JP7099211B2 - Ball payout device and gaming machine - Google Patents

Ball payout device and gaming machine Download PDF

Info

Publication number
JP7099211B2
JP7099211B2 JP2018170936A JP2018170936A JP7099211B2 JP 7099211 B2 JP7099211 B2 JP 7099211B2 JP 2018170936 A JP2018170936 A JP 2018170936A JP 2018170936 A JP2018170936 A JP 2018170936A JP 7099211 B2 JP7099211 B2 JP 7099211B2
Authority
JP
Japan
Prior art keywords
ball
passage
screw
game ball
game
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018170936A
Other languages
Japanese (ja)
Other versions
JP2019136476A (en
Inventor
賢太 望月
博己 岡田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Omron Corp
Original Assignee
Omron Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Omron Corp filed Critical Omron Corp
Publication of JP2019136476A publication Critical patent/JP2019136476A/en
Application granted granted Critical
Publication of JP7099211B2 publication Critical patent/JP7099211B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pinball Game Machines (AREA)

Description

本発明は、遊技機において球皿へ遊技球の払い出しを行う球払出装置および遊技機に関する。 The present invention relates to a ball payout device and a game machine for paying out a game ball to a ball plate in a game machine.

一般に、パチンコ機等の遊技機においては、遊技機の背面側から遊技機の前面側に遊技球を供給する。遊技機の背面上部には、多数個の遊技球を貯留する貯留タンクが設置されており、遊技球は、貯留タンクから球整列通路および球通路を介して、下方の球払出装置に導かれる。 Generally, in a gaming machine such as a pachinko machine, a gaming ball is supplied from the back side of the gaming machine to the front side of the gaming machine. A storage tank for storing a large number of game balls is installed in the upper part of the back surface of the game machine, and the game balls are guided from the storage tank to the lower ball payout device via the ball alignment passage and the ball passage.

球払出装置は、払出指令された球数の遊技球を、遊技機の前面下部に位置する上球皿または下球皿に払出すものである。球払出装置は、遊技球をスクリューやスロットケットを用いて送り出し、送り出された遊技球を下流の計数センサで計数して払出個数を管理する。このような球払出装置には、球供給通路に残された遊技球を抜き出すための球抜き構造が設けられている。 The ball payout device pays out the game balls of the number of balls ordered to be paid out to the upper ball plate or the lower ball plate located at the lower part of the front surface of the game machine. The ball payout device sends out the game balls using a screw or a slot bucket, counts the sent out game balls with a downstream counting sensor, and manages the number of payouts. Such a ball payout device is provided with a ball pulling structure for pulling out a game ball left in a ball supply passage.

例えば、特許文献1には、横置きのスクリューを回転させて遊技球を送り出すタイプの球払出装置において、球払出装置の側方を球排出用通路として用いる構成が記載されている。これによれば、球払出装置の側方に、球供給通路の通路壁の一部をなす開閉式の球抜き部材(球抜き弁)が設けられ、球供給通路の上流の通路の形状が遊技球を球排出用通路に案内する形状に形成されている。球抜き部材を開いて球排出用通路を開放することで、球供給通路を流下してくる遊技球を球排出用通路に案内して抜き出すことができる。 For example, Patent Document 1 describes a configuration in which a side of a ball payout device is used as a ball discharge passage in a ball payout device of a type in which a horizontally placed screw is rotated to send out a game ball. According to this, an open / close type ball pulling member (ball pulling valve) forming a part of the passage wall of the ball supply passage is provided on the side of the ball payout device, and the shape of the passage upstream of the ball supply passage is a game. It is formed in a shape that guides the ball to the ball discharge passage. By opening the ball ejection member to open the ball ejection passage, the game ball flowing down the ball supply passage can be guided to the ball ejection passage and extracted.

また、特許文献2には、縦置きのスクリューを回転させて遊技球を送り出すタイプの球払出装置において、球払出口と球抜き口とを並べて設け、回転式の球抜き部材(球抜き弁)にて、通常状態では球抜き口を塞ぎ、球抜き状態では球抜き口を開放して球払出口を塞ぐ構成が記載されている。球抜き部材は、球払出口を塞ぐ球抜きガイドを有しており、球抜きガイドにて球供給通路を流下してきた遊技球を球抜き口に案内する。 Further, in Patent Document 2, in a ball payout device of a type in which a vertically placed screw is rotated to send out a game ball, a ball payout outlet and a ball takeout port are provided side by side, and a rotary ball pulling member (ball pulling valve) is provided. The configuration is described in which the ball ejection port is closed in the normal state, and the ball ejection port is opened to close the ball payout outlet in the ball removing state. The ball pulling member has a ball pulling guide that closes the ball paying outlet, and guides the game ball that has flowed down the ball supply passage to the ball pulling port by the ball pulling guide.

特開2011-206329号公報Japanese Unexamined Patent Publication No. 2011-206329 特開2014-136079号公報Japanese Unexamined Patent Publication No. 2014-136079

球払出装置が配置される遊技機の背面側は、遊技機の遊技領域に配置される大型の表示装置や役物装置を含む遊技盤を設置するスペースである。そのため、遊技盤のさらなる大型化にも対応し得るように、球払出装置に対しては常に小型化、省スペース化が要求される。 The back side of the gaming machine in which the ball payout device is arranged is a space for installing a gaming board including a large display device and an accessory device arranged in the gaming area of the gaming machine. Therefore, it is always required to reduce the size and space of the ball payout device so that the game board can be further increased in size.

上記特許文献1の構成では、球払出装置の側方に球排出用通路を設けるスペースを確保する必要があり、省スペース化に問題がある。また、球供給通路の形状にて遊技球を球排出用通路に導く構成であるため、通路構成上の自由度が低く、球払出装置の外形寸法が大きくなり、省スペース化も図れない。 In the configuration of Patent Document 1, it is necessary to secure a space for providing a ball discharge passage on the side of the ball payout device, and there is a problem in space saving. Further, since the game ball is guided to the ball discharge passage by the shape of the ball supply passage, the degree of freedom in the passage configuration is low, the external dimension of the ball payout device becomes large, and space saving cannot be achieved.

一方、特許文献2の構成では、球払出装置の側方に球排出用通路を設けるスペースを確保する必要はない。しかしながら、遊技球を球抜き口に導く球抜きガイドは、球払出口を塞ぐように突出する舌片状の部材であり、舌片状の部材の上面で流下する遊技球を受け止める構成である。そのため、長期にわたって使用すると、球抜きガイドが破損する恐れがあり、耐久性に問題があることは否めない。 On the other hand, in the configuration of Patent Document 2, it is not necessary to secure a space for providing a ball discharge passage on the side of the ball payout device. However, the ball pulling guide that guides the game ball to the ball pulling port is a tongue piece-shaped member that protrudes so as to close the ball payout outlet, and is configured to receive the game ball flowing down on the upper surface of the tongue piece-shaped member. Therefore, if it is used for a long period of time, the ball pulling guide may be damaged, and it is undeniable that there is a problem in durability.

さらに、特許文献1、2の構成は何れも、スクリューの回転位置に関わりなく、球排出用通路あるいは球抜き口を塞いでいる球抜き部材を動かしさえすれば遊技球を抜き出すことが可能となっている。これはつまり、通路構造に余裕があり、その分、球払出装置の外形寸法が大きくなっていることに他ならない。 Further, in any of the configurations of Patent Documents 1 and 2, it is possible to pull out the game ball as long as the ball pulling member blocking the ball discharging passage or the ball pulling opening is moved, regardless of the rotation position of the screw. ing. In other words, this means that there is a margin in the passage structure, and the external dimensions of the ball payout device are increased accordingly.

本発明は、より小型でより省スペース化が図れ、かつ、耐久性にも優れた球払出装置およびそれを搭載した遊技機を提供することを目的としている。 An object of the present invention is to provide a ball payout device which is smaller in size, more space-saving, and has excellent durability, and a gaming machine equipped with the ball payout device.

本発明は、上記課題を解決するために、以下の構成を採用している。 The present invention employs the following configuration in order to solve the above problems.

すなわち、本発明の一側面に係る球払出装置は、軸部の外周に螺旋状突起が設けられ、球通路内の遊技球を球払出口へと送り出す略水平方向に配置されたスクリューと、球払出状態で、外周壁面が前記球通路の通路壁の一部をなして前記球通路内の遊技球を前記球払出口へ案内し、球抜き状態で、前記外周壁面が前記球通路の通路壁の一部をなさず前記球通路内の遊技球を球抜き口に案内する球排出用通路を開く球抜き部材と、前記スクリューの駆動を制御する制御部と、を備え、前記スクリューは、所定の回転位置で停止した状態で、前記螺旋状突起にて前記球通路における前記球払出口へ連通する球払出用通路を塞ぎ、前記球抜き部材および前記球通路は、前記スクリューが所定の回転位置で停止している場合に、前記螺旋状突起の前記球払出用通路を塞いでいる部分に接触した遊技球が前記球排出用通路に入り込むように形成され、上記制御部は、前記スクリューの停止時、前記スクリューを前記所定の回転位置にて停止させる。 That is, in the ball payout device according to one aspect of the present invention, a screw and a ball are provided on the outer periphery of the shaft portion and are arranged substantially horizontally to send the game ball in the ball passage to the ball payout outlet. In the payout state, the outer peripheral wall surface forms a part of the passage wall of the ball passage to guide the game ball in the ball passage to the ball payout outlet, and in the ball removal state, the outer peripheral wall surface is the passage wall of the ball passage. The screw is provided with a ball removing member that opens a ball discharging passage that guides a game ball in the ball passage to a ball ejection port without forming a part of the ball passage, and a control unit that controls the drive of the screw. In the state of being stopped at the rotation position of, the spiral protrusion closes the ball payout passage communicating with the ball payout outlet in the ball passage, and the ball removal member and the ball passage have the screw in a predetermined rotation position. When stopped at, the game ball in contact with the portion of the spiral protrusion blocking the ball payout passage is formed so as to enter the ball discharge passage, and the control unit stops the screw. At that time, the screw is stopped at the predetermined rotation position.

上記構成によれば、スクリューが停止することで、螺旋状突起にて球払出用通路が塞がれ、球通路を流れる遊技球は、螺旋状突起に当接して流下を停止する。ここでスクリューは、制御部による制御にて、所定の回転位置にて停止するよう制御される。 According to the above configuration, when the screw is stopped, the ball payout passage is blocked by the spiral protrusion, and the game ball flowing through the ball passage abuts on the spiral protrusion and stops flowing down. Here, the screw is controlled to stop at a predetermined rotation position by the control of the control unit.

球抜き部材および球通路は、スクリューが所定の回転位置で停止している場合に、螺旋状突起の球払出用通路を塞いでいる部分に接触した遊技球が球排出用通路に入り込むように形成されている。 The ball pulling member and the ball passage are formed so that the game ball in contact with the portion of the spiral protrusion blocking the ball payout passage enters the ball discharge passage when the screw is stopped at a predetermined rotation position. Has been done.

これにより、スクリューが所定の回転位置で停止している場合は、球抜き部材を球抜き状態として球排出用通路を開放することで、螺旋状突起における球払出用通路を塞いでいる部分を案内部材として機能させて、流下を停止していた遊技球を球排出用通路に案内することができる。 As a result, when the screw is stopped at a predetermined rotation position, the ball ejection member is set to the ball extraction state and the ball ejection passage is opened to guide the portion of the spiral protrusion that is blocking the ball ejection passage. It can function as a member to guide the game ball that has stopped flowing to the ball discharge passage.

このように、上記構成とすることで、球通路に球排出用通路に案内するための形状を持たせる必要がなくなり、通路構成の自由を上げることができる。また、螺旋状突起は、前述した舌片状の球抜きガイド部材に比べて十分な強度を有しているので、遊技球を球排出用通路に案内する部材として用いても耐久性に問題はない。また、上記構成とすることで、球排出用通路を球払出用通路と並べて設けることができるので、球払出装置の側方に球排出用通路を設けるスペースを確保する必要もない。 As described above, with the above configuration, it is not necessary to give the ball passage a shape for guiding to the ball discharge passage, and the freedom of the passage configuration can be increased. Further, since the spiral protrusion has sufficient strength as compared with the above-mentioned tongue piece-shaped ball pulling guide member, there is no problem in durability even if the game ball is used as a member for guiding the game ball to the ball discharge passage. do not have. Further, with the above configuration, since the ball discharge passage can be provided side by side with the ball discharge passage, it is not necessary to secure a space for providing the ball discharge passage on the side of the ball discharge device.

さらに、上記構成によれば、スクリューが所定の回転位置で停止している場合は、球抜き状態で遊技球を球排出用通路に入り込ませる必要がある。しかしながら、スクリューが所定の回転位置以外で停止している場合はその限りではなく、球排出用通路を開放しても球抜きができないような通路構成を含んでいてもよい。 Further, according to the above configuration, when the screw is stopped at a predetermined rotation position, it is necessary to allow the game ball to enter the ball discharge passage in the ball-pulled state. However, this is not the case when the screw is stopped at a position other than a predetermined rotation position, and a passage configuration may be included in which the ball cannot be pulled out even if the ball discharge passage is opened.

つまり、上記構成では、球抜き状態としても球通路内の遊技球を抜き出すことができない極めて余裕のない通路構造を敢えて採ることで、停止時のスクリューの回転位置に関係なく球抜きが可能な構成に比べて、球払出装置の外形寸法を小さくすることを可能にしている。なお、極めて余裕のない構成と採用しても、制御部が、確実に所定の回転位置にてスクリューを停止させるので、問題なく遊技球を抜き出すことができる。 That is, in the above configuration, the ball can be pulled out regardless of the rotation position of the screw when stopped by deliberately adopting a passage structure in which the game ball in the ball passage cannot be pulled out even when the ball is pulled out. It is possible to reduce the external dimensions of the ball payout device as compared with the above. Even if the configuration is extremely tight, the control unit reliably stops the screw at a predetermined rotation position, so that the game ball can be pulled out without any problem.

