JP7086877B2 - Transport method using unit transport jig and unit transport jig - Google Patents

Transport method using unit transport jig and unit transport jig Download PDF

Info

Publication number
JP7086877B2
JP7086877B2 JP2019023943A JP2019023943A JP7086877B2 JP 7086877 B2 JP7086877 B2 JP 7086877B2 JP 2019023943 A JP2019023943 A JP 2019023943A JP 2019023943 A JP2019023943 A JP 2019023943A JP 7086877 B2 JP7086877 B2 JP 7086877B2
Authority
JP
Japan
Prior art keywords
jig
unit
gantry
vertical
fixing portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019023943A
Other languages
Japanese (ja)
Other versions
JP2020133133A (en
Inventor
達彦 日置
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Housing Corp
Original Assignee
Toyota Housing Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyota Housing Corp filed Critical Toyota Housing Corp
Priority to JP2019023943A priority Critical patent/JP7086877B2/en
Publication of JP2020133133A publication Critical patent/JP2020133133A/en
Application granted granted Critical
Publication of JP7086877B2 publication Critical patent/JP7086877B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

本発明は、ユニット輸送用治具及びユニット輸送用治具を用いた輸送方法に関する。 The present invention relates to a unit transport jig and a transport method using the unit transport jig.

下記特許文献1には、トラックの荷台に固定され、その上方側に複数のバルコニーユニットが積層載置されたバルコニーユニットの搬送用具が開示されている。これにより、一台のトラックで複数のバルコニーユニットを搬送することができる。 The following Patent Document 1 discloses a transport tool for a balcony unit fixed to a truck bed and having a plurality of balcony units stacked and mounted on the upper side thereof. As a result, a single truck can transport a plurality of balcony units.

特開平9-078687号公報Japanese Unexamined Patent Publication No. 9-078687

しかしながら、特許文献1に記載された搬送用具によれば、積層載置された複数のバルコニーユニットのうち最下段のユニットだけが搬送用具に固定されている。最下段のユニットよりも上段のユニットは、下段のユニットの上面に載置され、最上段のユニットの上面側から掛けられたロープによりトラックの荷台に固定されている。このため、トラック輸送による振動等によって荷物が安定しない可能性がある。そこで、複数の建物ユニットがそれぞれ固定された状態で1つの輸送手段に積層載置できるユニット輸送用治具を設けることが望ましい。 However, according to the transport tool described in Patent Document 1, only the lowest unit among the plurality of balcony units stacked and mounted is fixed to the transport tool. The unit above the bottom unit is placed on the upper surface of the lower unit, and is fixed to the truck bed by a rope hung from the upper surface side of the top unit. Therefore, the luggage may not be stable due to vibration caused by truck transportation. Therefore, it is desirable to provide a unit transport jig that can be stacked and mounted on one transport means with a plurality of building units fixed to each other.

本発明は、上記事実を考慮し、複数の建物ユニットがそれぞれ固定された状態で1つの輸送手段に積層載置できるユニット輸送用治具を得ることを目的とする。 In consideration of the above facts, an object of the present invention is to obtain a unit transport jig that can be laminated and mounted on one transport means in a state where a plurality of building units are fixed to each other.

第1の態様に係るユニット輸送用治具は、段積みされた複数の建物ユニットの一方の端部を固定する第1固定部を備えた架台と、下端が前記架台に固定され、前記複数の建物ユニットの他方の端部を固定する第2固定部を備えた縦治具と、上下に段積みされた前記複数の建物ユニットの上段側の前記建物ユニットと下段側の前記建物ユニットとの間に設けられ、一方の端部が前記架台に支持されると共に、他方の端部が前記縦治具に固定された第1横治具と、前記第1横治具の上面に、平面視で前記第1横治具と直交するように載置され、上面に前記建物ユニットが載置される第2横治具と、を含んで構成されている。 The unit transport jig according to the first aspect has a pedestal provided with a first fixing portion for fixing one end of a plurality of stacked building units, and the plurality of pedestals having a lower end fixed to the pedestal. Between the vertical jig provided with the second fixing portion for fixing the other end of the building unit and the building unit on the upper stage side and the building unit on the lower stage side of the plurality of building units stacked one above the other. One end is supported by the gantry, and the other end is fixed to the vertical jig on the first horizontal jig and the upper surface of the first horizontal jig in a plan view. It is configured to include a second horizontal jig that is placed so as to be orthogonal to the first horizontal jig and on which the building unit is placed on the upper surface.

第1の態様に係るユニット輸送用治具によれば、段積みされた複数の建物ユニットの一方の端部が架台の第1固定部に固定される。また、複数の建物ユニットの他方の端部は、縦治具の第2固定部に固定される。これにより、複数の建物ユニットをそれぞれ輸送用治具に固定した状態で1つの輸送手段に積層載置することができる。 According to the unit transport jig according to the first aspect, one end of a plurality of stacked building units is fixed to the first fixing portion of the gantry. Further, the other end of the plurality of building units is fixed to the second fixing portion of the vertical jig. As a result, the plurality of building units can be stacked and placed on one transport means in a state of being fixed to the transport jig.

さらに、第1の態様に係るユニット輸送用治具によれば、上下段に段積みされた複数の建物ユニットの上段側のユニットと下段側のユニットとの間には、一方の端部が架台に支持されると共に、他方の端部が縦治具に固定された第1横治具が設けられている。また、第1横治具の上面には、平面視で第1横治具と直交するように第2横治具が載置されている。このため、上段側のユニットと下段側のユニットとを直接接触させることなく輸送用治具に積層載置することができる。これにより、複数の建物ユニットを安定して積層載置することができる。 Further, according to the unit transport jig according to the first aspect, one end is pedestal between the upper unit and the lower unit of the plurality of building units stacked in the upper and lower stages. A first horizontal jig is provided in which the other end is fixed to a vertical jig. Further, a second horizontal jig is placed on the upper surface of the first horizontal jig so as to be orthogonal to the first horizontal jig in a plan view. Therefore, the unit on the upper stage side and the unit on the lower stage side can be laminated and placed on the transportation jig without directly contacting each other. As a result, a plurality of building units can be stably stacked and placed.

第2の態様に係るユニット輸送用治具は、第1の態様において、前記複数の建物ユニットは、前記一方の端部が前記架台の前記第1固定部に第1方向から固定され、前記他方の端部が前記縦治具の前記第2固定部に平面視で前記第1方向と直交する第2方向から固定される。 In the unit transport jig according to the second aspect, in the first aspect, one end of the plurality of building units is fixed to the first fixing portion of the gantry from the first direction, and the other end thereof is fixed to the first fixing portion of the gantry. The end portion of the vertical jig is fixed to the second fixing portion of the vertical jig from the second direction orthogonal to the first direction in a plan view.

第2の態様に係るユニット輸送用治具によれば、複数の建物ユニットは、一方の端部が第1固定部に第1方向から固定されると共に、他方の端部が第2固定部に第1方向と平面視で直交する第2方向から固定されている。このため、例えば、複数の建物ユニットの重心が、輸送用治具の中央部からずれるような場合であっても、複数の建物ユニットを安定して固定することができる。これにより、複数の建物ユニットを安定して輸送することができる。 According to the unit transport jig according to the second aspect, in the plurality of building units, one end is fixed to the first fixing portion from the first direction, and the other end is fixed to the second fixing portion. It is fixed from the second direction, which is orthogonal to the first direction in a plan view. Therefore, for example, even if the center of gravity of the plurality of building units deviates from the central portion of the transportation jig, the plurality of building units can be stably fixed. As a result, a plurality of building units can be stably transported.

第3の態様に係るユニット輸送用治具は、第1又は第2の態様の何れか1の態様において、前記架台は、前記第1横治具の前記一方の端部を挟み込むように配置された一対のプレート部を備えている。 The unit transport jig according to the third aspect is arranged so as to sandwich the one end of the first horizontal jig in any one aspect of the first or second aspect. It is provided with a pair of plate portions.

第3の態様に係るユニット輸送用治具によれば、架台には、第1横治具の一方の端部を挟み込むように配置された一対のプレート部が備えられている。このため、第1横治具は、架台に安定的に支持される。これにより、建物ユニットと第2横治具が載置される第1横治具を安定的に支持することができる。 According to the unit transport jig according to the third aspect, the gantry is provided with a pair of plate portions arranged so as to sandwich one end of the first horizontal jig. Therefore, the first horizontal jig is stably supported by the gantry. As a result, the building unit and the first horizontal jig on which the second horizontal jig is placed can be stably supported.

第4の態様に係るユニット輸送用治具は、第1から第3の態様の何れか1の態様において、前記架台は、前記第1固定部に固定された前記建物ユニットが載置される側と前記第1固定部に対して反対側の端部に設けられ、前記第1固定部を補強する補強部を備えている。 The unit transport jig according to the fourth aspect is the side in which the building unit fixed to the first fixing portion is placed on the gantry in any one of the first to third aspects. It is provided at the end opposite to the first fixing portion, and is provided with a reinforcing portion for reinforcing the first fixing portion.

第4の態様に係るユニット輸送用治具によれば、架台の第1固定部に固定された建物ユニットが載置される側と第1固定部に対して反対側の端部に、補強部が備えられ、第1固定部が補強されている。このため、建物ユニットが固定される第1固定部の強度を補強することができる。また、例えば、同じ向きに複数の建物ユニットが積層載置されることにより、複数の建物ユニットの重心位置が、輸送用治具の中央部から離れた位置に設けられる場合であっても、輸送用治具全体としての重心位置の偏りを抑制することができる。これにより、複数の建物ユニットを輸送用治具に安定して固定することができる。 According to the unit transport jig according to the fourth aspect, the reinforcing portion is located on the side where the building unit fixed to the first fixing portion of the gantry is placed and at the end opposite to the first fixing portion. Is provided, and the first fixing portion is reinforced. Therefore, it is possible to reinforce the strength of the first fixing portion to which the building unit is fixed. Further, for example, by stacking a plurality of building units in the same direction, even if the position of the center of gravity of the plurality of building units is provided at a position away from the central portion of the transport jig, the transport is performed. It is possible to suppress the deviation of the position of the center of gravity of the jig as a whole. As a result, a plurality of building units can be stably fixed to the transportation jig.

