JP7240100B2 - Proportion calculation device, proportion calculation method, and proportion calculation program - Google Patents

Proportion calculation device, proportion calculation method, and proportion calculation program Download PDF

Info

Publication number
JP7240100B2
JP7240100B2 JP2018056914A JP2018056914A JP7240100B2 JP 7240100 B2 JP7240100 B2 JP 7240100B2 JP 2018056914 A JP2018056914 A JP 2018056914A JP 2018056914 A JP2018056914 A JP 2018056914A JP 7240100 B2 JP7240100 B2 JP 7240100B2
Authority
JP
Japan
Prior art keywords
employee
days
identification data
project
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018056914A
Other languages
Japanese (ja)
Other versions
JP2019168979A (en
Inventor
至誠 今井
剛光 上野
Original Assignee
株式会社オービック
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社オービック filed Critical 株式会社オービック
Priority to JP2018056914A priority Critical patent/JP7240100B2/en
Publication of JP2019168979A publication Critical patent/JP2019168979A/en
Application granted granted Critical
Publication of JP7240100B2 publication Critical patent/JP7240100B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、仕訳データ作成装置、仕訳データ作成方法および仕訳データ作成プログラムに関する。 The present invention relates to a journal data creation device, a journal data creation method, and a journal data creation program.

特許文献1には、効率的に人件費を予測するための人件費シミュレーションシステム、人件費シミュレーション方法及び人件費シミュレーションプログラムが開示されている(特許文献1の段落0006参照)。 Patent Document 1 discloses a personnel cost simulation system, a personnel cost simulation method, and a personnel cost simulation program for efficiently predicting personnel costs (see paragraph 0006 of Patent Document 1).

特許第5917785号公報Japanese Patent No. 5917785

このように、人件費を管理する分野においては、例えば、社員が複数の業務を兼務した場合、前記社員に対する給与支払いの際には、前記複数の業務それぞれについての前記社員の従事日数に応じた按分率を算出し、当該按分率を用いて前記社員に対する給与金額を按分することで、前記複数の業務それぞれに対応する人件費を含む仕訳データを作成する必要がある。 In this way, in the field of managing personnel expenses, for example, when an employee concurrently performs multiple tasks, when paying salaries to the employee, the number of days worked by the employee for each of the multiple tasks is calculated. It is necessary to create journal data including personnel expenses corresponding to each of the plurality of operations by calculating a proportional division ratio and proportionally dividing the salary amount for the employee using the proportional division ratio.

しかしながら、従来においては、前記従事日数は、例えば、社員が日々入力する日報等により管理するという運用となっていたため、入力の手間がある上に、運用習熟も困難であるという問題があった。 However, in the past, the number of working days was managed by, for example, a daily report input by the employee on a daily basis.

このため、例えば、社員の業務経歴(例えば、ある業務についての発令日の情報)に基づいて前記按分率を算出できるようにしたいという要望が従来からあったものの、実現できていなかった。 For this reason, for example, there has been a request to be able to calculate the proportional division ratio based on the employee's work history (for example, information on the date of issue of a certain work), but it has not been realized.

本発明は、上記問題点に鑑みてなされたものであって、社員の業務経歴を用いて算出した按分率を用いて社員が従事する業務それぞれに対応する人件費を算出し、当該算出した人件費を含む仕訳データを作成できる仕訳データ作成装置、仕訳データ作成方法および仕訳データ作成プログラムを提供することを目的とする。 The present invention has been made in view of the above problems. It is an object of the present invention to provide a journal data creation device, a journal data creation method, and a journal data creation program capable of creating journal data including expenses.

上述した課題を解決し、目的を達成するために、本発明に係る仕訳データ作成装置は、制御部および記憶部を備える仕訳データ作成装置であって、前記記憶部には、社員の業務経歴と前記社員の業務を識別するための業務識別データと前記業務経歴を元にした仕訳データにおいて前記業務に対応する勘定科目を識別するための勘定科目識別データとが紐付けて格納されており、前記制御部は、前記業務に従事した期間に対応する按分率を前記記憶部中の業務経歴に基づいて算出する按分率算出手段と、前記社員に関する給与金額と、当該給与金額を前記按分率算出手段で算出した前記按分率に基づいて按分した按分金額と、前記記憶部中の業務識別データと、当該業務識別データと紐付く前記記憶部中の勘定科目識別データで特定される勘定科目と、を含む仕訳データを作成する仕訳データ作成手段と、を備えること、を特徴とする。 In order to solve the above-mentioned problems and achieve the object, the journalizing data creation device according to the present invention is a journalizing data creation device comprising a control unit and a storage unit, wherein the storage unit stores the employee's work history and Business identification data for identifying the business of the employee and account identification data for identifying the account corresponding to the business in the journal data based on the business history are linked and stored, The control unit includes a proportional division ratio calculating means for calculating a proportional division ratio corresponding to the period of engaging in the work based on the work history in the storage unit, a salary amount for the employee, and the salary amount for the proportional division ratio calculating means. The apportioned amount proportionally divided based on the apportionment rate calculated in , the business identification data in the storage unit, and the account specified by the account identification data in the storage unit linked to the business identification data. and journal data creation means for creating journal data including.

また、本発明に係る仕訳データ作成装置は、前記業務経歴が、前記社員が複数の業務に従事した場合における当該複数の業務それぞれについての従事期間である業務毎期間であり、前記按分率算出手段は、前記業務毎期間を前記業務毎期間の合計で割った値に100を掛けることにより、前記複数の業務それぞれに対応する前記按分率を算出すること、を特徴とする。 Further, in the journal data creation device according to the present invention, the work history is a period for each work, which is a period of engagement for each of the plurality of jobs when the employee is engaged in a plurality of jobs, and the proportional division ratio calculation means is characterized by calculating the proportional division ratio corresponding to each of the plurality of tasks by multiplying a value obtained by dividing the period for each task by the total of the periods for each task by 100.

また、本発明に係る仕訳データ作成装置は、前記業務経歴が、前記業務についての発令日を元に計算される前記業務についての従事日数であること、を特徴とする。 Further, the journalizing data creation device according to the present invention is characterized in that the work history is the number of days of work for the work calculated based on the date of issue of the work.

また、本発明に係る仕訳データ作成方法は、制御部および記憶部を備える情報処理装置で実行される仕訳データ作成方法であって、前記記憶部には、社員の業務経歴と前記社員の業務を識別するための業務識別データと前記業務経歴を元にした仕訳データにおいて前記業務に対応する勘定科目を識別するための勘定科目識別データとが紐付けて格納されており、前記制御部で実行される、前記業務に従事した期間に対応する按分率を前記記憶部中の業務経歴に基づいて算出する按分率算出ステップと、前記社員に関する給与金額と、当該給与金額を前記按分率算出ステップで算出した前記按分率に基づいて按分した按分金額と、前記記憶部中の業務識別データと、当該業務識別データと紐付く前記記憶部中の勘定科目識別データで特定される勘定科目と、を含む仕訳データを作成する仕訳データ作成ステップと、を含むこと、を特徴とする。 Further, a journal data creation method according to the present invention is a journal data creation method executed by an information processing apparatus having a control unit and a storage unit, wherein the storage unit stores the employee's work history and the employee's business. Business identification data for identification and account item identification data for identifying account items corresponding to the business in the journal data based on the business history are linked and stored, and are executed by the control unit. a proportional division ratio calculating step of calculating a proportional division ratio corresponding to the period of engaging in the work based on the work history stored in the storage unit; a journal including an apportioned amount proportionally distributed based on the apportionment ratio, the business identification data in the storage unit, and the account specified by the account identification data in the storage unit linked to the business identification data and a journal data creation step of creating data.

また、本発明に係る仕訳データ作成プログラムは、制御部および記憶部を備える情報処理装置に実行させるための仕訳データ作成プログラムであって、前記記憶部には、社員の業務経歴と前記社員の業務を識別するための業務識別データと前記業務経歴を元にした仕訳データにおいて前記業務に対応する勘定科目を識別するための勘定科目識別データとが紐付けて格納されており、前記制御部に実行させるための、前記業務に従事した期間に対応する按分率を前記記憶部中の業務経歴に基づいて算出する按分率算出ステップと、前記社員に関する給与金額と、当該給与金額を前記按分率算出ステップで算出した前記按分率に基づいて按分した按分金額と、前記記憶部中の業務識別データと、当該業務識別データと紐付く前記記憶部中の勘定科目識別データで特定される勘定科目と、を含む仕訳データを作成する仕訳データ作成ステップと、を含むこと、を特徴とする。 Further, a journal data creation program according to the present invention is a journal data creation program to be executed by an information processing apparatus having a control unit and a storage unit, wherein the storage unit stores an employee's work history and the employee's business and the account item identification data for identifying the account items corresponding to the business in the journal data based on the business history are linked and stored, and the control unit executes a proportional division ratio calculating step of calculating a proportional division ratio corresponding to the period of engaging in the work based on the work history stored in the storage unit; The apportioned amount proportionally divided based on the apportionment rate calculated in , the business identification data in the storage unit, and the account specified by the account identification data in the storage unit linked to the business identification data. and a journal data creation step of creating journal data including.

