Prior art keywords
adjustment
plan
amount
price
contract
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021525418A
Other languages
Japanese (ja)
Other versions
JPWO2020250277A1 (en
Inventor
瑛美 杉山
マルタ マルミローリ
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Publication of JPWO2020250277A1 publication Critical patent/JPWO2020250277A1/en
Application granted granted Critical
Publication of JP7118266B2 publication Critical patent/JP7118266B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Water Supply & Treatment (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Power Engineering (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

本発明は、相対契約によって取引される電力の計画値を調整する電力取引調整装置、電力取引調整システムおよび電力取引調整方法に関する。 TECHNICAL FIELD The present invention relates to an electric power transaction adjustment device, an electric power transaction adjustment system, and an electric power transaction adjustment method for adjusting a planned value of electric power traded under a bilateral contract.

電力小売事業者、発電事業者といった電気事業者は、電力の需給に関する計画を電力広域的運営推進機関(以下、広域機関と呼ぶ)に提出する必要がある。広域機関は、これらの計画に基づいて、各電力会社により管轄制御されるエリア間を結ぶ連系線の空き容量の管理などを行う。広域機関に提出する計画には、翌日の計画を示す翌日計画と当日の計画を示す当日計画とがある。翌日計画の提出期限は、実際の需給の生じる日の前日の12時であり、当日計画の提出期限は、30分単位の時間帯の開始時刻の1時間前である。当日計画の提出期限は、ゲートクローズと呼ばれる。 Electric power companies, such as electric power retailers and power generators, need to submit a plan regarding the supply and demand of electric power to the Organization for Cross-regional Coordination of Electric Power Operations (hereinafter referred to as OCCTO). Based on these plans, the OCCTO manages the free capacity of interconnection lines that connect areas under jurisdiction control by each electric power company. There are two types of plans to be submitted to OCCTO: the next day's plan and the current day's plan. The deadline for submission of the next day's plan is 12:00 on the day before the day when the actual demand and supply occurs, and the deadline for submission of the plan for the current day is one hour before the start time of the time zone in units of 30 minutes. The deadline for submitting the plan for the day is called gate close.

需要家により消費される電力は、翌日計画の策定時から変動する可能性がある。特許文献1には、予測外の需要変動にも対応できるように需給計画を調整する電力小売システムが開示されている。特許文献1に記載の電力小売システムは、当日の電力の需要量および発電量に応じて、前日に作成された発電計画を修正して発電事業者へ通知する。 The power consumed by consumers may fluctuate from the next day's plan. Patent Literature 1 discloses an electric power retail system that adjusts a supply and demand plan so as to cope with unexpected fluctuations in demand. The power retail system described in Patent Literature 1 corrects the power generation plan created the previous day and notifies the power generation company of the plan according to the amount of power demanded and the amount of power generated on the day.

特開2002-123578号公報JP-A-2002-123578

電力の取引に関する契約として、電気事業者が、1対1で、当事者間で契約する相対契約がある。相対契約では、やりとりされる電力量の計画値を当事者間で調整する。例えば、相対契約を締結している事業者は、広域機関に翌日計画を提出する必要があることから、12時までに、翌日の計画値を、一旦、当事者間で合意の上確定させる。相対契約を締結している事業者は、一旦確定させた計画値を変更する場合には、その都度、当事者間で電話などの人手により調整する必要があり手間がかかるという問題がある。 As a contract related to electricity trading, there is a bilateral contract in which an electric power company concludes a one-to-one contract between parties. In a bilateral contract, the parties coordinate the planned amount of power to be exchanged. For example, since it is necessary for a business operator that has concluded a bilateral contract to submit a plan for the next day to the OCCTO, by 12:00, the plan values for the next day are once decided upon agreement between the parties. A business operator who has entered into a bilateral contract has a problem that when changing the plan values that have once been fixed, it is necessary to make manual adjustments such as telephone calls between the parties each time, which is time-consuming.

上記特許文献1に記載の技術は、電力小売システムを保有する電力小売事業者が一方的に発電計画を修正して発電事業者へ通知するものであり、上記特許文献1に記載の技術では、相対契約の当事者間で合意した計画値の調整を行うことができない。例えば、電力小売事業者が翌日計画における計画値を変更しようとしても、発電事業者がその変更を許容できない場合も考えられる。また、特許文献1に記載の技術では、発電事業者が計画値を変更することができない。このように、特許文献1に記載の技術では、相対契約を締結している事業者の両者が許容できるように変更が行われていないので、特許文献1に記載の技術を、相対契約を締結している事業者の翌日計画提出後の計画値の調整に適用することができない。 In the technology described in Patent Document 1, an electric power retailer who owns an electric power retail system unilaterally modifies the power generation plan and notifies it to the power generation company. In the technology described in Patent Document 1, Inability to make adjustments to the planned values agreed between the parties to the bilateral contract. For example, even if an electric power retailer tries to change the planned value in the next day's plan, the power producer may not allow the change. In addition, with the technology described in Patent Literature 1, the power generation company cannot change the planned value. In this way, the technology described in Patent Document 1 has not been modified so that both parties who have entered into a bilateral contract can accept the technology described in Patent Document 1. It cannot be applied to the adjustment of the planned value after the next day's plan is submitted by the operator who has

本発明は、上記に鑑みてなされたものであって、手間を抑制して、相対契約を締結している事業者の需給量の計画値の調整を行うことが可能な電力取引調整装置を得ることを目的とする。 SUMMARY OF THE INVENTION The present invention has been made in view of the above, and provides an electric power transaction coordinating apparatus capable of adjusting the planned value of supply and demand of a business operator who has entered into a bilateral contract with less effort. The purpose is to

上述した課題を解決し、目的を達成するために、本発明にかかる電力取引調整装置は、2つの事業者間で締結される電力の供給に関する相対契約ごとに、相対契約に基づいて供給される電力量の計画値を2つの事業者間で合意済みの仮の確定値から変更する調整を行うための調整条件を示す調整条件情報を記憶する記憶部、を備える。また、電力取引調整装置は、計画値を仮の確定値から変更するための調整を2つの事業者のうち一方の事業者が要求することを示す計画調整要求を受信し、受信した計画調整要求と調整条件情報とに基づいて、計画値の調整対象となる相対契約と計画値を変更する量である調整量とを決定する調整処理を行う計画調整部と、を備える。計画調整要求は、一方の事業者が希望する計画値の変更量を示す希望調整量を含む。 In order to solve the above-described problems and achieve the object, the power transaction coordinator according to the present invention supplies power based on each bilateral contract for power supply concluded between two business operators. a storage unit that stores adjustment condition information indicating adjustment conditions for adjusting the planned value of the electric energy from the tentative fixed value agreed between the two business operators. Also, the power trading coordinator receives a plan adjustment request indicating that one of the two business operators requests adjustment for changing the planned value from the tentative fixed value, and receives the received plan adjustment request. and the adjustment condition information, a plan adjustment unit that performs an adjustment process for determining a relative contract to be adjusted for the planned value and an adjustment amount that is an amount by which the planned value is changed. The plan adjustment request includes a desired adjustment amount indicating the amount of change in the plan value desired by one of the operators.

本発明にかかる電力取引調整装置は、手間を抑制して、相対契約を締結している事業者の需給量の計画値の調整を行うことができるという効果を奏する。 Advantageous Effects of Invention The power transaction coordinating apparatus according to the present invention has the effect of being able to reduce time and effort and adjust the planned value of supply and demand of a business operator who has concluded a bilateral contract.

実施の形態1にかかる電力取引調整システムの構成例を示す図A diagram showing a configuration example of the power trading coordination system according to the first embodiment 実施の形態1の事業者装置の構成例を示す図A diagram showing a configuration example of a business operator device according to the first embodiment 実施の形態1の相対契約調整装置を実現するコンピュータシステムの構成例を示す図A diagram showing a configuration example of a computer system that realizes the bilateral contract adjustment device of the first embodiment. 実施の形態1の電力取引調整システムにおいて実施される各処理と期間の関係を示す図A diagram showing the relationship between each process performed in the power trading coordination system of Embodiment 1 and the period 実施の形態1の電力取引調整システムにおける翌日の計画値の仮の確定までの動作を示すチャート図4 is a chart diagram showing operations up to provisional determination of planned values for the next day in the power trading coordination system of Embodiment 1. FIG. 実施の形態1の相対契約調整装置の記憶部に記憶される契約基本情報の一例を示す図A diagram showing an example of basic contract information stored in the storage unit of the bilateral contract adjustment device of Embodiment 1 実施の形態1の相対契約調整装置の記憶部に記憶される計画値情報の一例を示す図A diagram showing an example of plan value information stored in the storage unit of the bilateral contract adjustment device of Embodiment 1 実施の形態1の相対契約調整装置の記憶部に記憶される調整条件情報の一例を示す図A diagram showing an example of adjustment condition information stored in the storage unit of the bilateral contract adjustment apparatus of Embodiment 1 実施の形態1の相対契約調整装置の記憶部に記憶される調整量情報の一例を示す図A diagram showing an example of adjustment amount information stored in the storage unit of the bilateral contract adjustment apparatus of Embodiment 1 実施の形態1の相対契約調整装置による計画値の調整処理手順の一例を示すフローチャートFlowchart showing an example of a planned value adjustment processing procedure by the bilateral contract adjustment device of Embodiment 1 実施の形態1の計画調整要求の構成例を示す図A diagram showing a configuration example of a plan adjustment request according to the first embodiment 第1の具体例の計画変更要求を受信したときの実施の形態1の計画値の調整処理の一例を示す図A diagram showing an example of the planned value adjustment process of the first embodiment when a plan change request of the first specific example is received. 第2の具体例の計画変更要求を受信したときの実施の形態1の計画値の調整処理の一例を示す図A diagram showing an example of the planned value adjustment process of the first embodiment when a plan change request of the second specific example is received 実施の形態1のトランザクション監視部が行う変動可能量の変更動作を説明するための図FIG. 4 is a diagram for explaining the change operation of the variable amount performed by the transaction monitoring unit according to the first embodiment; 図14に示した計画値の調整が行われた後の様子を示す図A diagram showing the state after the adjustment of the planned values shown in FIG. 14 実施の形態1のトランザクション監視部による変動可能量の変更の一例を示す図A diagram showing an example of change of the variable amount by the transaction monitoring unit according to the first embodiment. 実施の形態2にかかる電力取引調整システムの構成例を示す図A diagram showing a configuration example of an electricity trading coordination system according to a second embodiment 実施の形態2の事業者装置の構成例を示す図A diagram showing a configuration example of a provider device according to the second embodiment

以下に、本発明の実施の形態にかかる電力取引調整装置、電力取引調整システムおよび電力取引調整方法を図面に基づいて詳細に説明する。なお、この実施の形態によりこの発明が限定されるものではない。 EMBODIMENT OF THE INVENTION Below, the power market coordination apparatus, power market coordination system, and power market coordination method concerning embodiment of this invention are demonstrated in detail based on drawing. In addition, this invention is not limited by this embodiment.

実施の形態1.
図1は、本発明の実施の形態1にかかる電力取引調整システムの構成例を示す図である。本実施の形態の電力取引調整システムは、本発明にかかる電力取引調整装置である相対契約調整装置1と、相対契約調整装置1に接続される事業者装置2-1~2-3とを備える。事業者装置2-1~2-3は、それぞれが異なる電気事業者(以下、事業者とも呼ぶ)により管理される装置である。事業者装置2-1~2-3は同様の構成を有しており、以下事業者装置2-1~2-3を個別に区別せずに示すときには、事業者装置2と呼ぶ。なお、図1では相対契約調整装置1に接続される事業者装置2を3台図示しているが、相対契約調整装置1に接続される事業者装置2の数は図1に示した例に限定されない。
Embodiment 1.
FIG. 1 is a diagram showing a configuration example of an electricity trading coordination system according to Embodiment 1 of the present invention. The power transaction coordination system of the present embodiment includes a bilateral contract coordination device 1, which is the power trade coordination device according to the present invention, and business operator devices 2-1 to 2-3 connected to the bilateral contract coordination device 1. . The operator devices 2-1 to 2-3 are devices managed by different electric power operators (hereinafter also referred to as operators). The operator's devices 2-1 to 2-3 have the same configuration, and are hereinafter referred to as operator's device 2 when the operator's devices 2-1 to 2-3 are not distinguished individually. Although FIG. 1 shows three operator devices 2 connected to the bilateral contract adjustment device 1, the number of the operator devices 2 connected to the bilateral contract adjustment device 1 is shown in the example shown in FIG. Not limited.

相対契約調整装置1は、相対契約によって取引される電力量の計画値(以下、相対契約の計画値ともいう)を調整する。本実施の形態における相対契約は、2つの事業者間で締結される電力の供給に関する契約である。相対契約は、1対1で締結される契約であり、契約の内容は当事者間、すなわち事業者間で合意される。事業者は、本実施の形態の電力取引調整システムに参加する際には、事業者装置2を相対契約調整装置1に接続し、事業者装置2を介して相対契約調整装置1へ、計画値の調整に必要な情報を提供する。これにより、事業者は、相対契約の計画値の調整のサービスを受けることができる。相対契約調整装置1は、複数の電気事業者によって共同で管理される装置であってもよいし、電気事業者以外の第3者により管理される装置であってもよいし、特定の電気事業者により管理される装置であってもよい。相対契約の計画値の調整の処理については後述する。 The bilateral contract adjusting device 1 adjusts the planned value of the amount of power traded by the bilateral contract (hereinafter also referred to as the bilateral contract planned value). A bilateral contract in the present embodiment is a contract concerning power supply concluded between two business operators. A bilateral contract is a contract concluded on a one-to-one basis, and the contents of the contract are agreed between the parties, that is, between the business operators. When participating in the power transaction coordination system of the present embodiment, the business operator connects the business operator device 2 to the bilateral contract adjustment device 1, and transfers the planned value to the bilateral contract adjustment device 1 via the business operator device 2. provide the information necessary for the adjustment of As a result, the business operator can receive the service of adjusting the planned value of the bilateral contract. The bilateral contract adjustment device 1 may be a device jointly managed by a plurality of electric power companies, may be a device managed by a third party other than the electric power companies, or may be a device managed by a third party other than the electric power companies. It may be a device managed by a person. The process of adjusting the planned value of the bilateral contract will be described later.

事業者装置2-1は、需給管理システム3-1と接続され、事業者装置2-2は、需給管理システム3-2と接続される。需給管理システム3-1は、事業者装置2-1を管理する事業者により管理され、需給管理システム3-2は、事業者装置2-2を管理する事業者により管理される。需給管理システム3-1,3-2は、対応する事業者の管理対象の設備による需給量、例えば電力の需要量および発電量のうち少なくとも一方を管理する。需給管理システム3-1,3-2は、それぞれの構成および機能は異なっていてもよい。例えば、需給管理システム3-1を管理する事業者が電力小売事業者である場合、需給管理システム3-1は、該事業者と契約している需要家の需要量を管理する。需給管理システム3-1を管理する事業者が電力小売事業者であり、かつこの電力小売事業者が発電機を有している場合には、需給管理システム3-1は、さらに、発電機による発電量を管理する。また、需給管理システム3-2を管理する事業者が発電事業者である場合には、需給管理システム3-2は、発電機による発電量を管理する。 The operator's device 2-1 is connected to the supply and demand management system 3-1, and the operator's device 2-2 is connected to the supply and demand management system 3-2. The supply and demand management system 3-1 is managed by the operator who manages the operator device 2-1, and the demand and supply management system 3-2 is managed by the operator who manages the operator device 2-2. The demand-supply management systems 3-1 and 3-2 manage at least one of the amount of supply and demand, for example, the amount of electricity demanded and the amount of electricity generated, by facilities managed by the corresponding business operator. The supply and demand management systems 3-1 and 3-2 may have different configurations and functions. For example, if the business operator that manages the supply and demand management system 3-1 is an electric power retailer, the supply and demand management system 3-1 manages the demand amount of consumers who have contracts with the business operator. If the business operator managing the supply and demand management system 3-1 is an electric power retailer and this electric power retailer has a generator, the supply and demand management system 3-1 further includes Manage power generation. Further, when the business operator managing the supply and demand management system 3-2 is a power generation business operator, the supply and demand management system 3-2 manages the amount of power generated by the generator.

需給管理システム3-1,3-2は、管理している需給量に基づいて、需給計画を生成し広域機関システム4へ送信する。広域機関システム4は、広域機関により管理されるシステムであり、事業者からの需給計画の提出を受け付け、各事業者の需給計画を管理する。具体的には、事業者が広域機関に提出する需給計画には、翌日の計画を示す翌日計画と当日の計画を示す当日計画とがある。これらの計画では、30分を1枠とする時間帯ごとの需給量の計画値が示される。翌日計画の提出期限は、実際の需給の生じる日の前日の12時であり、当日計画の提出期限は、30分単位の時間帯の開始時刻の1時間前である。翌日計画では、翌日の1日分、すなわち48枠分の計画値が示される。また、これらの提出期限は現在の日本において定められた値を一例として示しており、各計画の提出期限はこの例に限定されず、例えば、今後、上述した提出期限が変更された場合にも、変更後の期限を用いて本実施の形態の電力取引調整システムは、同様の処理を行うことが可能である。 The supply and demand management systems 3-1 and 3-2 generate supply and demand plans based on the managed supply and demand amounts and transmit them to the cross-regional organization system 4. FIG. The cross-regional organization system 4 is a system managed by the cross-regional organization, receives supply and demand plans submitted by business operators, and manages the demand and supply plans of each business operator. Specifically, the supply and demand plan submitted by the business operator to the OCCTO includes the next-day plan, which indicates the plan for the next day, and the current-day plan, which indicates the plan for the current day. In these plans, planned values of supply and demand for each time period are shown with 30 minutes as one frame. The deadline for submission of the next day's plan is 12:00 on the day before the day when the actual demand and supply occurs, and the deadline for submission of the plan for the current day is one hour before the start time of the time zone in units of 30 minutes. The next day's plan shows planned values for one day of the next day, that is, for 48 frames. In addition, these submission deadlines are shown as an example of the values stipulated in Japan at present, and the submission deadlines for each plan are not limited to this example. , the power trading coordination system of the present embodiment can perform similar processing using the changed deadline.

また、本実施の形態では、広域機関が各事業者の計画を管理する例を説明するが、広域機関の代わりに他の機関、国、事業者などにより各事業者の計画が管理されてもよい。この場合には、広域機関システム4のかわりに、各事業者の計画を管理する計画管理システムが用いられる。また、ここでは、電力取引調整システムが日本で運用される例を挙げて説明するが、本実施の形態の電力取引調整システムは日本以外の他国で運用されてもよい。本実施の形態の電力取引調整システムが他国で運用される場合、広域機関システム4のかわりに、各国において広域機関と同様に事業者の計画を管理する管理システムが用いられる。広域機関と同様の機関の例としては、米国のPJM(Pennsylvania-New Jersey-Maryland)、英国のNGESO(National Grid Electricity System Operator)、インドのPOSOCO(POwer System Operation COrporation Limited)などが挙げられる。また、各計画の提出期限についても、各管理システムで定められた期限が用いられればよい。 Also, in this embodiment, an example in which the OCCTO manages the plans of each business operator will be explained, but instead of the OCCTO, other organizations, countries, business operators, etc. may manage the plans of each business operator. good. In this case, instead of the cross-regional organization system 4, a plan management system for managing the plans of each operator is used. Also, here, an example in which the power trading coordination system is operated in Japan will be described, but the power trading coordination system of the present embodiment may be operated in a country other than Japan. When the power trading coordination system of the present embodiment is operated in another country, instead of the cross-regional organization system 4, a management system for managing business operators' plans is used in each country in the same manner as the cross-regional organization. Examples of organizations similar to regional organizations include PJM (Pennsylvania-New Jersey-Maryland) in the United States, NGESO (National Grid Electricity System Operator) in the United Kingdom, and POSOCO (POwer System Operation COrporation Limited) in India. Also, as for the deadline for submission of each plan, the deadline determined by each management system may be used.

図1に示した例では、事業者装置2-1,2-2がそれぞれ需給管理システム3-1,3-2と接続され、事業者装置2-3は需給管理システムと接続されていない。このように、本実施の形態の相対契約調整装置1は、需給管理システムを有している事業者だけでなく、需給管理システムを有していない事業者に対しても相対契約の計画値の調整のサービスを提供可能である。以下、需給管理システム3-1,3-2を個別に区別せずに示すときには、需給管理システム3と呼ぶ。なお、需給管理システム3に接続される事業者装置2の数、および需給管理システム3に接続されない事業者装置2の数は、図1に示した例に限定されない。 In the example shown in FIG. 1, the operator devices 2-1 and 2-2 are connected to the supply and demand management systems 3-1 and 3-2, respectively, and the operator device 2-3 is not connected to the supply and demand management system. In this way, the bilateral contract adjustment device 1 of the present embodiment can be used not only for business operators having a supply and demand management system, but also for business operators without a supply and demand management system to increase the planned value of the bilateral contract. Coordination services can be provided. Hereinafter, the supply and demand management systems 3-1 and 3-2 will be referred to as the supply and demand management system 3 when they are indicated without distinction. The number of operator devices 2 connected to the supply and demand management system 3 and the number of operator devices 2 not connected to the supply and demand management system 3 are not limited to the example shown in FIG.

本実施の形態の電力取引調整システムに参加する事業者は、上述した通り、他の事業者との間で相対契約を締結している。相対契約を締結する事業者は、広域機関に翌日計画、当日計画を提出する必要があるとともに、契約相手の事業者との間で各計画における計画値を合意しておく必要がある。このため、事業者は、需要量または発電量などが、前日の予想から変化して計画値を変更したいとしても、自由に変更することはできない。従来は、例えば、相対契約を締結している事業者は、次のような手順で計画値を調整している。まず、相対契約を締結している事業者の両者は、12時までに、翌日の計画値を、一旦、合意の上確定させて、それぞれが、広域機関へ、合意した計画値を反映させた翌日計画を提出する。その後に、計画値を変更する必要が生じた場合、事業者は、その都度、当事者間で電話などの人手により計画値を調整し、調整後の計画値を反映させた当日計画を広域機関へ提出している。このように、従来は、合意した計画値を変更する場合には、手間がかかっていた。人手による調整は、変更の要求元となる事業者だけでなく、契約相手の事業者にとっても手間がかかることになる。特に、複数の事業者と相対契約を締結している事業者は、契約ごとに上記の調整を行うことになり、当日の状況に応じて計画値を柔軟に変更することは難しい。 Business operators participating in the power trading coordination system of the present embodiment conclude bilateral contracts with other business operators, as described above. A business operator who concludes a bilateral contract must submit plans for the next day and the same day to the OCCTO, as well as agree on planned values for each plan with the business operator of the contract partner. Therefore, even if the business operator wants to change the planned value due to changes in demand or power generation from the previous day's forecast, he or she cannot change it freely. Conventionally, for example, a business operator who has concluded a bilateral contract adjusts the planned value in the following procedure. First, by 12:00 noon, both operators who have concluded a bilateral contract agreed on the planned values for the next day, and each of them reflected the agreed planned values to the OCCTO. Submit a plan for the next day. After that, if there is a need to change the planned values, the operator will manually adjust the planned values by telephone or other means between the parties each time, and send the plan for the day that reflects the adjusted planned values to the OCCTO. have submitted. Thus, conventionally, it took time and effort to change the agreed planned values. Manual adjustments are troublesome not only for the business operator requesting the change, but also for the contracting business operator. In particular, operators who have entered into bilateral contracts with multiple operators will have to make the above adjustments for each contract, making it difficult to flexibly change planned values according to the situation on the day.

本実施の形態では、相対契約調整装置1に、相対契約ごとにあらかじめ調整のための条件を登録しておき、相対契約調整装置1が、この調整条件に基づいて、翌日計画の提出後の計画値の調整を自動で実施する。これにより、手間を抑制して、相対契約を締結している事業者の需給量の計画値の調整を行うことができる。 In the present embodiment, conditions for adjustment are registered in advance in the mutual contract adjustment device 1 for each mutual contract, and the mutual contract adjustment device 1, based on these adjustment conditions, plans after submitting the plan for the next day Automatically adjust the value. As a result, it is possible to reduce the time and effort and adjust the planned value of the supply and demand amount of the business operator who has concluded the bilateral contract.

