JP7154534B2 - Sabo dam - Google Patents

Sabo dam Download PDF

Info

Publication number
JP7154534B2
JP7154534B2 JP2018115433A JP2018115433A JP7154534B2 JP 7154534 B2 JP7154534 B2 JP 7154534B2 JP 2018115433 A JP2018115433 A JP 2018115433A JP 2018115433 A JP2018115433 A JP 2018115433A JP 7154534 B2 JP7154534 B2 JP 7154534B2
Authority
JP
Japan
Prior art keywords
rope
ring
valley
erosion control
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018115433A
Other languages
Japanese (ja)
Other versions
JP2019218723A (en
Inventor
伸吉 大岡
太郎 大岡
満良 張
Original Assignee
東亜グラウト工業株式会社
吉佳エンジニアリング株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 東亜グラウト工業株式会社, 吉佳エンジニアリング株式会社 filed Critical 東亜グラウト工業株式会社
Priority to JP2018115433A priority Critical patent/JP7154534B2/en
Publication of JP2019218723A publication Critical patent/JP2019218723A/en
Application granted granted Critical
Publication of JP7154534B2 publication Critical patent/JP7154534B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A50/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE in human health protection, e.g. against extreme weather

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Description

本発明は、砂防堰堤、特に、土石流災害や土砂災害を防止するための砂防堰堤に関する。 TECHNICAL FIELD The present invention relates to a sabo dam, and more particularly to a sabo dam for preventing debris flow disasters and sediment disasters.

砂防堰堤は、土砂災害、特に土石流による被害を低減するために、一般的には、重力式コンクリートダムの形状を模して設けられ、砂防ダムとも呼ばれる。そのため、砂防堰堤の谷部(河川を含む)幅方向両端部の両袖部は、両渓岸に深く埋設された安定した設置構造となっており、谷部幅方向全長に及ぶ堰堤の上部にあって谷部幅方向中央部には、水通しと呼ばれる越流部を形成する。この形態の砂防堰堤は、土石流発生時、大きな速度で流れる巨礫や流木といった流下物に加えて流体圧も頑強に受け止める剛構造であるため、コンクリート構造物の基礎構造が大掛かりで施工にも期間を要し、地山を大きく改変するという問題もある。 Sabo dams are generally constructed in the shape of concrete gravity dams in order to reduce damage caused by sediment disasters, particularly debris flows, and are also called sabo dams. Therefore, both sleeves at both ends in the width direction of the valley (including the river) of the erosion control dam have a stable installation structure that is deeply buried in both banks, and the upper part of the dam that spans the entire width of the valley At the central portion in the width direction of the valley, an overflow portion called a water passage is formed. This type of erosion control dam has a rigid structure that can withstand not only large boulders and driftwood flowing at high speed but also fluid pressure in the event of a debris flow. In other words, there is also the problem of significantly altering the ground.

そこで、堰堤の所定箇所にスリットなどの中間領域部を設け、土石流の発生時には、この中間領域部を通じて水は下流に流し、巨礫や流木といった流下物を堰き止める透過型砂防堰堤が注目されている。このような透過型砂防堰堤としては、例えば、下記特許文献1に記載されるものがある。この透過型砂防堰堤は、堰堤の両袖部間に、比較的大きく開口する中間領域部を形成し、この中間領域部内に、立体構造体と平面構造体を交互に設けて構成され、土石流発生時の巨礫や流木といった流下物が各構造体によって堰き止められる。 Therefore, permeable erosion control dams are attracting attention, in which an intermediate area such as a slit is provided at a predetermined location of the dam, and when a debris flow occurs, water flows downstream through this intermediate area to block out objects such as boulders and driftwood. . As such a permeable erosion control dam, for example, there is one described in Patent Document 1 below. This permeable sabo dam has an intermediate region with a relatively large opening formed between both sleeves of the dam, and is constructed by alternately providing a three-dimensional structure and a plane structure in this intermediate region to prevent the occurrence of a debris flow. Drifting materials such as boulders and driftwood of time are dammed by each structure.

特開2013-204272号公報JP 2013-204272 A

特許文献1に記載される砂防堰堤も、土石流発生時に巨礫や流木といった流下物を堰き止める各構造体の変形が許容されない剛構造であり、これらの構造体を受け止めるコンクリート構造物を構築する必要がある。こうしたコンクリート構造物は巨大であり、一般に、工事用道路がないと施工困難であるため、従来の砂防堰堤は、土石流の発生源に対して比較的下流側にしか構築できない。しかしながら、土石流の発生源の多くは、河川の最上流部、更には涸れ谷部などに代表される常時表流水のない、例えば山頂近傍の或いは深い山間の小規模な谷部であり、こうした小規模な谷部では、工事用道路もなく、巨大なコンクリート構造物を伴う砂防堰堤は構築することができない。 The erosion control dam described in Patent Document 1 is also a rigid structure that does not allow deformation of each structure that dams down objects such as boulders and driftwood when a debris flow occurs, and it is necessary to construct a concrete structure to receive these structures. be. Such concrete structures are huge and generally difficult to construct without construction roads, so conventional erosion control dams can only be constructed relatively downstream of the debris flow source. However, most of the sources of debris flows are the uppermost reaches of rivers and small valleys near mountain tops or in deep mountain valleys without regular surface water, such as dry valleys. In large-scale valleys, there are no construction roads, and erosion control dams with huge concrete structures cannot be constructed.

つまり、例えば山頂近傍や深い山間の小規模な谷部で発生した土石流は、下流側に流れながら、岸部の木や岩を巻き込んで下流側に行けば行くほど巨大化し、それに伴って土石流の運動エネルギーも大きくなる。従って、河川の下流側に構築される砂防堰堤は、この巨大な運動エネルギーを受け止めるために、どうしても頑健な構造とせざるを得ない。換言すれば、土石流による被害を効果的に低減するためには、土石流の運動エネルギーが未だ小さい、例えば山頂近傍や深い山間の小規模な谷部にこそ、発生直後の土石流の流下物を的確に堰き止める砂防堰堤が望まれる。 In other words, for example, a debris flow that occurs near a summit or in a small-scale valley in a deep mountain flows downstream, entraining trees and rocks on the shore, and becomes larger as it goes downstream, resulting in movement of the debris flow. energy will also increase. Therefore, the erosion control dam constructed on the downstream side of the river must have a robust structure in order to receive this huge kinetic energy. In other words, in order to effectively reduce the damage caused by a debris flow, it is necessary to accurately remove debris from a debris flow immediately after it occurs, especially in areas where the kinetic energy of the debris flow is still small, such as near mountain tops and in small valleys between deep mountains. A sabo dam is desirable.

本発明は、上記課題に鑑みてなされたものであり、その目的は、コンクリート構造物を必要とせず、小規模な谷部でも構築することができ、その結果、土石流による被害を効果的に低減することが可能な砂防堰堤を提供することにある。 The present invention has been made in view of the above problems, and its object is to be able to construct even small-scale valleys without the need for concrete structures, and as a result, effectively reduce damage caused by debris flows. To provide an erosion control dam capable of

上記目的を達成するため請求項1に記載の砂防堰堤は、
地山で挟まれた谷部に設けられる砂防堰堤であって、前記谷部の幅方向両端部間に架け渡され、両端部が夫々前記地山に固定されたロープと、前記ロープと係合されることで、前記谷部の底部から所定高さ位置までの領域に伸展されて前記谷部の略幅方向に張設されるネット体と、前記ロープの両端部を前記地山に固定する固定手段と、を備え、前記固定手段は、前記地山の表面に、前記地山のすべり面より深層の安定化地層まで到達するように打設されたアンカーと、前記アンカーの頭部が挿通固定され、該アンカーの緊張力によって前記地山の表面に押圧された状態で当接される受圧板と、前記受圧板又はアンカーと前記ロープの端部とを連結する連結手段と、を備えたことを特徴とする。
In order to achieve the above object, the erosion control dam according to claim 1,
A erosion control dam provided in a valley sandwiched by natural ground, wherein a rope is bridged between both ends in the width direction of the valley and both ends are respectively fixed to the natural ground, and the rope is engaged with the rope. By doing so, the net body stretched from the bottom of the valley to a predetermined height position and stretched substantially in the width direction of the valley and both ends of the rope are fixed to the ground. fixing means, wherein the fixing means includes an anchor driven on the surface of the natural ground so as to reach a stabilization stratum deeper than the slip surface of the natural ground, and the head of the anchor is inserted through the anchor. a pressure plate that is fixed and abuts against the surface of the natural ground while being pressed by the tension force of the anchor; and connecting means that connects the pressure plate or the anchor and the end of the rope. It is characterized by