本発明によれば、社員の業務経歴を用いて算出した按分率を用いて社員が従事する業務それぞれに対応する人件費を算出し、当該算出した人件費を含む仕訳データを作成できるという効果を奏する。 According to the present invention, it is possible to calculate the personnel expenses corresponding to each job that the employee is engaged in using the proportional division ratio calculated using the employee's work history, and create journal data including the calculated personnel expenses. Play.

図1は、仕訳データ作成装置の構成の一例を示すブロック図である。FIG. 1 is a block diagram showing an example of the configuration of a journal data creation device. 図2は、本実施形態に係る処理の流れの一例を示す図である。FIG. 2 is a diagram showing an example of the flow of processing according to this embodiment. 図3は、本務情報および兼務情報における具体的内容の一例を示す図である。FIG. 3 is a diagram showing an example of specific contents of main job information and concurrent job information. 図4は、本務情報および兼務情報に基づく按分率算出の仕方の一例を示す図である。FIG. 4 is a diagram showing an example of how to calculate a proportional division ratio based on main job information and concurrent job information. 図5は、作成される仕訳データの一例を示す図である。FIG. 5 is a diagram showing an example of created journal data.

以下に、仕訳データ作成装置、仕訳データ作成方法および仕訳データ作成プログラムの実施形態を、図面に基づいて詳細に説明する。なお、本実施形態により本発明が限定されるものではない。 Embodiments of a journal data creation device, a journal data creation method, and a journal data creation program will be described in detail below with reference to the drawings. It should be noted that the present invention is not limited by this embodiment.

[1.概要]
建設工事業界等においては、社員が複数の案件を兼務した場合、前記社員に対する給与支払いの際には、前記複数の案件に従事した日数に応じた按分率を算出し、当該按分率を用いて前記社員に対する給与金額を按分することで、前記複数の案件それぞれに対応する人件費(案件別人件費)を含む仕訳データを作成する必要がある。
[1. overview]
In the construction industry, etc., when an employee concurrently works on multiple projects, when paying salary to said employee, a proportional division rate is calculated according to the number of days engaged in said multiple projects, and this proportional division rate is used. It is necessary to create journal data including personnel expenses corresponding to each of the plurality of cases (personnel expenses for each case) by proportionally dividing the salary amounts for the employees.

しかしながら、従来においては、前記複数の案件それぞれに対応する人件費を算出するためには、日報管理や前記按分率の見直しが必要であり、また、仕訳データを作成する際の勘定科目を特定するためには、工事案件が完成工事と未完成工事のどちらに該当するかの判断を都度行うことが必要であるという問題があった。 However, conventionally, in order to calculate personnel expenses corresponding to each of the plurality of projects, it is necessary to manage daily reports and review the proportional division ratio. Therefore, there is a problem that it is necessary to determine whether a construction project corresponds to completed construction or unfinished construction each time.

そして、従来においては、固定比率や日報実績を用いて人件費を按分算出するという方法もあったが、それぞれ以下のような問題があった。すなわち、固定比率を用いる場合は、工事業界のように人件費の発生が変動する場合に実態(実際の人件費)と乖離してしまうという問題があった。また、日報実績を用いる場合は、現場作業者に日報入力や当該日報入力に基づく按分計算を負担させる必要があり、運用習熟が困難であるという問題があった。 Conventionally, there have been methods of proportionally dividing personnel expenses using fixed ratios and daily report results, but these methods have the following problems. In other words, when a fixed ratio is used, there is a problem that it deviates from the actual situation (actual labor cost) when the occurrence of labor cost fluctuates as in the construction industry. In addition, when using the actual daily report, it is necessary to make the site worker bear the burden of inputting the daily report and proportional division calculation based on the input of the daily report, and there is a problem that it is difficult to master the operation.

そこで、本実施形態においては、例えば、社員の人事経歴から案件別の按分率を自動算出できるようにした。また、本実施形態においては、例えば、社員に対する給与金額を前記按分率を用いて按分することにより前記案件別人件費を算出し、一方で、仕訳パターンコードから勘定科目を自動判断することにより、案件コードに応じた仕訳情報を作成できるようにした。 Therefore, in the present embodiment, for example, it is made possible to automatically calculate the proportional division ratio for each case from the personnel history of the employee. Further, in the present embodiment, for example, the personnel expenses for each case are calculated by proportionally dividing the salary amount for employees using the proportional division rate, and on the other hand, by automatically determining the account item from the journal pattern code, It is now possible to create journal information according to the item code.

このように、案件別収支管理のために人事経歴データを用いて前記按分率を自動算出することで、本実施形態においては、例えば、日報管理や前記按分率の煩雑な見直し等を行わずに、案件別人件費を算出できるようになった。また、本実施形態においては、例えば、社員の人事経歴に紐付けて案件コードおよび仕訳パターンコードを保持することで、案件別収支に関わる情報を、経歴管理により一元管理できるようになった。以下、具体的な構成および動作について説明する。 In this way, by automatically calculating the proportional division ratio using personnel history data for income and expenditure management for each project, in the present embodiment, for example, daily report management and complicated review of the proportional division ratio are not performed. , it became possible to calculate personnel expenses by project. In addition, in the present embodiment, for example, by holding item codes and journalizing pattern codes in association with personnel careers of employees, it is possible to centrally manage information related to income and expenditure for each item through history management. Specific configurations and operations will be described below.

[2.構成]
本実施形態に係る仕訳データ作成装置100の構成の一例について、図1を参照して説明する。図1は、仕訳データ作成装置100の構成の一例を示すブロック図である。
[2. composition]
An example of the configuration of the journalizing data creation device 100 according to this embodiment will be described with reference to FIG. FIG. 1 is a block diagram showing an example of the configuration of the journal data creation device 100. As shown in FIG.

仕訳データ作成装置100は、市販のデスクトップ型パーソナルコンピュータである。なお、仕訳データ作成装置100は、デスクトップ型パーソナルコンピュータのような据置型情報処理装置に限らず、市販されているノート型パーソナルコンピュータ、PDA(Personal Digital Assistants)、スマートフォン、タブレット型パーソナルコンピュータなどの携帯型情報処理装置であってもよい。 The journal data creation device 100 is a commercially available desktop personal computer. In addition, the journalizing data creation device 100 is not limited to a stationary information processing device such as a desktop personal computer, but can be a portable personal computer such as a commercially available notebook personal computer, PDA (Personal Digital Assistants), a smart phone, a tablet personal computer, etc. type information processing device.

仕訳データ作成装置100は、制御部102と通信インターフェース部104と記憶部106と入出力インターフェース部108と、を備えている。仕訳データ作成装置100が備えている各部は、任意の通信路を介して通信可能に接続されている。 The journalizing data creation device 100 includes a control section 102 , a communication interface section 104 , a storage section 106 and an input/output interface section 108 . Each unit included in the journalizing data creation device 100 is communicably connected via an arbitrary communication path.

通信インターフェース部104は、ルータ等の通信装置および専用線等の有線または無線の通信回線を介して、仕訳データ作成装置100をネットワーク300に通信可能に接続する。通信インターフェース部104は、他の装置と通信回線を介してデータを通信する機能を有する。ここで、ネットワーク300は、仕訳データ作成装置100とサーバ200とを相互に通信可能に接続する機能を有し、例えばインターネットやLAN(Local Area Network)等である。なお、後述する各種マスタ等のデータは、例えばサーバ200に格納されてもよい。 The communication interface unit 104 communicably connects the journalizing data creation device 100 to the network 300 via a communication device such as a router and a wired or wireless communication line such as a dedicated line. The communication interface unit 104 has a function of communicating data with another device via a communication line. Here, the network 300 has a function of connecting the journalizing data creation device 100 and the server 200 so that they can communicate with each other, and is, for example, the Internet or a LAN (Local Area Network). Data such as various masters described later may be stored in the server 200, for example.

入出力インターフェース部108には、入力装置112および出力装置114が接続されている。出力装置114には、モニタ(家庭用テレビを含む)の他、スピーカやプリンタを用いることができる。入力装置112には、キーボード、マウス、及びマイクの他、マウスと協働してポインティングデバイス機能を実現するモニタを用いることができる。なお、以下では、出力装置114をモニタ114とし、入力装置112をキーボード112またはマウス112として記載する場合がある。 An input device 112 and an output device 114 are connected to the input/output interface section 108 . The output device 114 can be a monitor (including a home television), a speaker, or a printer. The input device 112 can be a keyboard, a mouse, a microphone, or a monitor that realizes a pointing device function in cooperation with a mouse. Note that, hereinafter, the output device 114 may be referred to as the monitor 114 and the input device 112 may be referred to as the keyboard 112 or the mouse 112 .

記憶部106には、各種のデータベース、テーブルおよびファイルなどが格納される。記憶部106には、OS(Operating System)と協働してCPU(Central Processing Unit)に命令を与えて各種処理を行うためのコンピュータプログラムが記録される。記憶部106として、例えば、RAM(Random Access Memory)・ROM(Read Only Memory)等のメモリ装置、ハードディスクのような固定ディスク装置、フレキシブルディスク、および光ディスク等を用いることができる。 The storage unit 106 stores various databases, tables, files, and the like. The storage unit 106 stores a computer program for performing various processes by giving commands to a CPU (Central Processing Unit) in cooperation with an OS (Operating System). As the storage unit 106, for example, memory devices such as RAM (Random Access Memory) and ROM (Read Only Memory), fixed disk devices such as hard disks, flexible disks, and optical disks can be used.

