JP7053309B2 - How to use the strut mounting hole forming device and the strut mounting hole forming device - Google Patents

How to use the strut mounting hole forming device and the strut mounting hole forming device Download PDF

Info

Publication number
JP7053309B2
JP7053309B2 JP2018034198A JP2018034198A JP7053309B2 JP 7053309 B2 JP7053309 B2 JP 7053309B2 JP 2018034198 A JP2018034198 A JP 2018034198A JP 2018034198 A JP2018034198 A JP 2018034198A JP 7053309 B2 JP7053309 B2 JP 7053309B2
Authority
JP
Japan
Prior art keywords
formwork
mounting hole
die
concrete skeleton
support column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018034198A
Other languages
Japanese (ja)
Other versions
JP2019148132A (en
Inventor
貴正 上村
洋二 向井
Original Assignee
株式会社長谷工コーポレーション
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社長谷工コーポレーション filed Critical 株式会社長谷工コーポレーション
Priority to JP2018034198A priority Critical patent/JP7053309B2/en
Publication of JP2019148132A publication Critical patent/JP2019148132A/en
Application granted granted Critical
Publication of JP7053309B2 publication Critical patent/JP7053309B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

本発明は、例えば、集合住宅の各居室のベランダに手摺や柵を設置するために、上記手摺や柵の支柱を取り付ける穴を形成する支柱取付穴形成装置及び支柱取付穴形成装置の使用方法に関する。 The present invention relates to, for example, a method of using a support column mounting hole forming device and a support column mounting hole forming device for forming holes for attaching the handrails and fence columns in order to install handrails and fences on the veranda of each living room of an apartment house. ..

従来から、集合住宅等のベランダに手摺や柵を設置する場合、ベランダを形成するコンクリート躯体に手摺や柵の支柱を差し込んで取り付ける取付穴が設けられていた。取付穴は、コンクリート躯体を形成する型枠内にコンクリートが流し込まれる前に取付穴用の型が設置され、流し込まれたコンクリートが固まった後に引き抜かれた型の跡として形成されていた。ここで、型枠内への取付穴用の型の設置は、型の引き抜きの容易性を考慮して、型枠に対して宙吊り状態にしていた。 Conventionally, when a handrail or a fence is installed on a veranda of an apartment house or the like, a mounting hole for inserting the handrail or the support of the fence into the concrete skeleton forming the veranda has been provided. The mounting holes were formed as traces of a mold in which a mold for the mounting hole was installed before the concrete was poured into the formwork forming the concrete frame, and the cast concrete was pulled out after the poured concrete was solidified. Here, the mold for the mounting hole was installed in the formwork in a suspended state with respect to the formwork in consideration of the ease of pulling out the formwork.

例えば、特許文献1では、取付穴を形成する抜子型が、コンクリート躯体の先端部分を形成する型枠の両端を跨る冶具で上端部分をボルトで固定され、型枠に対して宙刷り状態にされている。そして、冶具の取り外し後、ボルトをねじ込んでコンクリート躯体から抜子型を剥がすように浮かせることで、抜子型を引き抜いて取付穴を形成している(例えば、段落「0014」、図1、及び図8参照)。 For example, in Patent Document 1, the pull-out mold that forms the mounting hole is bolted to the upper end portion with a jig that straddles both ends of the formwork that forms the tip portion of the concrete skeleton, and is in an air-printed state with respect to the formwork. Has been done. Then, after removing the jig, a bolt is screwed in and floated so as to peel off the pulling die from the concrete skeleton, so that the pulling die is pulled out to form a mounting hole (for example, paragraph "0014", FIG. 1, and See FIG. 8).

特開2011-80322号公報Japanese Unexamined Patent Publication No. 2011-80322

しかしながら、上述した特許文献で開示されている技術では、型枠の上端部分の幅が狭いため、冶具を取り付けるための止金を固定しにくい恐れがある。さらに、コンクリート躯体の先端部分が傾斜を有することから、それぞれ異なる型枠の両端の高さに合うよう、止金を加工しなければならない。また、ボルトをねじ込むために抜子型の下端に貼り付けた雌ネジ部材がコンクリート躯体に貼り付いてしまい、抜子型が剥がれにくい恐れがある。 However, in the technique disclosed in the above-mentioned patent document, since the width of the upper end portion of the formwork is narrow, there is a possibility that it is difficult to fix the clasp for attaching the jig. Furthermore, since the tip of the concrete skeleton has an inclination, the clasp must be processed so as to match the heights of both ends of the different formwork. In addition, the female screw member attached to the lower end of the pull-out mold for screwing the bolt may stick to the concrete skeleton, and the pull-out mold may not be easily peeled off.

一般的に、コンクリート躯体を形成する型枠内にはコンクリートの強度を補う補強筋が予め配されており、取付穴の位置が限られていることから、取付穴を形成する型の位置決めが容易であるべきである。さらに、スポンジ等の軟質の型では、コンクリートの圧縮力に耐え切れず、形状を維持できない恐れがあるため、硬質の型が採用されるべきである。さらに、作業性の向上及び部材コストの抑制を実現させるためには、取付穴の形成に伴う新たな部材の点数が少なく、かつ既存の部材が転用されるべきである。 In general, reinforcing bars that supplement the strength of concrete are arranged in advance in the formwork that forms the concrete frame, and the positions of the mounting holes are limited, so it is easy to position the mold that forms the mounting holes. Should be. Further, a soft mold such as a sponge cannot withstand the compressive force of concrete and may not be able to maintain its shape. Therefore, a hard mold should be adopted. Furthermore, in order to improve workability and reduce member costs, the number of new members associated with the formation of mounting holes should be small, and existing members should be diverted.