次に、相対契約調整装置1および事業者装置2の構成例について説明する。図1に示すように、相対契約調整装置1は、通信部11、計画値登録部12、調整条件登録部13、記憶部14、チェック結果反映部15、計画調整部16、トランザクション監視部17、結果出力部18および広域機関連係部19を備える。 Next, configuration examples of the bilateral contract adjustment device 1 and the business operator device 2 will be described. As shown in FIG. 1, the bilateral contract adjustment device 1 includes a communication unit 11, a planned value registration unit 12, an adjustment condition registration unit 13, a storage unit 14, a check result reflection unit 15, a plan adjustment unit 16, a transaction monitoring unit 17, A result output unit 18 and a wide area device related unit 19 are provided.

通信部11は、事業者装置2をはじめとした他の装置との間で通信を行う。計画値登録部12は、事業者装置2から通信部11を介して、計画値を示す情報である計画値情報を受信すると、受信した計画値情報を記憶部14へ格納することにより、計画値を登録する。事業者装置2から通信部11を介して、計画値の調整における調整条件を示す情報である調整条件情報を受信すると、受信した調整条件情報を記憶部14へ格納することにより、調整条件を登録する。 The communication unit 11 communicates with other devices such as the provider device 2 . When the planned value registration unit 12 receives the planned value information, which is the information indicating the planned value, from the business operator device 2 via the communication unit 11, the planned value registration unit 12 stores the received planned value information in the storage unit 14 to obtain the planned value. to register. When adjustment condition information, which is information indicating adjustment conditions for adjustment of planned values, is received from the operator device 2 via the communication unit 11, the adjustment conditions are registered by storing the received adjustment condition information in the storage unit 14. do.

記憶部14は、契約基本情報、計画値情報、調整条件情報および調整量情報を記憶する。契約基本情報は、相対契約ごとの契約に関する情報であり、調整量情報は、本実施の形態の計画値の調整で用いられる情報である。契約基本情報、計画値情報、調整条件情報および調整量情報の詳細については後述する。 The storage unit 14 stores contract basic information, planned value information, adjustment condition information, and adjustment amount information. The basic contract information is information related to a contract for each bilateral contract, and the adjustment amount information is information used for adjustment of planned values in the present embodiment. Details of the basic contract information, the planned value information, the adjustment condition information, and the adjustment amount information will be described later.

チェック結果反映部15は、通信部11を介して、計画チェック者の事業者装置2からチェック結果を受信すると、チェック結果を記憶部14の計画値情報に反映する。計画調整部16は、通信部11を介して計画調整要求を受信し、計画調整要求と調整条件情報とに基づいて、計画値の調整対象となる相対契約と計画値を変更する量である調整量とを決定する調整処理を行う。計画調整要求は、計画値を、後述する仮の確定値から変更するための調整を相対契約の当事者である2つの事業者のうち一方の事業者が要求することを示す要求であり、詳細は後述する。トランザクション監視部17は、計画調整部16による計画値の調整がループ状に行われることを避けるために、対応する事業者の計画値の変動可能量を変更する。変動可能量については後述する。チェック結果反映部15、計画調整部16およびトランザクション監視部17の動作の詳細については後述する。 The check result reflecting unit 15 , upon receiving the check result from the operator device 2 of the plan checker via the communication unit 11 , reflects the check result in the plan value information of the storage unit 14 . The plan adjustment unit 16 receives the plan adjustment request via the communication unit 11, and based on the plan adjustment request and the adjustment condition information, makes an adjustment that is an amount to change the bilateral contract to which the planned value is to be adjusted and the planned value. A reconciliation process is performed to determine the amount and The plan adjustment request is a request indicating that one of the two companies that are parties to the bilateral contract requests an adjustment to change the planned value from the tentative fixed value described later. will be described later. The transaction monitoring unit 17 changes the changeable amount of the plan value of the corresponding business operator in order to prevent the plan adjustment unit 16 from looping the adjustment of the plan value. The variable amount will be described later. Details of operations of the check result reflecting unit 15, the plan adjusting unit 16, and the transaction monitoring unit 17 will be described later.

結果出力部18は、計画調整部16による調整の結果を出力する。結果出力部18による調整の結果の出力方法は、事業者装置2へ調整の結果を送信する方法であってもよいし、調整の結果を画面表示する方法であってもよい。前者の場合には、事業者装置2が、調整の結果を画面表示することで事業者へ調整の結果を知らせることができる。 The result output unit 18 outputs the result of adjustment by the plan adjustment unit 16. FIG. A method of outputting the result of adjustment by the result output unit 18 may be a method of transmitting the result of adjustment to the provider device 2 or a method of displaying the result of adjustment on the screen. In the former case, the operator device 2 can notify the operator of the adjustment result by displaying the adjustment result on the screen.

広域機関連係部19は、計画調整部16による調整の結果を計画値情報に反映させ、調整の結果を反映させた計画値情報を、通信部11を介して、調整により計画値が変更された事業者の需給管理システム3へ送信する。これにより、事業者装置2は、調整後の計画値を当日計画に反映させ、調整を反映させた当日計画を広域機関システム4へ送信することができる。なお、事業者装置2が需給管理システム3と接続される場合には、当日計画の広域機関システム4への送信は、需給管理システム3によって行われる。この場合、事業者装置2は、調整後の計画値を反映した翌日結果を、需給管理システム3を介して広域機関システム4へ送信する。 The wide-area aircraft related section 19 reflects the result of the adjustment by the plan adjustment section 16 in the plan value information, and transmits the plan value information reflecting the adjustment result via the communication section 11 when the plan value is changed by the adjustment. It is transmitted to the supply and demand management system 3 of the business operator. As a result, the operator device 2 can reflect the adjusted plan value in the plan for the day, and transmit the plan for the day reflecting the adjustment to the cross-regional organization system 4 . When the business operator's device 2 is connected to the supply and demand management system 3 , the supply and demand management system 3 transmits the plan for the day to the cross-regional organization system 4 . In this case, the operator device 2 transmits the result of the next day reflecting the adjusted plan value to the cross-regional agency system 4 via the supply and demand management system 3 .

ここで、相対契約における計画登録者と計画チェック者について説明する。相対契約では、相対契約を締結している2つの事業者のうちの一方が計画登録者となり、他方が計画チェック者となる。計画登録者は、翌日計画として提出される翌日の計画値を登録する事業者であり、計画チェック者は、登録された計画値をチェックする事業者である。本実施の形態では、計画値は、事業者装置2から相対契約調整装置1に送信されることにより、登録される。計画チェック者は、登録された計画値をチェックし、登録された計画値に問題が有る場合には、計画登録者と調整の上、計画値を修正する。また、計画チェック者は、登録された計画値に問題が無い場合には、計画値を修正せずに承認する。計画チェック者は、例えば、事業者装置2を用いて、登録された計画値の修正量を、チェック結果として相対契約調整装置1へ送信する。登録された計画値が承認された場合には、修正量は0となる。相対契約調整装置1のチェック結果反映部15は、チェック結果を通信部11を介して、チェック計画者の事業者装置2から受信すると、チェック結果を、記憶部14に登録されている対応する計画値情報に反映する。なお、チェック結果の通知方法はこの例に限定されない。 Here, the plan registrant and the plan checker in the bilateral contract will be explained. In a bilateral contract, one of the two companies that have concluded the bilateral contract is the plan registrant, and the other is the plan checker. The plan registrant is a company that registers the next day's planned values submitted as the next day's plan, and the plan checker is a company that checks the registered planned values. In the present embodiment, plan values are registered by being transmitted from business operator apparatus 2 to bilateral contract adjustment apparatus 1 . A plan checker checks the registered plan values, and if there is a problem with the registered plan values, corrects the plan values after coordinating with the plan registrant. Also, if there is no problem with the registered plan values, the plan checker approves the plan values without correcting them. The plan checker uses, for example, the operator's device 2 to transmit the amount of correction of the registered plan value to the bilateral contract adjustment device 1 as a check result. If the registered plan value is approved, the correction amount becomes zero. When the check result reflection unit 15 of the bilateral contract adjustment device 1 receives the check result from the business operator device 2 of the check planner via the communication unit 11, the check result is transferred to the corresponding plan registered in the storage unit 14. Reflected in value information. Note that the check result notification method is not limited to this example.

図2は、本実施の形態の事業者装置2の構成例を示す図である。事業者装置2は、通信部21、計画作成部22、計画チェック部23、調整条件管理部24、調整要求生成部25および表示部26を備える。通信部21は、相対契約調整装置1をはじめとした他の装置との間で通信を行う。計画作成部22は、翌日の30分ごとの需給量の計画値を作成し、30分ごとの各計画値を計画値情報として通信部21を介して相対契約調整装置1へ送信する。なお、事業者装置2が需給管理システム3に接続される場合には、計画作成部22は、需給管理システム3から翌日計画を取得し、取得した翌日計画に基づいて翌日の30分ごとの需給量の計画値を作成してもよい。計画チェック部23は、通信部21を介して、相対契約調整装置1からまたは相対契約の相手方の事業者の事業者装置2から、相手方の事業者の計画値を示す計画値情報を取得し、相手方の事業者の計画値をチェックする。計画作成部22の処理は、計画作成部22を備える事業者装置2を管理する事業者が計画作成者である場合に行われ、計画チェック部23の処理は、計画チェック部23を備える事業者装置2を管理する事業者が計画チェック者である場合に行われる。 FIG. 2 is a diagram showing a configuration example of the business operator apparatus 2 of this embodiment. The provider device 2 includes a communication section 21 , a plan creating section 22 , a plan checking section 23 , an adjustment condition management section 24 , an adjustment request generation section 25 and a display section 26 . The communication unit 21 communicates with other devices including the bilateral contract adjustment device 1 . The plan creating unit 22 creates planned values of supply and demand for every 30 minutes for the next day, and transmits each planned value for every 30 minutes to the bilateral contract adjusting device 1 via the communication unit 21 as planned value information. When the provider device 2 is connected to the supply and demand management system 3, the plan creation unit 22 acquires the next day's plan from the supply and demand management system 3, and based on the acquired next day plan, supplies and demand for every 30 minutes of the next day. A planned value for the amount may be created. The plan check unit 23 acquires plan value information indicating the plan value of the other party from the bilateral contract adjustment device 1 or from the business operator device 2 of the other party to the bilateral contract via the communication unit 21, Check the planned value of the counterparty operator. The processing of the plan creation unit 22 is performed when the business operator managing the business device 2 including the plan creation unit 22 is the plan creator, and the processing of the plan check unit 23 is performed when the business operator including the plan check unit 23 This is done when the operator who manages the device 2 is the plan checker.

調整条件管理部24は、計画チェック部23を備える事業者装置2を管理する事業者が変動吸収者である場合に、調整条件を決定し、決定した調整条件を相対契約調整装置1へ通信部11を介して送信する。変動吸収者および調整条件については後述する。調整要求生成部25は、翌日計画の提出期限後に、計画値を変更する場合に、計画値の変更を要求するための計画調整要求を作成し、通信部21を介して相対契約調整装置1へ送信する。計画調整要求の詳細については後述する。表示部26は、計画作成部22により作成された計画値情報、契約の相手方が登録した計画値情報、相対契約調整装置1から受信した調整の結果、などを画面表示する。 The adjustment condition management unit 24 determines adjustment conditions when the business operator managing the business operator device 2 equipped with the plan check unit 23 is the fluctuation absorber, and transmits the determined adjustment conditions to the bilateral contract adjustment device 1 as the communication unit. 11. Variation absorbers and adjustment conditions will be described later. The adjustment request generation unit 25 creates a plan adjustment request for requesting a change in the plan value when the plan value is to be changed after the next day's plan submission deadline, and sends it to the bilateral contract adjustment device 1 via the communication unit 21. Send. Details of the plan adjustment request will be described later. The display unit 26 displays the planned value information created by the plan creating unit 22, the planned value information registered by the other party of the contract, the adjustment result received from the bilateral contract adjustment device 1, and the like.

なお、図2では、事業者装置2が、計画値のチェックを行う計画チェック部23を備える例を説明したが、相対契約調整装置1が、計画値のチェックを行う計画チェック部を備えてもよい。この場合、例えば、各事業者が事業者装置2を用いて相対契約調整装置1へログインするなどにより、アクセスして計画チェックの実行を指示することにより、相対契約調整装置1が相手方の事業者により登録された計画値情報を実行する。なお、この場合、相対契約調整装置1に記憶されている計画値情報については、計画値情報のうち相対契約ごとに、この相対契約に対応する計画値情報のみ閲覧および編集が可能なように構成される。 In FIG. 2, an example in which the business operator device 2 includes the plan checking unit 23 for checking the planned values has been described, but the bilateral contract adjustment device 1 may include a plan checking unit for checking the planned values. good. In this case, for example, each business operator logs into the bilateral contract adjustment device 1 using the business operator device 2 to access and instruct the execution of the plan check, so that the bilateral contract adjustment device 1 Executes the planned value information registered by In this case, the planned value information stored in the bilateral contract adjusting device 1 is configured so that only the planned value information corresponding to each bilateral contract among the bilateral contract among the bilateral contract can be browsed and edited. be done.

なお、以上の例では、相対契約を締結している事業者の一方が計画登録者であり他方が計画チェック者であったが、翌日計画の提出期限までに相対契約を締結する事業者間で計画値が合意される方法であればよく、この例に限定されない。 In the above example, one of the companies that has concluded a bilateral contract is the plan registrant and the other is the plan checker. The method is not limited to this example as long as the planned value is agreed upon.

次に、本実施の形態の電力取引調整システムを構成する各装置のハードウェアについて説明する。本実施の形態の相対契約調整装置1は、コンピュータシステム上で、相対契約調整装置1における処理が記述されたプログラムである電力取引調整プログラムが実行されることにより、コンピュータシステムが相対契約調整装置1として機能する。図3は、本実施の形態の相対契約調整装置1を実現するコンピュータシステムの構成例を示す図である。図3に示すように、このコンピュータシステムは、制御部101と入力部102と記憶部103と表示部104と通信部105と出力部106とを備え、これらはシステムバス107を介して接続されている。 Next, hardware of each device constituting the power trading coordination system of the present embodiment will be described. In the bilateral contract adjustment device 1 of the present embodiment, the computer system executes the power transaction adjustment program, which is a program describing the processing in the bilateral contract adjustment device 1, on the computer system. function as FIG. 3 is a diagram showing a configuration example of a computer system that realizes the bilateral contract adjusting apparatus 1 of the present embodiment. As shown in FIG. 3, this computer system comprises a control section 101, an input section 102, a storage section 103, a display section 104, a communication section 105 and an output section 106, which are connected via a system bus 107. there is

図3において、制御部101は、例えば、CPU(Central Processing Unit)等のプロセッサであり、本実施の形態の相対契約調整装置1における処理が記述された電力取引調整プログラムを実行する。入力部102は、たとえばキーボード、マウスなどで構成され、コンピュータシステムの使用者が、各種情報の入力を行うために使用する。記憶部103は、RAM(Random Access Memory),ROM(Read Only Memory)などの各種メモリおよびハードディスクなどのストレージデバイスを含み、上記制御部101が実行すべきプログラム、処理の過程で得られた必要なデータ、などを記憶する。また、記憶部103は、プログラムの一時的な記憶領域としても使用される。表示部104は、LCD(液晶表示パネル)などで構成され、コンピュータシステムの使用者に対して各種画面を表示する。通信部105は、通信処理を実施する受信機および送信機である。出力部106は、プリンタなどである。なお、図3は、一例であり、コンピュータシステムの構成は図3の例に限定されない。 In FIG. 3, the control unit 101 is a processor such as a CPU (Central Processing Unit), for example, and executes an electric power transaction adjustment program in which processes in the bilateral contract adjustment apparatus 1 of the present embodiment are described. The input unit 102 is composed of, for example, a keyboard and a mouse, and is used by the user of the computer system to input various information. The storage unit 103 includes various memories such as RAM (Random Access Memory) and ROM (Read Only Memory), and storage devices such as hard disks, and stores programs to be executed by the control unit 101 and necessary data obtained in the course of processing. store data, etc. The storage unit 103 is also used as a temporary storage area for programs. A display unit 104 is composed of an LCD (liquid crystal display panel) or the like, and displays various screens to the user of the computer system. A communication unit 105 is a receiver and a transmitter that perform communication processing. The output unit 106 is a printer or the like. Note that FIG. 3 is an example, and the configuration of the computer system is not limited to the example in FIG.

ここで、本実施の形態の電力取引調整プログラムが実行可能な状態になるまでのコンピュータシステムの動作例について説明する。上述した構成をとるコンピュータシステムには、たとえば、図示しないCD(Compact Disc)-ROMまたはDVD(Digital Versatile Disc)-ROMドライブにセットされたCD-ROMまたはDVD-ROMから、電力取引調整プログラムが記憶部103にインストールされる。そして、電力取引調整プログラムの実行時に、記憶部103から読み出された電力取引調整プログラムが記憶部103に格納される。この状態で、制御部101は、記憶部103に格納されたプログラムに従って、本実施の形態の相対契約調整装置1としての処理を実行する。 Here, an operation example of the computer system until the power transaction adjustment program of the present embodiment becomes executable will be described. The computer system configured as described above stores an electric power transaction coordination program from a CD (Compact Disc)-ROM or DVD (Digital Versatile Disc)-ROM set in a CD-ROM or DVD-ROM drive (not shown), for example. installed in the unit 103 . Then, when the power transaction adjustment program is executed, the power transaction adjustment program read from storage unit 103 is stored in storage unit 103 . In this state, control unit 101 executes processing as bilateral contract adjusting apparatus 1 of the present embodiment according to the program stored in storage unit 103 .

なお、上記の説明においては、CD-ROMまたはDVD-ROMを記録媒体として、相対契約調整装置1における処理を記述したプログラムを提供しているが、これに限らず、コンピュータシステムの構成、提供するプログラムの容量などに応じて、たとえば、通信部105を経由してインターネットなどの伝送媒体により提供されたプログラムを用いることとしてもよい。 In the above description, a program describing the processing in the bilateral contract adjustment apparatus 1 is provided using a CD-ROM or DVD-ROM as a recording medium, but the configuration of the computer system is not limited to this. For example, a program provided via a transmission medium such as the Internet via the communication unit 105 may be used depending on the capacity of the program.

図1に示した計画値登録部12、調整条件登録部13、チェック結果反映部15、計画調整部16、トランザクション監視部17、結果出力部18および広域機関連係部19は、図3の制御部101により実現される。また、調整条件登録部13、チェック結果反映部15、計画調整部16、トランザクション監視部17、結果出力部18および広域機関連係部19の実現には、記憶部103も用いられる。図1に示した記憶部14は、図3に示した記憶部103により実現される。図1に示した通信部11は、図3に示した通信部105により実現される。結果出力部18は、制御部101に加えて出力部106により実現される。 The planned value registration unit 12, the adjustment condition registration unit 13, the check result reflection unit 15, the plan adjustment unit 16, the transaction monitoring unit 17, the result output unit 18, and the wide area machine related unit 19 shown in FIG. 101. A storage unit 103 is also used to implement the adjustment condition registration unit 13, the check result reflection unit 15, the plan adjustment unit 16, the transaction monitoring unit 17, the result output unit 18, and the wide area machine related unit 19. FIG. Storage unit 14 shown in FIG. 1 is implemented by storage unit 103 shown in FIG. The communication unit 11 shown in FIG. 1 is implemented by the communication unit 105 shown in FIG. The result output unit 18 is implemented by the output unit 106 in addition to the control unit 101 .

図2に示した事業者装置2もコンピュータシステムにより実現される。事業者装置2は、例えば、相対契約調整装置1と同様に、図3に示したコンピュータシステムにより実現される。本実施の形態の事業者装置2は、コンピュータシステム上で、事業者装置2における処理が記述されたプログラムが実行されることにより、コンピュータシステムが事業者装置2として機能する。プログラムが実行可能な状態になるまでのコンピュータシステムの動作は、相対契約調整装置1と同様である。 The business operator device 2 shown in FIG. 2 is also implemented by a computer system. The business operator device 2 is realized by, for example, the computer system shown in FIG. 3, like the bilateral contract adjusting device 1. Business operator device 2 of the present embodiment functions as business operator device 2 by executing a program describing processing in business operator device 2 on the computer system. The operation of the computer system until the program becomes executable is the same as that of the bilateral contract adjustment device 1 .

図2に示した計画作成部22、計画チェック部23および調整要求生成部25は、図3の制御部101により実現される。また、計画作成部22、計画チェック部23および調整要求生成部25の実現には、記憶部103も用いられる。図2に示した通信部11は、図3に示した通信部105により実現される。図2に示した表示部26は、図3に示した出力部106により実現される。 The plan creation unit 22, the plan check unit 23, and the adjustment request generation unit 25 shown in FIG. 2 are implemented by the control unit 101 shown in FIG. A storage unit 103 is also used to implement the plan creation unit 22 , the plan check unit 23 and the adjustment request generation unit 25 . The communication unit 11 shown in FIG. 2 is implemented by the communication unit 105 shown in FIG. The display unit 26 shown in FIG. 2 is implemented by the output unit 106 shown in FIG.

次に、本実施の形態の電力取引調整システムの動作について説明する。まず、本実施の形態において各処理が行われる期間について説明する。図4は、本実施の形態の電力取引調整システムにおいて実施される各処理と期間の関係を示す図である。図4では、需給が実際に発生する日を当日とし、当日の前の日を前日として記載している。上述したように、各事業者は、前日には、翌日すなわち図4における当日にあたる日の需給に関する計画を翌日計画として広域機関に提出する必要がある。図4に示した例では、翌日計画の最終的な提出締切である翌日計画提出期限は、前日の12:00である。翌日計画提出期限は、相対契約の有無にかかわらず、すべての事業者が守るべき期限である。 Next, the operation of the power trading coordination system of this embodiment will be described. First, the period during which each process is performed in this embodiment will be described. FIG. 4 is a diagram showing the relationship between each process performed in the power trading coordination system of the present embodiment and the period. In FIG. 4, the day when supply and demand actually occur is the current day, and the day before the current day is the previous day. As described above, on the previous day, each operator is required to submit a plan for supply and demand on the day of the next day, that is, the current day in FIG. In the example shown in FIG. 4, the next-day plan submission deadline, which is the final submission deadline for the next-day plan, is 12:00 on the previous day. The next-day plan submission deadline is a deadline to be observed by all business operators, regardless of whether there is a bilateral contract.

図4に示した例では、計画登録期限は、翌日計画提出期限である前日の12:00の一時間前、すなわち前日の11:00に設定されている。計画登録期限は、相対契約ごとに設定される期限である。計画登録者は、計画登録期限までに翌日の計画値を、相対契約調整装置1に登録する。図4に示すように、計画登録者が翌日の計画値を登録可能な計画登録期間は、計画登録期限以前の期間である。なお、計画登録期間の始点は、計画登録期限より前であれば任意に決定可能である。計画登録期限から翌日計画提出期限までが、計画登録者によって計画をチェックすることが可能な計画チェック期間となる。 In the example shown in FIG. 4, the plan registration deadline is set to 11:00 on the previous day, one hour before 12:00 on the previous day, which is the next-day plan submission deadline. The plan registration deadline is a deadline set for each bilateral contract. The plan registrant registers the plan values for the next day in the bilateral contract adjustment device 1 by the plan registration deadline. As shown in FIG. 4, the plan registration period during which the plan registrant can register the plan values for the next day is the period before the plan registration deadline. The starting point of the plan registration period can be arbitrarily determined as long as it is before the plan registration deadline. The period from the plan registration deadline to the next day's plan submission deadline is a plan check period during which the plan registrant can check the plan.