記憶部106は、例えば、本務情報106aと、兼務情報106bと、按分率情報106cと、仕訳データ106dと、を備えている。 The storage unit 106 includes, for example, main job information 106a, concurrent job information 106b, proportional division ratio information 106c, and journal data 106d.

以下においては、「大阪 建築部 工事課 A作業所」における案件CD「AAAAA」の業務を本務とする社員CD「1111」の社員(以下、「社員1」という。)と、「大阪 建築部 工事課 B作業所」における案件CD「BBBBB」の業務を本務とし、「大阪 建築部 工事課 C作業所およびD作業所」における案件CD「CCCCC」および「DDDDD」の業務を兼務とする社員CD「2222」の社員(以下、「社員2」という。)と、「大阪 建築部 事務G」における業務を本務とし、「大阪 経理部」における業務を兼務とする社員CD「3333」の社員(以下、「社員3」という。)と、の3人を例にとり、説明を進める。 In the following, an employee of employee CD "1111" (hereinafter referred to as "employee 1") whose main work is project CD "AAAAA" at "Osaka Construction Department Construction Section A Workplace" and "Osaka Construction Department Construction Employee CD " 2222” employee (hereinafter referred to as “Employee 2”), and an employee CD “3333” whose main job is “Osaka Construction Department Administrative G” and concurrently works at “Osaka Accounting Department” (hereinafter referred to as “Employee 2”). (referred to as "employee 3"), and , as an example, to proceed with the explanation.

本務情報106aは、社員の本務に関する情報であり、社員一人一人について必ず発生する経歴である。社員1~社員3はすべて、図3に示すように、本務情報106aを有する。本務情報106aは、図3に示すように、例えば、社員を識別するための社員識別データ(社員CD)、社員の業務経歴(発令日)、経歴区分、前記社員の業務を識別するための業務識別データ(本務所属名および案件CD)、前記業務経歴を元にした仕訳データ106dにおいて前記業務に対応する勘定科目を識別するための勘定科目識別データ(仕訳パターンCD)および備考等を含む。 The regular business information 106a is information related to the regular business of the employee, and is a history that always occurs for each employee. Employees 1 to 3 all have regular business information 106a, as shown in FIG. As shown in FIG. 3, the main job information 106a includes, for example, employee identification data (employee CD) for identifying an employee, employee's work history (issued date), career classification, work for identifying the work of the employee. It includes identification data (main job affiliation name and project CD), account item identification data (journal pattern CD) for identifying the account item corresponding to the business in the journal data 106d based on the work history, remarks, and the like.

兼務情報106bは、社員の兼務に関する情報であり、社員が複数案件にまたがる場合(事務部門の兼務も含む)に発生する経歴である。このため、複数案件にまたがならい社員については、兼務情報106bは発生しない。社員1は本務のみを有し兼務を有さないため、社員2および社員3のみが、図3に示すように、兼務情報106bを有する。兼務情報106bは、図3に示すように、例えば、前記社員識別データ(社員CD)、前記業務経歴(発令日)、前記経歴区分、前記業務識別データ(兼務所属名および案件CD)、前記勘定科目識別データ(仕訳パターンCD)および備考等を含む。 The concurrent job information 106b is information about an employee's concurrent job, and is a history that occurs when an employee has multiple projects (including concurrent jobs in an administrative department). Therefore, the concurrent job information 106b is not generated for an employee who has multiple projects. Since employee 1 has only a main job and no concurrent jobs, only employees 2 and 3 have concurrent job information 106b, as shown in FIG. As shown in FIG. 3, the concurrent job information 106b includes, for example, the employee identification data (employee CD), the work history (issued date), the career classification, the work identification data (department name and project CD), the account Includes item identification data (journal pattern CD) and remarks.

前記業務経歴について説明する。前記業務経歴とは、例えば、前記業務についての発令日を元に計算される前記業務についての従事日数である。また、前記社員が複数の業務に従事した場合においては、前記業務経歴は、例えば、前記複数の業務それぞれについての従事期間(従事日数)である業務毎期間(業務毎日数)である。社員1~3を例にとって、前記従事日数の計算の仕方を説明する。 The work history will be explained. The work history is, for example, the number of days engaged in the work calculated based on the date of issue of the work. Further, when the employee has engaged in a plurality of tasks, the work history is, for example, the period of each task (the number of days of work), which is the period of engagement (number of days of engagement) for each of the plurality of tasks. Taking employees 1 to 3 as an example, how to calculate the number of working days will be explained.

社員1についての従事日数の計算の仕方を説明する。図3の本務情報106aに示すように、「大阪 建築部 工事課 A作業所」における案件CD「AAAAA」の業務についての発令日は「2017/4/1」である。この場合、社員1が当該業務に従事する4月中の従事日数は、図4の「期間算出イメージ1」に示すように、4月1日から4月31日までの「31日」となる。 A method of calculating the number of working days for employee 1 will be explained. As shown in the main work information 106a in FIG. 3, the date of issue for the work of project CD "AAAA" in "Osaka Construction Department Construction Section A Workplace" is "2017/4/1". In this case, the number of working days in April when employee 1 is engaged in the work is "31 days" from April 1st to April 31st, as shown in "period calculation image 1" in FIG. .

社員2についての従事日数の計算の仕方を説明する。図3の本務情報106aに示すように、「大阪 建築部 工事課 B作業所」における案件CD「BBBBB」の業務についての発令日は「2017/4/1」である。この場合、社員2が当該業務に従事する4月中の従事日数は、図4の「期間算出イメージ2」に示すように、4月1日から4月31日までの「31日」となる。また、図3の兼務情報106bに示すように、「大阪 建築部 工事課 C作業所」における案件CD「CCCCC」の業務についての発令日は「2017/4/1」であり、解除の発令日は「2017/4/16」である。この場合、社員2が当該業務に従事する4月中の日数は、図4の「期間算出イメージ2」に示すように、4月1日から4月15日までの「15日」となる。そして、図3の兼務情報106bに示すように、「大阪 建築部 工事課D作業所」における案件CD「DDDDD」の業務についての発令日は「2017/4/16」である。この場合、社員2が当該業務に従事する4月中の日数は、図4の「期間算出イメージ2」に示すように、4月16日から4月31日までの「16日」である。 Explain how to calculate the number of working days for employee 2. As shown in the main work information 106a of FIG. 3, the date of issue of the business of project CD "BBBBB" in "Osaka Building Department Construction Section B Workplace" is "2017/4/1". In this case, the number of working days in April when employee 2 is engaged in the work is "31 days" from April 1st to April 31st, as shown in "period calculation image 2" in FIG. . Also, as shown in the concurrent job information 106b in FIG. is "2017/4/16". In this case, the number of days in April that the employee 2 is engaged in the work is "15 days" from April 1st to April 15th, as shown in the "Period calculation image 2" in FIG. Then, as shown in the concurrent job information 106b in FIG. 3, the issue date for the work of the project CD "DDDDD" in "workplace D, construction department, construction section, Osaka" is "2017/4/16". In this case, the number of days in April during which the employee 2 is engaged in the work is "16 days" from April 16th to April 31st, as shown in the "Period calculation image 2" in FIG.

社員3についての従事日数の計算の仕方を説明する。図3の本務情報106aに示すように、「大阪 建築部 事務G」における業務についての発令日は「2017/4/1」である。この場合、社員3が当該業務に従事する4月中の日数は、図4の「期間算出イメージ3」に示すように、4月1日から4月31日までの「31日」となる。また、図3の兼務情報106bに示すように、「大阪 経理部」における業務についての発令日は「2017/4/1」である。この場合、社員3が当該業務に従事する4月中の日数は、図4の「期間算出イメージ3」に示すように、4月1日から4月31日までの「31日」となる。 The method of calculating the number of working days for employee 3 will be explained. As shown in the main work information 106a of FIG. 3, the date of issue of the work in "Osaka Architectural Department Clerical G" is "2017/4/1". In this case, the number of days in April during which the employee 3 is engaged in the work is "31 days" from April 1st to April 31st, as shown in the "Period calculation image 3" in FIG. Further, as shown in the concurrent job information 106b in FIG. 3, the date of issue of the work in the "Osaka Accounting Department" is "2017/4/1". In this case, the number of days in April during which the employee 3 is engaged in the work is "31 days" from April 1st to April 31st, as shown in the "Period calculation image 3" in FIG.

前記業務識別データについて説明する。前記業務識別データは、前記社員が従事する業務を識別できるデータであればいかなるものであってもよいが、例えば、前記社員の所属を識別するための所属識別データ(本務所属名および兼務所属名)ならびに前記社員が従事する案件を識別するための案件識別データ(案件CD)等である。 The business identification data will be explained. The work identification data may be any data as long as it can identify the work that the employee is engaged in. ) and case identification data (case CD) for identifying the case in which the employee is engaged.