この構成によれば、両端部が地山に固定されたロープにネット体を係合して谷部の略幅方向にネット体が張設される。従って、土石流発生時には、ネット体によって谷部を流れる巨礫や流木などの流下物が堰き止められ、その際、ネット体の変形性能によって土石流の持つ運動エネルギーが吸収されることにより、ネット体全体で流下物を堰き止めることができる。従って、巨大なコンクリート構造物を必要とせず、例えば山頂近傍や深い山間の小規模な谷部でも堰堤を構築することが可能となる。また、受圧板は、アンカーに係る力の反力を受けるだけでなく、地山の表面を押圧するように覆っているため、土石流巨大化の一因である地山表面の崩壊を抑制して地山表面を保護し、もって土石流の巨大化を抑制することが可能となる。 According to this configuration, the net body is engaged with the rope whose both ends are fixed to the natural ground, and the net body is stretched substantially in the width direction of the trough. Therefore, when a debris flow occurs, the net blocks the flowing objects such as boulders and driftwood that flow in the valley. Drainage can be dammed. Therefore, it is possible to construct a dam, for example, near a mountain top or in a small-scale valley between deep mountains without requiring a huge concrete structure. In addition, the pressure receiving plate not only receives the reaction force of the force related to the anchor, but also covers the surface of the ground so as to press it, so it suppresses the collapse of the ground surface, which is one of the causes of large-scale debris flows. It is possible to protect the ground surface and thereby suppress the enlarging of debris flows.

請求項2に記載の砂防堰堤は、請求項1に記載の砂防堰堤において、前記ロープが前記谷部の高さ方向に複数配設され、高さ方向でより下方のロープほど、上方のロープより弛みが大きく設定されたことを特徴とする。 The erosion control dam according to claim 2 is the erosion control dam according to claim 1, wherein a plurality of the ropes are arranged in the height direction of the valley, and the lower the rope in the height direction, the higher the rope. It is characterized in that the slack is set large.

この構成によれば、土石流発生時の流下物捕捉に伴って変形したネット体とロープで構成される流下物収容容積は高さ方向下方ほど大きくなることから、流下物をより多量に、且つ安定して捕捉することが可能となる。 According to this configuration, the capacity for accommodating the falling objects, which is composed of the net body and the rope that are deformed as the falling objects are captured when a debris flow occurs, increases in the downward direction in the height direction. can be captured by

請求項3に記載の砂防堰堤は、請求項1又は2に記載の砂防堰堤において、前記ロープが前記谷部の高さ方向に複数配設され、高さ方向でより下方のロープほど、上方のロープより両端固定部間の長さの許容伸び量が大きく設定されたことを特徴とする。 The sabo dam according to claim 3 is the erosion control dam according to claim 1 or 2, wherein a plurality of ropes are arranged in the height direction of the valley, and the lower the rope in the height direction, the higher the rope. The rope is characterized in that the allowable elongation amount of the length between the fixing portions at both ends is set larger than that of the rope.

この構成によれば、土石流発生時に流下物を捕捉したネット体の変形に伴うロープの伸びは、高さ方向でより下方のロープほど大きいので、変形したネット体と伸長したロープで構成される流下物収容容積は高さ方向下方ほど大きくなり、流下物をより多量に、且つ安定して捕捉することが可能となる。 According to this configuration, the rope elongation due to the deformation of the net body that caught the falling object when a debris flow occurred is greater for the lower rope in the height direction. The object storage volume increases downward in the height direction, making it possible to stably capture a larger amount of falling objects.

請求項4に記載の砂防堰堤は、請求項1乃至3の何れか1項に記載の砂防堰堤において、前記ネット体の下端部が、前記谷部の底部に固定されたことを特徴とする。 The sabo dam according to claim 4 is characterized in that, in the sabo dam according to any one of claims 1 to 3, the lower end of the net body is fixed to the bottom of the valley.

この構成によれば、土石流発生時、巨礫や流木などの流下物を堰き止めたネット体の下端部がめくれ上がるのを抑止することができることから、土石流発生時の流下物がネット体の下から下流に流れてしまうのを防止することができ、それらをネット体で確実に堰き止めることが可能となる。 According to this configuration, when a debris flow occurs, it is possible to prevent the lower end of the net body, which dams up debris such as boulders and driftwood, from being turned up. It is possible to prevent them from flowing downstream, and to reliably dam them up with the net body.

請求項5に記載の砂防堰堤は、請求項1乃至4の何れか1項に記載の砂防堰堤において、前記ロープには所定値以上の負荷が加えられたときに所定の制動力を伴いながら該ロープの長さの伸びを許容するブレーキ装置が設けられたことを特徴とする。 The erosion control dam according to claim 5 is the erosion control dam according to any one of claims 1 to 4, wherein when a load equal to or greater than a predetermined value is applied to the rope, the load is applied with a predetermined braking force. It is characterized in that a braking device is provided to allow the extension of the length of the rope.

この構成によれば、ロープに大きな負荷が加わったときに所定の制動力を伴いながらロープの伸びが許容されるので、ロープの伸びに伴って制動作用、つまり運動エネルギーの吸収力を確保することが可能となる。これにより、土石流等の流下物の持つ運動エネルギーをより一層的確に吸収することが可能となり、ロープを含めたネット体全体によって流下物をより確実に堰き止めることができる。請求項6に記載の砂防堰堤は、前記受圧板が、平面視で1m以上3m以下の長手方向長さを有することを特徴とする。 According to this configuration, when a large load is applied to the rope, the elongation of the rope is allowed while a predetermined braking force is applied. becomes possible. As a result, the kinetic energy of the falling objects such as debris flow can be more accurately absorbed, and the entire net body including the rope can more reliably dam the falling objects. The sabo dam according to claim 6 is characterized in that the pressure receiving plate has a longitudinal length of 1 m or more and 3 m or less in a plan view.

以上説明したように、本発明によれば、土石流発生時には、ネット体によって巨礫や流木などの流下物が堰き止められ、その際、ネット体の変形性能により土石流の持つ運動エネルギーが吸収されることにより、ネット体全体で流下物を堰き止めることができる。また、受圧板が地山表面を押圧するように覆うことで地山表面を保護し、土石流の巨大化を抑制することができる。その結果、コンクリート構造物を必要とせず、小規模な谷部にも有効な堰堤を構築することができ、景観や環境を保全しながら、土石流による被害を効果的に低減することができる。 As described above, according to the present invention, when a debris flow occurs, the net blocks flowing objects such as boulders and driftwood, and at that time, the deformation performance of the net absorbs the kinetic energy of the debris flow. Therefore, the entire net body can dam the flowing material. In addition, by covering the ground surface so as to press the pressure receiving plate, it is possible to protect the ground surface and suppress an increase in the size of the debris flow. As a result, it is possible to build effective dams even in small-scale valleys without the need for concrete structures, thereby effectively reducing damage caused by debris flows while preserving the landscape and environment.