上述したとおり、本実施の形態では、相対契約調整装置1が、翌日計画提出期限より後、相対契約ごとの調整条件に応じて、自動で計画値を調整する。相対契約調整装置1により計画値を調整可能な期間を、調整期間と呼ぶ。調整期間の始点は翌日計画提出期限であり、調整期間の終点である計画調整期限(以下、図では調整期限と記載)は、相対契約ごとに定められる。計画調整期限は、ゲートクローズより前となるように設定される。ゲートクローズは、当日計画の広域機関への提出期限であり、図4に示した例では、調整の対象となる枠(図4では調整対象コマと記載)の開始時刻の1時間前である。ゲートクローズが、相対契約の有無にかかわらず、すべての事業者が守るべき期限である。本実施の形態では、調整期間では、相対契約調整装置1による調整だけが行われ、事業者による計画値の変更はできない。なお、図4では、翌日計画提出期限とゲートクローズは、広域機関により現在定められている例を示しているが、上述したように、これらの具体的な時刻はこの例に限定されない。 As described above, in the present embodiment, the bilateral contract adjustment device 1 automatically adjusts the plan values according to the adjustment conditions for each bilateral contract after the next day's plan submission deadline. A period during which the bilateral contract adjustment device 1 can adjust the planned value is called an adjustment period. The starting point of the adjustment period is the next day plan submission deadline, and the plan adjustment deadline (hereinafter referred to as the adjustment deadline in the figure), which is the end point of the adjustment period, is determined for each bilateral contract. The schedule adjustment deadline is set to be before the gate closes. Gate closing is the deadline for submitting the plan for the day to the OCCTO, and in the example shown in FIG. Gate closing is the deadline that all operators must adhere to regardless of whether they have a bilateral contract or not. In the present embodiment, during the adjustment period, only adjustment by the bilateral contract adjustment device 1 is performed, and the plan value cannot be changed by the business operator. Note that FIG. 4 shows an example of the deadline for submission of the plan for the next day and the gate closing currently determined by the OCCTO, but as described above, these specific times are not limited to this example.

次に、本実施の形態の電力取引調整システムにおいて、翌日の計画値の仮の確定までの処理について説明する。本実施の形態では、図4を用いて説明したように、翌日計画提出期限までに、翌日の計画値の登録と計画値のチェックとが行われる。チェックを経た計画値は、翌日の計画値として一旦、仮に確定される。この仮に確定された計画値は、広域機関に提出される翌日計画における計画値に対応した値である。 Next, in the power trading coordination system of the present embodiment, processing up to provisional determination of planned values for the next day will be described. In the present embodiment, as described with reference to FIG. 4, registration of planned values for the next day and checking of the planned values are performed before the next day's plan submission deadline. Planned values that have undergone checking are tentatively determined as planned values for the next day. This tentatively determined plan value corresponds to the plan value in the next-day plan submitted to the OCCTO.

図5は、本実施の形態の電力取引調整システムにおける翌日の計画値の仮の確定までの動作を示すチャート図である。まず、計画登録者の事業者装置2は、翌日の需要量の計画を相対契約ごとに作成し(ステップS1)、作成した計画における時間帯ごとの計画値を、計画値情報として相対契約調整装置1へ送信する(ステップS2)。なお、上述したように、需給管理システム3に接続されている事業者装置2は、需給管理システム3が作成した翌日計画を取得し、翌日計画に基づいて翌日の計画を作成してもよい。 FIG. 5 is a chart showing the operation up to provisional determination of the planned value for the next day in the power trading coordination system of the present embodiment. First, the business operator device 2 of the plan registrant prepares a demand amount plan for the next day for each bilateral contract (step S1), and uses the planned value for each time slot in the prepared plan as planned value information as a bilateral contract coordinating device. 1 (step S2). As described above, the provider device 2 connected to the supply and demand management system 3 may acquire the next day's plan created by the supply and demand management system 3 and create the next day's plan based on the next day's plan.

相対契約調整装置1は、計画登録者の事業者装置2から受信した計画値を登録する(ステップS3)。具体的には、相対契約調整装置1は、記憶部14に事業者装置2から受信した計画値情報を記憶することにより、計画値を登録する。以上のステップS1からステップS3は、計画登録期間に実施される。 The bilateral contract adjustment device 1 registers the plan value received from the business operator device 2 of the plan registrant (step S3). Specifically, the bilateral contract adjustment device 1 registers the planned value by storing the planned value information received from the business operator device 2 in the storage unit 14 . Steps S1 to S3 described above are performed during the plan registration period.

次に、計画チェック期間に、計画チェック者の事業者装置2は、相対契約調整装置1から、計画登録者の事業者装置2により登録された計画値を受信する(ステップS4)。例えば、計画チェック者の事業者装置2は、相対契約調整装置1に、該当する該事業者装置2に対応する計画値情報の読み出しを要求することにより、計画登録者の事業者装置2により登録された計画値を受信する。上述した通り、計画チェック者の事業者装置2は、計画登録者の事業者装置2から計画値を受信してもよい。次に、計画チェック者の事業者装置2は、計画登録者の事業者装置2により登録された計画値をチェックし(ステップS5)、チェック結果を相対契約調整装置1へ送信する(ステップS6)。上述したように、計画チェック者の事業者装置2は、計画登録者の事業者装置2により登録された計画値の修正が必要な場合には修正量をチェック結果として相対契約調整装置1へ送信する。相対契約調整装置1は、計画チェック者の事業者装置2からチェック結果を受信すると、チェック結果を記憶している計画値情報に反映する(ステップS7)。以上の処理により、翌日の計画値が仮に確定される。ステップS7で、チェック結果の反映された後の計画値が仮の確定値となる。仮の確定値は、上述したとおり、相対契約に対応する2つの事業者間で合意済みの計画値である。 Next, during the plan check period, the operator device 2 of the plan checker receives the plan values registered by the operator device 2 of the plan registrant from the bilateral contract adjustment device 1 (step S4). For example, the business operator device 2 of the plan checker requests the bilateral contract adjustment device 1 to read out the plan value information corresponding to the relevant business operator device 2, thereby registering it with the business operator device 2 of the plan registrant receive planned values. As described above, the plan checker's operator device 2 may receive plan values from the plan registrant's operator device 2 . Next, the operator device 2 of the plan checker checks the plan values registered by the operator device 2 of the plan registrant (step S5), and transmits the check result to the bilateral contract adjustment device 1 (step S6). . As described above, the operator device 2 of the plan checker transmits the amount of correction to the bilateral contract adjustment device 1 as a check result when the plan value registered by the operator device 2 of the plan registrant needs to be corrected. do. Upon receiving the check result from the operator's device 2 of the plan checker, the bilateral contract adjustment device 1 reflects the check result in the stored plan value information (step S7). By the above processing, the planned values for the next day are tentatively determined. In step S7, the planned value after the check result is reflected becomes the provisional fixed value. The provisional fixed value is the planned value agreed between the two businesses corresponding to the bilateral contract, as described above.

次に、翌日の計画値が仮に確定された後に、本実施の形態の相対契約調整装置1が行う計画値の調整処理について説明する。ここで、まず、計画値の調整処理に用いる情報について説明する。図6は、本実施の形態の相対契約調整装置1の記憶部14に記憶される契約基本情報の一例を示す図である。契約基本情報は、後述する調整量情報の元になる情報の1つである。契約基本情報は、相対契約を締結した事業者が本実施の形態の電力取引調整システムに参加するとき、または相対契約を新たに締結したときなどに、事業者により登録される。例えば、事業者は、事業者装置2を操作することにより、事業者装置2から契約基本情報を相対契約調整装置1へ送信させることにより、契約基本情報を登録する。なお、契約基本情報は、相対契約の当事者間で合意されている情報であるため、相対契約調整装置1への契約基本情報の登録は、相対契約の当事者のどちらが行ってもよい。また、一度登録された契約基本情報が、当事者間の合意により変更された場合には、事業者は、相対契約調整装置1に登録されている内容を、事業者装置2を介して変更する。 Next, the adjustment processing of the planned values performed by the bilateral contract adjusting apparatus 1 of the present embodiment after the planned values for the next day are tentatively determined will be described. Here, first, information used for adjustment processing of planned values will be described. FIG. 6 is a diagram showing an example of basic contract information stored in the storage unit 14 of the bilateral contract adjustment apparatus 1 of the present embodiment. The contract basic information is one of the information on which adjustment amount information, which will be described later, is based. The contract basic information is registered by a business operator when the business operator who has concluded a bilateral contract participates in the power trading coordination system of the present embodiment, or when he/she newly concludes a bilateral contract. For example, the business operator registers the basic contract information by operating the business operator device 2 to transmit the basic contract information from the business operator device 2 to the bilateral contract adjustment device 1 . Since the contract basic information is information agreed between the parties to the bilateral contract, the registration of the contract basic information in the bilateral contract adjustment apparatus 1 may be performed by either party to the bilateral contract. Further, when the contract basic information that has been registered is changed by agreement between the parties, the business operator changes the content registered in the bilateral contract adjustment device 1 via the business operator device 2 .

図6に示すように、契約基本情報は、契約を識別する情報と、供給される電力量の上限値と、供給される電力量の下限値と、計画登録者と、計画登録期限と、計画調整期限とで構成される。上限値および下限値は、年単位など契約で定められている上限値および下限値であり、後述する計画値の調整処理で、調整後の値がこれらの値に収まっているかの確認に用いられてもよい。ここでは、相対契約を対象としているため、契約を識別する情報は、相対契約を識別する情報を意味する。図6では、相対契約の対象となる事業者と、電力の供給の方向とをわかりやすくするため、相対契約を識別する情報を、供給元の事業者の識別情報-供給先の事業者の識別情報の形式で示しているが情報の形式はこの例に限定されない。また、図6では、事業者の識別情報を、発電事業者Aを発Aと記載し、小売事業者aを小aと記載するといったように、事業者の種別と識別文字との略称で表している。図6に示した例では、少なくとも、発電事業者A,B,Cと小売事業者a,b,c,d,e,fとが、本実施の形態の電力取引調整システムに参加している。 As shown in FIG. 6, the contract basic information includes information identifying the contract, upper limit of power supply amount, lower limit of power supply amount, plan registrant, plan registration deadline, plan It consists of an adjustment deadline. The upper and lower limit values are the upper and lower limit values stipulated in the contract, such as on a yearly basis, and are used to confirm whether the adjusted values are within these values in the planned value adjustment processing described later. may Since bilateral contracts are targeted here, information identifying a contract means information identifying a bilateral contract. In FIG. 6, in order to make it easier to understand the business operator that is the target of the bilateral contract and the direction of power supply, the information that identifies the bilateral contract is divided into the following: Although shown in the form of information, the form of information is not limited to this example. In addition, in FIG. 6, the identification information of the businesses is represented by the abbreviations of the types of businesses and the identification characters, such as the power generation business A being described as Hori A, and the retail business business A being described as Small a. ing. In the example shown in FIG. 6, at least power generators A, B, and C and retailers a, b, c, d, e, and f participate in the power trading coordination system of the present embodiment. .

例えば、図6に示した例で、一番上に記載されている「発A-小b」は、発電事業者Aから小売事業者bへ電力が供給される相対契約を示している。この契約では、発電事業者Aが計画登録者に設定されている。このため、この相対契約の相手である小売事業者bが計画チェック者となる。また、この契約では、計画登録期限は、提出締切すなわち翌日計画の提出期限の60分前に設定されている。したがって、翌日計画の提出期限を12:00とすると、計画登録期限は11:00である。また、この契約では、計画調整期限は、ゲートクローズ(GC)の60分前に設定されている。なお、図6に示した例では、計画登録期限および計画調整期限は、それぞれ、全て同じ値となっているが、これらは相対契約ごとに設定されるものであり、同じ値でなくてもよい。 For example, in the example shown in FIG. 6, "Generator A-Small b" written at the top indicates a bilateral contract in which power is supplied from power generator A to retailer b. In this contract, the power producer A is set as the plan registrant. Therefore, the retailer b, who is the other party of this bilateral contract, becomes the plan checker. Also, in this contract, the plan registration deadline is set to 60 minutes before the submission deadline, that is, the deadline for submitting the next day's plan. Therefore, if the submission deadline for the plan for the next day is 12:00, the plan registration deadline is 11:00. Also, in this contract, the schedule adjustment deadline is set to 60 minutes before gate closing (GC). In the example shown in FIG. 6, the plan registration deadline and the plan adjustment deadline are all the same values, but they are set for each bilateral contract and do not have to be the same value. .

なお、相対契約の当事者以外は、他の相対契約に関する情報を閲覧できることは好ましくないため、相対契約調整装置1は、各相対契約に対応する契約基本情報を、対応する当時者だけが閲覧および編集可能であるように契約基本情報のアクセス権を設定しておく。例えば、事業者装置2の識別情報ごとに、記憶部14に格納されている各情報に、閲覧および編集に関するアクセス権を設定しておいてもよいし、事業者が事業者装置2を介して相対契約調整装置1へログインする構成としておき、事業者に割り当てられたログインID(IDentifier)ごとに記憶部14に格納されている各情報に閲覧および編集に関するアクセス権を設定しておいてもよい。 Since it is not preferable for anyone other than the parties to the bilateral contract to be able to view information related to other bilateral contracts, the bilateral contract adjustment device 1 allows only the corresponding parties to view and edit the contract basic information corresponding to each bilateral contract. Set the access rights for basic contract information as possible. For example, access rights related to viewing and editing may be set for each piece of information stored in the storage unit 14 for each identification information of the business operator device 2 , or the business operator may The configuration may be such that a login is made to the bilateral contract adjustment device 1, and access rights relating to viewing and editing may be set for each piece of information stored in the storage unit 14 for each login ID (IDentifier) assigned to the business operator. .

例えば、図6に示した例では、上から1番目から3番目までの契約が、発電事業者Aが当事者となる相対契約であるため、発電事業者Aは、図6に示した契約基本情報のうちエリア201の情報に対して、閲覧および編集を行うことが可能である。 For example, in the example shown in FIG. 6, since the first to third contracts from the top are bilateral contracts in which power generation company A is a party, power generation company A has the contract basic information shown in FIG. The information in area 201 can be viewed and edited.

図7は、本実施の形態の相対契約調整装置1の記憶部14に記憶される計画値情報の一例を示す図である。計画値情報は、本実施の形態の計画値の調整処理では用いられないが、広域機関との連係処理において用いられる。図7に示すように、計画値情報は、各相対契約に関しての、30分の枠ごとの各枠の時間帯を示す情報と枠内で供給される電力量とで構成される。図7に示した例では、縦方向に各時間帯を示し、横方向に相対契約を示している。なお、図7では、各契約を識別する情報として、図6に示した例と同様に、供給元の事業者の略称-供給先の事業者の略称の形式で示している。例えば、図7に示した計画値情報の左から1番目の相対契約は、発電事業者Aから小売事業者bへ電力が供給される契約である。 FIG. 7 is a diagram showing an example of planned value information stored in the storage unit 14 of the bilateral contract adjustment apparatus 1 of the present embodiment. The planned value information is not used in the process of adjusting planned values in this embodiment, but is used in the process of cooperation with the OCCTO. As shown in FIG. 7, the plan value information is composed of information indicating the time period of each 30-minute frame and the amount of electric power to be supplied within the frame for each bilateral contract. In the example shown in FIG. 7, the vertical direction indicates each time period, and the horizontal direction indicates bilateral contracts. It should be noted that in FIG. 7, as in the example shown in FIG. 6, the information for identifying each contract is shown in the format of the abbreviation of the supply source company-the abbreviation of the supply destination company. For example, the first bilateral contract from the left in the planned value information shown in FIG. 7 is a contract for power supply from power generator A to retailer b.

計画値情報は、上述したように、計画登録者による登録と、計画チェック者によるチェックとを経て仮に確定される。仮に確定された計画値は、各事業者が翌日計画として提出した計画値に対応するものである。なお、仮に確定された計画値が決定される前の手順は、上述した例に限定されない。例えば、計画登録者と計画チェック者を定めずに、相対契約の当事者間で調整することにより、翌日の計画として合意した計画値を決定し、この計画値を計画値情報として、当事者のいずれかが、翌日計画提出期限までに、相対契約調整装置1に、仮に確定された計画値情報として登録するようにしてもよい。 As described above, the planned value information is tentatively determined through registration by the plan registrant and checking by the plan checker. The tentatively decided planned values correspond to the planned values submitted by each company as the plan for the next day. It should be noted that the procedure before the tentatively determined plan value is determined is not limited to the example described above. For example, without specifying a plan registrant and a plan checker, the agreed plan value is determined as the next day's plan by coordinating between the parties of the bilateral contract, and this plan value is used as plan value information by one of the parties However, it may be registered in the bilateral contract adjustment device 1 as tentatively determined plan value information by the next day's plan submission deadline.

計画値情報は、翌日計画提出期限までに翌日の値として仮に確定された後は、相対契約調整装置1による計画値の調整処理によって変更されることがあるが、事業者からの直接的な変更はできない。また、契約基本情報と同様に、相対契約調整装置1は、各相対契約に対応する計画値情報を対応する当時者だけが閲覧および編集可能であるように計画値情報のアクセス権を設定しておく。例えば、図7に示した例では、1番左から3番目までの契約が、発電事業者Aが当事者となる相対契約であるため、発電事業者Aは、図7に示した計画値情報のうちエリア202の情報に対して、閲覧および編集を行うことが可能である。 After the plan value information is tentatively determined as the value for the next day by the next day's plan submission deadline, it may be changed by the adjustment processing of the plan value by the bilateral contract adjustment device 1, but the direct change from the business operator can't. In addition, similar to the contract basic information, the bilateral contract adjustment device 1 sets the access right of the planned value information so that only the person corresponding to the bilateral contract can view and edit the planned value information corresponding to each bilateral contract. back. For example, in the example shown in FIG. 7, since the contracts from the first left to the third are bilateral contracts in which the power generation company A is a party, the power generation company A uses the planned value information shown in FIG. Information in area 202 can be viewed and edited.

図8は、本実施の形態の相対契約調整装置1の記憶部14に記憶される調整条件情報の一例を示す図である。調整条件情報は、本実施の形態の相対契約調整装置1による計画値の調整処理の条件を示す情報である。調整条件情報は、相対契約ごとの、相対契約に基づいて供給される電力量の計画値を2つの事業者間で合意済みの仮の確定値から変更する調整を行うための調整条件を示す。調整条件情報は、後述する調整量情報の元になる情報の1つである。図8に示すように、調整条件情報は、契約を識別する情報と、調整キック者と、変動吸収者と、上げ価格と、下げ価格と、翌日計画提出値からの下げ変動可能量と、翌日計画提出値からの上げ変動可能量とで構成される。契約を識別する情報は、図6に示した契約基本情報における契約を識別する情報と同様である。上げ価格と、下げ価格と、翌日計画提出値からの下げ変動可能量と、翌日計画提出値からの上げ変動可能量とは、変動吸収者が決定する情報である。 FIG. 8 is a diagram showing an example of adjustment condition information stored in the storage unit 14 of the bilateral contract adjustment apparatus 1 of the present embodiment. The adjustment condition information is information indicating the conditions for the adjustment processing of the planned value by the bilateral contract adjustment device 1 of the present embodiment. The adjustment condition information indicates adjustment conditions for adjusting the planned value of the amount of power supplied based on the bilateral contract from the tentative fixed value agreed between the two business operators for each bilateral contract. The adjustment condition information is one of the information that forms the basis of adjustment amount information, which will be described later. As shown in FIG. 8, the adjustment condition information includes information identifying a contract, an adjustment kicker, a fluctuation absorber, an increase price, a decrease price, a possible downward fluctuation amount from the next day plan submission price, and the next day It consists of the amount of fluctuation that can be raised from the plan submission value. The information identifying the contract is the same as the information identifying the contract in the basic contract information shown in FIG. The increase price, the decrease price, the possible amount of downward fluctuation from the next day's plan submission value, and the possible upward fluctuation amount from the next day's plan submission value are information determined by the fluctuation absorber.

第1の事業者である調整キック者は、本実施の形態の相対契約調整装置1による計画値の調整処理を開始するトリガーとなる計画調整要求を送信可能な事業者であり、相対契約を締結している事業者のうちの一方である。第2の事業者である変動吸収者は、調整キック者により要求された計画値の変更を吸収する、すなわち要求に応じて計画値を変更する事業者である。1つの相対契約を締結している2つの事業者のうち、一方が調整キック者であり、他方が変動吸収者である。したがって、相対契約ごとに、調整キック者を定めれば変動吸収者は自動的に決定されることになる。相対契約を締結している事業者は、どちらが調整キック者になるかを合意の上定めておく。 The adjustment kicker, which is the first business operator, is a business operator capable of transmitting a plan adjustment request that serves as a trigger for starting the adjustment processing of the planned value by the bilateral contract adjustment device 1 of the present embodiment, and concludes a bilateral contract. It is one of the businesses that The second operator, the fluctuation absorber, is an operator who absorbs changes in the planned values requested by the adjustment kicker, that is, changes the planned values as requested. Of the two companies that have entered into one bilateral contract, one is the adjustment kicker and the other is the fluctuation absorber. Therefore, if an adjustment kicker is determined for each bilateral contract, the fluctuation absorber will be automatically determined. Business operators who have concluded a bilateral contract agree on who will be the coordinating kicker.

相対契約では、一方の事業者が他方の事業者へ電力を供給するため、どちらかの事業者が計画値を変更する場合には、他方の事業者も計画値の変更が必要となる。相対契約が1つしか存在しない場合には、調整キック者が計画値の変更を要求した場合に、この変更を受け入れ可能な事業者はこの相対契約における変動吸収者だけである。これに対し、1つの事業者が複数の相対契約を締結している場合には、この事業者の要求に応じて計画値を変更する事業者の候補が複数存在する可能性がある。すなわち、ある事業者が調整キック者となり他の事業者が変動吸収者となっている相対契約が複数存在する場合には、複数の相対契約に対応する複数の他の事業者が、実際に計画値を変更する事業者の候補となる。本実施の形態では、変動吸収者が、上げ価格と、下げ価格と、翌日計画提出値からの下げ変動可能量と、翌日計画提出値からの上げ変動可能量とを定めておくことで、相対契約調整装置1が、これらを考慮して、実際に計画値を変更する事業者と変更する電力量である調整量とを決定する。 In a bilateral contract, one business operator supplies power to the other business operator, so if either business operator changes the planned value, the other business operator also needs to change the planned value. If there is only one bilateral contract, if the adjustment kicker requests a change in the planned value, the only business operator that can accept this change is the fluctuation absorber in this bilateral contract. On the other hand, if one business operator concludes a plurality of bilateral contracts, there may be a plurality of business operator candidates who change the planned values according to the request of this business operator. In other words, if there are multiple bilateral contracts in which one business operator is the coordinating kicker and other business operators are the fluctuation absorbers, multiple other business operators corresponding to the multiple bilateral contracts will Candidates for businesses to change the value. In the present embodiment, the fluctuation absorber predetermines an increase price, a decrease price, a possible downward fluctuation amount from the next-day plan submission value, and an upward fluctuation possible amount from the next-day plan submission value. The contract adjustment device 1 considers these factors and determines the business operator that actually changes the planned value and the adjustment amount that is the amount of electric power to be changed.

上げ価格および下げ価格は第1の価格を構成する。第1の価格は、変動吸収者が、調整キック者から要求のあった計画値の変更を吸収する際の、吸収する電力量の単価である。すなわち、第1の価格は、計画値を仮の確定値から変更することにより生じて変化する電力量の単価であって第2の事業者が受け入れ可能な単価である。上げ価格は、調整キック者から要求のあった計画値の変更が供給量を上げる方向の変更であるときの単価であり、下げ価格は、調整キック者から要求のあった計画値の変更が供給量を下げる方向の変更であるときの単価である。 The increase price and the decrease price constitute the first price. The first price is the unit price of power absorbed when the fluctuation absorber absorbs the change in the planned value requested by the adjustment kicker. In other words, the first price is the unit price of electric energy that changes due to the change of the planned value from the provisional fixed value, and is the unit price acceptable to the second business operator. The increase price is the unit price when the change in the plan value requested by the adjustment kicker is a change in the direction of increasing the supply amount, and the decrease price is the change in the plan value requested by the adjustment kicker. It is the unit price when it is a change in the direction of lowering the quantity.