前記仕訳パターンCDについて説明する。前記仕訳パターンCDとしては、例えば、勘定科目「間接人件費」を識別するためのデータ(図3の仕訳パターンCD:1)、勘定科目「未成工事支出金」を識別するためのデータ(図3の仕訳パターンCD:2)および勘定科目「完成工事原価」を識別するためのデータ(図3の仕訳パターンCD:3)等があげられる。ある案件(工事)が終了した場合には、仕訳パターンCDは、2から3となる。例えば、図3の兼務情報106bにおいては、案件CD「CCCCC」で特定される工事については、解除の発令日が「2017/4/16」であることから、当該工事は既に完了していることがわかる。このため、案件CD「CCCCC」についての仕訳パターンCDは、図3の兼務情報106bに示すように、2から3へと変更されている。言い換えると、所属付随情報が同一案件で未成工事支出金から完成工事原価に変更になる場合は、所属情報が改定される。 The journalizing pattern CD will be described. As the journal pattern CD, for example, data for identifying the account item "indirect labor cost" (journal pattern CD: 1 in FIG. 3), data for identifying the account item "incomplete construction expenditure" (FIG. 3 journal entry pattern CD: 2) and data for identifying the account item "completion work cost" (journal entry pattern CD: 3 in FIG. 3). When a certain project (construction work) is completed, the journal pattern CD will be from 2 to 3. For example, in the concurrent job information 106b in FIG. 3, the construction specified by the project CD "CCCCC" has already been completed because the cancellation date is "2017/4/16". I understand. Therefore, the journalizing pattern CD for the matter CD "CCCCC" is changed from 2 to 3, as shown in the concurrent job information 106b in FIG. In other words, when the affiliation incidental information is changed from unfinished construction expenditure to completed construction cost for the same project, the affiliation information is revised.

按分率情報106cは、社員が前記業務に従事した期間に対応する按分率等を含む情報である。按分率情報106cは、図4に示すように、例えば、前記社員識別データ(社員CD)、前記業務経歴の合計(分母日数)、前記業務経歴(分子日数)、前記按分率、前記業務識別データ(発生部門および案件CD)ならびに前記勘定科目識別データ(仕訳パターンCD)等を含む。前記按分率は、前記業務経歴に基づいて算出することができる(当該算出の仕方の詳細は、以下の[3.処理の具体例]で説明する)。 The proportional division ratio information 106c is information including the proportional division ratio corresponding to the period in which the employee engaged in the work. As shown in FIG. 4, the apportionment rate information 106c includes, for example, the employee identification data (employee CD), the total work history (denominator days), the work history (numerator days), the apportionment rate, and the work identification data (Occurring department and matter CD) and the account item identification data (journal pattern CD). The proportional division rate can be calculated based on the work history (details of the calculation method will be described in [3. Specific example of processing] below).

仕訳データ106dは、社員が従事する業務それぞれに対応する人件費等を含む仕訳のデータである。仕訳データ106dは、図5に示すように、例えば、貸方科目、貸方金額、借方科目、借方の部門、借方の案件CDおよび借方金額等を含む。図5の仕訳データ106dにおける詳細は、以下の[3.処理の具体例]で説明するが、概要としては、以下のとおりである。すなわち、図5の上段の仕訳データ106dにおいては、「部門:大阪 建築部」および「案件CD:AAAAA」で特定される業務に対応する人件費として「200,000円」が含まれている。また、図5の中段の仕訳データ106dにおいては、「部門:大阪 建築部」および「案件CD:BBBBB」で特定される業務に対応する人件費として「100,000円」が含まれており、「部門:大阪 建築部」および「案件CD:CCCCC」で特定される業務に対応する人件費として「48,000円」が含まれており、「部門:大阪 建築部」および「案件CD:DDDDD」で特定される業務に対応する人件費として「52,000円」が含まれている。そして、図5の下段の仕訳データ106dにおいては、「部門:大阪 建築部」で特定される業務に対応する人件費として「100,000円」が含まれており、「部門:大阪 経理部」で特定される業務に対応する人件費として「100,000円」が含まれている。 The journal data 106d is journal data including personnel expenses and the like corresponding to each work performed by an employee. The journal data 106d, as shown in FIG. 5, includes, for example, a credit item, a credit amount, a debit item, a debit department, a debit case CD, and a debit amount. Details of the journal data 106d in FIG. 5 are described in [3. Specific example of processing], but the outline is as follows. That is, the journal data 106d in the upper part of FIG. 5 includes "200,000 yen" as personnel expenses corresponding to the work identified by "Department: Osaka Construction Department" and "Project CD: AAAAA". In addition, the journal data 106d in the middle of FIG. 5 includes “100,000 yen” as personnel expenses corresponding to the work specified by “Department: Osaka Construction Department” and “Project CD: BBBBB”, and “Department : Osaka Construction Department" and "Project CD: CCCCC" include "48,000 yen" as personnel expenses corresponding to the work specified in "Department: Osaka Construction Department" and "Project CD: DDDDD". “52,000 yen” is included as personnel expenses corresponding to the work done by the company. In the journal data 106d in the lower part of FIG. 5, "100,000 yen" is included as the labor cost corresponding to the work specified by "Department: Osaka Construction Department", and is specified by "Department: Osaka Accounting Department". "100,000 yen" is included as personnel expenses corresponding to the work done.

制御部102は、仕訳データ作成装置100を統括的に制御するCPU等である。制御部102は、OS等の制御プログラム・各種の処理手順等を規定したプログラム・所要データなどを格納するための内部メモリを有し、格納されているこれらのプログラムに基づいて種々の情報処理を実行する。 The control unit 102 is a CPU or the like that controls the journal data creation device 100 in an integrated manner. The control unit 102 has an internal memory for storing a control program such as an OS, a program defining various processing procedures, required data, and the like, and performs various information processing based on these stored programs. Execute.

制御部102は、機能概念的に、例えば、(1)前記業務に従事した期間に対応する按分率を前記記憶部中の業務経歴に基づいて算出する按分率算出手段としての按分率算出部102aと、(2)前記社員に関する給与金額と、当該給与金額を前記按分率算出手段で算出した前記按分率に基づいて按分した按分金額と、前記記憶部中の業務識別データと、当該業務識別データと紐付く前記記憶部中の勘定科目識別データで特定される勘定科目と、を含む仕訳データを作成する仕訳データ作成手段としての仕訳データ作成部102bと、を備えている。なお、各部が実行する処理の詳細については、以下の[3.処理の具体例]で説明する。 The control unit 102 functionally and conceptually includes, for example: (1) a proportional division ratio calculation unit 102a as a proportional division ratio calculation unit that calculates the proportional division ratio corresponding to the period of time engaged in the work based on the work history in the storage unit; and (2) a salary amount for said employee, a proportional division amount obtained by dividing said salary amount proportionally based on said proportional division ratio calculated by said proportional division ratio calculating means, task identification data in said storage unit, and said task identification data. and a journal data creation unit 102b as a journal data creation means for creating journal data including the account item specified by the account item identification data in the storage unit linked with. Details of the processing executed by each unit are described in [3. Specific example of processing].

[3.処理の具体例]
以下、本実施形態に係る処理の具体例について、図2~図5を用いて詳細に説明する。本実施形態に係る処理の概要としては、図2に示すように、まず、社員の経歴データ(本務情報106aおよび兼務情報106b)として[2.構成]で説明した内容を登録し、次に、以下の[3-1]で詳細に説明するように按分率の算出を行うことにより配賦データを作成し、最後に、以下の[3-2]で詳細に説明するように当該作成した配賦データを元にして仕訳データの作成を行う。按分率の算出の仕方の概要としては、各社員に案件CDおよび仕訳パターンCD(原価区分)を紐付けて管理している本務情報106aおよび兼務情報106bから、前記各社員が携わる案件の案件CDと紐付く経歴(発令日)を取得し、分子日数を計算する。そして、当該分子日数を用いて、1カ月の勤務期間内における各案件についての按分率を算出する。仕訳データの作成の概要としては、各案件に紐付く按分率(配賦率)および仕訳パターンCD(原価区分)等から仕訳データを作成する。
[3. Specific example of processing]
A specific example of the processing according to the present embodiment will be described in detail below with reference to FIGS. 2 to 5. FIG. As an overview of the processing according to this embodiment, as shown in FIG. 2, first, [2. configuration], then create allocation data by calculating the proportional distribution ratio as described in detail in [3-1] below, and finally, in [3- 2], journal data is created based on the created allocation data. As an overview of how to calculate the apportionment ratio, the project CD of the project in which each employee is involved is obtained from the main job information 106a and secondary job information 106b, which are managed by linking the project CD and the journal pattern CD (cost category) to each employee. Acquire the history (issued date) associated with and calculate the number of days. Then, using the number of days in the numerator, the apportionment rate is calculated for each case within the working period of one month. As an overview of the creation of journal data, journal data is created from the proportional division rate (allocation rate) and journal pattern CD (cost division) associated with each case.

なお、前提条件として、本務情報106aおよび兼務情報106bにおける具体的内容は、図3に示すとおりであるとする。また、[2.構成]で説明したように、仕訳パターンCD1で特定される勘定科目は「間接人件費」、仕訳パターンCD2で特定される勘定科目は「未成工事支出金」、仕訳パターンCD3で特定される勘定科目は「完成工事原価」であるとする。 As a prerequisite, the specific contents of the main job information 106a and the concurrent job information 106b are as shown in FIG. Also, [2. Configuration], the account item specified by the journal pattern CD1 is "indirect personnel expenses", the account item specified by the journal pattern CD2 is "uncompleted construction expenditure", and the account item specified by the journal pattern CD3. is the “completed construction cost”.

