JP7085382B2 - Dry floor structure and its construction method - Google Patents

Dry floor structure and its construction method Download PDF

Info

Publication number
JP7085382B2
JP7085382B2 JP2018061234A JP2018061234A JP7085382B2 JP 7085382 B2 JP7085382 B2 JP 7085382B2 JP 2018061234 A JP2018061234 A JP 2018061234A JP 2018061234 A JP2018061234 A JP 2018061234A JP 7085382 B2 JP7085382 B2 JP 7085382B2
Authority
JP
Japan
Prior art keywords
floor panel
dry
dry floor
heat insulating
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018061234A
Other languages
Japanese (ja)
Other versions
JP2019173334A (en
Inventor
雄介 加藤
浩之 矢島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiwa House Industry Co Ltd
Original Assignee
Daiwa House Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiwa House Industry Co Ltd filed Critical Daiwa House Industry Co Ltd
Priority to JP2018061234A priority Critical patent/JP7085382B2/en
Publication of JP2019173334A publication Critical patent/JP2019173334A/en
Application granted granted Critical
Publication of JP7085382B2 publication Critical patent/JP7085382B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、乾式床構造とその施工方法に関する。
The present invention relates to a dry floor structure and a construction method thereof.

建物の床には、モルタルやコンクリート等を充填して床を施工する湿式床工法と、これらの充填材を使用せずに床面材や根太等のみから床を施工する乾式床工法がある。従来の乾式床工法として、床荷重を受ける一対の床梁と連結材、及びブレース材からなる第1の床フレームと、ブレース材を一対の斜辺とする三角形状の第2の床フレームと、を桁梁方向に交互に配置して取付け、床フレームの位置決め穴に桁梁と大梁側の位置決めピンを挿通するように設置してボルト接合する、床の構成方法が提案されている(例えば、特許文献1参照)。 For the floor of a building, there are a wet floor construction method in which mortar, concrete, etc. are filled to construct the floor, and a dry floor construction method in which the floor is constructed only from floor materials, joists, etc. without using these fillers. As a conventional dry floor construction method, a first floor frame made of a pair of floor beams and connecting materials that receive a floor load, and a brace material, and a triangular second floor frame having the brace material as a pair of slanted sides are used. A method of constructing a floor has been proposed in which the girders are alternately arranged and mounted in the girder direction, and the girders and the positioning pins on the girder side are installed so as to be inserted into the positioning holes of the floor frame and bolted (for example, patented). See Document 1).

特開平5-295828号公報Japanese Unexamined Patent Publication No. 5-295828

しかしながら、特許文献1に記載の床の構成方法は、構成が全く異なる2種類の床フレームを交互に配置して乾式床を施工することから、床フレームの製作に手間と時間を要すると共に床構造が複雑になり、施工に手間がかかる可能性がある。 However, in the method of constructing a floor described in Patent Document 1, since two types of floor frames having completely different configurations are alternately arranged to construct a dry floor, it takes time and effort to manufacture the floor frame and the floor structure. However, it may be complicated and time-consuming to construct.

本発明は上記する問題に鑑みてなされたものであり、施工性に優れた乾式床構造とその施工方法を提供することを目的としている。
The present invention has been made in view of the above problems, and an object of the present invention is to provide a dry floor structure having excellent workability and a construction method thereof.

前記目的を達成すべく、本発明による乾式床構造の一態様は、
床梁の左右に相互に隙間を置いて配設されている先張り乾式床パネルと、該床梁の上の該隙間に配設されている塞ぎ乾式床パネルと、を有する乾式床構造であって、
前記先張り乾式床パネルは、デッキプレートと、該デッキプレートの上にある硬質断熱材と、該硬質断熱材の上にある床面材と、を有し、
前記塞ぎ乾式床パネルは、デッキプレートと、該デッキプレートの上にある硬質断熱材と、該硬質断熱材の上にある床面材と、を有し、
前記塞ぎ乾式床パネルの有する前記床面材の広幅面には複数の吊り治具用孔が開設されており、少なくとも該吊り治具用孔に対応する下方位置には、軟質断熱材が配設されていることを特徴とする。
In order to achieve the above object, one aspect of the drywall structure according to the present invention is
It is a dry floor structure having a pre-tension dry floor panel arranged with a gap between the left and right sides of the floor beam and a closed dry floor panel arranged in the gap on the floor beam. hand,
The upholstered dry floor panel has a deck plate, a hard insulation material on the deck plate, and a floor surface material on the hard insulation material.
The closed-dry floor panel has a deck plate, a hard insulation material on the deck plate, and a floor surface material on the hard insulation material.
A plurality of suspension jig holes are formed on the wide surface of the floor surface material of the closed-dry floor panel, and a soft heat insulating material is arranged at least at a lower position corresponding to the suspension jig holes. It is characterized by being done.

本態様によれば、床梁に対して相互に隙間を有して先行して設置される左右の先張り乾式床パネルの間に塞ぎ乾式床パネルが配設された乾式床構造に関し、後施工される塞ぎ乾式床パネルが床面材の広幅面(上面)に吊り治具用孔を有するとともに、床面材の下方の吊り治具用孔に対応する位置に軟質断熱材が配設されていることにより、施工後に吊り治具を取り外した際に、吊り治具用孔に対する処置を不要にできる。例えば、クレーン等の重機にて塞ぎ乾式床パネルを吊持して左右の先張り乾式床パネルの間の隙間に吊り下げる施工方法において、塞ぎ乾式床パネルの例えば左右の側面に吊り治具が係合される係合部を設ける処置が考えられる。このように塞ぎ乾式床パネルの側面への処置では、重機で吊り下ろし、先行設置されている左右の先張り乾式床パネルに干渉しないように塞ぎ乾式床パネルを吊り下ろすことを要するため、吊り下ろし後の後施工を必須とする係合部が必要になり得る。 According to this aspect, regarding the dry floor structure in which the dry floor panel is arranged by closing between the left and right pre-attached dry floor panels installed in advance with a mutual gap with respect to the floor beam, the post-construction is performed. The closed-dry floor panel to be closed has a hole for a hanging jig on the wide surface (upper surface) of the floor material, and a soft heat insulating material is arranged at a position corresponding to the hole for the hanging jig below the floor material. Therefore, when the hanging jig is removed after the construction, it is possible to eliminate the need for the treatment for the hole for the hanging jig. For example, in a construction method in which a heavy machine such as a crane is used to suspend a drywall panel and suspend it in a gap between the left and right pre-tensioned drywall panels, suspension jigs are engaged on, for example, the left and right sides of the closed drywall panel. A measure of providing an engaging portion to be fitted is conceivable. In this way, in the treatment to the side surface of the closed dry floor panel, it is necessary to hang it with a heavy machine, close it so as not to interfere with the left and right pre-installed dry floor panels installed in advance, and hang the dry floor panel. Engagement parts that require later post-construction may be required.

これに対して、本態様の乾式床構造では、塞ぎ乾式床パネルの上方に位置する床面材の広幅面(上面)に吊り治具用孔を有していること、吊り治具用孔に対応する床面材の下方に配設される断熱材が軟質断熱材であることにより、吊り治具用孔に吊り治具を挿通させた際に、軟質断熱材が適度に変形して床面材に対する吊り治具の係合を阻害しない。しかしながら、塞ぎ乾式床パネルにおける床面材の下方位置には、ほぼ全域に亘って硬質断熱材が配設され、例えば吊り治具用孔に対応する位置にのみ軟質断熱材が配設される。平面視矩形の塞ぎ乾式床パネルにおいて、床面材の4つの隅角部近傍にそれぞれ吊り治具用孔が開設されている場合を例示すると、この4つの吊り治具用孔を含むその周囲の領域にのみ軟質断熱材を配設することができる。また、4つの吊り治具用孔を左右で1組として合計2組の吊り治具用孔とした上で、各組の2つの吊り治具用孔に亘る帯状の軟質断熱材を計2条配設することができる。前者の形態としては、床面材と略同形状及び略同面積の矩形ブロック状の硬質断熱材のうち、床面材に開設されている4箇所の吊り治具用孔(例えば丸孔)に対応する位置に、軟質断熱材が配設される形態が挙げられる。一方、後者の形態としては、例えば、2本の細長の矩形ブロック状(帯状)の軟質断熱材と、複数の矩形ブロック状の硬質断熱材を接着等することにより、全体として床面材と略同形状及び略同面積の断熱材が配設される形態が挙げられる。 On the other hand, in the dry floor structure of this embodiment, the suspension jig hole is provided on the wide surface (upper surface) of the floor surface material located above the closed dry floor panel, and the suspension jig hole is provided. Since the heat insulating material disposed below the corresponding floor surface material is a soft heat insulating material, the soft heat insulating material is appropriately deformed and the floor surface is deformed when the hanging jig is inserted into the hole for the hanging jig. Does not interfere with the engagement of the hanging jig with the material. However, the hard heat insulating material is disposed over almost the entire area below the floor surface material in the closed-dry floor panel, and the soft heat insulating material is disposed only at the position corresponding to the hole for the hanging jig, for example. To exemplify a case where a hanging jig hole is provided in the vicinity of each of the four corners of the floor material in a rectangular closed-type floor panel in a plan view, the surrounding area including the four hanging jig holes is illustrated. Soft insulation can be placed only in the area. In addition, four hanging jig holes are combined into one set on the left and right to form a total of two sets of hanging jig holes, and a total of two strip-shaped soft heat insulating materials spanning the two hanging jig holes of each set. Can be arranged. In the former form, among the rectangular block-shaped hard heat insulating materials having substantially the same shape and area as the floor surface material, four holes for hanging jigs (for example, round holes) provided in the floor surface material are provided. A form in which a soft heat insulating material is arranged at a corresponding position can be mentioned. On the other hand, as the latter form, for example, by adhering two elongated rectangular block-shaped (strip-shaped) soft heat insulating materials and a plurality of rectangular block-shaped hard heat insulating materials, it is abbreviated as a floor surface material as a whole. Examples thereof include a form in which heat insulating materials having the same shape and substantially the same area are arranged.

