から放射線が外部に漏れないようになる。 As shown in FIGS. 3 and 4, the specific portion 34 is an opening having a rectangular shape when viewed from the side. The specific portion 34 is formed by horizontally penetrating the shielding wall 23 when the main building 15 is newly constructed. A closing portion 35 that closes the identifying portion 34 is a shielding door having a metal plate 36 such as lead or iron provided therein. By closing the specific portion 34 with the blocking portion 35 , radiation is prevented from leaking from the radiation controlled area 16 to the outside.

特定部34の縦方向の開口寸法Q1は、約60cmとなっている。特定部34の横方向の開口寸法Q2は、約80cmとなっている。なお、特定部34の縦横の開口寸法Q1,Q2は、1m以下が好ましい。例えば、ビーム輸送ライン4に用いられる偏向電磁石装置12の短手方向の寸法L1および長手方向の寸法L2は、1~2m程度である(図5参照)。これに対して特定部34の開口寸法Q1,Q2は、偏向電磁石装置12が通過不能な寸法となっている。なお、他の電磁石装置の寸法も概ね1~2m程度である。 The vertical opening dimension Q1 of the specific portion 34 is about 60 cm. A lateral opening dimension Q2 of the specific portion 34 is approximately 80 cm. It should be noted that the vertical and horizontal opening dimensions Q1 and Q2 of the identification portion 34 are preferably 1 m or less. For example, the lateral dimension L1 and the longitudinal dimension L2 of the bending electromagnet device 12 used in the beam transport line 4 are about 1 to 2 m (see FIG. 5). On the other hand, the opening dimensions Q1 and Q2 of the identifying portion 34 are dimensions that the bending electromagnet device 12 cannot pass through. The dimensions of other electromagnet devices are also approximately 1 to 2 m.

特定部34の縦横の開口寸法Q1,Q2が1m以下であることで、開口寸法を最小限にしつつ、増設用ビーム輸送ライン4を構成する真空ダクト8とケーブル37を、特定部34を介して設置することができる。開口寸法を最小限にすることで、主建屋15の堅牢性を維持でき、遮蔽壁23の厚さを必要最小限とできる。 Since the vertical and horizontal opening dimensions Q1 and Q2 of the identifying part 34 are 1 m or less, the vacuum duct 8 and the cable 37 constituting the extension beam transport line 4 can be connected via the identifying part 34 while minimizing the opening dimensions. can be installed. By minimizing the opening dimension, the robustness of the main building 15 can be maintained and the thickness of the shielding wall 23 can be minimized.

特定部34が開放された状態で、増設用ビーム輸送ライン4の真空ダクト8と各種ケーブル37とが主建屋15と増設用建屋31にまたがって設けられる。特定部34の横方向の開口寸法Q2のうち、右側の開口寸法Q3は、真空ダクト8と各種ケーブル37とを導出させるために用いられる。この開口寸法Q3は、約20cmとなっている。この開口寸法Q3は、真空ダクト8の直径に対応した寸法となっている。 The vacuum duct 8 of the extension beam transport line 4 and various cables 37 are provided across the main building 15 and the extension building 31 with the specifying section 34 open. Of the lateral opening dimension Q2 of the specific portion 34, the right opening dimension Q3 is used to lead out the vacuum duct 8 and various cables 37. As shown in FIG. This opening dimension Q3 is approximately 20 cm. This opening dimension Q3 is a dimension corresponding to the diameter of the vacuum duct 8 .

一方、左側の開口寸法Q4は、増設工事を行う作業者が、主建屋15と増設用建屋31とを行き来するために用いられる。この開口寸法Q4は、約60cmとなっている。また、特定部34は、床面から所定の高さ位置Hに設けられる。この高さ位置Hは、約1mとなっている。この高さ位置Hは、既設の真空ダクト7の高さ位置に応じて設定される。 On the other hand, the opening dimension Q4 on the left side is used for the workers who perform the expansion work to come and go between the main building 15 and the expansion building 31 . This opening dimension Q4 is approximately 60 cm. Further, the specifying portion 34 is provided at a predetermined height position H from the floor surface. This height position H is approximately 1 m. This height position H is set according to the height position of the existing vacuum duct 7 .

本実施形態の特定部34は、人の通常の進入経路である出入口および新設時の機器の搬入口と異なる開口部を確保するのが好ましい。つまり、主建屋15の遮蔽壁23において、人の通常の出入口および新設時の機器の搬入口とは別に、特定部34が設けられる。 The identifying unit 34 of the present embodiment preferably secures an opening that is different from a doorway that is a normal entrance route for people and a loading entrance for newly installed equipment. In other words, in the shielding wall 23 of the main building 15, the identification unit 34 is provided in addition to the normal entrance for people and the entrance for newly installed equipment.

なお、電磁石装置10~12などの新設時の機器の搬入口は、放射線管理区域16の天井部分に設けられる。この搬入口は、機器の搬入後にコンクリートで形成した天井板で覆われる。新設時の機器の搬入口を遮蔽壁23に設けても良いが、このときの搬入口は、開口寸法が最大5m程度となり、そのままでは建屋の構造が脆弱となり、遮蔽壁23の厚さを遮蔽性能から要求される以上に厚くする必要が生じる。そのため、機器の搬入後に再工事を行い周囲と同等の構造で搬入口を塞ぐ。このとき、完全に開口を塞ぐことなく開口寸法を調整して特定部34を設けることもできる。なお、特定部34を設ける位置として適切な位置に搬入口を設け、この搬入口を特定部34としても良い。 A loading port for newly installed equipment such as the electromagnet devices 10 to 12 is provided in the ceiling portion of the radiation controlled area 16 . This loading port is covered with a ceiling panel made of concrete after the equipment is loaded. Although it is possible to provide a loading port for new equipment in the shielding wall 23, the loading port at this time has a maximum opening size of about 5m, and if it is left as it is, the structure of the building will be fragile, and the thickness of the shielding wall 23 will be shielded. It becomes necessary to make the film thicker than required from performance. Therefore, after the equipment is brought in, the construction will be reworked and the entrance will be closed with the same structure as the surrounding area. At this time, the specific portion 34 can be provided by adjusting the size of the opening without completely closing the opening. It should be noted that an inlet may be provided at an appropriate position as the position where the identifying portion 34 is to be provided, and this inlet may be used as the identifying portion 34 .

新設時の機器の搬入時点では、運転開始前のため放射線管理の必要がなく、従来の新設時の機器の搬入口は、放射線の漏えいに関して充分な対策がなされていなかった。一方、第1実施形態の閉塞部35である遮蔽扉は、治療を開始した後の通常時に開放しない扉である。そのため、この遮蔽扉には、把手が設けられていない。さらに、この遮蔽扉には、遮蔽壁23の放射線管理区域16側からのみ開放操作可能な操作部49を備える。この操作部49は、放射線管理区域16側からのみ解錠が可能な錠前である。つまり、遮蔽扉は、内側(放射線管理区域16)からしか開放操作できない機構となっている。操作部49を操作し、遮蔽扉を開放するときには、所定の工具(例えば、着脱自在の把手)を用いて開放するようにする。なお、遮蔽扉に通常の扉と同じように把手を設けるようにしても良い。 At the time the equipment was brought into the new plant, there was no need for radiation control because it was before the start of operation. On the other hand, the blocking door, which is the closing part 35 of the first embodiment, is a door that is not opened normally after the start of treatment. Therefore, this shielding door is not provided with a handle. Further, this shielding door is provided with an operation part 49 that can be opened only from the radiation controlled area 16 side of the shielding wall 23 . This operation unit 49 is a lock that can be unlocked only from the radiation controlled area 16 side. In other words, the shielding door has a mechanism that can be opened only from the inside (the radiation controlled area 16). When operating the operating portion 49 to open the shielding door, a predetermined tool (for example, a detachable handle) is used to open the shielding door. It should be noted that the shielding door may be provided with a handle like a normal door.

また、増設工事が完了するまでは、遮蔽扉が開放されるなどして閉塞部35の閉塞状態が変化した場合に装置の運転を停止するインターロック51を備える(図1参照)。これにより、治療を開始してからの意図しない放射線の漏えいを防ぐことができる。 In addition, an interlock 51 is provided to stop the operation of the device until the expansion work is completed when the blocking state of the blocking portion 35 changes due to, for example, opening of the shielding door (see FIG. 1). This can prevent unintended radiation leakage after the start of treatment.