第5の態様に係る第1の態様から第4の態様の何れか1の態様に記載のユニット輸送用治具を用いた輸送方法は、下段側の前記建物ユニットを前記架台に載置する第1工程と、下段側の前記建物ユニットの一方の端部を前記架台の第1固定部に固定すると共に、下端が前記架台に固定された前記縦治具の第2固定部に下段側の前記建物ユニットの他方の端部を固定する第2工程と、下段側の前記建物ユニットの上段側に、一方の端部が前記架台に支持されると共に、他方の端部が前記縦治具に固定された前記第1横治具を配置する第3工程と、前記第1横治具の上面に、平面視で前記第1横治具と直交するように前記第2横治具を載置する第4工程と、前記第2横治具の上面に上段側の前記建物ユニットを載置する第5工程と、上段側の前記建物ユニットの一方の端部を前記架台の前記第1固定部に固定すると共に、他方の端部を前記縦治具の第2固定部に固定する第6工程と、を含んで構成されている。 In the transportation method using the unit transportation jig according to any one of the first to fourth aspects according to the fifth aspect, the building unit on the lower stage side is placed on the gantry. In one step, one end of the building unit on the lower stage side is fixed to the first fixing portion of the gantry, and the lower end is fixed to the second fixing portion of the vertical jig fixed to the gantry. In the second step of fixing the other end of the building unit, one end is supported by the gantry on the upper side of the building unit on the lower side, and the other end is fixed to the vertical jig. The second horizontal jig is placed on the upper surface of the first horizontal jig and the third step of arranging the first horizontal jig so as to be orthogonal to the first horizontal jig in a plan view. The fourth step, the fifth step of placing the building unit on the upper stage side on the upper surface of the second horizontal jig, and one end of the building unit on the upper stage side to the first fixing portion of the gantry. It is configured to include a sixth step of fixing and fixing the other end portion to the second fixing portion of the vertical jig.

第5の態様に係るユニット輸送用治具を用いた輸送方法によれば、第1工程において架台の上面側に載置された下段側の建物ユニットは、第2工程において架台の第1固定部と縦治具の第2固定部とに固定される。このため、下段側の建物ユニットは、輸送用治具に安定して固定される。また、第5工程において第1横治具と平面視で直交するように載置された第2横治具の上面に載置された上段側の建物ユニットは、第6工程において架台の第1固定部と縦治具の第2固定部とに固定される。このため、上段側の建物ユニットは、輸送用治具に安定して固定される。これにより、複数の建物ユニットがそれぞれ固定された状態で積層載置された輸送用治具を1つの輸送手段に積載して輸送することができる。 According to the transportation method using the unit transportation jig according to the fifth aspect, the building unit on the lower stage side mounted on the upper surface side of the gantry in the first step is the first fixing portion of the gantry in the second step. And the second fixing part of the vertical jig. Therefore, the building unit on the lower stage side is stably fixed to the transportation jig. Further, the building unit on the upper stage side mounted on the upper surface of the second horizontal jig mounted so as to be orthogonal to the first horizontal jig in the fifth step is the first of the gantry in the sixth step. It is fixed to the fixing portion and the second fixing portion of the vertical jig. Therefore, the building unit on the upper stage side is stably fixed to the transportation jig. As a result, it is possible to load and transport the transport jigs in which a plurality of building units are laminated and mounted in a fixed state on one transport means.

以上説明したように、第1の態様に係るユニット輸送用治具は、複数の建物ユニットがそれぞれ固定された状態で1つの輸送手段に積層載置できるという優れた効果を有する。 As described above, the unit transport jig according to the first aspect has an excellent effect that a plurality of building units can be laminated and mounted on one transport means in a fixed state.

第2の態様に係るユニット輸送用治具は、建物ユニットの重心が、輸送用治具の中央部からずれるような場合であっても、これらのユニットを輸送用治具に安定して固定することができるという優れた効果を有する。 The unit transport jig according to the second aspect stably fixes these units to the transport jig even when the center of gravity of the building unit deviates from the central portion of the transport jig. It has the excellent effect of being able to.

第3の態様に係るユニット輸送用治具は、建物ユニットと第2横治具が載置される第1横治具を安定的に支持することができるという優れた効果を有する。 The unit transport jig according to the third aspect has an excellent effect that the building unit and the first horizontal jig on which the second horizontal jig is placed can be stably supported.

第4の態様に係るユニット輸送用治具は、複数の建物ユニットが固定された第1固定部の強度を補強することができると共にこれらのユニットが載置された輸送用治具の重心位置が偏ることを抑制することができるという優れた効果を有する。 The unit transport jig according to the fourth aspect can reinforce the strength of the first fixing portion to which a plurality of building units are fixed, and the position of the center of gravity of the transport jig on which these units are mounted is set. It has an excellent effect of being able to suppress bias.

第5の態様に係るユニット輸送用治具を用いた輸送方法は、複数の建物ユニットがそれぞれ固定された状態で積層載置された輸送用治具を1つの輸送手段に積載して輸送することができるという優れた効果を有する。 In the transportation method using the unit transportation jig according to the fifth aspect, the transportation jigs in which a plurality of building units are laminated and mounted in a fixed state are loaded on one transportation means and transported. It has an excellent effect of being able to do.

本実施形態に係る建物ユニットが適用された建物の2階部分を示す平面図である。It is a top view which shows the 2nd floor part of the building to which the building unit which concerns on this embodiment is applied. 本実施形態に係るユニット輸送用治具の斜視図である。It is a perspective view of the unit transport jig which concerns on this embodiment. 本実施形態に係るユニット輸送用治具の側面図である。It is a side view of the unit transport jig which concerns on this embodiment. 本実施形態に係るユニット輸送用治具を用いた輸送方法の第1工程を示した斜視図である。It is a perspective view which showed the 1st process of the transportation method using the unit transportation jig which concerns on this embodiment. 本実施形態に係るユニット輸送用治具を用いた輸送方法の第2工程を示した斜視図である。It is a perspective view which showed the 2nd process of the transportation method using the unit transportation jig which concerns on this embodiment. 本実施形態に係るユニット輸送用治具を用いた輸送方法の第3工程を示した斜視図である。It is a perspective view which showed the 3rd process of the transportation method using the unit transportation jig which concerns on this embodiment. 本実施形態に係るユニット輸送用治具を用いた輸送方法の第4工程を示した斜視図である。It is a perspective view which showed the 4th process of the transportation method using the unit transportation jig which concerns on this embodiment. 本実施形態に係るユニット輸送用治具を用いた輸送方法の第5工程を示した斜視図である。It is a perspective view which showed the 5th process of the transportation method using the unit transportation jig which concerns on this embodiment. 本実施形態に係るユニット輸送用治具を用いた輸送方法の第6工程における上段の外廊下ユニットの第1固定部への固定を示した斜視図である。It is a perspective view which showed the fixing to the 1st fixing part of the outer corridor unit of the upper stage in the 6th process of the transportation method using the unit transportation jig which concerns on this embodiment. 本実施形態に係るユニット輸送用治具を用いた輸送方法の第6工程における上段の外廊下ユニットの第2固定部への固定を示した斜視図である。It is a perspective view which showed the fixing to the 2nd fixing part of the upper corridor unit in the 6th process of the transportation method using the unit transportation jig which concerns on this embodiment.

以下、図1~図10を用いて、本発明に係るユニット輸送用治具の一実施形態について説明する。なお、これらの図において適宜示される矢印UPは輸送用治具の治具上方側を示している。 Hereinafter, an embodiment of the unit transport jig according to the present invention will be described with reference to FIGS. 1 to 10. The arrows UP appropriately shown in these figures indicate the upper side of the transport jig.

(ユニット式建物の構成)
図1には、ユニット式建物により構成された建物12の一例として、複数の住戸を有する二階建ての集合住宅14(例えばアパートやマンション)の2階部分を示す平面図が示されている。集合住宅14は、図示しない基礎上に固定され、複数の建物ユニットとしての箱型ユニット16が互いに連結されることによって構成されており、一階部分(図示省略)と2階部分14Aとを有する2階建てユニット式建物として構成されている。ここでは、「建物ユニット」とは、箱型ユニット16及び後述する外廊下ユニット24やバルコニーユニット等も含めたユニット式建物を構成するためのユニットを総称する。
(Structure of unit type building)
FIG. 1 shows a plan view showing a second floor portion of a two-story apartment house 14 (for example, an apartment or condominium) having a plurality of dwelling units as an example of a building 12 composed of a unit type building. The apartment house 14 is fixed on a foundation (not shown), and is configured by connecting box-shaped units 16 as a plurality of building units to each other, and has a first floor portion (not shown) and a second floor portion 14A. It is configured as a two-story unit type building. Here, the “building unit” is a general term for units for forming a unit-type building including a box-shaped unit 16, an outer corridor unit 24 and a balcony unit, which will be described later.

集合住宅14の2階部分14Aには、複数の箱型ユニット16が連結されることにより構成され、横並びに(集合住宅14の長手方向に沿って)設けられた複数の住戸18と、各住戸18に通じる共用廊下を形成する外廊下20と、が設けられている。各住戸18はそれぞれ内部に居住空間18A(住戸内空間)を有しており、各住戸18の内側の居住空間18Aは仕切壁22により外廊下20と仕切られている。 The second floor portion 14A of the apartment house 14 is composed of a plurality of box-shaped units 16 connected to each other, and a plurality of dwelling units 18 provided side by side (along the longitudinal direction of the apartment house 14) and each dwelling unit. An outer corridor 20 and an outer corridor 20 forming a common corridor leading to 18 are provided. Each dwelling unit 18 has a living space 18A (space inside the dwelling unit) inside, and the living space 18A inside each dwelling unit 18 is separated from the outer corridor 20 by a partition wall 22.

外廊下20は、複数の建物ユニットとしての外廊下ユニット24が連結されることにより構成され、各住戸18の並び方向(集合住宅14の長手方向)に延在されている。外廊下20は、屋外に開放された屋外廊下とされており、外廊下20の屋外側となる外廊下軒先側には、腰壁を形成する腰壁部34が設けられている。また、外廊下20は共用外階段28に通じており、その共用外階段28を介して一階部分への行き来が可能とされている。 The outer corridor 20 is configured by connecting the outer corridor units 24 as a plurality of building units, and extends in the arrangement direction of each dwelling unit 18 (longitudinal direction of the apartment house 14). The outer corridor 20 is an outdoor corridor open to the outside, and a waist wall portion 34 forming a waist wall is provided on the eaves side of the outer corridor, which is the outdoor side of the outer corridor 20. Further, the outer corridor 20 leads to the common outer stairs 28, and it is possible to go to and from the first floor through the common outer stairs 28.

図4には、外廊下ユニット24の斜視図が示されている。外廊下ユニット24は、廊下を形成する床部32と、外廊下軒先側に形成された腰壁部34と、を含んで構成されている。床部32は、その外廊下軒先側に集合住宅14の長手方向に沿って配置された床大梁36と、集合住宅14の長手方向に沿って所定の間隔を空けて配置され、集合住宅14の短手方向に沿って延在された複数の床小梁38と、を含んで構成されている。 FIG. 4 shows a perspective view of the outer corridor unit 24. The outer corridor unit 24 includes a floor portion 32 forming the corridor and a waist wall portion 34 formed on the eaves side of the outer corridor. The floor portion 32 is arranged on the eaves side of the outer corridor along the longitudinal direction of the apartment house 14 and the floor girder 36, and is arranged at a predetermined interval along the longitudinal direction of the apartment house 14. It is configured to include a plurality of floor beams 38 extending along the lateral direction.

