JP6966386B2 - Continuous casting equipment - Google Patents

Continuous casting equipment Download PDF

Info

Publication number
JP6966386B2
JP6966386B2 JP2018127608A JP2018127608A JP6966386B2 JP 6966386 B2 JP6966386 B2 JP 6966386B2 JP 2018127608 A JP2018127608 A JP 2018127608A JP 2018127608 A JP2018127608 A JP 2018127608A JP 6966386 B2 JP6966386 B2 JP 6966386B2
Authority
JP
Japan
Prior art keywords
tundish
deck
casting
floor
car
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018127608A
Other languages
Japanese (ja)
Other versions
JP2020006385A (en
Inventor
浩志 川口
智則 西岡
隆之 下山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kobe Steel Ltd
Original Assignee
Kobe Steel Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kobe Steel Ltd filed Critical Kobe Steel Ltd
Priority to JP2018127608A priority Critical patent/JP6966386B2/en
Publication of JP2020006385A publication Critical patent/JP2020006385A/en
Application granted granted Critical
Publication of JP6966386B2 publication Critical patent/JP6966386B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Casting Support Devices, Ladles, And Melt Control Thereby (AREA)

Description

本発明は、連続鋳造設備に関する。 The present invention relates to a continuous casting facility.

従来、鋳型内に上方から溶鋼を注湯しつつその鋳型内で成型された鋳片を鋳型から下方へ引き出すことにより連続して鋳造を行う連続鋳造設備が知られている。このような連続鋳造設備では、鋳込床に鋳型が埋め込まれるように設置され、その鋳型の上方の位置である鋳込位置にタンディッシュが配置されるとともに、そのタンディッシュの上方に溶鋼が入れられた取鍋が配置される。 Conventionally, there is known a continuous casting facility that continuously casts by pouring molten steel into a mold from above and pulling out the slabs molded in the mold downward from the mold. In such a continuous casting facility, a mold is installed so as to be embedded in the casting floor, a tundish is placed at a casting position above the mold, and molten steel is placed above the tundish. The pot is placed.

タンディッシュは、取鍋から供給される溶鋼を受ける容器であり、その受けた溶鋼を一時的に滞留させつつ鋳型内の空間へ注湯する。タンディッシュは、所定の期間、鋳造に使用されると、メンテナンスを行う必要が生じる。メンテナンス時期が来たタンディッシュは、鋳込位置から離れた位置へ搬送されてメンテナンスが行われる。このタンディッシュのメンテナンス時には、連続鋳造設備の非稼働時間が生じる。 The tundish is a container that receives the molten steel supplied from the ladle, and the received molten steel is temporarily retained and poured into the space inside the mold. Once the tundish has been used for casting for a given period of time, it will need to be maintained. When the maintenance time has come, the tundish is transported to a position away from the casting position for maintenance. During maintenance of this tundish, there is a non-operating time of the continuous casting equipment.

また、連続鋳造設備の操業では、鋳造する鋼種を途中で変更する場合があり、この鋼種の変更時にも従来では連続鋳造設備の非稼働時間が生じる。具体的には、鋼種の変更時には、それまでの鋼種の鋳造を終了してタンディッシュを交換する作業、また、変更後の新しい鋼種の鋳造を開始するために鋳型内にダミーバーを挿入する作業等により、連続鋳造設備の非稼働時間が生じる。ダミーバーは、鋳造の開始時に鋳型内から下方へ溶鋼が流出するのを阻止するように当該鋳型内の下部の開口を塞ぐとともに、鋳型内で成型された鋳片を下方へ引き出すためにその鋳片の先導となって送り装置により下流側へ送られるものである。 Further, in the operation of the continuous casting equipment, the steel grade to be cast may be changed in the middle, and even when the steel grade is changed, the non-operating time of the continuous casting equipment is conventionally generated. Specifically, when the steel grade is changed, the work of finishing the casting of the previous steel grade and replacing the tundish, the work of inserting a dummy bar in the mold to start the casting of the new steel grade after the change, etc. This causes non-operating time of the continuous casting equipment. The dummy bar closes the lower opening in the mold so as to prevent the molten steel from flowing downward from the mold at the start of casting, and the slab is used to pull out the slab molded in the mold downward. It is sent to the downstream side by the feeding device as a leader of the above.