本発明の一側面に係る球払出装置においては、さらに、前記球抜き部材は、前記外周壁面にて、前記塞いでいる部分に接触して停止した遊技球の荷重を受けると共に、前記外周壁面における、前記スクリューが遊技球を送り出す方向の端部が、前記停止した遊技球の重心位置よりも前記送り出し方向に位置している構成とすることもできる。 In the ball payout device according to one aspect of the present invention, the ball removing member further receives the load of the game ball stopped in contact with the blocked portion on the outer peripheral wall surface, and is on the outer peripheral wall surface. The end portion in the direction in which the screw sends out the game ball may be configured to be located in the delivery direction from the position of the center of gravity of the stopped game ball.

上記構成によれば、球抜き状態とすることで、螺旋状突起の球払出用通路を塞いでいる部分を案内部材として遊技球を球排出用通路に入り込ませることができる球抜き部材を容易に実現することができる。 According to the above configuration, the ball pulling member can easily allow the game ball to enter the ball discharging passage by using the portion of the spiral protrusion blocking the ball payout passage as a guide member. It can be realized.

本発明の一側面に係る球払出装置においては、さらに、前記球抜き部材が球抜き状態になるのに連動して、前記スクリューが前記螺旋状突起にて塞ぐよりも前記球払出口に近い位置で前記球払出用通路を塞いで遊技球を担持する球担持部を備える構成とすることもできる。 In the ball payout device according to one aspect of the present invention, the position closer to the ball payout outlet than the screw is closed by the spiral protrusion in conjunction with the ball pulling member being in the ball pulling state. It is also possible to provide a ball supporting portion for supporting the game ball by blocking the ball payout passage.

上記構成によれば、先頭の遊技球が、重心が球払出用通路側に位置し、球抜き部材を引き出しても球排出用通路に落下しないような位置で停止していたとしても、球抜き部材を引き出すことで、これに連動して球払出用通路を防ぐ球担持部にて該先頭の遊技球を担持することができる。球担持部が球払出用通路を塞ぐ位置は、スクリューが螺旋状突起にて塞ぐよりも球払出口に近い位置であるので、2番目以降の遊技球が球排出用通路へと抜ける隙間が確保され、2番目以降の遊技球が球排出用通路へと抜ける。 According to the above configuration, even if the leading game ball is stopped at a position where the center of gravity is located on the ball payout passage side and the ball pulling member is pulled out but does not fall into the ball ejection passage, the ball is pulled out. By pulling out the member, the leading game ball can be supported by the ball supporting portion that prevents the ball payout passage in conjunction with the member. Since the position where the ball carrier blocks the ball payout passage is closer to the ball payout exit than when the screw closes with the spiral protrusion, a gap is secured for the second and subsequent game balls to pass out to the ball discharge passage. Then, the second and subsequent game balls escape to the ball ejection passage.

これにより、スクリューの停止位置に関わらず、球抜き部材を球抜き状態とすることで、確実に遊技球を抜き出すことができる。 As a result, the game ball can be reliably pulled out by putting the ball pulling member in the ball pulling state regardless of the stop position of the screw.

本発明の一側面に係る球払出装置においては、さらに、前記球担持部は、前記球抜き部材に一体に設けられている構成とすることもできる。 In the ball payout device according to one aspect of the present invention, the ball supporting portion may be configured to be integrally provided with the ball removing member.

上記構成によれば、球担持部が球抜き部材と一体に設けられているので、球抜き部材の動きとの連動を簡単に実現させることができる。 According to the above configuration, since the ball supporting portion is provided integrally with the ball pulling member, it is possible to easily realize the interlocking with the movement of the ball pulling member.

本発明の一側面に係る球払出装置においては、さらに、前記球担持部は、遊技球を担持する面に前記球排出用通路に向かって低くなる傾斜を有している構成とすることもできる。 In the ball payout device according to one aspect of the present invention, the ball supporting portion may further have a configuration in which the surface on which the game ball is supported has an inclination that becomes lower toward the ball discharging passage. ..

上記構成によれば、球担持部に担持されていた先頭の遊技球は、全ての遊技球が球排出用通路へ抜けた後、球担持部における遊技球を担持する面の傾斜にしたがって転動して球排出用通路へと落下する。これにより、球担持部に担持されていた先頭の遊技球を、指を引っ掛けるなどして球排出用通路へ落下させる作業が不要となり、作業性が向上する。 According to the above configuration, the leading game ball supported on the ball-supporting portion rolls according to the inclination of the surface of the ball-supporting portion that supports the game ball after all the game balls have passed through the ball discharge passage. Then, it falls into the ball discharge passage. As a result, it becomes unnecessary to drop the leading game ball supported on the ball supporting portion into the ball discharge passage by hooking a finger or the like, and workability is improved.

本発明の一側面に係る球払出装置においては、さらに、前記所定の回転位置が、前記スクリューが前記球払出口へと送り出す遊技球を待機させるホームポジションである構成とすることができる。 In the ball payout device according to one aspect of the present invention, the predetermined rotation position may be further configured to be a home position in which the game ball sent out by the screw to the ball payout outlet is made to stand by.

従来、球払出装置においては、球払出動作を行った後、次の球払出動作に備えて、スクリューを、次に送り出す遊技球を待機させた状態のホームポジションにて停止させるようになっている。したがって、上記所定の回転位置をこのようなホームポジションとすることができる。これにより、球払出装置の既存のスクリューの制御をそのまま用いることができる。 Conventionally, in a ball payout device, after performing a ball payout operation, the screw is stopped at a home position in a state where the next game ball to be sent is made to stand by in preparation for the next ball payout operation. .. Therefore, the predetermined rotation position can be set as such a home position. As a result, the existing screw control of the ball payout device can be used as it is.

本発明の一側面に係る球払出装置においては、さらに、前記球払出口に遊技球を計測する計測センサを有し、前記制御部は、前記スクリューを所定の角度で順次回転させ、その際に、前記計測センサによる検出結果を用いて、前記ホームポジションを決定する構成とすることもできる。 The ball payout device according to one aspect of the present invention further has a measurement sensor for measuring a game ball at the ball payout outlet, and the control unit sequentially rotates the screw at a predetermined angle, at that time. , The home position may be determined by using the detection result by the measurement sensor.

上記構成によれば、スクリューの回転位置を検出するためのセンサを用いることなく、球払出装置においては必須の構成である計測センサの検出結果を用いてホームポジションを決定することができるので、部材点数を削減して、外形寸法をより小さくできる。 According to the above configuration, the home position can be determined using the detection result of the measurement sensor, which is an indispensable configuration in the ball payout device, without using the sensor for detecting the rotation position of the screw. The number of points can be reduced and the external dimensions can be made smaller.

本発明の一側面に係る球払出装置においては、さらに、前記球通路は、流下する遊技球を平面視にて前記スクリューにおける軸方向に沿った側方に略鉛直方向より流入させる上球通路を有し、前記スクリューは、前記上球通路より流入される遊技球に対し前記螺旋状突起を平面視にて前記軸方向に沿った側方より当接させることで流下を停止して待機させ、回転に伴い待機させていた前記遊技球を前記軸方向に沿って移動させて前記球払出用通路へ送り出す構成とすることができる。 In the ball payout device according to one aspect of the present invention, the ball passage further provides an upper ball passage through which a flowing game ball flows laterally along the axial direction of the screw in a substantially vertical direction in a plan view. The screw has the spiral protrusion against the game ball flowing in from the upper ball passage from the side along the axial direction in a plan view to stop the flow and make it stand by. The game ball that has been kept on standby due to rotation may be moved along the axial direction and sent out to the ball payout passage.

上記構成によれば、略水平方向に配されたスクリューに対し、流下する遊技球を平面視にてスクリューにおける軸方向に沿った側方に略鉛直方向より流入させて、遊技球の側方に螺旋状突起を当接させる。 According to the above configuration, the flowing game ball is flowed into the side of the screw along the axial direction from the substantially vertical direction with respect to the screw arranged in the substantially horizontal direction, and is directed to the side of the game ball. The spiral protrusions are brought into contact with each other.

このような構成では、略鉛直方向の上球通路が略水平方向に配置されたスクリューの軸の側方にねじれ軸の位置関係になるように配置されているため、スクリュー軸長に影響を受けることなく、任意の水平位置に上球通路を配置することが可能となる。同様に、下球通路においても任意の水平位置に配置することが可能となる。 In such a configuration, since the upper ball passage in the substantially vertical direction is arranged so as to have a positional relationship of the twisted shaft on the side of the shaft of the screw arranged in the substantially horizontal direction, it is affected by the screw shaft length. It is possible to arrange the upper ball passage at an arbitrary horizontal position without any problem. Similarly, the lower ball passage can be arranged at an arbitrary horizontal position.

その結果、スクリューにて流下する遊技球を待機させる球待機位置から、スクリューにて待機させている遊技球を軸方向に移動させて解放する球解放位置(後述するリリースポイント)までの水平移動距離(スクリューの軸方向に沿った遊技球の移動量)を、スクリューの1ピッチ(球待機位置にある球が払い出されて次の遊技球が球待機位置に到達する距離)以下に収めることが可能となる。スクリューの1ピッチは、遊技球の直径よりも小さく設定されるため、スクリューの軸方向に沿った遊技球の移動量は遊技球1個分のサイズよりも小さくすることができる。 As a result, the horizontal movement distance from the ball standby position where the game ball flowing down by the screw is made to stand by to the ball release position (release point described later) where the game ball which is made to stand by the screw is moved in the axial direction and released. (The amount of movement of the game ball along the axial direction of the screw) can be kept within one pitch of the screw (the distance at which the ball in the ball standby position is paid out and the next game ball reaches the ball standby position). It will be possible. Since one pitch of the screw is set smaller than the diameter of the game ball, the amount of movement of the game ball along the axial direction of the screw can be made smaller than the size of one game ball.

スクリューの軸方向に沿った遊技球の移動量をこのように小さくすることで、スクリューの軸方向に沿って必要となる球通路の距離が短いものとなり、スクリューの軸方向に沿ってスクリューの長さとほぼ同距離以上の球通路が必要であった従来構成よりも装置サイズを小さくして、小型化、省スペース化を図ることができる。 By reducing the amount of movement of the game ball along the axial direction of the screw in this way, the distance required for the ball passage along the axial direction of the screw is shortened, and the length of the screw is lengthened along the axial direction of the screw. It is possible to reduce the size of the device and save space by reducing the size of the device as compared with the conventional configuration that requires a ball passage having a distance equal to or longer than that of the device.

しかも、上記構成によれば、スクリューに対し、その軸方向と略直交する方向(略鉛直方向)より遊技球を流入させるため、先頭の遊技球(最下流の遊技球)に隣接する遊技球のスクリューへの噛み込みが発生し難い。そのため、螺旋状突起に対して隣接する遊技球の噛み込みを回避するための特別な形状工夫等を行う必要もない。 Moreover, according to the above configuration, since the game ball flows into the screw from a direction substantially orthogonal to the axial direction (substantially vertical direction), the game ball adjacent to the leading game ball (the most downstream game ball) It is difficult for the screw to get caught. Therefore, it is not necessary to devise a special shape for avoiding the biting of the game ball adjacent to the spiral protrusion.

本発明の一側面に係る遊技機は、前述した球払出装置を備えている。 The gaming machine according to one aspect of the present invention includes the above-mentioned ball payout device.

前述したように、本発明の一側面に係る球払出装置は、より小型でより省スペース化が図れ、かつ、耐久性にも優れているので、このような球払出装置を備えた遊技機は、背面側のスペースを有効に利用して遊技盤のさらなる大型化を図ることができる。 As described above, the ball payout device according to one aspect of the present invention is smaller, more space-saving, and has excellent durability. Therefore, a gaming machine equipped with such a ball payout device is available. , The space on the back side can be effectively used to further increase the size of the game board.

本発明によれば、より小型でより省スペース化が図れ、かつ、耐久性にも優れた球払出装置およびそれを搭載した遊技機を提供できるといった効果を奏する。 According to the present invention, it is possible to provide a ball payout device which is smaller in size, more space-saving, and has excellent durability, and a gaming machine equipped with the ball payout device.