床大梁36は、外廊下20の内側(住戸18側)へ向けて開放された溝形鋼により構成されている。また、床小梁38は、集合住宅14の長手方向へ向けて開放された溝形鋼により構成されている。複数の床小梁38は、その外廊下軒先側の端部が接合された床大梁36の溝部36Aと各住戸18の箱型ユニット16の床フレームを構成する住戸側床大梁(図示省略)との間に架け渡されている。床小梁38の住戸18側(外廊下根元側)の端部には、床小梁38の上方側のフランジ部の端部と下方側のフランジ部の端部を繋ぐように板状に形成された補助プレート39が接合されている。また、床小梁38のうち所定の位置に配置された床小梁38の外廊下根元側端部には、取付ブラケット40が接合されている。取付ブラケット40は、板状に形成され、内側には、住戸側床大梁にボルト締結するための孔部40Aがその板厚方向に沿って貫通形成されている。 The floor girder 36 is made of channel steel that is open toward the inside of the outer corridor 20 (on the side of the dwelling unit 18). Further, the floor beam 38 is made of channel steel that is open toward the longitudinal direction of the apartment house 14. The plurality of floor beams 38 include a groove 36A of the floor girder 36 to which the end on the eaves side of the outer corridor is joined, and a dwelling unit side floor girder (not shown) constituting the floor frame of the box-shaped unit 16 of each dwelling unit 18. It is bridged between. At the end of the floor beam 38 on the dwelling unit 18 side (outer corridor root side), a plate shape is formed so as to connect the end of the upper flange portion of the floor beam 38 and the end of the lower flange portion. The auxiliary plate 39 is joined. Further, a mounting bracket 40 is joined to the base side end of the outer corridor of the floor beam 38 arranged at a predetermined position among the floor beams 38. The mounting bracket 40 is formed in a plate shape, and a hole 40A for bolting to the floor girder on the dwelling unit side is formed through the inside along the plate thickness direction.

床大梁36の上側フランジ部36B及び床小梁38の上面には、床大梁36の長手方向(集合住宅14の長手方向)に沿って板状に形成され、外廊下20の排水溝を構成する溝用プレート42が配置されている。床小梁38の上面には、床大梁36の長手方向に沿って延在された複数の床板支持梁44が、床大梁36の長手方向の両端部に配置された床小梁38との間に架け渡されている。複数の床板支持梁44は、外廊下軒先側へ向けて開放された溝形鋼により形成され、溝用プレート42の外廊下根元側から床小梁38の外廊下根元側端部に亘って所定の間隔を空けて複数本配置されている。 The upper flange portion 36B of the floor girder 36 and the upper surface of the floor girder 38 are formed in a plate shape along the longitudinal direction of the floor girder 36 (longitudinal direction of the apartment house 14) to form a drainage groove of the outer corridor 20. A groove plate 42 is arranged. On the upper surface of the floor girder 38, a plurality of floor plate support beams 44 extending along the longitudinal direction of the floor girder 36 are provided between the floor girders 38 arranged at both ends in the longitudinal direction of the floor girder 36. It is hung on the floor. The plurality of floor plate support beams 44 are formed of channel steel that is open toward the eaves side of the outer corridor, and are predetermined from the outer corridor root side of the groove plate 42 to the outer corridor root side end of the floor beam 38. Multiple lines are arranged at intervals of.

外廊下軒先側の床板支持梁44は、溝用プレート42の外廊下根元側端部に沿って配置されている。このため、外廊下軒先側の床板支持梁44と溝用プレート42により排水溝を構成するための段差(溝)が形成されている。床板支持梁44の上面には、板状に形成され、外廊下20の床面を構成する廊下用プレート46が配置されている。 The floor plate support beam 44 on the eaves side of the outer corridor is arranged along the end on the root side of the outer corridor of the groove plate 42. Therefore, a step (groove) for forming a drainage groove is formed by the floor plate support beam 44 on the eaves side of the outer corridor and the groove plate 42. A corridor plate 46, which is formed in a plate shape and constitutes the floor surface of the outer corridor 20, is arranged on the upper surface of the floor plate support beam 44.

床大梁36のウエブ36Cの外廊下軒先側の面には、腰壁部34が接合されている。腰壁部34は、床大梁36のウエブ36Cに接合されると共に建物上方側へ向けて延在された柱部34Aと、柱部34Aの外側及び内側に図示しないビスによりそれぞれ固定された外壁パネル34B及び内壁パネル34Cと、を含んで構成されている。また、柱部34Aは、下端部に設けられた固定部材48(図6参照)が床大梁36のウエブ36Cにボルト締結されている。外壁パネル34B及び内壁パネル34Cは、例えば、サイディング材により構成されている。内壁パネル34Cのユニット下方側には、取付部材34Dが取り付けられており、取付部材34Dの上端から溝用プレート42の上面に亘って図示しない防水用シートが取り付けられている。 A waist wall portion 34 is joined to the surface of the floor girder 36 on the eaves side of the outer corridor of the web 36C. The waist wall portion 34 is a pillar portion 34A joined to the web 36C of the floor girder 36 and extended toward the upper side of the building, and an outer wall panel fixed to the outside and inside of the pillar portion 34A by screws (not shown), respectively. It is configured to include 34B and an inner wall panel 34C. Further, in the column portion 34A, a fixing member 48 (see FIG. 6) provided at the lower end portion is bolted to the web 36C of the floor girder 36. The outer wall panel 34B and the inner wall panel 34C are made of, for example, a siding material. A mounting member 34D is mounted on the lower side of the unit of the inner wall panel 34C, and a waterproof sheet (not shown) is mounted from the upper end of the mounting member 34D to the upper surface of the groove plate 42.

(輸送用治具の構成)
図2には、外廊下ユニット24を段積み(積層載置)するための輸送用治具10の斜視図が示されている。輸送用治具10の治具下方側には、複数の外廊下ユニット24A、24B(図3参照)を積層載置すると共に固定する架台52が形成されている。
(Composition of transportation jig)
FIG. 2 shows a perspective view of a transportation jig 10 for stacking (stacking) the outer corridor units 24. On the lower side of the jig 10 of the transport jig 10, a gantry 52 for laminating and fixing a plurality of outer corridor units 24A and 24B (see FIG. 3) is formed.

架台52は、載置される外廊下ユニット24の長手方向に沿った方向が長手方向とされている(図3参照)。複数の外廊下ユニット24が積層載置された架台52は、輸送手段、例えば、トラックの荷台の上面に載置される。 The gantry 52 has a longitudinal direction along the longitudinal direction of the outer corridor unit 24 on which the gantry 52 is mounted (see FIG. 3). The gantry 52 on which a plurality of outer corridor units 24 are stacked and mounted is mounted on the upper surface of a transportation means, for example, a truck bed.

架台52は、その下部を形成する梁部56と、梁部56の上面に形成された桁部58と、を含んで構成されている。梁部56は、角形鋼管により形成され、平面視で架台52の長手方向と直交する第1方向としての架台短手方向に延在された複数の梁部材56Aを含んで構成されている。梁部材56Aは、架台52の長手方向両端部と長手方向略中央部に配置されている。ここで、架台52の一方の長手方向端部としての架台第1端部に配置された梁部材56Aを第1梁部材62、他方の長手方向端部としての架台第2端部に配置された梁部材56Aを第2梁部材64と称する。また、架台52の長手方向略中央部に配置された梁部材56Aを第3梁部材66と称する。第1梁部材62と第3梁部材66の間には、2本の梁部材56Aが配置されている。これらのうち架台52の長手方向中央部に近い側の梁部材56Aを第4梁部材68、架台第1端部側の梁部材56Aを第5梁部材70と称する。第5梁部材70は、外廊下ユニット24の大きさ(長さ)に応じて、架台52の長手方向の位置が設定される。さらに、第2梁部材64と第3梁部材66の間にも梁部材56Aが設けられており、これを第6梁部材72と称する。 The gantry 52 is configured to include a beam portion 56 forming a lower portion thereof and a girder portion 58 formed on the upper surface of the beam portion 56. The beam portion 56 is formed of a square steel pipe, and includes a plurality of beam members 56A extending in the lateral direction of the gantry as a first direction orthogonal to the longitudinal direction of the gantry 52 in a plan view. The beam member 56A is arranged at both ends in the longitudinal direction of the gantry 52 and at substantially the center in the longitudinal direction. Here, the beam member 56A arranged at the first end of the gantry as one longitudinal end of the gantry 52 is arranged at the first beam member 62 and the second end of the gantry as the other longitudinal end. The beam member 56A is referred to as a second beam member 64. Further, the beam member 56A arranged at the substantially central portion in the longitudinal direction of the gantry 52 is referred to as a third beam member 66. Two beam members 56A are arranged between the first beam member 62 and the third beam member 66. Of these, the beam member 56A on the side close to the central portion in the longitudinal direction of the gantry 52 is referred to as a fourth beam member 68, and the beam member 56A on the side of the first end portion of the gantry is referred to as a fifth beam member 70. The position of the fifth beam member 70 in the longitudinal direction of the gantry 52 is set according to the size (length) of the outer corridor unit 24. Further, a beam member 56A is also provided between the second beam member 64 and the third beam member 66, and this is referred to as a sixth beam member 72.

第3梁部材66の架台52の長手方向両側には、梁部材56Aと共に梁部56を構成する持上用部材56Bがそれぞれ配置されている。持上用部材56Bには、その幅(架台52の長手方向の長さ)が梁部材56Aの幅よりも長い角形鋼管が用いられている。具体的には、持上用部材56Bの幅は、例えば、フォークリフトのフォーク(ツメ)が、角形鋼管の管内に挿入できる程度の長さに設定されている。 Lifting members 56B constituting the beam portion 56 are arranged together with the beam member 56A on both sides of the gantry 52 of the third beam member 66 in the longitudinal direction. A square steel pipe whose width (length in the longitudinal direction of the gantry 52) is longer than the width of the beam member 56A is used for the lifting member 56B. Specifically, the width of the lifting member 56B is set so that, for example, the fork (claw) of the forklift can be inserted into the pipe of the square steel pipe.

梁部56の治具上方側には、桁部58が形成されている。桁部58は、第1梁部材62から第2梁部材64に亘って架台52の長手方向に沿って延在され、梁部56の上面に接合された複数の桁部材58Aを含んで構成されている。桁部材58Aは、架台52の短手方向の両端部に配置されると共に外廊下ユニット24が積層載置される側に複数(2本)配置されている。ここで、外廊下ユニット24が積層載置される架台52の一方の短手方向端部としての第1短手方向端部に配置された桁部材58Aを第1桁部材82、架台52の他方の短手方向端部としての第2短手方向端部に配置された桁部材58Aを第2桁部材84、と称する。第1桁部材82は、治具下方側へ向けて開放された溝形鋼により形成され、第2桁部材84は、角形鋼管により形成されている。また、第1桁部材82と第2桁部材84の間には、外廊下ユニット24が積層載置される2本の桁部材58Aが配置されている。これらのうち、第1短手方向端部側に配置された桁部材58Aを第3桁部材86と称し、第2短手方向端部側に配置された桁部材58Aを第4梁部材88と称する。第3桁部材86と第4桁部材88は、角形鋼管により形成されている。 A girder portion 58 is formed on the upper side of the beam portion 56 of the jig. The girder portion 58 extends from the first beam member 62 to the second beam member 64 along the longitudinal direction of the gantry 52, and includes a plurality of girder members 58A joined to the upper surface of the beam portion 56. ing. The girder members 58A are arranged at both ends of the gantry 52 in the lateral direction, and a plurality (two) of the girder members 58A are arranged on the side where the outer corridor units 24 are laminated and mounted. Here, the girder member 58A arranged at the end in the first lateral direction as one end in the lateral direction of the gantry 52 on which the outer corridor unit 24 is laminated is placed on the other of the first girder member 82 and the gantry 52. The girder member 58A arranged at the end in the second short direction as the end in the short direction is referred to as the second girder member 84. The first girder member 82 is formed of channel steel that is open toward the lower side of the jig, and the second girder member 84 is formed of a square steel pipe. Further, between the first girder member 82 and the second girder member 84, two girder members 58A on which the outer corridor unit 24 is laminated and mounted are arranged. Of these, the girder member 58A arranged on the end side in the first lateral direction is referred to as the third girder member 86, and the girder member 58A arranged on the end side in the second lateral direction is referred to as the fourth beam member 88. Refer to. The third girder member 86 and the fourth girder member 88 are formed of a square steel pipe.