[3-1.按分率の算出]
按分率算出部102aは、業務に従事した期間に対応する按分率を記憶部106中の業務経歴(従事日数)に基づいて算出する。本項目では、社員1~3についての按分率の算出の仕方を例にとって説明する。
[3-1. Proportion calculation]
The proportional division ratio calculation unit 102a calculates the proportional division ratio corresponding to the period of time engaged in work based on the work history (number of days worked) in the storage unit 106. FIG. In this item, the method of calculating the proportional division ratio for employees 1 to 3 will be described as an example.

本項目での処理の概要としては、本務情報106aおよび兼務情報106bから、給与計算期間(1カ月)における前記従事日数の算出を行い、各々の前記従事日数の合計を分母に、各々の前記従事日数を分子にして按分率を算出し、更に、当該算出した按分率と紐付く案件CDおよび仕訳パターンCDの特定を行う。 As an overview of the processing in this item, the number of working days in the salary calculation period (one month) is calculated from the main work information 106a and the concurrent work information 106b, A proportional division ratio is calculated using the number of days as the numerator, and the matter CD and journal pattern CD associated with the calculated proportional division ratio are specified.

(1)社員1についての按分率の算出
[2.構成]で説明したように、社員1が従事した「大阪 建築部 工事課 A作業所」における案件CD「AAAAA」の業務についての従事日数は、「31日」である。このため、按分率算出部102aは、「大阪 建築部 工事課 A作業所」における案件CD「AAAAA」の業務についての按分率を31日÷31日×100=100%と算出する。そして、当該算出した按分率および本務情報106aにおける情報を含む按分率情報106c(図4の上段に示す)が作成される。なお、按分率情報106cは、配賦データと同義である。
(1) Calculation of proportional division ratio for employee 1 [2. structure], the number of days engaged in work for project CD "AAAAA" in "Workplace A, Construction Department, Construction Section, Osaka" in which employee 1 was engaged is "31 days". Therefore, the apportionment rate calculation unit 102a calculates the apportionment rate for the work of project CD "AAAA" in "workplace A, construction department, construction section, Osaka" as follows: 31 days/31 days x 100 = 100%. Then, the proportional division ratio information 106c (shown in the upper part of FIG. 4) including the information in the calculated proportional division ratio and the main job information 106a is created. Note that the proportional division ratio information 106c is synonymous with allocation data.

(2)社員2についての按分率の算出
[2.構成]で説明したように、社員2が従事した「大阪 建築部 工事課 B作業所」における案件CD「BBBBB」の業務についての従事日数は、「31日」であり、社員2が従事した「大阪 建築部 工事課 C作業所」における案件CD「CCCCC」の業務についての従事日数は「15日」であり、社員2が従事した「大阪 建築部 工事課 D作業所」における案件CD「DDDDD」の業務についての従事日数は、「16日」である。このように、社員が複数の業務に従事した場合においては、按分率算出部102aは、業務毎期間(各業務についての従事日数)を前記業務毎期間の合計で割った値に100を掛けることにより、前記複数の業務それぞれに対応する按分率を算出する。
(2) Calculation of proportional division ratio for employee 2 [2. structure], the number of days worked for the project CD "BBBBB" in "Osaka Construction Department Construction Section B Workplace" where employee 2 was engaged was "31 days", and employee 2 was engaged in " The number of working days for the project CD "CCCCC" at Osaka Construction Department Construction Section C Workplace is "15 days", and the project CD "DDDDD" at "Osaka Construction Department Construction Section D Workplace" where employee 2 was engaged. is "16 days". In this way, when an employee is engaged in a plurality of tasks, the proportional division ratio calculation unit 102a divides the period for each task (the number of days of work for each task) by the total of the periods for each task, and multiplies the value by 100. , the proportional division ratio corresponding to each of the plurality of tasks is calculated.

具体的には、按分率算出部102aは、「大阪 建築部 工事課 B作業所」における案件CD「BBBBB」の業務についての按分率を31日÷(31日+15日+16日)×100=50%と算出し、「大阪 建築部 工事課 C作業所」における案件CD「CCCCC」の業務についての按分率を15日÷(31日+15日+16日)×100≒24%と算出し、「大阪 建築部 工事課 D作業所」における案件CD「DDDDD」についての按分率を16日÷(31日+15日+16日)×100≒26%と算出する。そして、当該算出した按分率ならびに本務情報106aおよび兼務情報106bにおける情報を含む按分率情報106c(図4の中段に示す)が作成される。 Specifically, the apportionment rate calculation unit 102a calculates the apportionment rate for the work of project CD "BBBBB" in "workshop B, construction department, construction department, Osaka" by 31 days/(31 days + 15 days + 16 days) x 100 = 50. 15 days ÷ (31 days + 15 days + 16 days) × 100 ≒ 24% The apportionment rate for project CD "DDDDD" in Construction Department Construction Section D Workplace" is calculated as follows: 16 days ÷ (31 days + 15 days + 16 days) x 100 ≈ 26%. Then, the proportional division ratio information 106c (shown in the middle of FIG. 4) including the calculated proportional division ratio and the information in the main job information 106a and the concurrent job information 106b is created.

(3)社員3についての按分率の算出
[2.構成]で説明したように、社員3が従事した「大阪 建築部 事務G」における業務についての従事日数は、「31日」であり、「大阪 経理部」における業務についての従事日数は「31日」である。このように、社員が複数の業務に従事した場合においては、按分率算出部102aは、業務毎期間(各業務についての従事日数)を前記業務毎期間の合計で割った値に100を掛けることにより、前記複数の業務それぞれに対応する按分率を算出する。
(3) Calculation of proportional division ratio for employee 3 [2. Structure], the number of days worked for the work in "Osaka Construction Department Office G" in which employee 3 was engaged was "31 days", and the number of days worked for the work in "Osaka Accounting Department" was "31 days". ”. In this way, when an employee is engaged in a plurality of tasks, the proportional division ratio calculation unit 102a divides the period for each task (the number of days of work for each task) by the total of the periods for each task, and multiplies the value by 100. , the proportional division ratio corresponding to each of the plurality of tasks is calculated.

具体的には、按分率算出部102aは、「大阪 建築部 事務G」における業務についての按分率を31日÷(31日+31日)×100=50%と算出し、「大阪 経理部」における業務ついての按分率を31日÷(31日+31日)×100=50%と算出する。そして、当該算出した按分率ならびに本務情報106aおよび兼務情報106bにおける情報を含む按分率情報106c(図4の下段に示す)が作成される。 Specifically, the proportional division ratio calculation unit 102a calculates the proportional division ratio for the work in “Osaka Construction Department Office G” as 31 days ÷ (31 days + 31 days) × 100 = 50%, The apportionment rate for work is calculated as 31 days/(31 days + 31 days) x 100 = 50%. Then, the proportional division ratio information 106c (shown in the lower part of FIG. 4) including the calculated proportional division ratio and the information in the main job information 106a and the concurrent job information 106b is created.

[3-2.仕訳データの作成]
仕訳データ作成部102bは、社員に関する給与金額と、当該給与金額を按分率算出部102aで算出した按分率に基づいて按分した按分金額と、記憶部106中の業務識別データと、当該業務識別データと紐付く記憶部106中の勘定科目識別データ(仕訳パターンCD)で特定される勘定科目と、を含む仕訳データ106dを作成する。本項目では、社員1~3についての仕訳データの作成の仕方を例にとって説明する。なお、図5の左側に示す3つの按分率情報106cは、それぞれ、[3-1]で作成した按分率情報106cにおける分母日数および分子日数を切り取ったものである。
[3-2. Create Journal Data]
The journal data creation unit 102b prepares the salary amount for the employee, the apportionment amount obtained by proportionally dividing the salary amount based on the apportionment ratio calculated by the apportionment ratio calculation unit 102a, the work identification data in the storage unit 106, and the work identification data. and the account item specified by the account item identification data (journal pattern CD) in the storage unit 106 associated with the journal data 106d. In this item, the method of creating journal data for employees 1 to 3 will be explained as an example. The three proportional division ratio information 106c shown on the left side of FIG. 5 are obtained by cutting out the denominator days and the numerator days in the proportional division ratio information 106c created in [3-1].

本項目での処理の概要としては、按分率、発生部門、案件CDおよび仕訳パターンCDから、仕訳を発生させる。 As an overview of the processing in this item, journal entries are generated from the apportionment rate, generating department, matter CD and journal entry pattern CD.

(1)社員1についての仕訳データ
社員1についての4月の給与金額は、200,000円であるとする。この場合、200,000円を[3-1]の(1)で算出した按分率100%で按分すると、「大阪 建築部 工事課 A作業所」における案件CD「AAAAA」の業務についての按分金額は、200,000円となる。また、社員1についての業務識別データは、図3の本務情報106aを参照すると、本務所属名「大阪 建築部」および案件CD「AAAAA」である。そして、本務所属名「大阪 建築部」および案件CD「AAAAA」と紐付く記憶部106中の仕訳パターンCDは、図3の本務情報106aを参照すると、「2」であるため、本務所属名「大阪 建築部」および案件CD「AAAAA」で特定される業務についての勘定科目は「未成工事支出金」となる。
(1) Journal data for employee 1 Assume that the salary for employee 1 in April is 200,000 yen. In this case, if 200,000 yen is apportioned at the apportionment rate of 100% calculated in (1) of [3-1], the apportionment amount for the project CD "AAAA" in "Osaka Construction Department Construction Section A Workplace" will be: 200,000 yen. Further, the job identification data for the employee 1 is, referring to the main job information 106a in FIG. Then, the journal pattern CD in the storage unit 106 that is associated with the main job affiliation name "Osaka Construction Department" and the project CD "AAAAA" is "2" when referring to the main job information 106a of FIG. The account item for the work specified in "Osaka Construction Department" and project CD "AAAAA" is "expenditure on uncompleted construction".