本発明の砂防堰堤の一実施の形態の全体構成を示す一部断面正面図である。BRIEF DESCRIPTION OF THE DRAWINGS Fig. 1 is a partially cross-sectional front view showing the overall configuration of an embodiment of a erosion control dam of the present invention; 図1の砂防堰堤に用いられる固定手段の斜視図である。FIG. 2 is a perspective view of fixing means used in the erosion control dam of FIG. 1; 図1のリング式ネットに用いられるリング状部材の一例を示す斜視図である。FIG. 2 is a perspective view showing an example of a ring-shaped member used in the ring-type net of FIG. 1; 図1の砂防堰堤によって流下物を堰き止めた状態を示す一部断面側面図である。1. It is a partial cross-sectional side view which shows the state which dammed the flowing material with the sabo dam of FIG. 本発明で適用可能なネット体の他の例を示す説明図である。FIG. 4 is an explanatory diagram showing another example of a net body applicable in the present invention;

以下、本発明の砂防堰堤の実施の形態について図面を参照して詳細に説明する。図1は、この実施の形態の砂防堰堤の全体構成を示す一部断面正面図である。この実施の形態に係る砂防堰堤は、既存の砂防堰堤と同様に、土砂災害、特に、土石流による被害を防止すること等を目的に谷部の幅方向に延設されるものであるが、この実施の形態では、幅方向両側が地山Hで挟まれた比較的幅の狭い谷部Rに構築することを目的とする。「地山Hで挟まれた比較的幅の狭い谷部R」は、特に、コンクリート構造物の構築が困難なような比較的小規模な谷部、例えば山頂近傍や深い山間の谷部を指す。なお、この実施の形態で定義する谷部Rは、水の流れの有無を問わない。図示する谷部Rは、通常時には水の流れ(常時表流水)がない、所謂涸れ沢である。しかしながら、降雨時などには、土石流が発生する恐れがある。 EMBODIMENT OF THE INVENTION Hereinafter, embodiment of the sabo dam of this invention is described in detail with reference to drawings. FIG. 1 is a partial cross-sectional front view showing the overall construction of the erosion control dam of this embodiment. The erosion control dam according to this embodiment, like the existing sabo dam, extends in the width direction of the valley for the purpose of preventing damage caused by sediment disasters, especially debris flows. In the embodiment, the object is to construct a relatively narrow trough portion R sandwiched by ground H on both sides in the width direction. The "relatively narrow valley R sandwiched between natural grounds H" particularly refers to relatively small-scale valleys where it is difficult to construct a concrete structure, such as the vicinity of a summit or a valley between deep mountains. . It should be noted that the troughs R defined in this embodiment may or may not have water flow. The valley R shown in the figure is a so-called dry stream in which water does not normally flow (always surface water). However, when it rains, debris flow may occur.

この砂防堰堤では、土石流発生時の巨礫や流木などの流下物を堰き止めるために、後述するリング式ネット18からなるネット体を、谷部Rの底部B側から所定高さ位置まで伸展するようにして谷部Rの幅方向両側の地山H間に張設する。この実施の形態のリング式ネット18は、後述するように、例えば鋼線材を複数回巻回してなるリング状部材20を互いに連結して構成される。ネット体は、何れも、自身が変形することによって流下物の運動エネルギーを吸収可能とするが、特にリング式ネット18を構成するリング状部材20は、許容する変形量が大きく、その分だけ、吸収可能な運動エネルギーが大きいという利点を有する。なお、図1では、理解を容易にするために、リング式ネット18のリング状部材20を一部省略しているが、リング式ネット18のリング部材20はネット体の張設領域全域を覆うように配設されている。 In this erosion control dam, a net body consisting of a ring-type net 18, which will be described later, is extended from the bottom portion B side of the valley portion R to a predetermined height position in order to dam up debris such as boulders and driftwood when a debris flow occurs. and stretched between ground H on both sides of the valley R in the width direction. As will be described later, the ring-type net 18 of this embodiment is constructed by connecting ring-shaped members 20 each formed by winding a steel wire a plurality of times, for example. Any net body can absorb the kinetic energy of the falling material by deforming itself, but the ring-shaped member 20 that constitutes the ring-type net 18 in particular has a large amount of deformation that can be allowed. It has the advantage that the kinetic energy that can be absorbed is large. In FIG. 1, the ring-shaped member 20 of the ring-type net 18 is partly omitted for the sake of easy understanding, but the ring-shaped member 20 of the ring-type net 18 covers the entire stretched area of the net body. are arranged as follows.

このリング式ネット18を谷部Rの幅方向に張設するために、この実施の形態では、複数、図では3本のロープ26を谷部Rの幅方向両端部間に架け渡し、それらのロープ26とリング式ネット18を係合している。このロープ26には、例えば高強度のワイヤロープなどが適用される。ロープ26の線径は、例えば12~30mm程度である。3本のロープ26は、上記所定高さ位置を最上として、それより高さ方向下方に所定の間隔を開けて配設され、各ロープ26を例えばリング式ネット18のリング状部材20のリング内に挿通するなどして係合している。従って、上記最上のロープ26とリング式ネット18の係合高さ位置がリング式ネット18の上端部となる。 In order to stretch the ring-type net 18 in the width direction of the valley R, in this embodiment, a plurality of ropes 26 (three in the drawing) are stretched between both ends of the valley R in the width direction. The rope 26 and the ring-type net 18 are engaged. A high-strength wire rope, for example, is applied to the rope 26 . The wire diameter of the rope 26 is, for example, approximately 12 to 30 mm. The three ropes 26 are arranged at predetermined intervals downward in the height direction with the predetermined height position as the uppermost position, and each rope 26 is arranged, for example, in the ring of the ring-shaped member 20 of the ring-type net 18. It is engaged by inserting it into the Therefore, the engagement height position between the uppermost rope 26 and the ring-type net 18 is the upper end of the ring-type net 18 .

なお、ロープ26の挿通部分では、リング状部材20とロープ26を連結することが望ましい。また、ロープ26は、リング式ネット18のリング部材に挿通せずに、例えばシャンクやジョーと呼ばれる個別の係止具を用いてリング状部材20に係止してもよい。また、ネット体張設領域上端部のロープ26は、例えばリング式ネット18を吊り下げるようにして支持しているが、この上端部のロープ26を含めて、全てのロープ26は、単にリング式ネット18を支持するだけでなく、リング式ネット18が流下物を堰き止めた際に、そのリング式ネット18を補強する機能を発揮する。つまり、土石流発生時の流下物の運動エネルギーは、リング式ネット18の変形によって吸収されるものの、ロープ26にも伝達される。このロープ26に伝達される運動エネルギーに対して、ロープ26を堅固に地山Hに固定したり、或いはロープ26の伸びを許容しながら、その伸びに対して制動力を付与したりすることで、リング式ネット18を補強することが可能となる。 In addition, it is desirable to connect the ring-shaped member 20 and the rope 26 at the insertion portion of the rope 26 . Alternatively, the rope 26 may be locked to the ring-shaped member 20 by using a separate locking tool called, for example, a shank or jaw, without passing through the ring member of the ring-type net 18 . In addition, the rope 26 at the upper end of the net body tensioning area supports, for example, the ring-type net 18 by suspending it. It not only supports the net 18 but also exhibits the function of reinforcing the ring-type net 18 when the ring-type net 18 dams up the flowing material. In other words, the kinetic energy of the falling material when a debris flow occurs is absorbed by the deformation of the ring-type net 18 but is also transmitted to the rope 26 . The kinetic energy transmitted to the rope 26 can be dealt with by firmly fixing the rope 26 to the natural ground H, or by applying a braking force to the elongation while allowing the elongation of the rope 26. , the ring-type net 18 can be reinforced.