第5梁部材70以外の梁部材56Aには、第4桁部材88と第2桁部材84の間の位置に複数の下段用縦部材92及び上段用縦部材94が配置されている。複数の下段用縦部材92は、架台52の長手方向へ向けて開放され、治具上方側へ向けて延在された溝形鋼により構成されている。また、複数の上段用縦部材94は、下段用縦部材92よりも第2短手方向端部側に配置されている。複数の上段用縦部材94は、架台52の長手方向へ向けて開放され、治具上方側へ向けて延在された溝形鋼により構成されている。 In the beam member 56A other than the fifth beam member 70, a plurality of lower vertical members 92 and upper vertical members 94 are arranged at positions between the fourth girder member 88 and the second girder member 84. The plurality of lower vertical members 92 are made of channel steel that is opened toward the longitudinal direction of the gantry 52 and extends toward the upper side of the jig. Further, the plurality of upper vertical members 94 are arranged closer to the end side in the second lateral direction than the lower vertical member 92. The plurality of upper vertical members 94 are made of channel steel that is opened toward the longitudinal direction of the gantry 52 and extends toward the upper side of the jig.

複数の下段用縦部材92の第1短手方向端部側のフランジ92Aには、架台52の長手方向に沿って延在された下段用桁材96がボルト締結されている。下段用桁材96は、第1短手方向端部側へ向けて開放され、架台52の長手方向両端部に亘って延在された溝形鋼により構成されている。下段用桁材96のウエブ96Aには、第1固定部としての下側第1固定部98が形成されている。下側第1固定部98は、架台52に積層載置される下段側の外廊下ユニット24Aの取付ブラケット40(図3参照)の位置に対応して形成されている。下側第1固定部98には、下段用桁材96のウエブ96Aの板厚方向(架台52の短手方向)に沿ってボルト挿通孔98Aが貫通形成されている。架台52に載置された下段側の外廊下ユニット24Aの取付ブラケット40は、下側第1固定部98のボルト挿通孔98Aを介して下段用桁材96にボルト締結される。 A lower girder member 96 extending along the longitudinal direction of the gantry 52 is bolted to the flange 92A on the end side in the first lateral direction of the plurality of lower vertical members 92. The lower girder member 96 is made of channel steel that is opened toward the end side in the first lateral direction and extends over both ends in the longitudinal direction of the gantry 52. The lower first fixing portion 98 is formed as the first fixing portion on the web 96A of the lower girder member 96. The lower first fixing portion 98 is formed corresponding to the position of the mounting bracket 40 (see FIG. 3) of the lower corridor unit 24A laminated and mounted on the gantry 52. A bolt insertion hole 98A is formed through the lower first fixing portion 98 along the plate thickness direction (the lateral direction of the gantry 52) of the web 96A of the lower girder member 96. The mounting bracket 40 of the lower corridor unit 24A mounted on the gantry 52 is bolted to the lower girder member 96 via the bolt insertion hole 98A of the lower first fixing portion 98.

複数の上段用縦部材94の第1短手方向端部側のフランジ94Aには、架台52の長手方向に沿って延在された上段用桁材100がボルト締結されている。上段用桁材100は、第1短手方向端部側へ向けて開放され、架台52の長手方向両端部に亘って延在された溝形鋼により構成されている。上段用桁材100のウエブ100Aには、第1固定部としての上側第1固定部102が形成されている。上側第1固定部102は、架台52に積層載置される上段側の外廊下ユニット24Bの取付ブラケット40(図3参照)の位置に対応して形成されている。上側第1固定部102には、上段用桁材100のウエブ100Aの板厚方向(架台52の短手方向)に沿ってボルト挿通孔102Aが貫通形成されている。架台52に載置された上段側の外廊下ユニット24Bの取付ブラケット40は、上側第1固定部102のボルト挿通孔102Aを介して上段用桁材100にボルト締結されている。 An upper girder member 100 extending along the longitudinal direction of the gantry 52 is bolted to the flange 94A on the end side in the first lateral direction of the plurality of upper vertical members 94. The upper girder 100 is made of channel steel that is opened toward the end side in the first lateral direction and extends over both ends in the longitudinal direction of the gantry 52. The upper first fixing portion 102 as the first fixing portion is formed on the web 100A of the upper girder material 100. The upper first fixing portion 102 is formed corresponding to the position of the mounting bracket 40 (see FIG. 3) of the outer corridor unit 24B on the upper stage side which is laminated and mounted on the gantry 52. A bolt insertion hole 102A is formed through the upper first fixing portion 102 along the plate thickness direction (the lateral direction of the gantry 52) of the web 100A of the upper girder member 100. The mounting bracket 40 of the outer corridor unit 24B on the upper stage side mounted on the gantry 52 is bolted to the upper stage girder material 100 via the bolt insertion hole 102A of the upper first fixing portion 102.

複数の上段用縦部材94の第1短手方向端部側のフランジ94Aには、上段用桁材100の治具下方側において、架台52の長手方向両端部に亘って延在された支持部材104が接合されている。支持部材104は、縦壁104Aが架台上方側へ向けて延在されると共に横壁104Bが第1短手方向端部側へ向けて延在された山形鋼により構成され、縦壁104Aがフランジ94Aに接合されている。 The flange 94A on the end side in the first lateral direction of the plurality of vertical members 94 for the upper stage has a support member extending over both ends in the longitudinal direction of the gantry 52 on the lower side of the jig of the girder member 100 for the upper stage. 104 are joined. The support member 104 is made of angle steel in which the vertical wall 104A extends toward the upper side of the gantry and the horizontal wall 104B extends toward the end side in the first lateral direction, and the vertical wall 104A has a flange 94A. It is joined to.

支持部材104の第1梁部材62、第2梁部材64及び第5梁部材70側には、一対のプレート部としての一対の固定用プレート106が設けられている。固定用プレート106は、架台52の長手方向を板厚方向とし、その二辺が縦壁104Aの第1短手方向端部側と横壁104Bの治具上方側に接する略三角形状に形成され、縦壁104Aと横壁104Bとに接合されている。一対の固定用プレート106は、後述する第1横治具112の幅(架台52の長手方向長さ)に合わせた間隔を空けて支持部材104に接合されている。これにより、支持部材104に支持された第1横治具112が架台52の長手方向にスライドすることを防止することができる。 A pair of fixing plates 106 as a pair of plate portions are provided on the first beam member 62, the second beam member 64, and the fifth beam member 70 side of the support member 104. The fixing plate 106 has a longitudinal direction of the gantry 52 as a plate thickness direction, and its two sides are formed in a substantially triangular shape in contact with the end side in the first lateral direction of the vertical wall 104A and the upper side of the jig of the horizontal wall 104B. It is joined to the vertical wall 104A and the horizontal wall 104B. The pair of fixing plates 106 are joined to the support member 104 at intervals according to the width (length in the longitudinal direction of the gantry 52) of the first horizontal jig 112, which will be described later. This makes it possible to prevent the first horizontal jig 112 supported by the support member 104 from sliding in the longitudinal direction of the gantry 52.

図3に示されるように、外廊下ユニット24が積層載置される架台52の第1短手方向端部と上側第1固定部102に対して反対側の端部となる架台52の第2短手方向端部側には、第5梁部材70以外の梁部材56Aに、補強部としての補強部材108が配置されている。補強部材108は、架台52の長手方向へ向けて開放され、梁部材56Aの第2短手方向端部側から第1短手方向端部側かつ治具上方側へ向けて延在された溝形鋼により構成されている。補強部材108の下端部は、梁部材56Aの側面に接合され、上端部が上段用縦部材94の治具上方側に接合されている。 As shown in FIG. 3, the second end of the gantry 52, which is the end opposite to the first lateral end of the gantry 52 on which the outer corridor unit 24 is laminated and the upper first fixing portion 102, is located. On the end side in the lateral direction, a reinforcing member 108 as a reinforcing portion is arranged on the beam member 56A other than the fifth beam member 70. The reinforcing member 108 is opened toward the longitudinal direction of the gantry 52, and is a groove extending from the end side in the second short direction of the beam member 56A toward the end side in the first short direction and toward the upper side of the jig. It is composed of shaped steel. The lower end of the reinforcing member 108 is joined to the side surface of the beam member 56A, and the upper end is joined to the upper side of the jig of the upper vertical member 94.

図2に示されるように、第1梁部材62の上面には、第1桁部材82と第3桁部材86の間に、治具上方側に延在された縦治具としての第1縦治具122が配置されている。第1縦治具122は、第1縦固定部材152を介して第1梁部材62の上面に固定されている。第1縦固定部材152は、山形鋼で形成され、その縦壁が、第1縦治具122の第2短手方向端部側のフランジにボルト締結されると共に、横壁が第1梁部材62の上面にボルト締結されている。また、第1縦治具122の第1短手方向端部側のフランジの下端部は、隣接する第1桁部材82の側部82Aにボルト締結されている(図示省略)。 As shown in FIG. 2, on the upper surface of the first beam member 62, a first vertical jig as a vertical jig extending above the jig between the first girder member 82 and the third girder member 86. The jig 122 is arranged. The first vertical jig 122 is fixed to the upper surface of the first beam member 62 via the first vertical fixing member 152. The first vertical fixing member 152 is made of angle steel, and the vertical wall thereof is bolted to the flange on the end side in the second lateral direction of the first vertical jig 122, and the horizontal wall is the first beam member 62. It is bolted to the upper surface of the. Further, the lower end of the flange of the first vertical jig 122 on the end side in the first lateral direction is bolted to the side portion 82A of the adjacent first girder member 82 (not shown).