図3および図4に示すように、遮蔽扉である閉塞部35には、開閉状態を検知する開閉センサ52が設けられる。制御装置50のインターロック51(図1参照)は、開閉センサ52にて取得した情報に基づいて、遮蔽扉が開放されたか否かを判定する。ここで、遮蔽扉が開放されており、かつ円形加速器3が運転中である場合に、円形加速器3の運転を緊急停止する処理を行う。 As shown in FIGS. 3 and 4, the closing portion 35, which is a shielding door, is provided with an opening/closing sensor 52 for detecting an opening/closing state. The interlock 51 (see FIG. 1) of the control device 50 determines whether or not the shielding door is opened based on the information acquired by the open/close sensor 52 . Here, when the shield door is open and the circular accelerator 3 is in operation, a process of emergency stopping the operation of the circular accelerator 3 is performed.

本実施形態では、主建屋15の新設時において、予め特定部34を施工しておく。そして、増設用建屋31の増設時において、特定部34を開放することで、遮蔽壁23に増設用開口部を容易に設けることができる。遮蔽壁23を取り壊して増設用開口部を形成する工事を行う必要がないので、工期を大幅に短縮することができる。閉塞部35を取り外す作業は、通常1日以内、およそ2時間程度で完了する。 In this embodiment, when the main building 15 is newly constructed, the specifying part 34 is constructed in advance. Further, when the expansion building 31 is expanded, the opening for expansion can be easily provided in the shielding wall 23 by opening the specific portion 34 . Since it is not necessary to demolish the shielding wall 23 to form an extension opening, the construction period can be greatly shortened. The work of removing the blocking part 35 is usually completed within one day, in about two hours.

増設用建屋31の増設工事を行うときには、予め増設用建屋31の遮蔽壁32を構築する。そして、増設用真空ダクト8、四極電磁石装置11、偏向電磁石装置12cおよび回転ガントリ5などの機器を増設用建屋31に搬入して組み立てる。これらの工事は、主建屋15で通常の治療を継続しながら日中にも行うことができる。そして、増設用建屋31の機器を設置した後に、特定部34を開放して主建屋15のビーム輸送ライン4の真空ダクト7と、増設用建屋31のビーム輸送ライン4の真空ダクト8とを接続する。つまり、既設の真空ダクト7と増設用真空ダクト8の接続作業を機器の組立工程の最後に行うようにする。 When the expansion work of the expansion building 31 is carried out, the shielding wall 32 of the expansion building 31 is constructed in advance. Equipment such as the expansion vacuum duct 8, the quadrupole electromagnet device 11, the bending electromagnet device 12c, and the rotating gantry 5 are carried into the expansion building 31 and assembled. These construction works can be carried out during the daytime while continuing normal treatment in the main building 15 . After installing the equipment of the expansion building 31, the specific part 34 is opened to connect the vacuum duct 7 of the beam transportation line 4 of the main building 15 and the vacuum duct 8 of the beam transportation line 4 of the expansion building 31. do. That is, the work of connecting the existing vacuum duct 7 and the additional vacuum duct 8 is performed at the end of the equipment assembly process.

なお、特定部34を開放して真空ダクト7,8同士を接続する作業は、1日程度で行うことができる。つまり、主建屋15において、通常の治療を行っていない土日などの休日または夜間に、この作業を行うことで、粒子線治療システム1の稼働率を低下させずに増設工事を完了することができる。 The operation of opening the identification portion 34 and connecting the vacuum ducts 7 and 8 can be completed in about one day. In other words, in the main building 15, by performing this work on holidays such as weekends or at night when normal treatment is not performed, it is possible to complete the expansion work without lowering the operating rate of the particle beam therapy system 1. .

従来のように、放射線管理区域16を外部と区分ける遮蔽壁23に開口を設けるときには、外部に放射線が漏れないように、円形加速器3などの機器を停止しなければならない。工事は1日では完了せず、開口を設ける最中または設けた後に、適切に放射線遮蔽が必要となるためである。放射線の問題が解決できたとしても、壁面に穴を開ける際に発生する振動(ノイズ)が治療に悪影響を与えるため、やはり治療中は工事を中断しなければならない。従来技術では、遮蔽壁23に増設用開口部を設ける工事を行うときに、機器を停止しなければならず、通常の治療が行えない期間があった。本実施形態では、主建屋15の新設時に予め特定部34を設けておくことで、増設時に通常の治療が行えない期間を無くすことができる。さらに、増設時に主建屋15にて大がかりな工事を行う必要がなくなる。 When an opening is provided in the shielding wall 23 that separates the radiation controlled area 16 from the outside as in the conventional case, equipment such as the circular accelerator 3 must be stopped so that radiation does not leak to the outside. This is because the construction work cannot be completed in one day and adequate radiation shielding is required during or after the opening is made. Even if the problem of radiation could be solved, the vibration (noise) generated when drilling a hole in the wall adversely affects the treatment, so the construction work must be suspended during the treatment. In the prior art, the equipment had to be stopped during construction work to provide an additional opening in the shielding wall 23, and there was a period during which normal treatment could not be performed. In this embodiment, by providing the specifying unit 34 in advance when the main building 15 is newly constructed, it is possible to eliminate the period during which normal treatment cannot be performed when the main building 15 is newly constructed. Furthermore, it is not necessary to carry out large-scale construction work in the main building 15 at the time of expansion.

特に、粒子線治療では、一般的に1週間に3~4日程度の治療を数週間継続する必要がある。そのため、4日以上の治療ができない期間が生じると、治療を最初からやり直す必要が生じる。本実施形態では、設備を増設する場合であっても、治療を中断する必要がない。そのため、粒子線治療システム1の稼働率を向上させることができる。 In particle beam therapy, in particular, it is generally necessary to continue treatment for several weeks for about 3 to 4 days a week. Therefore, if there is a period of 4 days or more during which treatment cannot be performed, it will be necessary to start the treatment again from the beginning. In this embodiment, there is no need to interrupt treatment even when adding equipment. Therefore, the operating rate of the particle beam therapy system 1 can be improved.

また、増設用建屋31を構築するときにおいて、既設の機器と増設用の機器とを実際に接続する前に、双方の位置合わせを行っておく必要がある。このような場合に、閉塞部35を開放することで、既設の機器に合わせて増設用の機器の位置合わせを行い、その位置合わせが終了した後は、直ぐに開口を閉塞して、放射線を遮蔽することができる。位置合わせは、機器設置作業の他、基準点の移し替えを行うこともある。この作業も、通常の治療を行っていない休日または夜間の期間を用いて行うことができる。必要に応じて閉塞部35の開閉を行うことができるので、増設工事期間であっても、粒子線治療システム1を用いた治療を継続することができる。 Further, when constructing the expansion building 31, it is necessary to align the existing equipment and the expansion equipment before actually connecting them. In such a case, by opening the blocking part 35, the additional equipment is aligned with the existing equipment, and immediately after the alignment is completed, the opening is closed to shield the radiation. can do. Alignment may be performed by relocating the reference point in addition to equipment installation work. This work can also be done using holidays or nighttime periods when normal therapy is not being done. Since the blocking part 35 can be opened and closed as necessary, treatment using the particle beam therapy system 1 can be continued even during the extension work period.

図5に示すように、ビーム輸送ライン4は、分岐のない通常用真空ダクト7,8と、2方向に分岐される分岐用真空ダクト9とを含む。分岐用真空ダクト9は、メイン輸送ライン20とサブ輸送ライン21,22の分岐部分に設けられる(図1参照)。なお、通常用真空ダクト7,8の端部には接続用のフランジ38が設けられるとともに、分岐用真空ダクト9の端部にも接続用のフランジ39が設けられる。 As shown in FIG. 5, the beam transport line 4 includes normal vacuum ducts 7 and 8 without branches and a branch vacuum duct 9 branched in two directions. Branching vacuum ducts 9 are provided at branching portions of the main transport line 20 and the sub-transport lines 21 and 22 (see FIG. 1). A connecting flange 38 is provided at the ends of the normal vacuum ducts 7 and 8 , and a connecting flange 39 is provided at the end of the branching vacuum duct 9 .

これらの分岐部分には、偏向電磁石装置12a,12bが設けられる(図1参照)。これらの偏向電磁石装置12a,12bが発生させる磁場により、メイン輸送ライン20を進行する粒子線ビームを、直進させたり、サブ輸送ライン21,22に向かうように屈曲させたりすることができる。 Bending electromagnet devices 12a and 12b are provided at these branched portions (see FIG. 1). The magnetic field generated by these bending electromagnet devices 12 a and 12 b can cause the particle beam traveling on the main transport line 20 to go straight or bend toward the sub-transport lines 21 and 22 .