本実施形態に係る球払出装置の適用例を例示するもので、球払出装置が搭載されている遊技機の構成を示す斜視図である。An example of application of the ball payout device according to the present embodiment is illustrated, and is a perspective view showing the configuration of a gaming machine equipped with the ball payout device. 上記遊技機の背面側を示した図であり(a)は背面図、(b)は斜視図である。It is the figure which showed the back side of the said gaming machine, (a) is a rear view, (b) is a perspective view. 上記球払出装置の斜視図であり、遊技機に取り付けられた状態で操作する側より見た図である。It is a perspective view of the said ball payout device, and is the view seen from the side which operates with it attached to the gaming machine. 上記球払出装置の斜視図であり、操作する側とは反対側の遊技機の背面と向き合う側より見た図である。It is a perspective view of the ball payout device, and is a view seen from the side facing the back surface of the gaming machine on the side opposite to the operating side. 上記球払出装置のベースを外した状態を示す斜視図であり、操作する側より見た図である。It is a perspective view which shows the state which the base of the ball payout device was removed, and is the figure which was seen from the side which operates. 上記球払出装置の平面図である。It is a top view of the ball payout device. 図6のA-A線矢視断面図である。FIG. 6 is a cross-sectional view taken along the line AA of FIG. 図6のB-B線矢視断面図である。FIG. 6 is a cross-sectional view taken along the line BB of FIG. 上記球払出装置における払出動作が可能な通常状態を示す図であり、(a)は、ベースを外した状態の球払出装置を操作面側より見た斜視図、(b)はベースを外した状態の球払出装置を操作面側より見た正面図である。It is a figure which shows the normal state | It is a front view which looked at the ball payout device in a state from the operation surface side. 上記球払出装置の払出動作を示す説明図であり、上部に記載する断面図は、図6のA-A線矢視断面図に相当し、下部に記載する断面図は、上部のA-A線矢視断面図におけるC-C線矢視断面図である。It is explanatory drawing which shows the payout operation of the said ball payout device, the cross-sectional view described in the upper part corresponds to the cross-sectional view taken along the line AA of FIG. FIG. 3 is a cross-sectional view taken along the line CC in the cross-sectional view taken along the line arrow. 上記球払出装置の払出動作を示す説明図であり、図10の続きの動作を示す図である。It is explanatory drawing which shows the payout operation of the said ball payout device, and is the figure which shows the continuation operation of FIG. 上記球払出装置における球抜き部材を引き出して球排出用通路を開放した状態を操作面側より見た正面図である。It is a front view which saw from the operation surface side the state which pulled out the ball pulling member in the said ball payout device and opened the ball discharge passage. 図12のD-D線矢視断面図であり、スクリュー10がホームポジションにある状態を示す。FIG. 12 is a cross-sectional view taken along the line DD of FIG. 12, showing a state in which the screw 10 is in the home position. 上記球払出装置を制御する制御系のブロック図である。It is a block diagram of the control system which controls the ball payout device. 上記球払出装置において実行される払出制御のフローチャートである。It is a flowchart of the payout control executed in the said ball payout device. 図15のフローチャートにおけるイニシャライズ動作のフローチャートである。It is a flowchart of the initialization operation in the flowchart of FIG. 図15のフローチャートにおける払出動作のフローチャートである。It is a flowchart of the payout operation in the flowchart of FIG. 上記球払出装置における球抜き動作を行う球抜き状態を示す図であり、(a)は、ベースを外した状態の球払出装置を操作面側より見た斜視図、(b)はベースを外した状態の球払出装置を操作面側より見た正面図である。It is a figure which shows the ball pulling state which performs the ball pulling operation in the said ball payout device, (a) is the perspective view which looked at the ball payout device with the base removed from the operation surface side, (b) is the base outside. It is a front view which looked at the ball payout device in the state which was done from the operation surface side. 変形例の球払出装置における、ベースを外した状態を操作面側より見た正面図であり、(a)は払出動作が可能な通常状態を示す図であり、(b)は、球抜き状態を示す図である。It is a front view which looked at the state which removed the base in the ball payout device of a modification from the operation surface side, (a) is a figure which shows the normal state which a payout operation is possible, (b) is a ball pulling out state. It is a figure which shows. (a)は、上記球払出装置におけるスクリューがホームポジションから3セット移動した位置で球抜き部材を引き出した状態を操作面側より見た斜視図であり、(b)はこの状態を操作面側より見た正面図である。(A) is a perspective view of a state in which the ball pulling member is pulled out at a position where the screw in the ball payout device is moved three sets from the home position, and (b) is a perspective view of this state as seen from the operation surface side. It is a more seen front view. (a)は、別の実施形態の球払出装置におけるスクリューがホームポジションから3セット移動した位置で球抜き部材を引き出した状態を操作面側より見た斜視図であり、(b)はこの状態を操作面側より見た正面図である。(A) is a perspective view of a state in which the ball pulling member is pulled out at a position where the screw has moved three sets from the home position in another embodiment of the ball payout device, as viewed from the operation surface side, and (b) is this state. Is a front view seen from the operation surface side. 上記別の実施形態の球払出装置における球抜き部材の斜視図である。It is a perspective view of the ball pulling member in the ball payout device of the said another embodiment. (a)(b)は、上記別の実施形態の球払出装置における球担持部と、球供給通路を構成する上球通路および下球通路と、球排出用通路との位置関係を示す図であり、(a)は球払出状態を示し、(b)は球抜き状態を示す。(A) and (b) are diagrams showing the positional relationship between the ball supporting portion, the upper ball passage and the lower ball passage constituting the ball supply passage, and the ball discharge passage in the ball payout device of the other embodiment. Yes, (a) indicates a ball payout state, and (b) indicates a ball removal state. (a)(b)は、上記別の実施形態の球払出装置において、スクリューがホームポジションから3セット移動した位置で、球抜き部材を引き出す球抜き動作を説明する図であり、(a)は球抜き部材を引き出す前を示し、(b)は球抜き部材を引き出した状態を示す。(A) and (b) are diagrams for explaining a ball-pulling operation of pulling out a ball-pulling member at a position where the screw has moved three sets from the home position in the ball-discharging device of the other embodiment. It shows before pulling out the ball pulling member, and (b) shows the state which pulled out the ball pulling member.

以下、本発明の一側面に係る実施形態(以下、「本実施形態」とも表記する)を、図面に基づいて説明する。ただし、以下で説明する本実施形態は、あらゆる点において本発明の例示に過ぎない。本発明の範囲を逸脱することなく種々の改良や変形を行うことができることは言うまでもない。つまり、本発明の実施にあたって、実施形態に応じた具体的構成が適宜採用されてもよい。 Hereinafter, an embodiment according to one aspect of the present invention (hereinafter, also referred to as “the present embodiment”) will be described with reference to the drawings. However, the embodiments described below are merely examples of the present invention in all respects. Needless to say, various improvements and modifications can be made without departing from the scope of the present invention. That is, in carrying out the present invention, a specific configuration according to the embodiment may be appropriately adopted.

§1 適用例
まず、本発明が適用される場面の一例について説明する。図1は、本実施形態に係る球払出装置1の適用例を例示するもので、球払出装置1が搭載されている遊技機100の構成を示す斜視図である。遊技機100はパチンコ機である。
§1 Application example First, an example of a situation in which the present invention is applied will be described. FIG. 1 illustrates an application example of the ball payout device 1 according to the present embodiment, and is a perspective view showing a configuration of a gaming machine 100 on which the ball payout device 1 is mounted. The gaming machine 100 is a pachinko machine.

図1は、本実施形態の遊技機100を示した斜視図である。図1に示すように、遊技機100は、遊技領域101、ハンドル102、上球皿103、下球皿104等を備えている。遊技領域101は、ハンドル102によって打ち出された遊技球(遊技媒体)が移動する領域である。ハンドル102は、遊技球の発射操作を行うための装置であり、利用者がハンドル102を回した状態で保持すると、遊技球が連続発射されて遊技領域101に打ち出される。 FIG. 1 is a perspective view showing the gaming machine 100 of the present embodiment. As shown in FIG. 1, the gaming machine 100 includes a gaming area 101, a handle 102, an upper ball plate 103, a lower ball plate 104, and the like. The game area 101 is an area in which the game ball (game medium) launched by the handle 102 moves. The handle 102 is a device for launching a game ball, and when the user holds the handle 102 in a rotated state, the game ball is continuously fired and launched into the game area 101.

上球皿103は、遊技において獲得した遊技球、または、球貸し操作にて貸し出された遊技球が貯留され、下球皿104は、上球皿103から溢れた遊技球が貯留される。つまり、遊技領域101に設けられた入賞口(不図示)に遊技球が入賞すると、入賞口に応じて設定されている数の遊技球が、遊技機100の背面側に設置された球払出装置1(図2参照)より上球皿103または下球皿104に払い出される。 The upper ball plate 103 stores the game balls acquired in the game or the game balls lent out by the ball lending operation, and the lower ball plate 104 stores the game balls overflowing from the upper ball plate 103. That is, when a game ball wins a prize in the winning opening (not shown) provided in the game area 101, a number of game balls set according to the winning opening are distributed to the ball payout device installed on the back side of the game machine 100. 1 (see FIG. 2) is paid out to the upper ball plate 103 or the lower ball plate 104.

図2は、遊技機100の背面側を示した図であり(a)は背面図、(b)は斜視図である。図2の(a)(b)に示すように、遊技機100の背面には、貯留タンク105、球整列通路106、縦型球通路107、球払出装置1、遊技盤109が設置されている。 2A and 2B are views showing the back side of the gaming machine 100, where FIG. 2A is a rear view and FIG. 2B is a perspective view. As shown in FIGS. 2A and 2B, a storage tank 105, a ball alignment passage 106, a vertical ball passage 107, a ball payout device 1, and a game board 109 are installed on the back surface of the game machine 100. ..

貯留タンク105は、遊技機100の背面上部に設けられており、遊技島の補給シュート(不図示)から遊技機100に供給される遊技球を一時的に貯留する収容部である。球整列通路106は、遊技球を整列させて流す通路であり、上流側が貯留タンク105に接続され、下流側が縦型球通路107に接続されている。縦型球通路107は、遊技球を上方から下方に(重力方向に向けて)落下させる通路であり、上流側が球整列通路106に接続され、下流側が球払出装置1に接続されている。これにより、遊技島の補給シュート(不図示)から遊技機100に供給された遊技球は、貯留タンク105、球整列通路106、縦型球通路107を順に経由して、球払出装置1へ供給される。 The storage tank 105 is provided in the upper part of the back surface of the gaming machine 100, and is a storage unit for temporarily storing the gaming balls supplied to the gaming machine 100 from the supply chute (not shown) of the gaming island. The ball alignment passage 106 is a passage for aligning and flowing game balls, and the upstream side is connected to the storage tank 105 and the downstream side is connected to the vertical ball passage 107. The vertical ball passage 107 is a passage for dropping a game ball from above to below (in the direction of gravity), and the upstream side is connected to the ball alignment passage 106 and the downstream side is connected to the ball payout device 1. As a result, the game balls supplied to the game machine 100 from the supply chute (not shown) on the game island are supplied to the ball payout device 1 via the storage tank 105, the ball alignment passage 106, and the vertical ball passage 107 in this order. Will be done.

球払出装置1は、払出制御部(不図示)から払出信号(所定数の遊技球の払い出しを命令する信号)を受信すると、所定数の遊技球を上球皿103または下球皿104へ放出する(払出す)装置である。球払出装置1は、遊技機100の背面側に取り付けられ、球払出装置1に対する操作は、遊技機100の背面側より行われる。 When the ball payout device 1 receives a payout signal (a signal instructing payout of a predetermined number of game balls) from the payout control unit (not shown), the ball payout device 1 discharges a predetermined number of game balls to the upper ball plate 103 or the lower ball plate 104. It is a device to (pay out). The ball payout device 1 is attached to the back side of the game machine 100, and the operation for the ball payout device 1 is performed from the back side of the game machine 100.

遊技盤109は、遊技機100の背面側の最も大きな領域を占有しており、遊技領域101(図1参照)の盤面にある、演出用画像を表示する大型の表示装置や役物装置およびこれらを制御する制御部等を備えている。 The game board 109 occupies the largest area on the back side of the game machine 100, and is a large display device or accessory device for displaying an effect image on the board surface of the game area 101 (see FIG. 1). It is equipped with a control unit and the like to control.

§2 構成例
〔実施形態1〕
以下、本発明の一側面における実施形態を、図3~図18に基づいて例示する。
§2 Configuration example [Embodiment 1]
Hereinafter, embodiments of one aspect of the present invention will be illustrated with reference to FIGS. 3 to 18.

(球払出装置1の構成)
図3は、遊技機100に搭載された本実施形態の球払出装置1の斜視図であり、遊技機100に取り付けられた状態で操作する側より見た図である。図4は、球払出装置1の斜視図であり、操作する側とは反対側の遊技機100の背面と向き合う側より見た図である。図5は、後述するベース2Aを外した状態の球払出装置1の斜視図であり、操作する側より見た図である。以下、操作する側を操作面側、操作面側の反対側の遊技機100の背面と向き合う側を対向面側と称する。
(Configuration of ball payout device 1)
FIG. 3 is a perspective view of the ball payout device 1 of the present embodiment mounted on the gaming machine 100, and is a view seen from the side of operation while being attached to the gaming machine 100. FIG. 4 is a perspective view of the ball payout device 1, which is a view seen from the side facing the back surface of the gaming machine 100 on the side opposite to the operating side. FIG. 5 is a perspective view of the ball payout device 1 with the base 2A removed, which will be described later, and is a view seen from the operating side. Hereinafter, the operating side is referred to as an operation surface side, and the side facing the back surface of the gaming machine 100 on the opposite side of the operation surface side is referred to as a facing surface side.

図3~図5に示すように、球払出装置1は、樹脂製のケース2を備え、ケース2は、操作面側に配されるベース2Aと、対向面側に配されるカバー2Bとを有する。これらベース2Aとカバー2Bとは、突き合わされた状態でネジ等で固定されている。ケース2の内部には、球供給通路(球通路)3が形成されると共に、スクリュー10が配置されている(図4、図5参照)。スクリュー10は後述するように、球供給通路3の途中に横向きに配置されている。カバー2Bの対向面側には、スクリュー10の外周部を覆うスクリューカバー14が取り付けられている。 As shown in FIGS. 3 to 5, the ball payout device 1 includes a resin case 2, and the case 2 includes a base 2A arranged on the operation surface side and a cover 2B arranged on the facing surface side. Have. The base 2A and the cover 2B are fixed to each other with screws or the like in a butted state. Inside the case 2, a ball supply passage (ball passage) 3 is formed and a screw 10 is arranged (see FIGS. 4 and 5). As will be described later, the screw 10 is arranged sideways in the middle of the ball supply passage 3. A screw cover 14 that covers the outer peripheral portion of the screw 10 is attached to the facing surface side of the cover 2B.

球払出装置1における操作面側より見て右の側面には、スクリュー10を回転させるためのモータ7が配置されている。カバー2Bの右の側面には、モータ7を保護するモータカバー15が取り付けられている。 A motor 7 for rotating the screw 10 is arranged on the right side surface of the ball payout device 1 when viewed from the operation surface side. A motor cover 15 that protects the motor 7 is attached to the right side surface of the cover 2B.

ケース2の上面には、球供給通路3の入口である球入口4が形成され、ケース2の底面には、球供給通路3の出口である球払出口5が形成されている。球払出口5には、球払出口5を通過した遊技球の数を計数する計数センサ11が配置されている(図5参照)。 A ball inlet 4, which is an inlet of the ball supply passage 3, is formed on the upper surface of the case 2, and a ball payout outlet 5, which is an exit of the ball supply passage 3, is formed on the bottom surface of the case 2. At the ball payout outlet 5, a counting sensor 11 for counting the number of game balls that have passed through the ball payout outlet 5 is arranged (see FIG. 5).