先張り乾式床パネルは床面材の下方の全域に亘って硬質断熱材を有し、塞ぎ乾式床パネルは床面材のほぼ全域に亘って硬質断熱材を有することにより、乾式床構造の剛性を高めることができる。また、塞ぎ乾式床パネルは、床面材に開設されている吊り治具用孔の下方にも軟質断熱材が配設されることにより、全域に亘って断熱材を有し、従って断熱性能の低い部位を有さない塞ぎ乾式床パネルが形成される。 Pre-attached drywall panels have hard insulation over the entire area below the flooring material, and closed drywall panels have hard insulation over almost the entire area of the flooring material, thus making the dryfloor structure rigid. Can be enhanced. In addition, the closed-dry floor panel has a heat insulating material over the entire area by disposing a soft heat insulating material below the hole for the hanging jig provided in the floor surface material, and therefore has a heat insulating performance. A closed dryfloor panel with no low spots is formed.

床面材の表面に開設されている吊り治具用孔は、塞ぎ乾式床パネルの設置後は、何等の後施工も不要であるが、例えば塞ぎ用のキャップ等を取付けてもよい。 The holes for hanging jigs provided on the surface of the floor surface material do not require any post-construction after the installation of the closed dry floor panel, but for example, a cap for closing may be attached.

また、本発明による乾式床構造の他の態様において、前記デッキプレートは、一方の端部に雌キーを有し、他方の端部に雄キーを有しており、隣接する前記デッキプレート同士の前記雄キーに前記雌キーが係合して該デッキプレート同士の接続が行われるように構成されており、
前記床梁の左右にある前記先張り乾式床パネルのいずれか一方は、前記隙間に臨む端部にハット形状プレートを有し、
前記塞ぎ乾式床パネルの有する前記デッキプレートの両端部において、左右いずれか一方の前記先張り乾式床パネルのハット形状プレートに対応する端部には前記雄キーが配設され、左右いずれか他方の前記先張り乾式床パネルの前記雄キーに対応する端部には前記雌キーが配設されていることを特徴とする。
Further, in another aspect of the dry floor structure according to the present invention, the deck plate has a female key at one end and a male key at the other end, and the deck plates are adjacent to each other. The female key is engaged with the male key to connect the deck plates to each other.
One of the upholstered drywall panels on the left and right of the floor beam has a hat-shaped plate at the end facing the gap.
At both ends of the deck plate of the closed-dry floor panel, the male key is arranged at the end corresponding to the hat-shaped plate of either the left or right of the pre-tensioned dry floor panel, and the male key is arranged on either the left or right side. It is characterized in that the female key is arranged at the end corresponding to the male key of the pre-tension dry floor panel.

本態様によれば、隙間を有して左右に配設されている先張り乾式床パネルのそれぞれのデッキプレートに対して、隙間に配設される塞ぎ乾式床パネルの有するデッキプレートの端部を設置困難な状態で干渉させることなく、デッキプレートの端部同士を係合させながら設置することが可能になる。ここで、ハット形状プレートとは、例えばデッキプレートと同素材のプレートであって、両端がフラットなΩ状を呈し、デッキプレートのように雄キーも雌キーも有していないプレートである。デッキプレートにおいては、雄キーに対して雌キーを上方から嵌め込んで係合させることは可能である一方、雌キーに対して雄キーを上方から嵌め込んで係合させることは困難であることに加えて、雌キーに対して雄キーが干渉する結果、2つのデッキプレートの上端を同じレベルに揃えて配設することができなくなる。本態様によれば、先張り乾式床パネルの有するハット形状プレートの端部のフラットキーに対して、後施工される塞ぎ乾式床パネルの有するデッキプレートの端部の例えば雄キーが上方から落とし込まれることにより、双方が干渉することなく、先張り乾式床パネルと塞ぎ乾式床パネルを同じレベルとなるように塞ぎ乾式床パネルを設置することが可能になる。 According to this aspect, the end portion of the deck plate of the closed dry floor panel arranged in the gap is provided with respect to each deck plate of the pre-tensioned dry floor panel arranged on the left and right with a gap. It is possible to install the deck plates while engaging them with each other without interfering with each other in a difficult state. Here, the hat-shaped plate is, for example, a plate made of the same material as the deck plate, which has a flat Ω shape at both ends and does not have a male key or a female key like a deck plate. In the deck plate, it is possible to fit and engage the female key with the male key from above, but it is difficult to fit and engage the male key with the female key from above. In addition, as a result of the male key interfering with the female key, it becomes impossible to align the upper ends of the two deck plates at the same level. According to this aspect, for example, a male key at the end of the deck plate of the closed dryfloor panel to be installed is dropped from above with respect to the flat key at the end of the hat-shaped plate of the pre-attached drywall panel. By doing so, it becomes possible to install the closed dry floor panel so that the leading dry floor panel and the closed dry floor panel are at the same level without interfering with each other.

また、本発明による乾式床構造の他の態様において、前記先張り乾式床パネルでは、前記硬質断熱材と前記床面材よりも前記デッキプレートが側方に張出しており、
前記塞ぎ乾式床パネルでは、前記デッキプレートよりも前記硬質断熱材と前記床面材が側方に張出しており、
前記塞ぎ乾式床パネルの有する前記硬質断熱材と前記床面材の端部が、前記先張り乾式床パネルの有する前記デッキプレートの上に載置されていることを特徴とする。
Further, in another aspect of the dry floor structure according to the present invention, in the pre-covered dry floor panel, the deck plate projects laterally from the hard heat insulating material and the floor surface material.
In the closed-dry floor panel, the hard heat insulating material and the floor surface material project laterally from the deck plate.
It is characterized in that the hard heat insulating material and the end portion of the floor surface material of the closed dry floor panel are placed on the deck plate of the pre-loaded dry floor panel.

本態様によれば、床梁の左右に配設されている先張り乾式床パネルの間の隙間に対して、重機にて吊持され、吊り下ろされた塞ぎ乾式床パネルを、先張り乾式床パネルの構成部材と干渉させることなく設置することができる。 According to this aspect, the closed drywall panels suspended and hung by a heavy machine are placed in the gaps between the drywall panels arranged on the left and right sides of the floor beam with the drywall floors. It can be installed without interfering with the components of the panel.

また、本発明による乾式床構造の他の態様は、前記硬質断熱材が樹脂系フォーム断熱材からなり、前記軟質断熱材がグラスウールもしくはロックウールからなる繊維系断熱材からなることを特徴とする。 Further, another aspect of the dry floor structure according to the present invention is characterized in that the hard heat insulating material is made of a resin-based foam heat insulating material, and the soft heat insulating material is made of a fiber-based heat insulating material made of glass wool or rock wool.

本態様によれば、樹脂系フォーム断熱材と繊維系断熱材により硬質断熱材と軟質断熱材を形成することによって、共に断熱性に優れ、変形性を有する軟質断熱材と、パネルに剛性を付与できる硬質断熱材とを形成することができる。樹脂系フォーム断熱材としては、フェノール樹脂やウレタン樹脂等のフォーム材を適用できる。 According to this aspect, by forming a hard heat insulating material and a soft heat insulating material by a resin-based foam heat insulating material and a fiber-based heat insulating material, a soft heat insulating material having excellent heat insulating properties and deformability and rigidity are imparted to the panel. It is possible to form a hard insulating material that can be formed. As the resin-based foam heat insulating material, a foam material such as phenol resin or urethane resin can be applied.

また、本発明による乾式床構造の施工方法の一態様は、
床梁の左右に相互に隙間を置いて先張り乾式床パネルを設置する、先張り乾式床パネル設置工程と、
前記床梁の上の前記隙間に塞ぎ乾式床パネルを設置して該隙間を塞ぐ、塞ぎ乾式床パネル設置工程と、を有し、
前記先張り乾式床パネルは、デッキプレートと、該デッキプレートの上にある硬質断熱材と、該硬質断熱材の上にある床面材と、を有し、
前記塞ぎ乾式床パネルは、デッキプレートと、該デッキプレートの上にある硬質断熱材と、該硬質断熱材の上にある床面材と、を有し、
前記塞ぎ乾式床パネルの前記床面材の広幅面には複数の吊り治具用孔が開設され、少なくとも該吊り治具用孔に対応する下方位置には、軟質断熱材が配設されており、
前記塞ぎ乾式床パネル設置工程では、前記吊り治具用孔に吊り治具を係止し、該吊り治具に繋がるワイヤーを介して重機で前記塞ぎ乾式床パネルを吊り下ろして設置し、該吊り治具用孔から吊り治具を外すことにより乾式床構造を施工することを特徴とする。
Further, one aspect of the construction method of the dry floor structure according to the present invention is.
The process of installing a dry-walled floor panel, which installs a dry-walled floor panel with a gap between the left and right sides of the floor beam,
It has a closing dry floor panel installation step of closing the gap on the floor beam and installing the closing dry floor panel to close the gap.
The upholstered dry floor panel has a deck plate, a hard insulation material on the deck plate, and a floor surface material on the hard insulation material.
The closed-dry floor panel has a deck plate, a hard heat insulating material on the deck plate, and a floor surface material on the hard heat insulating material.
A plurality of holes for hanging jigs are formed on the wide surface of the floor surface material of the closing dry type floor panel, and a soft heat insulating material is arranged at least at a lower position corresponding to the holes for the hanging jigs. ,
In the closing dry floor panel installation step, the hanging jig is locked in the hole for the hanging jig, and the closing dry floor panel is suspended and installed by a heavy machine via a wire connected to the hanging jig, and the hanging is suspended. It is characterized in that a dry floor structure is constructed by removing the hanging jig from the jig hole.

