JP7134124B2 - curtain wall - Google Patents

curtain wall Download PDF

Info

Publication number
JP7134124B2
JP7134124B2 JP2019065932A JP2019065932A JP7134124B2 JP 7134124 B2 JP7134124 B2 JP 7134124B2 JP 2019065932 A JP2019065932 A JP 2019065932A JP 2019065932 A JP2019065932 A JP 2019065932A JP 7134124 B2 JP7134124 B2 JP 7134124B2
Authority
JP
Japan
Prior art keywords
steel
frame
panel unit
curtain wall
spandrel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019065932A
Other languages
Japanese (ja)
Other versions
JP2020165168A (en
Inventor
辰雄 安田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sankyo Tateyama Inc
Original Assignee
Sankyo Tateyama Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sankyo Tateyama Inc filed Critical Sankyo Tateyama Inc
Priority to JP2019065932A priority Critical patent/JP7134124B2/en
Publication of JP2020165168A publication Critical patent/JP2020165168A/en
Priority to JP2022136521A priority patent/JP2022169745A/en
Application granted granted Critical
Publication of JP7134124B2 publication Critical patent/JP7134124B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Description

本発明は、カーテンウォールに関する。 The present invention relates to curtain walls.

従来より、アルミ製の方立と無目とからなる開口部にガラスを嵌め込んだカーテンウォールが知られている(例えば、非特許文献1参照。)。かかるカーテンウォールは、防火性能を有しておらず、防火性能を有するものが求められた。 Conventionally, there has been known a curtain wall in which glass is fitted into openings made of aluminum mullions and mulches (see, for example, Non-Patent Document 1). Such a curtain wall does not have fireproof performance, and it has been required to have fireproof performance.

三協立山株式会社 三協アルミ社発行のカタログ「カーテンウォール 総合カタログ」(カタログNo.STB0261I YP.15.07-030)、2015年7月、p.26Catalog "Curtain Wall Comprehensive Catalog" (Catalog No. STB0261I YP.15.07-030) published by Sankyo Aluminum Co., Ltd., Sankyo Tateyama Co., Ltd., July 2015, p. 26

本発明は以上に述べた実情に鑑み、防火性能を有するカーテンウォールの提供を目的とする。 SUMMARY OF THE INVENTION It is an object of the present invention to provide a curtain wall having fireproof performance in view of the circumstances described above.

上記の課題を達成するために請求項1記載の発明によるカーテンウォールは、左右方向に並べて配置した複数のパネルユニットを備え、パネルユニットは、縦枠を有し、縦枠は、アルミ製枠材と、アルミ製枠材の室内側に設けたスチール製枠材を有し、アルミ製枠材にガラスが保持してあり、スチール製枠材に網入りガラス又は網入りガラスを入れたスチール製障子が保持してあることを特徴とする。 In order to achieve the above object, the curtain wall according to the first aspect of the invention comprises a plurality of panel units arranged side by side in the horizontal direction, each panel unit having a vertical frame, and the vertical frame being an aluminum frame member. and a steel frame material provided on the indoor side of the aluminum frame material, glass is held in the aluminum frame material, and wire glass or steel shoji with wire glass inserted in the steel frame material is retained.

請求項1記載の発明によるカーテンウォールは、左右方向に並べて配置した複数のパネルユニットを備え、パネルユニットは、縦枠を有し、縦枠は、アルミ製枠材と、アルミ製枠材の室内側に設けたスチール製枠材を有し、アルミ製枠材にガラスが保持してあり、スチール製枠材に網入りガラス又は網入りガラスを入れたスチール製障子が保持してあることで、防火性能を発揮できる。また、アルミ製枠材に保持したガラスとスチール製枠材に保持した網入りガラス又は網入りガラスを入れたスチール製障子との間に空気層が形成されることで、断熱性能及び遮音性能が向上する。 The curtain wall according to the first aspect of the invention comprises a plurality of panel units arranged side by side in the left-right direction, each panel unit having a vertical frame, the vertical frame comprising an aluminum frame member and a chamber made of an aluminum frame member. It has a steel frame provided inside, glass is held in the aluminum frame, and wire glass or steel shoji with wire glass is held in the steel frame, Demonstrate fire performance. In addition, by forming an air layer between the glass held in the aluminum frame and the wire glass held in the steel frame or the steel shoji with wire glass, heat insulation and sound insulation performance is improved. improves.