また、この実施の形態では、3本のロープ26は、図からも明らかなように、高さ方向でより下方のロープ26の弛みを上方のロープ26の弛みより大きくしている。これは、後述するように、流下物を堰き止めたリング式ネット18が変形したときのリング式ネット18とロープ26による流下物収容容積、いわばポケットの容積を下方ほど大きくする目的のためである。また、この実施の形態では、後述するブレーキ装置30によるロープ26の両端固定部間の許容伸び量をより下方のロープ26ほど大きくしている。これも同様に、リング式ネット18とロープ26による流下物収容容積、つまりポケットの容積を下方ほど大きくする目的のためである。 In this embodiment, as is clear from the figure, the lower rope 26 in the height direction has more slack than the upper rope 26 . This is for the purpose of increasing the capacity of the ring-type net 18 and the rope 26 to contain the falling material, that is, the volume of the pocket, when the ring-type net 18 that dams up the falling material is deformed, as will be described later. . Further, in this embodiment, the lower the rope 26, the greater the allowable amount of elongation between both end fixing portions of the rope 26 by the brake device 30, which will be described later. This is also for the purpose of increasing the volume of the falling matter by the ring-type net 18 and the rope 26, that is, the volume of the pocket, toward the bottom.

各ロープ26の両端部は、夫々、谷部Rの幅方向両側の地山Hの夫々に固定手段2で固定されている。これらの固定手段2は、例えば図2に示すように、地山Hの表面に打設されたアンカー3、このアンカー3が挿通固定され且つ地山Hの表面に当接される受圧板4、この受圧板4とロープ26の端部とを連結する連結手段5を備えて構成される。受圧板4は、例えば金属、コンクリート、プラスチック製の厚板材からなり、例えば図に示すような十字形状のものや、この十字間をフィン状の薄板で連結したようなものの他、多種の形状のものが既存である。受圧板4の大きさは、例えば十字の差渡しで1~3m程度である。連結手段5には、例えばターンバックル部材を用いた。例えば図2の受圧板4では十字形状中央連結部の四隅の夫々に連結用のアイボルト6が設けられている。そして、これらのアイボルト6とロープ26の端部をターンバックル部材などの連結手段5で連結する。連結手段5には、ワイヤロープなども適用可能である。 Both ends of each rope 26 are fixed to the ground H on both sides of the valley R in the width direction by fixing means 2 . These fixing means 2 are, for example, as shown in FIG. A connecting means 5 for connecting the pressure receiving plate 4 and the end of the rope 26 is provided. The pressure-receiving plate 4 is made of, for example, a thick plate material made of metal, concrete, or plastic. something already exists. The size of the pressure receiving plate 4 is, for example, about 1 to 3 m across the cross. A turnbuckle member, for example, is used as the connecting means 5 . For example, in the pressure receiving plate 4 of FIG. 2, connecting eyebolts 6 are provided at each of the four corners of the cross-shaped central connecting portion. These eyebolts 6 and the ends of the ropes 26 are connected by connecting means 5 such as turnbuckle members. A wire rope or the like can also be applied to the connecting means 5 .

この実施の形態のアンカー3は、例えば鋼棒材からなり、地山Hの表面から安定化地層Dまで穿設されたアンカー穴7に挿入され且つ該アンカー穴7に注入されたセメントミルク8が硬化して地山Hに固設されている。アンカー穴7の直径は120mm程度、アンカー3の直径は50mm程度で、アンカー穴7の深さは7~30m程度である。周知のように、急斜面の地山Hでは、図に破線で示すすべり面を境に、表層部の不安定層Tが滑落するおそれがある。そこで、一般に、アンカー3はすべり面より深層の安定化地層Dまで到達するように打設する。つまり、地山Hの安定化地層Dまで到達するアンカー穴7内でセメントミルク8が硬化すれば、アンカー3は安定化地層Dと一体化される。 The anchor 3 of this embodiment is made of, for example, a steel bar, and is inserted into an anchor hole 7 drilled from the surface of the natural ground H to the stabilization stratum D. Cement milk 8 is injected into the anchor hole 7. It is hardened and fixed to the natural ground H. The diameter of the anchor hole 7 is approximately 120 mm, the diameter of the anchor 3 is approximately 50 mm, and the depth of the anchor hole 7 is approximately 7 to 30 m. As is well known, in the ground H on a steep slope, there is a risk that the unstable layer T of the surface layer may slide down along the slip surface indicated by the dashed line in the figure. Therefore, generally, the anchor 3 is placed so as to reach the stabilization stratum D which is deeper than the slip surface. That is, when the cement milk 8 hardens in the anchor hole 7 reaching the stabilization stratum D of the ground H, the anchor 3 is integrated with the stabilization stratum D.

この実施の形態では、アンカー3の受圧板貫通突出部には雄ネジが形成されており、受圧板4の貫通孔にアンカー3を挿通した後、この雄ネジに例えば座付きキャップナット9を螺合し締め付けて受圧板4を地山Hの表面に押圧し、これによりアンカー3が受圧板4に挿通固定される。従って、地山Hの表面に当接する受圧板4は、地山Hの表面を押圧するようにしてアンカー3によって地山Hに固定される。なお、アンカー3の受圧板貫通突出部及びキャップナット9の上には、例えば図に一点鎖線で示すようなキャップが取付けられ、その内部に防錆のためのグリースが封入される。また、受圧板4と地山Hの表面の間に液体吸収性のクッションを介装し、このクッションにセメントミルクを注入・固化させるようにしてもよい。また、鋼棒製のアンカーに代えて、複数のPC鋼撚り線を用いる既存のアンカー工法を用いてもよい。 In this embodiment, the pressure-receiving plate penetrating portion of the anchor 3 is formed with a male thread, and after the anchor 3 is inserted into the through-hole of the pressure-receiving plate 4, for example, a seat cap nut 9 is screwed into the male screw. By tightening, the pressure receiving plate 4 is pressed against the surface of the ground H, whereby the anchor 3 is inserted and fixed to the pressure receiving plate 4 . Therefore, the pressure receiving plate 4 that abuts on the surface of the ground H is fixed to the ground H by the anchor 3 so as to press the surface of the ground H. As shown in FIG. For example, a cap shown by a dashed line in the figure is attached to the projection of the anchor 3 passing through the pressure receiving plate and the cap nut 9, and the inside of the cap is filled with grease for rust prevention. Alternatively, a liquid absorbing cushion may be interposed between the pressure receiving plate 4 and the surface of the ground H, and the cement milk may be injected and solidified into this cushion. Also, an existing anchor construction method using a plurality of PC steel stranded wires may be used instead of steel bar anchors.

また、前述のリング式ネット18は、流下物を受け止めてリング状部材20が変形すると、リング式ネット18全体が下流側に膨出する。その際、下流に膨出するリング式ネット18の下端部がめくれ上がって、リング式ネット18の下側から流下物が下流側に流れ出てしまわないために、リング式ネット18の下端部を上流側に向けて谷部Rの底部Bに這わせ、その上流側端部のリング状部材20をアンカーピン38によって谷部Rの底部Bに固定する(図4参照)。 When the ring-shaped member 20 is deformed by receiving the falling material, the ring-shaped net 18 as a whole bulges downstream. At that time, the lower end of the ring-type net 18 that bulges downstream does not roll up, and the liquid does not flow out from the lower side of the ring-type net 18 to the downstream side. The ring-shaped member 20 at the upstream end is fixed to the bottom B of the valley R by an anchor pin 38 (see FIG. 4).

実際のロープ26は、図1に示すように、自重やリング式ネット18の重みによって下方に弛んでいる。この弛み量によって、リング式ネット18による流下物の抑止とそれに係合止されているロープ26による流下物の抑止を調整することが可能となる。即ち、ロープ26はリング式ネット18のリング状部材20と係合されているため、土石流発生時のロープ26の動きとリング式ネット18の動きは互いにリンクしている。 The actual rope 26 is slackened downward due to its own weight and the weight of the ring net 18, as shown in FIG. This amount of slack makes it possible to adjust the restraint of the falling material by the ring-type net 18 and the restraining of the flowing material by the rope 26 engaged with it. That is, since the rope 26 is engaged with the ring-shaped member 20 of the ring-type net 18, the movement of the rope 26 and the movement of the ring-type net 18 are linked to each other when debris flow occurs.