本態様によれば、床梁の左右に先行して配設されている先張り乾式床パネルの間の隙間に対して、重機にて吊持され、吊り下ろされた塞ぎ乾式床パネルを設置するに当たり、塞ぎ乾式床パネルの広幅面(上面)に複数の小面積の吊り治具用孔が開設され、ここに吊り治具が挿通されることにより、吊り下ろしの際に吊り治具等が先張り乾式床パネルに干渉することがない。また、吊り下ろし後に吊り治具用孔を後施工することを不要にできる。従って、良好な施工性を有する施工方法となる。 According to this aspect, the closed dry floor panel suspended by a heavy machine is installed in the gap between the pre-tensioned dry floor panels arranged in front of the left and right of the floor beam. A plurality of small-area suspension jig holes are opened on the wide surface (upper surface) of the closed-dry floor panel, and the suspension jig is inserted through the holes so that the suspension jig and the like can be first suspended when hanging. Does not interfere with the tension-dry floor panel. Further, it is possible to eliminate the need for post-construction of a hole for a hanging jig after hanging. Therefore, it is a construction method having good workability.

また、本発明による乾式床構造を形成する塞ぎ乾式床パネルの一態様は、
床梁の左右に相互に隙間を置いて配設されている先張り乾式床パネルと、該床梁の上の該隙間に配設されている塞ぎ乾式床パネルと、を有する、乾式床構造を形成する塞ぎ乾式床パネルであって、
前記塞ぎ乾式床パネルは、デッキプレートと、該デッキプレートの上にある硬質断熱材と、該硬質断熱材の上にある床面材と、を有し、
前記塞ぎ乾式床パネルの前記床面材の広幅面には複数の吊り治具用孔が開設されており、少なくとも該吊り治具用孔に対応する下方位置には、軟質断熱材が配設されていることを特徴とする。
Further, one aspect of the closed dry floor panel forming the dry floor structure according to the present invention is.
A dry floor structure having a pre-tension dry floor panel arranged with a gap between the left and right sides of the floor beam and a closed dry floor panel arranged in the gap on the floor beam. It is a closed-dry floor panel that forms
The closed-dry floor panel has a deck plate, a hard insulation material on the deck plate, and a floor surface material on the hard insulation material.
A plurality of holes for hanging jigs are formed on the wide surface of the floor surface material of the closing dry type floor panel, and a soft heat insulating material is arranged at least at a lower position corresponding to the holes for the hanging jigs. It is characterized by being.

本態様によれば、後施工される塞ぎ乾式床パネルが床面材の広幅面(上面)に吊り治具用孔を有するとともに、床面材の下方の吊り治具用孔に対応する位置に軟質断熱材が配設されていることにより、施工後に吊り治具を取り外した際に、吊り治具用孔に対する処置を不要にできる。さらに、吊り治具用孔に吊り治具を挿通した際に、軟質断熱材が適度に変形することにより、吊り治具の吊り治具用孔への挿通と床面材への係合が断熱材によって阻害される恐れはない。 According to this aspect, the closed-dry floor panel to be constructed later has a hole for a hanging jig on the wide surface (upper surface) of the floor material, and is located at a position corresponding to the hole for the hanging jig below the floor material. By disposing the soft heat insulating material, it is possible to eliminate the need for treatment for the hole for the hanging jig when the hanging jig is removed after the construction. Further, when the hanging jig is inserted into the hole for the hanging jig, the soft heat insulating material is appropriately deformed, so that the insertion of the hanging jig into the hole for the hanging jig and the engagement with the floor material are heat-insulated. There is no risk of being hindered by the material.

また、本発明による乾式床構造を形成する先張り乾式床パネルの一態様は、
床梁の左右に相互に隙間を置いて配設されている先張り乾式床パネルと、該床梁の上の該隙間に配設されている塞ぎ乾式床パネルと、を有する、乾式床構造を形成する先張り乾式床パネルであって、
デッキプレートと、該デッキプレートの上にある硬質断熱材と、該硬質断熱材の上にある床面材と、前記デッキプレートの有する波形の稜線方向に延びる複数の桟部材と、該桟部材同士を繋ぐ水平ブレースと、を有していることを特徴とする。
Further, one aspect of the pre-tensioned drywall panel forming the drywall structure according to the present invention is.
A dry floor structure having a pre-tension dry floor panel arranged with a gap between the left and right sides of the floor beam and a closed dry floor panel arranged in the gap on the floor beam. It is a dry-walled floor panel with a lining to be formed.
The deck plate, the hard heat insulating material on the deck plate, the floor surface material on the hard heat insulating material, a plurality of crosspiece members extending in the corrugated ridge line direction of the deck plate, and the crosspiece members It is characterized by having a horizontal brace that connects the two.

本態様によれば、複数の桟部材と、桟部材同士を繋ぐ水平ブレースとによって補強されることにより、特に水平剛性の高い先張り乾式床パネルが形成される。そして、水平剛性の高い先張り乾式床パネルを有することにより、同様に水平剛性の高い乾式床構造が形成される。 According to this aspect, by being reinforced by a plurality of crosspiece members and horizontal braces connecting the crosspiece members, a toe-lined dry floor panel having particularly high horizontal rigidity is formed. Further, by having the lining dry floor panel having high horizontal rigidity, a dry floor structure having high horizontal rigidity is formed as well.

以上の説明から理解できるように、本発明の乾式床構造とその施工方法によれば、施工性に優れた乾式床構造とその施工方法を提供することができる。 As can be understood from the above description, according to the dry floor structure and its construction method of the present invention, it is possible to provide a dry floor structure having excellent workability and its construction method.

実施形態に係る先張り乾式床パネルの下段構成を示す図であって、(a)は平面図であり、(b)は図1(a)のb方向矢視図である。It is a figure which shows the lower structure of the lining dry type floor panel which concerns on embodiment, (a) is a plan view, (b) is the b direction arrow view of FIG. 1 (a). 先張り乾式床パネルの下方の中段構成を示す図であって、(a)は平面図であり、(b)は図2(a)のb方向矢視図である。It is a figure which shows the lower middle structure of the pre-tension dry floor panel, (a) is a plan view, (b) is the b direction arrow view of FIG. 2 (a). (a)はデッキプレートの雄キーに対してデッキプレートの雌キーが係合する状態を説明した斜視図であり、(b)はハット形状プレートの斜視図である。(A) is a perspective view explaining a state in which a female key of the deck plate is engaged with a male key of the deck plate, and (b) is a perspective view of a hat-shaped plate. 先張り乾式床パネルの上方の中段構成を示す図であって、(a)は平面図であり、(b)は図4(a)のb方向矢視図である。It is a figure which shows the upper middle structure of the pre-tension dry floor panel, (a) is a plan view, (b) is the b direction arrow view of FIG. 4 (a). 先張り乾式床パネルの上段構成を示すと共に先張り乾式床パネルを示す図であって、(a)は平面図であり、(b)は図5(a)のb方向矢視図である。It is a figure which shows the upper structure of the lining dry type floor panel and shows the laying dry floor panel, (a) is a plan view, (b) is the b direction arrow view of FIG. 5 (a). 実施形態に係る塞ぎ乾式床パネルの下段構成及び中段構成を示す図であって、(a)は平面図であり、(b)は図6(a)のb方向矢視図である。It is a figure which shows the lower structure and the middle structure of the closed dry floor panel which concerns on embodiment, (a) is a plan view, (b) is the b direction arrow view of FIG. 6 (a). 塞ぎ乾式床パネルの上段構成を示すと共に塞ぎ乾式床パネルを示す図であって、(a)は平面図であり、(b)は図7(a)のb方向矢視図である。It is a figure which shows the upper structure of the closed-dry floor panel and shows the closed-dry floor panel, (a) is a plan view, and (b) is the b-direction arrow view of FIG. 7 (a). 実施形態に係る乾式床構造の施工方法を説明する工程図である。It is a process drawing explaining the construction method of the drywall structure which concerns on embodiment. 図8に続いて乾式床構造の施工方法を説明する工程図である。Following FIG. 8, it is a process diagram for explaining the construction method of the dry floor structure. 図9に続いて乾式床構造の施工方法を説明する工程図であって、実施形態に係る乾式床構造を共に示す図である。Following FIG. 9, it is a process diagram for explaining the construction method of the dry floor structure, and is a diagram showing both the dry floor structure according to the embodiment.

以下、実施形態に係る乾式床構造とその施工方法、乾式床構造を形成する塞ぎ乾式床パネルと先張り乾式床パネルについて添付の図面を参照しながら説明する。なお、本明細書及び図面において、実質的に同一の構成要素については、同一の符号を付することにより重複した説明を省く場合がある。 Hereinafter, the drywall structure and its construction method according to the embodiment, the closed drywall panel forming the drywall structure, and the upholstered drywall panel will be described with reference to the attached drawings. In the present specification and the drawings, substantially the same components may be designated by the same reference numerals to omit duplicate explanations.