連続鋳造設備には、前記のタンディッシュのメンテナンスや鋳造する鋼種の変更のために生じる非稼働時間を抑制するための構成を備えるものがある。例えば、タンディッシュのメンテナンスのために生じる非稼働時間を抑制する連続鋳造設備では、鋳込位置で鋳造に使用されているタンディッシュとは別のメンテナンス済みのタンディッシュを待機させておき、鋳込位置のタンディッシュのメンテナンス時期が来た時にそのタンディッシュを鋳込位置から移動させるとともに待機中の別のタンディッシュを鋳込位置に配置することで鋳込位置にタンディッシュがない期間を削減している。また、鋼種の変更のために生じる非稼働時間を抑制する連続鋳造設備では、変更前の鋼種の鋳造中に鋳込位置で鋳造に使用されているタンディッシュとは別のタンディッシュを待機させておき、変更前の鋼種の鋳造を終了する時点で鋳型内への注湯を停止して鋳込位置のタンディッシュを待機中の別のタンディッシュに素早く交換し、新たに鋳込位置に配置したタンディッシュから変更後の新しい鋼種の溶鋼を鋳型内へ注湯することにより、変更前の鋼種の鋳片に繋がって変更後の鋼種の鋳片を鋳型内から引き出すことができる。このため、変更後の鋼種の鋳造を開始するためにダミーバーを鋳型内に挿入する必要がなくなり、そのダミーバーの挿入作業に要する期間が削減される。 Some of the continuous casting facilities are provided with a configuration for suppressing the non-operating time caused by the maintenance of the tundish and the change of the steel type to be cast. For example, in a continuous casting facility that suppresses non-operating time caused by maintenance of a tundish, a maintained tundish other than the tundish used for casting is kept on standby at the casting position for casting. When the maintenance time of the tundish at the position comes, the tundish is moved from the casting position and another waiting tundish is placed at the casting position to reduce the period when there is no tundish at the casting position. ing. In addition, in a continuous casting facility that suppresses non-operating time caused by a change in steel grade, a tundish different from the tundish used for casting is made to stand by at the casting position during casting of the steel grade before the change. When the casting of the steel grade before the change was completed, the pouring into the mold was stopped and the tundish at the casting position was quickly replaced with another waiting tundish and placed at the new casting position. By pouring molten steel of the new steel grade from the tundish into the mold, it is possible to connect to the slab of the steel grade before the change and pull out the slab of the new steel grade from the mold. Therefore, it is not necessary to insert the dummy bar into the mold in order to start casting the changed steel grade, and the period required for inserting the dummy bar is reduced.

以上のような非稼働時間を抑制する連続鋳造設備は、具体的には、それぞれ別のタンディッシュを搭載して鋳込床上を自走可能な2台のタンディッシュカーを備える。鋳込位置にある一方のタンディッシュに替えて待機位置にある他方のタンディッシュを鋳込位置に配置するときには、その一方のタンディッシュを搭載する一方のタンディッシュカーが移動して鋳込位置からその一方のタンディッシュを退かせるとともに、他方のタンディッシュカーが待機位置にある他方のタンディッシュを鋳込位置へ配置するように移動する。このようにして、鋳込位置にある一方のタンディッシュと待機位置にある他方のタンディッシュとを入れ替えるようになっている。 Specifically, the continuous casting equipment for suppressing the non-operating time as described above includes two tundish cars capable of self-propelling on the cast floor by mounting different tundish. When placing the other tundish in the standby position in the casting position instead of one in the casting position, the one tundish car equipped with that one tundish moves from the casting position. While retreating one tundish, the other tundish car moves to place the other tundish in the standby position at the casting position. In this way, one tundish in the casting position and the other tundish in the standby position are exchanged.

下記特許文献1には、以上のような連続鋳造設備に用いられるタンディッシュカーの一例が開示されている。この特許文献1のタンディッシュカー上には、このタンディッシュカーが鋳込床上を移動するときにそのタンディッシュカーとともに移動する作業デッキとしての台が設けられている。この台は、タンディッシュカーに搭載されたタンディッシュの上端と概ね一致する高さ位置に配置されている。また、タンディッシュカーには、鋳込床上から前記台上へ上り下りするための階段が設けられている。 The following Patent Document 1 discloses an example of a tundish car used in the above-mentioned continuous casting equipment. On the tundish car of Patent Document 1, a stand as a work deck that moves together with the tundish car when the tundish car moves on the cast floor is provided. This platform is located at a height that roughly coincides with the top edge of the tundish mounted on the tundish car. Further, the tundish car is provided with a staircase for going up and down from the cast floor to the table.