以上より、仕訳データ作成部102bは、図5の上段の仕訳データ106dを作成する。当該仕訳データには、貸方として、前記給与金額200,000円が含まれている。また、当該仕訳データには、借方として、按分金額200,000円と、本務所属名「大阪 建築部」および案件CD「AAAAA」と、勘定科目「未成工事支出金」と、が含まれている。 As described above, the journal data creating unit 102b creates the journal data 106d shown in the upper part of FIG. The journal entry data includes the salary amount of 200,000 yen as a credit. The journal data also includes, as debits, the apportioned amount of 200,000 yen, the name of the main job affiliation "Osaka Architectural Department", the project CD "AAAA", and the account item "expenditure on uncompleted construction".

(2)社員2についての仕訳データ
社員2についての4月の給与金額は、200,000円であるとする。この場合、200,000円を[3-1]の(2)で算出した按分率50%、24%および26%で按分すると、「大阪 建築部 工事課 B作業所」における案件CD「BBBBB」の業務についての按分金額は100,000円となり、「大阪 建築部 工事課 C作業所」における案件CD「CCCCC」の業務についての按分金額は48,000円となり、「大阪 建築部 工事課 D作業所」における案件CD「DDDDD」の業務についての按分金額は52,000円となる。また、社員2についての業務識別データは、図3の本務情報106aを参照すると、本務所属名「大阪 建築部」および案件CD「BBBBB」であり、図3の兼務情報106bを参照すると、兼務所属名「大阪 建築部」および案件CD「CCCCC」ならびに兼務所属名「大阪 建築部」および案件CD「DDDDD」である。そして、本務所属名「大阪 建築部」および案件CD「BBBBB」と紐付く記憶部106中の仕訳パターンCDは、図3の本務情報106aを参照すると、「2」であるため、本務所属名「大阪 建築部」および案件CD「BBBBB」で特定される業務についての勘定科目は「未成工事支出金」となる。更に、兼務所属名「大阪 建築部」および案件CD「CCCCC」と紐付く記憶部106中の仕訳パターンCDは、図3の兼務情報106bを参照すると、「3」であるため、兼務所属名「大阪 建築部」および案件CD「CCCCC」で特定される業務についての勘定科目は「完成工事原価」となる。更に、兼務所属名「大阪 建築部」および案件CD「DDDDD」と紐付く記憶部106中の仕訳パターンCDは、図3の兼務情報106bを参照すると、「2」であるため、兼務所属名「大阪 建築部」および案件CD「DDDDD」で特定される業務についての勘定科目は「未成工事支出金」となる。
(2) Journal data for employee 2 Assume that the salary for employee 2 in April is 200,000 yen. In this case, if 200,000 yen is apportioned by the apportionment ratios of 50%, 24%, and 26% calculated in (2) of [3-1], the work of project CD "BBBBB" in "Osaka Construction Department Construction Section B Workplace" will be 100,000 yen, and the apportioned amount for the project CD "CCCCC" in "Osaka Construction Department Construction Section C Workplace" will be 48,000 yen, and the project CD " DDDDD”, the apportioned amount will be 52,000 yen. Further, the work identification data for employee 2 is, referring to the main work information 106a in FIG. The name is “Osaka Architectural Department” and the project CD is “CCCCC”, and the name of concurrent affiliation is “Osaka Architectural Department” and the project CD is “DDDDD”. Then, the journal pattern CD in the storage unit 106 associated with the main job affiliation name "Osaka Construction Department" and the project CD "BBBBB" is "2" when referring to the main job information 106a of FIG. The account item for the work specified in "Osaka Construction Department" and the project CD "BBBBB" is "Unfinished construction expenditure". Furthermore, the journal pattern CD in the storage unit 106 associated with the concurrent affiliation name “Osaka Construction Department” and the project CD “CCCCC” is “3” when referring to the concurrent affiliation information 106b in FIG. The account item for the work specified in "Osaka Construction Department" and project CD "CCCCC" is "Completed construction cost". Furthermore, the journal pattern CD in the storage unit 106 associated with the concurrent affiliation name “Osaka Construction Department” and the project CD “DDDDD” is “2” when referring to the concurrent affiliation information 106b in FIG. The account item for the work specified in "Osaka Construction Department" and the project CD "DDDDD" is "Expenditure on uncompleted construction work."

以上より、仕訳データ作成部102bは、図5の中段の仕訳データ106dを作成する。当該仕訳データには、貸方として、前記給与金額200,000円が含まれている。また、当該仕訳データの借方の1行目には、按分金額100,000円と、本務所属名「大阪 建築部」および案件CD「BBBBB」と、勘定科目「未成工事支出金」と、が含まれている。そして、当該仕訳データの借方の2行目には、按分金額48,000円と、兼務所属名「大阪 建築部」および案件CD「CCCCC」と、勘定科目「完成工事原価」と、が含まれている。更に、仕訳データの借方の3行目には、按分金額52,000円と、兼務所属名「大阪 建築部」および案件CD「DDDDD」と、勘定科目「未成工事支出金」と、が含まれている。 As described above, the journal data creating unit 102b creates the journal data 106d shown in the middle of FIG. The journal entry data includes the salary amount of 200,000 yen as a credit. In addition, the first line of the debit side of the journal entry data includes the apportioned amount of 100,000 yen, the main job affiliation name "Osaka Construction Department", the project CD "BBBBB", and the account item "Unfinished construction expenditure". there is The second line of the debit side of the journal entry data includes the apportioned amount of 48,000 yen, the name of concurrent affiliation "Osaka Architectural Department", the project CD "CCCCC", and the account item "Completed construction cost". . Furthermore, the third line of the debit side of the journal entry data includes the apportioned amount of 52,000 yen, the name of concurrent affiliation "Osaka Architectural Department", the project CD "DDDDD", and the account item "Unfinished construction expenditure". .

(3)社員3についての仕訳データ
社員3についての4月の給与金額は、200,000円であるとする。この場合、200,000円を[3-1]の(3)で算出した按分率50%および50%で按分すると、「大阪 建築部 事務G」における業務についての按分金額は100,000円となり、「大阪 経理部」における業務についての按分金額も100,000円となる。また、社員3についての業務識別データは、図3の本務情報106aを参照すると、本務所属名「大阪 建築部 事務G」であり、図3の兼務情報106bを参照すると、兼務所属名「大阪 経理部」である。そして、本務所属名「大阪 建築部 事務G」と紐付く記憶部106中の仕訳パターンCDは、図3の本務情報106aを参照すると、「1」であるため、本務所属名「大阪 建築部 事務G」で特定される業務についての勘定科目は「間接人件費」となる。そして、兼務所属名「大阪 経理部」と紐付く記憶部106中の仕訳パターンCDも、図3の兼務情報106bを参照すると、「1」であるため、兼務所属名「大阪 経理部」で特定される業務についての勘定科目も「間接人件費」となる。
(3) Journal data for employee 3 Assume that the salary for employee 3 in April is 200,000 yen. In this case, if 200,000 yen is apportioned at the apportionment ratios of 50% and 50% calculated in (3) of [3-1], the apportionment amount for the work in "Osaka Construction Department Administration G" will be 100,000 yen, and "Osaka Accounting The apportioned amount for the work in the "Department" is also 100,000 yen. Further, the work identification data for employee 3 is the main work affiliation name “Osaka Construction Department Office G” when referring to the main work information 106a in FIG. Department. Then, the journalizing pattern CD in the storage unit 106 associated with the main job affiliation name "Osaka Construction Department Office G" is "1" when referring to the main job information 106a in FIG. The account item for the work specified by G” is “indirect personnel expenses”. Then, the journal pattern CD in the storage unit 106 that is associated with the concurrent affiliation name "Osaka Accounting Department" is also "1" when referring to the concurrent affiliation information 106b in FIG. The account item for the work performed will also be “indirect personnel costs”.

以上より、仕訳データ作成部102bは、図5の下段の仕訳データ106dを作成する。当該仕訳データには、貸方として、前記給与金額200,000円が含まれている。また、当該仕訳データの借方の1行目には、按分金額100,000円と、本務所属名「大阪 建築部」と、勘定科目「間接人件費」と、が含まれている。そして、当該仕訳データの借方の2行目には、按分金額100,000円と、兼務所属名「大阪 経理部」と、勘定科目「間接人件費」と、が含まれている。 As described above, the journal data creating unit 102b creates the journal data 106d shown in the lower part of FIG. The journal entry data includes the salary amount of 200,000 yen as a credit. In addition, the first debit line of the journal entry data includes the apportioned amount of 100,000 yen, the name of the main job affiliation "Osaka Construction Department", and the account item "indirect personnel expenses". The second line of the debit side of the journal entry data includes the apportioned amount of 100,000 yen, the concurrent affiliation name "Osaka Accounting Department", and the account item "indirect personnel expenses".