翌日計画提出値からの下げ変動可能量(以下、下げ変動可能量と呼ぶ)は、変動吸収者が、仮に確定された翌日の計画値から下げることが可能な最大の電力量を示す値である。図8に示した例では、下げ変動可能量は、計画値から下げることが可能な電力量であることから、正負符号が負の値で示されている。翌日計画提出値からの上げ変動可能量(以下、上げ変動可能量と呼ぶ)は、変動吸収者が、仮に確定された翌日の計画値から上げることが可能な最大の電力量を示す値である。図8に示した例では、上げ変動可能量は、計画値から上げることが可能な電力量であることから、正負符号が正の値で示されている。なお、下げ変動可能量と上げ変動可能量とを区別せずに示すときには、変動可能量と呼ぶ。変動可能量は、第2の事業者が受け入れ可能な仮の確定値からの計画値の変更量を示す。 The amount of possible downward fluctuation from the next day's plan submission value (hereinafter referred to as the possible amount of downward fluctuation) is a value that indicates the maximum amount of electric power that the fluctuation absorber can reduce from the tentatively determined planned value for the next day. . In the example shown in FIG. 8, the possible downward fluctuation amount is the amount of electric power that can be reduced from the planned value, so the positive/negative sign is indicated by a negative value. The possible increase fluctuation amount from the next day's plan submission value (hereinafter referred to as the increase fluctuation amount) is a value that indicates the maximum power amount that the fluctuation absorber can raise from the tentatively determined plan value for the next day. . In the example shown in FIG. 8, the increase variable amount is the electric power amount that can be increased from the planned value, so the positive and negative signs are indicated by positive values. It should be noted that when the downward fluctuation amount and the upward fluctuation amount are indicated without distinction, they are referred to as the fluctuation amount. The variable amount indicates the amount of change in the planned value from the tentative fixed value acceptable to the second operator.

なお、調整条件情報のうち調整キック者および変動吸収者の情報は、調整キック者と変動吸収者のうちいずれの事業者装置2から登録されてもよい。ただし、相対契約ごとに、どちらが調整キック者となるかは、当事者間で合意されているとする。また、上げ価格と、下げ価格と、下げ変動可能量と、上げ変動可能量とは変動吸収者によって定められるので、変動吸収者の事業者装置2から登録される。調整条件情報は、枠ごとすなわち30分の時間帯ごとに設定されてもよいし、調整条件情報が変更されない限り登録された調整条件情報を枠によらずに用いることとして枠ごとには調整条件情報を設定しない形態としてもよい。枠ごとに調整条件情報が設定される場合には、図8に例示した情報が時間帯ごとに記憶部14に記憶される。また、複数の枠を単位として調整条件情報を設定するようにしてもよい。 The information of the adjustment kicker and the fluctuation absorber in the adjustment condition information may be registered from either the adjustment kicker or the fluctuation absorber. However, for each bilateral contract, it is assumed that the parties have agreed which of them will be the coordinating kicker. Also, since the increase price, decrease price, possible downward fluctuation amount, and possible upward fluctuation amount are determined by the fluctuation absorber, they are registered from the operator device 2 of the fluctuation absorber. The adjustment condition information may be set for each frame, that is, for each 30-minute time slot, or the registered adjustment condition information may be used regardless of the frame as long as the adjustment condition information is not changed. A form in which no information is set may be adopted. When the adjustment condition information is set for each frame, the information illustrated in FIG. 8 is stored in the storage unit 14 for each time period. Alternatively, the adjustment condition information may be set in units of a plurality of frames.

また、契約基本情報と同様に、相対契約調整装置1は、各相対契約に対応する調整条件情報を対応する当時者だけが閲覧および編集可能であるように調整条件情報のアクセス権を設定しておく。ただし、調整条件情報は、変動吸収者により決定される情報であるため、対応する相対契約の変動吸収者だけが、閲覧および編集可能であるように調整条件情報のアクセス権を設定しておいてもよい。調整キック者については対応する相対契約に関する調整条件情報の閲覧だけを可能とするようアクセス権を設定してもよい。例えば、図8に示した例では、1番上から3番目までの契約が、発電事業者Aが当事者となる相対契約であるため、発電事業者Aは、図8に示した調整条件情報のうちエリア203の情報に対して、閲覧および編集を行うことが可能である。 In addition, similar to the contract basic information, the bilateral contract adjustment device 1 sets the access right to the adjustment condition information so that only the corresponding party can view and edit the adjustment condition information corresponding to each bilateral contract. back. However, since the adjustment terms information is information determined by the change absorber, the access rights to the adjustment terms information should be set so that only the change absorber of the corresponding bilateral contract can view and edit it. good too. Access rights may be set so that adjustment kickers can only view adjustment condition information related to the corresponding bilateral contract. For example, in the example shown in FIG. 8, the contracts from the top to the third are bilateral contracts in which the power generation company A is a party, so the power generation company A uses the adjustment condition information shown in FIG. Information in area 203 can be viewed and edited.

なお、変動吸収者は、上げ価格と、下げ価格と、下げ変動可能量と、上げ変動可能量とを、例えば、自身が管理する設備の能力と需給状況などに応じて決定する。例えば、変動吸収者が発電事業者であり、相対契約における電力の供給の方向が、発電事業者から小売事業者へ電力を供給する方向である場合、上げ価格は、発電にかかる原価などと得たい利益とを考慮して決定する。また、変動吸収者が発電事業者であり、相対契約における電力の供給の方向が、発電事業者から小売事業者へ電力を供給する方向である場合、管理する全ての発電機で発電が可能な最大値の合計である最大発電量と翌日の計画値との差に応じて、上げ変動可能量を決定する。また、複数の相対契約に関して変動吸収者となっている事業者は、下げ変動可能量、上げ変動可能量のそれぞれを、複数の相対契約に割り振ることにより相対契約ごとの下げ変動可能量、上げ変動可能量を決定する。例えば、発電事業者である変動吸収者が、最大発電量と翌日の計画値とを考慮して、合計の300kWhまで計画値を上げることが可能であると判断したとする。そして、この変動吸収者は3つの相対契約において変動吸収者となっていたとする。この場合、変動吸収者は300kWhを3で割った100kWhを、各相対契約の上げ変動可能量としてもよいし、3つの相対契約にそれぞれ80kWh、100kWh、120kWhといったように異なる上げ変動可能量を割当てるようにしてもよい。 Note that the fluctuation absorber determines the increase price, the decrease price, the possible amount of downward fluctuation, and the possible amount of upward fluctuation according to, for example, the capacity of the equipment that it manages and the supply and demand situation. For example, if the fluctuation absorber is a power generation company and the direction of power supply in the bilateral contract is from the power generation company to the retailer, the price increase can be regarded as the cost of power generation. You want to make a decision considering your interests. In addition, if the fluctuation absorber is a power generation company and the direction of power supply in the bilateral contract is the direction of supplying power from the power generation company to the retailer, all power generators under management can generate power. Depending on the difference between the maximum power generation amount, which is the sum of the maximum values, and the planned value for the next day, the amount that can be increased is determined. In addition, a business operator that is a fluctuation absorber for multiple bilateral contracts can allocate the possible downward fluctuation amount and the possible upward fluctuation amount to multiple bilateral contracts, respectively. determine the possible amount. For example, assume that the fluctuation absorber, who is a power generation company, considers the maximum power generation amount and the planned value for the next day and determines that the planned value can be raised to a total of 300 kWh. Suppose that this fluctuation absorber has become a fluctuation absorber in three bilateral contracts. In this case, the fluctuation absorber may divide 300 kWh by 3, ie, 100 kWh, as the maximum variable amount for each bilateral contract, or assign different maximum variable amounts, such as 80 kWh, 100 kWh, and 120 kWh, to the three bilateral contracts. You may do so.

また、変動吸収者が発電事業者であり、相対契約における電力の供給の方向が、発電事業者から小売事業者へ電力を供給する方向である場合は、計画値を下げる方向の調整が行われると、小売事業者から発電事業者へ仮に確定した計画値からの減少分が返品されることに相当する。発電事業者は、仮に確定した計画値から減少した分を買い取ることになるが、発電事業者にとっては計画値が減るとその分を支払うことになるため下げ価格は一般には低い値に設定される。また、変動吸収者が小売事業者であり、相対契約における電力の供給の方向が、発電事業者から小売事業者へ電力を供給する方向である場合は、計画値を上げる方向の調整が行われると、発電事業者が小売事業者に対して、仮に確定した計画値からの増加分を強制的に購入させることに相当する。したがって、この場合には、一般には、下げ価格は低い値に設定される。また、変動吸収者が小売事業者であり、相対契約における電力の供給の方向が、発電事業者から小売事業者へ電力を供給する方向である場合に、計画値を下げる方向の調整が行われると、発電事業者が小売事業者に対して、仮に確定した計画値より少ない供給量しか供給されないことになり、小売事業者は他の手段により足りない電力を購入するなどにより対応する。したがって、この場合には、一般には、上げ価格は、小売事業者が別の手段で調達する場合のコストなどを考慮して設定される。上げ価格と、下げ価格と、下げ変動可能量と、上げ変動可能量の決定方法は、上述した例に限定されず、変動吸収者は、上げ価格と、下げ価格と、下げ変動可能量と、上げ変動可能量とを、自身の都合により任意に決定することが可能である。 In addition, if the fluctuation absorber is a power generation company and the direction of power supply in the bilateral contract is from the power generation company to the retailer, adjustments will be made to lower the planned value. This corresponds to the return of the decrease from the tentatively determined planned value from the retailer to the power generation business. Power generation companies will purchase the amount that has decreased from the tentatively determined planned value, but if the planned value decreases, the power generation company will have to pay for that amount, so the reduced price is generally set at a low value. . In addition, if the fluctuation absorber is a retailer and the direction of power supply in the bilateral contract is from the power generator to the retailer, adjustments will be made to raise the planned value. This corresponds to the power generation company forcing the retailer to purchase the increased amount from the tentatively determined planned value. Therefore, in this case, the reduced price is generally set at a low value. In addition, if the fluctuation absorber is a retailer and the direction of power supply in the bilateral contract is from the power generator to the retailer, adjustments are made to lower the planned value. In this case, the power generator will supply the retailer with a supply amount less than the provisionally determined planned value, and the retailer will respond by purchasing the insufficient power by other means. Therefore, in this case, the increased price is generally set in consideration of the cost of procurement by the retailer by other means. The method of determining the increase price, decrease price, possible decrease amount, and increase amount is not limited to the above example. It is possible to arbitrarily determine the amount of possible upward fluctuation according to one's own convenience.

図9は、本実施の形態の相対契約調整装置1の記憶部14に記憶される調整量情報の一例を示す図である。調整量情報は、本実施の形態の相対契約調整装置1による計画値の調整処理で用いられるとともに、計画値の調整処理の過程で適宜更新される情報である。相対契約調整装置1の計画調整部16は、契約基本情報および調整条件情報が登録されると契約基本情報および調整条件情報に基づいて調整量情報を生成して記憶部14に格納する。また、契約基本情報および調整条件情報のうちの一方または両方が更新されると、相対契約調整装置1の計画調整部16は、更新された情報に基づいて調整量情報を更新する。調整量情報は、枠ごとすなわち30分の時間帯ごとに設定される。すなわち、記憶部14には、30分の時間帯ごとの調整量情報が記憶される。 FIG. 9 is a diagram showing an example of adjustment amount information stored in the storage unit 14 of the bilateral contract adjustment apparatus 1 of the present embodiment. The adjustment amount information is information that is used in the planned value adjustment processing by the bilateral contract adjustment device 1 of the present embodiment and that is updated as appropriate during the planned value adjustment processing. When the basic contract information and the adjustment condition information are registered, the plan adjustment unit 16 of the bilateral contract adjustment device 1 generates adjustment amount information based on the basic contract information and the adjustment condition information and stores it in the storage unit 14 . Further, when one or both of the contract basic information and the adjustment condition information are updated, the plan adjustment unit 16 of the bilateral contract adjustment device 1 updates the adjustment amount information based on the updated information. The adjustment amount information is set for each frame, that is, for each 30-minute time slot. That is, the storage unit 14 stores the adjustment amount information for each time period of 30 minutes.

図9に示すように、調整量情報は、契約を識別する情報と、調整期限と、調整キック者と、変動吸収者と、上げ価格と、下げ価格と、下げ変動可能量と、上げ変動可能量と、現時点での変動量とで構成される。調整量情報のうち、調整期限と現時点での変動量とを除いた情報は、調整条件情報と同様の項目であり、初期値としては調整条件情報と同一の値が格納される。また、調整量情報の調整期限には、契約基本情報の調整期限と同一の値が格納される。調整キック者と、変動吸収者と、上げ価格と、下げ価格とは、相対契約調整装置1によって変更されることはないが、下げ変動可能量および上げ変動可能量は、後述するようにループ状に計画値の調整が行われることがないようにするために、相対契約調整装置1によって変更される場合がある。 As shown in FIG. 9, the adjustment amount information includes information identifying a contract, an adjustment deadline, an adjustment kicker, a fluctuation absorber, an increase price, a decrease price, a possible amount of downward fluctuation, and an upward fluctuation possible. It consists of the amount and the amount of fluctuation at the present time. Of the adjustment amount information, information other than the adjustment deadline and the amount of fluctuation at the present time is the same item as the adjustment condition information, and the same value as the adjustment condition information is stored as the initial value. Further, the adjustment term of the adjustment amount information stores the same value as the adjustment term of the basic contract information. The adjustment kicker, the fluctuation absorber, the raising price, and the lowering price are not changed by the bilateral contract adjustment device 1, but the downward fluctuation amount and the upward fluctuation amount are looped as described later. may be changed by the bilateral contract adjustment device 1 in order to prevent the planned value from being adjusted in the future.

現時点での変動量は、調整処理によって仮の確定値から変更された調整量の現時点での累積値を示し、初期値は0に設定される。後述する計画値の調整処理により、変動吸収者の計画値が調整処理により変更された場合、この調整量が現時点での変動量に反映される。すなわち、現時点での変動量は、計画値の調整のたびに更新される。相対契約調整装置1は、各相対契約の現時点での変動量が、下げ変動可能量を下回らずかつ上げ変動可能量を超えないように、計画値の調整を実施する。 The amount of variation at the present time indicates the accumulated value at the present time of the adjustment amount that has been changed from the temporary fixed value by the adjustment process, and the initial value is set to zero. When the planned value of the fluctuation absorber is changed by the adjustment processing of the planned value, which will be described later, this adjustment amount is reflected in the current fluctuation amount. That is, the current variation amount is updated each time the planned value is adjusted. The bilateral contract adjusting device 1 adjusts the plan value so that the current fluctuation amount of each bilateral contract does not fall below the possible downward fluctuation amount and does not exceed the possible upward fluctuation amount.

次に、本実施の形態の相対契約調整装置1による計画値の調整処理の詳細について説明する。本実施の形態の計画値の調整処理では、相対契約調整装置1は、変動吸収者によってあらかじめ設定された調整条件と、計画調整要求により調整キック者から要求された条件とを用いて、調整が成立する条件を満たす変動吸収者と調整量を求める。調整キック者と変動吸収者を決めずに、任意の事業者から計画値の調整の要求を受け付けると相反する方向の調整を同時に受ける可能性もあり、調整処理が複雑になる。本実施の形態では、このように、調整キック者と変動吸収者の役割を分けて、調整を行うことで、調整処理が複雑化することを抑制して、計画値の調整を行うことができる。 Next, the details of the planned value adjustment processing by the bilateral contract adjustment device 1 of the present embodiment will be described. In the planned value adjustment process of the present embodiment, the bilateral contract adjustment device 1 uses the adjustment conditions preset by the fluctuation absorber and the conditions requested by the adjustment kicker according to the plan adjustment request, so that the adjustment can be performed. A fluctuation absorber and an adjustment amount that satisfy the conditions to be established are obtained. If a request for adjustment of planned values is received from an arbitrary business operator without determining an adjustment kicker and a fluctuation absorber, there is a possibility that adjustments in opposite directions will be received at the same time, which complicates the adjustment process. In this embodiment, by separating the roles of the adjustment kicker and the variation absorber and performing adjustment in this way, it is possible to suppress the adjustment process from becoming complicated and adjust the planned value. .

図10は、本実施の形態の相対契約調整装置1による計画値の調整処理手順の一例を示すフローチャートである。図10に示した処理は、図5で説明した翌日の計画値の仮の確定の後に行われる。図10に示すように、相対契約調整装置1の計画調整部16は、通信部11を介して、事業者装置2から計画調整要求を受信したか否かを判断する(ステップS11)。なお、図10に示す処理が行われる前に、各事業者は、契約基本情報および調整条件情報を登録済であり、相対契約調整装置1の計画調整部16は、調整条件情報に基づいて調整量情報を生成して、調整量情報を記憶部14へ格納済みであるとする。 FIG. 10 is a flow chart showing an example of a procedure for adjusting the planned values by the bilateral contract adjusting apparatus 1 of the present embodiment. The processing shown in FIG. 10 is performed after the provisional determination of the planned values for the next day explained in FIG. As shown in FIG. 10, the plan adjustment unit 16 of the bilateral contract adjustment device 1 determines whether or not a plan adjustment request has been received from the business operator device 2 via the communication unit 11 (step S11). Before the processing shown in FIG. 10 is performed, each business operator has already registered basic contract information and adjustment condition information, and the plan adjustment unit 16 of the bilateral contract adjustment device 1 adjusts based on the adjustment condition information. It is assumed that the amount information has been generated and the adjustment amount information has been stored in the storage unit 14 .

図11は、本実施の形態の計画調整要求の構成例を示す図である。図11に示すように、計画調整要求には、送信元の事業者を示す事業者の識別情報と、調整対象の日時と、送信元の事業者が調整を希望する計画値の変更量を示す希望調整量と、希望価格とが含まれる。送信元の事業者を示す事業者の識別情報は、計画調整要求の送信元の事業者を示す識別情報であり、調整対象の日時は、計画値の変更要求の対象となる枠、すなわち30分の時間帯を示す情報である。調整を希望する変更量(以下、希望調整量)は、計画調整要求の送信元の事業者が、現在の計画値から変更を希望する量を示す。希望調整量は、計画調整要求の送信元の事業者において、電力が足りなくなるときに負の値をとり、電力が余るときに正の値をとることとする。例えば、計画調整要求の送信元の事業者が電力の供給元となる相対契約の場合には、供給する電力が足りなくなる場合には、希望調整量は負の値となる。このとき、この相対契約では、供給される電力が減ることになるので、供給量の計画値を減少させる調整が行われる。一方、計画調整要求の送信元の事業者が電力の供給を受ける供給先となる相対契約の場合には、供給する電力が足りなくなる場合には、希望調整量は負の値となるが、この相対契約の計画値の調整では計画値を増やす調整が行われることになる。このように、同じ希望調整量であっても、相対契約の電力の供給の方向によって計画値の調整において計画値を上げるか下げるかの方向が異なることになる。 FIG. 11 is a diagram showing a configuration example of a plan adjustment request according to this embodiment. As shown in FIG. 11, the plan adjustment request indicates the identification information of the operator indicating the sender, the date and time to be adjusted, and the amount of change in the plan value that the sender wishes to adjust. A desired adjustment amount and a desired price are included. The business operator identification information indicating the transmission source business operator is the identification information indicating the transmission source business operator of the plan adjustment request. This is information indicating the time zone of The amount of change desired to be adjusted (hereinafter referred to as desired adjustment amount) indicates the amount desired to be changed from the current plan value by the operator who sent the plan adjustment request. The desired adjustment amount is assumed to take a negative value when the power is insufficient in the operator who sent the plan adjustment request, and take a positive value when the power is surplus. For example, in the case of a bilateral contract in which the provider of the plan adjustment request is the power supply source, the desired adjustment amount becomes a negative value when the power to be supplied becomes insufficient. At this time, in this bilateral contract, the amount of power to be supplied will decrease, so an adjustment is made to reduce the planned amount of supply. On the other hand, in the case of a bilateral contract in which the business operator that sent the plan adjustment request is the recipient of the power supply, the desired adjustment amount will be a negative value if the power to be supplied becomes insufficient. In the adjustment of the planned value of the bilateral contract, an adjustment is made to increase the planned value. In this way, even if the desired adjustment amount is the same, the direction of increasing or decreasing the planned value in the adjustment of the planned value will differ depending on the direction of power supply in the bilateral contract.

希望価格は、計画値を仮の確定値から変更することにより生じて変化する電力量の単価であって、計画調整要求の要求元の事業者が希望する単価を示す。希望価格は、変更によって変更を要求した事業者が最終的に変更された量である調整量に応じて調整キック者が変動吸収者に支払うまたは変動吸収者が調整キック者へ支払う際の、調整キック者にとっての希望単価である。調整量に関して変動吸収者と調整キック者のうちどちらが支払者になるかは、相対契約で定められている電力の供給の方向、電力の供給元と供給先のどちらの事業者が調整キック者であるか、および計画値を下げる調整か上げる調整か、によって決まる。例えば、発電事業者Aから小売事業者aへ電力を供給する相対契約があり、発電事業者Aが調整キック者であれば、計画値を上げる調整が行われた場合には、発電事業者Aが小売事業者aから支払を受ける。このため、調整キック者の利益を考慮すれば、希望単価は高いほど望ましい。一方で、このような場合には、変動吸収者である小売事業者は調整条件情報における下げ価格は低く設定されている可能性が高いことから、希望単価を高く設定すると、調整が成立しない可能性もある。したがって、調整キック者は、例えば、調整の必要度などに応じて希望単価を決定する。 The desired price is the unit price of electric energy that changes due to the change of the planned value from the tentative fixed value, and indicates the unit price desired by the business operator who requested the plan adjustment request. The desired price is the final amount changed by the business operator who requested the change due to the change. It is the desired unit price for the kicker. Regarding the amount of adjustment, which of the fluctuation absorber and the adjustment kicker will be the payer depends on the direction of the electricity supply specified in the bilateral contract, and which of the electricity supply source and the supply destination is the adjustment kicker. and whether it adjusts to lower or higher planned values. For example, if there is a bilateral contract to supply electricity from power generation company A to retailer a, and power generation company A is the adjustment kicker, if an adjustment is made to raise the planned value, power generation company A receives payment from retailer a. Therefore, considering the profit of the adjustment kicker, the higher the desired unit price, the better. On the other hand, in such a case, it is highly likely that the retailer, who absorbs fluctuations, has set a low discounted price in the adjustment condition information. There is also sex. Therefore, the adjustment kicker determines the desired unit price according to, for example, the degree of necessity of adjustment.

図10の説明に戻る。ステップS11で事業者装置2から計画調整要求を受信していないと判断した場合(ステップS11 No)、計画調整部16は、ステップS11を繰り返す。ステップS11で事業者装置2から計画調整要求を受信したと判断した場合(ステップS11 Yes)、計画調整部16は、計画調整要求を送信した事業者装置2に対応する事業者によって調整可能な相対契約が有るか否かを判断する(ステップS12)。具体的には、計画調整部16は、記憶部14に格納されている調整量情報を参照して、計画調整要求の送信元の事業者が調整キック者となっている相対契約があるか否かを判断する。 Returning to the description of FIG. If it is determined in step S11 that the plan adjustment request has not been received from the provider apparatus 2 (step S11 No), the plan adjustment unit 16 repeats step S11. If it is determined in step S11 that a plan adjustment request has been received from the provider apparatus 2 (Yes in step S11), the plan adjustment unit 16 selects a partner that can be adjusted by the provider corresponding to the provider apparatus 2 that has transmitted the plan adjustment request. It is determined whether or not there is a contract (step S12). Specifically, the plan adjustment unit 16 refers to the adjustment amount information stored in the storage unit 14 to determine whether there is a bilateral contract in which the operator that sent the plan adjustment request is a coordinator. determine whether

計画調整部16は、計画調整要求を送信した事業者装置2に対応する事業者によって調整可能な相対契約が無いと判断した場合(ステップS12 No)、受信した計画調整要求に関する処理を終了する。これにより、調整キック者以外から計画調整要求を受信しても計画値の調整処理は実施されない。 When the plan adjustment unit 16 determines that there is no bilateral contract that can be adjusted by the business operator corresponding to the business operator device 2 that has transmitted the plan adjustment request (step S12 No), the process related to the received plan adjustment request ends. As a result, even if a plan adjustment request is received from someone other than the adjustment kicker, the adjustment processing of the plan values is not performed.