主建屋15の新設時において、メイン輸送ライン20の端部には、第2治療室18に延びるサブ輸送ライン22が接続されるものの、分岐させる必要はない。しかし、予め分岐用真空ダクト9を用いてサブ輸送ライン22をメイン輸送ライン20に接続させる。 When the main building 15 is newly constructed, the end of the main transport line 20 is connected to the sub-transport line 22 extending to the second treatment room 18, but there is no need to branch it. However, the branching vacuum duct 9 is used in advance to connect the sub transport line 22 to the main transport line 20 .

そして、分岐用真空ダクト9の一方の端部のフランジ39には、閉止フランジ40が取り付けられている。この閉止フランジ40により分岐用真空ダクト9の一方の端部が閉塞される。なお、分岐用真空ダクト9の一方の端部が、増設用真空ダクト8を接続可能な接続部となっている。さらに、この分岐用真空ダクト9は、主建屋15のビーム輸送ライン4における特定部34に最も近い部分に設けられているものである。 A closing flange 40 is attached to the flange 39 at one end of the branching vacuum duct 9 . One end of the branching vacuum duct 9 is closed by this closing flange 40 . One end of the branch vacuum duct 9 serves as a connecting portion to which the extension vacuum duct 8 can be connected. Furthermore, this branching vacuum duct 9 is provided at a portion of the beam transport line 4 in the main building 15 that is closest to the specific portion 34 .

なお、分岐用真空ダクト9の一方の端部のフランジ39に閉止バルブを設けても良い。このようにすれば、分岐用真空ダクト9の一方の端部に、閉止バルブを介して増設用真空ダクト8を接続し、適宜、この閉止バルブの開放と閉鎖を行うことで、ビーム輸送ライン4の試験または調整を行うことができる。 A closing valve may be provided on the flange 39 at one end of the branching vacuum duct 9 . By doing so, the expansion vacuum duct 8 is connected to one end of the branching vacuum duct 9 via a closing valve, and the beam transport line 4 is opened and closed by appropriately opening and closing this closing valve. can be tested or adjusted.

増設用建屋31の増設工事を行うときには、分岐用真空ダクト9から閉止フランジ40を取り外し、増設用真空ダクト8を接続することができる。このようにすれば、増設用建屋31の増設工事を行うときに、主建屋15のビーム輸送ライン4の部品を交換しなくても、増設用真空ダクト8を接続することができるので、短期間で作業を完了することができる。 When expanding the expansion building 31, the closing flange 40 can be removed from the branch vacuum duct 9 and the expansion vacuum duct 8 can be connected. In this way, when the expansion work of the expansion building 31 is carried out, the expansion vacuum duct 8 can be connected without replacing the parts of the beam transport line 4 of the main building 15. can complete the work.

なお、本実施形態では、主建屋15の新設時において、メイン輸送ライン20の端部に分岐用真空ダクト9を設けるようにしているが、他の実施態様でも良い。例えば、主建屋15の新設時には、メイン輸送ライン20の端部に一方向に屈曲された真空ダクトを介してサブ輸送ライン22を接続しておく。そして、粒子線治療システム1の定期点検期間中に、メイン輸送ライン20の端部の一方向に屈曲された真空ダクトを分岐用真空ダクト9に交換するようにしても良い。 In this embodiment, when the main building 15 is newly constructed, the branching vacuum duct 9 is provided at the end of the main transport line 20, but other embodiments are also possible. For example, when the main building 15 is newly constructed, the sub-transport line 22 is connected to the end of the main transport line 20 via a vacuum duct bent in one direction. Then, the vacuum duct bent in one direction at the end of the main transport line 20 may be replaced with the branching vacuum duct 9 during the periodical inspection period of the particle beam therapy system 1 .

本実施形態では、円形加速器3、ビーム輸送ライン4、回転ガントリ5を制御する制御装置50が主建屋15に設けられている。なお、ビーム輸送ライン4、回転ガントリ5を増設した場合に、これら増設された機器を制御する制御装置は、増設用建屋31に増設しても良いし、主建屋15にある既設の制御装置50を用いて増設された機器を制御するようにしても良い。 In this embodiment, the main building 15 is provided with a control device 50 that controls the circular accelerator 3 , the beam transport line 4 , and the rotating gantry 5 . When the beam transport line 4 and the rotating gantry 5 are added, the control device for controlling these added devices may be added to the expansion building 31, or the existing control device 50 in the main building 15 may be installed. may be used to control the added device.

次に、新設時の粒子線治療システムの構築方法について図6のフローチャートを用いて説明する。 Next, a method for constructing a new particle beam therapy system will be described with reference to the flowchart of FIG.

まず、ステップS11において、主建屋15の新設工事を開始する。次のステップS12において、主建屋15の遮蔽壁23の施工を行う。次のステップS13において、主建屋15の遮蔽壁23に特定部34を設ける施工を行う。次のステップS14において、特定部34を閉塞部35で閉塞する。 First, in step S11, the new construction of the main building 15 is started. In the next step S12, the shielding wall 23 of the main building 15 is constructed. In the next step S13, the shielding wall 23 of the main building 15 is provided with the specific portion 34. As shown in FIG. In the next step S<b>14 , the specifying portion 34 is closed with the closing portion 35 .

次のステップS15において、主建屋15の治療室17,18の施工を行う。次のステップS16において、主建屋15の放射線管理区域16に円形加速器3を搬入する。次のステップS17において、主建屋15の放射線管理区域16にビーム輸送ライン4を搬入する。次のステップS18において、主建屋15の治療室17,18に回転ガントリ5を搬入する。 In the next step S15, the treatment rooms 17 and 18 of the main building 15 are constructed. In the next step S16, the circular accelerator 3 is carried into the radiation control area 16 of the main building 15. As shown in FIG. In the next step S17, the beam transport line 4 is carried into the radiation controlled area 16 of the main building 15. As shown in FIG. In the next step S18, the rotating gantry 5 is carried into the treatment rooms 17 and 18 of the main building 15. FIG.

次のステップS19において、主建屋15に搬入した円形加速器3、ビーム輸送ライン4、回転ガントリ5などの各種設備の試験または調整を行う。次のステップS20において、主建屋15の新設工事を完了する。次のステップS21において、主建屋15の新設された設備で治療を開始する。 In the next step S19, various facilities such as the circular accelerator 3, the beam transport line 4, and the rotating gantry 5 brought into the main building 15 are tested or adjusted. In the next step S20, the new construction of the main building 15 is completed. In the next step S21, treatment is started with the newly installed equipment in the main building 15. FIG.

次に、増設時の粒子線治療システムの構築方法について図7のフローチャートを用いて説明する。 Next, the construction method of the particle beam therapy system at the time of expansion will be described using the flowchart of FIG.

まず、ステップS31において、主建屋15に隣接する増設用敷地30にて増設工事を開始する。ここで、主建屋15の設備を用いた治療は継続して行う。次のステップS32において、増設用建屋31の増設用遮蔽壁32の施工を行う。次のステップS33において、増設用建屋31の第3治療室19の施工を行う。 First, in step S 31 , the expansion work is started on the expansion site 30 adjacent to the main building 15 . Here, treatment using the equipment in the main building 15 is continued. In the next step S32, the additional shielding wall 32 of the additional building 31 is constructed. In the next step S33, construction of the third treatment room 19 of the expansion building 31 is performed.

次のステップS34において、増設用建屋31にビーム輸送ライン4を搬入する。次のステップS35において、増設用建屋31の第3治療室19に回転ガントリ5を搬入する。 In the next step S34, the beam transportation line 4 is carried into the building 31 for expansion. In the next step S35, the rotating gantry 5 is carried into the third treatment room 19 of the building 31 for expansion.

次のステップS36において、主建屋15の特定部34を閉塞している閉塞部35を操作し、特定部34を開放する。そして、主建屋15のビーム輸送ライン4と増設用建屋31のビーム輸送ライン4とを接続する。これらの作業は、休日または夜間の期間を用いて行うことができる。このとき、既に増設用遮蔽壁32が設置されているため、放射線管理区域16の設定が容易で、特定部34の開放後に遮蔽の心配をする必要はない。 In the next step S36, the blocking section 35 blocking the identification section 34 of the main building 15 is operated to open the identification section 34. FIG. Then, the beam transport line 4 of the main building 15 and the beam transport line 4 of the expansion building 31 are connected. These tasks can be performed using holidays or overnight periods. At this time, since the additional shielding wall 32 has already been installed, it is easy to set the radiation controlled area 16, and there is no need to worry about shielding after the specifying section 34 is opened.