図3に示されるように、第2梁部材64の上面には、第1桁部材82と第3桁部材86の間に、治具上方側に延在された縦治具としての第2縦治具124が配置されている。第2縦治具124は、第2縦固定部材154を介して第2梁部材64の上面に固定されている。第2縦固定部材154は、山形鋼で形成され、その縦壁が、第2縦治具124の第2短手方向端部側のフランジにボルト締結されると共に、横壁が第2梁部材64の上面にボルト締結されている。また、第2縦治具124の第1短手方向端部側のフランジの下端部は、隣接する第1桁部材82の側部82Aにボルト締結されている。 As shown in FIG. 3, on the upper surface of the second beam member 64, a second vertical jig as a vertical jig extending above the jig between the first girder member 82 and the third girder member 86. The jig 124 is arranged. The second vertical jig 124 is fixed to the upper surface of the second beam member 64 via the second vertical fixing member 154. The second vertical fixing member 154 is made of angle steel, and the vertical wall thereof is bolted to the flange on the end side in the second lateral direction of the second vertical jig 124, and the horizontal wall is the second beam member 64. It is bolted to the upper surface of the. Further, the lower end of the flange on the end side in the first lateral direction of the second vertical jig 124 is bolted to the side portion 82A of the adjacent first girder member 82.

図2に示されるように、第5梁部材70の上面には、第1桁部材82と第3桁部材86の間で、架台上方側に延在された縦治具としての第3縦治具126が配置されている。第3縦治具126は、第3縦固定部材156を介して第5梁部材70の上面に固定されている。第3縦固定部材156は、山形鋼で形成され、その縦壁が、第5梁部材70の第2短手方向端部側のフランジにボルト締結されると共に、横壁が第5梁部材70の上面にボルト締結されている。また、第3縦治具126の第1短手方向端部側のフランジの下端部は、隣接する第1桁部材82の側部82Aにボルト締結されている(図示省略)。 As shown in FIG. 2, on the upper surface of the fifth beam member 70, there is a third vertical jig as a vertical jig extending above the gantry between the first girder member 82 and the third girder member 86. The tool 126 is arranged. The third vertical jig 126 is fixed to the upper surface of the fifth beam member 70 via the third vertical fixing member 156. The third vertical fixing member 156 is made of angle steel, and the vertical wall thereof is bolted to the flange on the end side in the second lateral direction of the fifth beam member 70, and the horizontal wall is the fifth beam member 70. Bolted to the top surface. Further, the lower end of the flange of the third vertical jig 126 on the end side in the first lateral direction is bolted to the side portion 82A of the adjacent first girder member 82 (not shown).

図3に示されるように、第2縦治具124のウエブ124Aの治具下方側には、下段側の外廊下ユニット24Aを固定するための第2固定部としての下側第2固定部138が形成されている。下側第2固定部138は、架台52に積層載置される下段側の外廊下ユニット24Aの治具上下方向位置に対応して形成されている。下側第2固定部138には、第2縦治具124のウエブ124Aの板厚方向(架台52の長手方向)に沿ってボルト挿通孔138Aが貫通形成されている。架台52に載置された下段側の外廊下ユニット24Aの長手方向端部は、外廊下ユニット24Aの長手方向端部に形成された図示しないボルト挿通孔と下側第2固定部138のボルト挿通孔138Aに挿通されたボルトにより第2縦治具124に第2方向としての架台52の長手方向から固定されている。 As shown in FIG. 3, on the lower side of the web 124A of the second vertical jig 124, the lower second fixing portion 138 as the second fixing portion for fixing the lower outer corridor unit 24A. Is formed. The lower second fixing portion 138 is formed corresponding to the position in the vertical direction of the jig of the outer corridor unit 24A on the lower stage side which is laminated and mounted on the gantry 52. A bolt insertion hole 138A is formed through the lower second fixing portion 138 along the plate thickness direction (longitudinal direction of the gantry 52) of the web 124A of the second vertical jig 124. The longitudinal end of the lower outer corridor unit 24A mounted on the gantry 52 has a bolt insertion hole (not shown) formed at the longitudinal end of the outer corridor unit 24A and a bolt insertion of the lower second fixing portion 138. It is fixed to the second vertical jig 124 by a bolt inserted through the hole 138A from the longitudinal direction of the gantry 52 as the second direction.

図5及び図4に示されるように、第3縦治具126のウエブ126Aの治具下方側には、下段側の外廊下ユニット24Aを固定するための第2固定部としての下側第2固定部138が形成されている。下側第2固定部138は、架台52に積層載置される下段側の外廊下ユニット24Aの治具上下方向位置に対応して形成されている。下側第2固定部138には、第3縦治具126のウエブ126Aの板厚方向(架台52の長手方向)に沿ってボルト挿通孔138Aが貫通形成されている。架台52に載置された下段側の外廊下ユニット24Aの長手方向端部は、外廊下ユニット24Aの長手方向端部に形成された図示しないボルト挿通孔と下側第2固定部138のボルト挿通孔138Aに挿通されたボルトにより第3縦治具126に架台52の長手方向から固定されている。 As shown in FIGS. 5 and 4, on the lower side of the web 126A of the third vertical jig 126, the lower second as a second fixing portion for fixing the lower outer corridor unit 24A. A fixing portion 138 is formed. The lower second fixing portion 138 is formed corresponding to the position in the vertical direction of the jig of the outer corridor unit 24A on the lower stage side which is laminated and mounted on the gantry 52. A bolt insertion hole 138A is formed through the lower second fixing portion 138 along the plate thickness direction (longitudinal direction of the gantry 52) of the web 126A of the third vertical jig 126. The longitudinal end of the lower outer corridor unit 24A mounted on the gantry 52 has a bolt insertion hole (not shown) formed at the longitudinal end of the outer corridor unit 24A and a bolt insertion of the lower second fixing portion 138. It is fixed to the third vertical jig 126 from the longitudinal direction of the gantry 52 by a bolt inserted through the hole 138A.

図6に示されるように、架台52に載置された下段側の外廊下ユニット24Aの治具上方側には、上段側の外廊下ユニット24Bを載置するために第1横治具112と第2横治具114、116が配置されている。第1横治具112は、架台52の短手方向に沿って延在された角形鋼管により構成され、架台52の複数箇所(3箇所)に配置されている。複数の第1横治具112の第1短手方向端部側の端部は、第1縦治具122、第2縦治具124及び第3縦治具126にそれぞれ固定され、第2短手方向端部側の端部は、支持部材104に支持されている。架台52に配置された第1横治具112の上面には、平面視で第1横治具112と直交する方向(架台52の長手方向)に沿って延在され、角形鋼板で構成された第2横治具114、116が配置されている。 As shown in FIG. 6, on the upper side of the jig of the lower outer corridor unit 24A mounted on the gantry 52, the first horizontal jig 112 is used to mount the upper outer corridor unit 24B. The second horizontal jigs 114 and 116 are arranged. The first horizontal jig 112 is composed of a square steel pipe extending along the lateral direction of the gantry 52, and is arranged at a plurality of locations (three locations) of the gantry 52. The ends of the plurality of first horizontal jigs 112 on the end side in the first lateral direction are fixed to the first vertical jig 122, the second vertical jig 124, and the third vertical jig 126, respectively, and the second short jig 112 is used. The end on the hand side is supported by the support member 104. The upper surface of the first horizontal jig 112 arranged on the gantry 52 extends along a direction orthogonal to the first horizontal jig 112 (longitudinal direction of the gantry 52) in a plan view, and is composed of a square steel plate. The second horizontal jigs 114 and 116 are arranged.

図2に示されるように、第1縦治具122に固定された第1横治具112の第1短手方向端部側の端部は、第1縦治具122のウエブ122Aの治具上方側に形成された第3固定部132に固定されている。第3固定部132には、第1縦治具122のウエブ122Aの板厚方向(架台52の長手方向)に沿ってボルト挿通孔(図示省略)が貫通形成されている。第1横治具112の第1短手方向端部側の端部は、第1横治具112に形成された図示しないボルト挿通孔及び第3固定部132のボルト挿通孔に挿通されたボルトにより第1縦治具122に固定されている。 As shown in FIG. 2, the end portion of the first horizontal jig 112 fixed to the first vertical jig 122 on the end side in the first lateral direction is a jig of the web 122A of the first vertical jig 122. It is fixed to the third fixing portion 132 formed on the upper side. A bolt insertion hole (not shown) is formed through the third fixing portion 132 along the plate thickness direction (longitudinal direction of the gantry 52) of the web 122A of the first vertical jig 122. The end of the first horizontal jig 112 on the end side in the first lateral direction is a bolt inserted into a bolt insertion hole (not shown) formed in the first horizontal jig 112 and a bolt insertion hole of the third fixing portion 132. It is fixed to the first vertical jig 122 by.

図3に示されるように、第2縦治具124に固定された第1横治具112の第1短手方向端部側の端部は、第2縦治具124のウエブ124Aの治具上方側に形成された第3固定部132に固定されている。第3固定部132には、第2縦治具124のウエブ124Aの板厚方向(架台52の長手方向)に沿ってボルト挿通孔132Aが貫通形成されている。第1横治具112の第1短手方向端部側の端部は、第1横治具112に形成された図示しないボルト挿通孔及び第3固定部132のボルト挿通孔132Aに挿通されたボルトにより第2縦治具124に固定されている。 As shown in FIG. 3, the end portion of the first horizontal jig 112 fixed to the second vertical jig 124 on the end side in the first lateral direction is a jig of the web 124A of the second vertical jig 124. It is fixed to the third fixing portion 132 formed on the upper side. A bolt insertion hole 132A is formed through the third fixing portion 132 along the plate thickness direction (longitudinal direction of the gantry 52) of the web 124A of the second vertical jig 124. The end of the first horizontal jig 112 on the end side in the first lateral direction was inserted into a bolt insertion hole (not shown) formed in the first horizontal jig 112 and a bolt insertion hole 132A of the third fixing portion 132. It is fixed to the second vertical jig 124 by bolts.

図5及び図4に示されるように、第1縦治具122に固定された第1横治具112の第1短手方向端部側の端部は、第1縦治具122のウエブ122Aの治具上方側に形成された第3固定部132に固定されている。第3固定部132には、第1縦治具122のウエブ122Aの板厚方向(架台52の長手方向)に沿ってボルト挿通孔132Aが貫通形成されている。第1横治具112の第1短手方向端部側の端部は、第1横治具112に形成された図示しないボルト挿通孔及び第3固定部132のボルト挿通孔132Aに挿通されたボルトにより第1縦治具122に固定されている。 As shown in FIGS. 5 and 4, the end portion of the first horizontal jig 112 fixed to the first vertical jig 122 on the end side in the first lateral direction is the web 122A of the first vertical jig 122. It is fixed to the third fixing portion 132 formed on the upper side of the jig. A bolt insertion hole 132A is formed through the third fixing portion 132 along the plate thickness direction (longitudinal direction of the gantry 52) of the web 122A of the first vertical jig 122. The end of the first horizontal jig 112 on the end side in the first lateral direction was inserted into a bolt insertion hole (not shown) formed in the first horizontal jig 112 and a bolt insertion hole 132A of the third fixing portion 132. It is fixed to the first vertical jig 122 by bolts.