ステップS12で計画調整要求を送信した事業者装置2に対応する事業者によって調整可能な相対契約が有ると判断した場合(ステップS12 Yes)、計画調整部16は、計画調整要求を送信した事業者装置2に対応する事業者によって調整可能な相対契約の調整量情報を抽出する(ステップS13)。具体的には、計画調整部16は、記憶部14に格納されている調整量情報から、計画調整要求の送信元の事業者が調整キック者となっており、かつ調整期限が過ぎておらず、かつ調整の成立の条件を満たす相対契約の調整量情報を抽出する。 If it is determined in step S12 that there is a bilateral contract that can be adjusted by the business operator corresponding to the business operator device 2 that has transmitted the plan adjustment request (Yes in step S12), the plan adjustment unit 16 sends the plan adjustment request to the business operator that has sent the plan adjustment request. The adjustment amount information of the bilateral contract that can be adjusted by the business operator corresponding to the apparatus 2 is extracted (step S13). Specifically, the plan adjustment unit 16 determines from the adjustment amount information stored in the storage unit 14 that the operator that sent the plan adjustment request is the adjustment kicker and that the adjustment deadline has not passed. and extracts the adjustment amount information of the bilateral contract that satisfies the conditions for establishment of the adjustment.

ここで、本実施の形態の計画値の調整処理における調整の成立の条件と調整の順序とをケースごとに説明する。なお、以下では、電力の供給元の事業者を単に供給元とも呼び、電力の供給先の事業者を単に供給先とも呼ぶ。ここでは、ケースNo.1~ケースNo.4までの4つのケースに分けて説明する。以下の説明では、支払方向は、調整により生じた電力量に関する支払が、供給元から供給先の方向と供給先から供給元の方向とのどちらの方向で行われるかを示している。調整方向とは、調整キック者から変更吸収者へ向かう方向を示し、調整キック者が電力の供給元である場合には、調整方向は供給元から供給先へ向かう方向であり、調整キック者が供給先である場合には、調整方向は供給先から供給元へ向かう方向である。 Here, the condition for establishment of adjustment and the order of adjustment in the adjustment processing of the planned value of the present embodiment will be described for each case. Note that, hereinafter, the company that supplies power is simply referred to as a supply source, and the company that is a destination of power supply is simply referred to as a supply destination. Here, case no. 1 to case No. Four cases up to 4 will be described separately. In the following description, payment direction indicates whether payment for the amount of power generated by the adjustment is made from the source to the destination or from the destination to the source. The adjustment direction indicates the direction from the adjustment kicker to the change absorber, and when the adjustment kicker is the power supply source, the adjustment direction is the direction from the supply source to the supply destination, and the adjustment kicker is the direction from the power supply source to the power supply destination. In the case of the supply destination, the adjustment direction is the direction from the supply destination to the supply source.

計画調整部16は、計画調整要求の送信元の事業者の利益が最大となるように、調整の対象となる相対契約を決定していくが、ケースによって送信元の利益を最大とするために、優先して考慮すべき相対契約とが異なる。例えば、ケースNo.1の場合、計画値の変更方向が計画値を上げる方向であり、支払方向が供給先から供給元へ向かう方向であり、調整キック者が供給元であるとする。このため、ケースNo.1では、調整方向が供給元から供給先へ向かう方向となり、調整方向と支払方向が一致しない。ケースNo.1の場合、調整キック者に対応する事業者装置2が計画調整要求を送信する場合には、計画調整要求の送信元の事業者は、調整により増えた計画値に関して高く買い取ってもらった方が有利である。したがって、ケースNo.1では、調整の成立の条件は、上げ価格が計画調整要求により通知された希望価格以上であることとなり、調整を進めていく順序は、上げ価格が高い順となる。なお、上げ価格は、上述したとおり、変動吸収者により設定される。 The plan adjustment unit 16 determines bilateral contracts to be adjusted so that the profit of the sender of the plan adjustment request is maximized. , is different from the bilateral contract that should be considered with priority. For example, case no. In the case of 1, the change direction of the planned value is the direction to increase the planned value, the payment direction is from the supply destination to the supply source, and the adjustment kicker is the supply source. Therefore, case no. In 1, the adjustment direction is the direction from the supply source to the supply destination, and the adjustment direction and the payment direction do not match. Case no. In the case of 1, when the business operator device 2 corresponding to the adjustment kicker transmits a plan adjustment request, it is better for the business operator that sent the plan adjustment request to purchase the plan value increased by the adjustment at a higher price. Advantageous. Therefore, case no. In 1, the condition for establishment of the adjustment is that the increase price is equal to or higher than the desired price notified by the plan adjustment request, and the order in which the adjustment proceeds is in descending order of the increase price. The increase price is set by the fluctuation absorber as described above.

ケースNo.2の場合、計画値の変更方向が計画値を上げる方向であり、支払方向が供給先から供給元へ向かう方向であり、調整キック者が供給先であるとする。このため、ケースNo.2では、調整方向が供給先から供給元へ向かう方向となり、調整方向と支払方向が一致する。ケースNo.2で、調整キック者に対応する事業者装置2が計画調整要求を送信する場合には、計画調整要求の送信元の事業者は、調整により増えた分の購入価格が安いほど有利となる。したがって、ケースNo.2では、調整の成立の条件は、上げ価格が計画調整要求により通知された希望価格以下であることとなり、調整を進めていく順序は、上げ価格が安い順となる。 Case no. In the case of 2, it is assumed that the change direction of the planned value is to increase the planned value, the payment direction is from the supply destination to the supply source, and the adjustment kicker is the supply destination. For this reason, case no. In 2, the adjustment direction is the direction from the supply destination to the supply source, and the adjustment direction and the payment direction match. Case no. In 2, when the business operator device 2 corresponding to the adjustment kicker transmits a plan adjustment request, the lower the purchase price for the increase due to the adjustment, the better the business operator that sent the plan adjustment request. Therefore, case no. In 2, the condition for establishment of the adjustment is that the increase price is equal to or less than the desired price notified by the plan adjustment request, and the order in which the adjustment proceeds is in ascending order of the increase price.

ケースNo.3の場合、計画値の変更方向が計画値を下げる方向であり、支払方向が供給元から供給先へ向かう方向であり、調整キック者が供給元であるとする。このため、ケースNo.3では、調整方向が供給元から供給先へ向かう方向となり、調整方向と支払方向が一致する。ケースNo.3で、調整キック者に対応する事業者装置2が計画調整要求を送信する場合には、計画調整要求の送信元の事業者は、調整により計画値が減少することに対する対価を供給先に支払うことになる。ケースNo.3では、計画調整要求の送信元の事業者は、調整によって支払う額が安いほど有利となる。したがって、ケースNo.3では、調整の成立の条件は、下げ価格が計画調整要求により通知された希望価格以下であることとなり、調整を進めていく順序は、下げ価格が安い順となる。なお、下げ価格は、上述したとおり、変動吸収者により設定される。 Case no. In the case of 3, it is assumed that the change direction of the planned value is to decrease the planned value, the payment direction is from the supplier to the supply destination, and the adjustment kicker is the supplier. For this reason, case no. In 3, the adjustment direction is the direction from the supply source to the supply destination, and the adjustment direction and the payment direction match. Case no. In 3, when the operator device 2 corresponding to the adjustment kicker transmits a plan adjustment request, the operator that sent the plan adjustment request pays the supply destination for the reduction of the planned value due to the adjustment. It will be. Case no. In 3, the lower the amount to be paid by the adjustment, the better the operator who sent the plan adjustment request. Therefore, case no. In 3, the condition for establishment of adjustment is that the reduced price is equal to or lower than the desired price notified by the plan adjustment request, and the order in which adjustments are made is in descending order of the reduced price. Note that the reduced price is set by the fluctuation absorber as described above.

ケースNo.4の場合、計画値の変更方向が計画値を下げる方向であり、支払方向が供給元から供給先へ向かう方向であり、調整キック者が供給先であるとする。このため、ケースNo.4では、調整方向が供給先から供給元へ向かう方向となり、調整方向と支払方向が一致しない。ケースNo.4で、調整キック者に対応する事業者装置2が計画調整要求を送信する場合には、計画調整要求の送信元の事業者は、供給される電力量の計画値を調整により減少させた分を供給元に購入してもらうことになる。ケースNo.4では、計画調整要求の送信元の事業者は、購入してもらう価格が高い方が有利となる。したがって、ケースNo.4の調整の成立の条件は、下げ価格が計画調整要求により通知された希望価格以上であることとなり、調整を進めていく順序は、下げ価格が高い順となる。 Case no. In the case of 4, it is assumed that the change direction of the planned value is to decrease the planned value, the payment direction is from the supply source to the supply destination, and the adjustment kicker is the supply destination. Therefore, case no. In 4, the adjustment direction is the direction from the supply destination to the supply source, and the adjustment direction and the payment direction do not match. Case no. In 4, when the business operator device 2 corresponding to the adjustment kicker transmits a plan adjustment request, the business operator that sent the plan adjustment request reduces the planned value of the amount of power to be supplied by the adjustment. will be purchased from the supplier. Case no. In 4, the higher the purchase price, the more advantageous it is for the company that sent the plan adjustment request. Therefore, case no. The condition for establishment of the adjustment in 4 is that the reduced price is greater than or equal to the desired price notified by the plan adjustment request, and the order in which the adjustment proceeds is in descending order of the reduced price.

上述した4つのケースと希望調整量の正負の対応は、次のとおりとなる。希望調整量が正の場合、調整キック者が供給元である場合にケースNo.1に対応し、調整キック者が供給先である場合にケースNo.4に対応する。また、希望調整量が負の場合は、調整キック者が供給元である場合にケースNo.3に対応し、調整キック者が供給先である場合にケースNo.2に対応する。したがって、1つの計画調整要求に対してステップS13で抽出される相対契約は、ケースNo.1およびケースNo.4のうちの少なくとも一方であるか、またはケースNo.2およびケースNo.3のうちの少なくとも一方である。したがって、ステップS13で抽出される相対契約にケースNo.1~ケースNo.4のうちの複数のケースの相対契約が含まれていても、ケースNo.1とケースNo.4の組み合わせであるか、またはケースNo.2およびケースNo.3の組み合わせである。例えば、ケースNo.1とケースNo.2の組み合わせ、ケースNo.2とケースNo.4の組み合わせとなることはない。 The positive/negative correspondence between the four cases described above and the desired adjustment amount is as follows. If the desired adjustment amount is positive, case no. 1, and case No. 1 when the coordinating kicker is the supply destination. 4. In addition, when the desired adjustment amount is negative, case No. 1 is applied when the adjustment kicker is the supply source. Corresponding to case No. 3, when the coordinating kicker is the supply destination. 2. Therefore, the bilateral contracts extracted in step S13 for one plan adjustment request are case numbers. 1 and case no. 4, or case no. 2 and case no. is at least one of 3; Therefore, the bilateral contract extracted in step S13 has a case number. 1 to case No. Even if bilateral agreements in multiple cases out of 4 are included, case no. 1 and case no. 4 or case no. 2 and case no. It is a combination of 3. For example, case no. 1 and case no. 2 combination, case no. 2 and case no. There is no combination of 4.

ケースNo.1とケースNo.4は、参照する項目はそれぞれ上げ価格と下げ価格とであり異なっているものの、調整の順序がいずれも価格の高い順である。ケースNo.2とケースNo.3は、参照する項目はそれぞれ上げ価格と下げ価格とであり異なっているものの、調整の順序がいずれも価格の安い順である。したがって、ステップS13では、計画調整部16は、まず、調整量情報から、計画調整要求の送信元の事業者が調整キック者となっており、かつ調整期限が過ぎていないものを抽出し、抽出された調整量情報に対応する相対契約が、ケースNo.1~No.4のうちのいずれであるかを判定する。計画調整部16は、抽出された調整量情報から、判定結果に基づいて、各ケースの調整の成立の条件を満たす調整量情報をさらに抽出する。 Case no. 1 and case no. In 4, the items to be referred to are the raised price and the lowered price, respectively, and although the items are different, the order of adjustment is the descending order of the price. Case no. 2 and case no. In 3, the items to be referred to are the raised price and the lowered price, respectively, and although the items are different, the order of adjustment is the ascending order of the price. Therefore, in step S13, the plan adjustment unit 16 first extracts, from the adjustment amount information, information for which the operator that sent the plan adjustment request is the adjustment kicker and whose adjustment deadline has not passed, and extracts If the bilateral contract corresponding to the adjusted amount information is the case No. 1 to No. 4 is determined. The plan adjustment unit 16 further extracts adjustment amount information that satisfies conditions for establishment of adjustment in each case based on the determination result from the extracted adjustment amount information.

次に、計画調整部16は、抽出した調整量情報を用いて、計画調整要求の送信元の事業者の利益が最大となるように計画値の調整を行う(ステップS14)。具体的には、計画調整部16は、調整の成立の条件を満たす範囲で計画調整要求の送信元の事業者の利益が最大となるように、調整の対象となる相対契約と対応する調整量とを決定する。なお、上述したとおり、相対契約ごとに調整キック者と変動吸収者とが定められているため、調整の対象となる相対契約が決定されることにより、調整の対象となる変動吸収者も決定される。 Next, the plan adjustment unit 16 uses the extracted adjustment amount information to adjust the plan value so that the profit of the business operator that sent the plan adjustment request is maximized (step S14). Specifically, the plan adjustment unit 16 maximizes the profit of the business operator that sent the plan adjustment request within the range that satisfies the conditions for establishment of the adjustment, and the bilateral contract to be adjusted and the corresponding adjustment amount. to determine. As mentioned above, the adjustment kicker and the variation absorber are specified for each bilateral contract, so when the bilateral contract to be adjusted is determined, the variation absorber to be adjusted is also determined. be.

ステップS14では、計画調整部16は、抽出した調整量情報を用いて、例えば、上述したケースに応じた調整の順序に基づいて計画値の調整を行うことにより、計画調整要求の送信元の事業者の利益が最大となるように計画値の調整を行う。なお、上述したように、希望調整量が同じであっても、相対契約ごとの電力の供給の方向によっては、要求された調整が計画値を下げる調整であるのか上げる調整であるのかが異なることになる。 In step S14, the plan adjustment unit 16 uses the extracted adjustment amount information, for example, by adjusting the plan value based on the order of adjustment according to the above-described case, so that the business that sent the plan adjustment request Adjust the planned value so that the profit of the person is maximized. As described above, even if the desired adjustment amount is the same, depending on the direction of power supply for each bilateral contract, whether the requested adjustment is an adjustment to lower the planned value or an adjustment to raise it will differ. become.

具合的には、ステップS14では、計画調整部16は、ステップS13で抽出された調整量情報から、希望調整量が正か負かに基づいて、各相対契約の上げ価格を参照するか下げ価格を参照するかを決定する。そして、計画調整部16は、参照する価格に基づいて相対契約を、調整量情報で定められた調整の順序に並べる。上述したように、抽出されたケースNo.1とケースNo.4が混在する、またはケースNo.2とケースNo.3が混在する可能性がある。しかし、参照する価格が上げ価格か下げ価格であるかは異なるものの、ケースNo.1とケースNo.4はいずれも調整の順序は高い順であり、参照する価格が上げ価格か下げ価格であるかは異なるものの、ケースNo.2とNo.3はいずれも調整の順序は安い順である。したがって、計画調整部16は、参照する価格を決定すれば、ケースによらずに、参照する価格を、高い順、または安い順に並べればよい。 Specifically, in step S14, the plan adjustment unit 16 refers to the increase price of each bilateral contract or determines the decrease price based on whether the desired adjustment amount is positive or negative from the adjustment amount information extracted in step S13. to decide whether to refer to Then, the plan adjustment unit 16 arranges the bilateral contracts in the order of adjustment determined by the adjustment amount information based on the prices to be referred to. As described above, the extracted case No. 1 and case no. 4 are mixed, or case No. 2 and case no. 3 may be mixed. However, although the price to be referred to differs depending on whether it is an increase price or a decrease price, case no. 1 and case no. In all cases, the order of adjustment is in descending order, and although the reference price differs depending on whether the price is raised or lowered, case No. 2 and No. 3, the order of adjustment is in ascending order. Therefore, when the price to be referred to is determined, the plan adjustment unit 16 may arrange the prices to be referred to in descending order or descending order regardless of the case.

すなわち、計画調整部16は、希望調整量が正の値である場合、第1の価格が第2の価格である希望調整価格以上の相対契約のうち第1の価格が高いものから順に優先して調整対象に決定することになる。また、計画調整部16は、希望調整量が負の値である場合、第1の価格が希望調整価格以下の相対契約のうち第1の価格が安いものから順に優先して調整対象に決定することになる。詳細には、計画調整部16は、希望調整量が正の値である場合、計画調整要求の要求元の事業者が電力の供給元となる相対契約については上げ価格を参照し、要求元の事業者が供給先となる相対契約については下げ価格を参照する。また、計画調整部16は、希望調整量が負の値である場合、計画調整要求の要求元の事業者が電力の供給元となる相対契約については下げ価格を参照し、要求元の事業者が供給先となる相対契約については上げ価格を参照する。 That is, when the desired adjustment amount is a positive value, the plan adjustment unit 16 gives priority to the bilateral contract with the higher first price among the bilateral contracts whose first price is equal to or greater than the desired adjustment price, which is the second price. will be determined as an adjustment target. In addition, when the desired adjustment amount is a negative value, the plan adjustment unit 16 preferentially determines, in descending order of the first price among the bilateral contracts for which the first price is equal to or less than the desired adjustment price, the contract to be adjusted. It will be. Specifically, when the desired adjustment amount is a positive value, the plan adjustment unit 16 refers to the increased price for a bilateral contract in which the business operator that requested the plan adjustment request is the power supply source, and We refer to discounted prices for bilateral contracts in which the supplier is the destination. In addition, when the desired adjustment amount is a negative value, the plan adjustment unit 16 refers to the discounted price for a bilateral contract in which the requesting business operator of the plan adjustment request is the power supply source, We refer to the raised price for bilateral contracts to which

そして、調整の順序で定められた順に、抽出された調整量情報に対応する相対契約における上げ変動可能量または下げ変動可能量で希望調整量を賄えるかどうかを判断する。なお、希望調整量を賄えるかの判断において上げ変動可能量を参照するか下げ変動可能量を参照するかは、希望調整量がプラスであるかマイナスであるかと、調整キック者が供給元であるか供給先であるかと、により決まる。具体的には、上述した4つのケースのうち、上げ価格を参照するケースNo.1,No.2の場合は上げ変動可能量が参照され、下げ価格を参照するケースNo.3,No.4の場合は下げ変動可能量が参照される。 Then, it is determined whether or not the desired adjustment amount can be covered by the upward variable amount or the downward variable amount in the bilateral contract corresponding to the extracted adjustment amount information in the order determined by the adjustment order. It should be noted that whether the desired adjustment amount is positive or negative and whether the desired adjustment amount is positive or negative depends on whether the adjustment kicker is the supplier. It is determined by whether it is a supplier or a supplier. Specifically, among the four cases described above, the case No. 1 that refers to the raised price is selected. 1, No. In the case of case No. 2, the up fluctuation amount is referred to, and the down price is referred to. 3, No. In the case of 4, the amount of downward variation is referred to.

計画調整部16は、調整の順序の最初の相対契約で、希望調整量を賄える場合には、この相対契約を調整対象と決定するとともにこの相対契約の計画値を変更する量である調整量を決定し、ステップS14を終了する。希望調整量を賄えない場合は、計画調整部16は、調整の順序の最初の相対契約と次の相対契約とで、希望調整量を賄えるかを判断する。計画調整部16は、これらを繰り返し、希望調整量を賄えるまで考慮する相対契約を順次増やし、希望調整量を賄える場合には、ステップS14を終了する。抽出した調整量情報に対応する全ての相対契約を考慮しても希望調整量を賄えない場合には、調整可能な量だけ調整を行うこととしてもよいし、調整不可と判断して調整を行わなくてもよい。 If the first bilateral contract in the order of adjustment can cover the desired adjustment amount, the plan adjustment unit 16 determines this bilateral contract as an adjustment target and adjusts the adjustment amount, which is the amount to change the planned value of this bilateral contract. It decides and ends step S14. If the desired adjustment amount cannot be covered, the plan adjustment unit 16 determines whether the desired adjustment amount can be covered by the first bilateral contract and the next bilateral contract in the order of adjustment. The plan adjustment unit 16 repeats these steps to sequentially increase bilateral contracts to be considered until the desired adjustment amount is covered, and when the desired adjustment amount can be covered, step S14 ends. If the desired adjustment amount cannot be met even after considering all the bilateral contracts corresponding to the extracted adjustment amount information, the adjustment may be made only for the amount that can be adjusted, or the adjustment may be made by judging that the adjustment is not possible. You don't have to.

図10の説明に戻り、計画調整部16は、ステップS14で行われた調整の結果を、記憶部14の調整量情報に反映する(ステップS15)。具体的には、調整量情報のうち、調整対象として決定された相対契約の現時点での変動量に、ステップS14の調整結果である調整量を反映させる。このように、現時点での変動量は、1回の計画値の調整処理により得られる調整量が、調整処理ごとに反映された結果となる。また、ループ状の調整が行われることを避けるために、トランザクション監視部17が、調整量情報のうち、計画調整要求の送信元の事業者が変動吸収者となっている相対契約の上げ変動可能量または下げ変動可能量を予め定められた値に設定する。すなわち、トランザクション監視部17は、調整処理が行われた後、調整処理に対応する計画調整要求の要求元の事業者が変動吸収者として定められている相対契約に対応する変動可能量を予め定められた値に設定する。予め定められた値の一例は0であり、以下予め定められた値は0であるとして説明する。なお、このとき、トランザクション監視部17が、上げ変動可能量および下げ変動可能量のうち対応する変動可能量を0に設定するかは、計画値を上げる調整が行われるか下げる調整が行われるかに依存する。 Returning to the description of FIG. 10, the plan adjustment unit 16 reflects the result of the adjustment performed in step S14 on the adjustment amount information in the storage unit 14 (step S15). Specifically, among the adjustment amount information, the adjustment amount, which is the adjustment result of step S14, is reflected in the current fluctuation amount of the bilateral contract determined as the adjustment target. In this way, the amount of change at the present time is the result of reflecting the amount of adjustment obtained by one adjustment process of the planned value for each adjustment process. In addition, in order to avoid loop-like adjustments, the transaction monitoring unit 17 determines that, among the adjustment amount information, the bilateral contract for which the operator that sent the plan adjustment request is the change absorber can be raised and changed. Set the amount or downward variable amount to a predetermined value. That is, after the adjustment process is performed, the transaction monitoring unit 17 predetermines the variable amount corresponding to the bilateral contract for which the operator who requested the plan adjustment request corresponding to the adjustment process is determined as the variation absorber. set to the specified value. An example of the predetermined value is 0, and the predetermined value is assumed to be 0 below. At this time, whether the transaction monitoring unit 17 sets the corresponding variable amount of the possible upward fluctuation amount and the possible downward fluctuation amount to 0 depends on whether the planned value is adjusted to be raised or lowered. depends on

次に、計画調整部16は、調整結果を計画値情報に反映する(ステップS16)。具体的には、計画調整部16は、調整対象として決定された相対契約の現時点での変動量に基づいて、記憶部14に格納されている計画値情報のうちの対応する計画値を変更する。相対契約調整装置1は、計画値が変更された場合に、結果出力部18が、変更された計画値を表示するようにしてもよい。 Next, the plan adjustment unit 16 reflects the adjustment result in the plan value information (step S16). Specifically, the plan adjustment unit 16 changes the corresponding plan value among the plan value information stored in the storage unit 14 based on the amount of fluctuation at the present time of the bilateral contract determined as the adjustment target. . The bilateral contract adjustment device 1 may cause the result output unit 18 to display the changed planned value when the planned value is changed.