次のステップS37において、増設用建屋31の増設工事を完了する。次のステップS38において、さらに別の休日または夜間の期間に、増設用建屋31に搬入した円形加速器3、ビーム輸送ライン4、回転ガントリ5などの各種設備の試験または調整を行う。次のステップS39において、増設用建屋31の増設された設備で治療を開始する。 In the next step S37, the extension construction of the extension building 31 is completed. In the next step S38, various facilities such as the circular accelerator 3, the beam transport line 4, and the rotating gantry 5 carried into the expansion building 31 are tested or adjusted during another holiday or nighttime period. In the next step S39, treatment is started with the additional equipment in the additional building 31. FIG.

(第2実施形態)
次に、第2実施形態の特定部34Aと閉塞部35Aについて図8を用いて説明する。なお、前述した実施形態に示される構成部分と同一構成部分については同一符号を付して重複する説明を省略する。
(Second embodiment)
Next, the identifying portion 34A and the closing portion 35A of the second embodiment will be described with reference to FIG. The same reference numerals are assigned to the same components as those shown in the above-described embodiment, and overlapping descriptions are omitted.

図8に示すように、第2実施形態の特定部34Aは、主建屋15の新設時に、遮蔽壁23が水平方向に貫通されることで形成される。この特定部34Aは、前述の第1実施形態と同様に、主建屋15の新設時に遮蔽壁23に設けられる。さらに、この特定部34Aが設けられる位置も、前述の第1実施形態と同様に、遮蔽壁23における屋外と放射線管理区域16とを隔てる位置である。 As shown in FIG. 8, the specifying portion 34A of the second embodiment is formed by horizontally penetrating the shielding wall 23 when the main building 15 is newly constructed. The specifying part 34A is provided on the shielding wall 23 when the main building 15 is newly constructed, as in the first embodiment described above. Furthermore, the position where the specifying part 34A is provided is also the position of the shielding wall 23 that separates the outdoors from the radiation controlled area 16, as in the first embodiment.

また、特定部34Aを閉塞する閉塞部35Aは、その内部に鉛または鉄などの金属板36を設けた遮蔽ブロックである。閉塞部35Aは、断面視で凸状を成す部材である。部材は一体でなく取扱いが容易なように複数に分かれていても良い。この閉塞部35Aを屋外側から特定部34Aに取り付けることができる。また、閉塞部35Aを特定部34Aから取り外すこともできる。 A closing portion 35A that closes the specifying portion 34A is a shielding block having a metal plate 36 such as lead or iron provided therein. The closing part 35A is a member having a convex shape in a cross-sectional view. The member may not be integrated but may be divided into a plurality of parts for easy handling. The closing portion 35A can be attached to the specific portion 34A from the outdoor side. Also, the closing portion 35A can be removed from the specifying portion 34A.

なお、閉塞部35Aを施錠しておき、容易に開放できないようにしても良い。そして、閉塞部35Aに放射線管理区域16側からのみ解除操作が可能な操作部49を設けるようにしても良い。つまり、閉塞部35Aは、内側(放射線管理区域16)からしか開放操作できない機構としても良い。また、閉塞部35Aの閉塞状態が変化した場合に装置の運転を停止するインターロック51を設けるようにしても良い。 It should be noted that the closing portion 35A may be locked so that it cannot be easily opened. Further, an operation part 49 that can be operated to release only from the radiation controlled area 16 side may be provided in the blocking part 35A. In other words, the blocking part 35A may be a mechanism that can be opened only from the inside (the radiation controlled area 16). Further, an interlock 51 may be provided to stop the operation of the device when the closed state of the closed portion 35A changes.

増設用建屋31の増設時において、特定部34Aが開放された状態で、ビーム輸送ライン4の増設用の真空ダクト8と各種ケーブル37とが主建屋15から増設用建屋31に導かれる。この閉塞部35Aにより特定部34Aを閉塞することで、放射線管理区域16から放射線が外部に漏れないようになる。 When the expansion building 31 is expanded, the vacuum duct 8 for expansion of the beam transport line 4 and various cables 37 are led from the main building 15 to the expansion building 31 with the specific part 34A opened. By blocking the specific portion 34A with the blocking portion 35A, radiation is prevented from leaking from the radiation controlled area 16 to the outside.

なお、主建屋15の新設時に重量のある強固な遮蔽ブロックである閉塞部35Aを特定部34Aに取り付けておく。そして、増設用建屋31の増設時に、軽量な簡易遮蔽ブロックである閉塞部35Aに交換しても良い。軽量な遮蔽ブロックに交換することで、増設工事を行うときに、閉塞部35Aを着脱し易くなる。 In addition, when the main building 15 is newly constructed, the blocking portion 35A, which is a heavy and strong shielding block, is attached to the specific portion 34A. Then, when the expansion building 31 is expanded, it may be replaced with the blocking part 35A, which is a light and simple shielding block. Replacing it with a lightweight shielding block makes it easier to attach and detach the blocking part 35A when performing expansion work.

第2実施形態では、閉塞部35Aが特定部34Aに対して着脱可能な遮蔽ブロックであることで、治療室を増設するときに、遮蔽壁23の破壊作業を行うことなく、増設用開口部を開放する作業を容易に行うことができる。 In the second embodiment, since the blocking part 35A is a shielding block that can be attached to and detached from the specifying part 34A, when expanding the treatment room, the expansion opening can be opened without performing the work of breaking the shielding wall 23. The opening operation can be easily performed.

(第3実施形態)
次に、第3実施形態の特定部34Bと閉塞部35Bについて図9から図10を用いて説明する。なお、前述した実施形態に示される構成部分と同一構成部分については同一符号を付して重複する説明を省略する。
(Third embodiment)
Next, the identifying portion 34B and the blocking portion 35B of the third embodiment will be described with reference to FIGS. 9 to 10. FIG. The same reference numerals are assigned to the same components as those shown in the above-described embodiment, and overlapping descriptions are omitted.

図9に示すように、第3実施形態の特定部34Bは、前述の第1実施形態と同様に、主建屋15の新設時に遮蔽壁23に設けられる。さらに、この特定部34Bが設けられる位置も、前述の第1実施形態と同様に、遮蔽壁23における屋外と放射線管理区域16とを隔てる位置である。主建屋15の新設時において、特定部34Bは、遮蔽壁23の一部を成す閉塞部35Bにより閉塞されている。 As shown in FIG. 9, the specifying unit 34B of the third embodiment is provided on the shielding wall 23 when the main building 15 is newly constructed, as in the first embodiment. Furthermore, the position where the specifying part 34B is provided is also the position of the shielding wall 23 that separates the outdoors from the radiation controlled area 16, as in the first embodiment. When the main building 15 is newly constructed, the specific portion 34B is blocked by the blocking portion 35B forming part of the shielding wall 23 .

図10に示すように、遮蔽壁23の殆どの部分は、内部に鉄筋41を有する鉄筋コンクリートで形成される。そして、特定部34Bを閉塞する閉塞部35Bは、内部に鉄筋41が無い無筋コンクリートで形成される。つまり、閉塞部35Bは、遮蔽壁23の他の部分よりも強度が弱く形成された部分である。このようにすれば、放射線をコンクリートで遮蔽しつつ、無筋コンクリートで形成された部分を、遮蔽壁23の他の部分よりも強度が弱い閉塞部35Bとすることができる。 As shown in FIG. 10, most of the shielding wall 23 is made of reinforced concrete with reinforcing bars 41 inside. A blocking portion 35B that blocks the specific portion 34B is formed of unreinforced concrete without reinforcing bars 41 therein. In other words, the blocking portion 35B is a portion formed to be weaker than the other portions of the shielding wall 23 . In this way, while radiation is shielded by concrete, the portion formed of plain concrete can be used as the blocking portion 35B that is weaker in strength than the other portions of the shielding wall 23 .

そして、増設用建屋31の増設時に、無筋コンクリートで形成された閉塞部35Bを貫通する工事を行い、特定部34Bに増設用開口部を形成する。なお、この特定部34Bは、床面から所定の高さ位置までの開口される寸法を有する。 Then, when the expansion building 31 is expanded, construction work is performed to penetrate the closed portion 35B formed of plain concrete, and an expansion opening is formed in the specified portion 34B. In addition, this specific part 34B has a dimension of opening from the floor surface to a predetermined height position.