図5のA-A断面図である。FIG. 6 is a cross-sectional view taken along the line AA of FIG. 5; 図5のB-B断面図である。FIG. 6 is a cross-sectional view taken along the line BB of FIG. 5; 図5のC-C断面図である。6 is a cross-sectional view taken along line CC of FIG. 5; FIG. 図5のD-D断面図である。FIG. 6 is a cross-sectional view taken along line DD of FIG. 5; 本発明のカーテンウォールの第1実施形態を示す室外側正面図である。BRIEF DESCRIPTION OF THE DRAWINGS It is an outdoor side front view which shows 1st Embodiment of the curtain wall of this invention. 第1実施形態のカーテンウォールにおいて、ビジョン部のパネルユニットの室内側にスチール製障子を設けた場合の例を示す縦断面図である。FIG. 4 is a vertical cross-sectional view showing an example in which a steel shoji is provided on the indoor side of the panel unit of the vision section in the curtain wall of the first embodiment. 第1実施形態のカーテンウォールにおいて、ビジョン部のパネルユニットの室内側にスチール製障子を設けた場合の例を示す横断面図である。FIG. 4 is a cross-sectional view showing an example in which a steel shoji is provided on the indoor side of the panel unit of the vision section in the curtain wall of the first embodiment. 第1実施形態のカーテンウォールの施工手順を示す室外側正面図である。It is an outdoor side front view which shows the construction procedure of the curtain wall of 1st Embodiment. 第1実施形態のカーテンウォールの施工手順を示す横断面図である。It is a cross-sectional view which shows the construction procedure of the curtain wall of 1st Embodiment. 第1実施形態のカーテンウォールのビジョン部のパネルユニットの取付け時の状態を示す縦断面図である。FIG. 4 is a longitudinal sectional view showing a state at the time of attachment of the panel unit of the vision section of the curtain wall of the first embodiment; 本発明のカーテンウォールの第2実施形態を示す室外側正面図である。FIG. 4 is an outdoor side front view showing a second embodiment of the curtain wall of the present invention; 図11のE-E断面図である。FIG. 12 is a cross-sectional view taken along line EE of FIG. 11; 図11のF-F断面図である。FIG. 12 is a cross-sectional view taken along line FF of FIG. 11; 図11のG-G断面図である。FIG. 12 is a cross-sectional view taken along line GG of FIG. 11; 第2実施形態のカーテンウォールの施工手順を示す室外側正面図である。It is an outdoor side front view which shows the construction procedure of the curtain wall of 2nd Embodiment. 第2実施形態のカーテンウォールの施工手順を示す横断面図である。It is a cross-sectional view which shows the construction procedure of the curtain wall of 2nd Embodiment.

以下、本発明の実施の形態を図面に基づいて説明する。図1~10は、本発明のカーテンウォールの第1実施形態を示している。本カーテンウォールは、ビルの外壁を成すものであって、図5に示すように、ビル1階分にあたる層間部のうちの上部に設けたスパンドレル部6と、その下方に設けたビジョン部7とで構成されている。スパンドレル部6は、天井8から上の階の床9までの空間に対向しており、ビジョン部7は居住空間に対向している。 BEST MODE FOR CARRYING OUT THE INVENTION Hereinafter, embodiments of the present invention will be described with reference to the drawings. 1-10 show a first embodiment of the curtain wall of the invention. This curtain wall forms the outer wall of a building. consists of The spandrel part 6 faces the space from the ceiling 8 to the upper floor 9, and the vision part 7 faces the living space.

スパンドレル部6は、図3,4に示すように、スチール方立10と、スチール方立10に取付けたスパンドレルパネルユニット11と、スパンドレルパネルユニット11の室内側に設けた耐火ボード12を有している。スチール方立10は、スチールの角パイプで形成したものであり、図8(a)と図9(a)に示すように、床スラブ13と、床スラブ13を支持する梁14とに金具15で固定して、左右方向に間隔をおいて設けてある。スチール方立10の上端部と下端部には、図4に示すように、スパンドレルパネルユニット11を取付けるためのブラケット16が設けてある。 3 and 4, the spandrel section 6 has a steel mullion 10, a spandrel panel unit 11 attached to the steel mullion 10, and a fireproof board 12 provided on the indoor side of the spandrel panel unit 11. there is The steel mullion 10 is formed of steel square pipes, and as shown in FIGS. , and are spaced apart in the left-right direction. Brackets 16 for mounting spandrel panel units 11 are provided at the upper and lower ends of the steel mullion 10, as shown in FIG.