[実施形態に係る先張り乾式床パネル、塞ぎ乾式床パネル、乾式床構造とその施工方法]
<先張り乾式床パネル>
はじめに、図1乃至図5を参照して、実施形態に係る先張り乾式床パネルについて説明する。ここで、図1は、実施形態に係る先張り乾式床パネルの下段構成を示す図であり、図2は、先張り乾式床パネルの下方の中段構成を示す図である。また、図3(a)はデッキプレートの雄キーに対してデッキプレートの雌キーが係合する状態を説明した斜視図であり、図3(b)はハット形状プレートの斜視図である。また、図4は、先張り乾式床パネルの上方の中段構成を示す図であり、図5は、先張り乾式床パネルの上段構成を示すと共に先張り乾式床パネルを示す図である。
[Plaid dry floor panel, closed dry floor panel, dry floor structure and its construction method according to the embodiment]
<Tip dry floor panel>
First, with reference to FIGS. 1 to 5, a pre-attached dry floor panel according to an embodiment will be described. Here, FIG. 1 is a diagram showing a lower configuration of a prepayment drywall panel according to an embodiment, and FIG. 2 is a diagram showing a lower middle tier configuration of the prepayment drywall panel. Further, FIG. 3A is a perspective view illustrating a state in which the female key of the deck plate is engaged with the male key of the deck plate, and FIG. 3B is a perspective view of the hat-shaped plate. Further, FIG. 4 is a diagram showing an upper middle stage configuration of the pre-attached dry floor panel, and FIG. 5 is a diagram showing the upper configuration of the pre-attached dry floor panel and showing the pre-attached dry floor panel.

図1乃至図5に示すように、図示例の先張り乾式床パネル10は4段構成を有している。以下、下段構成、下方の中段構成、上方の中段構成、上段構成の順に説明する。まず、図1に示すように、先張り乾式床パネル10の下段には、4本の桟部材1が間隔を置いて並設されている。桟部材1は例えば角形鋼管から形成され、桟部材1の両端部には接続金具2が溶接等により接続されている。 As shown in FIGS. 1 to 5, the lining drywall panel 10 in the illustrated example has a four-stage configuration. Hereinafter, the lower configuration, the lower middle configuration, the upper middle configuration, and the upper configuration will be described in this order. First, as shown in FIG. 1, four crosspiece members 1 are arranged side by side at intervals in the lower part of the front-mounted drywall panel 10. The crosspiece member 1 is formed of, for example, a square steel pipe, and connecting metal fittings 2 are connected to both ends of the crosspiece member 1 by welding or the like.

接続金具2は、図1(b)に示すように、載置材21と、閉塞材22、被吊り材23とを有する。載置材21は、桟部材1の下面に溶接され、桟部材1の端部から側方に張出している。閉塞材22は、桟部材1の端部を閉塞するようにして載置材21から立設し、桟部材1と載置材21の双方に溶接等により接続されている。被吊り材23は、閉塞材22と直交する態様で載置材21から立設し、載置材21と閉塞材22の双方に溶接等により接続されている。 As shown in FIG. 1 (b), the connection fitting 2 has a mounting material 21, a closing material 22, and a suspended material 23. The mounting material 21 is welded to the lower surface of the crosspiece member 1 and projects laterally from the end portion of the crosspiece member 1. The blocking material 22 is erected from the mounting material 21 so as to close the end portion of the crosspiece member 1, and is connected to both the crosspiece member 1 and the mounting material 21 by welding or the like. The suspended material 23 is erected from the mounting material 21 in a manner orthogonal to the closing material 22, and is connected to both the mounting material 21 and the closing material 22 by welding or the like.

隣接する2つの桟部材1において、交差する態様で各載置材21に対して2本の水平ブレース3がボルト・ナット等により接続されていることにより、下段構成が形成される。なお、桟部材1の本数、桟部材1同士の間隔等は、施工される乾式床構造の大きさにより適宜設定され、図示例の形態に限定されるものではない。 In two adjacent crosspiece members 1, two horizontal braces 3 are connected to each mounting material 21 by bolts, nuts, or the like in an intersecting manner, whereby a lower configuration is formed. The number of crosspiece members 1, the distance between the crosspiece members 1 and the like are appropriately set according to the size of the dry floor structure to be constructed, and are not limited to the form shown in the illustrated example.

図2に示すように、桟部材1と水平ブレース3とを有する下段構成の上に、複数枚のデッキプレート5が相互に端部のキー同士を係合させた姿勢で載置され、さらに、右端には、デッキプレート5と同素材のハット形状プレート6が配設されている。複数枚のデッキプレート5が相互に係合すると共に右端にハット形状プレート6が配設されていることにより、図2(b)に示すような稜線方向の形状が波形であり、図2(a)に示すように下段構成をほぼカバーする下方の中段構成が形成される。デッキプレート5やハット形状プレート6は、桟部材1に対してそれぞれの適所がビス等により固定される。 As shown in FIG. 2, a plurality of deck plates 5 are placed on a lower structure having a crosspiece member 1 and a horizontal brace 3 in a posture in which the keys at the ends are engaged with each other, and further. A hat-shaped plate 6 made of the same material as the deck plate 5 is arranged at the right end. Since the plurality of deck plates 5 are engaged with each other and the hat-shaped plate 6 is arranged at the right end, the shape in the ridge line direction as shown in FIG. 2 (b) is a waveform, and FIG. 2 (a). ), The lower middle structure that almost covers the lower structure is formed. The deck plate 5 and the hat-shaped plate 6 are fixed in appropriate places to the crosspiece member 1 by screws or the like.

ここで、図3(a)を参照して、2つのデッキプレート5の係合態様について説明する。図3(a)に示すように、デッキプレート5は、長手方向に直交する断面形状が、左右の平坦部と、これら平坦部からテーパー状に上るテーパー側面と、平坦な天井面とを有し、図において右側の平坦部の側端には雌キー5aが設けられており、図において左側の平坦部の側端には雄キー5bが設けられている。図3(a)に示すように、一方のデッキプレート5の雄キー5bに対して、上方から他方のデッキプレート5の雌キー5aをX1方向に下ろしてきた際には、雄キー5bに雌キー5aが良好に嵌まり込み、相互に係合する。一方、図示を省略するが、逆に、一方のデッキプレート5の雌キー5aに対して、上方から他方のデッキプレート5の雄キー5bを下してきた際には、雌キー5aに雄キー5bが嵌まり込まないことから、相互に係合させることができない。そして、係合できないばかりでなく、相互に干渉してしまうことにより、上端を同じレベルにして2つのデッキプレート5を配設することができなくなる。従って、2つのデッキプレート5同士を端部のキー同士で係合させる場合には、雄キー5bに対して上方から雌キー5aを下してきて係合させることを前提として、雌キー5aと雄キー5bとの間に既定の左右関係が存在する。すなわち、図示例のように、右側に位置する雄キー5bに対して上方から下りてきた雌キー5aが係合して左側に位置する。 Here, an engagement mode of the two deck plates 5 will be described with reference to FIG. 3 (a). As shown in FIG. 3A, the deck plate 5 has flat portions on the left and right sides orthogonal to the longitudinal direction, tapered side surfaces that taper up from these flat portions, and a flat ceiling surface. In the figure, a female key 5a is provided at the side end of the flat portion on the right side, and a male key 5b is provided at the side end of the flat portion on the left side in the figure. As shown in FIG. 3A, when the female key 5a of the other deck plate 5 is lowered in the X1 direction from above with respect to the male key 5b of one deck plate 5, the male key 5b is female. The keys 5a fit well and engage with each other. On the other hand, although not shown, on the contrary, when the male key 5b of the other deck plate 5 is lowered from above with respect to the female key 5a of one deck plate 5, the male key 5b is attached to the female key 5a. Cannot be engaged with each other because they do not fit into each other. Not only can they not be engaged, but they also interfere with each other, making it impossible to dispose of the two deck plates 5 with the upper ends at the same level. Therefore, when the two deck plates 5 are engaged with each other by the keys at the ends, the female key 5a and the male key 5a are engaged on the premise that the female key 5a is lowered from above with respect to the male key 5b. There is a default left-right relationship with the key 5b. That is, as shown in the illustrated example, the female key 5a descending from above engages with the male key 5b located on the right side and is located on the left side.

このように、雌キー5aと雄キー5bの係合に際して、雌キー5aと雄キー5bとの間に既定の左右関係が存在することから、本実施形態では、図3(b)に示すハット形状プレート6をデッキプレート5の一方の側端に並設させることにより、後述する先張り乾式床パネル10と塞ぎ乾式床パネル20の良好な組み付けを実現させることとした。 As described above, when the female key 5a and the male key 5b are engaged with each other, there is a predetermined left-right relationship between the female key 5a and the male key 5b. Therefore, in the present embodiment, the hat shown in FIG. 3 (b). By arranging the shape plates 6 side by side on one side end of the deck plate 5, it was decided to realize good assembly of the upholstered dry floor panel 10 and the closed dry floor panel 20, which will be described later.