[3-3.まとめ]
以上、[3-1]および[3-2]で説明したように、本実施形態に係る仕訳データ作成装置100によれば、社員の業務経歴を用いて算出した按分率を用いて社員が従事する業務それぞれに対応する人件費を算出し、当該算出した人件費を含む仕訳データを作成できる。
[3-3. summary]
As described above in [3-1] and [3-2], according to the journalizing data creation device 100 according to the present embodiment, the employee is engaged using the proportional division ratio calculated using the employee's work history It is possible to calculate personnel expenses corresponding to each task to be performed, and create journal data including the calculated personnel expenses.

[4.他の実施形態]
本発明は、上述した実施形態以外にも、特許請求の範囲に記載した技術的思想の範囲内において種々の異なる実施形態にて実施されてよいものである。
[4. Other embodiments]
The present invention may be implemented in various different embodiments other than the embodiments described above within the scope of the technical idea described in the claims.

例えば、実施形態において説明した各処理のうち、自動的に行われるものとして説明した処理の全部または一部を手動的に行うこともでき、あるいは、手動的に行われるものとして説明した処理の全部または一部を公知の方法で自動的に行うこともできる。 For example, among the processes described in the embodiments, all or part of the processes described as being automatically performed can be manually performed, or all of the processes described as being manually performed Alternatively, some can be done automatically by known methods.

また、本明細書中や図面中で示した処理手順、制御手順、具体的名称、各処理の登録データや検索条件等のパラメータを含む情報、画面例、データベース構成については、特記する場合を除いて任意に変更することができる。 In addition, unless otherwise specified, the processing procedures, control procedures, specific names, information including parameters such as registration data and search conditions for each process, screen examples, and database configurations shown in this specification and drawings can be changed arbitrarily.

また、仕訳データ作成装置100に関して、図示の各構成要素は機能概念的なものであり、必ずしも物理的に図示の如く構成されていることを要しない。 Also, with respect to the journalizing data creation device 100, each illustrated component is functionally conceptual, and does not necessarily need to be physically configured as illustrated.

例えば、仕訳データ作成装置100が備える処理機能、特に制御部にて行われる各処理機能については、その全部または任意の一部を、CPUおよび当該CPUにて解釈実行されるプログラムにて実現してもよく、また、ワイヤードロジックによるハードウェアとして実現してもよい。尚、プログラムは、本実施形態で説明した処理を情報処理装置に実行させるためのプログラム化された命令を含む一時的でないコンピュータ読み取り可能な記録媒体に記録されており、必要に応じて仕訳データ作成装置100に機械的に読み取られる。すなわち、ROMまたはHDD(Hard Disk Drive)などの記憶部などには、OSと協働してCPUに命令を与え、各種処理を行うためのコンピュータプログラムが記録されている。このコンピュータプログラムは、RAMにロードされることによって実行され、CPUと協働して制御部を構成する。 For example, the processing functions provided by the journal data creation device 100, especially the processing functions performed by the control unit, are implemented in whole or in part by a CPU and a program interpreted and executed by the CPU. Alternatively, it may be implemented as hardware using wired logic. In addition, the program is recorded on a non-temporary computer-readable recording medium containing programmed instructions for causing the information processing apparatus to execute the processing described in this embodiment, and journalizing data creation as necessary It is read mechanically by the device 100 . That is, a storage unit such as a ROM or HDD (Hard Disk Drive) stores a computer program for giving commands to the CPU in cooperation with the OS to perform various processes. This computer program is executed by being loaded into the RAM and constitutes a control section in cooperation with the CPU.

また、このコンピュータプログラムは、仕訳データ作成装置100に対して任意のネットワークを介して接続されたアプリケーションプログラムサーバに記憶されていてもよく、必要に応じてその全部または一部をダウンロードすることも可能である。 In addition, this computer program may be stored in an application program server connected to the journal data creation apparatus 100 via any network, and it is possible to download all or part of it as necessary. is.

また、本実施形態で説明した処理を実行するためのプログラムを、一時的でないコンピュータ読み取り可能な記録媒体に格納してもよく、また、プログラム製品として構成することもできる。ここで、この「記録媒体」とは、メモリーカード、USB(Universal Serial Bus)メモリ、SD(Secure Digital)カード、フレキシブルディスク、光磁気ディスク、ROM、EPROM(Erasable Programmable Read Only Memory)、EEPROM(登録商標)(Electrically Erasable and Programmable Read Only Memory)、CD-ROM(Compact Disk Read Only Memory)、MO(Magneto-Optical disk)、DVD(Digital Versatile Disk)、および、Blu-ray(登録商標) Disc等の任意の「可搬用の物理媒体」を含むものとする。 Also, the program for executing the processing described in this embodiment may be stored in a non-temporary computer-readable recording medium, or may be configured as a program product. Here, the term "recording medium" refers to memory cards, USB (Universal Serial Bus) memories, SD (Secure Digital) cards, flexible disks, magneto-optical disks, ROMs, EPROMs (Erasable Programmable Read Only Memory), EEPROMs (registered (trademark) (Electrically Erasable and Programmable Read Only Memory), CD-ROM (Compact Disk Read Only Memory), MO (Magneto-Optical disk), DVD (Digital Versatile Disk), and Disc (registered trademark) such as Blu- shall include any "portable physical medium".

また、「プログラム」とは、任意の言語または記述方法にて記述されたデータ処理方法であり、ソースコードまたはバイナリコード等の形式を問わない。なお、「プログラム」は必ずしも単一的に構成されるものに限られず、複数のモジュールやライブラリとして分散構成されるものや、OSに代表される別個のプログラムと協働してその機能を達成するものをも含む。なお、実施形態に示した各装置において記録媒体を読み取るための具体的な構成および読み取り手順ならびに読み取り後のインストール手順等については、周知の構成や手順を用いることができる。 A "program" is a data processing method written in any language or writing method, regardless of the format such as source code or binary code. In addition, the "program" is not necessarily limited to a single configuration, but is distributed as multiple modules or libraries, or cooperates with a separate program represented by the OS to achieve its function. Including things. It should be noted that well-known configurations and procedures can be used for the specific configuration and reading procedure for reading the recording medium in each device shown in the embodiments, the installation procedure after reading, and the like.

記憶部に格納される各種のデータベース等は、RAM、ROM等のメモリ装置、ハードディスク等の固定ディスク装置、フレキシブルディスク、および、光ディスク等のストレージ手段であり、各種処理やウェブサイト提供に用いる各種のプログラム、テーブル、データベース、および、ウェブページ用ファイル等を格納する。 The various databases stored in the storage unit are storage means such as memory devices such as RAM and ROM, fixed disk devices such as hard disks, flexible disks, and optical disks. It stores programs, tables, databases, files for web pages, and so on.

また、仕訳データ作成装置100は、既知のパーソナルコンピュータまたはワークステーション等の情報処理装置として構成してもよく、また、任意の周辺装置が接続された当該情報処理装置として構成してもよい。また、仕訳データ作成装置100は、当該装置に本実施形態で説明した処理を実現させるソフトウェア(プログラムまたはデータ等を含む)を実装することにより実現してもよい。 Further, the journal data creation device 100 may be configured as an information processing device such as a known personal computer or workstation, or may be configured as the information processing device to which any peripheral device is connected. Further, the journal data creation device 100 may be implemented by installing software (including programs or data) that allows the device to implement the processing described in the present embodiment.

更に、装置の分散・統合の具体的形態は図示するものに限られず、その全部または一部を、各種の付加等に応じてまたは機能負荷に応じて、任意の単位で機能的または物理的に分散・統合して構成することができる。すなわち、上述した実施形態を任意に組み合わせて実施してもよく、実施形態を選択的に実施してもよい。 Furthermore, the specific forms of distribution and integration of devices are not limited to those shown in the figures, and all or part of them can be functionally or physically arranged in arbitrary units according to various additions or functional loads. It can be distributed and integrated. In other words, the embodiments described above may be arbitrarily combined and implemented, or the embodiments may be selectively implemented.

本発明は、例えば、業務別の収支管理を行う業界において有用であり、特に、建設工事業界やITメディア業界等において極めて有用である。 INDUSTRIAL APPLICABILITY The present invention is useful, for example, in industries that manage income and expenditure by business, and is particularly useful in the construction industry, the IT media industry, and the like.