特許第4672026号公報Japanese Patent No. 4672026

前記特許文献1の構成では、鋳込位置においてタンディッシュからの溶鋼の漏出が発生した場合に、作業デッキとしての台上にいる作業者がその台上から退避できなくなる虞がある。 In the configuration of the above-mentioned Patent Document 1, when the molten steel leaks from the tundish at the casting position, there is a possibility that the worker on the table as the work deck cannot evacuate from the table.

具体的に、前記特許文献1では、前記台上に上り下りするための階段がタンディッシュカーに設けられていることから、その階段は、タンディッシュカーとともに移動する。このため、タンディッシュカーがタンディッシュを鋳込位置に配置する位置にあるときには、階段は鋳込位置近傍に位置する。この時、前記台上からこの階段を下りると、鋳込位置近傍の鋳込床上に降りることになるが、タンディッシュから漏出した溶鋼は鋳込位置近傍の鋳込床上に飛散するため、作業者は降りることができない。このため、作業者は、タンディッシュカーに設けられた台上から退避できなくなる。 Specifically, in Patent Document 1, since the stairs for going up and down on the table are provided in the tundish car, the stairs move together with the tundish car. Therefore, when the tundish car is in the position where the tundish is placed in the casting position, the stairs are located in the vicinity of the casting position. At this time, if the stairs are descended from the table, the stairs will be lowered to the cast floor near the casting position, but the molten steel leaking from the tundish will be scattered on the cast floor near the casting position, so that the operator Can't get off. Therefore, the worker cannot evacuate from the table provided in the tundish car.

また、前記特許文献1の構成は、作業者にとって利便性が悪い。 Further, the configuration of Patent Document 1 is inconvenient for the operator.

具体的に、鋳込位置では作業者が前記台上に乗ってタンディッシュの上方や取鍋の下方において行う作業が頻繁にあるが、鋳込位置近傍は高温になることから、作業者は、その鋳込位置近傍に位置する前記台上に留まることはできず、前記作業の都度、階段を上り下りして前記台上と鋳込床との間を往復しなければならない。 Specifically, at the casting position, the operator often rides on the table and performs the work above the tundish or below the ladle, but since the temperature near the casting position becomes high, the operator It is not possible to stay on the table located near the casting position, and each time the work is performed, the stairs must be climbed up and down and reciprocated between the table and the casting floor.

また、前記作業には様々な資材が必要になるが、タンディッシュカーに設けられた前記台上のスペースは狭小であることが一般的であるため、そのような資材を前記台上に置いておくことはスペースの制約上から困難である。このため、前記作業の都度、資材を鋳込床から階段を上って前記台上に運ばざるを得ない。 Further, although various materials are required for the work, since the space on the table provided in the tundish car is generally small, such materials are placed on the table. It is difficult to keep it due to space constraints. Therefore, each time the work is performed, the material must be carried from the cast floor to the table by climbing the stairs.

また、タンディッシュを鋳込位置に配置する前に待機させておく待機位置では、タンディッシュを予熱するための各種作業が行われるが、このときも、階段を上って前記台上にアクセスする必要がある。そして、タンディッシュカーがタンディッシュを待機位置から鋳込位置へ搬送するために移動するときには前記台上に留まることは困難であるため、作業者は、待機位置での作業後に前記台上から鋳込床上へ階段を下り、タンディッシュカーが移動した後、鋳込位置での作業を行うために鋳込床上を鋳込位置近傍まで歩いて移動して再びタンディッシュカーの階段を上って前記台上に上がる必要がある。 Further, in the standby position where the tundish is made to stand by before being placed in the casting position, various operations for preheating the tundish are performed, and at this time as well, the stairs are climbed to access the table. There is a need. Then, when the tundish car moves to transport the tundish from the standby position to the casting position, it is difficult to stay on the table. Therefore, the operator casts from the table after the work in the standby position. After going down the stairs to the built-in floor and moving the tundish car, walk on the cast floor to the vicinity of the casting position and climb the stairs of the tundish car again to work at the casting position. You need to go up to the table.

以上のことから、前記特許文献1の構成では、作業者が階段を上り下りする回数が増え、作業者にとって利便性が悪い。 From the above, in the configuration of Patent Document 1, the number of times the worker goes up and down the stairs increases, which is inconvenient for the worker.

本発明の目的は、鋳込位置においてタンディッシュから溶鋼が漏出した場合にタンディッシュカーに設けられたデッキ上から作業者が退避可能であり、且つ、作業者にとって利便性が高い連続鋳造設備を提供することである。 An object of the present invention is to provide a continuous casting facility that allows a worker to evacuate from a deck provided in a tundish car when molten steel leaks from the tundish at a casting position and is highly convenient for the worker. To provide.