スパンドレルパネルユニット11は、図3,4に示すように、アルミ形材よるなる上枠17と下枠18と左右の縦枠19,19を四周枠組みし、その内側にガラス20を嵌め込んで構成してある。上枠17と下枠18は、図4に示すように、室内側端部に外周側に向けて突出する突出部21を有し、突出部21には室内側が開口した溝22を有し、当該溝22内にボルト23の頭を保持した裏板24を挿入し、ボルト23のネジ部をスチール方立10の上下端部に設けたブラケット16に挿通してナット掛けすることにより、スパンドレルパネルユニット11がスチール方立10に取付けられている。左右に隣接するスパンドレルパネルユニット11間の隙間は、図3に示すように、室外側から湿式のシール材25を充填して塞いである。
耐火ボード12は、スパンドレルパネルユニット11の枠17,18,19の室内側に当接して左右のスチール方立10間に設けられ、ガラス20の室内側を覆っている。
As shown in FIGS. 3 and 4, the spandrel panel unit 11 is composed of an upper frame 17, a lower frame 18, and left and right vertical frames 19, 19, which are made of aluminum, and which are framed on all four sides, and a glass 20 is fitted inside. I have As shown in FIG. 4, the upper frame 17 and the lower frame 18 have a projecting portion 21 projecting toward the outer peripheral side at the end portion on the room side, and the projecting portion 21 has a groove 22 that is open to the room side, The back plate 24 holding the head of the bolt 23 is inserted into the groove 22, and the threaded portion of the bolt 23 is inserted into the bracket 16 provided at the upper and lower ends of the steel mullion 10, and the spandrel panel is fastened with a nut. A unit 11 is attached to the steel mullion 10 . As shown in FIG. 3, the gap between the spandrel panel units 11 adjacent to each other on the left and right is filled with a wet sealing material 25 from the outdoor side and closed.
The fireproof board 12 is provided between the left and right steel mullions 10 in contact with the indoor side of the frames 17, 18, 19 of the spandrel panel unit 11, and covers the indoor side of the glass 20. - 特許庁

このようにスパンドレル部6は、スパンドレルパネルユニット11の室内側に設けたスチール方立10と、スチール方立10間に設けた耐火ボード12により、防火性能を有するものとなっている。さらにスパンドレル部6は、室内側を耐火性の被覆材26で被覆してある。 In this way, the spandrel section 6 has fireproof performance due to the steel mullions 10 provided on the indoor side of the spandrel panel unit 11 and the fireproof boards 12 provided between the steel mullions 10 . Further, the spandrel portion 6 is covered with a fire-resistant covering material 26 on the indoor side.

ビジョン部7は、図5に示すように、左右方向に並べて配置した複数のパネルユニット1,1,…で構成してある。パネルユニット1は、図1,2に示すように、上枠27と下枠28と左右の縦枠2,2を四周枠組みして構成した枠体を有しており、上枠27と下枠28と左右の縦枠2,2は、それぞれアルミ形材よりなるアルミ製枠材27a,28b,2aと、アルミ製枠材27a,27b,2aの室内側に設けたスチール製枠材27b,28b,2bを有している。そして、四周のアルミ製枠材27a,28a,2aにガラス(複層ガラス)3を保持してあり、四周のスチール製枠材27b,28b,2bに網入りガラス4を保持してある。
パネルユニット1は、図2に示すように、上枠27のアルミ製枠材27aの室内側端部に外周側に突出して設けた突片29をスパンドレルパネルユニット11の下枠18にネジ30で固定し、下枠28のアルミ製枠材28aをスパンドレルパネルユニット11の上枠17上面に固定した支持具31に支持してネジ32で固定することで、上下のスパンドレルパネルユニット11,11間に取付けてある。パネルユニット1の上枠27とスパンドレルパネルユニット11の下枠18間の隙間、及びパネルユニット1の下枠28とスパンドレルパネルユニット11の上枠17間の隙間は、室外側から湿式のシール材33を充填して塞いである。また、パネルユニット1の上枠27のスチール製枠材27bと耐火ボード12間の隙間、及びパネルユニット1の下枠28のスチール製枠材28bと耐火ボード12間の隙間は、耐火性の被覆材26で被覆してある。
As shown in FIG. 5, the vision unit 7 is composed of a plurality of panel units 1, 1, . As shown in FIGS. 1 and 2, the panel unit 1 has a frame formed by framing an upper frame 27, a lower frame 28, and left and right vertical frames 2, 2 on all four sides. 28 and the left and right vertical frames 2, 2 are aluminum frame members 27a, 28b, 2a made of aluminum profiles, and steel frame members 27b, 28b provided inside the aluminum frame members 27a, 27b, 2a. , 2b. A glass (double glazing) 3 is held by four aluminum frame members 27a, 28a and 2a, and a wired glass 4 is held by four steel frame members 27b, 28b and 2b.
As shown in FIG. 2, the panel unit 1 has a projecting piece 29 provided on the room-side end of the aluminum frame member 27a of the upper frame 27 so as to protrude to the outer peripheral side and attached to the lower frame 18 of the spandrel panel unit 11 by screws 30. The aluminum frame material 28a of the lower frame 28 is supported by a support 31 fixed to the upper surface of the upper frame 17 of the spandrel panel unit 11 and fixed with a screw 32, so that between the upper and lower spandrel panel units 11, 11 installed. The gap between the upper frame 27 of the panel unit 1 and the lower frame 18 of the spandrel panel unit 11 and the gap between the lower frame 28 of the panel unit 1 and the upper frame 17 of the spandrel panel unit 11 are filled with a wet sealing material 33 from the outdoor side. is blocked by filling the In addition, the gap between the steel frame member 27b of the upper frame 27 of the panel unit 1 and the fireproof board 12 and the gap between the steel frame member 28b of the lower frame 28 of the panel unit 1 and the fireproof board 12 are coated with a fireproof coating. It is covered with material 26 .