図3に示されるように、第2縦治具124及び第3縦治具126に固定された第1横治具112の上面の第1短手方向端部側に第2横治具114が載置されている。また、第1縦治具122、第2縦治具124及び第3縦治具126に固定された第1横治具112の上面の第2短手方向端部側に第2横治具116が載置されている。第2横治具114、116の架台52の短手方向の両側の第1横治具112の上面には、山形鋼により形成された係止部材118が取り付けられている。これにより、第2横治具114、116が架台52の短手方向にスライドすることを防止されている。 As shown in FIG. 3, the second horizontal jig 114 is located on the end side in the first lateral direction of the upper surface of the first horizontal jig 112 fixed to the second vertical jig 124 and the third vertical jig 126. It is placed. Further, the second horizontal jig 116 is located on the end side in the second lateral direction of the upper surface of the first horizontal jig 112 fixed to the first vertical jig 122, the second vertical jig 124, and the third vertical jig 126. Is placed. Locking members 118 made of angle steel are attached to the upper surfaces of the first horizontal jig 112 on both sides of the gantry 52 of the second horizontal jigs 114 and 116 in the lateral direction. This prevents the second horizontal jigs 114 and 116 from sliding in the lateral direction of the gantry 52.

第2縦治具124のウエブ124Aの治具上方側には、上段側の外廊下ユニット24Bを固定するための第2固定部としての上側第2固定部142が形成されている。上側第2固定部142は、架台52に積層載置される上段側の外廊下ユニット24Bの治具上下方向位置に対応して形成されている。上側第2固定部142には、第2縦治具124のウエブ124Aの板厚方向(架台52の長手方向)に沿ってボルト挿通孔142Aが貫通形成されている。架台52に載置された上段側の外廊下ユニット24Bの長手方向端部は、外廊下ユニット24Bの長手方向両端部に形成された図示しないボルト挿通孔と上側第2固定部142のボルト挿通孔142Aに挿通されたボルトにより第2縦治具124に第2方向としての架台52の長手方向から固定されている。 An upper second fixing portion 142 as a second fixing portion for fixing the outer corridor unit 24B on the upper stage side is formed on the jig upper side of the web 124A of the second vertical jig 124. The upper second fixing portion 142 is formed corresponding to the position in the vertical direction of the jig of the outer corridor unit 24B on the upper stage side which is laminated and mounted on the gantry 52. A bolt insertion hole 142A is formed through the upper second fixing portion 142 along the plate thickness direction (longitudinal direction of the gantry 52) of the web 124A of the second vertical jig 124. The longitudinal end of the outer corridor unit 24B on the upper stage side mounted on the gantry 52 is a bolt insertion hole (not shown) formed at both ends of the outer corridor unit 24B in the longitudinal direction and a bolt insertion hole of the upper second fixing portion 142. It is fixed to the second vertical jig 124 by a bolt inserted through 142A from the longitudinal direction of the gantry 52 as the second direction.

図4及び図9に示されるように、第3縦治具126のウエブ126Aの治具上方側には、上段側の外廊下ユニット24Bを固定するための第2固定部としての上側第2固定部142が形成されている。上側第2固定部142は、架台52に積層載置される上段側の外廊下ユニット24Bの治具上下方向位置に対応して形成されている。上側第2固定部142には、第3縦治具126のウエブ126Aの板厚方向(架台52の長手方向)に沿ってボルト挿通孔142Aが貫通形成されている。架台52に載置された上段側の外廊下ユニット24Bの長手方向端部は、外廊下ユニット24Bの長手方向両端部に形成された図示しないボルト挿通孔と上側第2固定部142のボルト挿通孔142Aに挿通されたボルトにより第3縦治具126に架台52の長手方向から固定されている。 As shown in FIGS. 4 and 9, on the upper side of the web 126A of the third vertical jig 126, the upper second fixing as the second fixing portion for fixing the outer corridor unit 24B on the upper stage side. A portion 142 is formed. The upper second fixing portion 142 is formed corresponding to the position in the vertical direction of the jig of the outer corridor unit 24B on the upper stage side which is laminated and mounted on the gantry 52. A bolt insertion hole 142A is formed through the upper second fixing portion 142 along the plate thickness direction (longitudinal direction of the gantry 52) of the web 126A of the third vertical jig 126. The longitudinal end of the outer corridor unit 24B on the upper stage side mounted on the gantry 52 is a bolt insertion hole (not shown) formed at both ends of the outer corridor unit 24B in the longitudinal direction and a bolt insertion hole of the upper second fixing portion 142. It is fixed to the third vertical jig 126 from the longitudinal direction of the gantry 52 by a bolt inserted through 142A.

次に、本実施形態に係る外廊下ユニット24A、24Bの輸送用治具10を用いた輸送方法の説明を通じて作用並びに効果について説明する。 Next, the operation and the effect will be described through the explanation of the transportation method using the transportation jig 10 of the outer corridor units 24A and 24B according to the present embodiment.

外廊下ユニット24A、24Bの輸送方法は、外廊下ユニット24A、24Bを輸送用治具10に載置する6つの工程を含んで構成されている。第1工程では、図4に示されるように、下段側の外廊下ユニット24Aが架台52に載置される。具体的には、例えば、図示しないクレーン等により吊り込まれた下段側の外廊下ユニット24Aは、その腰壁部34が第1短手方向端部側に位置するように降ろされ、第1桁部材82、第3桁部材86及び第4桁部材88の上面に載置される。 The transportation method of the outer corridor units 24A and 24B includes six steps of mounting the outer corridor units 24A and 24B on the transportation jig 10. In the first step, as shown in FIG. 4, the outer corridor unit 24A on the lower stage side is mounted on the gantry 52. Specifically, for example, the outer corridor unit 24A on the lower stage side suspended by a crane or the like (not shown) is lowered so that the waist wall portion 34 is located on the end side in the first lateral direction, and the first girder. It is placed on the upper surface of the member 82, the third girder member 86, and the fourth girder member 88.

第2工程では、図5に示されるように、下段側の外廊下ユニット24Aは、架台52の下側第1固定部98と下側第2固定部138に固定される。具体的には、架台52に載置された下段側の外廊下ユニット24Aは、根元側端部に設けられた取付ブラケット40の孔部40Aと下段用桁材96の下側第1固定部98のボルト挿通孔98Aを介して下側第1固定部98にボルト締結される。これにより、下段側の外廊下ユニット24Aの根元側端部は、架台52にその短手方向から固定される。 In the second step, as shown in FIG. 5, the lower corridor unit 24A is fixed to the lower first fixing portion 98 and the lower second fixing portion 138 of the gantry 52. Specifically, the lower corridor unit 24A mounted on the gantry 52 has a hole 40A of the mounting bracket 40 provided at the root side end portion and a lower first fixing portion 98 of the lower girder member 96. It is bolted to the lower first fixing portion 98 through the bolt insertion hole 98A of the above. As a result, the root side end of the lower corridor unit 24A is fixed to the gantry 52 from the lateral side.

下段側の外廊下ユニット24Aの架台第2端部側の端部は、その長手方向端部に形成されたボルト挿通孔と第2縦治具124の下側第2固定部138に貫通形成されたボルト挿通孔138Aを介して下側第2固定部138にボルト締結される。また、外廊下ユニット24Aの架台第1端部側の端部は、その長手方向端部に形成されたボルト挿通孔と第3縦治具126の下側第2固定部138に貫通形成されたボルト挿通孔138Aを介して下側第2固定部138にボルト締結される。これにより、下段側の外廊下ユニット24Aの根元側端部は、架台52にその長手方向両側から固定される。 The end of the lower outer corridor unit 24A on the second end side of the gantry is formed through the bolt insertion hole formed at the end in the longitudinal direction thereof and the lower second fixing portion 138 of the second vertical jig 124. It is bolted to the lower second fixing portion 138 via the bolt insertion hole 138A. Further, the end portion of the outer corridor unit 24A on the first end side of the gantry is formed through the bolt insertion hole formed at the end portion in the longitudinal direction thereof and the lower second fixing portion 138 of the third vertical jig 126. It is bolted to the lower second fixing portion 138 via the bolt insertion hole 138A. As a result, the root side ends of the lower corridor unit 24A are fixed to the gantry 52 from both sides in the longitudinal direction.

第3工程では、図6に示されるように、下段側の外廊下ユニット24Aの治具上方側において、第1縦治具122、第2縦治具124及び第3縦治具126に、それぞれ第1横治具112が配置される。具体的には、第1横治具112の一方の端部としての架台52の第2短手方向端部側の端部は、架台52の支持部材104の横壁104Bの上面に配置される。このとき、第1横治具112は、支持部材104に取り付けられた一対の固定用プレート106の間に配置される。このため、第1横治具112は、支持部材104の横壁の104Bをスライドすることなく支持部材104に安定して支持されている。 In the third step, as shown in FIG. 6, the first vertical jig 122, the second vertical jig 124, and the third vertical jig 126 are connected to the first vertical jig 122, the second vertical jig 124, and the third vertical jig 126 on the upper side of the jig of the outer corridor unit 24A on the lower stage side, respectively. The first horizontal jig 112 is arranged. Specifically, the end portion of the gantry 52 as one end portion of the first horizontal jig 112 on the end side in the second lateral direction is arranged on the upper surface of the side wall 104B of the support member 104 of the gantry 52. At this time, the first horizontal jig 112 is arranged between the pair of fixing plates 106 attached to the support member 104. Therefore, the first horizontal jig 112 is stably supported by the support member 104 without sliding the 104B of the side wall of the support member 104.

複数の第1横治具112の第2短手方向端部側の端部は、第1縦治具122、第2縦治具124及び第3縦治具126に、それぞれ固定される。具体的には、第1横治具112は、第1縦治具122、第2縦治具124及び第3縦治具126に形成された第3固定部132にボルト締結によりそれぞれ固定される。 The ends of the plurality of first horizontal jigs 112 on the end side in the second lateral direction are fixed to the first vertical jig 122, the second vertical jig 124, and the third vertical jig 126, respectively. Specifically, the first horizontal jig 112 is fixed to the third fixing portion 132 formed on the first vertical jig 122, the second vertical jig 124, and the third vertical jig 126 by bolting, respectively. ..

第4工程では、図7に示されるように、第1横治具112の上面に、第2横治具114、116が、第1横治具112と平面視で直交するように架台52の長手方向に沿って載置される。具体的には、第2縦治具124及び第3縦治具126に固定された第1横治具112の上面の第1短手方向端部側に第2横治具114が載置される。また、第1縦治具122、第2縦治具124及び第3縦治具126に固定された第1横治具112の上面の第2短手方向端部側に第2横治具116が載置される。ここで、第2横治具114、116は、第1横治具112の上面に取り付けられた一対の係止部材118の間に載置される。これにより、第2横治具114、116は、第1横治具112の上面を架台52の短手方向にスライドすることを防止した上で、第1横治具112に安定して載置される。 In the fourth step, as shown in FIG. 7, on the upper surface of the first horizontal jig 112, the second horizontal jigs 114 and 116 are arranged on the gantry 52 so as to be orthogonal to the first horizontal jig 112 in a plan view. It is placed along the longitudinal direction. Specifically, the second horizontal jig 114 is placed on the end side in the first lateral direction of the upper surface of the first horizontal jig 112 fixed to the second vertical jig 124 and the third vertical jig 126. Jig. Further, the second horizontal jig 116 is located on the end side in the second lateral direction of the upper surface of the first horizontal jig 112 fixed to the first vertical jig 122, the second vertical jig 124, and the third vertical jig 126. Is placed. Here, the second horizontal jigs 114 and 116 are placed between the pair of locking members 118 attached to the upper surface of the first horizontal jig 112. As a result, the second horizontal jigs 114 and 116 are stably placed on the first horizontal jig 112 after preventing the upper surface of the first horizontal jig 112 from sliding in the lateral direction of the gantry 52. Will be done.