本発明により提供されるのは、鋳片を連続的に鋳造する連続鋳造設備である。この連続鋳造設備は、鋳込床の下に設置され、前記鋳込床に開口した鋳込口を通じて受け入れた溶鋼から前記鋳片を連続的に形成する鋳込装置と、溶鋼が入れられて前記鋳込口の上方に配置される取鍋と、前記鋳込口の上方で且つ前記取鍋の下方の鋳込位置にいずれか一方が配置されて前記取鍋から溶鋼を受けるとともにその受けた溶鋼を前記鋳込口へ注湯する第1タンディッシュ及び第2タンディッシュと、前記第1タンディッシュを搭載し、その搭載した第1タンディッシュが前記鋳込位置に配置される鋳込場と当該第1タンディッシュが前記鋳込位置から離れた第1待機位置に配置される第1待機場との間で前記鋳込床上を特定の移動方向に沿って移動することにより前記第1タンディッシュを前記鋳込位置と前記第1待機位置との間で搬送する第1タンディッシュカーと、前記第2タンディッシュを搭載し、その搭載した第2タンディッシュが前記鋳込位置に配置される前記鋳込場と当該第2タンディッシュが前記鋳込位置から前記第1待機位置と反対側へ離れた第2待機位置に配置される第2待機場との間で前記鋳込床上を前記移動方向に沿って移動することにより前記第2タンディッシュを前記鋳込位置と前記第2待機位置との間で搬送する第2タンディッシュカーと、前記第1タンディッシュカー上に設置されていてその上で作業者が作業を行うことを許容する第1タンディッシュデッキと、前記第2タンディッシュカー上に設置されていてその上で作業者が作業を行うことを許容する第2タンディッシュデッキと、前記第1タンディッシュカーの移動領域に対して前記移動方向と直交する配置方向における一方側の位置で前記鋳込床上に設置された第1デッキと、前記第1デッキに設けられ、その第1デッキと前記鋳込床との間を作業者が上り下りすることを許容する第1階段と、前記第2タンディッシュカーの移動領域に対して前記配置方向における前記一方側の位置で前記鋳込床上に設置された第2デッキと、前記第2デッキに設けられ、その第2デッキと前記鋳込床との間を作業者が上り下りすることを許容する第2階段と、を備える。そして、前記第1デッキは、前記第1タンディッシュカーが前記鋳込場にあるときに前記配置方向において前記第1タンディッシュデッキに隣接するとともに前記第2タンディッシュカーが前記鋳込場にあるときに前記配置方向において前記第2タンディッシュデッキに隣接する第1デッキ鋳込時隣接部と、前記第1タンディッシュカーが前記第1待機場にあるときに前記配置方向において前記第1タンディッシュデッキに隣接する第1デッキ待機時隣接部とを有し、前記第2デッキは、前記第2タンディッシュカーが前記鋳込場にあるときに前記配置方向において前記第2タンディッシュデッキに隣接するとともに前記第1タンディッシュカーが前記鋳込場にあるときに前記配置方向において当該第1タンディッシュデッキに隣接する第2デッキ鋳込時隣接部と、前記第2タンディッシュカーが前記第2待機場にあるときに前記配置方向において前記第2タンディッシュデッキに隣接する第2デッキ待機時隣接部とを有する。 Provided by the present invention is a continuous casting facility for continuously casting slabs. This continuous casting facility is installed under the casting floor, and a casting device for continuously forming the slab from the molten steel received through the casting port opened in the casting floor, and the molten steel are inserted. One of the ladle placed above the casting port and the molten steel placed above the casting port and below the ladle to receive molten steel from the ladle and the received molten steel. A first tundish and a second tundish for pouring hot water into the casting port, and a casting place where the first tundish is mounted and the mounted first tundish is arranged at the casting position. The first tundish is moved along a specific movement direction on the cast floor to and from the first waiting area where the first tundish is arranged at the first waiting position away from the casting position. The casting in which a first tundish car to be conveyed between the casting position and the first standby position and the second tundish are mounted, and the mounted second tundish is arranged at the casting position. In the moving direction on the cast floor between the loading area and the second waiting area where the second tundish is arranged at the second standby position, which is located on the opposite side of the first standby position from the casting position. A second tundish car that conveys the second tundish between the casting position and the second standby position by moving along the same, and a second tundish car that is installed on the first tundish car and on the first tundish car. A first tundish deck that allows workers to work, a second tundish deck that is installed on the second tundish car and allows workers to work on it, and the above. A first deck installed on the cast floor at a position on one side in an arrangement direction orthogonal to the movement direction with respect to the movement area of the first tundish car, and a first deck provided on the first deck. On the cast floor at a position on one side of the arrangement direction with respect to the moving area of the first staircase and the second tundish car, which allows an operator to go up and down between the cast floor and the cast floor. A second deck installed in the floor and a second staircase provided on the second deck and allowing an operator to go up and down between the second deck and the cast floor are provided. Then, the first deck is adjacent to the first tundish deck in the arrangement direction when the first tundish car is in the casting place, and the second tundish car is in the casting place. Sometimes the first deck casting adjacent portion adjacent to the second tundish deck in the arrangement direction and the first tundish in the arrangement direction when the first tundish car is in the first waiting area. It has a first deck standby adjoining portion adjacent to the deck, and the second deck is adjacent to the second tundish deck in the arrangement direction when the second tundish car is in the casting site. When the first tundish car is in the casting place, the second deck adjacent portion adjacent to the first tundish deck in the arrangement direction at the time of casting and the second tundish car are in the second standby. It has a second deck standby adjacent portion adjacent to the second tundish deck in the arrangement direction when it is in the field.