次に、結果出力部18が、計画値の調整結果を、対応する事業者に送信し(ステップS17)、計画値の調整処理が終了する。また、ステップS17では、広域機関連係部19は、調整処理により計画値が変更される事業者が需給管理システム3を有する事業者である場合、対応する需給管理システム3へ調整処理によって生じる計画値の変更を通知する。具値的には、広域機関連係部19は、計画値の修正に必要な情報を通信部11を介して需給管理システム3へ送信する。例えば、広域機関連係部19は、通信部11を介して計画値が更新された事業者の需給管理システム3へ、調整により変更された計画値の変更量と対応する時間帯とを通知してもよいし、調整により変更された計画値と対応する時間帯とを通知してもよい。これにより、需給管理システム3は、調整結果を、広域機関システム4へ送信する当日計画に、速やかに反映することができる。 Next, the result output unit 18 transmits the adjustment result of the planned value to the corresponding business operator (step S17), and the adjustment process of the planned value is completed. Further, in step S17, if the operator whose plan value is to be changed by the adjustment process is the operator having the supply and demand management system 3, the wide area machine related section 19 sends the plan value generated by the adjustment process to the corresponding supply and demand management system 3. Notify of changes in Specifically, the wide-area machine related unit 19 transmits information necessary for correcting the planned values to the supply and demand management system 3 via the communication unit 11 . For example, the wide-area machine related unit 19 notifies, via the communication unit 11, the change amount of the planned value changed by the adjustment and the corresponding time period to the supply and demand management system 3 of the business operator whose planned value has been updated. Alternatively, the planned values changed by the adjustment and the corresponding time period may be notified. As a result, the supply and demand management system 3 can promptly reflect the adjustment result in the daily plan to be transmitted to the cross-regional organization system 4 .

また、上記の例では、計画調整要求を受信するたびに、図10に示したステップS12からステップS17の処理すなわち調整処理を行うようにしたが、一定期間ごとに、この一定期間に受信した計画調整要求に関してステップS12からステップS17までの処理を行うようにしてもよい。一定期間に受信した計画調整要求が複数あった場合には、複数の計画調整要求のそれぞれについて、順次ステップS12からステップS17までの処理を行う。すなわち、計画調整部16は、一定期間内に1つ以上の計画調整要求を受信したか否かを判断し、1つ以上の計画調整要求を受信したと判断した場合に、一定期間内に受信した1つ以上の計画調整要求に対応する調整処理を連続して実施するようにしてもよい。 In the above example, each time a plan adjustment request is received, the processing from step S12 to step S17 shown in FIG. 10, that is, the adjustment processing is performed. The processing from step S12 to step S17 may be performed with respect to the adjustment request. If there are a plurality of plan adjustment requests received within a certain period of time, the processing from step S12 to step S17 is sequentially performed for each of the plurality of plan adjustment requests. That is, the plan adjustment unit 16 determines whether or not one or more plan adjustment requests have been received within a certain period of time. Adjustment processing corresponding to one or more plan adjustment requests may be continuously performed.

次に、ステップS13とステップS14の処理を、具体例を挙げて、詳細に説明する。図12は、第1の具体例の計画変更要求を受信したときの本実施の形態の計画値の調整処理の一例を示す図である。図12に示した第1の具体例では、発電事業者Aの事業者装置2が、計画調整要求を送信する。この計画調整要求では、事業者の識別情報が発電事業者Aであり、調整対象の日時がYYYYMMDD hh:mmであり、調整を希望する変更量が-100kWhであり、希望価格が5円/kWhであったとする。 Next, the processing of steps S13 and S14 will be described in detail with a specific example. FIG. 12 is a diagram showing an example of a plan value adjustment process according to the present embodiment when a plan change request of the first specific example is received. In the first specific example shown in FIG. 12, the operator device 2 of the power producer A transmits a plan adjustment request. In this plan adjustment request, the identification information of the operator is power generation operator A, the date and time to be adjusted is YYYYMMDD hh:mm, the amount of change desired to be adjusted is -100 kWh, and the desired price is 5 yen/kWh. Suppose it was

図12の中央付近には、第1の具体例の計画調整要求を受信する前の、YYYYMMDD hh:mmの時間帯の枠に対応する調整量情報の内容が示されている。この調整量情報では、説明の都合上、左端に相対契約を識別するための番号であるNo(契約No.)が示されている。図12に示した調整量情報のうち、発電事業者Aが当事者となっている相対契約は、契約No.1~No.4の4つである。契約No.1は、発電事業者Aから小売事業者bへ電力を供給する相対契約であり、調整キック者は発電事業者Aである。契約No.2は、発電事業者Aから小売事業者cへ電力を供給する相対契約であり、調整キック者は小売事業者cである。契約No.3は、発電事業者Aから小売事業者dへ電力を供給する相対契約であり、調整キック者は発電事業者Aである。契約No.4は、小売事業者aから発電事業者Aへ電力を供給する相対契約であり、調整キック者は、小売事業者aである。 Around the center of FIG. 12, the content of the adjustment amount information corresponding to the time frame of YYYYMMDD hh:mm before receiving the plan adjustment request of the first specific example is shown. In this adjustment amount information, No (contract No.), which is a number for identifying the bilateral contract, is shown at the left end for convenience of explanation. Among the adjustment amount information shown in FIG. 1 to No. Four of four. Contract no. 1 is a bilateral contract to supply electric power from power generation company A to retailer b, and power generation company A is the coordinator. Contract no. 2 is a bilateral contract to supply electric power from the power generation company A to the retailer c, and the coordinating kicker is the retailer c. Contract no. 3 is a bilateral contract to supply electric power from power generation company A to retailer d, and power generation company A is the coordinator. Contract no. 4 is a bilateral contract to supply electric power from retailer a to power generator A, and the coordinator is retailer a.

第1の具体例の計画調整要求を受信すると、相対契約調整装置1では、図10に示したステップS11でYesと判断されてステップS12の処理が行われる。ステップS12では、相対契約調整装置1の計画調整部16は、上述したように調整量情報に、計画調整要求の送信元である発電事業者Aが調整キック者である相対契約があるかどうかを判断する。図12に示すように、調整量情報に発電事業者Aが調整キック者である相対契約が存在するため、計画調整部16は、ステップS13へ処理を進める。なお、ここでは、相対契約調整装置1が計画調整要求を受信した時刻は、YYYYMMDD hh:mmの60分前より前、すなわち調整期限より前であったとする。 When the plan adjustment request of the first specific example is received, the bilateral contract adjustment device 1 determines Yes in step S11 shown in FIG. 10 and performs the process of step S12. In step S12, the plan adjustment unit 16 of the bilateral contract adjustment device 1 determines whether or not the adjustment amount information includes a bilateral contract in which the power generation business operator A, who is the transmission source of the plan adjustment request, is the coordinator. to decide. As shown in FIG. 12, since the adjustment amount information includes a bilateral contract in which the power generation business operator A is the adjustment kicker, the plan adjustment unit 16 advances the process to step S13. Here, it is assumed that the time at which the bilateral contract adjustment device 1 received the plan adjustment request was before 60 minutes before YYYYMMDD hh:mm, that is, before the adjustment deadline.

ステップS13では、相対契約調整装置1の計画調整部16は、発電事業者Aが調整キック者であり、下げ価格が希望価格以下の契約No.1と契約No.3が抽出される。図12では、ステップS13で抽出される調整量情報を情報301として示している。なお、希望調整量が負の値であるときには上述したケースNo.2,No.3に対応するケースとなるが、第1の具体例では、発電事業者Aが調整キック者となる相対契約はいずれも、発電事業者Aが供給元となっている。このため、これら2つは両方ともケースNo.3に相当するので、計画調整部16は、ステップS13では下げ価格を希望価格と比較する。なお、現時点での変動量は、上述したように、初期値は全て0に設定されるが、図12では、既に、YYYYMMDD hh:mmの時間帯に関して計画値の調整が行われており、これにより、契約No.1の現時点での変動量は-100kWhに設定されているとする。 In step S13, the plan adjustment unit 16 of the bilateral contract adjustment device 1 determines that the power generation business operator A is the adjustment kicker and the contract No. for which the reduced price is equal to or lower than the desired price. 1 and Contract No. 3 is extracted. FIG. 12 shows the adjustment amount information extracted in step S13 as information 301. As shown in FIG. When the desired adjustment amount is a negative value, case No. 2, No. 3, in the first specific example, the power generation business operator A is the supply source for all bilateral contracts in which the power generation business operator A serves as the coordinating kicker. Therefore, these two are both case no. 3, the plan adjustment unit 16 compares the reduced price with the desired price in step S13. As described above, the initial values of the fluctuation amounts at the present time are all set to 0, but in FIG. contract no. 1 is set to -100 kWh at present.

相対契約調整装置1の計画調整部16は、ステップS14の処理において、契約No.1と契約No.3に関して、下げ価格の安い順に調整を実施する。図12に示すように、契約No.1の下げ価格は2円/kWhであり、契約No.3の下げ価格は3円/kWhであるから、契約No.1の方が下げ価格が安い。したがって、計画調整部16は、契約No.1から調整を実行する。計画調整部16は、契約No.1の下げ変動可能量は-130kWhであり、契約No.1の現時点での変動量が-100kWhであることから、下げ変動可能量から既に調整により変更された量である現時点での変動量を差し引いて、契約No.1の調整可能量を求める。契約No.1の調整可能量は、以下の式(1)により求めることができ、-30kWhとなる。
-130-(-100)=-30 ・・・(1)
In the process of step S14, the plan adjustment unit 16 of the bilateral contract adjustment device 1 selects the contract No. 1 and Contract No. Regarding 3, adjustments will be made in order of decreasing price. As shown in FIG. The reduced price for Contract No. 1 is 2 yen/kWh. Since the reduced price for contract No. 3 is 3 yen/kWh, contract no. 1 is lower and the price is cheaper. Therefore, the plan adjustment unit 16 determines the contract number. Adjust from 1. The plan adjustment unit 16 determines the contract number. The downward variable amount of contract No. 1 is -130 kWh. 1 is −100 kWh at the present time, subtracting the current amount of change, which is the amount that has already been changed by adjustment, from the possible amount of downward change, the contract No. 1 is obtained. Find the tunable amount of 1. Contract no. The adjustable amount of 1 can be obtained by the following formula (1) and is −30 kWh.
-130-(-100)=-30 (1)

希望調整量は、-100kWhであることから、-30kWhの調整では希望調整量を賄うことができない。したがって、計画調整部16は、契約No.1と契約No.3のうち、2番目に下げ価格の安い契約No.3の調整量情報を参照して、契約No.1と同様に、調整可能量を求める。契約No.3の下げ変動可能量は-80kWhであり、現時点での変動量が0kWhであることから、契約No.3の調整可能量は-80kWhとなる。 Since the desired adjustment amount is -100 kWh, -30 kWh adjustment cannot cover the desired adjustment amount. Therefore, the plan adjustment unit 16 determines the contract No. 1 and Contract No. Contract No. 3 with the second lowest price. By referring to the adjustment amount information of No. 3, contract No. As in 1, determine the adjustable amount. Contract no. Contract No. 3 has a possible downward fluctuation amount of -80 kWh, and the current fluctuation amount is 0 kWh. The adjustable amount of 3 is -80 kWh.

契約No.1の方が契約No.3より下げ価格が安いことから、計画調整部16は、契約No.1による調整を優先し、契約No.1の調整量が-30kWh、契約No.3の調整量が-70kWhという調整結果を得る。また、トランザクション監視部17は、ループ状の調整を避けるために、発電事業者Aが変動吸収者となっている契約No.2および契約No.4の調整情報を抽出する。図12では、トランザクション監視部17が抽出した調整量情報を情報302として示している。トランザクション監視部17は、抽出した調整量情報の下げ変動可能量を0に設定する。 Contract no. 1 is the contract number. Since the discounted price is lower than Contract No. 3, the plan adjustment unit 16 selects Contract No. Prioritize the adjustment by contract No. 1. 1 adjustment amount is -30 kWh, contract No. An adjustment result of −70 kWh is obtained for the adjustment amount of 3. Also, in order to avoid loop-like adjustments, the transaction monitoring unit 17 determines whether the contract No. 1 for which the power generator A is the fluctuation absorber. 2 and Contract No. 4 is extracted. FIG. 12 shows the adjustment amount information extracted by the transaction monitoring unit 17 as information 302 . The transaction monitoring unit 17 sets the possible downward fluctuation amount of the extracted adjustment amount information to zero.

図13は、第2の具体例の計画変更要求を受信したときの本実施の形態の計画値の調整処理の一例を示す図である。図13に示した第2の具体例では、発電事業者Aの事業者装置2が、第1の具体例と同様に、事業者の識別情報が発電事業者Aであり、調整対象の日時がYYYYMMDD hh:mmであり、調整を希望する変更量が-100kWhであり、希望価格が5円/kWhである計画調整要求を送信する。 13A and 13B are diagrams showing an example of the adjustment processing of the plan values according to the present embodiment when the plan change request of the second specific example is received. In the second specific example shown in FIG. 13, as in the first specific example, the operator device 2 of the power generation operator A has the identification information of the power generation operator A and the date and time to be adjusted. Send a plan adjustment request with YYYYMMDD hh:mm, a desired change amount of adjustment of −100 kWh, and a desired price of 5 yen/kWh.

図13の中央付近には、第2の具体例の計画調整要求を受信する前の、YYYYMMDD hh:mmの時間帯の枠に対応する調整量情報の内容が示されている。この調整量情報は、第1の具体例と契約No.3および契約No.6の内容が異なっているが、これら以外は第1の具体例の調整量情報と同じである。契約No.3の調整量情報は、下げ価格が第1の具体例と異なるが、これ以外は第1の具体例と同様である。契約No.6は、発電事業者Bから発電事業者Aへ電力を供給する相対契約であり、調整キック者は発電事業者Aである。図13に示した調整量情報のうち、発電事業者Aが当事者となっている相対契約は、契約No.1~No.4,No.6の5つである。 In the vicinity of the center of FIG. 13, the content of the adjustment amount information corresponding to the time frame of YYYYMMDD hh:mm before receiving the plan adjustment request of the second specific example is shown. This adjustment amount information is based on the first specific example and the contract number. 3 and contract no. 6 is different, but the rest is the same as the adjustment amount information of the first specific example. Contract no. The adjustment amount information of 3 is the same as the first specific example except for the reduced price. Contract no. 6 is a bilateral contract to supply power from power generation company B to power generation company A, and power generation company A is the coordinating kicker. Among the adjustment amount information shown in FIG. 1 to No. 4, No. 5 out of 6.

第1の具体例と同様に、相対契約調整装置1では、計画調整要求を受信すると、図10に示したステップS11でYesと判断されてステップS12の処理が行われ、第1の具体例と同様に、ステップS13へ処理が進められる。なお、ここでは、第1の具体例と同様に、相対契約調整装置1が計画調整要求を受信した時刻は、YYYYMMDD hh:mmの60分前より前、すなわち調整期限より前であったとする。 As in the first specific example, when the bilateral contract adjustment device 1 receives the plan adjustment request, it is determined as Yes in step S11 shown in FIG. Similarly, the process proceeds to step S13. Here, as in the first specific example, it is assumed that the time when the bilateral contract adjustment device 1 received the plan adjustment request was 60 minutes before YYYYMMDD hh:mm, that is, before the adjustment deadline.

第2の具体例では、ステップS13では、相対契約調整装置1の計画調整部16は、発電事業者Aが調整キック者であり、下げ価格が希望価格以下の契約No.1および契約No.3と、上げ価格が希望価格以下の契約No.6と、が抽出される。図13では、図12と同様に、ステップS13で抽出される調整量情報を情報301として示している。第2の具体例では、ケースNo.3に対応する契約No.1および契約No.3と、ケースNo.2に対応する契約No.6とが混在する。計画調整部16は、ケースNo.3に対応する契約については下げ価格を、ケースNo.2に対応する契約については上げ価格をそれぞれ参照して、参照した価格の安い順に調整を実行する。 In the second specific example, in step S13, the plan adjustment unit 16 of the bilateral contract adjustment device 1 determines that the power generation business operator A is the adjustment kicker and the contract No. for which the reduced price is equal to or lower than the desired price. 1 and contract no. 3 and contract No. 3 for which the raised price is equal to or lower than the desired price. 6 and are extracted. 13, similarly to FIG. 12, the adjustment amount information extracted in step S13 is shown as information 301. In FIG. In a second specific example, case no. Contract no. 1 and contract no. 3 and case no. 2 corresponding to contract no. 6 are mixed. The plan adjustment unit 16 determines the case No. A reduced price for the contract corresponding to case No. 3. For the contracts corresponding to 2, the raised prices are referenced, and adjustments are made in ascending order of the referenced prices.

図13に示すように、契約No.1の下げ価格は2円/kWhであり、契約No.3の下げ価格は4円/kWhであり、契約No.6の上げ価格は3円/kWhである。したがって、これらを安い順に並べると、契約No.1の下げ価格、No.6の上げ価格、契約No.3の下げ価格の順となる。したがって、計画調整部16は、契約No.1から調整を実行する。契約No.1の調整可能量は、第1の具体例と同様に-30kWhである。希望調整量は、-100kWhであることから、-30kWhの調整では希望調整量を賄うことができない。したがって、計画調整部16は、次に価格の安い契約No.6の調整量情報を参照して、調整可能量を求める。なお、契約No.6は、ケースNo.2に対応するため、計画値を上げる方向で調整が行われる。具体的には、計画調整部16は、契約No.6の上げ変動可能量は(+)120kWhであり、現時点での変動量が0kWhであることから、契約No.6の調整可能量は120kWhとなる。 As shown in FIG. The reduced price for Contract No. 1 is 2 yen/kWh. The reduced price for Contract No. 3 is 4 yen/kWh. The raised price of 6 is 3 yen/kWh. Therefore, if these are arranged in ascending order of price, contract no. 1 reduced price, No. 6 raised price, contract no. It will be in order of 3 lower prices. Therefore, the plan adjustment unit 16 determines the contract number. Adjust from 1. Contract no. The adjustable amount of 1 is -30 kWh as in the first example. Since the desired adjustment amount is -100 kWh, -30 kWh adjustment cannot cover the desired adjustment amount. Therefore, the plan adjustment unit 16 selects the next cheapest contract number. The adjustable amount is obtained by referring to the adjustment amount information of 6. In addition, contract No. 6 is case no. 2, adjustments will be made to raise the planned value. Specifically, the plan adjustment unit 16 determines the contract number. 6 is (+) 120 kWh, and the current variation is 0 kWh. The adjustable amount of 6 is 120 kWh.

契約No.1の下げ価格の方が契約No.6の上げ価格より安いことから、計画調整部16は、契約No.1による調整を優先し、契約No.1の調整量が-30kWh、契約No.3の調整量が(+)70kWhという調整結果を得る。また、トランザクション監視部17は、ループ状の調整を避けるために、第1の具体例と同様に、発電事業者Aが変動吸収者となっている契約No.2および契約No.4の調整情報を抽出する。図13では、図12と同様に、トランザクション監視部17が抽出した調整量情報を情報302として示している。トランザクション監視部17は、抽出した調整量情報の下げ変動可能量を0に設定する。 Contract no. Contract No. 1 is the reduced price. 6, the plan adjustment unit 16 determines that the contract No. Prioritize the adjustment by contract No. 1. 1 adjustment amount is -30 kWh, contract No. 3 obtains an adjustment result of (+) 70 kWh. In addition, in order to avoid loop-like adjustments, the transaction monitoring unit 17, similarly to the first specific example, checks the contract No. for which the power generator A is the fluctuation absorber. 2 and Contract No. 4 is extracted. 13, similarly to FIG. 12, the adjustment amount information extracted by the transaction monitoring unit 17 is shown as information 302. In FIG. The transaction monitoring unit 17 sets the possible downward fluctuation amount of the extracted adjustment amount information to zero.

次に、ループ状の調整を避けるためにトランザクション監視部17が行う変動可能量の変更動作について説明する。図14は、本実施の形態のトランザクション監視部17が行う変動可能量の変更動作を説明するための図である。図14に示した例では、発電事業者Cと小売事業者aと小売事業者fとの間で、図14の矢印で示す3つの相対契約がある。具体的には、3つの相対契約は、小売事業者aが発電事業者Cへ電力を供給する契約401と、発電事業者Cが小売事業者fへ電力を供給する契約402と、小売事業者fが小売事業者aへ電力を供給する契約403と、である。契約401では調整キック者は小売事業者aであり、契約402では調整キック者は発電事業者Cであり、契約403では調整キック者は小売事業者fであるとする。また、契約402の翌日の計画における計画値は200kwhであり、契約403の翌日の計画における計画値は100kwhであり、契約401の翌日の計画における計画値は100kwhであったとする。なお、図では、計画値の単位を省略している。 Next, the operation of changing the variable amount performed by the transaction monitoring unit 17 in order to avoid loop-like adjustments will be described. FIG. 14 is a diagram for explaining the change operation of the variable amount performed by the transaction monitoring unit 17 of this embodiment. In the example shown in FIG. 14, there are three bilateral contracts indicated by arrows in FIG. 14 among power generator C, retailer a, and retailer f. Specifically, the three bilateral contracts are a contract 401 for retailer a to supply power to power generator C, a contract 402 for power generator C to supply power to retailer f, and a retailer f. contract 403 for f to supply electricity to retailer a; In contract 401, the coordinating kicker is retailer a, in contract 402, the coordinating kicker is power generator C, and in contract 403, the coordinating kicker is retailer f. Also, assume that the planned value in the plan for the next day of contract 402 is 200 kwh, the planned value in the plan for the next day of contract 403 is 100 kwh, and the planned value in the plan for the next day of contract 401 is 100 kwh. In the figure, units of planned values are omitted.

図14に示すように、翌日の計画における計画値の仮の確定後、(1)として発電事業者Cの発電機に故障が生じ、発電事業者Cは電力が足りない状態になったとする。これにより、発電事業者Cは、事業者装置2を用いて、(2)として、希望調整量を-100kWhとした計画調整要求を相対契約調整装置1へ送信する。相対契約調整装置1は、この計画調整要求に基づいて計画値の調整を行い、その結果、契約402が調整対象として選択されて契約402の計画値が100kWhに変更される。 As shown in FIG. 14, after tentative determination of planned values in the plan for the next day, as in (1), a failure occurs in the generator of power generation company C, and power generation company C is in a state of power shortage. As a result, the power generation business operator C uses the business operator device 2 to transmit to the bilateral contract adjustment device 1 a plan adjustment request with a desired adjustment amount of -100 kWh as (2). The bilateral contract adjustment device 1 adjusts the planned value based on this plan adjustment request, and as a result, the contract 402 is selected as an adjustment target and the planned value of the contract 402 is changed to 100 kWh.

図15は、図14に示した計画値の調整が行われた後の様子を示す図である。図15に示すように、図14で説明した計画値の調整が行われることにより、契約402の計画値が100kWhに変更されており、これにより、小売事業者fは、電力が不足する状態となり、(3)として、事業者装置2を用いて、希望調整量を-100kWhとした計画調整要求を相対契約調整装置1へ送信する。相対契約調整装置1は、この計画調整要求に基づいて計画値の調整を行い、その結果、契約403が調整対象として選択されて契約403の計画値が0kWhに変更される。これにより、小売事業者aは、電力が不足する状態となり、(4)として、事業者装置2を用いて、希望調整量を-100kWhとした計画調整要求を相対契約調整装置1へ送信する。 FIG. 15 is a diagram showing a state after the planned values shown in FIG. 14 are adjusted. As shown in FIG. 15, the planned value of the contract 402 has been changed to 100 kWh by adjusting the planned value described in FIG. , (3), using the operator device 2, a plan adjustment request with a desired adjustment amount of -100 kWh is transmitted to the bilateral contract adjustment device 1. The bilateral contract adjustment device 1 adjusts the planned value based on this plan adjustment request, and as a result, the contract 403 is selected as an adjustment target and the planned value of the contract 403 is changed to 0 kWh. As a result, the retailer a is in a state of power shortage, and in (4), uses the business operator device 2 to transmit a plan adjustment request with a desired adjustment amount of -100 kWh to the bilateral contract adjustment device 1 .