第3実施形態では、閉塞部35Bが、遮蔽壁23の一部を成し、遮蔽壁23の他の部分よりも強度が弱く形成された部分であることで、大きな開口部を確保しつつ、治療室を増設するときに、増設用開口部を形成する作業を短期間で行うことができる。 In the third embodiment, the blocking portion 35B forms part of the shielding wall 23 and is formed to have a lower strength than other portions of the shielding wall 23, thereby ensuring a large opening and When expanding the number of treatment rooms, the work of forming the expansion opening can be performed in a short period of time.

(第4実施形態)
次に、第4実施形態の特定部34Cと閉塞部35Cについて図11を用いて説明する。なお、前述した実施形態に示される構成部分と同一構成部分については同一符号を付して重複する説明を省略する。
(Fourth embodiment)
Next, the identifying portion 34C and the closing portion 35C of the fourth embodiment will be described with reference to FIG. The same reference numerals are assigned to the same components as those shown in the above-described embodiment, and overlapping descriptions are omitted.

図11に示すように、第4実施形態では、異なる階層に円形加速器3と回転ガントリ5を設置した主建屋15Aを例示する。そして、この主建屋15Aに隣接して同じ階数の増設用建屋を建築する。2階建て以上の主建屋15Aの場合には、1階42に円形加速器3を設置して、特定部34Cを2階43またはそれ以上の階に設けるようにしても良い。この主建屋15Aでは、2階43の遮蔽壁23Aに特定部34Cが設けられている。なお、この特定部34Cは、蓋状の閉塞部35Cで閉塞されている。 As shown in FIG. 11, the fourth embodiment exemplifies a main building 15A in which the circular accelerator 3 and the rotating gantry 5 are installed on different floors. Then, an extension building having the same number of floors is constructed adjacent to the main building 15A. In the case of the main building 15A having two or more stories, the circular accelerator 3 may be installed on the first floor 42, and the specifying unit 34C may be installed on the second floor 43 or higher. In this main building 15A, the shielding wall 23A on the second floor 43 is provided with a specific portion 34C. The specifying portion 34C is closed with a lid-like closing portion 35C.

このように円形加速器3と特定部34Cとが設けられる階が異なっている場合でも、平面視において、遮蔽壁23Aにおける屋外と放射線管理区域16とを隔てる位置に、特定部34Cが設けられる。平面視において、メイン輸送ライン20を輸送方向の延長した場合の仮想線と遮蔽壁23Aとが交わる位置、つまり、平面視において、メイン輸送ライン20が延びる方向のさらに先の位置に、特定部34Cが設けられる。また、平面視において、遮蔽壁23Aにおける円形加速器3から遠い側の位置に、特定部34Cが設けられる。 Even when the circular accelerator 3 and the specifying section 34C are provided on different floors, the specifying section 34C is provided at a position separating the outside and the radiation controlled area 16 in the shielding wall 23A in plan view. In plan view, the specified portion 34C is located at the position where the imaginary line when the main transport line 20 is extended in the transport direction intersects the shielding wall 23A, that is, at the position further ahead in the direction in which the main transport line 20 extends in plan view. is provided. Further, in plan view, a specific portion 34C is provided at a position on the side of the shielding wall 23A farther from the circular accelerator 3 .

第4実施形態では、特定部34Cが存在する2階43の床面44の高さ位置を示す床基準部45が設けられる。この床基準部45は、特定部34Cの下方位置に対応した位置に設けられる。床基準部45は、2階43の遮蔽壁23Aの屋外側の壁面から側方に突出された板状を成す部分である。床基準部45の上面が、2階43の床面44の高さ位置と一致している。 In the fourth embodiment, a floor reference portion 45 is provided to indicate the height position of the floor surface 44 of the second floor 43 where the identifying portion 34C exists. The floor reference portion 45 is provided at a position corresponding to the lower position of the specifying portion 34C. The floor reference portion 45 is a plate-shaped portion that protrudes laterally from the wall surface of the shielding wall 23A on the second floor 43 on the outdoor side. The upper surface of the floor reference portion 45 matches the height position of the floor surface 44 of the second floor 43 .

このようにすれば、増設用建屋の工事を行うときに、機器の設置の基準となる主建屋15Aの床面44の高さ位置を、作業者が放射線管理区域16に立ち入らなくても、床基準部45によって遮蔽壁23Aの屋外側から確認することができる。この確認された主建屋15Aの床面44の高さ位置に基づいて、増設用建屋の2階の床面の高さ位置を決定することができる。つまり、1mm以下の高い設置位置精度が要求される中で、既設の機器と増設用の機器の高さずれを防いでビーム輸送ライン4の接続時の工程の後戻りを防ぐことができる。 In this way, when constructing the expansion building, the height position of the floor surface 44 of the main building 15A, which is the standard for installing the equipment, can be set without the operator entering the radiation controlled area 16. The reference portion 45 allows confirmation from the outdoor side of the shielding wall 23A. Based on the confirmed height position of the floor surface 44 of the main building 15A, the height position of the floor surface of the second floor of the expansion building can be determined. In other words, in a situation where a high installation position accuracy of 1 mm or less is required, it is possible to prevent a step back in the process of connecting the beam transport line 4 by preventing a height deviation between the existing equipment and the additional equipment.

なお、第4実施形態では、主建屋15Aの2階43に床基準部45が設けられているが、特定部34Cが対応する階が1階または地下階である場合には、1階または地下階の遮蔽壁の屋外側の壁面に、床基準部45を設けるようにしても良い。 In the fourth embodiment, the floor reference part 45 is provided on the second floor 43 of the main building 15A. A floor reference portion 45 may be provided on the outdoor wall surface of the floor shielding wall.

なお、床基準部45は、壁面から側方に突出された板状を成す部分となっているが、この床基準部45は、壁面を凹ませて形成した凹部であっても良い。また、床基準部45は、壁面に設けられたマーカであっても良い。 Although the floor reference portion 45 is a plate-like portion projecting sideways from the wall surface, the floor reference portion 45 may be a concave portion formed by recessing the wall surface. Also, the floor reference portion 45 may be a marker provided on the wall surface.

本実施形態に係る粒子線治療システムを第1実施形態から第4実施形態に基づいて説明したが、いずれか1の実施形態において適用された構成を他の実施形態に適用しても良いし、各実施形態において適用された構成を組み合わせても良い。例えば、第1実施形態の増設用開口部の開口寸法を他の実施形態の増設用開口部の寸法としても良い。 The particle beam therapy system according to this embodiment has been described based on the first to fourth embodiments, but the configuration applied in any one embodiment may be applied to another embodiment, You may combine the structure applied in each embodiment. For example, the opening dimensions of the expansion opening of the first embodiment may be the dimensions of the expansion opening of the other embodiments.

なお、本実施形態のフローチャートにおいて、各ステップが直列に実行される形態を例示しているが、必ずしも各ステップの前後関係が固定されるものでなく、一部のステップの前後関係が入れ替わっても良い。また、一部のステップが他のステップと並列に実行されても良い。 In the flowchart of the present embodiment, each step is executed in series. good. Also, some steps may be executed in parallel with other steps.

なお、本実施形態では、増設用の照射室としての治療室19に回転ガントリ5が設けられているが、その他の形態であっても良い。例えば、治療室は、回転ガントリ5を設けずに、粒子線ビームを患者に向けて照射する照射部が固定的に配置される固定室であっても良い。また、増設工事の対象となる照射室は、治療室19でなくても良く、実験室またはビーム確認室であっても良い。 In this embodiment, the treatment room 19 as an additional irradiation room is provided with the rotating gantry 5, but other forms may be used. For example, the treatment room may be a fixed room in which an irradiation unit that irradiates a patient with a particle beam is fixedly arranged without providing the rotating gantry 5 . Also, the irradiation room to be expanded may not be the treatment room 19, but may be an experimental room or a beam confirmation room.

なお、本実施形態では、増設用建屋31の床面の高さが主建屋15の床面の高さと同じになっているが、増設用建屋31と主建屋15とが同じ階であっても、床面の高さが若干異なっていても良い。また、1階建ての主建屋15に隣接して2階建ての増設用建屋31を建築し、これらの建屋15,31同士を連結しても良い。 In this embodiment, the height of the floor surface of the expansion building 31 is the same as the height of the floor surface of the main building 15, but even if the expansion building 31 and the main building 15 are on the same floor, , the height of the floor may be slightly different. Alternatively, a two-story extension building 31 may be constructed adjacent to the one-story main building 15, and these buildings 15 and 31 may be connected to each other.