後段に詳述するリング式ネット18の変形による土石流の運動エネルギー吸収効果は、ネットの撓みがなくなってリング状部材20が変形することで発揮される。一方、ロープ26は、リング式ネット18に流下物が受け止められ、リング式ネット18が下流側に膨出することでロープの弛みがなくなり、ロープ26に自重以上の張力が発生したときから流下物を支持することができる。このとき、ロープ26の伸びを許容しながらその伸びに制動力が付与されれば、制動力を伴うロープ26の伸びによって土石流の持つ運動エネルギーを吸収することができる。そのため、このロープ26の両端部には、所定の制動力を伴ってロープの両固定部間の長さの伸びを許容するブレーキ装置30が設けられている。なお、この実施の形態では、前述のように、ブレーキ装置30によるロープ26の両固定部間の長さの許容伸び量を、下方のロープ26ほど大きく設定している。 The effect of absorbing the kinetic energy of debris flow due to the deformation of the ring-type net 18, which will be described in detail later, is exhibited when the net is no longer flexed and the ring-shaped member 20 is deformed. On the other hand, the ring-type net 18 catches the falling material, and the ring-type net 18 bulges downstream so that the rope 26 loses its slack, and the rope 26 begins to exert a tension greater than its own weight. can support At this time, if the elongation of the rope 26 is permitted and a braking force is applied to the elongation, the kinetic energy of the debris flow can be absorbed by the elongation of the rope 26 accompanied by the braking force. For this reason, both ends of the rope 26 are provided with braking devices 30 that allow the length between the fixed portions of the rope to extend with a predetermined braking force. In this embodiment, as described above, the allowable elongation amount of the length between both fixed portions of the rope 26 by the brake device 30 is set larger for the lower rope 26 .

このブレーキ装置30は、例えば通常時にロープ26の長手方向への動きを規制するものである。土石流発生時、リング式ネット18が流下物を受け止め、下流側に膨出してロープ26の弛みがなくなると、ロープ26の張力が大きくなる。この張力が、ブレーキ装置30によるロープ26の規制力より大きくなると、例えばブレーキ装置30内でロープ26の滑りが生じ、その滑りに伴う摩擦抵抗が制動力となり、この制動力によって土石流の運動エネルギーが吸収される。 This brake device 30 regulates the movement of the rope 26 in the longitudinal direction, for example, in normal times. When a debris flow occurs, the ring-type net 18 catches the falling material and bulges downstream to eliminate the slack in the rope 26, increasing the tension of the rope 26. - 特許庁When this tension becomes larger than the restraining force of the rope 26 by the brake device 30, for example, the rope 26 slips within the brake device 30, and the frictional resistance associated with the slip becomes the braking force, and the kinetic energy of the debris flow is reduced by this braking force. be absorbed.

この実施の形態では、これらのブレーキ装置30によるロープ26の伸び量を、リング式ネット18の変形限界と同時かそれ以前にロープ26の両固定部間の長さの伸びが限界となるように設定した。このように構成すると、ロープ26の両固定部間の長さの伸び限界と同時かそれ以後にリング式ネット18の変形限界となるため、制動力を伴うロープ26の伸びによる土石流の運動エネルギー吸収量を超える土石流の運動エネルギーをリング式ネット18の変形によって吸収することが可能となる。 In this embodiment, the amount of elongation of the rope 26 by these braking devices 30 is set so that the elongation of the length between both fixed portions of the rope 26 reaches the limit at the same time as or before the deformation limit of the ring-type net 18. set. With this configuration, the deformation limit of the ring-type net 18 is reached at the same time as or after the elongation limit of the length between the fixed portions of the rope 26, so the kinetic energy of the debris flow is absorbed by the elongation of the rope 26 accompanied by the braking force. The deformation of the ring-type net 18 can absorb the excess kinetic energy of debris flow.

例えば、ブレーキ装置30の制動力を伴うロープ26の伸びの限界を土石流の運動エネルギー吸収上限値に設定した場合、万が一、これを超える運動エネルギーを土石流が有していた場合、ロープ26が伸びきった後からリング式ネット18の変形によって、その上限値を超える運動エネルギーを吸収することができ、これにより流下物を抑止することができる。また、土石流発生の際、リング式ネット18が変形限界になっていなければ、ロープ26を張り替え、リング式ネット18は、そのまま再利用することも可能となるので、堰堤10の再生工事が簡易になる。 For example, when the elongation limit of the rope 26 accompanied by the braking force of the brake device 30 is set to the kinetic energy absorption upper limit value of the debris flow, if the debris flow has kinetic energy exceeding this limit, the rope 26 will be fully stretched. After that, the deformation of the ring-type net 18 can absorb the kinetic energy exceeding the upper limit value, thereby suppressing the falling matter. In addition, if the ring-type net 18 does not reach its deformation limit when a debris flow occurs, the rope 26 can be replaced and the ring-type net 18 can be reused as it is. Become.

なお、例えば図1のように、1本のロープ26に対し、夫々、複数のブレーキ装置30を設ける場合、それらのブレーキ装置30の制動力の大きさを互いに異なる大きさに設定してもよい。このような制動力配分にすると、例えば1本のロープ26に2個のブレーキ装置30を設けた場合、何れか一方のブレーキ装置30が先に作動して制動力を発揮し、その後から、他方のブレーキ装置30が作動して制動力を発揮する。こうすることで、流下物を支持するロープ26が伸び続ける間、継続的或いは断続的に制動力を発揮する、つまり運動エネルギーを吸収し続けることが可能となる。 For example, as shown in FIG. 1, when a plurality of braking devices 30 are provided for each rope 26, the magnitudes of the braking forces of the braking devices 30 may be set to different magnitudes. . With such a braking force distribution, for example, when two braking devices 30 are provided for one rope 26, one of the braking devices 30 operates first to exert a braking force, and then the other brake device 30 operates. brake device 30 operates to exert a braking force. By doing so, it is possible to exert braking force continuously or intermittently, that is, continue to absorb kinetic energy while the rope 26 supporting the falling material continues to stretch.

次に、本実施の形態に用いられているリング式ネット18について説明する。このリング式ネット18は、例えば特開2014-1584号公報(以下、先行技術文献とも記す)に記載されるものと同様であり、複数のリング状部材20を互いに連結して構成される。この実施の形態では、例えば、図1から理解されるように、1つのリング状部材20の周囲に4つのリング状部材20が均等に配置されるようにして、それらのリング状部材20の内周側同士が接触するように連結する。リング状部材20の連結構造は、先行技術文献に記載されるように、様々な形態がある。 Next, the ring-type net 18 used in this embodiment will be described. The ring-type net 18 is similar to that described in, for example, Japanese Patent Laying-Open No. 2014-1584 (hereinafter also referred to as prior art document), and is configured by connecting a plurality of ring-shaped members 20 to each other. In this embodiment, for example, as can be seen from FIG. Connect so that the peripheral sides are in contact with each other. The connection structure of the ring-shaped member 20 has various forms as described in prior art documents.

図3は、図1のリング式ネット18に用いられるリング状部材20の一例を示す斜視図である。このリング状部材20は、例えば鋼線からなる線材22を複数回(5~20回)巻回し、周方向の数か所を締結具24によって締め付けて構成されている。締結具24は、例えば側面形状がC字状の略筒状の金具であり、巻回により重合された線材22の外側に被せてから加締めることにより固定されている。このリング状部材20も、前述の先行技術文献に記載されているものと同様であり、例えば、線材22の材料、線材22の線径、線材22の巻回数、締結具24による加締め力などを調整することで、後述する変形時の強度やエネルギー吸収力を調整することができる。 FIG. 3 is a perspective view showing an example of a ring-shaped member 20 used in the ring-type net 18 of FIG. The ring-shaped member 20 is constructed by winding a wire rod 22 made of, for example, a steel wire a plurality of times (5 to 20 times) and tightening it with fasteners 24 at several points in the circumferential direction. The fastener 24 is, for example, a substantially cylindrical metal fitting having a C-shaped side surface, and is fixed by covering the outside of the wire rod 22 that is superimposed by winding and then crimping. This ring-shaped member 20 is also the same as that described in the above-mentioned prior art document. By adjusting , it is possible to adjust the strength and energy absorption capacity during deformation, which will be described later.