また、ケース2の底面には、球払出口5と並んで球抜き口6が形成されている。球抜き口6は、球供給通路3より分岐して設けられた球排出用通路8の出口である。球排出用通路8は、外周壁面12aが球供給通路3の通路壁として機能する球抜き部材12を、ベース2Aより引き出すことで開放され、球供給通路3と連通する。球排出用通路8と球払出用通路をなす後述する下球通路32との間には、球排出用通路8と下球通路32とを隔てる隔壁40が設けられている。隔壁40は、計数センサ11の上部に設けられている。 Further, on the bottom surface of the case 2, a ball ejection port 6 is formed along with the ball payout outlet 5. The ball ejection port 6 is an outlet of the ball discharge passage 8 provided by branching from the ball supply passage 3. The ball discharge passage 8 is opened by pulling out the ball pulling member 12 whose outer peripheral wall surface 12a functions as a passage wall of the ball supply passage 3 from the base 2A and communicates with the ball supply passage 3. A partition wall 40 that separates the ball discharge passage 8 and the lower ball passage 32 is provided between the ball discharge passage 8 and the lower ball passage 32 that forms the ball payout passage, which will be described later. The partition wall 40 is provided above the counting sensor 11.

球抜き部材12は、通常状態(球払出状態)で、外周壁面12aが球供給通路3の通路壁の一部をなして球供給通路3内の遊技球を球払出口5へ案内する。球抜き部材12は、球抜き状態で、外周壁面12aが球供給通路3の通路壁の一部をなさず球供給通路3の遊技球を球抜き口6に案内する球排出用通路8を開く。球抜き部材12における引き出される操作側の面には、引き出し時に作業者が把持する把持部12bが設けられている。 In the normal state (ball payout state) of the ball pulling member 12, the outer peripheral wall surface 12a forms a part of the passage wall of the ball supply passage 3 and guides the game ball in the ball supply passage 3 to the ball payout outlet 5. In the ball pulling state, the ball pulling member 12 opens the ball discharging passage 8 for guiding the game ball of the ball supply passage 3 to the ball pulling port 6 without the outer peripheral wall surface 12a forming a part of the passage wall of the ball supply passage 3. .. A grip portion 12b that is gripped by an operator at the time of pulling out is provided on the surface of the ball pulling member 12 on the side to be pulled out.

図6は、球払出装置1の平面図である。図7は、図6のA-A線矢視断面図、図8は図6のB-B線矢視断面図である。図7および図8は、球払出装置1を操作面側より見た断面図である。 FIG. 6 is a plan view of the ball payout device 1. 7 is a cross-sectional view taken along the line AA of FIG. 6, and FIG. 8 is a cross-sectional view taken along the line BB of FIG. 7 and 8 are cross-sectional views of the ball payout device 1 as viewed from the operation surface side.

図7に示すように、球供給通路3は、遊技球を1条で流下させる状態で形成されている。球払出口5は、球入口4に対して通路幅の半分ほどモータ7側(操作面側より見て右側)に変位している。球供給通路3は、球払出装置1を上方より見た平面視にてスクリュー10の軸方向に沿った側方、本例ではスクリュー10の操作面側に遊技球を流下させるようになっている。 As shown in FIG. 7, the ball supply passage 3 is formed in a state where the game ball is allowed to flow down by one row. The ball payout outlet 5 is displaced to the motor 7 side (on the right side when viewed from the operation surface side) by about half the width of the passage with respect to the ball inlet 4. The ball supply passage 3 allows the game ball to flow down to the side along the axial direction of the screw 10 in a plan view of the ball payout device 1 from above, in this example, to the operation surface side of the screw 10. ..

具体的には、球供給通路3は、球入口4から流入された遊技球を流下させてスクリュー10に流入させる上球通路31と、スクリュー10より送り出される遊技球を流下させる下球通路32と、上球通路31と下球通路32とを繋ぐ湾曲通路33とを有する。なお、本例では上球通路31は、球入口4から湾曲通路33に向かって左方向(操作面側より見て左方向)にやや傾斜しているが、球入口4から湾曲通路33まで傾斜することなく延びている構成であってもよい。 Specifically, the ball supply passage 3 includes an upper ball passage 31 that causes the game ball that has flowed in from the ball inlet 4 to flow down into the screw 10, and a lower ball passage 32 that causes the game ball that is sent out from the screw 10 to flow down. It has a curved passage 33 connecting the upper ball passage 31 and the lower ball passage 32. In this example, the upper ball passage 31 is slightly inclined to the left (to the left when viewed from the operation surface side) from the ball entrance 4 toward the curved passage 33, but is inclined from the ball entrance 4 to the curved passage 33. It may be a configuration that extends without doing anything.

上球通路31の下部および湾曲通路33における、操作面側より見て左側の通路壁は、球抜き部材12の外周壁面12aにて構成されている。球抜き部材12を操作面側より引き出すことで、球供給通路3と球排出用通路8とが連通する。図示してはいないが、下球通路32は、湾曲通路33より球払出口5にかけて対向面側に傾斜している。 The passage wall on the left side of the lower part of the upper ball passage 31 and the curved passage 33 when viewed from the operation surface side is composed of the outer peripheral wall surface 12a of the ball removing member 12. By pulling out the ball removing member 12 from the operation surface side, the ball supply passage 3 and the ball discharge passage 8 communicate with each other. Although not shown, the lower ball passage 32 is inclined toward the facing surface side from the curved passage 33 to the ball payout outlet 5.

図8に示すように、スクリュー10は、軸部21の外周に螺旋状突起22が設けられた構成であり、軸方向を左右方向として略水平方向(横置き)に配設されている。スクリュー10は、軸部21の両側の端部が2つの軸受23・23に回動自在に支持されている。スクリュー10における軸部21の一端は、継手部材24を介してモータ7のモータ軸7aに同軸接続されており、モータ7にて回転駆動されるようになっている。 As shown in FIG. 8, the screw 10 has a configuration in which a spiral protrusion 22 is provided on the outer periphery of the shaft portion 21, and is arranged in a substantially horizontal direction (horizontally placed) with the axial direction as the left-right direction. The screw 10 has end portions on both sides of the shaft portion 21 rotatably supported by two bearings 23 and 23. One end of the shaft portion 21 of the screw 10 is coaxially connected to the motor shaft 7a of the motor 7 via the joint member 24, and is rotationally driven by the motor 7.

スクリュー10は、球供給通路3の対向面側に配置され、湾曲通路33に球供給通路3を横切るように配置されている。スクリュー10は、上球通路31を流下する遊技球に対し、湾曲通路33の部分において螺旋状突起22を対向面側より当接させることで、遊技球の流下を停止させる(待機)。以下、遊技球の流下を停止させて待機させる位置を、球待機位置と称する。 The screw 10 is arranged on the facing surface side of the ball supply passage 3, and is arranged in the curved passage 33 so as to cross the ball supply passage 3. The screw 10 stops the flow of the game ball by bringing the spiral protrusion 22 into contact with the game ball flowing down the upper ball passage 31 from the facing surface side at the portion of the curved passage 33 (standby). Hereinafter, the position where the flow of the game ball is stopped and made to stand by is referred to as a ball waiting position.

スクリュー10は、回転駆動されることで、待機させている遊技球をスクリュー10の軸方向に沿って操作面側より見て右側に移動させる。スクリュー10の回転駆動によって球待機位置から後述する球解放位置(リリースポイント)まで移動された遊技球は、スクリュー10による待機が解除されて放出され、下球通路32に送り出される。 The screw 10 is rotationally driven to move the waiting game ball along the axial direction of the screw 10 to the right side when viewed from the operation surface side. The game ball moved from the ball standby position to the ball release position (release point) described later by the rotational drive of the screw 10 is released from the standby position by the screw 10 and sent out to the lower ball passage 32.

また、スクリュー10は、ホームポジションで停止した状態で、螺旋状突起22にて下球通路32を塞ぎ、螺旋状突起22における下球通路32を塞いでいる部分が遊技球を球排出用通路8に案内する案内部材としても機能する。 Further, in the state where the screw 10 is stopped at the home position, the lower ball passage 32 is blocked by the spiral protrusion 22, and the portion of the spiral protrusion 22 blocking the lower ball passage 32 allows the game ball to be discharged from the ball discharge passage 8. It also functions as a guide member to guide the driver.

(球払出装置1の払出動作)
図9は、球払出装置1における払出動作が可能な通常状態を示す図であり、(a)は、ベース2Aを外した状態の球払出装置1を操作面側より見た斜視図、(b)はベース2Aを外した状態の球払出装置1を操作面側より見た正面図である。図9において、スクリュー10はホームポジションに位置している。
(Payout operation of ball payout device 1)
9A and 9B are views showing a normal state in which the ball payout device 1 is capable of payout operation, and FIG. 9A is a perspective view of the ball payout device 1 with the base 2A removed, as viewed from the operation surface side, (b). ) Is a front view of the ball payout device 1 with the base 2A removed as viewed from the operation surface side. In FIG. 9, the screw 10 is located in the home position.

図9の(a)(b)に示すように、通常状態では、スクリュー10の螺旋状突起22が、球払出口5に繋がる下球通路32を塞いでいる。この位置は、スクリュー10の螺旋状突起22が、遊技球Rを球排出用通路8に案内(案内)する位置でもある。また、球抜き部材12が球排出用通路8を塞ぎ、球抜き部材12の外周壁面12aが遊技球Rを下球通路32に案内する。払出動作時には、スクリュー10が回転することにより遊技球Rと当接している螺旋状突起22が通路前方側に送られ、所定のポイントで球が球払出用通路をなす下球通路32にリリースされる。 As shown in FIGS. 9A and 9B, under the normal state, the spiral protrusion 22 of the screw 10 blocks the lower ball passage 32 connected to the ball payout outlet 5. This position is also a position where the spiral protrusion 22 of the screw 10 guides (guides) the game ball R to the ball discharge passage 8. Further, the ball removing member 12 closes the ball discharging passage 8, and the outer peripheral wall surface 12a of the ball removing member 12 guides the game ball R to the lower ball passage 32. During the payout operation, the spiral protrusion 22 in contact with the game ball R is sent to the front side of the passage by the rotation of the screw 10, and the ball is released to the lower ball passage 32 forming the ball payout passage at a predetermined point. To.

より詳細には、遊技球Rは、球入口4から球供給通路3内に連続して流入される。流入された遊技球Rのうちの先頭(最下流)の遊技球Rの流下が、湾曲通路33においてスクリュー10の螺旋状突起22に当接し待機させられる。この位置が、遊技球Rを待機させる球待機位置であり、スクリュー10のホームポジション(所定の回転位置)である。停止している先頭の遊技球Rは、スクリュー10が回転駆動されると、その回転に伴いスクリュー10に沿って、操作面側より見て右側に移動しつつ下方(右斜め下方向)に移動し、球解放位置に達するとスクリュー10より解放され、下球通路32へ送り出される。 More specifically, the game ball R continuously flows into the ball supply passage 3 from the ball entrance 4. The flow of the leading (most downstream) game ball R of the inflowing game ball R abuts on the spiral protrusion 22 of the screw 10 in the curved passage 33 and is made to stand by. This position is the ball standby position where the game ball R is made to stand by, and is the home position (predetermined rotation position) of the screw 10. When the screw 10 is rotationally driven, the stopped leading game ball R moves downward (diagonally downward to the right) along the screw 10 while moving to the right when viewed from the operation surface side. Then, when the ball release position is reached, the ball is released from the screw 10 and sent out to the lower ball passage 32.

本例では、スクリュー10の1ピッチ(螺旋状突起22の1ピッチ)は7mmとしており、遊技球Rの直径11mmよりも小さく設定されている。スクリューの1ピッチは、球待機位置にある遊技球Rが払い出されて次の遊技球Rが待機位置に到達する距離に相当する。そして、遊技球Rを待機させるスクリュー10のホームポジションを基準に、ホームポジションよりスクリュー10を270°回転させた位置をリリースポイント(球解放位置)として設計されている。なお、本例では7mmとしたが、スクリュー10の1ピッチは7mm未満でも実現可能である。もちろん、スクリュー10の1ピッチはピッチ7mm以上でも可能である。 In this example, one pitch of the screw 10 (one pitch of the spiral protrusion 22) is set to 7 mm, which is smaller than the diameter of the game ball R of 11 mm. One pitch of the screw corresponds to the distance at which the game ball R in the ball standby position is paid out and the next game ball R reaches the standby position. The release point (ball release position) is designed at a position where the screw 10 is rotated by 270 ° from the home position with reference to the home position of the screw 10 that makes the game ball R stand by. Although it is set to 7 mm in this example, one pitch of the screw 10 can be realized even if it is less than 7 mm. Of course, one pitch of the screw 10 can be a pitch of 7 mm or more.

図10、図11は、球払出装置1の払出動作を示す説明図である。図10、図11において、上部に記載する断面図は、図6のA-A線矢視断面図に相当し、下部に記載する断面図は、上部のA-A線矢視断面図におけるC-C線矢視断面図である。図10、図11においては、先頭の遊技球をR1、これに隣接する2番目の遊技球をR2として区別する。 10 and 11 are explanatory views showing a payout operation of the ball payout device 1. In FIGS. 10 and 11, the cross-sectional view shown in the upper part corresponds to the cross-sectional view taken along the line AA in FIG. 6, and the cross-sectional view shown in the lower part corresponds to the cross-sectional view taken along the line AA in the upper part C. -C sectional view taken along the line C. In FIGS. 10 and 11, the first game ball is referred to as R1, and the second game ball adjacent thereto is referred to as R2.

スクリュー10は、ホームポジションを原点とし、60°を1セットとして、6セットで360°回転する。回転方向は、図10のC-C線矢視断面図に示す矢印方向であり、球払出装置1をモータ7が配置されている側とは反対側より見て、反時計回りである。なお、1セットは、モータ7(ステッピングモータ)のステップ角15°×4ステップに相当する。 The screw 10 rotates 360 ° in 6 sets with the home position as the origin and 60 ° as one set. The rotation direction is the arrow direction shown in the cross-sectional view taken along the line CC in FIG. 10, and is counterclockwise when the ball payout device 1 is viewed from the side opposite to the side where the motor 7 is arranged. One set corresponds to a step angle of 15 ° × 4 steps of the motor 7 (stepping motor).