100 仕訳データ作成装置
102 制御部
102a 按分率算出部
102b 仕訳データ作成部
104 通信インターフェース部
106 記憶部
106a 本務情報
106b 兼務情報
106c 按分率情報
106d 仕訳データ
108 入出力インターフェース部
112 入力装置
114 出力装置
200 サーバ
300 ネットワーク
100 journal data creation device 102 control unit
102a proportional division ratio calculation unit
102b journal data creation unit 104 communication interface unit 106 storage unit
106a Business Information
106b Concurrent job information
106c Proportion ratio information
106d journal data 108 input/output interface unit 112 input device 114 output device 200 server 300 network

Claims (3)

制御部および記憶部を備える按分率算出装置であって、
前記記憶部には、
社員を識別するための社員識別データと、前記社員の所属先を識別するための所属先識別データと、前記社員が従事する案件を識別するための案件識別データと、前記社員が前記所属先において前記案件への従事を開始する日である従事開始日と、前記社員が前記所属先において前記案件への従事を終了する日である従事終了日と、を含む人事経歴データ
が格納されており、
前記制御部は、
前記人事経歴データ中の前記社員識別データ、前記所属先識別データおよび前記案件識別データの組合せ毎に、前記人事経歴データ中の従事開始日から、当該従事開始日が属する月の月末日または前記人事経歴データ中の従事終了日までの日数を従事日数として算出する従事日数算出手段と、
前記従事日数算出手段で算出した前記組合せ毎の前記従事日数を前記社員識別データ単位で集計した日数で割った値に100を掛けることにより、前記組合せ毎の按分率を算出する按分率算出手段と、
を備えること、
を特徴とする按分率算出装置。
A proportional division ratio calculation device comprising a control unit and a storage unit,
The storage unit contains
Employee identification data for identifying an employee, affiliation identification data for identifying the affiliation of the employee, project identification data for identifying the project that the employee is engaged in, and the employee at the affiliation Personnel history data including an engagement start date, which is the date when the employee starts working on the project, and an engagement end date, which is the date when the employee finishes working on the project at the department, is stored,
The control unit
For each combination of the employee identification data, the department identification data and the project identification data in the personnel history data, from the engagement start date in the personnel history data to the last day of the month to which the engagement start date belongs or working days calculation means for calculating the number of days until the working end date in the history data as working days;
a proportional division ratio calculation means for calculating a proportional division ratio for each combination by multiplying a value obtained by dividing the number of days worked for each combination calculated by the number of days worked calculated by the number of days aggregated in units of the employee identification data by 100; ,
to provide
A proportional division ratio calculation device characterized by:
制御部および記憶部を備える情報処理装置で実行される按分率算出方法であって、
前記記憶部には、
社員を識別するための社員識別データと、前記社員の所属先を識別するための所属先識別データと、前記社員が従事する案件を識別するための案件識別データと、前記社員が前記所属先において前記案件への従事を開始する日である従事開始日と、前記社員が前記所属先において前記案件への従事を終了する日である従事終了日と、を含む人事経歴データ
が格納されており、
前記制御部で実行される、
前記人事経歴データ中の前記社員識別データ、前記所属先識別データおよび前記案件識別データの組合せ毎に、前記人事経歴データ中の従事開始日から、当該従事開始日が属する月の月末日または前記人事経歴データ中の従事終了日までの日数を従事日数として算出する従事日数算出ステップと、
前記従事日数算出ステップで算出した前記組合せ毎の前記従事日数を前記社員識別データ単位で集計した日数で割った値に100を掛けることにより、前記組合せ毎の按分率を算出する按分率算出ステップと、
を含むこと、
を特徴とする按分率算出方法。
A proportional division ratio calculation method executed by an information processing device comprising a control unit and a storage unit,
The storage unit contains
Employee identification data for identifying an employee, affiliation identification data for identifying the affiliation of the employee, project identification data for identifying the project that the employee is engaged in, and the employee at the affiliation Personnel history data including an engagement start date, which is the date when the employee starts working on the project, and an engagement end date, which is the date when the employee finishes working on the project at the department, is stored,
executed by the control unit;
For each combination of the employee identification data, the department identification data and the project identification data in the personnel history data, from the engagement start date in the personnel history data to the last day of the month to which the engagement start date belongs or a work day calculation step for calculating the number of days until the work end date in the history data as work days;
a proportional division rate calculating step of calculating a proportional division rate for each combination by multiplying a value obtained by dividing the number of days worked for each combination calculated in the number of days worked calculated by the number of days aggregated in units of the employee identification data by 100; ,
including
A proportional division ratio calculation method characterized by
制御部および記憶部を備える情報処理装置に実行させるための按分率算出プログラムであって、
前記記憶部には、
社員を識別するための社員識別データと、前記社員の所属先を識別するための所属先識別データと、前記社員が従事する案件を識別するための案件識別データと、前記社員が前記所属先において前記案件への従事を開始する日である従事開始日と、前記社員が前記所属先において前記案件への従事を終了する日である従事終了日と、を含む人事経歴データ
が格納されており、
前記制御部に実行させるための、
前記人事経歴データ中の前記社員識別データ、前記所属先識別データおよび前記案件識別データの組合せ毎に、前記人事経歴データ中の従事開始日から、当該従事開始日が属する月の月末日または前記人事経歴データ中の従事終了日までの日数を従事日数として算出する従事日数算出ステップと、
前記従事日数算出ステップで算出した前記組合せ毎の前記従事日数を前記社員識別データ単位で集計した日数で割った値に100を掛けることにより、前記組合せ毎の按分率を算出する按分率算出ステップと、
を含むこと、
を特徴とする按分率算出プログラム。
A proportional division ratio calculation program to be executed by an information processing device having a control unit and a storage unit,
The storage unit contains
Employee identification data for identifying an employee, affiliation identification data for identifying the affiliation of the employee, project identification data for identifying the project that the employee is engaged in, and the employee at the affiliation Personnel history data including an engagement start date, which is the date when the employee starts working on the project, and an engagement end date, which is the date when the employee finishes working on the project at the department, is stored,
for causing the control unit to execute
For each combination of the employee identification data, the department identification data and the project identification data in the personnel history data, from the engagement start date in the personnel history data to the last day of the month to which the engagement start date belongs or a work day calculation step for calculating the number of days until the work end date in the history data as work days;
a proportional division rate calculating step of calculating a proportional division rate for each combination by multiplying a value obtained by dividing the number of days worked for each combination calculated in the number of days worked calculated by the number of days aggregated in units of the employee identification data by 100; ,
including
A proportional division ratio calculation program characterized by
JP2018056914A 2018-03-23 2018-03-23 Proportion calculation device, proportion calculation method, and proportion calculation program Active JP7240100B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018056914A JP7240100B2 (en) 2018-03-23 2018-03-23 Proportion calculation device, proportion calculation method, and proportion calculation program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018056914A JP7240100B2 (en) 2018-03-23 2018-03-23 Proportion calculation device, proportion calculation method, and proportion calculation program

Publications (2)

Publication Number Publication Date
JP2019168979A JP2019168979A (en) 2019-10-03
JP7240100B2 true JP7240100B2 (en) 2023-03-15

Family

ID=68107449

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018056914A Active JP7240100B2 (en) 2018-03-23 2018-03-23 Proportion calculation device, proportion calculation method, and proportion calculation program

Country Status (1)

Country Link
JP (1) JP7240100B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7431716B2 (en) 2020-11-20 2024-02-15 株式会社オービック Secondment fee calculation device, secondment fee calculation method, and secondment fee calculation program

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
概説書 IBM AS/400 NEW PACKシリーズ 建設業システム Const-PACK/工事原価拡張 初版 ,日本・アイ・ビー・エム株式会社,1993年06月30日,第1版,特にp.3-9,49-54参照

Also Published As

Publication number Publication date
JP2019168979A (en) 2019-10-03

Similar Documents

Publication Publication Date Title
US20060200792A1 (en) Process templates for software creation
JP2022107788A (en) Expense calculation device, expense calculation method and expense calculation program
JP2022140619A (en) Appropriation operation support device, appropriation operation support method, and appropriation operation support program
JP7240100B2 (en) Proportion calculation device, proportion calculation method, and proportion calculation program
JP2024015351A (en) Cost budget/actual management device, cost budget/actual management method, and cost budget/actual management program
JP6827837B2 (en) Project-specific credit management device, project-specific credit management method, and project-specific credit management program
JP6798856B2 (en) Amount calculation device, amount calculation method and amount calculation program
JP7389849B2 (en) Information processing device, information processing method, and information processing program
JP6830835B2 (en) Personnel cost allocation device, personnel cost allocation method and personnel cost allocation program
JP7344190B2 (en) Construction business accounting device, construction business accounting method, and construction business accounting program
JP2020004213A (en) Sales transfer classification apparatus, sales transfer classification method and sales transfer classification program
JP2018139053A (en) Amount data generation device, amount data generation method and amount data generation program
JP2018109869A (en) Amount calculation apparatus, amount calculation method and amount calculation program
JP7153535B2 (en) Apportionment execution device, apportionment execution method, and apportionment execution program
JP7280735B2 (en) Costing device, costing method and costing program
JP7356476B2 (en) Daily report processing device, daily report processing method, and daily report processing program
JP7300431B2 (en) Productivity Index Calculation Device, Productivity Index Calculation Method, and Productivity Index Calculation Program
JP7248752B2 (en) Accounting device, accounting method and accounting program
JP7361006B2 (en) Current deduction amount calculation device, current deduction amount calculation method, and current deduction amount calculation program
JP2018112988A (en) Journaling preparation device, journaling preparation method, and journaling preparation program
JP7182867B2 (en) Expense Entry Device by Business, Expense Entry Method by Business and Expense Entry Program by Business
JP7190825B2 (en) Contract-related information management device, contract-related information management method, and contract-related information management program
JP6850162B2 (en) Business data change check device, business data change check method, and business data change check program
JP2022117005A (en) Budget data generation apparatus, budget data generation method, and budget data generation program
JP2021152877A (en) Cost allocation device, cost allocation method, cost allocation program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210305

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220126

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220201

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220329

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220823

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20221004

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230124

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230126

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230207

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230303

R150 Certificate of patent or registration of utility model

Ref document number: 7240100

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150