リング状部材20を構成する線材22には、例えば硬鋼線材から製造される鋼線が好ましいが、例えば軟鋼線材から製造される鉄線でもよい。鋼線の場合、引張強度800N/mm2以上のものが好ましい。また、これらの線材22にメッキや被覆を施したものも用いることができる。線材22の線径は2.5~5mm程度で、リング状部材20の直径は300~1500mm程度である。リング式ネット18は、リング状部材20の直径を変更することで、堰き止めたい流下物(巨礫)の大きさに容易に対応することができる。例えば、上流の巨礫の大きさを調査し、その大きさに合わせてリング状部材20の直径を設定すれば、土石流発生時の流下物を効果的に堰き止めることができる。 The wire rod 22 forming the ring-shaped member 20 is preferably a steel wire manufactured from, for example, a hard steel wire rod, but may be an iron wire manufactured from, for example, a mild steel wire rod. Steel wire preferably has a tensile strength of 800 N/mm 2 or more. Moreover, those obtained by plating or coating these wires 22 can also be used. The diameter of the wire rod 22 is about 2.5-5 mm, and the diameter of the ring-shaped member 20 is about 300-1500 mm. By changing the diameter of the ring-shaped member 20, the ring-type net 18 can easily correspond to the size of the falling objects (boulders) to be dammed up. For example, if the size of the boulders upstream is investigated and the diameter of the ring-shaped member 20 is set according to the size, it is possible to effectively block the falling objects when a debris flow occurs.

リング状部材20を連結して構成されるリング式ネット18は、例えばネット面に垂直な力(負荷)が加わると、リング状部材20が互いに引っ張られるので、リング状部材20の形状そのものが変形すると共に、リング状部材20を構成する線材22の巻回が緩むように変形する。これらの変形は、土石流の運動エネルギー、具体的には巨礫や流木が衝突してネット面に負荷が作用するときに生じ、リング式ネット18に負荷が加わるとリング状部材20が変形することで、土石流の運動エネルギーが吸収され、結果としてリング式ネット18全体で巨礫や流木を堰き止める効果が得られる。なお、土石流は渓流の上流側から下流側に向けて生じるので、土石流の運動エネルギーでリング状部材20が変形するリング式ネット18は、前述したように、土石流を受けると下流側に膨出する。 In the ring-type net 18 configured by connecting the ring-shaped members 20, for example, when a force (load) perpendicular to the surface of the net is applied, the ring-shaped members 20 are pulled together, so the shape of the ring-shaped members 20 themselves is deformed. At the same time, the winding of the wire rod 22 forming the ring-shaped member 20 is deformed so as to loosen. These deformations are caused by the kinetic energy of the debris flow, specifically when the load acts on the net surface due to the collision of boulders and driftwood. , the kinetic energy of the debris flow is absorbed, and as a result, the ring-type net 18 as a whole has the effect of blocking boulders and driftwood. Since a debris flow occurs from the upstream side to the downstream side of a mountain stream, the ring-type net 18, in which the ring-shaped member 20 is deformed by the kinetic energy of the debris flow, bulges downstream when subjected to the debris flow, as described above. .

これらのことから、リング式ネット18を用いる砂防堰堤は、リング状部材20の変形によって土石流の運動エネルギーを受け止める「柔構造」であるといえ、従来のコンクリートダム型の砂防堰堤や中間流域部だけを設けた透過型砂防堰堤の「剛構造」と異なる。この実施の形態の場合、前述のロープ26やブレーキ装置30を含めて、リング式ネット18全体によって流下物の動きを抑止することができれば、その後、ロープ26やリング式ネット18を繋ぎ止めている固定手段2が受け止める負荷は流下物の静荷重である。周知のように、同じ物体でも、動荷重に比べて静荷重は遥かに小さい。そのため、簡易な構造であっても、固定手段2は、流下物を堰き止めたリング式ネット18やロープ26を支持し続けることができることから、所謂コンクリート構造物からなる基礎・躯体を必要としない。従って、コンクリート構造物の構築が困難な谷部Rであっても砂防堰堤が構築可能となると共に、その施工も大幅に容易になる。この施工の容易さは、堰堤が構築される場所、つまり山間において多大なメリットをもたらす。 From these facts, it can be said that the erosion control dam using the ring-type net 18 is a "flexible structure" that receives the kinetic energy of the debris flow due to the deformation of the ring-shaped member 20. It is different from the “rigid structure” of permeable erosion control dams. In the case of this embodiment, if the movement of the falling material can be restrained by the entire ring-type net 18, including the rope 26 and the brake device 30, then the rope 26 and the ring-type net 18 are tied. The load received by the fixing means 2 is the static load of the flowing material. As is well known, the static load on the same object is much smaller than the dynamic load. Therefore, even with a simple structure, the fixing means 2 can continue to support the ring-type net 18 and the rope 26 that dammed the falling material, so that a foundation or frame made of a so-called concrete structure is not required. . Therefore, even in the valley R where it is difficult to construct a concrete structure, a erosion control dam can be constructed, and the construction is greatly facilitated. This ease of construction brings great merit in places where dams are constructed, that is, in mountainous areas.

図4は、図1の砂防堰堤1によって流下物を堰き止めた状態を示す一部断面側面図である。前述のように、流下物を堰き止めたリング式ネット18は、リング状部材20の変形(伸び)に伴って、下流側に膨出する。この実施の形態では、3本のロープ26のうち、高さ方向でより下方のロープ26の弛みが上方のロープ26の弛みより大きく、且つより下方のロープ26の許容伸び量が上方のロープ26の許容伸び量より大きく設定されているため、下流側に膨出するように変形するリング式ネット18とロープ26で構成される流下物収容容積、つまり流下物を受け入れるポケットの容積は、高さ方向下方ほど大きい。そのため、流下物は、下方の大きなポケット内にたくさん、且つ安定して収容されることから、多量の流下物を安定して捕捉することが可能となる。また、ロープ26を地山Hに固定するための受圧板4は、地山Hの表面を押圧するように覆うことから、土石流の巨大化の一因である谷部岸部、つまり地山Hの表面の崩壊を抑制することができ、これにより土石流の巨大化を抑制することが可能となる。なお、流下物収容容積を高さ方向下方ほど大きくするのは、ロープ26の弛みの設定及び許容伸び量の設定の何れか一方だけでも可能である。 FIG. 4 is a partial cross-sectional side view showing a state in which the erosion control dam 1 of FIG. As described above, the ring-type net 18 that has dammed the falling material bulges downstream as the ring-shaped member 20 deforms (extends). In this embodiment, among the three ropes 26, the slack of the lower rope 26 in the height direction is greater than the slack of the upper rope 26, and the allowable elongation of the lower rope 26 is is set to be larger than the allowable elongation of the , the volume of the falling matter storage composed of the ring-type net 18 and the rope 26 that deforms to bulge downstream, that is, the volume of the pocket that receives the falling matter, is equal to the height Larger in the downward direction. Therefore, a large amount of the falling matter is stably stored in the large lower pocket, so that a large amount of the falling matter can be stably captured. In addition, since the pressure receiving plate 4 for fixing the rope 26 to the ground H covers the surface of the ground H so as to press it, the valley bank, which is one of the causes of the enlarging debris flow, i.e. It is possible to suppress the collapse of the surface, thereby suppressing the enlarging of the debris flow. It should be noted that it is possible to increase the storage capacity of the falling material downward in the height direction by setting either the slackness of the rope 26 or the allowable elongation amount.