そこで、本発明の目的は、取付穴を形成する型の位置決めができ、所望の形状に取付穴が確実に形成され、別の取付穴の形成にも転用できる支柱取付穴形成装置及び支柱取付穴形成装置の使用方法を提供することにある。 Therefore, an object of the present invention is a support column mounting hole forming device and a support column mounting hole that can position a mold for forming a mounting hole, reliably form a mounting hole in a desired shape, and can be diverted to the formation of another mounting hole. To provide a method of using the forming apparatus.

すなわち、本発明による支柱取付穴形成装置は、コンクリート躯体に支柱の取付穴を形成するための抜き型部材と、上記コンクリート躯体を形成する型枠の内側に上記抜き型部材を宙吊りするための冶具とを備え、上記冶具は、上記型枠の外側に配される支柱部材と、上記型枠を隔てて上記支柱部材と上記抜き型部材とを着脱自在に連結する連結部材と、上記支柱部材を上記型枠の側壁部分に対して着脱自在に固定する固定部材とを備えていることを特徴としている。 That is, the support column mounting hole forming device according to the present invention is a die member for forming a support column mounting hole in the concrete skeleton and a jig for suspending the punching die member inside the formwork forming the concrete skeleton. The jig comprises a support member arranged on the outside of the formwork, a connecting member that detachably connects the support member and the punching die member across the formwork, and the support member. It is characterized by being provided with a fixing member that is detachably fixed to the side wall portion of the formwork.

上記連結部材が、上記抜き型部材の高さと上記支柱部材の高さとが同じになるように連結していることが望ましい。 It is desirable that the connecting members are connected so that the height of the punching die member and the height of the strut member are the same.

上記固定部材が、上記支柱部材に引っ掛かった状態で上記型枠の側壁部分の外側から固定されるL字状のフォームタイと、上記フォームタイのスリット及び上記型枠の側壁部分を貫通した状態で上記型枠の内側から固定される棒状のセパレータと、上記支柱部材に対して上記フォームタイと上記セパレータとを締め付けた状態にする略三角形状の楔材とを備えていることが望ましい。 The fixing member penetrates the L-shaped foam tie that is fixed from the outside of the side wall portion of the formwork while being hooked on the support column member, the slit of the foam tie, and the side wall portion of the formwork. It is desirable to provide a rod-shaped separator fixed from the inside of the formwork, and a substantially triangular wedge member for tightening the foam tie and the separator to the support column member.

上記コンクリート躯体に固定され上記冶具が取り外された上記抜き型部材を抜き取るための脱型部材をさらに備え、上記脱型部材が、貫通孔を有する天井部分と、上記天井部分の端縁から下方に設けられた脚部分とを有し、上記コンクリート躯体に載置された状態で、上記天井部分と上記抜き型部材の上端部分との間に隙間が生じるように形成されていることが望ましい。 A demolding member for pulling out the die-cutting member fixed to the concrete skeleton and from which the jig has been removed is further provided, and the die-cutting member is provided downward from the ceiling portion having a through hole and the edge of the ceiling portion. It is desirable that the ceiling portion is formed so as to have a provided leg portion and a gap is formed between the ceiling portion and the upper end portion of the die-cutting member in a state of being placed on the concrete skeleton.

本発明による支柱取付穴形成装置の使用方法は、コンクリート躯体に支柱の取付穴を形成するために、上記コンクリート躯体を形成する型枠の内側に宙吊りする抜き型部材と、上記型枠の外側に配される支柱部材とを、それぞれ高さが同じになるように連結部材で着脱自在に連結し、上記支柱部材に引っ掛かった状態でL字状のフォームタイを上記型枠の側壁部分の外側から着脱自在に固定し、上記フォームタイのスリット及び上記型枠の側壁部分を貫通した状態で棒状のセパレータを上記型枠の内側から固定して外側から分割自在にし、上記支柱部材に対して上記フォームタイと上記セパレータとを略三角形状の楔材で着脱自在に締め付け、上記コンクリート躯体に載置した状態で上記抜き型部材の上端部分と隙間を生じるように形成された天井部分を備えた脱型部材で上記天井部分に設けた貫通孔からネジ部材を捻じ込み上記抜き型部材を抜き取ることを特徴とする。 The method of using the support column mounting hole forming device according to the present invention is to use a punching die member suspended in the air inside the formwork forming the concrete skeleton and outside the formwork in order to form a support column mounting hole in the concrete skeleton. The strut members to be arranged are detachably connected by a connecting member so as to have the same height, and an L-shaped foam tie is attached from the outside of the side wall portion of the formwork while being hooked on the strut member. Detachably fixed, the rod-shaped separator is fixed from the inside of the formwork in a state of penetrating the slit of the foam tie and the side wall portion of the formwork so that it can be split freely from the outside, and the foam is attached to the support column member. The tie and the separator are detachably fastened with a substantially triangular wedge material, and the mold is removed with a ceiling portion formed so as to form a gap with the upper end portion of the die-cutting member in a state of being placed on the concrete frame. It is characterized in that a screw member is screwed into a through hole provided in the ceiling portion of the member to remove the die member.

本発明による支柱取付穴形成装置及び支柱取付穴形成装置の使用方法では、取付穴を形成する型の位置決めが容易で、所望の形状に取付穴が確実に形成され、別の取付穴の形成にも容易に転用できるため、作業性の向上及び材料コストの抑制の実現が期待できる。 In the method of using the support column mounting hole forming device and the support column mounting hole forming device according to the present invention, the positioning of the mold for forming the mounting hole is easy, the mounting hole is surely formed in a desired shape, and another mounting hole can be formed. Can be easily diverted, so it can be expected to improve workability and reduce material costs.