図1に示すように、パネルユニット1の縦枠2のスチール製枠材2bは、室内側端部に外周側に向けて突出する突片34を有し、左右に隣接するパネルユニット1,1のスチール製枠材2b,2bの突片34同士を重合させてネジ35で固定することで、左右に隣接するパネルユニット1,1間の隙間をスチール製枠材2b,2bで塞いでいる。左右に隣接するパネルユニット1,1の縦枠2,2の室内側にはカバー36が取付けてあり、カバー36でスチール製枠材2b,2bを室内側から覆っている。また、左右に隣接するパネルユニット1,1間の室外側の隙間は、室外側から湿式のシール材37を充填して塞いである。 As shown in FIG. 1, the steel frame member 2b of the vertical frame 2 of the panel unit 1 has a projecting piece 34 projecting toward the outer periphery at the end portion on the indoor side, and the panel units 1, 1 adjacent to the left and right By overlapping the projecting pieces 34 of the steel frame members 2b, 2b and fixing them with screws 35, the gaps between the panel units 1, 1 adjacent to each other on the left and right are closed with the steel frame members 2b, 2b. A cover 36 is attached to the indoor side of the vertical frames 2, 2 of the panel units 1, 1 adjacent to the left and right, and the cover 36 covers the steel frames 2b, 2b from the indoor side. Further, the gap on the outdoor side between the panel units 1, 1 adjacent to each other on the left and right is filled with a wet sealing material 37 from the outdoor side to close it.

図6,7は、ビジョン部7の他の実施例を示している。本実施例では、パネルユニット1の室内側に設けた四周のスチール製枠材27b,28b,2bの内側に、網入りガラス4をスチール製の枠材38で枠組みしてなるスチール製障子5が支持金具39で支持して室内側に開くように設けてある。スチール製障子5を室内側に開くことで、ガラス3の室内側面と網入りガラス4の室外側面を掃除することができる。 6 and 7 show another embodiment of the vision unit 7. FIG. In this embodiment, a steel shoji 5 made by framing a wire glass 4 with a steel frame 38 is placed inside four steel frame members 27b, 28b, 2b provided on the indoor side of the panel unit 1. It is provided so as to be supported by a support fitting 39 and open to the indoor side. By opening the steel shoji 5 to the indoor side, the indoor side surface of the glass 3 and the outdoor side surface of the wire glass 4 can be cleaned.

このようにビジョン部7は、パネルユニット1の室内側にスチール製枠材27b,28b,2bを設け、スチール製枠材27b,28b,2bに網入りガラス4を保持するか、網入りガラス4を入れたスチール製障子5を保持したので、防火性能を有するものとなっている。 In this way, the vision unit 7 is provided with the steel frame members 27b, 28b, 2b on the indoor side of the panel unit 1, and the wire glass 4 is held on the steel frame members 27b, 28b, 2b. Since the steel shoji 5 containing the is held, it has fireproof performance.

次に、本カーテンウォールの施工手順を説明する。まず、図8(a)と図9(a)に示すように、床スラブ13と梁14に固定してスチール方立10,10,…を取付ける。次に、図8(b)と図9(b)に示すように、スチール方立10,10間にスパンドレルパネルユニット11,11,…を取付ける。次に、図8(c)と図9(c)と図10に示すように、上下のスパンドレルパネルユニット11,11間にパネルユニット1,1,…を取付ける。パネルユニット1は、アルミ製枠材27a,28a,2aにスチール製枠材27b,28b,2bが工場であらかじめ取付けられている。アルミ製枠材27a,28a,2aに保持するガラス3と、スチール製枠材27b,28b,2bに保持する網入りガラス4は、パネルユニット1を躯体に取付ける前にセットしておいてもよいし、パネルユニット1を躯体に取付けた後からセットすることもできる。その後、スパンドレルパネルユニット11同士の隙間、パネルユニット1同士の隙間、スパンドレルパネルユニット11とパネルユニット1間の隙間に室外側からシール材25,33,37を充填してシールする。 Next, the construction procedure of this curtain wall will be explained. First, as shown in FIGS. 8(a) and 9(a), the steel mullions 10, 10, . Next, as shown in FIGS. 8(b) and 9(b), the spandrel panel units 11, 11, . Next, as shown in FIGS. 8(c), 9(c) and 10, the panel units 1, 1, . . . In the panel unit 1, steel frame members 27b, 28b and 2b are attached to aluminum frame members 27a, 28a and 2a in advance at the factory. The glass 3 held by the aluminum frame members 27a, 28a, 2a and the wired glass 4 held by the steel frame members 27b, 28b, 2b may be set before the panel unit 1 is attached to the frame. Alternatively, it can be set after the panel unit 1 is attached to the frame. After that, gaps between spandrel panel units 11, gaps between panel units 1, and gaps between spandrel panel units 11 and panel units 1 are filled with sealing materials 25, 33, and 37 from the outdoor side for sealing.