このように、この実施の形態の砂防堰堤によれば、両端部が地山Hに固定されたロープ26にリング式ネット18を係合して谷部Rの略幅方向にリング式ネット18が張設されるので、土石流発生時には、リング式ネット18によって谷部Rを流れる巨礫や流木などの流下物が堰き止められ、その際、リング式ネット18の変形性能によって土石流の持つ運動エネルギーが吸収されることにより、リング式ネット18全体で流下物を堰き止めることができる。従って、巨大なコンクリート構造物を必要とせず、例えば山頂近傍や深い山間の小規模な谷部Rでも堰堤を構築することが可能となる。また、ロープ26を地山Hの表面に固定するための受圧板4は、アンカー3に係る力の反力を受けるだけでなく、地山Hの表面を押圧するように覆っているため、土石流巨大化の一因である地山表面の崩壊を抑制して地山表面を保護し、もって土石流の巨大化を抑制することが可能となる。 As described above, according to the erosion control dam of this embodiment, the ring-type net 18 is engaged with the rope 26 whose both ends are fixed to the natural ground H, and the ring-type net 18 extends substantially in the width direction of the valley R. Since it is stretched, when a debris flow occurs, the ring-type net 18 dams the falling objects such as boulders and driftwood flowing in the valley R, and at that time, the deformation performance of the ring-type net 18 absorbs the kinetic energy of the debris flow. As a result, the ring-type net 18 as a whole can dam up the falling matter. Therefore, it is possible to construct a dam even in the vicinity of a mountain top or in a small-scale valley R between deep mountains, for example, without requiring a huge concrete structure. Further, the pressure receiving plate 4 for fixing the rope 26 to the surface of the natural ground H not only receives the reaction force of the force related to the anchor 3, but also covers the surface of the natural ground H so as to press it. It is possible to protect the ground surface by suppressing the collapse of the ground surface, which is one of the causes of the gigantic size, and thereby suppressing the gigantic size of the debris flow.

また、高さ方向でより下方のロープ26ほど、上方のロープ26より弛みを大きく設定したことにより、土石流発生時の流下物捕捉に伴って変形したリング式ネット18とロープ26で構成される流下物収容容積は高さ方向下方ほど大きくなることから、流下物をより多量に、且つ安定して捕捉することが可能となる。 In addition, the lower the rope 26 in the height direction, the more slack is set than the upper rope 26, so that the ring-type net 18 and the rope 26 deformed as they caught the falling objects when debris flow occurred. Since the object storage volume increases downward in the height direction, it is possible to stably capture a larger amount of falling objects.

また、高さ方向でより下方のロープ26ほど、上方のロープ26より両端固定部間の長さの許容伸び量を大きく設定したことにより、土石流発生時に流下物を捕捉したリング式ネット18の変形に伴うロープ26の伸びは、高さ方向でより下方のロープ26ほど大きいので、変形したリング式ネット18と伸長したロープ26で構成される流下物収容容積は高さ方向下方ほど大きくなり、流下物をより多量に、且つ安定して捕捉することが可能となる。 In addition, the lower the rope 26 in the height direction, the larger the allowable elongation of the length between the fixed parts at both ends than the upper rope 26, so that the ring-type net 18 that catches the falling objects when a debris flow occurs is deformed. Since the elongation of the rope 26 due to the height direction is greater in the lower rope 26 in the height direction, the flow-down material storage volume composed of the deformed ring-type net 18 and the elongated rope 26 increases in the height direction downward. It is possible to stably capture a larger amount of objects.

また、リング式ネット18の下端部を谷部Rの底部Bに固定したことにより、土石流発生時、巨礫や流木などの流下物を堰き止めたリング式ネット18の下端部がめくれ上がるのを抑止することができることから、土石流発生時の流下物がリング式ネット18の下から下流に流れてしまうのを防止することができ、それらをリング式ネット18で確実に堰き止めることが可能となる。 In addition, by fixing the lower end of the ring-type net 18 to the bottom B of the valley R, the lower end of the ring-type net 18, which dams up falling objects such as boulders and driftwood, is prevented from being turned up when a debris flow occurs. As a result, it is possible to prevent the falling objects from flowing downstream from under the ring-type net 18 when a debris flow occurs, and the ring-type net 18 can reliably dam them up.

また、所定値以上の負荷が加えられたときに所定の制動力を伴いながらロープ26の長さの伸びを許容するブレーキ装置30をロープ26に設けたことにより、ロープ26に大きな負荷が加わったときに所定の制動力を伴いながらロープ26の伸びが許容されるので、ロープ26の伸びに伴って制動作用、つまり運動エネルギーの吸収力を確保することが可能となる。これにより、土石流等の流下物の持つ運動エネルギーをより一層的確に吸収することが可能となり、ロープ26を含めたリング式ネット18全体によって流下物をより確実に堰き止めることができる。 In addition, a large load is applied to the rope 26 by providing the rope 26 with a braking device 30 that allows the length of the rope 26 to expand while applying a predetermined braking force when a load of a predetermined value or more is applied. Since the elongation of the rope 26 is permitted with a predetermined braking force, it is possible to secure the braking action, that is, the ability to absorb kinetic energy as the rope 26 elongates. As a result, the kinetic energy of the falling objects such as debris flow can be more accurately absorbed, and the entire ring-type net 18 including the rope 26 can more reliably dam the falling objects.

以上、実施の形態について説明したが、本発明の構成はこれらの実施の形態に限定されるものではなく、発明の要旨の範囲内で種々変形が可能である。例えば、上述したロープ26の本数や材質については現場の状況に応じて適宜選択されるものであり、また、それらのブレーキ装置は、上述の構成に限定されるものではなく、制動力を伴いながらロープ26の伸びを許容するものであれば如何なるものを用いてもよい。 Although the embodiments have been described above, the configuration of the present invention is not limited to these embodiments, and various modifications are possible within the scope of the invention. For example, the number and material of the ropes 26 described above are appropriately selected according to the situation of the site, and their braking devices are not limited to the above-described configuration, and are accompanied by braking force. Anything that allows the rope 26 to stretch may be used.

また、前述の実施の形態では、リング式ネット18を1張だけ、地山H間に張架したが、リング式ネット18を複数張、地山H間に張架してもよい。 Further, in the above-described embodiment, only one ring-type net 18 is stretched between the natural grounds H, but a plurality of ring-type nets 18 may be stretched between the natural grounds H.

更には、リング式ネット18に代えて、他のネット体を適用することも可能である。このようなネット体としては、例えば図5に示すように、網目が菱形の金属線材からなる菱形金網26をネット体として用いることもできる。この菱形金網26は、例えば特開2016-37773号公報に記載されるように、例えば金属線材28を曲げ加工して三角波状ワイヤとし、並列に配置された複数の三角波状ワイヤの山と谷を互いに編んで、それらの三角波状ワイヤを係合することで構成される。この三角波状ワイヤを構成する金属線材28には、軟鋼、硬鋼、 ばね鋼、ステンレス鋼等を用いることができる。この金属線材28には必要により被覆処理がなされていてもよく、これにより三角波状ワイヤの接触部分の摩耗や、腐食等を防止することができる。被覆処理としては、例えば、亜鉛メッキ処理やポリエステル被覆処理が挙げられる。この菱形金網26を含めて、本発明のネット体には、流下物を堰き止めることが可能であれば、如何様なネット体を用いることも可能である。 Furthermore, instead of the ring-type net 18, it is also possible to apply another net body. As such a net body, for example, as shown in FIG. 5, a rhombic metal wire mesh 26 made of a rhombic metal wire can be used as the net body. As described in Japanese Unexamined Patent Application Publication No. 2016-37773, for example, the rhombic wire mesh 26 is formed by bending a metal wire 28 into triangular wavy wires, and forming peaks and valleys of a plurality of triangular wavy wires arranged in parallel. It is constructed by interweaving and engaging those triangular wavy wires. Soft steel, hard steel, spring steel, stainless steel, or the like can be used for the metal wire 28 that constitutes the triangular wavy wire. If necessary, the metal wire 28 may be coated to prevent wear and corrosion of the contact portion of the triangular-wavy wire. The coating treatment includes, for example, galvanizing treatment and polyester coating treatment. Any net body including this rhombic wire mesh 26 can be used for the net body of the present invention as long as it can dam up the flowing material.