なお、本実施形態では、増設用建屋31が主建屋15と一体となるように建てられているが、増設用建屋31が主建屋15から離れた位置に建てられても良い。その場合には、特定部34から増設用建屋31まで延びる連結用通路を形成し、この通路により主建屋15から増設用建屋31までビーム輸送ラインを延長しても良い。 Although the expansion building 31 is built integrally with the main building 15 in this embodiment, the expansion building 31 may be built at a location separate from the main building 15 . In that case, a connecting passage extending from the specific part 34 to the expansion building 31 may be formed, and the beam transport line may be extended from the main building 15 to the expansion building 31 through this passage.

なお、本実施形態では、特定部34が遮蔽壁23を水平方向に貫通しているが、その他の形態であっても良い。例えば、ビーム輸送ライン4が水平面に対し斜めに配置されている場合は、特定部34が遮蔽壁23を斜め方向に傾斜されて貫通しても良い。また、特定部34が遮蔽壁23の内部で屈曲されても良い。 In this embodiment, the specifying part 34 penetrates the shielding wall 23 in the horizontal direction, but other forms may be used. For example, when the beam transport line 4 is arranged obliquely with respect to the horizontal plane, the specific part 34 may pass through the shielding wall 23 obliquely. Further, the specifying portion 34 may be bent inside the shielding wall 23 .

なお、本実施形態では、特定部34が遮蔽壁23に設けられているが、放射線管理区域16を仕切る天井(遮蔽壁)に特定部が設けられても良い。つまり、特定部34が天井を垂直方向に貫通しても良い。 In this embodiment, the specifying part 34 is provided on the shielding wall 23 , but the specifying part may be provided on the ceiling (shielding wall) that partitions the radiation controlled area 16 . That is, the specifying part 34 may penetrate the ceiling in the vertical direction.

なお、本実施形態では、特定部34が地上階の遮蔽壁23に設けられているが、特定部34を地下階の遮蔽壁23に設けても良い。 In this embodiment, the specifying part 34 is provided on the shielding wall 23 on the ground floor, but the specifying part 34 may be provided on the shielding wall 23 on the basement floor.

なお、本実施形態では、重粒子線がん治療を行う施設を例示しているが、その他の施設にも本実施形態を適用できる。例えば、陽子線がん治療を行う施設に本実施形態を適用しても良い。また、中性子捕捉療法(BNCT:Boron Neutron Capture Therapy)で治療を行う施設に本実施形態を適用しても良い。つまり、粒子線ビームを照射する照射部は、患者に粒子線ビームを照射するのみならず、所定のターゲットに粒子線ビームを照射して中性子を発生させるものであっても良い。 In this embodiment, a facility for heavy ion radiotherapy is exemplified, but this embodiment can also be applied to other facilities. For example, the present embodiment may be applied to facilities that perform proton beam cancer therapy. Moreover, you may apply this embodiment to the facility which treats by neutron capture therapy (BNCT:Boron Neutron Capture Therapy). In other words, the irradiation unit that irradiates the particle beam may not only irradiate the patient with the particle beam, but may also irradiate a predetermined target with the particle beam to generate neutrons.

なお、本実施形態では、主建屋15の新設時に、この主建屋15の遮蔽壁23に特定部34を設けているが、増設用建屋31の増設時に、この増設用建屋31の増設用遮蔽壁32に新たに特定部34を設けるようにしても良い。そして、その後にさらに別の増設用建屋を増設する場合に、既設の増設用建屋31の特定部34を開口させても良い。 In the present embodiment, when the main building 15 is newly constructed, the specifying portion 34 is provided in the shielding wall 23 of the main building 15. 32 may be newly provided with a specifying unit 34 . Then, if another building for expansion is to be added after that, the specific part 34 of the existing building for expansion 31 may be opened.

なお、本実施形態では、主建屋15の新設時に、増設用建屋31が建設されておらず、その増設用敷地30のみが確保されるようになっているが、その他の形態でも良い。例えば、主建屋15の新設時に、増設用建屋31の遮蔽壁32のみを一緒に建設しておき、特定部34を閉塞部35で閉塞しておいても良い。そして、運営を開始して数年後に増設工事を行い、増設用建屋31に回転ガントリ5などの機器を増設した後に、閉塞部35を取り除いて特定部34を開放するようにしても良い。 In this embodiment, when the main building 15 is newly constructed, the expansion building 31 is not constructed, and only the expansion site 30 is secured. For example, when the main building 15 is newly constructed, only the shielding wall 32 of the additional building 31 may be constructed together, and the specific portion 34 may be blocked by the blocking portion 35 . Then, after several years from the start of operation, expansion work may be carried out, and after adding equipment such as the rotating gantry 5 to the expansion building 31, the blocking part 35 may be removed and the specific part 34 may be opened.

以上説明した少なくとも1つの実施形態によれば、照射室の増設用開口部を形成可能な特定部を備えることにより、工事を行う際に治療が中断される期間を短くして稼働率を向上させることができる。 According to at least one embodiment described above, by providing the specific part capable of forming an opening for extension of the irradiation room, the period during which treatment is interrupted during construction is shortened and the operating rate is improved. be able to.

本発明のいくつかの実施形態を説明したが、これらの実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。これら実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更、組み合わせを行うことができる。これら実施形態やその変形は、発明の範囲や要旨に含まれると同様に、特許請求の範囲に記載された発明とその均等の範囲に含まれるものである。 While several embodiments of the invention have been described, these embodiments have been presented by way of example and are not intended to limit the scope of the invention. These embodiments can be implemented in various other forms, and various omissions, replacements, changes, and combinations can be made without departing from the scope of the invention. These embodiments and their modifications are included in the scope and spirit of the invention as well as the scope of the invention described in the claims and equivalents thereof.

1…粒子線治療システム、2…イオン源、3…円形加速器、4…ビーム輸送ライン、5…回転ガントリ、6~9…真空ダクト、10~12(12a,12b,12c)…電磁石装置、15(15A)…主建屋、16…放射線管理区域、17…第1治療室、18…第2治療室、19…第3治療室、20…メイン輸送ライン、21,22…サブ輸送ライン、23(23A)…遮蔽壁、24…通常壁、25…ロビー、26…廊下、27…診察室、28…スタッフ室、29…患者の待機室、30…増設用敷地、31…増設用建屋、32…遮蔽壁、33…通常壁、34(34A,34B,34C)…特定部、35(35A,35B,35C)…閉塞部、36…金属板、37…ケーブル、38,39…フランジ、40…閉止フランジ、41…鉄筋、42…1階、43…2階、44…床面、45…床基準部、49…操作部、50…制御装置、51…インターロック、52…開閉センサ、C…中心、H…位置、K…境界、L1,L2…寸法、Q1~Q4…開口寸法、V…仮想線。 1 Particle beam therapy system 2 Ion source 3 Circular accelerator 4 Beam transport line 5 Rotating gantry 6 to 9 Vacuum duct 10 to 12 (12a, 12b, 12c) Electromagnet device 15 (15A)... Main building, 16... Radiation control area, 17... First treatment room, 18... Second treatment room, 19... Third treatment room, 20... Main transport line, 21, 22... Sub transport line, 23 ( 23A)...Shielding wall 24...Normal wall 25...Lobby 26...Corridor 27...Examination room 28...Staff room 29...Patient waiting room 30...Expansion site 31...Expansion building 32... Shielding wall 33 Normal wall 34 (34A, 34B, 34C) Specific part 35 (35A, 35B, 35C) Closing part 36 Metal plate 37 Cable 38, 39 Flange 40 Closing Flange 41 Reinforcing bar 42 1st floor 43 2nd floor 44 Floor surface 45 Floor reference unit 49 Operation unit 50 Control device 51 Interlock 52 Open/close sensor C Center , H...position, K...boundary, L1, L2...size, Q1 to Q4...opening size, V...virtual line.