第5工程では、図8に示されるように、上段側の外廊下ユニット24Bが第2横治具114、116の上面に載置される。具体的には、例えば、図示しないクレーン等により吊り込まれた上段側の外廊下ユニット24Bは、その腰壁部34が第1短手方向端部側に位置するように降ろされ、第2横治具114、116の上面に載置される。 In the fifth step, as shown in FIG. 8, the outer corridor unit 24B on the upper stage side is placed on the upper surface of the second horizontal jigs 114 and 116. Specifically, for example, the outer corridor unit 24B on the upper stage side suspended by a crane or the like (not shown) is lowered so that the waist wall portion 34 is located on the end side in the first lateral direction, and the second lateral corridor unit 24B is lowered. It is placed on the upper surface of the jigs 114 and 116.

第6工程では、図9に示されるように、上段側の外廊下ユニット24Bは、架台52の上側第1固定部102と上側第2固定部142に固定される。具体的には、第2横治具114、116に載置された上段側の外廊下ユニット24Bは、根元側端部に設けられた取付ブラケット40の孔部40Aと上段用桁材100の上側第1固定部102のボルト挿通孔102Aを介して上側第1固定部102にボルト締結される。これにより、上段側の外廊下ユニット24Bの根元側端部が架台52にその短手方向から固定される。 In the sixth step, as shown in FIG. 9, the outer corridor unit 24B on the upper stage side is fixed to the upper first fixing portion 102 and the upper second fixing portion 142 of the gantry 52. Specifically, the outer corridor unit 24B on the upper stage side mounted on the second horizontal jigs 114 and 116 has the hole 40A of the mounting bracket 40 provided at the end on the root side and the upper side of the upper girder material 100. The bolt is fastened to the upper first fixing portion 102 via the bolt insertion hole 102A of the first fixing portion 102. As a result, the root side end portion of the outer corridor unit 24B on the upper stage side is fixed to the gantry 52 from the lateral side.

さらに、第6工程では、図10に示されるように、上段側の外廊下ユニット24Bの架台第2端部側の端部は、その端部に形成されたボルト挿通孔と第2縦治具124の上側第2固定部142に貫通形成されたボルト挿通孔142Aを介して上側第2固定部142にボルト締結される。また、上段側の外廊下ユニット24Bの架台第1端部側の端部は、その端部に形成されたボルト挿通孔と第3縦治具126の上側第2固定部142に貫通形成されたボルト挿通孔142Aを介して上側第2固定部142にボルト締結される。これにより、上段側の外廊下ユニット24Bの長手方向根元側が架台52に固定される。 Further, in the sixth step, as shown in FIG. 10, the end portion of the outer corridor unit 24B on the upper stage side on the second end side of the gantry is a bolt insertion hole formed at the end portion and a second vertical jig. It is bolted to the upper second fixing portion 142 through the bolt insertion hole 142A formed through the upper second fixing portion 142 of 124. Further, the end portion of the outer corridor unit 24B on the upper stage side on the first end side of the gantry is formed through the bolt insertion hole formed at the end portion and the upper second fixing portion 142 of the third vertical jig 126. It is bolted to the upper second fixing portion 142 via the bolt insertion hole 142A. As a result, the root side in the longitudinal direction of the outer corridor unit 24B on the upper stage side is fixed to the gantry 52.

下段側の外廊下ユニット24Aと上段側の外廊下ユニット24Bが固定された輸送用治具10は、例えば、持上用部材56Bの端部にフォーク(ツメ)が挿入されたフォークリフト等により持ち上げられる。持ち上げられた架台52は、輸送手段である、例えば、トラック等の荷台に載置されると共に固定される。これにより、下段側の外廊下ユニット24Aと上段側の外廊下ユニット24Bの複数の外廊下ユニット24A、24Bが架台52に固定された状態で1台のトラック等の輸送手段により輸送することができる。 The transportation jig 10 to which the lower corridor unit 24A and the upper corridor unit 24B are fixed is lifted by, for example, a forklift having a fork (claw) inserted at the end of the lifting member 56B. .. The lifted pedestal 52 is placed and fixed on a loading platform such as a truck, which is a means of transportation. As a result, the plurality of outer corridor units 24A and 24B of the lower corridor unit 24A and the upper corridor unit 24B can be transported by one truck or the like in a state of being fixed to the gantry 52. ..

本実施形態に係る外廊下ユニット24A、24Bの輸送用治具10によれば、段積みされた複数の外廊下ユニット24A、24Bの根元側端部が架台52の下側第1固定部98及び上側第1固定部102に固定される。また、複数の外廊下ユニット24A、24Bの長手方向両端部は、第2縦治具124の下側第2固定部138及び上側第2固定部142に固定されると共に及び第3縦治具126の下側第2固定部138及び上側第2固定部142に固定される。このため、複数の外廊下ユニット24A、24Bは、架台52の短手方向とこれに平面視で直交する架台52の長手方向の両方からそれぞれ固定される。これにより、複数の外廊下ユニット24A、24Bを輸送用治具10に安定して固定した状態で、例えば、トラック等の1つの輸送手段に搭載することができる。 According to the transportation jig 10 of the outer corridor units 24A and 24B according to the present embodiment, the root side ends of the plurality of stacked outer corridor units 24A and 24B are the lower first fixing portion 98 and the gantry 52. It is fixed to the upper first fixing portion 102. Further, both ends in the longitudinal direction of the plurality of outer corridor units 24A and 24B are fixed to the lower second fixing portion 138 and the upper second fixing portion 142 of the second vertical jig 124, and the third vertical jig 126. It is fixed to the lower second fixing portion 138 and the upper second fixing portion 142. Therefore, the plurality of outer corridor units 24A and 24B are fixed from both the lateral direction of the gantry 52 and the longitudinal direction of the gantry 52 orthogonal to the gantry 52 in a plan view. As a result, the plurality of outer corridor units 24A and 24B can be mounted on one transportation means such as a truck in a state of being stably fixed to the transportation jig 10.

本実施形態に係る外廊下ユニット24A、24Bの輸送用治具10によれば、上下段に段積みされた下段側の外廊下ユニット24Aと上段側の外廊下ユニット24Bとの間には、第1横治具112及び第2横治具114、116が設けられている。このため、上段側の外廊下ユニット24Bの下部を安定して支持することができると共に上段側の外廊下ユニット24Bと下段側の外廊下ユニット24Aとの直接接触や干渉を防止又は抑制することができる。これにより、複数の外廊下ユニット24A、24Bを安定して輸送用治具10に積層載置することができる。 According to the transportation jig 10 of the outer corridor units 24A and 24B according to the present embodiment, there is a first layer between the lower outer corridor unit 24A and the upper outer corridor unit 24B stacked in the upper and lower stages. 1 horizontal jig 112 and 2nd horizontal jigs 114 and 116 are provided. Therefore, it is possible to stably support the lower portion of the outer corridor unit 24B on the upper stage side, and prevent or suppress direct contact or interference between the outer corridor unit 24B on the upper stage side and the outer corridor unit 24A on the lower stage side. can. As a result, the plurality of outer corridor units 24A and 24B can be stably stacked and placed on the transportation jig 10.

さらに、本実施形態に係る外廊下ユニット24A、24Bの輸送用治具10によれば、架台52の第2短手方向端部には、補強部材108が配置され、上段用縦部材94及び上段用桁材100が補強されている。このため、外廊下ユニット24Bが固定された上側第1固定部102の強度を補強することができる。また、例えば、複数の外廊下ユニット24A、24Bの腰壁部34を、いずれも架台52の短手方向第1桁部材82側に配置することにより、複数の外廊下ユニット24A、24Bの重心位置が、輸送用治具10の中央部から離れた位置に設けられる場合であっても、輸送用治具10全体としての重心位置の偏りを抑制することができる。これにより、複数の外廊下ユニット24A,24Bを輸送用治具10に安定して固定することができる。 Further, according to the transportation jig 10 of the outer corridor units 24A and 24B according to the present embodiment, the reinforcing member 108 is arranged at the end in the second lateral direction of the gantry 52, and the vertical member 94 for the upper stage and the upper stage The jig 100 is reinforced. Therefore, the strength of the upper first fixing portion 102 to which the outer corridor unit 24B is fixed can be reinforced. Further, for example, by arranging the waist wall portions 34 of the plurality of outer corridor units 24A and 24B on the side of the first girder member 82 in the lateral direction of the gantry 52, the positions of the centers of gravity of the plurality of outer corridor units 24A and 24B are positioned. However, even when the transport jig 10 is provided at a position away from the central portion, it is possible to suppress the deviation of the center of gravity position of the transport jig 10 as a whole. As a result, the plurality of outer corridor units 24A and 24B can be stably fixed to the transportation jig 10.

また、本実施形態に係る外廊下ユニット24A、24Bの輸送用治具10によれば、架台52の支持部材104には、一対の固定用プレート106が設けられている。このため、例えば、トラックに積層載置された外廊下ユニット24A、24Bが、トラックの発進及び停止による慣性力を受けた場合であっても、第2横治具114、116を支持する第1横治具112は支持部材104上をスライドしない。このため、第2横治具114、116に載置された上端側の外廊下ユニット24Bが輸送途中にスライドすることを防止又は抑制することができる。これにより、輸送用治具10に固定された複数の外廊下ユニット24A、24Bを安定して輸送することができる。 Further, according to the transportation jig 10 of the outer corridor units 24A and 24B according to the present embodiment, the support member 104 of the gantry 52 is provided with a pair of fixing plates 106. Therefore, for example, even when the outer corridor units 24A and 24B stacked and mounted on the truck receive the inertial force due to the start and stop of the truck, the first horizontal jigs 114 and 116 are supported. The horizontal jig 112 does not slide on the support member 104. Therefore, it is possible to prevent or suppress the outer corridor unit 24B on the upper end side mounted on the second horizontal jigs 114 and 116 from sliding during transportation. As a result, the plurality of outer corridor units 24A and 24B fixed to the transportation jig 10 can be stably transported.

以上説明したように、本実施形態に係る外廊下ユニット24A、24Bの輸送用治具10により、複数の外廊下ユニット24A,24Bがそれぞれ固定された状態で1つの輸送手段に積層載置することができる。 As described above, the transport jigs 10 of the outer corridor units 24A and 24B according to the present embodiment are used to stack and mount the plurality of outer corridor units 24A and 24B on one transport means in a fixed state. Can be done.