本発明の一実施形態における支柱取付穴形成装置が設置された状態の(a)側面図及び(b)平面図を概念的に示している。A side view (a) and a plan view (b) of a state in which the support column mounting hole forming device according to the embodiment of the present invention is installed are conceptually shown. (a)~(c)は図1に示す支柱取付穴形成装置の施工状態を示す図である。(A) to (c) are views showing the construction state of the support column mounting hole forming apparatus shown in FIG.

以下、図1及び図2を参照しつつ、本発明の一実施形態における支柱取付穴形成装置(以下、「本支柱取付穴形成装置」ともいう。)の構造及び使用方法について説明する。
なお、これらの図において、複数個存在する同一の部位については、一つの部位のみに符番した部分もある。説明の便宜上、所定の部位やこの引き出し線を破線や想像線(二点鎖線)で示し、断面部分をハッチングで示した部分もある。
Hereinafter, the structure and usage of the support column mounting hole forming device (hereinafter, also referred to as “this support column mounting hole forming device”) according to the embodiment of the present invention will be described with reference to FIGS. 1 and 2.
In addition, in these figures, there is a part numbered only for one part about the same part which exists more than once. For convenience of explanation, a predetermined part and this leader line are shown by a broken line or an imaginary line (two-dot chain line), and a cross-sectional part is shown by hatching.

本支柱取付穴形成装置は、例えば、集合住宅の各居室に備わるベランダのコンクリート躯体の先端部分から上方に立ち上がる手摺や柵を設置するために、これらを構成する各々の支柱の取付穴を形成するものである。ベランダのコンクリート躯体は、木製の型枠に流し込まれた液状のコンクリート材が固まって形成される。
なお、型枠の内側には、コンクリート躯体の強度を補強する補強筋が配されてもよい。
This pillar mounting hole forming device forms mounting holes for each of the pillars constituting the pillars, for example, in order to install handrails and fences that rise upward from the tip of the concrete skeleton of the veranda provided in each living room of the apartment house. It is a thing. The concrete skeleton of the veranda is formed by solidifying the liquid concrete material poured into the wooden formwork.
In addition, a reinforcing bar for reinforcing the strength of the concrete skeleton may be arranged inside the formwork.

本支柱取付穴形成装置は、コンクリート躯体Cに支柱の取付穴Hを形成するための抜き型部材1と、コンクリート躯体Cを形成する型枠Fの内側に抜き型部材1を宙吊りするための冶具2と、コンクリート躯体Cに固定され冶具2が取り外された抜き型部材1を抜き取るための脱型部材3とを備えている。
なお、本支柱取付穴形成装置は、抜き型部材1と冶具2と脱型部材3とが別々の部品として随時組み立てられたものでも、常に一体的なものでもよい。
This strut mounting hole forming device is a jig for suspending a punching die member 1 for forming a strut mounting hole H in a concrete skeleton C and a punching die member 1 inside a formwork F for forming a concrete skeleton C. 2 and a demolding member 3 for pulling out the die-cutting member 1 fixed to the concrete skeleton C and from which the jig 2 has been removed are provided.
The support column mounting hole forming device may be a die-cutting member 1, a jig 2, and a die-cutting member 3 assembled as separate parts at any time, or may be always integrated.

抜き型部材1は、縦長のテーパ状である。抜き型部材1は、平面状の上端部分を有している。抜き型部材1の上端部分には、ボルトを抜き差しするためのネジ穴が設けられている。 この構成によれば、抜き型部材1が、上端部分のネジ穴に抜き差し可能なボルトで冶具2に対して着脱自在に宙吊り状態にすることができる。抜き型部材1が、上端部分のネジ穴に差し込んだボルトを捻ることで、固まったコンクリート躯体Cから剥がれやすくなるため、容易に抜き取り可能となる。
なお、抜き型部材1の断面形状は、支柱の断面形状と同形でも異形でもよく、円形や矩形でもよい。抜き型部材1の素材は、コンクリート躯体Cの圧縮に耐え、かつ転用しやすいものが好ましく、例えば、電気亜鉛メッキを施した鋼でもよい。抜き型部材1の長さは、冶具2との関係において、型枠Fの内側に宙吊りできる程度であればよい。
The punching die member 1 has a vertically long tapered shape. The punching die member 1 has a flat upper end portion. A screw hole for inserting and removing a bolt is provided in the upper end portion of the punching die member 1. According to this configuration, the punching die member 1 can be detachably suspended from the jig 2 with a bolt that can be inserted into and removed from the screw hole at the upper end portion. By twisting the bolt inserted into the screw hole at the upper end of the punching die member 1, the concrete skeleton C can be easily peeled off from the solidified concrete skeleton C, so that the punching die member 1 can be easily pulled out.
The cross-sectional shape of the die-cutting member 1 may be the same as or different from the cross-sectional shape of the column, and may be circular or rectangular. The material of the punching die member 1 is preferably a material that can withstand the compression of the concrete skeleton C and is easily diverted, and may be, for example, electrozinc-plated steel. The length of the punching die member 1 may be such that it can be suspended inside the mold F in relation to the jig 2.