ここで、(4)の計画調整要求を受信することにより、相対契約調整装置1が、契約401を計画値の調整の対象として、計画値を100kWh減らしてしまうと、発電事業者Cに供給される電力が減ることになってしまい、再び発電事業者Cが事業者装置2を用いて計画調整要求を送信することになる。すなわち、この例で、契約401の計画値を100kWh減らしてしまうと、ループ状の調整が行われてしまうことになる。このようなループ状の調整を避けるために、本実施の形態では、トランザクション監視部17が、変動可能量の変更を行う。すなわち、トランザクション監視部17は、計画調整要求の送信元の事業者が変動吸収者となる相対契約の上げ変動可能量および下げ変動可能量のうち、計画値の調整の行われた方向に対応する変動可能量を0kWhに変更する。 Here, by receiving the plan adjustment request of (4), the bilateral contract adjustment device 1 reduces the planned value by 100 kWh with the contract 401 as the target of adjusting the planned value. As a result, the power generation company C uses the company device 2 to transmit the plan adjustment request again. That is, in this example, if the planned value of the contract 401 is reduced by 100 kWh, a looped adjustment will be performed. In order to avoid such a loop-like adjustment, in the present embodiment, the transaction monitoring unit 17 changes the variable amount. That is, the transaction monitoring unit 17 corresponds to the direction in which the planned value is adjusted, out of the possible upward fluctuation amount and the downward fluctuation amount of the bilateral contract in which the business operator that has sent the plan adjustment request is the fluctuation absorber. Change the variable amount to 0 kWh.

図16は、本実施の形態のトランザクション監視部17による変動可能量の変更の一例を示す図である。図16は、図14に示した例に対応する調整量情報を示す図である。図16に示した3つの契約は上から順に契約401,402,403にそれぞれ対応している。図16は、図14の(2)の計画調整要求に基づいて相対契約調整装置1が契約401の計画値を変更した後の状態を示している。このため、図16の上から2番目の契約である図14に示した契約402の現時点での変動量が-100kWhとなっている。図16の上から1番目の契約である図14に示した契約401の下げ変動可能量は、欄303に示すように、契約402の計画値の調整の前は-100kWhであるが、トランザクション監視部17によって、契約402の計画値の調整後に0kWhに変更される。これにより、この後に、相対契約調整装置1が、小売事業者aから、希望調整量を負の値とした計画調整要求を受信しても、契約401の計画値は変更されないので、ループ状の調整は生じない。 FIG. 16 is a diagram showing an example of change of the variable amount by the transaction monitoring unit 17 of this embodiment. FIG. 16 is a diagram showing adjustment amount information corresponding to the example shown in FIG. The three contracts shown in FIG. 16 correspond to contracts 401, 402, and 403 in order from the top. FIG. 16 shows the state after the bilateral contract adjustment device 1 has changed the plan value of the contract 401 based on the plan adjustment request of (2) in FIG. Therefore, the amount of fluctuation at the present point in the contract 402 shown in FIG. 14, which is the second contract from the top in FIG. 16, is -100 kWh. The downward variability of contract 401 shown in FIG. 14, which is the first contract from the top of FIG. By unit 17 it is changed to 0 kWh after adjustment of the planned value of contract 402 . As a result, even if the bilateral contract adjustment device 1 subsequently receives a plan adjustment request in which the desired adjustment amount is a negative value from the retailer a, the planned value of the contract 401 is not changed. No adjustment occurs.

また、計画調整要求が無制限に頻繁に送信されると、計画値の調整が頻繁に行われることになり、他の事業者にとって好ましくない。また、計画調整要求が頻繁に送信されると相対契約調整装置1の負荷も増加する。したがって、計画調整要求の送信に手数料を設けるようにしてもよい。また、1つの事業者からの同一の30分の時間帯に関する計画調整要求の送信の回数に上限を設けてもよい。また、過大な希望調整量の要求がある場合にも他の事業者への影響が大きくなるため、希望調整量に関する従量制の料金を設けてもよい。 Also, if plan adjustment requests are sent unlimitedly and frequently, the plan values will be adjusted frequently, which is undesirable for other business operators. Further, when plan adjustment requests are frequently transmitted, the load on the bilateral contract adjustment device 1 also increases. Therefore, a fee may be provided for sending the plan adjustment request. Also, an upper limit may be set for the number of transmissions of plan adjustment requests for the same 30-minute time slot from one business operator. In addition, if there is a request for an excessive amount of desired adjustment, the effect on other business operators will increase, so a pay-as-you-go fee for the desired amount of adjustment may be provided.

以上のように、本実施の形態では、相対契約ごとに、計画値の調整の要求を行うことのできる調整キック者と変動吸収者とを定めておき、変動吸収者が、計画値の変更を許容できる最大量である変動可能量と計画値を変更するときの許容可能な単価とを含む調整条件をあらかじめ定めておく。そして、相対契約調整装置1は、調整キック者に対応する事業者装置2から計画値の変更を要求する計画調整要求を受信すると、計画調整要求に含まれる調整を希望する調整量と希望する単価である希望価格と、調整条件とに基づいて、調整対象の相対契約を決定し、調整対象の相対契約ごとの調整量を求めるようにした。これにより、本実施の形態の相対契約調整装置1は、手間を抑制して、相対契約を締結している事業者の需給量の計画値の調整を行うことができる。 As described above, in the present embodiment, for each bilateral contract, an adjustment kicker and a fluctuation absorber who can request adjustment of the planned value are defined, and the fluctuation absorber changes the planned value. Adjusting conditions including an allowable maximum variable amount and an allowable unit price when changing the planned value are determined in advance. Then, when the bilateral contract adjustment device 1 receives a plan adjustment request requesting a change in the plan value from the operator device 2 corresponding to the adjustment kicker, the desired adjustment amount and the desired unit price included in the plan adjustment request and the adjustment conditions, the bilateral contract to be adjusted is determined, and the adjustment amount for each bilateral contract to be adjusted is obtained. As a result, the bilateral contract adjustment device 1 of the present embodiment can adjust the planned value of the supply and demand amount of the business operator with whom the bilateral contract is concluded, with less effort.

実施の形態2.
図17は、本発明の実施の形態2にかかる電力取引調整システムの構成例を示す図である。本実施の形態の電力取引調整システムは、本発明にかかる電力取引調整装置である事業者装置1a-1~1a-9を備える。事業者装置1a-1~1a-9は、それぞれが異なる事業者により管理される。事業者装置1a-1~1a-9は、ネットワーク50を介して、ブロックチェーンと呼ばれる分散型ネットワーク方式で接続される。事業者装置1a-1~1a-9は同様の構成を有しており、以下事業者装置1a-1~1a-9を個別に区別せずに示すときには、事業者装置1aと呼ぶ。事業者装置1a-1は、需給管理システム3-1と接続され、事業者装置1a-2は、需給管理システム3-2と接続される。需給管理システム3-1,3-2は、実施の形態1の需給管理システム3-1,3-2と同様であり、広域機関システム4と接続される。なお、図17では、事業者装置1aを9台示しているが、事業者装置1aの数は、図17に示した例に限定されない。
Embodiment 2.
FIG. 17 is a diagram showing a configuration example of a power trading coordination system according to Embodiment 2 of the present invention. The power transaction coordinating system of the present embodiment includes business operator devices 1a-1 to 1a-9, which are power trading coordinating devices according to the present invention. The operator devices 1a-1 to 1a-9 are managed by different operators. The operator devices 1a-1 to 1a-9 are connected via a network 50 in a distributed network system called block chain. The operator devices 1a-1 to 1a-9 have the same configuration, and hereinafter, the operator devices 1a-1 to 1a-9 are referred to as the operator device 1a when they are indicated without being individually distinguished. The business operator's device 1a-1 is connected to the supply and demand management system 3-1, and the business operator's device 1a-2 is connected to the supply and demand management system 3-2. The supply and demand management systems 3-1 and 3-2 are the same as the supply and demand management systems 3-1 and 3-2 of the first embodiment, and are connected to the cross-regional organization system 4. FIG. Note that FIG. 17 shows nine operator apparatuses 1a, but the number of operator apparatuses 1a is not limited to the example shown in FIG.

実施の形態1では、相対契約調整装置1が、中央管理型で計画値の調整処理を実施した。本実施の形態では、各事業者が有する事業者装置1aを用いて、計画値の調整を分散処理によって実施する。以下、実施の形態1と同一の機能を有する構成要素は、実施の形態1と同一の符号を付して重複する説明を省略する。 In Embodiment 1, the bilateral contract adjustment device 1 performs the adjustment processing of the planned values in a central management type. In the present embodiment, the operator device 1a of each operator is used to adjust the planned values by distributed processing. Hereinafter, constituent elements having the same functions as those of the first embodiment are assigned the same reference numerals as those of the first embodiment, and overlapping descriptions are omitted.

図18は、本実施の形態の事業者装置1aの構成例を示す図である。図18に示すように、本実施の形態の事業者装置1aは、通信部11、記憶部14、計画調整部16、トランザクション監視部17、結果出力部18および広域機関連係部19、計画作成部22、計画チェック部23、調整条件管理部24、調整要求生成部25、表示部26および情報伝搬部27を備える。事業者装置1aの通信部11、記憶部14、計画調整部16、トランザクション監視部17、結果出力部18および広域機関連係部19は、相対契約調整装置1の対応する構成要素とそれぞれ同様である。ただし、通信部11の通信の相手先と、これらが実施する一部の処理は実施の形態1と異なる。事業者装置1aの計画作成部22、計画チェック部23、調整条件管理部24、調整要求生成部25および表示部26は、実施の形態1の事業者装置2の対応する構成要素とそれぞれ同様である。以下実施の形態1と異なる点を中心に説明し、実施の形態1と重複する説明を省略する。以上のように、本実施の形態の事業者装置1aは、概ね、実施の形態1の事業者装置2の機能と相対契約調整装置1の機能との両方を有する。 FIG. 18 is a diagram showing a configuration example of the business operator apparatus 1a according to the present embodiment. As shown in FIG. 18, the provider device 1a of the present embodiment includes a communication unit 11, a storage unit 14, a plan adjustment unit 16, a transaction monitoring unit 17, a result output unit 18, a wide area machine related unit 19, and a plan creation unit. 22 , a plan checking unit 23 , an adjustment condition management unit 24 , an adjustment request generation unit 25 , a display unit 26 and an information propagation unit 27 . The communication unit 11, the storage unit 14, the plan adjustment unit 16, the transaction monitoring unit 17, the result output unit 18, and the wide area device related unit 19 of the business operator device 1a are the same as the corresponding components of the bilateral contract adjustment device 1. . However, the communication partner of the communication unit 11 and part of the processing performed by them are different from those in the first embodiment. Plan creation unit 22, plan check unit 23, adjustment condition management unit 24, adjustment request generation unit 25, and display unit 26 of provider device 1a are the same as corresponding components of provider device 2 of the first embodiment. be. Differences from the first embodiment will be mainly described below, and descriptions that overlap with the first embodiment will be omitted. As described above, the business operator device 1a of the present embodiment generally has both the functions of the business operator device 2 and the bilateral contract adjustment device 1 of the first embodiment.

情報伝搬部27は、ブロックチェーン方式により、事業者装置1a内で、計画値の調整処理で使用する情報および計画値の調整処理の内容が変更になった場合、変更内容を、通信部11を介して他の事業者装置1aへ送信する。このように、本実施の形態では、調整処理で用いられる情報は、ブロックチェーン方式により、複数の事業者装置1a間で共有される。また、他の事業者装置1aから、通信部11を介して変更内容を受信した場合、予め定められた手順にしたがって変更内容を承認するか否かを判断し、承認する場合には、変更内容を記憶部14へ反映する。変更内容の送信先、改ざん防止のための処理、他の事業者装置1aから変更内容を受信した場合の承認処理などは、事前に事業者装置1a間で定められる。 The information propagation unit 27 uses the block chain method to notify the communication unit 11 of the change when the information used in the adjustment processing of the planned value and the content of the adjustment processing of the planned value are changed in the operator device 1a. to another provider device 1a. As described above, in the present embodiment, information used in adjustment processing is shared among a plurality of business operator devices 1a by the blockchain method. Further, when receiving the change contents from the other provider apparatus 1a via the communication unit 11, it determines whether or not to approve the change contents according to a predetermined procedure. is reflected in the storage unit 14 . The transmission destination of the change content, the processing for preventing falsification, the approval processing when the change content is received from the other business operator device 1a, etc. are determined in advance between the business operator devices 1a.

本実施の形態の相対契約ごとの、契約基本情報、計画値情報、調整条件情報および調整量情報は、実施の形態1と同様であるが、本実施の形態では、事業者装置1aを管理する事業者に関する情報は、事業者装置1a内で生成されて記憶部14に格納される。そして、情報伝搬部27は、記憶部14に格納された契約基本情報、計画値情報、調整条件情報および調整量情報などの情報のうち更新されたものがあれば、更新された情報を他の事業者装置1aへ、通信部11を介して送信することにより、電力取引調整システムを構成する事業者装置1a間で、情報を共有する。また、情報伝搬部27は、事業者装置1a内の処理のためのプログラムが変更された場合にも同様に変更されたプログラムの内容を供給するために他の事業者装置1aへ変更内容を送信する。情報の共有の方法は、ブロックチェーンにおける情報の共有方法を用いることができるため、詳細な説明は省略する。 The contract basic information, planned value information, adjustment condition information, and adjustment amount information for each bilateral contract in this embodiment are the same as in Embodiment 1, but in this embodiment, the operator apparatus 1a is managed. The information about the business is generated in the business device 1a and stored in the storage unit 14. FIG. Then, if any of the information stored in the storage unit 14, such as the contract basic information, the planned value information, the adjustment condition information, and the adjustment amount information, is updated, the information propagation unit 27 transmits the updated information to another By transmitting the information to the business operator's device 1a via the communication unit 11, the information is shared between the business operator's devices 1a constituting the power transaction coordination system. Also, when the program for processing in the operator apparatus 1a is changed, the information propagation unit 27 similarly transmits the changed contents to the other operator apparatus 1a in order to supply the changed contents of the program. do. Since the method of sharing information can use the method of sharing information in blockchain, detailed description is omitted.

電力取引調整システムの動作のうち、翌日の計画値の仮の確定までの処理について説明する。本実施の形態では、計画登録者の事業者装置1aが、実施の形態1の計画チェック者の事業者装置2と同様に図5に示すステップS1を実施する。本実施の形態では、ステップS2,S3では、事業者装置1aの計画作成部22は、相対契約調整装置1へ送信する替わりに、記憶部14の計画値情報に作成した計画を反映する。また、上述したとおり、情報伝搬部27は、記憶部14の計画値情報が更新されると、更新された情報を、通信部11を介して他の事業者装置1aに送信する。 Among the operations of the power trading coordination system, processing up to provisional determination of planned values for the next day will be described. In the present embodiment, the operator device 1a of the plan registrant implements step S1 shown in FIG. 5, similarly to the operator device 2 of the plan checker in the first embodiment. In this embodiment, in steps S2 and S3, the plan creation unit 22 of the business operator apparatus 1a reflects the created plan in the plan value information of the storage unit 14 instead of transmitting it to the bilateral contract adjustment apparatus 1. FIG. Further, as described above, when the planned value information in the storage unit 14 is updated, the information propagation unit 27 transmits the updated information to the other business operator device 1a via the communication unit 11 .

また、本実施の形態では、計画チェック者の事業者装置1aは、ステップS4では記憶部14の計画値情報を参照することになる。そして、計画チェック者の事業者装置1aは、実施の形態1の計画チェック者の事業者装置2と同様に図5に示すステップS5を実施する。その後、実施の形態1のステップS6,S7の替わりに、計画チェック者の事業者装置1aの計画チェック部23は、計画チェックにより、計画値を修正する場合には、計画登録者と合意された修正を、記憶部14の計画値情報に直接反映する。上述したとおり、情報伝搬部27は、記憶部14の計画値情報が更新されると、更新された情報を、通信部11を介して他の事業者装置1aに送信する。 Further, in the present embodiment, the operator device 1a of the plan checker refers to the plan value information in the storage unit 14 in step S4. Then, the business operator device 1a of the plan checker performs step S5 shown in FIG. After that, instead of steps S6 and S7 in the first embodiment, the plan check unit 23 of the operator device 1a of the plan checker performs the plan check, and when correcting the plan value, The correction is directly reflected in the planned value information in the storage unit 14 . As described above, when the planned value information in the storage unit 14 is updated, the information propagation unit 27 transmits the updated information to the other business operator device 1a via the communication unit 11 .

次に、仮の計画値の確定後の、計画値の調整処理について説明する。本実施の形態では、調整条件管理部24は、調整条件管理部24を備える事業者装置1aが変動吸収者となる相対契約に関する調整条件を、記憶部14の調整条件情報に格納する。また、契約基本情報についても、相対契約の当事者の事業者装置1aが、記憶部14に対応する相対契約の契約基本情報を格納する。上述したとおり、情報伝搬部27は、記憶部14の調整条件情報、契約基本情報が更新されると、更新された情報を、通信部11を介して他の事業者装置1aに送信する。このようにして、調整条件情報、契約基本情報は、全ての事業者装置1aで共有される。なお、実施の形態1と同様に、各情報のアクセス権を相対契約の当事者以外が閲覧および編集できないように設定する。 Next, the process of adjusting the planned values after the tentative planned values are determined will be described. In the present embodiment, the adjustment condition management unit 24 stores, in the adjustment condition information of the storage unit 14, the adjustment conditions related to the bilateral contract in which the operator device 1a provided with the adjustment condition management unit 24 is the change absorber. As for the basic contract information, the business operator device 1a of the party to the bilateral contract stores the basic contract information of the corresponding bilateral contract in the storage unit 14 . As described above, when the adjustment condition information and basic contract information in the storage unit 14 are updated, the information propagation unit 27 transmits the updated information to the other business operator device 1a via the communication unit 11 . In this way, the adjustment condition information and the contract basic information are shared by all the provider's devices 1a. As in the first embodiment, access rights to each information are set so that only parties to the bilateral contract can view and edit the information.

本実施の形態の計画調整部16の動作は、実施の形態1の計画調整部16と同様である。ただし、本実施の形態では、調整要求生成部25は、計画調整要求を生成すると、計画調整部16へ計画調整要求を送信する。計画調整部16は、調整要求生成部25から計画調整要求を受信すると、図10で示したステップS11で計画調整要求を受信した場合と同様の動作を行う。または、計画調整部16は、受け取った計画調整要求を、記憶部14、情報伝搬部27および通信部11を介して、他の事業者装置1aへ送信してもよい。また、計画調整部16は、通信部11、情報伝搬部27および記憶部14を介して計画調整要求を他の事業者装置1aから受信した場合、実施の形態1の計画調整部16と同様の動作を行う。また、実施の形態1と同様に、計画調整要求を受信するごとに計画値の調整処理を行ってもよいし、一定期間ごとに、一定期間に受信した計画調整要求に対応する処理を行ってもよい。 The operation of the plan adjustment unit 16 of this embodiment is the same as that of the plan adjustment unit 16 of the first embodiment. However, in the present embodiment, after generating the plan adjustment request, adjustment request generator 25 transmits the plan adjustment request to plan adjuster 16 . When the plan adjustment request is received from the adjustment request generation unit 25, the plan adjustment unit 16 performs the same operation as when the plan adjustment request is received in step S11 shown in FIG. Alternatively, the plan adjustment unit 16 may transmit the received plan adjustment request to the other operator device 1a via the storage unit 14, the information propagation unit 27 and the communication unit 11. FIG. Further, when the plan adjustment unit 16 receives a plan adjustment request from another provider device 1a via the communication unit 11, the information propagation unit 27 and the storage unit 14, the plan adjustment unit 16 performs the same take action. Further, as in the first embodiment, the adjustment processing of the plan value may be performed each time a plan adjustment request is received, or the processing corresponding to the plan adjustment request received during a given period may be performed at regular intervals. good too.

本実施の形態の事業者装置1aは、実施の形態1の相対契約調整装置1、事業者装置2と同様に、コンピュータシステムにより実現される。事業者装置1aは、例えば、相対契約調整装置1と同様に、図3に示したコンピュータシステムにより実現される。本実施の形態の事業者装置1aは、コンピュータシステム上で、事業者装置1aにおける処理が記述されたプログラムが実行されることにより、コンピュータシステムが事業者装置1aとして機能する。プログラムが実行可能な状態になるまでのコンピュータシステムの動作は、実施の形態1の相対契約調整装置1と同様である。 The business operator device 1a of the present embodiment is realized by a computer system, like the bilateral contract adjustment device 1 and the business operator device 2 of the first embodiment. The business operator device 1a is realized by, for example, the computer system shown in FIG. 3, like the bilateral contract adjustment device 1. Business operator device 1a of the present embodiment functions as business operator device 1a by executing a program describing processing in business operator device 1a on the computer system. The operation of the computer system until the program becomes executable is the same as that of the bilateral contract adjustment apparatus 1 of the first embodiment.

以上説明した以外の本実施の形態の動作は、実施の形態1と同様である。本実施の形態では、各事業者の事業者装置1aにより構成されるブロックチェーンにより、計画値の調整処理を行うようにした。これにより、実施の形態1と同様の効果を奏することができる。また、実施の形態1では中央管理方式で相対契約調整装置1が計画値の調整を行っているため、相対契約調整装置1がある事業者により管理される場合などには、この事業者が相対契約調整装置1内の計画値の調整処理の内容を変更しても他の事業者にはわからない。このため、公平性が保てなくなる可能性もあるが、本実施の形態では、全ての事業者装置1aは同じ処理を行うことが可能なため、公平性を確保することができる。 Operations of the present embodiment other than those described above are the same as those of the first embodiment. In the present embodiment, the block chain configured by the business operator device 1a of each business operator is used to adjust the planned value. Thereby, the same effects as in the first embodiment can be obtained. In addition, in Embodiment 1, since the bilateral contract adjustment device 1 adjusts the plan value by the central management method, when the bilateral contract adjustment device 1 is managed by a certain business operator, this business operator Even if the contents of the adjustment processing of the planned values in the contract adjustment device 1 are changed, other business operators will not know. For this reason, there is a possibility that fairness cannot be maintained, but in the present embodiment, fairness can be ensured because all the provider apparatuses 1a can perform the same processing.

なお、以上説明した実施の形態1、2の例では、相対契約ごとに、変動吸収者が調整条件を決定するようにした。これに限らず、調整条件は事業者ごとに決定しておいてもよい。すなわち、各事業者は、変動吸収者となったときの上げ価格、下げ価格、上げ変更可能量および下げ変動可能量を、相対契約によらず共通の値として定めておいてもよい。この場合、図8に示す調整条件情報は、相対契約ごとではなく、事業者ごとの情報で構成されることになる。したがって、調整条件情報は、事業者ごとに定められており、事業者が受け入れ可能な仮の確定値からの計画値の変更量を示す変動可能量と、計画値を仮の確定値から変更することにより生じて変化する電力量の単価であって事業者が受け入れ可能な単価を示す第1の価格と、を含むことになる。 In the examples of the first and second embodiments described above, the fluctuation absorber determines the adjustment conditions for each bilateral contract. The adjustment condition is not limited to this, and may be determined for each business operator. In other words, each business operator may set the increase price, decrease price, increase changeable amount, and decrease changeable amount as common values regardless of the bilateral contract. In this case, the adjustment condition information shown in FIG. 8 is made up of information for each business operator, not for each bilateral contract. Therefore, the adjustment condition information is defined for each business operator, and includes a variable amount that indicates the amount of change in the planned value from the temporary fixed value that the business operator can accept, and a change in the planned value from the temporary fixed value. and a first price, which is a unit price of electric power that changes due to a change and indicates a unit price that can be accepted by the business operator.