スクリュー10が1セット回転する毎に、先頭の遊技球R1が斜め右下に少しずつ移動する。2番目の遊技球R2も先頭の遊技球R1と一緒に移動する。5セット目(240°から300°)の回転の途中で、スクリュー10はホームポジションから270°に到達し、先頭の遊技球R1がスクリュー10よりリリースされる。つまり、スクリュー10の螺旋状突起22におけるモータ7側(右側)部分の先端と、球供給通路3の通路壁との間隔が、遊技球Rの直径11mmよりも大きくなり、遊技球R1が下球通路32へ送り出される。このとき、2番目の遊技球R2は、スクリュー10の螺旋状突起22におけるモータ7側とは反対側(左側)部分に当接する。この位置における反対側部分の先端と球供給通路3の通路壁との間隔は、遊技球Rの直径11mmよりも小さい。そのため、2番目の遊技球R2は流下が停止され、スクリュー10にて動きが制限される。スクリュー10が、6セット目(300°から360°)の回転を終えてホームポジションに到達することで、2番目の遊技球R2は球待機位置に到達する。この時点で、先頭の遊技球R1は、下球通路32を通って球払出口5より排出される。 Every time the screw 10 rotates one set, the leading game ball R1 moves diagonally to the lower right. The second game ball R2 also moves together with the first game ball R1. In the middle of the rotation of the fifth set (240 ° to 300 °), the screw 10 reaches 270 ° from the home position, and the leading game ball R1 is released from the screw 10. That is, the distance between the tip of the motor 7 side (right side) portion of the spiral protrusion 22 of the screw 10 and the passage wall of the ball supply passage 3 becomes larger than the diameter of the game ball R of 11 mm, and the game ball R1 is a lower ball. It is sent out to the passage 32. At this time, the second game ball R2 comes into contact with the portion of the spiral protrusion 22 of the screw 10 opposite to the motor 7 side (left side). The distance between the tip of the opposite portion at this position and the passage wall of the ball supply passage 3 is smaller than the diameter of the game ball R of 11 mm. Therefore, the flow of the second game ball R2 is stopped, and the movement of the second game ball R2 is restricted by the screw 10. When the screw 10 finishes the rotation of the sixth set (300 ° to 360 °) and reaches the home position, the second game ball R2 reaches the ball standby position. At this point, the leading game ball R1 is discharged from the ball payout outlet 5 through the lower ball passage 32.

このように、本例の球払出装置1は、遊技機100からの払出信号に基づいて、払出信号にて指示された払出個数Nに応じてスクリュー10をN回転、つまり、N×6セット分回転させることで、払出信号にて命じられた個数の遊技球Rを払い出す。 As described above, the ball payout device 1 of this example rotates the screw 10 N times according to the payout number N indicated by the payout signal based on the payout signal from the gaming machine 100, that is, for N × 6 sets. By rotating, the number of game balls R ordered by the payout signal is paid out.

なお、モータ7として例えばステップ角18°のステッピングモータを使用した場合は、18°×4ステップの72°を1セットとし、5セットでスクリュー10を1回転させる構成とし、例えば、4セット目の回転の途中にリリースポイントを設けてもよい。また、リリースポイントを設ける位置を、スクリュー10がホームポジションに戻る1セット前に設定する必要はない。例えば、ホームポジションに戻る21セット前や、ホームポジションに達するセットの途中にリリースポイントを設けてもよい。 When a stepping motor having a step angle of 18 ° is used as the motor 7, for example, 72 ° of 18 ° × 4 steps is set as one set, and the screw 10 is rotated once in 5 sets, for example, the 4th set. A release point may be provided in the middle of rotation. Further, it is not necessary to set the position where the release point is provided one set before the screw 10 returns to the home position. For example, a release point may be set before 21 sets returning to the home position or in the middle of a set reaching the home position.

(球払出装置1の球抜き構造)
図9、図10、図12および図13を用いて球払出装置1の球抜き構造について説明する。図12は、球抜き部材12を引き出して球排出用通路8を開放した状態の球払出装置1を操作面側より見た正面図である。図13は、図12のD-D線矢視断面図であり、スクリュー10がホームポジションにある状態を示す。
(Ball removal structure of ball payout device 1)
The ball pulling structure of the ball payout device 1 will be described with reference to FIGS. 9, 10, 12, and 13. FIG. 12 is a front view of the ball payout device 1 in a state where the ball ejection member 12 is pulled out and the ball discharge passage 8 is opened, as viewed from the operation surface side. FIG. 13 is a cross-sectional view taken along the line DD of FIG. 12, showing a state in which the screw 10 is in the home position.

図13に示すように、スクリュー10がホームポジションにある状態で、螺旋状突起22の先端と球供給通路3の通路壁との間隔W1は、遊技球Rの直径(11mm)よりも小さく設定されている。これにより、球払出口5に続く下球通路32が塞がれ、遊技球Rは下球通路32に抜けることができない。 As shown in FIG. 13, with the screw 10 in the home position, the distance W1 between the tip of the spiral protrusion 22 and the passage wall of the ball supply passage 3 is set to be smaller than the diameter (11 mm) of the game ball R. ing. As a result, the lower ball passage 32 following the ball payout exit 5 is blocked, and the game ball R cannot pass through the lower ball passage 32.

また、図9に示すように、球抜き部材12は、外周壁面12aにて、停止した遊技球Rの荷重を受けると共に、外周壁面12aにおけるスクリュー10が遊技球Rを送り出す方向の端部が、停止した遊技球Rの重心位置よりも送り出し方向に位置している。 Further, as shown in FIG. 9, the ball pulling member 12 receives the load of the stopped game ball R on the outer peripheral wall surface 12a, and the end portion of the outer peripheral wall surface 12a in the direction in which the screw 10 sends out the game ball R is formed. It is located in the delivery direction from the position of the center of gravity of the stopped game ball R.

この状態で、球抜き部材12を引き出すと、球排出用通路8が開放され、球供給通路3と球排出用通路8とが連通する。球排出用通路8は、遊技球Rの直径(11mm)よりも大きい通路幅W2を有している。球排出用通路8が開放されると、螺旋状突起22の先端に当接して移動が規制されていた遊技球Rは球排出用通路8に移動(落下)し、球排出用通路8を介して球抜き口6より排出される。 When the ball removing member 12 is pulled out in this state, the ball discharging passage 8 is opened, and the ball supply passage 3 and the ball discharging passage 8 communicate with each other. The ball discharge passage 8 has a passage width W2 larger than the diameter (11 mm) of the game ball R. When the ball discharge passage 8 is opened, the game ball R, which is in contact with the tip of the spiral protrusion 22 and whose movement is restricted, moves (falls) to the ball discharge passage 8 and passes through the ball discharge passage 8. It is discharged from the ball ejection port 6.

図12に示すように、スクリュー10の螺旋状突起22は、球排出用通路8に入り込む遊技球Rに接触してその動きを規制しないように設計されている。 As shown in FIG. 12, the spiral protrusion 22 of the screw 10 is designed so as not to come into contact with the game ball R entering the ball discharge passage 8 and restrict its movement.

ここで、球排出用通路8と球供給通路3とは、スクリュー10がホームポジションにある状態では、必ず移動が規制されている遊技球Rが開放された球排出用通路8に入り込むように設計されている。しかしながら、スクリュー10がホームポジション以外の位置にある場合は、その限りではない。 Here, the ball discharge passage 8 and the ball supply passage 3 are designed so that the game ball R whose movement is restricted always enters the open ball discharge passage 8 when the screw 10 is in the home position. Has been done. However, this is not the case when the screw 10 is in a position other than the home position.

これについて、前述した図10、図11を用いて説明する。図10に示すように、スクリュー10がホームポジションにある状態で、2番目の遊技球R2は、先頭の遊技球R1の右寄り(操作面側より見て)に積載されている。これにより、先頭の遊技球R1には、下流側の遊技球Rからの荷重によって球排出用通路8が位置する左側に押し出す力が作用している。したがって、この状態で、球抜き部材12を引き出すと、先頭の遊技球R1は球排出用通路8へ押し出され、これ以降の遊技球Rも球排出用通路8へと押し出される。 This will be described with reference to FIGS. 10 and 11 described above. As shown in FIG. 10, with the screw 10 in the home position, the second game ball R2 is loaded on the right side (viewed from the operation surface side) of the leading game ball R1. As a result, a force is acting on the leading game ball R1 to push it to the left side where the ball discharge passage 8 is located due to the load from the game ball R on the downstream side. Therefore, when the ball pulling member 12 is pulled out in this state, the leading game ball R1 is pushed out to the ball discharge passage 8, and the subsequent game ball R is also pushed out into the ball discharge passage 8.

一方、図10に示すように、スクリュー10がホームポジションから1セット移動すると、2番目の遊技球R2は、先頭の遊技球R1の左寄りに積載される。これにより、先頭の遊技球R1には、ホームポジションにある状態とは逆に、下流流側の遊技球Rからの荷重によって下球通路32が位置する右側に押し出す力が作用し、球抜き部材12を引き出しても、球排出用通路8へ押し出されにくい。しかしながら、この状態でも、物理的な力を加えて先頭の遊技球R1を球排出用通路8へ取り込むと、これ以降の遊技球Rも球排出用通路8へと押し出される。 On the other hand, as shown in FIG. 10, when the screw 10 moves one set from the home position, the second game ball R2 is loaded on the left side of the leading game ball R1. As a result, a force that pushes the lower ball passage 32 to the right side where the lower ball passage 32 is located acts on the leading game ball R1 due to the load from the game ball R on the downstream flow side, contrary to the state in which the ball is in the home position. Even if 12 is pulled out, it is difficult to be pushed out to the ball discharge passage 8. However, even in this state, if the leading game ball R1 is taken into the ball discharge passage 8 by applying a physical force, the subsequent game balls R are also pushed out into the ball discharge passage 8.

なお、スクリュー10がホームポジションから3セット、4セット移動した状態は、先頭の遊技球R1の重心は、既に球排出用通路8よりも下球通路32上に移動している。そのため、この状態で球抜き部材12を引き出しても、先頭の遊技球R1は球排出用通路8へは落ち込まない。2番目の遊技球R2も先頭の遊技球R1にて動きが制限され、球排出用通路8へ抜けることはない。 In the state where the screw 10 has moved 3 sets or 4 sets from the home position, the center of gravity of the leading game ball R1 has already moved above the ball discharge passage 8 and above the lower ball passage 32. Therefore, even if the ball pulling member 12 is pulled out in this state, the leading game ball R1 does not fall into the ball discharging passage 8. The movement of the second game ball R2 is also restricted by the first game ball R1, and the ball does not go out to the ball discharge passage 8.

スクリュー10がホームポジションから5セットした状態は、ホームポジションにある場合と同様に、球抜き部材12を引き出すことで、遊技球Rを抜き出すことができる。 When the screw 10 is set 5 times from the home position, the game ball R can be pulled out by pulling out the ball pulling member 12 as in the case where the screw 10 is in the home position.

このように、上記構成では、球抜き状態としても球供給通路3内の遊技球Rを抜き出すことができない極めて余裕のない通路構造を敢えて採ることで、停止時のスクリューの回転位置に関係なく球抜きが可能な構成に比べて、球払出装置1の外形寸法を小さくすることを可能にしている。なお、極めて余裕のない構成と採用しても、後述する制御部110が、確実にスクリュー10をホームポジションに停止させるので、問題なく遊技球Rを抜き出すことができる。 As described above, in the above configuration, by deliberately adopting a passage structure in which the game ball R in the ball supply passage 3 cannot be pulled out even when the ball is pulled out, there is no margin, and the ball is irrespective of the rotation position of the screw when stopped. It is possible to reduce the external dimensions of the ball payout device 1 as compared with the configuration that can be pulled out. Even if the configuration is extremely tight, the control unit 110, which will be described later, reliably stops the screw 10 at the home position, so that the game ball R can be pulled out without any problem.

(球払出装置1の制御)
図14は、球払出装置1を制御する制御系のブロック図である。図14示すように、球払出装置1のモータ7および計数センサ11は、遊技機100が備える制御部110に接続されている。制御部110は、周知のCPU、ROM、RAM等を有し、予めROMに格納されているプログラムに従って各種の演算処理を実行可能な制御部が組み込まれている。なお、遊技機100と接続されてスクリュー10の駆動を制御する制御部を、球払出装置1の内部に備える構成としてもよい。
(Control of ball payout device 1)
FIG. 14 is a block diagram of a control system that controls the ball payout device 1. As shown in FIG. 14, the motor 7 and the counting sensor 11 of the ball payout device 1 are connected to the control unit 110 included in the gaming machine 100. The control unit 110 has a well-known CPU, ROM, RAM, and the like, and incorporates a control unit capable of executing various arithmetic processes according to a program stored in the ROM in advance. A control unit connected to the gaming machine 100 and controlling the drive of the screw 10 may be provided inside the ball payout device 1.

計数センサ11から出力される検出結果を示す信号は制御部110に入力される。計数センサ11が遊技球Rを検出すると、制御部110にON信号が入力される。また、モータ7は、制御部110から図示しない駆動回路へ出力された指令信号に基づいて電力の供給が制御される。制御部110は、賞球を管理する図示しない別の制御部より払出信号を受信し、受信した払出信号に基づいてモータ7を制御する。制御部110は、スクリュー10が必ずホームポジションに停止するようにモータ7を駆動する。 The signal indicating the detection result output from the counting sensor 11 is input to the control unit 110. When the counting sensor 11 detects the game ball R, an ON signal is input to the control unit 110. Further, the motor 7 is controlled to supply electric power based on a command signal output from the control unit 110 to a drive circuit (not shown). The control unit 110 receives a payout signal from another control unit (not shown) that manages the prize ball, and controls the motor 7 based on the received payout signal. The control unit 110 drives the motor 7 so that the screw 10 always stops at the home position.