冶具2は、型枠Fの外側かつ型枠Fの側壁部分F1に接する又は隣接するように配される支柱部材21と、型枠Fの側壁部分F1を隔てて支柱部材21と抜き型部材1とを着脱自在に連結する連結部材22と、支柱部材21を型枠Fの側壁部分F1に対して着脱自在に固定する固定部材23とを備えている。
この構成によれば、型枠Fの内側の抜き型部材1に対して、支柱部材21が型枠Fを隔てて外側かつ型枠Fの側壁部分F1に固定部材23で固定されるため、支柱部材21が安定して設置され、連結部材22を介して抜き型部材1を容易に宙吊りすることができる。連結部材22及び固定部材23が、それぞれの対象物に対して着脱自在な構造であるため、本支柱取付穴形成装置の組み立てから冶具2の撤去まで容易に行うことができる。
なお、支柱部材21の断面形状は、円形や矩形でもよい。支柱部材21の素材は、抜き型部材1と同等でもよく、コンクリート等が内部に充填されていても中空な筒状であってもよい。支柱部材21と型枠Fの側壁部分F1との間には、枕木等のクッション材が介在してもよい。
The jig 2 includes a strut member 21 arranged outside the formwork and in contact with or adjacent to the side wall portion F1 of the formwork F, and the strut member 21 and the die-cutting member 1 separated by the side wall portion F1 of the formwork F. It is provided with a connecting member 22 for detachably connecting the support member 21 and a fixing member 23 for detachably fixing the support column member 21 to the side wall portion F1 of the formwork F.
According to this configuration, the support column member 21 is fixed to the punching die member 1 inside the formwork F by the fixing member 23 on the outside side of the formwork F and to the side wall portion F1 of the formwork F. The member 21 is stably installed, and the die-cutting member 1 can be easily suspended in the air via the connecting member 22. Since the connecting member 22 and the fixing member 23 have a structure that can be attached to and detached from each object, it is possible to easily perform from the assembly of the main column mounting hole forming device to the removal of the jig 2.
The cross-sectional shape of the support member 21 may be circular or rectangular. The material of the support member 21 may be the same as that of the punching member 1, and may be filled with concrete or the like or may have a hollow tubular shape. A cushion material such as sleepers may be interposed between the support column member 21 and the side wall portion F1 of the formwork F.

連結部材22は、抜き型部材1の高さと支柱部材21の高さとが同じになるように連結している。詳細には、連結部材22は、平面状の板材(符番しない)とL字状の板材(符番しない)とが組み合わさって形成され、平面状の板材の一端が支柱部材21の上端部分と同じ高さになるように固定されたL字状の板材の突出部分とボルトでネジ止めされ、他端が抜き型部材1の上端部分とボルトでネジ止めされる。
この構成によれば、連結部材22を介して、抜き型部材1の上端部分と支柱部材21の上端部分とが略同等の高さとなるように連結することができるため、型枠Fに対する抜き型部材1の深さの調整が容易となる。すなわち、型枠Fに対する抜き型部材1の下端部分の深さが支柱部材21の高さに対応するため、取付穴が所望の深さで形成されやすい。
なお、支柱部材21の上端部分がネジ穴を有する場合、連結部材22はネジ止め可能な平面状の板材のみでもよい。連結部材22の長さは、型枠Fの外側の支柱部材21と型枠Fの内の抜き型部材1との位置関係に応じて決定してもよい。連結部材22が長尺で、かつ複数のネジ穴を有し、支柱部材21の位置を適宜決定してもよい。連結部材22が、支柱部材21に対して取り外しできないように固定されていてもよく、接着剤などで固定してもよい。支柱部材21の素材は、転用しやすいものが好ましく、例えば、電気亜鉛メッキを施した鋼でもよい。
The connecting member 22 is connected so that the height of the punching die member 1 and the height of the strut member 21 are the same. Specifically, the connecting member 22 is formed by combining a flat plate material (not numbered) and an L-shaped plate material (not numbered), and one end of the flat plate material is an upper end portion of the support column member 21. The protruding portion of the L-shaped plate material fixed so as to have the same height as the above is screwed with a bolt, and the other end is screwed with the upper end portion of the die member 1 with a bolt.
According to this configuration, the upper end portion of the punching die member 1 and the upper end portion of the support column member 21 can be connected to each other via the connecting member 22 so as to have substantially the same height. The depth of the member 1 can be easily adjusted. That is, since the depth of the lower end portion of the punching die member 1 with respect to the formwork F corresponds to the height of the support column member 21, the mounting hole is likely to be formed at a desired depth.
When the upper end portion of the support column member 21 has a screw hole, the connecting member 22 may be only a flat plate material that can be screwed. The length of the connecting member 22 may be determined according to the positional relationship between the support column member 21 outside the formwork F and the punching die member 1 inside the formwork F. The connecting member 22 may be long and have a plurality of screw holes, and the position of the support member 21 may be appropriately determined. The connecting member 22 may be fixed to the strut member 21 so as not to be removable, or may be fixed with an adhesive or the like. The material of the strut member 21 is preferably a material that can be easily diverted, and may be, for example, electrozinc-plated steel.