図3(b)に示すように、ハット形状プレート6は、左右にフラットキー6aを有するハット形状のプレートである。デッキプレート5の有する雌キー5aや雄キー5bと異なり、フラットキー6aは文字通り平坦であることから、このフラットキー6aの上に、雌キー5aと雄キー5bのいずれを下してきた場合であっても、相互に係合はしないものの、デッキプレート5とハット形状プレート6の双方の上端レベルを同じレベルにして配設することができる。必ずしも端部同士で係合しなくても、良好に配設された状態で、例えば、フラットキー6aと雄キー5bの重ね合せ部を下方の桟部材1に対してビス留め等することにより、双方を接続することができる。 As shown in FIG. 3B, the hat-shaped plate 6 is a hat-shaped plate having flat keys 6a on the left and right sides. Unlike the female key 5a and the male key 5b of the deck plate 5, the flat key 6a is literally flat, so it is the case that either the female key 5a or the male key 5b is placed on the flat key 6a. However, although they do not engage with each other, the upper end levels of both the deck plate 5 and the hat-shaped plate 6 can be arranged at the same level. Even if the ends are not necessarily engaged with each other, in a well-arranged state, for example, by fastening the overlapping portion of the flat key 6a and the male key 5b to the lower crosspiece member 1 with screws or the like. Both can be connected.

図2に戻り、先張り乾式床パネル10を形成する下方の中段構成においては、複数枚のデッキプレート5同士が、一方の雄キー5bに対して他方の雌キー5aが上方から嵌め込まれることにより係合され、さらに、右端のデッキプレート5に対してはその側方にハット形状プレート6が配設されることにより、下方の中段構成が形成される。 Returning to FIG. 2, in the lower middle stage configuration for forming the pre-tension dry floor panel 10, a plurality of deck plates 5 are fitted to one male key 5b with the other female key 5a from above. By being engaged and further disposing a hat-shaped plate 6 on the side of the deck plate 5 at the right end, a lower middle stage configuration is formed.

次に、図4に示すように、複数枚のデッキプレート5とハット形状プレート6の上に、複数枚の硬質断熱材7を敷設することにより、先張り乾式床パネル10の上方の中段構成が形成される。図示例では、3枚の広幅面積の硬質断熱材7と、端部の残り幅調整用の狭幅面積の硬質断熱材7が配設されているが、硬質断熱材7の形状は数は適宜設定される。 Next, as shown in FIG. 4, by laying a plurality of hard heat insulating materials 7 on the plurality of deck plates 5 and the hat-shaped plate 6, the upper middle stage configuration of the upholstered dry floor panel 10 is formed. It is formed. In the illustrated example, three wide-area hard heat insulating materials 7 and a narrow-width hard heat insulating material 7 for adjusting the remaining width of the end are arranged, but the number of the hard heat insulating materials 7 is appropriate. Set.

硬質断熱材7は、比較的剛性があり、硬い断熱材である。硬質断熱材7として、フェノールフォーム、硬質ウレタンフォーム、ポリスチレンフォーム等の樹脂系フォーム断熱材が適用される。この「フォーム材」には、ウレタンフォームに代表される連続気泡構造体と、ポリエチレンフォームに代表される独立気泡構造体が含まれる。 The hard heat insulating material 7 is a relatively rigid and hard heat insulating material. As the hard heat insulating material 7, a resin-based foam heat insulating material such as phenol foam, rigid urethane foam, and polystyrene foam is applied. This "foam material" includes an open cell structure typified by urethane foam and a closed cell structure typified by polyethylene foam.

そして、図5に示すように、複数枚の合板等から形成される床面材8を硬質断熱材7の上に敷設することにより、先張り乾式床パネル10の上段構成が形成されるとともに、4段構成の先張り乾式床パネル10が形成される。例えば、床面材8の適所において、床面材8と硬質断熱材7を貫通するようにして、ビス等で下段の桟部材1に対して床面材8及び硬質断熱材7を取り付けることができる。 Then, as shown in FIG. 5, by laying the floor surface material 8 formed of a plurality of plywood or the like on the hard heat insulating material 7, the upper structure of the pre-prepared dry floor panel 10 is formed, and at the same time, the upper structure is formed. A four-tiered drywall panel 10 is formed. For example, the floor surface material 8 and the hard heat insulating material 7 can be attached to the lower crosspiece member 1 with a screw or the like so as to penetrate the floor surface material 8 and the hard heat insulating material 7 at an appropriate position of the floor surface material 8. can.

また、図5に示すように、先張り乾式床パネル10では、硬質断熱材7と床面材8よりもデッキプレート5及びハット形状プレート6が側方に張出している。 Further, as shown in FIG. 5, in the tipped dry floor panel 10, the deck plate 5 and the hat-shaped plate 6 project laterally from the hard heat insulating material 7 and the floor surface material 8.

図示する先張り乾式床パネル10は、予め工場にて製作されたプレキャストパネルを現場搬送し、現場にて床梁上に速やかに設置してもよいし、例えば、床面材8以外を工場にて組み付けたものを現場搬送し、現場にて床面材8をビス等で留め付けた後、床梁上に設置してもよい。 The illustrated dry floor panel 10 may be carried on-site from a precast panel manufactured in advance at the factory and quickly installed on the floor beam at the site. For example, other than the floor surface material 8 may be transported to the factory. The assembled material may be transported to the site, the floor surface material 8 may be fastened with screws or the like at the site, and then installed on the floor beam.

<塞ぎ乾式床パネル>
次に、図6及び図7を参照して、実施形態に係る塞ぎ乾式床パネルについて説明する。ここで、図6は、実施形態に係る塞ぎ乾式床パネルの下段構成及び中段構成を示す図であり、図7は、塞ぎ乾式床パネルの上段構成を示すと共に塞ぎ乾式床パネルを示す図である。
<Closed dry floor panel>
Next, the closed-dry floor panel according to the embodiment will be described with reference to FIGS. 6 and 7. Here, FIG. 6 is a diagram showing a lower configuration and a middle configuration of the closed-dry floor panel according to the embodiment, and FIG. 7 is a diagram showing the upper configuration of the closed-dry floor panel and showing the closed-dry floor panel. ..

図6に示すように、塞ぎ乾式床パネル20の下段構成においては、複数枚のデッキプレート5を相互に係合させた上に、複数枚の硬質断熱材7を敷設すると共に、硬質断熱材7の間に狭幅で帯状の2枚の軟質断熱材9を敷設する。2枚の軟質断熱材9は、図7に示す床面材8に開設される吊り治具用孔8aに対応する位置に配設されている。 As shown in FIG. 6, in the lower configuration of the closed dry floor panel 20, a plurality of deck plates 5 are engaged with each other, and a plurality of hard heat insulating materials 7 are laid and the hard heat insulating material 7 is laid. Two narrow and strip-shaped soft heat insulating materials 9 are laid between the two. The two soft heat insulating materials 9 are arranged at positions corresponding to the suspension jig holes 8a provided in the floor surface material 8 shown in FIG. 7.

図6に戻り、軟質断熱材9には、ロックウールやグラスウールといった繊維系断熱材が適用される。繊維系断熱材は樹脂系フォーム断熱材に比べて剛性が低く、変形性能に優れている。 Returning to FIG. 6, a fiber-based heat insulating material such as rock wool or glass wool is applied to the soft heat insulating material 9. The fiber-based heat insulating material has lower rigidity than the resin-based foam heat insulating material and is excellent in deformation performance.

図6に示す硬質断熱材7と軟質断熱材9の上に、図7に示すように複数枚の床面材8を敷設し、床面材8の適所において、床面材8と硬質断熱材7を貫通するようにしてデッキプレート5に対してビス留めすることにより、塞ぎ乾式床パネル20が形成される。 As shown in FIG. 7, a plurality of floor surface materials 8 are laid on the hard heat insulating material 7 and the soft heat insulating material 9 shown in FIG. 6, and the floor surface material 8 and the hard heat insulating material 8 are placed in appropriate places of the floor surface material 8. By screwing to the deck plate 5 so as to penetrate the 7 to form a closed-dry floor panel 20.

図7に示すように、塞ぎ乾式床パネル20には、平面視矩形の塞ぎ乾式床パネル20の短手方向に並んだ2つで1組の吊り治具用孔8aが長手方向の両端側に計2組設けられている。そして、各組の吊り治具用孔8aに亘る範囲において、床面材8の下方に帯状の軟質断熱材9が配設されている。以下で説明する乾式床構造の施工方法で詳説するが、吊り治具用孔8aに吊り治具が挿通された際に、仮に吊り治具用孔8aの下方に硬質断熱材7が配設されていると、硬質断熱材7が硬すぎて吊り治具をスムーズに挿通させて床面材8に係止させることができない。そこで、吊り治具用孔8aに対応する下方位置には、軟質断熱材9を配設している。 As shown in FIG. 7, in the closed-dry floor panel 20, two sets of hanging jig holes 8a arranged in the lateral direction of the rectangular closed-dry floor panel 20 in a plan view are provided on both ends in the longitudinal direction. There are two sets in total. A band-shaped soft heat insulating material 9 is arranged below the floor surface material 8 in a range extending over the suspension jig holes 8a of each set. As will be described in detail in the method of constructing the dry floor structure described below, when the suspension jig is inserted into the suspension jig hole 8a, the hard heat insulating material 7 is temporarily arranged below the suspension jig hole 8a. If so, the hard heat insulating material 7 is too hard to allow the hanging jig to be smoothly inserted and locked to the floor surface material 8. Therefore, a soft heat insulating material 9 is arranged at a lower position corresponding to the suspension jig hole 8a.