図15は、球払出装置1において実行される払出制御のフローチャートである。図16は、図15のフローチャートにおけるイニシャライズ動作のフローチャートである。図17は、図15のフローチャートにおける払出動作のフローチャートである。 FIG. 15 is a flowchart of payout control executed in the ball payout device 1. FIG. 16 is a flowchart of the initialization operation in the flowchart of FIG. FIG. 17 is a flowchart of the payout operation in the flowchart of FIG.

図15に示すように、遊技機100の電源がONされ、球払出装置1の電源がONされると、制御部110は、電源ON後に最初の払出信号を受信したか否かを判定する(S1)。制御部110は、電源ON後に最初の払出信号を受信したと判定すると次のS2へ進み、イニシャライズ動作を実行する。 As shown in FIG. 15, when the power of the gaming machine 100 is turned on and the power of the ball payout device 1 is turned on, the control unit 110 determines whether or not the first payout signal is received after the power is turned on (. S1). When the control unit 110 determines that the first payout signal has been received after the power is turned on, the control unit 110 proceeds to the next S2 and executes the initialization operation.

図16に示すように、イニシャライズ動作では、制御部110は、モータ7を制御して、スクリュー10を1セット(60°)回転させる(S11)。次にS12に進み、計数センサ11からON信号が入力されたか否かを判定する。つまり、計数センサ11が遊技球Rを検出したか否かを判定する。制御部110は、ON信号が入力されたていないと判定するとS11に戻り、スクリュー10をさらに1セット(60°)回転させる。制御部110は、S12にてON信号が入力されたと判定するまで、S11とS12繰り返す。制御部110は、S12にてON信号が入力されたと判定すると次のS13へ進み、スクリュー10をさらい1セット回転させたポジションをスクリュー10のホームポジションに決定する。これにより、イニシャライズ動作は終了する。 As shown in FIG. 16, in the initialization operation, the control unit 110 controls the motor 7 to rotate the screw 10 by one set (60 °) (S11). Next, the process proceeds to S12, and it is determined whether or not an ON signal has been input from the counting sensor 11. That is, it is determined whether or not the counting sensor 11 has detected the game ball R. When the control unit 110 determines that the ON signal has not been input, the control unit 110 returns to S11 and further rotates the screw 10 by one set (60 °). The control unit 110 repeats S11 and S12 until it is determined that the ON signal has been input in S12. When the control unit 110 determines that the ON signal has been input in S12, the control unit 110 proceeds to the next S13, and determines the position where the screw 10 is swept and rotated by one set as the home position of the screw 10. This ends the initialization operation.

図15に戻り、制御部110は、イニシャライズ動作が終了するとS3に進み、スクリュー10を回転させる数を、S1で受信した払出信号に命じられた払出数より1引いた値に設定する。これは、S2のイニシャライズ動作にて既に払い出した1個分を差し引く処理である。スクリュー10を回転させる数が設定されると次にS4に進み、遊技球の払出し動作を実行する。 Returning to FIG. 15, the control unit 110 proceeds to S3 when the initialization operation is completed, and sets the number of rotations of the screw 10 to a value obtained by subtracting 1 from the number of payouts commanded by the payout signal received in S1. This is a process of subtracting one already paid out in the initialization operation of S2. When the number of rotations of the screw 10 is set, the process proceeds to S4 to execute the payout operation of the game ball.

図17に示すように、遊技球の払出し動作では、制御部110は、モータ7を制御して、設定された数だけスクリュー10を回転させる(S21)。例えば、設定された数が「12」であれば、スクリュー10を12回回転させて12個の遊技球Rを払い出す。最後の遊技球Rを払出した後、制御部110は、必ずスクリュー10をホームポジションで停止させる。 As shown in FIG. 17, in the payout operation of the game ball, the control unit 110 controls the motor 7 to rotate the screw 10 by a set number (S21). For example, if the set number is "12", the screw 10 is rotated 12 times to pay out 12 game balls R. After paying out the last game ball R, the control unit 110 always stops the screw 10 at the home position.

制御部110は、設定された数だけスクリュー10を回転させると、次のS22に進み、設定された数に応じた遊技球Rを計数センサにて検出したか否かを判定する。つまり、計数センサ11からON信号が、設定された数に応じた分入力されたか否かを判定する。 When the screw 10 is rotated by the set number, the control unit 110 proceeds to the next S22 and determines whether or not the game ball R corresponding to the set number is detected by the counting sensor. That is, it is determined whether or not the ON signal is input from the counting sensor 11 according to the set number.

制御部110は、設定された数に応じた遊技球Rを計数センサにて検出したと判定すると払出し動作を終了し、図15のS5に進む。一方、設定された数に応じた遊技球Rを計数センサにて検出していないと判定するとS23に進み、所定時間が経過したか否かを判定する。S23で所定時間が経過したと判定すると、リトライ動作に入り、S24に進んでイニシャライズ動作を行う。 When the control unit 110 determines that the game ball R corresponding to the set number has been detected by the counting sensor, the control unit 110 ends the payout operation and proceeds to S5 in FIG. On the other hand, if it is determined that the game ball R corresponding to the set number has not been detected by the counting sensor, the process proceeds to S23, and it is determined whether or not the predetermined time has elapsed. When it is determined in S23 that the predetermined time has elapsed, the retry operation is started, and the process proceeds to S24 to perform the initialization operation.

イニシャライズ動作が終了すると、次のS25に進み、スクリュー10を回転させる数を、設定した値から払出し済みの個数分を引いた値に再設定し、その後、S21に戻る。例えば、図15のS6にて設定された値が「20」であり、S22で検出したON信号の数が「12」とする。この場合、S25では、スクリュー10を回転させる数を、イニシャライズ動作で払出した1個分と、既に払出した12個分を差し引いた値「7」に再設定する。 When the initialization operation is completed, the process proceeds to the next S25, the number of rotations of the screw 10 is reset to a value obtained by subtracting the number already paid out from the set value, and then the process returns to S21. For example, the value set in S6 of FIG. 15 is "20", and the number of ON signals detected in S22 is "12". In this case, in S25, the number of rotations of the screw 10 is reset to the value "7" obtained by subtracting the one paid out in the initialization operation and the twelve already paid out.

なお、図15~図17のフローチャートにおいては特に記載していないが、球払出装置1の電源OFFを検出するステップが適宜挿入されており、電源OFFを検出すると、図15のフローチャートに示すルーチンを終了する。 Although not particularly described in the flowcharts of FIGS. 15 to 17, a step for detecting the power off of the ball payout device 1 is appropriately inserted, and when the power off is detected, the routine shown in the flowchart of FIG. 15 is performed. finish.

(球払出装置1の球抜き動作)
図18は、球払出装置1における球抜き動作を行う球抜き状態を示す図であり、(a)は、ベース2Aを外した状態の球払出装置1を操作面側より見た斜視図、(b)はベース2Aを外した状態の球払出装置1を操作面側より見た正面図である。
(Ball removal operation of ball payout device 1)
FIG. 18 is a diagram showing a ball pulling state in which the ball paying operation is performed in the ball paying device 1, and FIG. 18A is a perspective view of the ball paying device 1 in a state where the base 2A is removed, as viewed from the operation surface side. b) is a front view of the ball payout device 1 with the base 2A removed as viewed from the operation surface side.

図18の(a)(b)に示すように、球抜き状態では、球抜き部材12を引き出して球排出用通路8を開放し、スクリュー10の螺旋状突起22の案内により遊技球Rを球排出用通路8に導く。このとき、球払出口5に繋がる下球通路32は螺旋状突起22によって塞がれており、下球通路32側に遊技球Rが排出されることは無い。 As shown in FIGS. 18A and 18B, in the ball pulling state, the ball pulling member 12 is pulled out to open the ball discharging passage 8, and the game ball R is guided by the spiral protrusion 22 of the screw 10. Lead to the discharge passage 8. At this time, the lower ball passage 32 connected to the ball payout outlet 5 is blocked by the spiral protrusion 22, and the game ball R is not discharged to the lower ball passage 32 side.

球抜き状態では、制御部110によりスクリュー10の回転位置を制御して、スクリュー10の螺旋状突起22が、確実に下球通路32を塞ぎ、接触した遊技球Rを球排出用通路8に案内する所定の回転位置となるように動作させる。この所定の回転位置として、本例では、上述したように、遊技球Rを払出し可能な状態で待機させる球待機位置、つまり、スクリュー10のホームポジションとしている。スクリューを利用した球払出装置に限らず、スプロケットと用いた球払出装置においても、遊技球の払出しを終えた後、スクリューもスプロケットも必ず次の払出しを迅速に行えるように、ホームポジションで待機する。 In the ball-pulled state, the rotation position of the screw 10 is controlled by the control unit 110, and the spiral protrusion 22 of the screw 10 surely closes the lower ball passage 32 and guides the contacted game ball R to the ball discharge passage 8. It is operated so as to be in a predetermined rotation position. As the predetermined rotation position, in this example, as described above, the ball standby position in which the game ball R is made to stand by in a payable state, that is, the home position of the screw 10 is set. Not only in the ball payout device using the screw, but also in the ball payout device using the sprocket, after finishing the payout of the game ball, both the screw and the sprocket always stand by at the home position so that the next payout can be performed promptly. ..

したがって、停電等の不測の事態による駆動停止を除いて、球抜きが必要になった状態では、スクリューもスプロケットも必ずホームポジションに位置している。したがって、所定の回転位置を、ホームポジションとしておくことで、球払出装置の既存のスクリューの制御をそのまま用いることができる。 Therefore, except for the drive stop due to an unexpected situation such as a power failure, the screw and the sprocket are always in the home position when the ball needs to be pulled out. Therefore, by setting the predetermined rotation position as the home position, the control of the existing screw of the ball payout device can be used as it is.

以上のように、球払出装置1においては、球供給通路3に球排出用通路83案内するための形状を持たせる必要がなくなり、通路構成の自由を上げることができる。また、螺旋状突起22は、前述した舌片状の球抜きガイド部材に比べて十分な強度を有しているので、遊技球を球排出用通路8に案内する部材として用いても耐久性に問題はない。また、上記構成とすることで、球排出用通路8を球払出用通路をなす下球通路32と並べて設けることができるので、球払出装置の側方に球排出用通路を設けるスペースを確保する必要もない。 As described above, in the ball payout device 1, it is not necessary for the ball supply passage 3 to have a shape for guiding the ball discharge passage 83, and the freedom of the passage configuration can be increased. Further, since the spiral protrusion 22 has sufficient strength as compared with the above-mentioned tongue piece-shaped ball pulling guide member, it is durable even if it is used as a member for guiding the game ball to the ball discharge passage 8. No problem. Further, with the above configuration, the ball discharge passage 8 can be provided side by side with the lower ball passage 32 forming the ball discharge passage, so that a space for providing the ball discharge passage is secured on the side of the ball discharge device. There is no need.

しかも、球抜き部材12および球供給通路3は、スクリュー10が所定の回転位置で停止している場合のみ、螺旋状突起22における下球通路32を塞いでいる部分に接触した遊技球を球排出用通路8に受け入れるといった、極めて余裕のない構成となっているので、球払出装置1の外形寸法を極めて小さくすることができる。 Moreover, the ball pulling member 12 and the ball supply passage 3 discharge the game ball in contact with the portion of the spiral protrusion 22 that is blocking the lower ball passage 32 only when the screw 10 is stopped at a predetermined rotation position. Since the structure is extremely tight, such as accepting the ball in the passage 8, the external dimensions of the ball payout device 1 can be made extremely small.

極めて余裕のない構成であっても、制御部110が、確実に所定の回転位置にてスクリューを停止させるので、問題なく遊技球を抜き出すことができる。 Even if the configuration is extremely tight, the control unit 110 reliably stops the screw at a predetermined rotation position, so that the game ball can be pulled out without any problem.

(変形例)
図19は変形例の球払出装置1’における、ベース2Aを外した状態を操作面側より見た正面図であり、(a)は払出動作が可能な通常状態を示す図であり、(b)は球抜き状態を示す図である。
(Modification example)
FIG. 19 is a front view of the ball payout device 1'of the modified example in which the base 2A is removed from the operation surface side, and FIG. 19A is a view showing a normal state in which the payout operation is possible, and FIG. ) Is a diagram showing a ball-free state.

前述した例では、上球通路31は、左方向にやや傾斜していたが、図19に示すように、直線的に形成することもできる。 In the above-mentioned example, the upper ball passage 31 is slightly inclined to the left, but as shown in FIG. 19, it can also be formed linearly.

〔実施形態2〕
以下、本発明の一側面における他の実施形態を、図20~24に基づいて例示する。なお、説明の便宜上、上記実施形態にて説明した部材と同じ機能を有する部材については、同じ符号を付記し、その説明を繰り返さない。
[Embodiment 2]
Hereinafter, other embodiments of one aspect of the present invention will be illustrated with reference to FIGS. 20 to 24. For convenience of explanation, the same reference numerals are given to the members having the same functions as the members described in the above embodiment, and the description thereof will not be repeated.

前述したように、実施形態1の球払出装置1の場合、スクリュー10がホームポジションから3セット、4セット移動した位置では、球抜き部材12を引き出しても、遊技球Rを抜き出すことができなかった(図10、図11参照)。ここで、図20の(a)(b)を用いて、遊技球Rを抜き出すことができない状態を詳しく説明する。 As described above, in the case of the ball payout device 1 of the first embodiment, at the position where the screw 10 has moved 3 sets or 4 sets from the home position, even if the ball pulling member 12 is pulled out, the game ball R cannot be pulled out. (See FIGS. 10 and 11). Here, the state in which the game ball R cannot be extracted will be described in detail with reference to FIGS. 20 (a) and 20 (b).