固定部材23は、支柱部材21に引っ掛かった状態で型枠Fの側壁部分F1の外側から固定されるL字状のフォームタイ23aと、フォームタイ23aのスリット(符番しない)及び型枠Fの側壁部分F1を貫通した状態で型枠Fの内側から固定される棒状のセパレータ23bと、支柱部材21に対してフォームタイ23aとセパレータ23bとを締め付けた状態にする略三角形状の楔材23cとで構成されている。各部材について説明すると、フォームタイ23aは、L字部分の一方が支柱部材21に引っ掛けられ、L字部分の他方の末端が型枠Fの側壁部分F1の外側に対してネジ止めされるものである。セパレータ23bは、フォームタイ23aのスリットから支柱部材21の脇を通過して型枠Fの側壁部分F1まで貫通して型枠Fの内側からPコーンでネジ止めされ、Pコーンをコンクリート躯体C内に残留させたまま外側から分割自在とするものである。楔材23cは、セパレータ23bのスリットからフォームタイ23aのL字部分の一方に沿って差し込まれた状態でフォームタイ23aとセパレータ23bとを締め付けるものである。
この構成によれば、支柱部材21が地面に接しているか否かに関わらず、支柱部材21がフォームタイ23aとセパレータ23bと楔材23cとの組み合わせにより、型枠Fの側壁部分F1に対して外側から安定して固定されるため、抜き型部材1も安定して宙吊りされる。フォームタイ23a、セパレータ23b、及び楔材23cの搬送、組立、及び解体が容易なため、作業効率の向上が期待できる。
なお、固定部材23は、例えば、支柱部材21を型枠Fの側壁部分F1に直接固定するネジ部材や所定のアタッチメント構造でもよい。フォームタイ23a、セパレータ23b、及び楔材23cは、固定部材23の機能を果たす形状、素材、及び構造であれば、いずれでもよい。
The fixing member 23 is an L-shaped foam tie 23a fixed from the outside of the side wall portion F1 of the formwork F while being hooked on the support column member 21, a slit (not numbered) of the formwork 23a, and the formwork F. A rod-shaped separator 23b fixed from the inside of the formwork F while penetrating the side wall portion F1, and a substantially triangular wedge member 23c in which the foam tie 23a and the separator 23b are tightened to the support column member 21. It is composed of. Explaining each member, in the form tie 23a, one of the L-shaped portions is hooked on the support column member 21, and the other end of the L-shaped portion is screwed to the outside of the side wall portion F1 of the formwork F. be. The separator 23b passes from the slit of the foam tie 23a, passes by the side of the support column member 21, penetrates to the side wall portion F1 of the formwork F, is screwed from the inside of the formwork F with a P cone, and the P cone is screwed into the concrete skeleton C. It can be split freely from the outside while remaining in the concrete. The wedge material 23c is for tightening the foam tie 23a and the separator 23b in a state of being inserted from the slit of the separator 23b along one of the L-shaped portions of the foam tie 23a.
According to this configuration, regardless of whether or not the support member 21 is in contact with the ground, the support member 21 is combined with the foam tie 23a, the separator 23b, and the wedge member 23c with respect to the side wall portion F1 of the formwork F. Since it is stably fixed from the outside, the die member 1 is also stably suspended in the air. Since the foam ties 23a, separator 23b, and wedge material 23c can be easily transported, assembled, and disassembled, improvement in work efficiency can be expected.
The fixing member 23 may be, for example, a screw member that directly fixes the support column member 21 to the side wall portion F1 of the formwork F, or a predetermined attachment structure. The foam tie 23a, the separator 23b, and the wedge member 23c may be any shape, material, and structure that functions as the fixing member 23.

脱型部材3は、貫通孔(符番しない)を有する天井部分(符番しない)と、天井部分の端縁から下方に設けられた脚部分(符番しない)とを有し、コンクリート躯体Cに載置された状態で、天井部分と抜き型部材1の上端部分との間に隙間が生じるように形成されている。詳細には、脱型部材3は、門型状で、天井部分及び脚部分は、板状である。天井部分は、少なくとも連結部材22と抜き型部材1とを連結するボルトが挿通できる直径の貫通孔を有する。脚部分は、コンクリート躯体Cの傾斜面と一致し、天井部分と抜き型部材1の上端部分との間に隙間が生じるように形成されている。
この構成によれば、脱型部材3の天井部分の貫通孔を介して抜き型部材1のネジ穴にボルトを捻じ込むと、引き抜き力が抜き型部材1に加わりやすいため、容易に抜き取り可能となる。
なお、脱型部材3は、天井部分と脚部分とが一体となったドーム状でもよい。脱型部材3の素材は、転用しやすいものが好ましく、例えば、電気亜鉛メッキを施した鋼でもよい。脱型部材3の天井部分が保つべき抜き型部材1の上端部分との距離は、抜き型部材1がコンクリート躯体Cから剥がれて持ち上がった際にぶつからない程度であればよい。
The demolding member 3 has a ceiling portion (not numbered) having a through hole (not numbered) and a leg portion (not numbered) provided below the edge of the ceiling portion, and has a concrete skeleton C. It is formed so that a gap is formed between the ceiling portion and the upper end portion of the die-cutting member 1 in the state of being placed on the ceiling. Specifically, the demolding member 3 has a gate shape, and the ceiling portion and the leg portion have a plate shape. The ceiling portion has at least a through hole having a diameter through which a bolt connecting the connecting member 22 and the punching member 1 can be inserted. The leg portions are formed so as to coincide with the inclined surface of the concrete skeleton C and to form a gap between the ceiling portion and the upper end portion of the die member 1.
According to this configuration, when a bolt is screwed into the screw hole of the die-cutting member 1 through the through hole in the ceiling portion of the die-cutting member 3, the pulling force is easily applied to the die-cutting member 1, so that it can be easily pulled out. Become.
The demolding member 3 may have a dome shape in which the ceiling portion and the leg portion are integrated. The material of the demolding member 3 is preferably a material that can be easily diverted, and may be, for example, electrozinc-plated steel. The distance from the upper end portion of the die-cutting member 1 to be maintained by the ceiling portion of the die-cutting member 3 may be such that the die-cutting member 1 does not collide with the concrete skeleton C when it is peeled off and lifted.