尚、図示例の軟質断熱材9は、並んだ2つの吊り治具用孔8aに亘る帯状の形態であるが、図示例以外の形態の軟質断熱材が適用されてもよい。例えば、吊り治具用孔8aの直下のみ軟質断熱材が配設される形態であってもよい。この形態では、硬質断熱材7のうち、吊り治具用孔8aに対応する位置に例えば丸孔が開設され、この丸孔に軟質断熱材が詰め込まれる。 The soft heat insulating material 9 in the illustrated example has a strip-shaped shape extending over the two side-by-side hanging jig holes 8a, but a soft heat insulating material in a form other than the illustrated example may be applied. For example, the soft heat insulating material may be arranged only directly under the suspension jig hole 8a. In this embodiment, for example, a round hole is opened at a position corresponding to the suspension jig hole 8a in the hard heat insulating material 7, and the soft heat insulating material is filled in the round hole.

図7に示すように、塞ぎ乾式床パネル20では、デッキプレート5よりも硬質断熱材7(及び軟質断熱材9)と床面材8が側方に張出している。 As shown in FIG. 7, in the closed-dry floor panel 20, the hard heat insulating material 7 (and the soft heat insulating material 9) and the floor surface material 8 project laterally from the deck plate 5.

<乾式床構造とその施工方法>
次に、図8乃至図10を参照して、実施形態に係る乾式床構造とその施工方法について説明する。ここで、図8乃至図10は順に、実施形態に係る乾式床構造の施工方法を説明する工程図であり、図10はさらに実施形態に係る乾式床構造を示す図である。尚、図9は、軟質断熱材9が配設されている箇所で切断した断面図を示している。
<Dry floor structure and its construction method>
Next, the drywall structure and the construction method thereof according to the embodiment will be described with reference to FIGS. 8 to 10. Here, FIGS. 8 to 10 are process diagrams for explaining the construction method of the dry floor structure according to the embodiment in order, and FIG. 10 is a diagram further showing the dry floor structure according to the embodiment. Note that FIG. 9 shows a cross-sectional view cut at a portion where the soft heat insulating material 9 is arranged.

まず、図8に示すように、例えばコンクリート製でプレキャスト製のべた基礎Kの上にH形鋼等の形鋼材からなる床梁30が敷設され、基礎Kに固定される。なお、基礎Kの形態は、べた基礎の他、布基礎等であってもよいし、プレキャスト製でなくて現場打設された基礎であってもよい。例えば外形が平面視矩形の建物の場合、実際には、外形に沿う方向に大梁が敷設され、対向する大梁と大梁の間に小梁が配設されることにより、床梁が形成されるが、図8乃至図10では、これらをまとめて床梁30とし、その一部を取り出して施工方法を説明することにする。 First, as shown in FIG. 8, a floor beam 30 made of a shaped steel material such as H-shaped steel is laid on a solid foundation K made of concrete and precast, and fixed to the foundation K. The form of the foundation K may be a solid foundation, a cloth foundation, or the like, or a foundation cast on site instead of being made of precast. For example, in the case of a building whose outer shape is rectangular in a plan view, a floor beam is actually formed by laying a girder in the direction along the outer shape and arranging a small beam between the opposite girders. In FIGS. 8 to 10, these are collectively referred to as a floor beam 30, and a part thereof will be taken out to explain the construction method.

実施形態に係る施工方法では、まず、図8に示すように、間隔を置いて敷設された床梁30の左右に、床梁30の直上に隙間Gを有する態様で先張り乾式床パネル10を設置する。図8では、左右の床梁30の側方に既に先張り乾式床パネル10が設置され、左右の床梁30の間に先張り乾式床パネル10が設置される状態を示しているが、例えば建物の左右いずれか一方の端から順に先張り乾式床パネル10が設置されてもよい。 In the construction method according to the embodiment, first, as shown in FIG. 8, a pre-attached dry floor panel 10 is provided on the left and right sides of the floor beams 30 laid at intervals so as to have a gap G directly above the floor beams 30. Install. FIG. 8 shows a state in which the dry-walled floor panels 10 are already installed on the sides of the left and right floor beams 30, and the dry-walled floor panels 10 are installed between the left and right floor beams 30, for example. The drywall panel 10 may be installed in order from either the left or right end of the building.

床梁30を形成するH形鋼において、ウエブの途中位置には鋼製で水平方向に延設する被載置プレート31がウエブに対して溶接にて接続されており、被載置プレート31の上下が、ウエブ及び上下のフランジに溶接されている鋼製の補強リブ33、32にて補強されている。先張り乾式床パネル10の有する被吊り材23に開設されている治具用孔23aに吊り治具Jが係合され、吊り治具JにワイヤーWが接続されている。例えば、図5に示す先張り乾式床パネル10において、左右上下の4箇所の被吊り材23に対して吊り治具Jが係合され、各吊り治具Jに接続されているワイヤーWが図8に示す態様で纏められ、不図示のクレーン等の重機によって吊持され、床梁30に対してX2方向に吊り下ろされる。この際、先張り乾式床パネル10の有する載置材21が床梁30から側方に張出す被載置プレート31の上に載置される。そして、載置材21が被載置プレート31の上に載置された状態において、双方のボルト孔21a、31aが連通する。連通したボルト孔21a、31aにボルトを挿通し、ナット締めすることにより、ボルト・ナット34にて双方を接続する。以上が、先張り乾式床パネル設置工程である。 In the H-shaped steel forming the floor beam 30, a steel mounting plate 31 extending in the horizontal direction is connected to the web by welding at a position in the middle of the web, and the mounting plate 31 is connected to the web. The top and bottom are reinforced with steel reinforcing ribs 33, 32 welded to the web and the top and bottom flanges. The hanging jig J is engaged with the jig hole 23a provided in the suspended material 23 of the upholstered dry floor panel 10, and the wire W is connected to the hanging jig J. For example, in the tipped dry floor panel 10 shown in FIG. 5, the hanging jig J is engaged with the four hanging members 23 on the left, right, top and bottom, and the wire W connected to each hanging jig J is shown in the figure. It is put together in the embodiment shown in No. 8, suspended by a heavy machine such as a crane (not shown), and suspended in the X2 direction with respect to the floor beam 30. At this time, the mounting material 21 of the pre-tensioned dry floor panel 10 is placed on the mounting plate 31 projecting laterally from the floor beam 30. Then, in a state where the mounting material 21 is placed on the mounting plate 31, both bolt holes 21a and 31a communicate with each other. By inserting bolts into the communicated bolt holes 21a and 31a and tightening the nuts, both are connected by the bolts and nuts 34. The above is the process of installing the drywall floor panel.

次に、図9に示すように、塞ぎ乾式床パネル20の有する床面材8に開設されている4箇所の吊り治具用孔8a(図7参照)に吊り治具Jを挿通して係合させ、各吊り治具Jに接続されているワイヤーWを1本に纏め、不図示のクレーン等の重機により、隣接する先張り乾式床パネル10の間の隙間Gに吊り下ろす。尚、図9は、2箇所の隙間Gに同時に2つの塞ぎ乾式床パネル20をX2方向に吊り下ろしている状態を示しているが、各隙間Gに対して塞ぎ乾式床パネル20を順次吊り下ろしていく方法であってもよいことは勿論である。 Next, as shown in FIG. 9, the hanging jig J is inserted into the four hanging jig holes 8a (see FIG. 7) provided in the floor surface material 8 of the closed dry floor panel 20 to engage with the floor material 8. The wires W connected to each hanging jig J are combined into one, and the wires W are hung in the gap G between the adjacent dry floor panels 10 by a heavy machine such as a crane (not shown). Note that FIG. 9 shows a state in which two closed-dry floor panels 20 are suspended in the X2 direction at the same time in two gaps G, but the closed-dry floor panels 20 are sequentially suspended in each gap G. Of course, it may be a method of going.

図9に示すように、床面材8に開設されている吊り治具用孔8aの下方にある断熱材が軟質断熱材9であることから、吊り治具用孔8aに吊り治具Jを挿通した際に、軟質断熱材9は適度にδ方向に変形して、吊り治具Jの挿通及び床面材8への係合を阻害しない。 As shown in FIG. 9, since the heat insulating material below the hanging jig hole 8a provided in the floor surface material 8 is the soft heat insulating material 9, the hanging jig J is provided in the hanging jig hole 8a. Upon insertion, the soft heat insulating material 9 is appropriately deformed in the δ direction and does not hinder the insertion of the hanging jig J and the engagement with the floor surface material 8.

さらに、図9からも明らかなように、先張り乾式床パネル10は、硬質断熱材7と床面材8よりもデッキプレート5及びハット形状プレート6が側方の隙間G側に張出しており、塞ぎ乾式床パネル20は、デッキプレート5よりも硬質断熱材7(及び軟質断熱材9)と床面材8が側方の隙間G側に張出している。そのため、塞ぎ乾式床パネル20を隙間Gに吊り下ろした際に、左右の先張り乾式床パネル10のハット形状プレート6とデッキプレート5の上端に、塞ぎ乾式床パネル20の硬質断熱材7(及び軟質断熱材9)をスムーズに載置することができる。 Further, as is clear from FIG. 9, in the tipped dry floor panel 10, the deck plate 5 and the hat-shaped plate 6 project to the side gap G side from the hard heat insulating material 7 and the floor surface material 8. In the closed-dry floor panel 20, the hard heat insulating material 7 (and the soft heat insulating material 9) and the floor surface material 8 project from the deck plate 5 to the side gap G side. Therefore, when the closed dry floor panel 20 is hung in the gap G, the hard heat insulating material 7 (and the closed dry floor panel 20) of the closed dry floor panel 20 is placed on the upper ends of the hat-shaped plate 6 and the deck plate 5 of the left and right pre-loaded dry floor panels 10. The soft heat insulating material 9) can be placed smoothly.