図20の(a)は、球払出装置1におけるスクリュー10がホームポジションから3セット移動した位置で球抜き部材12を引き出した状態を操作面側より見た斜視図であり、(b)はこの状態を操作面側より見た正面図である。なお、図20の(a)(b)においては、ベース2Aが外され、図20の(b)においては、球抜き部材12も外された状態を示している。 FIG. 20A is a perspective view showing a state in which the ball pulling member 12 is pulled out at a position where the screw 10 in the ball payout device 1 is moved by 3 sets from the home position, as viewed from the operation surface side, and FIG. 20B is a perspective view thereof. It is a front view which looked at the state from the operation surface side. Note that, in FIGS. 20A and 20B, the base 2A is removed, and in FIG. 20B, the ball removing member 12 is also removed.

図20の(a)(b)に示すように、スクリュー10が3セット移動した位置では、先頭の遊技球R1の重心は下球通路32上にある。そのため、球抜き部材12を引き出しても、先頭の遊技球R1が球排出用通路8へ落ち込むことはない。このとき、先頭の遊技球R1は、スクリュー10の螺旋状突起22と隔壁40とに突き当たって停止している。 As shown in FIGS. 20A and 20B, the center of gravity of the leading game ball R1 is on the lower ball passage 32 at the position where the screw 10 has moved three sets. Therefore, even if the ball pulling member 12 is pulled out, the leading game ball R1 does not fall into the ball discharging passage 8. At this time, the leading game ball R1 abuts on the spiral protrusion 22 of the screw 10 and the partition wall 40 and is stopped.

先頭の遊技球R1がこのような位置で停止すると、球供給通路3の球入口4側の通路壁41の下端部41aと先頭の遊技球R1との間隔L1が、遊技球Rの直径よりも小さい。そのため、2番目の遊技球R2は球排出用通路8へ抜けることができない。通路壁41は、球抜き部材12の外周壁面12aと連続して球供給通路3の通路壁を構成する。球抜き部材12が引き出されることで、通路壁41の下端部41aが球排出用通路8の入口となる。なお、図示してはいないが、スクリュー10が4セット移動した位置でも同様である。 When the leading game ball R1 stops at such a position, the distance L1 between the lower end portion 41a of the passage wall 41 on the ball entrance 4 side of the ball supply passage 3 and the leading game ball R1 is larger than the diameter of the game ball R. small. Therefore, the second game ball R2 cannot escape to the ball discharge passage 8. The passage wall 41 constitutes the passage wall of the ball supply passage 3 continuously with the outer peripheral wall surface 12a of the ball removing member 12. By pulling out the ball pulling member 12, the lower end portion 41a of the passage wall 41 becomes the entrance of the ball discharge passage 8. Although not shown, the same applies to the position where the screw 10 is moved by 4 sets.

スクリュー10が何らかの原因でこのような3セット、4セット移動した位置で停止した場合でも、スクリュー10をホームポジションに移動に移動させることで、遊技球Rを抜き出すことができる。 Even if the screw 10 stops at such a position where the screw 10 has moved 3 sets or 4 sets for some reason, the game ball R can be taken out by moving the screw 10 to the home position.

本実施形態の球払出装置50は、スクリュー10の停止位置に関わらず、つまり、スクリューが3セット、4セット移動した位置で停止した場合もで、球抜き部材51を引き出すことで確実に遊技球Rを抜き出すことができる構成となっている。 The ball payout device 50 of the present embodiment reliably pulls out the ball pulling member 51 regardless of the stop position of the screw 10, that is, even when the screw is stopped at a position where the screw has moved 3 sets or 4 sets. It is configured so that R can be extracted.

図21の(a)は、球払出装置50におけるスクリュー10がホームポジションから3セット移動した位置で球抜き部材51を引き出した状態を操作面側より見た斜視図であり、(b)はこの状態を操作面側より見た正面図である。なお、図21の(a)(b)においては、ベース2Aが外され、図21の(b)においては、球抜き部材51の後述する球担持部51d以外の部分の記載が省略されている。 21 (a) is a perspective view of a state in which the ball pulling member 51 is pulled out at a position where the screw 10 in the ball payout device 50 is moved by 3 sets from the home position, as viewed from the operation surface side, and (b) is this. It is a front view which looked at the state from the operation surface side. In addition, in (a) and (b) of FIG. 21, the base 2A is removed, and in (b) of FIG. ..

図21の(a)(b)に示すように、球払出装置50は、球抜き部材12に代えて球抜き部材51を備えている。球抜き部材51は球担持部51dを有する。球担持部51dは、球抜き部材51が引き出された球抜き状態で、球払出装置1における隔壁40が設けられていた箇所に位置する(図20の(a)参照)。球払出装置50において、隔壁40は設けられていない。これらの点が、実施形態1の球払出装置1と球払出装置50との主な違いである。 As shown in FIGS. 21A and 21B, the ball payout device 50 includes a ball pulling member 51 instead of the ball pulling member 12. The ball removing member 51 has a ball supporting portion 51d. The ball supporting portion 51d is located at a position where the partition wall 40 is provided in the ball payout device 1 in the ball pulling state in which the ball pulling member 51 is pulled out (see (a) of FIG. 20). In the ball payout device 50, the partition wall 40 is not provided. These points are the main differences between the ball payout device 1 and the ball payout device 50 of the first embodiment.

図22は、球抜き部材51の斜視図である。図22に示すように、球抜き部材51は、球抜き部材12と同様に、外周壁面12aおよび把持部12bに相当する外周壁面51aおよび把持部51bを有している。球抜き部材51と球抜き部材12との異なる点は、球抜き部材51が、延長壁51cと球担持部51dとを備える点である。 FIG. 22 is a perspective view of the ball removing member 51. As shown in FIG. 22, the ball pulling member 51 has an outer peripheral wall surface 51a and a grip portion 51b corresponding to the outer peripheral wall surface 12a and the grip portion 12b, similarly to the ball pulling member 12. The difference between the ball pulling member 51 and the ball pulling member 12 is that the ball pulling member 51 includes an extension wall 51c and a ball supporting portion 51d.

延長壁51cは、外周壁面51aの下端部から下方に延設されている。延長壁51cは、計数センサ11の上面近傍に至る長さを有し(図21の(a)参照)、球払出状態において球排出用通路8と下球通路32とを隔てる隔壁として機能する。 The extension wall 51c extends downward from the lower end of the outer peripheral wall surface 51a. The extension wall 51c has a length extending to the vicinity of the upper surface of the counting sensor 11 (see (a) in FIG. 21), and functions as a partition wall separating the ball discharge passage 8 and the lower ball passage 32 in the ball payout state.

球担持部51dは、延長壁51cの下端部より、把持部51bが設けられた操作面とは反対側の奥側に延設された延設部51eの先端部に設けられている。図21の(a)(b)に示すように、球担持部51dは、球抜き部材51が引き出された球抜き状態において下球通路32を塞いで、遊技球Rを担持する。球担持部51dは、スクリュー10が螺旋状突起22にて下球通路32を塞ぐ位置よりも球払出口5に近い位置で下球通路32を担持する。 The ball supporting portion 51d is provided at the tip end portion of the extension portion 51e extending from the lower end portion of the extension wall 51c to the back side opposite to the operation surface on which the grip portion 51b is provided. As shown in FIGS. 21 (a) and 21 (b), the ball supporting portion 51d closes the lower ball passage 32 in the ball-pulled state in which the ball-pulling member 51 is pulled out, and supports the game ball R. The ball supporting portion 51d supports the lower ball passage 32 at a position closer to the ball payout outlet 5 than the position where the screw 10 blocks the lower ball passage 32 with the spiral protrusion 22.

本実施形態では、球担持部51dは、球抜き部材51と一体に設けられている。そのため、球抜き部材51の動きとの連動を簡単に実現させることができる。しかしながら、球抜き部材51と一体に設けることは必須ではなく、球抜き部材が球抜き状態になるのに連動して下球通路32を塞ぐ構成であればよく、球抜き部材と別体に構成されていてもよい。 In the present embodiment, the ball supporting portion 51d is provided integrally with the ball removing member 51. Therefore, it is possible to easily realize the interlocking with the movement of the ball removing member 51. However, it is not essential to provide the ball pulling member integrally with the ball pulling member 51, and it is sufficient if the ball pulling member is configured to block the lower ball passage 32 in conjunction with the ball pulling state, and is configured separately from the ball pulling member. It may have been done.

また、本実施形態では、球担持部51dは、延設部51eの先端部に下球通路32に向かって突出した舌片状に形成されている。そして、球担持部51dは、図21(a)(b)に示すように、遊技球R1を担持する面(上面)に、球排出用通路8に向かって低くなる傾斜を有している。これにより、球担持部51dは、担持していた遊技球R1を、遊技球R1の自重を利用した転動にて球排出用通路8へ送り込むことができる。 Further, in the present embodiment, the ball supporting portion 51d is formed in the shape of a tongue piece protruding toward the lower ball passage 32 at the tip end portion of the extending portion 51e. Then, as shown in FIGS. 21 (a) and 21 (b), the ball-supporting portion 51d has an inclination on the surface (upper surface) that supports the game ball R1 so as to be lowered toward the ball discharge passage 8. As a result, the ball supporting portion 51d can feed the supported game ball R1 into the ball discharge passage 8 by rolling using the weight of the game ball R1.

図23の(a)(b)は、球担持部51dと、球供給通路3を構成する上球通路31および下球通路32と、球排出用通路8との位置関係を示す図であり、図23の(a)は球払出状態を示し、図23の(b)は球抜き状態を示す。 (A) and (b) of FIG. 23 are views showing the positional relationship between the ball supporting portion 51d, the upper ball passage 31 and the lower ball passage 32 constituting the ball supply passage 3, and the ball discharge passage 8. FIG. 23 (a) shows a ball payout state, and FIG. 23 (b) shows a ball removal state.

図23の(a)は示すように、球抜き部材51が引き出されていない球払出状態では、球担持部51dは、破線にて示す上球通路31および下球通路32よりも奥側に位置している。したがって、上球通路31から下球通路32へと流下する遊技球Rの流れに支障をきたすことは無い。この状態で、球抜き部材51の延長壁51cは、下球通路32と球排出用通路8とを仕切る隔壁として機能する。 As shown in FIG. 23A, in the ball payout state in which the ball pulling member 51 is not pulled out, the ball supporting portion 51d is located behind the upper ball passage 31 and the lower ball passage 32 shown by the broken line. is doing. Therefore, the flow of the game ball R flowing down from the upper ball passage 31 to the lower ball passage 32 is not hindered. In this state, the extension wall 51c of the ball removing member 51 functions as a partition wall separating the lower ball passage 32 and the ball discharge passage 8.

一方、図23の(b)は示すように、球抜き部材51が引き出された球払出状態では、球担持部51dは、下球通路32を塞ぐように下球通路32内に位置する。したがって、球抜き部材51を引き出した際、先頭の遊技球R1の重心が下球通路32側にあった場合、先頭の遊技球R1は球担持部51d上に落下して担持される。 On the other hand, as shown in FIG. 23 (b), in the ball payout state in which the ball pulling member 51 is pulled out, the ball supporting portion 51d is located in the lower ball passage 32 so as to block the lower ball passage 32. Therefore, when the ball pulling member 51 is pulled out, if the center of gravity of the leading game ball R1 is on the lower ball passage 32 side, the leading game ball R1 falls on the ball supporting portion 51d and is supported.

図24の(a)(b)は、球払出装置50において、スクリュー10がホームポジションから3セット移動した位置で、球抜き部材51を引き出す球抜き動作を説明する図であり、(a)は球抜き部材51を引き出す前を示し、(b)は球抜き部材51を引き出した状態を示す。図24の(a)(b)においてはベース2Aが外され、図24の(b)においては、球抜き部材51の球担持部51d以外の部分の記載が省略されている。 FIGS. 24A and 24B are views for explaining a ball pulling operation in which the ball pulling member 51 is pulled out at a position where the screw 10 is moved by 3 sets from the home position in the ball payout device 50, and FIG. 24A is a diagram. It shows before pulling out the ball pulling member 51, and (b) shows the state which pulled out the ball pulling member 51. In (a) and (b) of FIG. 24, the base 2A is removed, and in (b) of FIG. 24, the description of the portion other than the ball-supporting portion 51d of the ball-pulling member 51 is omitted.

図24の(a)に示すように、スクリュー10が3セット移動した位置では、先頭の遊技球R1の重心は下球通路32上にある。そのため、この状態で、球抜き部材51を引き出すと、図24の(b)に示すように、先頭の遊技球R1は下球通路32側へ落下する。しかしながら、球抜き部材51を引き出し動作に連動して球担持部51dが下球通路32を塞ぐので、先頭の遊技球R1は計数センサ11に達することなく、球担持部51dに担持される(保持)。 As shown in FIG. 24A, the center of gravity of the leading game ball R1 is on the lower ball passage 32 at the position where the screw 10 has moved three sets. Therefore, when the ball pulling member 51 is pulled out in this state, the leading game ball R1 falls to the lower ball passage 32 side as shown in FIG. 24 (b). However, since the ball supporting portion 51d blocks the lower ball passage 32 in conjunction with the pulling-out operation of the ball pulling member 51, the leading game ball R1 is supported (held) on the ball supporting portion 51d without reaching the counting sensor 11. ).

先頭の遊技球R1が球担持部51d上に落下することで、前述した通路壁41の下端部41aと先頭の遊技球R1との間隔L2が、遊技球Rの直径よりも大きくなる。これにより、2番目の遊技球R2は、球排出用通路8へ抜けることができ、以降の遊技球Rも球排出用通路8へと抜ける。2番目以降の遊技球Rが全て排出されると、先頭の遊技球R1は球担持部51dの上面の傾斜を転がり球排出用通路8へと排出される。 When the leading game ball R1 falls on the ball supporting portion 51d, the distance L2 between the lower end portion 41a of the passage wall 41 and the leading game ball R1 becomes larger than the diameter of the game ball R. As a result, the second game ball R2 can escape to the ball discharge passage 8, and the subsequent game ball R also exits to the ball discharge passage 8. When all the second and subsequent game balls R are discharged, the leading game ball R1 rolls on the slope of the upper surface of the ball supporting portion 51d and is discharged to the ball discharge passage 8.