図1及び図2を参照しつつ、本支柱取付穴形成装置の使用方法として、設置方法及び取り外し方法の一例を説明する。特に、図2では、抜き型部材の引き抜き方法の流れを説明する。
なお、型枠F及び補強筋(図示しない)は予め組まれているものとする。
An example of an installation method and a removal method will be described as a method of using the support column mounting hole forming device with reference to FIGS. 1 and 2. In particular, FIG. 2 describes the flow of the method of pulling out the punching die member.
It is assumed that the formwork F and the reinforcing bars (not shown) are assembled in advance.

図1から、本支柱取付穴形成装置の設置方法としては、はじめに、コンクリート躯体Cを形成する型枠Fの内側に宙吊りする抜き型部材1と、型枠Fの外側に配される支柱部材21とを、それぞれ高さが同じになるように連結部材22の両端をネジで固定して連結する。このとき、形成する取付穴Hの予定位置に合うように支柱部材21を引っ掛けて型枠F側に寄せた状態で、フォームタイ23aを型枠Fの側壁部分F1にネジで固定する。次に、支柱部材21の脇を通るように、セパレータ23bをフォームタイ23aのスリットから型枠Fの側壁部分F1まで貫通させ、側壁部分F1に対して内側からPコーンで固定する。そして、楔材23cをセパレータ23bのスリットに差し込み、フォームタイ23aが型枠F側に押されることで、支柱部材21を型枠Fに固定する。
このような設置方法により、型枠Fの側壁部分F1を隔てて内側に延びる連結部材22の他端に連結して抜き型部材1を取付穴Hの予定位置に容易に宙吊りすることができる。
From FIG. 1, as a method of installing the main strut mounting hole forming device, first, a punching die member 1 suspended inside the formwork F forming the concrete skeleton C and a strut member 21 arranged outside the formwork F are provided. And are connected by fixing both ends of the connecting member 22 with screws so that the heights are the same. At this time, the foam tie 23a is fixed to the side wall portion F1 of the formwork F1 with screws in a state where the support column member 21 is hooked so as to be aligned with the planned position of the mounting hole H to be formed and is brought closer to the formwork F side. Next, the separator 23b is passed through the slit of the foam tie 23a to the side wall portion F1 of the formwork F so as to pass by the side of the support column member 21, and is fixed to the side wall portion F1 from the inside with a P cone. Then, the wedge member 23c is inserted into the slit of the separator 23b, and the foam tie 23a is pushed toward the formwork F to fix the support column member 21 to the formwork F.
By such an installation method, the die-cutting member 1 can be easily suspended in the planned position of the mounting hole H by connecting to the other end of the connecting member 22 extending inward across the side wall portion F1 of the formwork F.

図1から、本支柱取付穴形成装置の取り外し方法としては、まず、抜き型部材1及び支柱部材21から連結部材22を取り外す。次に、楔材23cをセパレータ23bのスリットから抜き、セパレータ23bの一端を型枠Fの側壁部分F1の内側(コンクリート躯体C内)に残留させたまま他端を外側から分割してフォームタイ23aのスリットから抜き、フォームタイ23aを型枠Fの側壁部分F1から取り外すことで、支柱部材21を型枠Fの側壁部分F1から取り外す。 From FIG. 1, as a method of removing the main strut mounting hole forming device, first, the connecting member 22 is removed from the punching die member 1 and the strut member 21. Next, the wedge material 23c is pulled out from the slit of the separator 23b, and the other end is divided from the outside while leaving one end of the separator 23b inside the side wall portion F1 of the formwork F (inside the concrete skeleton C), and the foam tie 23a The support column member 21 is removed from the side wall portion F1 of the formwork F by pulling out the foam tie 23a from the side wall portion F1 of the formwork F.

図2から、抜き型部材1の引き抜き方法としては、まず、図2(a)に示すとおり、突き出た抜き型部材1の上側を被うように脱型部材3をコンクリート躯体Cの上に載置する。抜き型部材1と連結部材22との連結時に用いたボルトを脱型部材3の天井部分の貫通孔から抜き型部材1のネジ穴に差し込んで捻じ込む。その後、図2(b)に示すとおり、抜き型部材1に対して引き抜く力が働くと、抜き型部材1がコンクリート躯体Cから剥がれて浮き、取付穴Hとの間に隙間が生じる。そして、図2(c)に示すとおり、抜き型部材1の引き抜きが完了し、コンクリート躯体Cには取付穴Hが形成される。
このような取り外し方法により、各部材を転用すると共に、容易に保管及び搬送することができる。
なお、本支柱取付穴形成装置の使用方法としては、本発明の目的を達して所望の効果を得られれば、いずれの方法や手順でもよい。
From FIG. 2, as a method of pulling out the die-cutting member 1, first, as shown in FIG. 2A, the die-cutting member 3 is placed on the concrete skeleton C so as to cover the upper side of the protruding die-cutting member 1. Place. The bolt used for connecting the die-cutting member 1 and the connecting member 22 is inserted into the screw hole of the punching die member 1 through the through hole in the ceiling portion of the die-cutting member 3 and screwed. After that, as shown in FIG. 2B, when a pulling force acts on the punching die member 1, the punching die member 1 is peeled off from the concrete skeleton C and floats, and a gap is formed between the punching die member 1 and the mounting hole H. Then, as shown in FIG. 2C, the drawing of the punching die member 1 is completed, and the mounting hole H is formed in the concrete skeleton C.
By such a removal method, each member can be diverted and easily stored and transported.
As the method of using the support column mounting hole forming device, any method or procedure may be used as long as the object of the present invention is achieved and a desired effect can be obtained.