また、図3でも説明したように、塞ぎ乾式床パネル20の有する右端のデッキプレート5の右側端部のキーは雌キー5aであり、左側のデッキプレート5の左側端部のキーは雄キー5bである。これに対し、隙間Gの右側にある先張り乾式床パネル10の有する左端のデッキプレート5の左側端部のキーは雄キー5bであることから、塞ぎ乾式床パネル20をX2方向に吊り下ろしてきた際に、下方に位置する雄キー5bに対して、上方から雌キー5aがX3方向に下りてきてスムーズに嵌まり込み、相互に係合される。同時に、塞ぎ乾式床パネル20をX2方向に吊り下ろしてきた際に、下方に位置するフラットキー6aに対して、上方から雄キー5bがX4方向に下りてきて、相互に干渉することなくフラットキー6aの上に載置される。従って、左右の先張り乾式床パネル10の間の隙間Gに塞ぎ乾式床パネル20を吊り下ろした際に、それらの有する床面材8を同じレベルに設置することができる。以上が、塞ぎ乾式床パネル設置工程である。 Further, as described in FIG. 3, the key at the right end of the deck plate 5 at the right end of the closed-dry floor panel 20 is the female key 5a, and the key at the left end of the left deck plate 5 is the male key 5b. Is. On the other hand, since the key at the left end of the deck plate 5 at the left end of the fronted dry floor panel 10 on the right side of the gap G is the male key 5b, the closed dry floor panel 20 is hung in the X2 direction. At that time, the female key 5a descends in the X3 direction from above with respect to the male key 5b located below, smoothly fits into the male key 5b, and is engaged with each other. At the same time, when the closed-dry floor panel 20 is suspended in the X2 direction, the male key 5b descends in the X4 direction from above with respect to the flat key 6a located below, and the flat key does not interfere with each other. It is placed on top of 6a. Therefore, when the drywall panels 20 are hung by closing in the gap G between the left and right pre-tensioned drywall panels 10, the flooring materials 8 possessed by them can be installed at the same level. The above is the closing and drying floor panel installation process.

建物の床を形成する各床梁30に対して、先張り乾式床パネル設置工程を実行した後、先張り乾式床パネル設置工程にて形成されている先張り乾式床パネル10間の隙間Gに対して、塞ぎ乾式床パネル設置工程を実行して塞ぎ乾式床パネル20を設置する。 After executing the pre-dry floor panel installation process for each floor beam 30 forming the floor of the building, the gap G between the pre-dry floor panels 10 formed in the pre-dry floor panel installation process On the other hand, the closing dry floor panel installation step is executed to install the closing dry floor panel 20.

このようにして左右の先張り乾式床パネル10の間の隙間Gに対して塞ぎ乾式床パネル20を設置することにより、図10に示すように、床梁30の左右にある先張り乾式床パネル10と、左右の先張り乾式床パネル10の間に配設された塞ぎ乾式床パネル20とを有する乾式床構造100が形成される。図10からも明らかなように、先張り乾式床パネル10の側方への張出し部の上に塞ぎ乾式床パネル20の側方への張出し部が載置されることにより、左右の先張り乾式床パネル10と塞ぎ乾式床パネル20の有するそれぞれの床面材8が同じレベルに揃えられる。 By closing the gap G between the left and right lining dry floor panels 10 and installing the dry floor panel 20 in this way, as shown in FIG. 10, the lining dry floor panels on the left and right of the floor beam 30 are installed. A dry floor structure 100 having a closed dry floor panel 20 disposed between the left and right lining dry floor panels 10 is formed. As is clear from FIG. 10, by closing on the laterally overhanging portion of the drywall panel 10 and placing the laterally overhanging portion of the drywall panel 20, the left and right lining drywall type The floor surface materials 8 of the floor panel 10 and the closed dry floor panel 20 are aligned to the same level.

図10は、水平に広がる先張り乾式床パネル10の床面材8と塞ぎ乾式床パネル20の床面材8の上に、フローリング材40としてブロックカーペット等のカーペットが敷設された状態を示している。このように、床面材8の上にフローリング材40を敷設することにより、塞ぎ乾式床パネル20の床面材8の有する吊り治具用孔8aは室内側から見えない状態となる。また、図示例のように乾式床構造100が完成した状態において、吊り治具用孔8aに対して必ずしも塞ぎ処置を行う必要はないが、樹脂キャップ等を嵌めて閉塞処置を行ってもよい。 FIG. 10 shows a state in which a carpet such as a block carpet is laid as a flooring material 40 on the floor material 8 of the horizontally spreading dry floor panel 10 and the floor material 8 of the closed dry floor panel 20. There is. By laying the flooring material 40 on the floor surface material 8 in this way, the hanging jig hole 8a of the floor surface material 8 of the closed-dry floor panel 20 becomes invisible from the indoor side. Further, in the state where the dry floor structure 100 is completed as shown in the illustrated example, it is not always necessary to close the hole 8a for the hanging jig, but a resin cap or the like may be fitted to close the hole 8a.

図示する乾式床構造100とその施工方法によれば、塞ぎ乾式床パネル20を設置する際に適用される吊り治具用孔8aが床面材8の広幅面の複数箇所に開設されていること、及び、この吊り治具用孔8aに対応する下方位置に軟質断熱材9が配設されていることにより、塞ぎ乾式床パネル20を設置した後の後施工が不要になり、良好な施工性の下で、乾式床構造100を施工することが可能になる。 According to the illustrated dry floor structure 100 and its construction method, holes 8a for hanging jigs applied when the closed dry floor panel 20 is installed are provided at a plurality of locations on the wide surface of the floor material 8. And, since the soft heat insulating material 9 is arranged at the lower position corresponding to the hole 8a for the hanging jig, the post-installation after the closing dry floor panel 20 is installed becomes unnecessary, and the workability is good. Underneath, it becomes possible to construct the drywall structure 100.

なお、上記実施形態に挙げた構成等に対し、その他の構成要素が組み合わされるなどした他の実施形態であってもよく、また、本発明はここで示した構成に何等限定されるものではない。この点に関しては、本発明の趣旨を逸脱しない範囲で変更することが可能であり、その応用形態に応じて適切に定めることができる。 It should be noted that the configuration or the like described in the above embodiment may be another embodiment in which other components are combined, and the present invention is not limited to the configuration shown here. .. This point can be changed without departing from the spirit of the present invention, and can be appropriately determined according to the application form thereof.

1:桟部材、2:接続金具、21:載置材、22:閉塞材、23:被吊り材、3:水平ブレース、5:デッキプレート、5a:雌キー、5b:雄キー、6:ハット形状プレート、6a:フラットキー、7:硬質断熱材(断熱材)、8:床面材、8a:吊り治具用孔、9:軟質断熱材(断熱材)、10:先張り乾式床パネル、20:塞ぎ乾式床パネル、30:床梁、31:被載置プレート、32、33:補強リブ、34:ボルト・ナット、40:カーペット(フローリング材)、100:乾式床構造、G:隙間、J:吊り治具、W:ワイヤー 1: Crosspiece member 2: Connection fitting, 21: Mounting material, 22: Closure material, 23: Suspended material, 3: Horizontal brace, 5: Deck plate, 5a: Female key, 5b: Male key, 6: Hat Shape plate, 6a: Flat key, 7: Hard heat insulating material (heat insulating material), 8: Floor surface material, 8a: Hole for hanging jig, 9: Soft heat insulating material (heat insulating material), 10: Pre-attached dry floor panel, 20: Closing dry floor panel, 30: Floor beam, 31: Placement plate, 32, 33: Reinforcing rib, 34: Bolts and nuts, 40: Carpet (flooring material), 100: Dry floor structure, G: Gap, J: Hanging jig, W: Wire

Claims (4)