なお、本実施形態では、球担持部51dの上面に球排出用通路8に向かって低くなる傾斜を持たせた構成としている。しかしながら、球担持部51dとしては、下球通路32を塞いで、先頭の遊技球R1を担持して保持する機能さえ有していればよい。そのため、球担持部51dの上面は平面にしてもよい。その場合は、2番目以降の遊技球Rが全て排出された後に、指を引っ掛けるなどして先頭の遊技球R1を取り出せばよい。 In this embodiment, the upper surface of the ball supporting portion 51d is provided with an inclination that becomes lower toward the ball discharging passage 8. However, the ball supporting portion 51d need only have a function of blocking the lower ball passage 32 and supporting and holding the leading game ball R1. Therefore, the upper surface of the ball supporting portion 51d may be flat. In that case, after all the second and subsequent game balls R have been ejected, the first game ball R1 may be taken out by hooking a finger or the like.

また、図示してはいないが、下球通路32における奥側の通路壁には、球担持部51dが下球通路32内に出没する際に通過する開口が形成される。このような開口は、通路壁に形成された段差となるため、下球通路32を流下する遊技球Rの動きに影響を及ぼす恐れがゼロではない。 Further, although not shown, an opening is formed in the passage wall on the inner side of the lower ball passage 32 through which the ball supporting portion 51d appears and disappears in the lower ball passage 32. Since such an opening is a step formed in the passage wall, the possibility of affecting the movement of the game ball R flowing down the lower ball passage 32 is not zero.

そこで、本実施形態では、図24の(b)に示すように、下球通路32の通路幅の半分よりも小さい寸法で球担持部51dが下球通路32に突き出るように構成している。このような構成することで、球担持部51dが出没するための開口は、遊技球Rが接触する部分以外に形成されるようになり、段差による影響を一切無くすることができる。 Therefore, in the present embodiment, as shown in FIG. 24 (b), the ball supporting portion 51d is configured to protrude into the lower ball passage 32 with a dimension smaller than half the passage width of the lower ball passage 32. With such a configuration, the opening for the ball supporting portion 51d to appear and disappear is formed in a portion other than the portion where the game ball R comes into contact, and the influence of the step can be completely eliminated.

以上のように、本実施形態の球払出装置50の構成によれば、球抜き部材が球抜き状態になるのに連動して下球通路32を塞いで先頭の遊技球R1を担持する球担持部51dが設けられている。これにより、スクリュー10の停止位置に関わらず、球抜き部材51を引き出すことで確実に遊技球Rを抜き出すことができる。 As described above, according to the configuration of the ball payout device 50 of the present embodiment, the ball support that blocks the lower ball passage 32 and supports the leading game ball R1 in conjunction with the ball pulling member being in the ball pulling state. A portion 51d is provided. As a result, the game ball R can be reliably pulled out by pulling out the ball pulling member 51 regardless of the stop position of the screw 10.

最後に、前述した特許文献2の球払出口を塞ぐように突出する舌片状の部材の耐久性と、球担持部51dの耐久性とを比較する。特許文献2の舌片状の部材は、遊技球を抜き出す際、抜き出す全ての遊技球を受け止めるため、耐久性が必要となる。一方、球担持部51dの場合は、遊技球を抜き出す際、先頭の遊技球R1のみを受け止めて担持するものである。したがって、特許文献2の舌片状の部材のように、複数の遊技球が連続して衝突するような大きな衝撃を受けることはなく、かつ、遊技球が接触する回数も圧倒的に少ない。したがって、耐久性が問題になることはない。 Finally, the durability of the tongue piece-shaped member protruding so as to close the ball payout outlet of Patent Document 2 described above is compared with the durability of the ball supporting portion 51d. The tongue piece-shaped member of Patent Document 2 needs to be durable because it receives all the game balls to be pulled out when the game balls are pulled out. On the other hand, in the case of the ball supporting portion 51d, when the game ball is taken out, only the leading game ball R1 is received and supported. Therefore, unlike the tongue piece-shaped member of Patent Document 2, a large impact that a plurality of game balls collide with each other is not received, and the number of times the game balls come into contact with each other is overwhelmingly small. Therefore, durability is not an issue.

本発明は上述した各実施形態に限定されるものではなく、請求項に示した範囲で種々の変更が可能であり、異なる実施形態にそれぞれ開示された技術的手段を適宜組み合わせて得られる実施形態についても本発明の技術的範囲に含まれる。 The present invention is not limited to the above-described embodiments, and various modifications can be made within the scope of the claims, and the embodiments obtained by appropriately combining the technical means disclosed in the different embodiments. Is also included in the technical scope of the present invention.

1 球払出装置
2 ケース
2A ベース
2B カバー
3 球供給通路(球通路)
4 球入口
5 球払出口
7 モータ
7a モータ軸
8 球排出用通路
10 スクリュー
11 計数センサ
12 球抜き部材
12a 外周壁面
14 スクリューカバー
15 モータカバー
21 軸部
22 螺旋状突起
23・23 軸受
31 上球通路
32 下球通路(球払出用通路)
33 湾曲通路
50 球払出装置
51 球抜き部材
51a 外周壁面
51c 延長壁
51d 球担持部
100 遊技機
109 遊技盤
110 制御部
1 Ball payout device 2 Case 2A Base 2B Cover 3 Ball supply passage (ball passage)
4 Ball inlet 5 Ball payout outlet 7 Motor 7a Motor shaft 8 Ball discharge passage 10 Screw 11 Counting sensor 12 Ball pulling member 12a Outer wall surface 14 Screw cover 15 Motor cover 21 Shaft 22 Spiral protrusion 23/23 Bearing 31 Upper ball passage 32 Lower ball passage (ball payout passage)
33 Curved passage 50 Ball payout device 51 Ball extraction member 51a Outer wall surface 51c Extension wall 51d Ball support part 100 Game machine 109 Game board 110 Control part

Claims (9)

軸部の外周に螺旋状突起が設けられ、球通路内の遊技球を球払出口へと送り出す略水平方向に配置されたスクリューと、
球払出状態で、外周壁面が前記球通路の通路壁の一部をなして前記球通路内の遊技球を前記球払出口へ案内し、球抜き状態で、前記外周壁面が前記球通路の通路壁の一部をなさず前記球通路内の遊技球を球抜き口に案内する球排出用通路を開く球抜き部材と、
前記スクリューの駆動を制御する制御部と、を備え、
前記スクリューは、所定の回転位置で停止した状態で、前記螺旋状突起にて前記球通路における前記球払出口へ連通する球払出用通路を塞ぎ、
前記球抜き部材および前記球通路は、前記スクリューが所定の回転位置で停止している場合に、前記螺旋状突起の前記球払出用通路を塞いでいる部分に接触した遊技球が前記球排出用通路に入り込むように形成され、
上記制御部は、前記スクリューの停止時、前記スクリューを前記所定の回転位置にて停止させ
前記球通路は、流下する遊技球を平面視にて前記スクリューにおける軸方向に沿った側方に略鉛直方向より流入させる上球通路を有し、
前記球払出用通路と前記上球通路とは、下方に向かって湾曲した湾曲通路で繋がれ、
前記スクリューは、前記湾曲通路に正面視で横切るように配置されている球払出装置。
A screw that is provided with a spiral protrusion on the outer circumference of the shaft and is arranged in a substantially horizontal direction to send the game ball in the ball passage to the ball payout outlet.
In the ball payout state, the outer peripheral wall surface forms a part of the passage wall of the ball passage to guide the game ball in the ball passage to the ball payout exit, and in the ball removal state, the outer peripheral wall surface forms the passage of the ball passage. A ball removal member that opens a ball discharge passage that guides the game ball in the ball passage to the ball removal port without forming a part of the wall.
A control unit that controls the drive of the screw is provided.
The screw is stopped at a predetermined rotation position, and the spiral protrusion closes the ball payout passage communicating with the ball payout outlet in the ball passage.
In the ball pulling member and the ball passage, when the screw is stopped at a predetermined rotation position, a game ball in contact with a portion of the spiral protrusion blocking the ball payout passage is used for ejecting the ball. Formed to enter the aisle,
When the screw is stopped, the control unit stops the screw at the predetermined rotation position.
The ball passage has an upper ball passage through which a flowing game ball flows laterally along the axial direction of the screw from a substantially vertical direction in a plan view.
The ball payout passage and the upper ball passage are connected by a curved passage curved downward.
The screw is a ball payout device arranged so as to cross the curved passage in a front view .
前記球抜き部材は、前記外周壁面にて、前記塞いでいる部分に接触して停止した遊技球の荷重を受けると共に、前記外周壁面における、前記スクリューが遊技球を送り出す方向の端部が、前記停止した遊技球の重心位置よりも前記送り出方向に位置している請求項1に記載の球払出装置。 The ball removing member receives the load of the game ball stopped in contact with the blocked portion on the outer peripheral wall surface, and the end portion of the outer peripheral wall surface in the direction in which the screw sends out the game ball is the end portion. The ball payout device according to claim 1, which is located in the direction of feeding out from the position of the center of gravity of the stopped game ball. 前記球抜き部材が球抜き状態になるのに連動して、前記スクリューが前記螺旋状突起にて塞ぐよりも前記球払出口に近い位置で前記球払出用通路を塞いで遊技球を担持する球担持部を備える請求項2に記載の球払出装置。 A ball that supports a game ball by blocking the ball payout passage at a position closer to the ball payout outlet than the screw closing with the spiral protrusion in conjunction with the ball pulling member being in the ball pulling state. The ball payout device according to claim 2, further comprising a carrier. 前記球担持部は、前記球抜き部材に一体に設けられている請求項3に記載の球払出装置。 The ball dispensing device according to claim 3, wherein the ball supporting portion is integrally provided with the ball removing member. 前記球担持部は、遊技球を担持する面に前記球排出用通路に向かって低くなる傾斜を有している請求項3又は4に記載の球払出装置。 The ball dispensing device according to claim 3 or 4, wherein the ball-carrying portion has an inclination toward the ball discharging passage on the surface on which the game ball is supported. 前記所定の回転位置が、前記スクリューが前記球払出口へと送り出す遊技球を待機させるホームポジションである請求項1~5の何れか1項に記載の球払出装置。 The ball payout device according to any one of claims 1 to 5, wherein the predetermined rotation position is a home position where the game ball sent out by the screw to the ball payout outlet is on standby. 前記球払出口に遊技球を計測する計測センサを有し、
前記制御部は、前記スクリューを所定の角度で順次回転させ、その際に、前記計測センサによる検出結果を用いて、前記ホームポジションを決定する請求項6に記載の球払出装置。
A measurement sensor for measuring a game ball is provided at the ball payout exit.
The ball payout device according to claim 6, wherein the control unit sequentially rotates the screw at a predetermined angle, and at that time, uses the detection result of the measurement sensor to determine the home position.
記スクリューは、前記上球通路より流入される遊技球に対し前記螺旋状突起を平面視にて前記軸方向に沿った側方より当接させることで流下を停止して待機させ、回転に伴い待機させていた前記遊技球を前記軸方向に沿って移動させて前記球払出用通路へ送り出す請求項1~7の何れか1項に記載の球払出装置。 The screw abuts the spiral protrusion from the side along the axial direction with respect to the game ball flowing in from the upper ball passage to stop the flow and make it stand by for rotation. The ball payout device according to any one of claims 1 to 7, wherein the game ball that has been made to stand by is moved along the axial direction and sent out to the ball payout passage. 請求項1~8の何れか1項に記載の球払出装置を備えた遊技機。 A gaming machine provided with the ball payout device according to any one of claims 1 to 8.
JP2018170936A 2018-02-08 2018-09-12 Ball payout device and gaming machine Active JP7099211B2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2018021152 2018-02-08
JP2018021152 2018-02-08

Publications (2)

Publication Number Publication Date
JP2019136476A JP2019136476A (en) 2019-08-22
JP7099211B2 true JP7099211B2 (en) 2022-07-12

Family

ID=67692603

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018170936A Active JP7099211B2 (en) 2018-02-08 2018-09-12 Ball payout device and gaming machine

Country Status (1)

Country Link
JP (1) JP7099211B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7208633B2 (en) * 2019-11-28 2023-01-19 株式会社ニューギン game machine
JP7212368B2 (en) * 2019-11-28 2023-01-25 株式会社ニューギン game machine
JP7212369B2 (en) * 2019-11-28 2023-01-25 株式会社ニューギン game machine

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000024253A (en) 1999-06-21 2000-01-25 Sanyo Bussan Kk Pachinko ball dispensing device

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000024253A (en) 1999-06-21 2000-01-25 Sanyo Bussan Kk Pachinko ball dispensing device

Also Published As

Publication number Publication date
JP2019136476A (en) 2019-08-22

Similar Documents

Publication Publication Date Title
JP7099211B2 (en) Ball payout device and gaming machine
JP2013165859A (en) Pachinko game machine
JP2006271550A (en) Ball putting-out device and game machine
JP5282191B2 (en) Bullet ball machine
JP5875110B2 (en) Bullet ball machine
JP2008212753A (en) Ball storage structure for game machine
JP2007244806A (en) Put-out device for game machine
JP5670865B2 (en) Game machine
JP5192295B2 (en) Illegal sphere detection device
JP2003284845A (en) Pachinko ball hopper
JP4898102B2 (en) Bullet ball machine
JP2009050642A (en) Pachinko machine
JP6705386B2 (en) Ball dispensing device for gaming machine and gaming machine
JP4603513B2 (en) Bullet ball machine
JP4494101B2 (en) Bullet ball machine
JP4570573B2 (en) Game machine
JP4926795B2 (en) Ball dispenser for gaming machine
JP4922099B2 (en) Game machine
JP2007029364A (en) Game machine
JP2010088780A (en) Slot machine
JP2525341B2 (en) Ball game machine
JP5278916B2 (en) Bullet ball machine
JP5278917B2 (en) Bullet ball machine
JP4915757B1 (en) Bullet ball machine
JP6384347B2 (en) Medal sorting device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210303

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220119

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220125

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220222

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220531

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220613

R150 Certificate of patent or registration of utility model

Ref document number: 7099211

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150