1 抜き型部材
2 冶具
21 支柱部材
22 連結部材
23 固定部材
23a フォームタイ
23b セパレータ
23c 楔材
3 脱型部材
C コンクリート躯体
F 型枠
F1 型枠の側壁部分
H 取付穴
1 Die-cutting member 2 Jig 21 Supporting member 22 Connecting member 23 Fixing member 23a Foam tie 23b Separator 23c Wedge material 3 Demolding member C Concrete skeleton F Formwork F1 Side wall part of formwork H Mounting hole

Claims (4)

コンクリート躯体に支柱の取付穴を形成するための抜き型部材と、前記コンクリート躯体を形成する型枠の内側に前記抜き型部材を宙吊りするための冶具とを備え、
前記冶具は、前記型枠の外側に配される支柱部材と、前記型枠を隔てて前記支柱部材と前記抜き型部材とを着脱自在に連結する連結部材と、前記支柱部材を前記型枠の側壁部分に対して着脱自在に固定する固定部材とを備え、
前記固定部材は、L字状を有し、かつ、L字状の一方の端部が前記支柱部材に引っ掛かった状態で前記型枠の側壁部分の外側から固定されるフォームタイと、前記フォームタイのスリット及び前記型枠の側壁部分を貫通した状態で前記型枠の内側に設けられたボルトと螺合することにより固定される棒状のセパレータと、前記支柱部材に対して前記フォームタイと前記セパレータとを締め付けた状態にするようにセパレータのスリットからフォームタイのL字部分の一方に沿って差し込まれる略三角形状の楔材とを備える
ことを特徴とする支柱取付穴形成装置。
A die member for forming a mounting hole for a support in the concrete skeleton and a jig for suspending the die member inside the formwork forming the concrete skeleton are provided.
The jig includes a support member arranged on the outside of the formwork, a connecting member that detachably connects the support member and the die-cutting member across the formwork, and the support member of the formwork. Equipped with a fixing member that can be detachably fixed to the side wall
The fixing member has an L-shape, and the foam tie is fixed from the outside of the side wall portion of the formwork with one end of the L-shape hooked on the support member, and the foam tie. A rod-shaped separator fixed by screwing with a bolt provided inside the formwork while penetrating the slit and the side wall portion of the formwork, and the foam tie and the separator for the support column member. It is provided with a substantially triangular wedge material that is inserted along one of the L-shaped portions of the form tie from the slit of the separator so as to be in a tightened state.
A strut mounting hole forming device characterized by this.
前記連結部材が、
前記抜き型部材の上端の高さと前記支柱部材の上端の高さとが同じになるように連結している
ことを特徴とする請求項1に記載の支柱取付穴形成装置。
The connecting member
The support column mounting hole forming device according to claim 1, wherein the height of the upper end of the punching die member and the height of the upper end of the support column member are connected so as to be the same.
前記コンクリート躯体に固定され前記冶具が取り外された前記抜き型部材を抜き取るための脱型部材をさらに備え、
前記脱型部材が、貫通孔を有する天井部分と、当該天井部分の端縁から下方に設けられた脚部分とを有し、前記脱型部材を前記コンクリート躯体に単に載置した状態において、当該天井部分と前記抜き型部材の上端部分との間に隙間が生じるように前記連結部材と前記抜き型部材とが前記貫通孔を通して挿入されるボルトを介して結合される、
ことを特徴とする請求項1又は2に記載の支柱取付穴形成装置。
Further provided with a demolding member for removing the die-cutting member fixed to the concrete skeleton and from which the jig has been removed.
The demolding member has a ceiling portion having a through hole and a leg portion provided below the edge of the ceiling portion, and the demolding member is simply placed on the concrete skeleton. The connecting member and the punching member are connected via a bolt inserted through the through hole so that a gap is formed between the ceiling portion and the upper end portion of the punching die member.
The support column mounting hole forming device according to claim 1 or 2 .
コンクリート躯体に支柱の取付穴を形成するために、
当該コンクリート躯体を形成する型枠の内側に宙吊りする抜き型部材と、当該型枠の外側に配される支柱部材とを、それぞれの上端の高さが同じになるように連結部材で着脱自在に連結し、
L字状の一方の端部が前記支柱部材に引っ掛かった状態でL字状のフォームタイを前記型枠の側壁部分の外側から着脱自在に固定し、
前記フォームタイのスリット及び前記型枠の側壁部分を貫通した状態で棒状のセパレータを、前記型枠の内側に設けられたボルトに螺合させることにより外側から取り外し可能に固定し、
前記型枠内にコンクリートを充填してコンクリート躯体を形成し、
前記支柱部材に対して前記フォームタイと前記セパレータとを略三角形状の楔材をセパレータのスリットからフォームタイのL字部分の一方に沿って差し込むことにより着脱自在に締め付け、
前記コンクリート躯体に載置した状態で前記抜き型部材の上端部分と隙間を生じるように形成された天井部分を備えた脱型部材3で当該天井部分に設けた貫通孔からネジ部材を捻じ込み当該抜き型部材を抜き取る
ことを特徴とする支柱取付穴形成装置の使用方法。
To form mounting holes for stanchions in the concrete skeleton
A punching die member suspended in the air inside the formwork forming the concrete skeleton and a strut member arranged outside the formwork can be detachably attached and detached by a connecting member so that the heights of the upper ends thereof are the same. Connect and
The L-shaped foam tie is detachably fixed from the outside of the side wall portion of the formwork in a state where one end of the L-shape is hooked on the support column member.
A rod-shaped separator is screwed into a bolt provided inside the formwork while penetrating the slit of the foam tie and the side wall portion of the formwork to be detachably fixed from the outside .
The formwork is filled with concrete to form a concrete skeleton.
The foam tie and the separator are detachably fastened to the support member by inserting a substantially triangular wedge material from the slit of the separator along one of the L-shaped portions of the foam tie .
A screw member is screwed from a through hole provided in the ceiling portion by a demolding member 3 having a ceiling portion formed so as to form a gap with the upper end portion of the die cutting member while being placed on the concrete skeleton. How to use the column mounting hole forming device, which is characterized by extracting a die member.
JP2018034198A 2018-02-28 2018-02-28 How to use the strut mounting hole forming device and the strut mounting hole forming device Active JP7053309B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018034198A JP7053309B2 (en) 2018-02-28 2018-02-28 How to use the strut mounting hole forming device and the strut mounting hole forming device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018034198A JP7053309B2 (en) 2018-02-28 2018-02-28 How to use the strut mounting hole forming device and the strut mounting hole forming device