図11~16は、本発明のカーテンウォールの第2実施形態を示している。本実施形態は、建物の屋外側に足場を設置しなくても施工できるように、室外側からのシール作業を不要としたものである。
第1実施形態と異なる点について説明すると、スパンドレルパネルユニット11は、図11に示すように、ビジョン部7のパネルユニット1の2つ分の横幅を有しており、上枠17と下枠18と左右の縦枠19,19と中間縦枠40を有し、左右の縦枠19,19と中間縦枠40の間の2箇所の開口部にガラス20を嵌め込んである。図14に示すように、スチール方立10の室外側面には、コ字形断面の取付材41が取付けてあり、取付材41にスパンドレルパネルユニット11の左右の縦枠19,19及び中間縦枠40が側方からのネジ42で固定してある。
室外側から見て左側の縦枠19は凹溝43を有し、室外側から見て右側の縦枠19は一対の外向き突片44a,44bよりなる突部44を有し、左右に隣接するスパンドレルパネルユニット11,11の縦枠19,19が凹溝43と突部44で嵌合させてある。室外側の外向き突片44aの先端部にはレインバリアガスケット45が室外側に向けて取付けてあり、室内側の外向き突片44bの先端部にはウインドバリアガスケット46が室内側に向けて取付けてあり、両ガスケット45,46が凹溝43の室外側及び室内側の壁に当接している。室内側の外向き突片44bの室内側の縦枠19,19間の隙間は、室内側から湿式のシール材47を充填して塞いである。また、室外側の外向き突片44aより室外側の縦枠19,19間の隙間は、左右の縦枠19,19の見込面にそれぞれ取付けた乾式のシール材48により塞いである。
Figures 11-16 show a second embodiment of the curtain wall of the present invention. This embodiment eliminates the need for sealing work from the outdoor side so that construction can be performed without installing scaffolding on the outdoor side of the building.
As shown in FIG. 11, the spandrel panel unit 11 has a width equal to that of the panel unit 1 of the vision unit 7, and has an upper frame 17 and a lower frame 18. As shown in FIG. , left and right vertical frames 19 , 19 and an intermediate vertical frame 40 , and two openings between the left and right vertical frames 19 , 19 and the intermediate vertical frame 40 are fitted with glasses 20 . As shown in FIG. 14, a mounting member 41 having a U-shaped cross section is attached to the outdoor side surface of the steel mullion 10. The mounting member 41 is attached to the left and right vertical frames 19, 19 and the intermediate vertical frame 40 of the spandrel panel unit 11. are fixed by screws 42 from the side.
The vertical frame 19 on the left side as seen from the outdoor side has a groove 43, and the vertical frame 19 on the right side as seen from the outdoor side has a protrusion 44 consisting of a pair of outward protrusions 44a and 44b, which are adjacent to each other on the left and right. The vertical frames 19, 19 of the spandrel panel units 11, 11 are fitted to each other by means of grooves 43 and projections 44. As shown in FIG. A rain barrier gasket 45 is attached to the tip of the outward protrusion 44a on the outdoor side, and a wind barrier gasket 46 is attached to the tip of the outward protrusion 44b on the room side. Both gaskets 45 and 46 are in contact with the walls of the recessed groove 43 on the outside and the inside. A gap between the indoor-side vertical frames 19, 19 of the indoor-side outward projecting piece 44b is filled with a wet sealing material 47 from the indoor side and closed. Further, the gap between the outdoor side vertical frames 19, 19 from the outdoor side outward projecting piece 44a is closed by a dry sealing material 48 attached to the projected surfaces of the left and right vertical frames 19, 19, respectively.

ビジョン部7は、第1実施形態と同様に、左右方向に並べて配置した複数のパネルユニット1,1,…により構成され、図12に示すように、左右に隣接するパネルユニット1,1の縦枠2,2のアルミ製枠材2a,2a間の隙間は、室外側が乾式のシール材49により塞がれ、室内側が室内側から充填した湿式のシール材50により塞がれている。縦枠2のスチール製枠材2bは、シール材50を室内側から充填できるように、第1実施形態のような外周向きの突片34を有しないものとなっており、隣接するスチール製枠材2b,2b間の隙間をスチール製のカバー51で覆っている。 As in the first embodiment, the vision unit 7 is composed of a plurality of panel units 1, 1, . The gap between the aluminum frame members 2a, 2a of the frames 2, 2 is closed with a dry sealing material 49 on the outdoor side and closed with a wet sealing material 50 filled from the indoor side on the indoor side. The steel frame member 2b of the vertical frame 2 does not have the protrusion 34 directed toward the outer periphery as in the first embodiment so that the sealing material 50 can be filled from the inside of the room. A steel cover 51 covers the gap between the members 2b, 2b.