2 固定手段
3 アンカー
4 受圧板
5 連結手段
7 アンカー穴
8 セメントミルク
18 リング式ネット(ネット体)
20 リング状部材
26 ロープ
30 ブレーキ装置
38 アンカーピン
H 地山
R 谷部
B 底部
D 安定化地層
2 fixing means 3 anchor 4 pressure receiving plate 5 connecting means 7 anchor hole 8 cement milk 18 ring type net (net body)
20 Ring-shaped member 26 Rope 30 Brake device 38 Anchor pin H Natural ground R Valley B Bottom D Stabilizing stratum

Claims (6)

地山で挟まれた谷部に設けられる砂防堰堤であって、
前記谷部の幅方向両端部間に架け渡され、両端部が夫々前記地山に固定されたロープと、
前記ロープと係合されることで、前記谷部の底部から所定高さ位置までの領域に伸展されて前記谷部の略幅方向に張設されるネット体と、
前記ロープの両端部を前記地山に固定する固定手段と、を備え、
前記固定手段は、
前記地山の表面に、前記地山のすべり面より深層の安定化地層まで到達するように打設されたアンカーと、
前記アンカーの頭部が挿通固定され、該アンカーの緊張力によって前記地山の表面に押圧された状態で当接される受圧板と、
前記受圧板又はアンカーと前記ロープの端部とを連結する連結手段と、を備えたことを特徴とする砂防堰堤。
An erosion control dam provided in a valley sandwiched by natural ground,
a rope that is stretched between both ends in the width direction of the valley, and both ends are respectively fixed to the ground;
a net body that is stretched in a region from the bottom of the valley to a predetermined height position by being engaged with the rope and stretched substantially in the width direction of the valley;
fixing means for fixing both ends of the rope to the ground;
The fixing means are
an anchor placed on the surface of the natural ground so as to reach a stabilization stratum deeper than the slip surface of the natural ground ;
a pressure receiving plate, through which the head of the anchor is inserted and fixed, and which abuts against the surface of the natural ground while being pressed by the tension of the anchor ;
An erosion control dam, comprising a connection means for connecting the pressure plate or the anchor and the end of the rope.
前記ロープが前記谷部の高さ方向に複数配設され、
高さ方向でより下方のロープほど、上方のロープより弛みが大きく設定されたことを特徴とする請求項1に記載の砂防堰堤。
A plurality of the ropes are arranged in the height direction of the valley,
2. The erosion control dam according to claim 1, wherein a lower rope in the height direction is set to have a larger slack than an upper rope.
前記ロープが前記谷部の高さ方向に複数配設され、
高さ方向でより下方のロープほど、上方のロープより両端固定部間の長さの許容伸び量が大きく設定されたことを特徴とする請求項1又は2に記載の砂防堰堤。
A plurality of the ropes are arranged in the height direction of the valley,
The sabo dam according to claim 1 or 2, wherein the lower the rope in the height direction, the larger the permissible elongation of the length between the fixed portions at both ends than the upper rope.
前記ネット体の下端部が、前記谷部の底部に固定されたことを特徴とする請求項1乃至3の何れか1項に記載の砂防堰堤。 The sabo dam according to any one of claims 1 to 3, wherein a lower end portion of said net body is fixed to a bottom portion of said valley portion. 前記ロープには所定値以上の負荷が加えられたときに所定の制動力を伴いながら該ロープの長さの伸びを許容するブレーキ装置が設けられたことを特徴とする請求項1乃至4の何れか1項に記載の砂防堰堤。 5. The rope according to any one of claims 1 to 4, further comprising a braking device that allows the length of the rope to extend while applying a predetermined braking force when a load of a predetermined value or more is applied. or the erosion control dam according to item 1. 前記受圧板が、平面視で1m以上3m以下の長手方向長さを有することを特徴とする請求項1乃至5の何れか1項に記載の砂防堰堤。The erosion control dam according to any one of claims 1 to 5, wherein the pressure plate has a longitudinal length of 1 m or more and 3 m or less in plan view.
JP2018115433A 2018-06-18 2018-06-18 Sabo dam Active JP7154534B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018115433A JP7154534B2 (en) 2018-06-18 2018-06-18 Sabo dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018115433A JP7154534B2 (en) 2018-06-18 2018-06-18 Sabo dam

Publications (2)

Publication Number Publication Date
JP2019218723A JP2019218723A (en) 2019-12-26
JP7154534B2 true JP7154534B2 (en) 2022-10-18

Family

ID=69095777

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018115433A Active JP7154534B2 (en) 2018-06-18 2018-06-18 Sabo dam

Country Status (1)

Country Link
JP (1) JP7154534B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111877276B (en) * 2020-06-30 2022-01-07 水利部交通运输部国家能源局南京水利科学研究院 Bag-net type rain and flood weir for dispersing and collecting water in hilly areas and construction method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003261910A (en) 2002-03-11 2003-09-19 Kaihatsu Concrete Kk Protective body using net and protective structure
JP2009052215A (en) 2007-08-23 2009-03-12 Hokuriku Regional Development Bureau Ministry Land Infrastructure & Transport Safety ensuring method for site of construction of debris-flow dam-up structure
JP2018021333A (en) 2016-08-02 2018-02-08 東亜グラウト工業株式会社 Erosion control dam

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5162533A (en) * 1974-11-27 1976-05-31 Kobe Steel Ltd KEIKOKUNODOSEKIRYUKISEIYODAMU
KR101706588B1 (en) * 2014-11-18 2017-02-15 부경대학교 산학협력단 Eco-friendly debris flow mitigation structure and installation method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003261910A (en) 2002-03-11 2003-09-19 Kaihatsu Concrete Kk Protective body using net and protective structure
JP2009052215A (en) 2007-08-23 2009-03-12 Hokuriku Regional Development Bureau Ministry Land Infrastructure & Transport Safety ensuring method for site of construction of debris-flow dam-up structure
JP2018021333A (en) 2016-08-02 2018-02-08 東亜グラウト工業株式会社 Erosion control dam

Also Published As

Publication number Publication date
JP2019218723A (en) 2019-12-26

Similar Documents

Publication Publication Date Title
JP6799228B2 (en) Sabo dam
JP4874925B2 (en) Prevention fence such as falling rocks
JP7209991B2 (en) dam
JP4934855B2 (en) How to ensure safety at the debris flow weir structure construction site
JP7154534B2 (en) Sabo dam
JP3608773B2 (en) Falling thing capture structure
JP2009030274A (en) Permeable check dam
JP6973767B2 (en) Rockfall guard rail
DE10056857B4 (en) Anchoring-stabilized carrier buoy
WO2018069970A1 (en) Permeation-type trapping structure
JP7034464B2 (en) Rockfall guard rail
JP4925207B2 (en) Method for removing trapped debris in a debris flow damming device and debris flow damming device for carrying out this method
JP7199690B2 (en) Sabo dam secondary bank
JP5080373B2 (en) Transmission type dam
JP7104396B2 (en) Dam rope protection member and dam
JP4540259B2 (en) Suspended protective weir
JP2011153505A (en) Slope frame fixing method for promoting ground anchor effect by setting expansion and contraction zone on slope frame bottom and adjusting sheath length
JP5542405B2 (en) Wire rope tension retainer in rock fall protection work
JP2789803B2 (en) Liquefaction control piles and plugs for liquefaction control piles
JP4353388B2 (en) Connection structure of catchment
RU2564864C1 (en) Flexible breakwater
JP2007231700A (en) Guard structure for falling matter
JP7211585B2 (en) Slope stabilization structure and slope stabilization method
JP2021173041A (en) Civil engineering structure
JP3433350B2 (en) Impact absorbing net and impact absorbing method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210603

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220304

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220322

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220523

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220830

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220927

R150 Certificate of patent or registration of utility model

Ref document number: 7154534

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150