Publications (2)

Publication Number Publication Date
JP2019148132A JP2019148132A (en) 2019-09-05
JP7053309B2 true JP7053309B2 (en) 2022-04-12

Family

ID=67850320

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018034198A Active JP7053309B2 (en) 2018-02-28 2018-02-28 How to use the strut mounting hole forming device and the strut mounting hole forming device

Country Status (1)

Country Link
JP (1) JP7053309B2 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030101670A1 (en) 2001-12-05 2003-06-05 Gustin Morris Houston Foundation from bracket and method
JP2004204472A (en) 2002-12-24 2004-07-22 Hatano Co Ltd Box drawing form
US20080265128A1 (en) 2007-04-26 2008-10-30 Craig Morrow Hughes Stabilizing apparatus for securing anchor bolts
JP2010275819A (en) 2009-05-29 2010-12-09 Tanaka Kensetsu:Kk Support column hole forming device for concrete structure
JP2013028900A (en) 2011-07-26 2013-02-07 Takacho Kensetsu:Kk Blockout form and die-cut method therefor

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6019237Y2 (en) * 1980-09-19 1985-06-10 オリエンタルコンクリ−ト株式会社 Formwork for concrete holes
US4412407A (en) * 1981-06-15 1983-11-01 Samuel T. Melfi Mounting arrangement for guard rail post
JPH0240823B2 (en) * 1985-06-24 1990-09-13 Hasegawa Komuten Kk KATAMOCHISURABUNIOKERUTESURITORITSUKEBUZAINOSETSUCHIHOHO
JPS6458754A (en) * 1987-08-27 1989-03-06 Toyo Sash Kk Fixing device of handrail strut for parapet
US5058854A (en) * 1990-02-16 1991-10-22 Bravo Sergio M Containment box installation tool
JP2596583Y2 (en) * 1992-07-21 1999-06-14 立山アルミニウム工業株式会社 Jig for forming hole for embedding pillar in concrete structure
JP3141058B2 (en) * 1993-12-14 2001-03-05 ナカ工業株式会社 Formwork device for pillar buried hole and method of constructing pillar
JPH1024407A (en) * 1996-07-11 1998-01-27 Fujita Corp Apparatus and method for producing semi-pca balcony

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030101670A1 (en) 2001-12-05 2003-06-05 Gustin Morris Houston Foundation from bracket and method
JP2004204472A (en) 2002-12-24 2004-07-22 Hatano Co Ltd Box drawing form
US20080265128A1 (en) 2007-04-26 2008-10-30 Craig Morrow Hughes Stabilizing apparatus for securing anchor bolts
JP2010275819A (en) 2009-05-29 2010-12-09 Tanaka Kensetsu:Kk Support column hole forming device for concrete structure
JP2013028900A (en) 2011-07-26 2013-02-07 Takacho Kensetsu:Kk Blockout form and die-cut method therefor

Also Published As

Publication number Publication date
JP2019148132A (en) 2019-09-05

Similar Documents

Publication Publication Date Title
JP2006322215A (en) Foundation for facility
KR101237330B1 (en) Spacer for stripping deck
JP7053309B2 (en) How to use the strut mounting hole forming device and the strut mounting hole forming device
JP6356441B2 (en) Suspended anchor structure and tunnel construction method
US20120325983A1 (en) Template assembly for conduit installation
JP2005105766A (en) Removable support beam
JP6421397B2 (en) Lifting metal fittings for ceiling form of concrete lining formwork, method of lifting ceiling form of concrete lining formwork, method of assembling concrete lining formwork, and dismantling method of concrete lining formwork
JP2017082470A5 (en)
JP5931819B2 (en) Underground beam rebar placement method using separate vertical frame for underground beam rebar and its stand
KR200476569Y1 (en) conduit support holder
JP5912194B1 (en) Construction method of wooden building and basic member used in the construction method
JP6541473B2 (en) Legal frame movement prevention method and system
JP5635173B2 (en) Wooden pole support device
KR20040078146A (en) An erection unit for a building floor slab and the erection method thereof
JP6923463B2 (en) How to install precast concrete gutters and precast concrete gutters
KR101294745B1 (en) Installation Structure Of Water Proof Concrete Mold
JP2002339496A (en) Construction method of slab and construction method of ceiling
JP2009257006A (en) Ground anchor construction method
KR102581416B1 (en) PC cantilevered slab constructing method
KR20150068786A (en) Slab mold apparatus for precast module connection of bridge
KR20070122024A (en) Non supporting form system for down ward construction and non supporting down ward construction method using the same
CN213806688U (en) Interim protection encloses fender
JP7322696B2 (en) Hanging jig for anchor bolts
KR200464764Y1 (en) fence
JP2005232747A (en) Method and member for installing underwater framework structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210226

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20211210

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220105

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220222

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220309

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220331

R150 Certificate of patent or registration of utility model

Ref document number: 7053309

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150