ビジョン部7のパネルユニット1は、図13に示すように、上枠27と下枠28の室内側面にボルト52の頭を保持できる溝53が形成してあり、当該溝53に保持したボルト52のネジ部をスチール方立10の上下端部に設けたブラケット16に挿通してナット掛けすることで、上下のスパンドレルパネルユニット11,11間に取付けてある。パネルユニット1の上枠27とスパンドレルパネルユニット11の下枠18間の隙間は、室外側が乾式のシール材54で塞いであり、室内側が室内側から充填した湿式のシール材55で塞いである。パネルユニット1の下枠28とスパンドレルユニット11の上枠27間の隙間も同様に、室外側が乾式のシール材54で塞いであり、室内側が室内側から充填した湿式のシール材55で塞いである。 As shown in FIG. 13, the panel unit 1 of the vision unit 7 has grooves 53 formed on the inner side surfaces of the upper frame 27 and the lower frame 28 for holding the heads of the bolts 52. The bolts 52 held in the grooves 53 are is inserted into brackets 16 provided at the upper and lower ends of the steel mullion 10 and nuts are attached to the upper and lower spandrel panel units 11, 11. As shown in FIG. The gap between the upper frame 27 of the panel unit 1 and the lower frame 18 of the spandrel panel unit 11 is closed with a dry sealing material 54 on the outdoor side and closed with a wet sealing material 55 filled from the indoor side on the indoor side. . Similarly, the gap between the lower frame 28 of the panel unit 1 and the upper frame 27 of the spandrel unit 11 is closed with a dry sealing material 54 on the outdoor side and with a wet sealing material 55 filled from the indoor side on the indoor side. be.

次に、第2実施形態のカーテンウォールの施工手順を説明する。まず、図15(a)に示すように、スパンドレルパネルユニット11にあらかじめスチール方立10を取付け(最初に取付けるスパンドレルパネルユニット11は両側に、他は片側に取付ける)、スチール方立10を床スラブ13と梁14に金具15で固定することにより、スパンドレルパネルユニット11を躯体に取付ける。その際、図16(a)に示すように、隣接するスパンドレルパネルユニット11の縦枠19同士を凹溝43と突部44で嵌合させる。次に、図15(b)と図16(b)に示すように、上下のスパンドレルパネルユニット11,11間にパネルユニット1を取付ける。その後、スパンドレルパネルユニット11同士の隙間、パネルユニッ1ト同士の隙間、スパンドレルパネルユニット11とパネルユニット1間の隙間に室内側からシール材47,50,55を充填してシールする。 Next, the construction procedure of the curtain wall of the second embodiment will be described. First, as shown in FIG. 15(a), the steel mullions 10 are attached to the spandrel panel units 11 in advance (the first spandrel panel unit 11 is attached to both sides and the others are attached to one side), and the steel mullions 10 are attached to the floor slab. The spandrel panel unit 11 is attached to the building frame by fixing it to 13 and the beam 14 with metal fittings 15 . At this time, as shown in FIG. 16(a), the vertical frames 19 of the adjacent spandrel panel units 11 are fitted to each other by the concave grooves 43 and the protrusions 44. Then, as shown in FIG. Next, as shown in FIGS. 15(b) and 16(b), the panel unit 1 is attached between the upper and lower spandrel panel units 11,11. After that, the gaps between the spandrel panel units 11, the gaps between the panel units 1, and the gaps between the spandrel panel units 11 and the panel units 1 are filled with sealing materials 47, 50, 55 from the inside of the room for sealing.