Claims (12)

荷電粒子を加速する円形加速器と、
前記円形加速器で加速された前記荷電粒子を照射室に導くビーム輸送ラインと、
前記円形加速器および前記ビーム輸送ラインが配置される放射線管理区域の周囲にあって、前記円形加速器および前記ビーム輸送ラインから生じる放射線を遮蔽する遮蔽壁と、
前記遮蔽壁における外と前記放射線管理区域とを隔てる位置に設けられ、前記照射室の増設用開口部を形成可能な特定部と、
前記特定部を閉塞し、この特定部を通過する前記放射線を遮蔽する閉塞部と、
を備え、
前記ビーム輸送ラインは、前記円形加速器から延びるメイン輸送ラインと、前記メイン輸送ラインから前記照射室まで延びるサブ輸送ラインとから成り、
前記特定部は、前記メイン輸送ラインを輸送方向の下流に延長した場合の仮想線と前記遮蔽壁との交点を含む位置に設けられており、
前記特定部は、前記ビーム輸送ラインを前記遮蔽壁の一方の面から他方の面まで延ばすための前記増設用開口部を形成可能である、
粒子線治療システム。
a circular accelerator for accelerating charged particles;
a beam transport line that guides the charged particles accelerated by the circular accelerator to an irradiation chamber;
a shielding wall surrounding a radiation controlled area in which the circular accelerator and the beam transport line are arranged and shielding radiation generated from the circular accelerator and the beam transport line;
a specific part provided at a position separating the outside of the shielding wall from the radiation controlled area and capable of forming an opening for extension of the irradiation chamber;
a blocking part that blocks the specific part and shields the radiation that passes through the specific part;
with
The beam transport line comprises a main transport line extending from the circular accelerator and a sub-transport line extending from the main transport line to the irradiation chamber,
The specifying portion is provided at a position including an intersection point between the shielding wall and an imaginary line when the main transportation line is extended downstream in the transportation direction,
The specifying part can form the expansion opening for extending the beam transport line from one surface to the other surface of the shielding wall.
Particle therapy system.
荷電粒子を加速する円形加速器と、
前記円形加速器で加速された前記荷電粒子を照射室に導くビーム輸送ラインと、
前記円形加速器および前記ビーム輸送ラインが配置される放射線管理区域の周囲にあって、前記円形加速器および前記ビーム輸送ラインから生じる放射線を遮蔽する遮蔽壁と、
前記遮蔽壁における外と前記放射線管理区域とを隔てる位置に設けられ、前記照射室の増設用開口部を形成可能な特定部と、
前記特定部を閉塞し、この特定部を通過する前記放射線を遮蔽する閉塞部と、
前記ビーム輸送ラインにおける前記特定部に最も近い部分に設けられ、2方向に分岐される分岐用真空ダクトと、
前記分岐用真空ダクトの一方の端部に設けられ、増設用真空ダクトを接続可能な接続部と、
を備え、
前記特定部は、前記ビーム輸送ラインを前記遮蔽壁の一方の面から他方の面まで延ばすための前記増設用開口部を形成可能である、
粒子線治療システム。
a circular accelerator for accelerating charged particles;
a beam transport line that guides the charged particles accelerated by the circular accelerator to an irradiation chamber;
a shielding wall surrounding a radiation controlled area in which the circular accelerator and the beam transport line are arranged and shielding radiation generated from the circular accelerator and the beam transport line;
a specific part provided at a position separating the outside of the shielding wall from the radiation controlled area and capable of forming an opening for extension of the irradiation chamber;
a blocking part that blocks the specific part and shields the radiation that passes through the specific part;
a branching vacuum duct that is provided at a portion of the beam transport line closest to the specific portion and branches in two directions;
a connecting portion provided at one end of the branching vacuum duct to which an extension vacuum duct can be connected;
with
The specifying part can form the expansion opening for extending the beam transport line from one surface to the other surface of the shielding wall.
Particle therapy system.
前記特定部は、平面視における前記放射線管理区域の図心に対して前記円形加速器の中心が位置する領域と反対側の位置に設けられる請求項1または請求項2に記載の粒子線治療システム。 3. The particle beam therapy system according to claim 1, wherein the specifying unit is provided at a position opposite to a region where the center of the circular accelerator is located with respect to the centroid of the radiation controlled area in plan view. 前記特定部は、前記遮蔽壁における前記照射室の増設用敷地と前記放射線管理区域とを隔てる位置に設けられる請求項1から請求項3のいずれか1項に記載の粒子線治療システム。 4. The particle beam therapy system according to any one of claims 1 to 3, wherein the specifying unit is provided at a position on the shielding wall separating the site for extension of the irradiation room and the radiation controlled area. 前記増設用開口部の開口寸法は、1m以下である請求項1から請求項4のいずれか1項に記載の粒子線治療システム。 The particle beam therapy system according to any one of claims 1 to 4, wherein the extension opening has an opening dimension of 1 m or less. 前記特定部が前記遮蔽壁に貫通された開口部であり、前記閉塞部が前記放射線を遮蔽する遮蔽扉である請求項1から請求項5のいずれか1項に記載の粒子線治療システム。 The particle beam therapy system according to any one of claims 1 to 5, wherein the specific portion is an opening penetrating through the shielding wall, and the blocking portion is a shielding door that shields the radiation. 前記特定部が前記遮蔽壁に貫通された開口部であり、前記閉塞部が前記放射線を遮蔽し、かつ前記特定部に対して着脱可能な遮蔽ブロックである請求項1から請求項5のいずれか1項に記載の粒子線治療システム。 6. The specific portion is an opening penetrating through the shielding wall, and the blocking portion is a shielding block that shields the radiation and is detachable from the specific portion. The particle beam therapy system according to item 1. 前記閉塞部は、前記遮蔽壁の一部を成し、前記遮蔽壁の他の部分よりも強度が弱く形成された部分である請求項1から請求項5のいずれか1項に記載の粒子線治療システム。 The particle beam according to any one of claims 1 to 5, wherein the blocking portion forms part of the shielding wall and is a portion formed with a lower strength than other portions of the shielding wall. treatment system. 前記照射室に設けられ、前記ビーム輸送ラインにより導かれた前記荷電粒子の被検体に対する照射方向を変更可能な回転ガントリを備える請求項1から請求項8のいずれか1項に記載の粒子線治療システム。 The particle beam therapy according to any one of claims 1 to 8, further comprising a rotating gantry provided in the irradiation chamber and capable of changing an irradiation direction of the charged particles guided by the beam transport line toward the subject. system. 粒子線治療システムの新設時に、
荷電粒子を加速する円形加速器を設けるステップと、
前記円形加速器で加速された前記荷電粒子を照射室に導くビーム輸送ラインを設けるステップと、
前記円形加速器および前記ビーム輸送ラインが配置される放射線管理区域の周囲にあって、前記円形加速器および前記ビーム輸送ラインから生じる放射線を遮蔽する遮蔽壁を設けるステップと、
前記遮蔽壁における外と前記放射線管理区域とを隔てる位置に設けられ、前記照射室の増設用開口部を形成可能な特定部を設けるステップと、
前記特定部を閉塞し、この特定部を通過する前記放射線を遮蔽する閉塞部を設けるステップと、
を含み、
前記ビーム輸送ラインは、前記円形加速器から延びるメイン輸送ラインと、前記メイン輸送ラインから前記照射室まで延びるサブ輸送ラインとから成り、
前記特定部は、前記メイン輸送ラインを輸送方向の下流に延長した場合の仮想線と前記遮蔽壁との交点を含む位置に設けられており、
前記特定部は、前記ビーム輸送ラインを前記遮蔽壁の一方の面から他方の面まで延ばすための前記増設用開口部を形成可能である、
粒子線治療システムの構築方法。
When installing a new particle beam therapy system,
providing a circular accelerator for accelerating charged particles;
providing a beam transport line for guiding the charged particles accelerated by the circular accelerator to an irradiation chamber;
providing a shielding wall surrounding a radiation controlled area in which the circular accelerator and the beam transport line are arranged and shielding radiation generated from the circular accelerator and the beam transport line;
a step of providing a specific portion provided at a position separating the outside of the shielding wall from the radiation controlled area and capable of forming an opening for extension of the irradiation chamber;
providing a blocking portion that blocks the specific portion and shields the radiation that passes through the specific portion;
including
The beam transport line comprises a main transport line extending from the circular accelerator and a sub-transport line extending from the main transport line to the irradiation chamber,
The specifying portion is provided at a position including an intersection point between the shielding wall and an imaginary line when the main transportation line is extended downstream in the transportation direction,
The specifying part can form the expansion opening for extending the beam transport line from one surface to the other surface of the shielding wall.
A method of constructing a particle beam therapy system.
粒子線治療システムの増設時に、
特定部の周囲に増設用遮蔽壁を設けるステップと、
増設される照射室のための増設用ビーム輸送ラインを設けるステップと、
閉塞部を取り除いて前記特定部を開放するステップと、
円形加速器で加速された荷電粒子を増設される前記照射室に到達させるために、既設のビーム輸送ラインと前記増設用ビーム輸送ラインとを前記特定部を介して接続するステップと、
を含み、
増設前の前記粒子線治療システムは、
前記荷電粒子を加速する前記円形加速器と、
既設の前記ビーム輸送ラインと、
放射線を遮蔽する既設の遮蔽壁と、
既設の前記遮蔽壁に設けられた増設用開口部を形成可能な前記特定部と、
前記特定部を閉塞する前記閉塞部と、
を備え、
既設の前記ビーム輸送ラインは、前記円形加速器から延びるメイン輸送ラインと、前記メイン輸送ラインから前記照射室まで延びるサブ輸送ラインとから成り、
前記特定部は、前記メイン輸送ラインを輸送方向の下流に延長した場合の仮想線と前記遮蔽壁との交点を含む位置に設けられており、
前記特定部は、前記遮蔽壁の一方の側にある既設の前記ビーム輸送ラインと前記遮蔽壁の他方の側にある前記増設用ビーム輸送ラインとを接続するための前記増設用開口部を形成可能である、
粒子線治療システムの構築方法。
When expanding the particle beam therapy system,
A step of providing an additional shielding wall around the specific portion;
providing an additional beam transport line for an additional irradiation chamber;
removing the blocking portion to open the specific portion;
connecting the existing beam transport line and the extension beam transport line via the specifying unit in order to allow the charged particles accelerated by the circular accelerator to reach the additional irradiation chamber;
including
The particle beam therapy system before expansion is
the circular accelerator that accelerates the charged particles;
the existing beam transport line;
an existing shielding wall that shields radiation;
the specific part capable of forming an expansion opening provided in the existing shielding wall;
the closing portion that closes the specific portion;
with
The existing beam transport line consists of a main transport line extending from the circular accelerator and a sub-transport line extending from the main transport line to the irradiation chamber,
The specifying portion is provided at a position including an intersection point between the shielding wall and an imaginary line when the main transportation line is extended downstream in the transportation direction,
The specifying part can form the extension opening for connecting the existing beam transport line on one side of the shielding wall and the extension beam transport line on the other side of the shielding wall. is
A method of constructing a particle beam therapy system.
荷電粒子を増設用建屋内の照射室に導く増設用ビーム輸送ラインと、
前記照射室に設けられ、前記増設用ビーム輸送ラインにより導かれた前記荷電粒子の被検体に対する照射方向を変更可能な増設用回転ガントリと、
既設のビーム輸送ラインと前記増設用ビーム輸送ラインとを既設の建屋の放射線を遮蔽する遮蔽壁に予め設けられた特定部を介して連通する接続部と、
を備え、
既設の前記ビーム輸送ラインは、円形加速器から延びるメイン輸送ラインと、前記メイン輸送ラインから前記照射室まで延びるサブ輸送ラインとから成り、
前記特定部は、前記メイン輸送ラインを輸送方向の下流に延長した場合の仮想線と前記遮蔽壁との交点を含む位置に設けられており、
前記特定部は、前記遮蔽壁の一方の側にある既設の前記ビーム輸送ラインと前記遮蔽壁の他方の側にある前記増設用ビーム輸送ラインとを接続するための増設用開口部を形成可能である、
粒子線治療装置。
an extension beam transport line that guides charged particles to the irradiation room in the extension building;
an extension rotary gantry provided in the irradiation chamber and capable of changing the irradiation direction of the charged particles directed by the extension beam transport line toward the subject;
a connecting portion that connects the existing beam transport line and the extension beam transport line through a specific portion that is provided in advance in a shielding wall that shields radiation of the existing building;
with
The existing beam transport line consists of a main transport line extending from a circular accelerator and a sub-transport line extending from the main transport line to the irradiation chamber,
The specifying portion is provided at a position including an intersection point between the shielding wall and an imaginary line when the main transportation line is extended downstream in the transportation direction,
The specifying part can form an extension opening for connecting the existing beam transport line on one side of the shielding wall and the extension beam transport line on the other side of the shielding wall. be,
Particle therapy equipment.
JP2022092649A 2018-04-23 2022-06-08 Particle beam therapy system, construction method of particle beam therapy system, and particle beam therapy device Active JP7309973B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022092649A JP7309973B2 (en) 2018-04-23 2022-06-08 Particle beam therapy system, construction method of particle beam therapy system, and particle beam therapy device