例えば、発電事業者Aが、小売り事業者aとの間の相対契約と、小売り事業者bとの間の相対契約とを締結しているとする。これら2つの相対契約において、発電事業者Aが変動吸収者に設定されているとすると、計画調整部16は、調整対象の相対契約を決定する際に、発電事業者Aに対応する共通の調整条件を参照して、実施の形態1、2と同様の処理を行う。すなわち、計画調整部16は、第2の事業者である変動吸収者の調整条件情報における第1の価格および変動可能量と、計画調整要求における第2の価格および希望調整量とに基づいて調整処理を行う。具体的には、例えば、計画調整部16は、図9に示す調整量情報を生成する際に、相対契約ごとに、変動吸収者の事業者に対応する調整条件情報を読み出して、調整量情報に格納する。これにより、以降の動作は、実施の形態1、2と同様とすることができる。このように、事業者ごとに調整条件を設定すると、各事業者は相対契約ごとに調整条件を定める必要がなくなり、各事業者における登録および管理のための工数を抑制することができる。 For example, power generation company A concludes a bilateral contract with retailer a and a bilateral contract with retailer b. In these two bilateral contracts, assuming that the power generation company A is set as the fluctuation absorber, the plan adjustment unit 16, when determining the bilateral contract to be adjusted, makes a common adjustment corresponding to the power generation company A. By referring to the conditions, the same processing as in the first and second embodiments is performed. That is, the plan adjustment unit 16 adjusts based on the first price and the possible fluctuation amount in the adjustment condition information of the fluctuation absorber, who is the second business operator, and the second price and the desired adjustment amount in the plan adjustment request. process. Specifically, for example, when generating the adjustment amount information shown in FIG. store in As a result, subsequent operations can be the same as those in the first and second embodiments. By setting adjustment conditions for each business operator in this way, each business operator does not need to set adjustment conditions for each bilateral contract, and man-hours for registration and management at each business operator can be reduced.

以上の実施の形態に示した構成は、本発明の内容の一例を示すものであり、別の公知の技術と組み合わせることも可能であるし、本発明の要旨を逸脱しない範囲で、構成の一部を省略、変更することも可能である。 The configuration shown in the above embodiment shows an example of the content of the present invention, and it is possible to combine it with another known technology, and one configuration can be used without departing from the scope of the present invention. It is also possible to omit or change the part.

1 相対契約調整装置、1a,1a-1~1a-9,2,2-1~2-3 事業者装置、3-1,3-2 需給管理システム、4 広域機関システム、11,21 通信部、12 計画値登録部、13 調整条件登録部、14 記憶部、15 チェック結果反映部、16 計画調整部、17 トランザクション監視部、18 結果出力部、19 広域機関連係部、22 計画作成部、23 計画チェック部、24 調整条件管理部、25 調整要求生成部、26 表示部、27 情報伝搬部。 1 bilateral contract adjustment device, 1a, 1a-1 to 1a-9, 2, 2-1 to 2-3 operator device, 3-1, 3-2 supply and demand management system, 4 cross-regional agency system, 11, 21 communication unit , 12 planned value registration unit, 13 adjustment condition registration unit, 14 storage unit, 15 check result reflection unit, 16 plan adjustment unit, 17 transaction monitoring unit, 18 result output unit, 19 wide area machine related unit, 22 plan creation unit, 23 Plan check unit 24 adjustment condition management unit 25 adjustment request generation unit 26 display unit 27 information propagation unit.

Claims (13)

2つの事業者間で締結される電力の供給に関する相対契約ごとに、前記相対契約に基づいて供給される電力量の計画値を前記2つの事業者間で合意済みの仮の確定値から変更する調整を行うための調整条件を示す調整条件情報を記憶する記憶部と、
前記計画値を前記仮の確定値から変更するための調整を前記2つの事業者のうち一方の事業者が要求することを示す計画調整要求を受信し、受信した前記計画調整要求と前記調整条件情報とに基づいて、前記計画値の調整対象となる前記相対契約と前記計画値を変更する量である調整量とを決定する調整処理を行う計画調整部と、
を備え、
前記計画調整要求は、前記一方の事業者が調整を希望する計画値の変更量を示す希望調整量を含むことを特徴とする電力取引調整装置。
For each bilateral contract for power supply concluded between two business operators, the planned value of the amount of power to be supplied based on the bilateral contract is changed from the tentative fixed value agreed between the two business operators. a storage unit that stores adjustment condition information indicating adjustment conditions for performing adjustment;
receiving a plan adjustment request indicating that one of the two operators requests adjustment for changing the planned value from the tentative fixed value, and receiving the plan adjustment request and the adjustment condition; a plan adjustment unit that performs an adjustment process for determining the bilateral contract to be adjusted for the planned value and an adjustment amount that is an amount by which the planned value is changed, based on the information;
with
The power transaction coordinating apparatus, wherein the plan adjustment request includes a desired adjustment amount indicating an amount of change in the planned value that the one business operator wishes to adjust.
前記計画調整部は、前記計画調整要求を受信するたびに、前記調整処理を行うことを特徴とする請求項1に記載の電力取引調整装置。 2. The power transaction coordinating apparatus according to claim 1, wherein said plan adjusting unit performs said adjusting process each time said plan adjusting request is received. 前記計画調整部は、一定期間ごとに、前記一定期間内に1つ以上の前記計画調整要求を受信したか否かを判断し、1つ以上の前記計画調整要求を受信したと判断した場合に、前記一定期間内に受信した1つ以上の前記計画調整要求に対応する前記調整処理を連続して実施することを特徴とする請求項1に記載の電力取引調整装置。 The plan adjustment unit determines at regular intervals whether or not one or more of the plan adjustment requests have been received within the certain period of time, and when it is determined that one or more of the plan adjustment requests have been received, 2. The power trading coordinator according to claim 1, wherein said adjustment processing corresponding to one or more said plan adjustment requests received within said fixed period is continuously performed. 前記相対契約を締結する前記2つの事業者のうち一方は、前記計画調整要求を送信する第1の事業者であり、前記2つの事業者のうち他方は前記調整条件を定める第2の事業者であり、前記相対契約ごとに、前記2つの事業者のうちどちらが前記第1の事業者であるかが定められており、
前記調整条件情報は、前記第2の事業者が受け入れ可能な前記仮の確定値からの前記計画値の変更量を示す変動可能量と、前記計画値を前記仮の確定値から変更することにより生じて変化する電力量の単価であって前記第2の事業者が受け入れ可能な単価を示す第1の価格と、を含み、
前記計画調整要求は、前記計画値を前記仮の確定値から変更することにより生じて変化する電力量の単価であって前記計画調整要求の要求元の事業者が希望する単価を示す第2の価格、を含み、
前記計画調整部は、前記第1の価格、前記第2の価格、前記希望調整量および前記変動可能量に基づいて前記調整処理を行うことを特徴とする請求項1に記載の電力取引調整装置。
One of the two business operators that concludes the bilateral contract is the first business operator that transmits the plan adjustment request, and the other of the two business operators is the second business operator that determines the adjustment conditions. and which of the two operators is the first operator is determined for each bilateral contract,
The adjustment condition information includes a changeable amount indicating an amount of change of the planned value from the provisional fixed value acceptable to the second business operator, and a change of the planned value from the provisional fixed value a first price that indicates a unit price of the generated and changing amount of power that is acceptable to the second operator;
The plan adjustment request is a unit price of electric energy that changes due to the change of the planned value from the tentative fixed value, and indicates a unit price desired by a business operator who requested the plan adjustment request. price, including
2. The power transaction coordinator according to claim 1, wherein said plan adjustment unit performs said adjustment processing based on said first price, said second price, said desired adjustment amount, and said variable amount. .
前記調整条件情報は、事業者ごとに定められており、前記事業者が受け入れ可能な前記仮の確定値からの前記計画値の変更量を示す変動可能量と、前記計画値を前記仮の確定値から変更することにより生じて変化する電力量の単価であって前記事業者が受け入れ可能な単価を示す第1の価格と、を含み、
前記相対契約を締結する前記2つの事業者のうち一方は、前記計画調整要求を送信する第1の事業者であり、前記2つの事業者のうち他方は第2の事業者であり、前記相対契約ごとに、前記2つの事業者のうちどちらが前記第1の事業者であるかが定められており、
前記計画調整要求は、前記計画値を前記仮の確定値から変更することにより生じて変化する電力量の単価であって前記計画調整要求の要求元の事業者が希望する単価を示す第2の価格、を含み、
前記計画調整部は、前記第2の事業者の前記調整条件情報における前記第1の価格および前記変動可能量と、前記第2の価格および前記希望調整量とに基づいて前記調整処理を行うことを特徴とする請求項1に記載の電力取引調整装置。
The adjustment condition information is determined for each business operator, and includes a variable amount indicating a change amount of the planned value from the temporary fixed value acceptable by the business operator, and a change amount of the planned value to the temporary fixed value. a first price that is a unit price of electric energy that changes due to a change from the value and that indicates a unit price acceptable to the business operator;
One of the two business operators that concludes the bilateral contract is the first business operator that transmits the plan adjustment request, the other of the two business operators is the second business operator, and Each contract stipulates which of the two operators is the first operator,
The plan adjustment request is a unit price of electric energy that changes due to the change of the planned value from the tentative fixed value, and indicates a unit price desired by a business operator who requested the plan adjustment request. price, including
The plan adjustment unit performs the adjustment process based on the first price and the variable amount, and the second price and the desired adjustment amount in the adjustment condition information of the second business operator. The power transaction coordinator according to claim 1, characterized by:
前記調整処理が行われた後、前記調整処理に対応する前記計画調整要求の要求元の事業者が前記第2の事業者として定められている前記相対契約に対応する前記変動可能量を予め定められた値に設定するトランザクション監視部、
を備えることを特徴とする請求項4または5に記載の電力取引調整装置。
After the adjustment process is performed, the variable amount corresponding to the bilateral contract is determined in advance in which the business operator requesting the plan adjustment request corresponding to the adjustment process is defined as the second business operator. the transaction monitor, which sets the
6. The power trading coordinator according to claim 4 or 5, comprising:
前記記憶部は、前記相対契約ごとに、前記調整処理によって前記仮の確定値から変更された調整量の現時点での累積値を示す現時点での変動量を記憶し、
前記計画調整部は、前記第1の価格、前記第2の価格、前記希望調整量、前記変動可能量および前記現時点での変動量に基づいて前記調整処理を行い、前記調整処理の結果を前記現時点での変動量に反映することを特徴とする請求項4から6のいずれか1つに記載の電力取引調整装置。
The storage unit stores, for each bilateral contract, a current variation amount indicating a current accumulated value of the adjustment amount changed from the provisional fixed value by the adjustment process,
The plan adjustment unit performs the adjustment process based on the first price, the second price, the desired adjustment amount, the variable amount, and the current variation amount, and outputs the result of the adjustment process to the 7. The power trading coordinator according to any one of claims 4 to 6, wherein the amount of fluctuation at the present time is reflected.
記希望調整量は、前記計画調整要求の要求元の事業者が、電力が余ることにより変更を要求する場合に正の値であり、前記計画調整要求の要求元の事業者が、電力が不足することにより変更を要求する場合に負の値であり、
前記計画調整部は、前記希望調整量が正の値である場合、前記第1の価格が前記第2の価格以上の前記相対契約のうち前記第1の価格が高いものから順に優先して前記調整対象に決定し、前記希望調整量が負の値である場合、前記第1の価格が前記第2の価格以下の前記相対契約のうち前記第1の価格が安いものから順に優先して前記調整対象に決定する、
ことを特徴とする請求項7に記載の電力取引調整装置。
The desired adjustment amount is a positive value when the business operator requesting the plan adjustment request requests a change due to surplus power. a negative value to request a change due to lack of
When the desired adjustment amount is a positive value, the plan adjustment unit prioritizes, in descending order of the first price, among the bilateral contracts in which the first price is equal to or higher than the second price When it is determined to be an adjustment target and the desired adjustment amount is a negative value, the bilateral contract with the first price equal to or lower than the second price is prioritized in order from the one with the lowest first price Decide on an adjustment target,
The power transaction coordinator according to claim 7, characterized by:
前記第1の価格は、前記計画値を上げる方向に調整する場合に適用される上げ価格と、前記計画値を下げる方向に調整する場合に適用される下げ価格と、を含み、
前記計画調整部は、
前記希望調整量が正の値である場合、前記計画調整要求の要求元の事業者が電力の供給元となる前記相対契約については前記第1の価格のうち前記上げ価格を参照し、前記計画調整要求の要求元の事業者が電力の供給先となる前記相対契約については前記第1の価格のうち前記下げ価格を参照して、前記第1の価格が前記第2の価格以上の前記相対契約のうち前記第1の価格が高いものから順に優先して前記調整対象に決定し、
前記希望調整量が負の値である場合、前記計画調整要求の要求元の事業者が電力の供給元となる前記相対契約については前記第1の価格のうち前記下げ価格を参照し、前記計画調整要求の要求元の事業者が電力の供給先となる前記相対契約については前記第1の価格のうち前記上げ価格を参照して、前記第1の価格が前記第2の価格以下の前記相対契約のうち前記第1の価格が安いものから順に優先して前記調整対象に決定する、
ことを特徴とする請求項8に記載の電力取引調整装置。
The first price includes an increase price applied when adjusting the planned value upward and a decrease price applied when adjusting the planned value downward,
The plan coordination department
When the desired adjustment amount is a positive value, the increase price of the first price is referred to for the bilateral contract in which the business operator requesting the plan adjustment request is the power supply source, and the plan With regard to the bilateral contract to which the business operator requesting the adjustment request is the power supply destination, the reduced price among the first prices is referred to, and the bilateral contract is determined such that the first price is the second price or more. Prioritizing the contract with the highest first price in descending order as the adjustment target,
When the desired adjustment amount is a negative value, with respect to the bilateral contract in which the business operator requesting the plan adjustment request is the power supply source, the reduced price among the first prices is referred to, and the plan With regard to the bilateral contract to which the business operator requesting the adjustment request is the power supply destination, the raised price of the first price is referred to, and the first price is equal to or lower than the second price. Prioritizing one of the contracts with the lowest first price in descending order to determine the adjustment target;
The power transaction coordinator according to claim 8, characterized by:
前記調整処理により計画値が変更される事業者が、前記計画値を管理する計画管理システムへ前記計画値を送信する需給管理システムを有する事業者である場合、前記需給管理システムへ、前記調整処理によって生じる前記計画値の変更を通知することを特徴とする請求項1から9のいずれか1つに記載の電力取引調整装置。 If the business whose planned values are changed by the adjustment process is a business operator having a supply and demand management system that transmits the planned values to a plan management system that manages the planned values, the adjustment process is performed to the supply and demand management system. 10. The power trading coordinator according to any one of claims 1 to 9, wherein the change in the planned value caused by the change is notified. それぞれが異なる事業者により管理される複数の事業者装置と、
電力取引調整装置と、
を備え、
電力の供給に関する相対契約を締結する2つの前記事業者の一方により管理される前記事業者装置は、前記相対契約に基づいて供給される電力量の計画値を、前記相対契約に対応する2つの前記事業者間で合意済みの仮の確定値から変更する調整を要求することを示す計画調整要求を送信し、
前記計画調整要求は、変更を希望する量を示す希望調整量を含み、
前記電力取引調整装置は、
前記相対契約ごとに、前記相対契約に基づいて供給される電力量の計画値を前記仮の確定値から変更する調整を行うための調整条件を示す調整条件情報を記憶する記憶部と、
前記事業者装置から前記計画調整要求を受信し、受信した前記計画調整要求と前記調整条件情報とに基づいて、前記計画値の調整対象となる前記相対契約と前記計画値を変更する量である調整量とを決定する調整処理を行う計画調整部と、
を備えることを特徴とする電力取引調整システム。
a plurality of operator devices each managed by a different operator;
a power trading coordinator;
with
The operator's device managed by one of the two operators that concludes a bilateral contract for the supply of electric power divides the planned value of the amount of power to be supplied based on the bilateral contract into two corresponding to the bilateral contract. Sending a plan adjustment request indicating a request for adjustment to change from the tentative fixed value agreed between the operators,
The plan adjustment request includes a desired adjustment amount indicating an amount desired to be changed,
The power trading coordinator,
A storage unit that stores adjustment condition information indicating adjustment conditions for performing adjustment for changing the planned value of the amount of power supplied based on the bilateral contract from the tentative fixed value for each bilateral contract;
It is an amount by which the bilateral contract subject to adjustment of the planned value and the planned value are changed based on the received plan adjustment request and the adjustment condition information. a plan adjustment unit that performs an adjustment process that determines an adjustment amount;
A power trading coordination system, comprising:
それぞれが異なる事業者により管理される複数の電力取引装置を備え、
前記複数の電力取引装置のそれぞれは、
2つの事業者間で締結される電力の供給に関する相対契約ごとに、前記相対契約に基づいて供給される電力量の計画値を前記2つの事業者間で合意済みの仮の確定値から変更する調整を行うための調整条件を示す調整条件情報を記憶する記憶部と、
前記計画値を前記仮の確定値から変更するための調整を前記2つの事業者のうち一方の事業者が要求することを示す計画調整要求を受信し、受信した前記計画調整要求と前記調整条件情報とに基づいて、前記計画値の調整対象となる前記相対契約と前記計画値を変更する量である調整量とを決定する調整処理を行う計画調整部と、
を備え、
前記計画調整要求は、前記一方の事業者が希望する前記計画値の変更量を示す希望調整量を含み、
前記調整処理で用いられる情報は、ブロックチェーン方式により、前記複数の電力取引装置間で共有されることを特徴とする電力取引調整システム。
Equipped with multiple power trading devices, each managed by a different operator,
Each of the plurality of power trading devices,
For each bilateral contract for power supply concluded between two business operators, the planned value of the amount of power to be supplied based on the bilateral contract is changed from the tentative fixed value agreed between the two business operators. a storage unit that stores adjustment condition information indicating adjustment conditions for performing adjustment;
receiving a plan adjustment request indicating that one of the two operators requests adjustment for changing the planned value from the tentative fixed value, and receiving the plan adjustment request and the adjustment condition; a plan adjustment unit that performs an adjustment process for determining the bilateral contract to be adjusted for the planned value and an adjustment amount that is an amount by which the planned value is changed, based on the information;
with
The plan adjustment request includes a desired adjustment amount indicating a change amount of the plan value desired by the one operator,
An electric power transaction adjustment system, wherein information used in the adjustment process is shared among the plurality of electric power transaction devices by a blockchain system.
電力取引調整装置が、
2つの事業者間で締結される電力の供給に関する相対契約ごとに、前記相対契約に基づいて供給される電力量の計画値を前記2つの事業者間で合意済みの仮の確定値から変更する調整を行うための調整条件を示す調整条件情報を記憶する記憶ステップと、
前記計画値を前記仮の確定値から変更するための調整を前記2つの事業者のうち一方の事業者が要求することを示す計画調整要求を受信し、受信した前記計画調整要求と前記調整条件情報とに基づいて、前記計画値の調整対象となる前記相対契約と前記計画値を変更する量である調整量とを決定する調整処理を行う計画調整ステップと、
を含み、
前記計画調整要求は、前記一方の事業者が希望する前記計画値の変更量を示す希望調整量を含むことを特徴とする電力取引調整方法。
A power trading coordinator
For each bilateral contract for power supply concluded between two business operators, the planned value of the amount of power to be supplied based on the bilateral contract is changed from the tentative fixed value agreed between the two business operators. a storage step of storing adjustment condition information indicating adjustment conditions for making adjustments;
receiving a plan adjustment request indicating that one of the two operators requests adjustment for changing the planned value from the tentative fixed value, and receiving the plan adjustment request and the adjustment condition; a plan adjustment step of performing an adjustment process for determining the bilateral contract to be adjusted for the planned value and an adjustment amount that is an amount by which the planned value is changed, based on the information;
including
The power transaction adjustment method, wherein the plan adjustment request includes a desired adjustment amount indicating an amount of change in the plan value desired by the one business operator.
JP2021525418A 2019-06-10 2019-06-10 Power trading coordination device, power trading coordination system, and power trading coordination method Active JP7118266B2 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2019/022946 WO2020250277A1 (en) 2019-06-10 2019-06-10 Power transaction adjustment device, power transaction adjustment system, and power transaction adjustment method

Publications (2)

Publication Number Publication Date
JPWO2020250277A1 JPWO2020250277A1 (en) 2021-11-04
JP7118266B2 true JP7118266B2 (en) 2022-08-15

Family

ID=73780735

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021525418A Active JP7118266B2 (en) 2019-06-10 2019-06-10 Power trading coordination device, power trading coordination system, and power trading coordination method

Country Status (2)

Country Link
JP (1) JP7118266B2 (en)
WO (1) WO2020250277A1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002123578A (en) 2000-08-10 2002-04-26 Osaka Gas Co Ltd Electric power retail system
JP2006271148A (en) 2005-03-25 2006-10-05 Osaka Gas Co Ltd Electric power procurement planning system
JP2008077346A (en) 2006-09-20 2008-04-03 Osaka Gas Co Ltd Complex energy transaction support system
JP2020087345A (en) 2018-11-30 2020-06-04 中国電力株式会社 Mediation device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002056225A (en) * 2000-08-14 2002-02-20 Toshiba Corp Method and system for mediating power transaction and recording medium recording software for power transaction mediation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002123578A (en) 2000-08-10 2002-04-26 Osaka Gas Co Ltd Electric power retail system
JP2006271148A (en) 2005-03-25 2006-10-05 Osaka Gas Co Ltd Electric power procurement planning system
JP2008077346A (en) 2006-09-20 2008-04-03 Osaka Gas Co Ltd Complex energy transaction support system
JP2020087345A (en) 2018-11-30 2020-06-04 中国電力株式会社 Mediation device

Also Published As

Publication number Publication date
JPWO2020250277A1 (en) 2021-11-04
WO2020250277A1 (en) 2020-12-17

Similar Documents

Publication Publication Date Title
KR101323136B1 (en) Method and system for optimal pricing and allocation for a set of contract rights to be offered
US8396790B2 (en) System and method for financing commercial transactions
US20040073507A1 (en) Method and system for providing international procurement, such as via an electronic reverse auction
US10853774B2 (en) Data transfer control based on connected device usage analysis
US20130018799A1 (en) Construction payment management system and method with sub-tier document exchange and approval features
WO2004051394A2 (en) System and method for financing commercial transactions
Campbell On‐call overtime for service workforce scheduling when demand is uncertain
JP2007323439A (en) Resource allocation system, information processor, resource allocation method, and resource allocation program
Hu et al. Dynamic matching in a two-sided market
JP2002041729A (en) Method and device for reward calculation and recording medium
US20150032613A1 (en) Payment systems and methods for accelerating debt payoff and reducing interest expense
US20140372279A1 (en) Energy collaboration platform
US20140067431A1 (en) System and method of providing devices for injuries under worker's compensation coverage
JP7118266B2 (en) Power trading coordination device, power trading coordination system, and power trading coordination method
EP1321875A1 (en) Commodity order acceptance and transportation system, method and recording medium
KR20220113901A (en) Providing method for multi-asset portfolio platform and system thereof
KR102268894B1 (en) A method for managing construction projects using the smart mediation platform
US20170039658A1 (en) Energy collaboration platform with multiple information level matching
US20120150711A1 (en) Linked short order and securities loan or locate
US11113736B1 (en) Method, apparatus, and computer program product for estimating inventory based on distribution data
ESO et al. Report on DSO & TSO value generation drivers D7. 5
WO2023044540A1 (en) Electronic system and method for managing commercial activities between members of a network of users
KR20210027166A (en) Land Purchase Total Platform
Bachman SUBMITTED VIA E-TARIFF FILING
Medudula et al. Costing and Pricing Mechanism of Telecom Services

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210622

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220510

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220622

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220705

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220802

R150 Certificate of patent or registration of utility model

Ref document number: 7118266

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150