以上に述べたように本カーテンウォール(第1及び第2実施形態)は、左右方向に並べて配置した複数のパネルユニット1,1,…を備え、パネルユニット1は、縦枠2を有し、縦枠2は、アルミ製枠2aと、アルミ製枠材2aの室内側に設けたスチール製枠材2bを有し、アルミ製枠材2aにガラス3が保持してあり、スチール製枠材2bに網入りガラス4又は網入りガラス4を入れたスチール製障子5が保持してあることで、防火性能を発揮できる。また、アルミ製枠材2aに保持したガラス3とスチール製枠材2bに保持した網入りガラス4又は網入りガラス4を入れたスチール製障子5との間に空気層が形成されることで、断熱性能及び遮音性能が向上する。
さらに本カーテンウォール(第1実施形態)は、隣接するパネルユニット1,1間の隙間をスチール製枠材2b,2bで塞いであるため、隣接するパネルユニット1,1の縦枠2,2間を炎が連通することを確実に防ぐことができ、防火性能が向上する。
また、本カーテンウォール(第1実施形態)は、層間部の上部に設けたスパンドレルパネルユニット11を有し、スパンドレルパネルユニット11は、床スラブ13と梁14に支持したスチール方立10に取付けてあり、パネルユニット1は、上部がスパンドレルパネルユニット11の下部に取付けてあり、下部が下層のスパンドレルパネルユニット11の上部に取付けてあるので、防火性能を確保しながら施工性を向上できる。
また、本カーテンウォール(第2実施形態)は、隣接するパネルユニット1,1間の隙間の室外側を乾式のシール材49で塞いであり、隙間の室内側を湿式のシール材50で塞いであり、湿式のシール材50によるシール部の室内側をスチール製のカバー51で覆ったことで、室外側からのシール作業が不要なため、建物の室外側に足場を設けずに施工することができ、工期の短縮、コストの削減ができる。
本カーテンウォール(第1及び第2実施形態)は、通常、層間部の全長に亘って設けられるアルミ製の方立を無くし、スパンドレル部6にだけスチール方立10を設け、ビジョン部7には方立が無い代わりに縦枠2の室内側にスチール製枠材2bを設けることで強度を確保したので、防火性能を有するカーテンウォールを低コストで形成することができる。
パネルユニット1にスチール製枠材27b,28b,2bをあらかじめセットしておくことで、施工性が向上する。
As described above, the present curtain wall (first and second embodiments) comprises a plurality of panel units 1, 1, . . . arranged side by side in the horizontal direction. The vertical frame 2 has an aluminum frame 2a and a steel frame 2b provided on the indoor side of the aluminum frame 2a. The aluminum frame 2a holds the glass 3, and the steel frame 2b By holding the wire glass 4 or the steel shoji 5 in which the wire glass 4 is put in, the fireproof performance can be exhibited. In addition, an air layer is formed between the glass 3 held by the aluminum frame member 2a and the wire glass 4 held by the steel frame member 2b or the steel shoji 5 containing the wire glass 4. Thermal insulation performance and sound insulation performance are improved.
Furthermore, in this curtain wall (first embodiment), the gaps between the adjacent panel units 1, 1 are closed with the steel frame members 2b, 2b, so that the vertical frames 2, 2 of the adjacent panel units 1, 1 can be reliably prevented from communicating with the flame, and the fire prevention performance is improved.
In addition, the present curtain wall (first embodiment) has a spandrel panel unit 11 provided in the upper part of the interlayer section, and the spandrel panel unit 11 is attached to the steel mullion 10 supported by the floor slab 13 and the beam 14. Since the upper part of the panel unit 1 is attached to the lower part of the spandrel panel unit 11 and the lower part is attached to the upper part of the lower layer spandrel panel unit 11, the workability can be improved while ensuring the fire prevention performance.
In addition, in this curtain wall (second embodiment), the outdoor side of the gap between the adjacent panel units 1, 1 is closed with a dry sealing material 49, and the indoor side of the gap is closed with a wet sealing material 50. By covering the indoor side of the sealed portion by the wet sealing material 50 with the steel cover 51, sealing work from the outdoor side is unnecessary, so construction can be performed without providing scaffolding on the outdoor side of the building. It is possible to shorten the construction period and reduce the cost.
This curtain wall (first and second embodiments) eliminates the aluminum mullions that are normally provided over the entire length of the interlayer section, and provides steel mullions 10 only in the spandrel section 6, and in the vision section 7 Since strength is ensured by providing the steel frame member 2b on the indoor side of the vertical frame 2 in place of the absence of mullions, a curtain wall having fireproof performance can be formed at low cost.
By setting the steel frames 27b, 28b, and 2b on the panel unit 1 in advance, workability is improved.

本発明は以上に述べた実施形態に限定されない。アルミ製枠材及びスチール製枠材の断面形状は、適宜変更することができる。スチール製枠材は、アルミ製枠材の室内側に設けてあればよく、その取付け方は問わない。本発明のカーテンウォールは、スパンドレル部を有しないもの(ビジョン部だけのもの)であってもよい。 The invention is not limited to the embodiments described above. The cross-sectional shapes of the aluminum frame member and the steel frame member can be changed as appropriate. The steel frame member may be provided on the indoor side of the aluminum frame member, and the mounting method does not matter. The curtain wall of the present invention may have no spandrel section (only a vision section).