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2018082245A JP7118720B2 (en) 2018-04-23 2018-04-23 Particle therapy system
JP2022092649A JP7309973B2 (en) 2018-04-23 2022-06-08 Particle beam therapy system, construction method of particle beam therapy system, and particle beam therapy device

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2018082245A Division JP7118720B2 (en) 2018-04-23 2018-04-23 Particle therapy system

Publications (2)

Publication Number Publication Date
JP2022111250A JP2022111250A (en) 2022-07-29
JP7309973B2 true JP7309973B2 (en) 2023-07-18

Family

ID=87201163

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022092649A Active JP7309973B2 (en) 2018-04-23 2022-06-08 Particle beam therapy system, construction method of particle beam therapy system, and particle beam therapy device

Country Status (1)

Country Link
JP (1) JP7309973B2 (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007268031A (en) 2006-03-31 2007-10-18 Hitachi Ltd Therapeutic system by particle radiation and method for switching beam course thereof
JP2010017365A (en) 2008-07-11 2010-01-28 Hitachi Ltd Particle therapy system
JP2011182987A (en) 2010-03-09 2011-09-22 Sumitomo Heavy Ind Ltd Accelerated particle irradiation equipment
JP2011250910A (en) 2010-06-01 2011-12-15 Hitachi Ltd Particle beam therapeutic apparatus
WO2013011583A1 (en) 2011-07-21 2013-01-24 三菱電機株式会社 Particle radiotherapy device
JP2014171560A (en) 2013-03-07 2014-09-22 Mitsubishi Electric Corp Particle beam therapy facility
JP2017080487A (en) 2017-01-05 2017-05-18 住友重機械工業株式会社 Particle beam therapy facility
JP2019150295A (en) 2018-03-02 2019-09-12 株式会社日立製作所 Particle beam therapy system and method for equipment update of particle beam therapy system

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10261099B4 (en) * 2002-12-20 2005-12-08 Siemens Ag Ion beam system
JP4537924B2 (en) * 2005-09-29 2010-09-08 株式会社日立製作所 Accelerator system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007268031A (en) 2006-03-31 2007-10-18 Hitachi Ltd Therapeutic system by particle radiation and method for switching beam course thereof
JP2010017365A (en) 2008-07-11 2010-01-28 Hitachi Ltd Particle therapy system
JP2011182987A (en) 2010-03-09 2011-09-22 Sumitomo Heavy Ind Ltd Accelerated particle irradiation equipment
JP2011250910A (en) 2010-06-01 2011-12-15 Hitachi Ltd Particle beam therapeutic apparatus
WO2013011583A1 (en) 2011-07-21 2013-01-24 三菱電機株式会社 Particle radiotherapy device
JP2014171560A (en) 2013-03-07 2014-09-22 Mitsubishi Electric Corp Particle beam therapy facility
JP2017080487A (en) 2017-01-05 2017-05-18 住友重機械工業株式会社 Particle beam therapy facility
JP2019150295A (en) 2018-03-02 2019-09-12 株式会社日立製作所 Particle beam therapy system and method for equipment update of particle beam therapy system

Also Published As

Publication number Publication date
JP2022111250A (en) 2022-07-29

Similar Documents

Publication Publication Date Title
US9687680B2 (en) Accelerated particle irradiation equipment
JP2009217938A (en) Accelerator system and particle beam medical treatment system
WO2016051550A1 (en) Particle beam therapy apparatus, and operation method therefor
JP7118720B2 (en) Particle therapy system
JP2021532908A (en) Proton therapy gantry
US11511134B2 (en) Particle therapy system and extension method thereof
JP7309973B2 (en) Particle beam therapy system, construction method of particle beam therapy system, and particle beam therapy device
JP3969663B2 (en) Mobile accelerator system and radionuclide production method
KR101839369B1 (en) Boron Neutron Capture Therapy System
JP6529524B2 (en) Particle therapy equipment
JP5373220B2 (en) Particle therapy equipment
JP7317618B2 (en) Particle therapy system
JP6343357B2 (en) Particle therapy equipment
JP6111370B2 (en) Particle therapy equipment
JP6307056B2 (en) Particle therapy equipment
JP5999850B2 (en) Particle therapy equipment
JP2022089463A (en) Radiation shield structure
JP5437527B2 (en) Particle therapy equipment
JP2012120861A (en) Accelerated particle irradiation facility

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220608

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230606

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230705

R150 Certificate of patent or registration of utility model

Ref document number: 7309973

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150