床梁の左右に相互に隙間を置いて配設されている先張り乾式床パネルと、該床梁の上の該隙間に配設されている塞ぎ乾式床パネルと、を有する乾式床構造であって、
前記先張り乾式床パネルは、デッキプレートと、該デッキプレートの上にある硬質断熱材と、該硬質断熱材の上にある床面材と、を有し、
前記塞ぎ乾式床パネルは、デッキプレートと、該デッキプレートの上にある硬質断熱材と、該硬質断熱材の上にある床面材と、を有し、
前記塞ぎ乾式床パネルの有する前記床面材の広幅面には複数の吊り治具用孔が開設されており、少なくとも該吊り治具用孔に対応する下方位置には、軟質断熱材が配設されており、
前記デッキプレートは、一方の端部に雌キーを有し、他方の端部に雄キーを有しており、隣接する前記デッキプレート同士の前記雄キーに前記雌キーが係合して該デッキプレート同士の接続が行われるように構成されており、
前記床梁の左右にある前記先張り乾式床パネルのいずれか一方は、前記隙間に臨む端部にハット形状プレートを有し、
前記塞ぎ乾式床パネルの有する前記デッキプレートの両端部において、左右いずれか一方の前記先張り乾式床パネルのハット形状プレートに対応する端部には前記雄キーが配設され、左右いずれか他方の前記先張り乾式床パネルの前記雄キーに対応する端部には前記雌キーが配設されていることを特徴とする、乾式床構造。
It is a dry floor structure having a pre-tension dry floor panel arranged with a gap between the left and right sides of the floor beam and a closed dry floor panel arranged in the gap on the floor beam. hand,
The upholstered dry floor panel has a deck plate, a hard insulation material on the deck plate, and a floor surface material on the hard insulation material.
The closed-dry floor panel has a deck plate, a hard insulation material on the deck plate, and a floor surface material on the hard insulation material.
A plurality of suspension jig holes are formed on the wide surface of the floor surface material of the closed-dry floor panel, and a soft heat insulating material is arranged at least at a lower position corresponding to the suspension jig holes. Has been
The deck plate has a female key at one end and a male key at the other end, and the female key engages with the male key between adjacent deck plates. It is configured so that the plates are connected to each other.
One of the upholstered drywall panels on the left and right of the floor beam has a hat-shaped plate at the end facing the gap.
At both ends of the deck plate of the closed-dry floor panel, the male key is arranged at the end corresponding to the hat-shaped plate of either the left or right sided dry floor panel, and the male key is arranged on either the left or right side. A dry floor structure, characterized in that the female key is disposed at an end corresponding to the male key of the upholstered dry floor panel.
前記先張り乾式床パネルでは、前記硬質断熱材と前記床面材よりも前記デッキプレートが側方に張出しており、
前記塞ぎ乾式床パネルでは、前記デッキプレートよりも前記硬質断熱材と前記床面材が側方に張出しており、
前記塞ぎ乾式床パネルの有する前記硬質断熱材と前記床面材の端部が、前記先張り乾式床パネルの有する前記デッキプレートの上に載置されていることを特徴とする、請求項に記載の乾式床構造。
In the upholstered dry floor panel, the deck plate projects laterally from the hard heat insulating material and the floor surface material.
In the closed-dry floor panel, the hard heat insulating material and the floor surface material project laterally from the deck plate.
The first aspect of the present invention is characterized in that the hard heat insulating material of the closed dry floor panel and the end portion of the floor surface material are placed on the deck plate of the pre-loaded dry floor panel. The dryfloor structure described.
前記硬質断熱材が樹脂系フォーム断熱材からなり、前記軟質断熱材がグラスウールもしくはロックウールからなる繊維系断熱材からなることを特徴とする、請求項1又は2に記載の乾式床構造。 The dry floor structure according to claim 1 or 2 , wherein the hard heat insulating material is made of a resin-based foam heat insulating material, and the soft heat insulating material is made of a fiber-based heat insulating material made of glass wool or rock wool. 床梁の左右に相互に隙間を置いて先張り乾式床パネルを設置する、先張り乾式床パネル設置工程と、
前記床梁の上の前記隙間に塞ぎ乾式床パネルを設置して該隙間を塞ぐ、塞ぎ乾式床パネル設置工程と、を有し、
前記先張り乾式床パネルは、デッキプレートと、該デッキプレートの上にある硬質断熱材と、該硬質断熱材の上にある床面材と、を有し、
前記塞ぎ乾式床パネルは、デッキプレートと、該デッキプレートの上にある硬質断熱材と、該硬質断熱材の上にある床面材と、を有し、
前記塞ぎ乾式床パネルの前記床面材の広幅面には複数の吊り治具用孔が開設され、少なくとも該吊り治具用孔に対応する下方位置には、軟質断熱材が配設されており、
前記塞ぎ乾式床パネル設置工程では、前記吊り治具用孔に吊り治具を係止し、該吊り治具に繋がるワイヤーを介して重機で前記塞ぎ乾式床パネルを吊り下ろして設置し、該吊り治具用孔から吊り治具を外すことにより乾式床構造を施工し、
前記デッキプレートは、一方の端部に雌キーを有し、他方の端部に雄キーを有しており、
前記床梁の左右にある前記先張り乾式床パネルのいずれか一方は、前記隙間に臨む端部にハット形状プレートを有し、
前記塞ぎ乾式床パネルの有する前記デッキプレートの両端部において、左右いずれか一方の前記先張り乾式床パネルのハット形状プレートに対応する端部には前記雄キーが配設され、左右いずれか他方の前記先張り乾式床パネルの前記雄キーに対応する端部には前記雌キーが配設されており、
前記塞ぎ乾式床パネル設置工程では、隣接する前記デッキプレート同士の前記雄キーに前記雌キーを係合させて該デッキプレート同士の接続を行うことを特徴とする、乾式床構造の施工方法。
The process of installing a dry-walled floor panel, which installs a dry-walled floor panel with a gap between the left and right sides of the floor beam,
It has a closing dry floor panel installation step of closing the gap on the floor beam and installing the closing dry floor panel to close the gap.
The upholstered dry floor panel has a deck plate, a hard insulation material on the deck plate, and a floor surface material on the hard insulation material.
The closed-dry floor panel has a deck plate, a hard insulation material on the deck plate, and a floor surface material on the hard insulation material.
A plurality of suspension jig holes are formed on the wide surface of the floor surface material of the closed-dry floor panel, and a soft heat insulating material is disposed at least at a lower position corresponding to the suspension jig holes. ,
In the closing dry floor panel installation step, the hanging jig is locked in the hole for the hanging jig, and the closing dry floor panel is suspended and installed by a heavy machine via a wire connected to the hanging jig, and the hanging is suspended. A dry floor structure is constructed by removing the hanging jig from the jig hole.
The deck plate has a female key at one end and a male key at the other end.
One of the upholstered drywall panels on the left and right of the floor beam has a hat-shaped plate at the end facing the gap.
At both ends of the deck plate of the closed-dry floor panel, the male key is arranged at the end corresponding to the hat-shaped plate of either the left or right of the pre-tensioned dry floor panel, and the male key is arranged on either the left or right side. The female key is arranged at the end corresponding to the male key of the pre-tension dry floor panel.
The method for constructing a dry floor structure, which comprises engaging the female key with the male key between adjacent deck plates to connect the deck plates to each other in the closing dry floor panel installation step .
JP2018061234A 2018-03-28 2018-03-28 Dry floor structure and its construction method Active JP7085382B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018061234A JP7085382B2 (en) 2018-03-28 2018-03-28 Dry floor structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018061234A JP7085382B2 (en) 2018-03-28 2018-03-28 Dry floor structure and its construction method

Publications (2)

Publication Number Publication Date
JP2019173334A JP2019173334A (en) 2019-10-10
JP7085382B2 true JP7085382B2 (en) 2022-06-16

Family

ID=68168289

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018061234A Active JP7085382B2 (en) 2018-03-28 2018-03-28 Dry floor structure and its construction method

Country Status (1)

Country Link
JP (1) JP7085382B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022004451A1 (en) * 2020-06-29 2022-01-06 ケンテック株式会社 Groove-shaped deck plate
WO2022004452A1 (en) * 2020-06-29 2022-01-06 ケンテック株式会社 Flat deck
WO2022004453A1 (en) * 2020-06-30 2022-01-06 ケンテック株式会社 Reinforced deck plate

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001098688A (en) 1999-09-29 2001-04-10 Daiwa House Ind Co Ltd Floor structure and floor panel of building
JP2002309758A (en) 2001-04-17 2002-10-23 Kanegafuchi Chem Ind Co Ltd Foamed resin composite floor structure

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05295828A (en) * 1992-04-18 1993-11-09 Sekisui House Ltd Constituting method of floor and fitting device of floor frame
JPH0683686U (en) * 1993-05-20 1994-11-29 三井ホーム株式会社 Floor panel hanger

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001098688A (en) 1999-09-29 2001-04-10 Daiwa House Ind Co Ltd Floor structure and floor panel of building
JP2002309758A (en) 2001-04-17 2002-10-23 Kanegafuchi Chem Ind Co Ltd Foamed resin composite floor structure

Also Published As

Publication number Publication date
JP2019173334A (en) 2019-10-10

Similar Documents

Publication Publication Date Title
CA2365717C (en) Constructional elements
JP7085382B2 (en) Dry floor structure and its construction method
KR102243984B1 (en) Non-supporting formwork system for retaining wall using self-supporting form and construction method thereof
JP2008503670A (en) Isolated concrete formwork system with variable length wall connections
RU2376424C1 (en) Ready-built and solid-cast building construction system
KR101776129B1 (en) Built-up type precast double structure for slab and wall and double precast wall construction method using the same
RU2558868C2 (en) Prefabricated bearing structure of slab with beams
RU2118432C1 (en) Construction panel
KR101275932B1 (en) Method for installing ALC panel to concrete slab
KR101908356B1 (en) Aseismatic Reinforcement Double Steel Frame and Aseismatic Reinforcement Method using thereof
US8763317B2 (en) Concrete roof panel
KR102174760B1 (en) Roof structure for culvert houses
JP2002213077A (en) Construction method of set form for concrete wall and steel-made form used therefor
JPH09195438A (en) Precast concrete plate and reinforcing structure of building
JP5975708B2 (en) Building roof structure
JP2010070907A (en) Dry double wall structure of underground exterior wall
JP3643809B2 (en) Connection structure of precast concrete foundation blocks
JP7329770B2 (en) Overhang panel unit and overhang panel structure
JP7206805B2 (en) Thermal insulation structure of building and its construction method
KR102606698B1 (en) Precast concrete void slab, method for manufacturing thereof and void forming structure for the same
JP7229836B2 (en) Hollow slab structure
JP7176677B2 (en) Floor insulation structure of building and construction method for building with floor insulation structure
RU2479702C1 (en) Multi-storeyed panel building of higher resistance to impact and seismic effects
RU2623745C1 (en) Flat precast-monolithic slab and ceiling panel for this slab
JP6934294B2 (en) Equipment structure unit and floor construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210301

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220125

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220201

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220311

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220517

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220606

R150 Certificate of patent or registration of utility model

Ref document number: 7085382

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150