さらに、本実施形態に係る外廊下ユニット24A、24Bの輸送用治具10によれば、第1横治具112及び第2横治具114、116は、容易に取り外すことができる。このため、外廊下ユニット24A、24Bをトラック等の輸送手段の荷台から直接クレーン等で吊り上げ、建物12に直接取り付けることができる。これにより、外廊下ユニット24A、24Bが固定された輸送用治具10をトラック等の荷台から降ろし、一時的に仮置きすることが容易ではない比較的狭小な敷地でも効率よく作業をすることができる。 Further, according to the transportation jigs 10 of the outer corridor units 24A and 24B according to the present embodiment, the first horizontal jig 112 and the second horizontal jigs 114 and 116 can be easily removed. Therefore, the outer corridor units 24A and 24B can be lifted directly from the loading platform of a transportation means such as a truck by a crane or the like and directly attached to the building 12. As a result, the transportation jig 10 to which the outer corridor units 24A and 24B are fixed can be unloaded from a loading platform such as a truck, and work can be efficiently performed even in a relatively small site where it is not easy to temporarily place the jig 10 temporarily. can.

また、本実施形態に係る外廊下ユニット24A、24Bの輸送用治具10によれば、第1縦治具122、第2縦治具124及び第3縦治具126は、ボルト締結されているだけの構成であるため梁部材56Aから容易に取り外すことができる。また、下段用桁材96や上段用桁材100もボルト締結されているだけの構成であるため架台52から容易に取り外すことができる。このため、輸送用治具10を使用しない際に、分解して比較的小さなスペースで保管することができる。 Further, according to the transportation jig 10 of the outer corridor units 24A and 24B according to the present embodiment, the first vertical jig 122, the second vertical jig 124 and the third vertical jig 126 are bolted together. It can be easily removed from the beam member 56A because it has only a structure. Further, since the lower girder member 96 and the upper girder member 100 are only bolted together, they can be easily removed from the gantry 52. Therefore, when the transportation jig 10 is not used, it can be disassembled and stored in a relatively small space.

なお、ここでは、輸送用治具10には、外廊下ユニット24が段積みされるとして説明したが、これに限らず、バルコニーユニット等他の建物ユニットが段積みされてもよい。 Although it has been described here that the outer corridor unit 24 is stacked on the transportation jig 10, the present invention is not limited to this, and other building units such as a balcony unit may be stacked.

10 輸送用治具
24 外廊下ユニット(建物ユニット)
24A 外廊下ユニット(建物ユニット)
24B 外廊下ユニット(建物ユニット)
52 架台
98 下側第1固定部(第1固定部)
102 上側第1固定部(第1固定部)
106 固定用プレート(プレート部)
108 補強部材(補強部)
112 第1横治具
114 第2横治具
116 第2横治具
122 第1縦治具(縦治具)
124 第2縦治具(縦治具)
126 第3縦治具(縦治具)
138 下側第2固定部(第2固定部)
142 上側第2固定部(第2固定部)
10 Transport jig 24 Outer corridor unit (building unit)
24A outer corridor unit (building unit)
24B outer corridor unit (building unit)
52 Stand 98 Lower 1st fixing part (1st fixing part)
102 Upper first fixing part (first fixing part)
106 Fixing plate (plate part)
108 Reinforcing member (reinforcing part)
112 1st horizontal jig 114 2nd horizontal jig 116 2nd horizontal jig 122 1st vertical jig (vertical jig)
124 Second vertical jig (vertical jig)
126 Third vertical jig (vertical jig)
138 Lower second fixing part (second fixing part)
142 Upper second fixing part (second fixing part)

Claims (5)

段積みされた複数の建物ユニットの一方の端部を固定する第1固定部を備えた架台と、
下端が前記架台に固定され、前記複数の建物ユニットの他方の端部を固定する第2固定部を備えた縦治具と、
上下に段積みされた前記複数の建物ユニットの上段側の前記建物ユニットと下段側の前記建物ユニットとの間に設けられ、一方の端部が前記架台に支持されると共に、他方の端部が前記縦治具に固定された第1横治具と、
前記第1横治具の上面に、平面視で前記第1横治具と直交するように載置され、上面に前記建物ユニットが載置される第2横治具と、
を含んで構成されたユニット輸送用治具。
A pedestal with a first fixing part that fixes one end of a plurality of stacked building units,
A vertical jig having a second fixing portion whose lower end is fixed to the gantry and fixing the other end portion of the plurality of building units.
It is provided between the building unit on the upper stage side and the building unit on the lower stage side of the plurality of building units stacked one above the other, one end is supported by the gantry, and the other end is supported. The first horizontal jig fixed to the vertical jig and
A second horizontal jig on which the building unit is placed on the upper surface of the first horizontal jig so as to be orthogonal to the first horizontal jig in a plan view.
Unit transport jig configured to include.
前記複数の建物ユニットは、前記一方の端部が前記架台の前記第1固定部に第1方向から固定され、前記他方の端部が前記縦治具の前記第2固定部に平面視で前記第1方向と直交する第2方向から固定される請求項1に記載のユニット輸送用治具。 In the plurality of building units, one end thereof is fixed to the first fixing portion of the gantry from the first direction, and the other end portion thereof is fixed to the second fixing portion of the vertical jig in a plan view. The unit transport jig according to claim 1, which is fixed from a second direction orthogonal to the first direction. 前記架台は、前記第1横治具の前記一方の端部を挟み込むように配置された一対のプレート部を備える請求項1又は請求項2に記載のユニット輸送用治具。 The unit transport jig according to claim 1 or 2, wherein the gantry includes a pair of plate portions arranged so as to sandwich one end of the first horizontal jig. 前記架台は、前記第1固定部に固定された前記建物ユニットが載置される側と前記第1固定部に対して反対側の端部に設けられ、前記第1固定部を補強する補強部を備える請求項1から3の何れか1項に記載のユニット輸送用治具。 The gantry is provided at the end on the side where the building unit fixed to the first fixing portion is placed and on the opposite side to the first fixing portion, and is a reinforcing portion for reinforcing the first fixing portion. The unit transport jig according to any one of claims 1 to 3. 下段側の前記建物ユニットを前記架台に載置する第1工程と、
下段側の前記建物ユニットの一方の端部を前記架台の第1固定部に固定すると共に、下端が前記架台に固定された前記縦治具の第2固定部に下段側の前記建物ユニットの他方の端部を固定する第2工程と、
下段側の前記建物ユニットの上段側に、一方の端部が前記架台に支持されると共に、他方の端部が前記縦治具に固定された前記第1横治具を配置する第3工程と、
前記第1横治具の上面に、平面視で前記第1横治具と直交するように前記第2横治具を載置する第4工程と、
前記第2横治具の上面に上段側の前記建物ユニットを載置する第5工程と、
上段側の前記建物ユニットの一方の端部を前記架台の前記第1固定部に固定すると共に、他方の端部を前記縦治具の第2固定部に固定する第6工程と、
を含んで構成された請求項1から請求項4の何れか1項に記載のユニット輸送用治具を用いた輸送方法。
The first step of mounting the building unit on the lower stage side on the gantry,
One end of the building unit on the lower tier side is fixed to the first fixing portion of the gantry, and the other end of the building unit on the lower tier side is fixed to the second fixing portion of the vertical jig whose lower end is fixed to the gantry. The second step of fixing the end of the
A third step of arranging the first horizontal jig whose one end is supported by the gantry and whose other end is fixed to the vertical jig on the upper side of the building unit on the lower side. ,
A fourth step of placing the second horizontal jig on the upper surface of the first horizontal jig so as to be orthogonal to the first horizontal jig in a plan view.
The fifth step of placing the building unit on the upper stage side on the upper surface of the second horizontal jig, and
A sixth step of fixing one end of the building unit on the upper stage side to the first fixing portion of the gantry and fixing the other end to the second fixing portion of the vertical jig.
The transportation method using the unit transportation jig according to any one of claims 1 to 4, which is configured to include the above.
JP2019023943A 2019-02-13 2019-02-13 Transport method using unit transport jig and unit transport jig Active JP7086877B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019023943A JP7086877B2 (en) 2019-02-13 2019-02-13 Transport method using unit transport jig and unit transport jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019023943A JP7086877B2 (en) 2019-02-13 2019-02-13 Transport method using unit transport jig and unit transport jig

Publications (2)

Publication Number Publication Date
JP2020133133A JP2020133133A (en) 2020-08-31
JP7086877B2 true JP7086877B2 (en) 2022-06-20

Family

ID=72278028

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019023943A Active JP7086877B2 (en) 2019-02-13 2019-02-13 Transport method using unit transport jig and unit transport jig

Country Status (1)

Country Link
JP (1) JP7086877B2 (en)

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60159790U (en) * 1984-04-03 1985-10-24 ミサワホ−ム株式会社 Assembly type crane
JPS61126247A (en) * 1984-11-20 1986-06-13 積水化学工業株式会社 Shape holding apparatus for house unit
JP2515467Y2 (en) * 1991-07-02 1996-10-30 ミサワホーム株式会社 Roof unit assembly and transportation jig
JPH07173941A (en) * 1993-12-20 1995-07-11 Misawa Homes Co Ltd Balcony transportation jig
JPH08189198A (en) * 1995-01-10 1996-07-23 Misawa Homes Co Ltd Jig for transportation of unit
JPH09132073A (en) * 1995-11-09 1997-05-20 Sekisui House Ltd Frame for transporting building material
JPH09242338A (en) * 1996-03-06 1997-09-16 Misawa Homes Co Ltd Transportation jig of roof unit
JPH11129808A (en) * 1997-10-30 1999-05-18 Sumitomo Forestry Co Ltd Building unit loading device

Also Published As

Publication number Publication date
JP2020133133A (en) 2020-08-31

Similar Documents

Publication Publication Date Title
US8769886B2 (en) Building unit with temporary reinforcing members, unit building, and method for constructing unit building
RU2208099C2 (en) Process of erection of building
JP2011202439A (en) Building unit
JP6006978B2 (en) Conveying equipment
JP7086877B2 (en) Transport method using unit transport jig and unit transport jig
US20100107517A1 (en) Structural brace for modular housing module
WO2012151612A1 (en) Bearer arrangement
JP2001115559A (en) Container for container house and container house
JP5603805B2 (en) Lifting jig, lifting jig mounting structure, and balcony unit lifting method
JP2990417B2 (en) Metal fittings for transporting buildings
JPH09125524A (en) Building unit
JP2004168481A (en) Connecting structure for elevator tower unit
JP3221782B2 (en) Fireproof structure and fireproof panel unit of prefabricated building
JP7245645B2 (en) Panel erection jig and panel loading rack
JP5322216B2 (en) Steel frame reinforced concrete frame construction method
JP5162876B2 (en) Reinforcement structure of existing structures
JPH0826622A (en) Construction method of guide rail of elevator
WO2021024382A1 (en) Modular transport modules, plant structure, and method for constructing plant structure
JP2017110425A (en) building
JP4286369B2 (en) Vertical pipe unit
JP2023098374A (en) Locking fixture, receiving stage, and lifting system
JP4559196B2 (en) Manufacturing method of building unit
JP6411788B2 (en) Hanging jig
JPH04153460A (en) Constructing method for building, and its equipment
JPH07173941A (en) Balcony transportation jig

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210714

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220420

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220510

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220608

R150 Certificate of patent or registration of utility model

Ref document number: 7086877

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150