1 パネルユニット
2 縦枠
2a アルミ製枠材
2b スチール製枠材
3 ガラス
4 網入りガラス
5 スチール製障子
1 panel unit 2 vertical frame 2a aluminum frame material 2b steel frame material 3 glass 4 wired glass 5 steel shoji

Claims (1)

左右方向に並べて配置した複数のパネルユニットを備え、パネルユニットは、縦枠を有し、縦枠は、アルミ製枠材と、アルミ製枠材の室内側に設けたスチール製枠材を有し、アルミ製枠材にガラスが保持してあり、スチール製枠材に網入りガラス又は網入りガラスを入れたスチール製障子が保持してあることを特徴とするカーテンウォール。 Equipped with a plurality of panel units arranged side by side in the horizontal direction, each panel unit has a vertical frame, and the vertical frame has an aluminum frame material and a steel frame material provided on the interior side of the aluminum frame material. A curtain wall characterized by holding glass in an aluminum frame, and wire glass or a steel shoji with wire glass in a steel frame.
JP2019065932A 2019-03-29 2019-03-29 curtain wall Active JP7134124B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2019065932A JP7134124B2 (en) 2019-03-29 2019-03-29 curtain wall
JP2022136521A JP2022169745A (en) 2019-03-29 2022-08-30 curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019065932A JP7134124B2 (en) 2019-03-29 2019-03-29 curtain wall

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2022136521A Division JP2022169745A (en) 2019-03-29 2022-08-30 curtain wall

Publications (2)

Publication Number Publication Date
JP2020165168A JP2020165168A (en) 2020-10-08
JP7134124B2 true JP7134124B2 (en) 2022-09-09

Family

ID=72714345

Family Applications (2)

Application Number Title Priority Date Filing Date
JP2019065932A Active JP7134124B2 (en) 2019-03-29 2019-03-29 curtain wall
JP2022136521A Pending JP2022169745A (en) 2019-03-29 2022-08-30 curtain wall

Family Applications After (1)

Application Number Title Priority Date Filing Date
JP2022136521A Pending JP2022169745A (en) 2019-03-29 2022-08-30 curtain wall

Country Status (1)

Country Link
JP (2) JP7134124B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7134124B2 (en) * 2019-03-29 2022-09-09 三協立山株式会社 curtain wall

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000120199A (en) 1998-10-19 2000-04-25 Nisshin Steel Co Ltd Curtain wall unit
JP5847848B2 (en) 2011-02-11 2016-01-27 ザ プロクター アンド ギャンブルカンパニー Grab mechanism assembly for moving device
JP2017115568A (en) 2016-04-19 2017-06-29 株式会社Lixil Curtain wall unit, curtain wall installation structure, and installation method of curtain wall

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5847848A (en) * 1981-09-16 1983-03-19 山内サツシ工業株式会社 Curtain wall
JP2000038792A (en) * 1998-07-23 2000-02-08 Ykk Architectural Products Inc Curtain wall
JP5294305B2 (en) * 2008-06-20 2013-09-18 株式会社Lixil curtain wall
JP5232588B2 (en) * 2008-10-03 2013-07-10 株式会社三菱地所設計 Curtain wall
JP7134124B2 (en) * 2019-03-29 2022-09-09 三協立山株式会社 curtain wall

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000120199A (en) 1998-10-19 2000-04-25 Nisshin Steel Co Ltd Curtain wall unit
JP5847848B2 (en) 2011-02-11 2016-01-27 ザ プロクター アンド ギャンブルカンパニー Grab mechanism assembly for moving device
JP2017115568A (en) 2016-04-19 2017-06-29 株式会社Lixil Curtain wall unit, curtain wall installation structure, and installation method of curtain wall

Also Published As

Publication number Publication date
JP2022169745A (en) 2022-11-09
JP2020165168A (en) 2020-10-08

Similar Documents

Publication Publication Date Title
US11002007B2 (en) Process for assembling a unitized panel for use within an exterior dynamic curtain wall assembly
US7644549B2 (en) Hybrid window wall/curtain wall system and method of installation
JP5294305B2 (en) curtain wall
JP2022169745A (en) curtain wall
JP2020186574A (en) curtain wall
JP7077470B2 (en) curtain wall
JP7077435B2 (en) curtain wall
JP2022172349A (en) Fire preventive fitting
JP4976821B2 (en) Exterior exterior panel system and its construction method
EP3561189A1 (en) A partition wall, especially for creation of a fire compartment in rooms of buildings
JP6994333B2 (en) Curtain walls and buildings
JP7094194B2 (en) curtain wall
KR102283702B1 (en) Curtain wall unit
US20220333378A1 (en) Exterior wall system
JP5216117B2 (en) Fireproof wall structure provided in the opening of apartment houses and layout change method
JP7152855B2 (en) opening building materials
RU2143037C1 (en) Face wall of building
JP6662718B2 (en) Curtain wall unit, curtain wall unit assembly, and wall structure
JP2003253795A (en) Curtain wall
JP3562470B2 (en) Wall
RU2266379C1 (en) Building facade add-on enclosure and enclosure block
KR20220001795U (en) Curtain wall fireproof filling structure of building
EA030990B1 (en) Column-beam facade system connection to a floor with horizontal fire barriers
JP2020148051A (en) Building panel, building panel unit, mounting structure of building panel
JPH06294175A (en) Attic space separation wall construction

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210927

TRDD Decision of grant or rejection written
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220729

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220802

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220830

R150 Certificate of patent or registration of utility model

Ref document number: 7134124

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150