この連続鋳造設備では、鋳込位置において第1タンディッシュから溶鋼が漏出したときには、第1タンディッシュデッキ上の作業者は、第1デッキ鋳込時隣接部へ渡って第1デッキ上から第1階段を経て鋳込位置から離れた位置の鋳込床上に降りるか、もしくは、第2デッキ鋳込時隣接部へ渡って第2デッキ上から第2階段を経て鋳込位置から離れた位置の鋳込床上に降りることができる。また、鋳込位置において第2タンディッシュから溶鋼が漏出したときには、第2タンディッシュデッキ上の作業者は、前記の鋳込位置において第1タンディッシュから溶鋼が漏出したときと同様に第1階段もしくは第2階段を経て鋳込位置から離れた位置の鋳込床上に降りることができる。このため、漏出した溶鋼が鋳込位置近傍の鋳込床上に飛散している場合であっても、作業者は、その飛散した溶鋼を避けて各タンディッシュデッキ上から退避することができる。しかも、この連続鋳造設備では、第1タンディッシュデッキ上及び第2タンディッシュデッキ上からそれぞれ2つの退避経路、すなわち第1デッキ上へ渡って第1階段を下りる退避経路と第2デッキ上へ渡って第2階段を下りる退避経路とを確保できる。このため、退避の安全性を高めることができる。 In this continuous casting facility, when molten steel leaks from the first tundish at the casting position, the worker on the first tundish deck moves from the first deck to the first from the first deck to the adjacent portion at the time of casting the first deck. Either descend to the casting floor at a position away from the casting position via the stairs, or cast at a position away from the casting position from the second deck through the second stairs across the adjacent part when casting the second deck. You can get off on the built-in floor. Further, when the molten steel leaks from the second tundish at the casting position, the operator on the second tundish deck can perform the first stairs in the same manner as when the molten steel leaks from the first tundish at the casting position. Alternatively, it is possible to descend onto the casting floor at a position away from the casting position via the second staircase. Therefore, even if the leaked molten steel is scattered on the casting floor near the casting position, the operator can avoid the scattered molten steel and evacuate from each tundish deck. Moreover, in this continuous casting facility, there are two evacuation routes from the first tundish deck and the second tundish deck, that is, the evacuation route to the first deck and the evacuation route to go down the first stairs and the second deck. It is possible to secure an evacuation route down the second stairs. Therefore, the safety of evacuation can be enhanced.

また、この連続鋳造設備では、作業者は、鋳込位置や第1及び第2待機位置での作業が生じるまでの間、また、第1及び第2タンディッシュカーの移動時に、第1又は第2デッキ上で待機することができ、第1及び第2タンディッシュカーの移動が終了して前記作業を行う必要が生じたときに、第1デッキ鋳込時隣接部や第1デッキ待機時隣接部、第2デッキ鋳込時隣接部、第2デッキ待機時隣接部から第1又は第2タンディッシュデッキ上へ渡ることができる。すなわち、このときに階段を上り下りする必要がない。また、前記作業に必要な資材を第1及び第2デッキ上に置いておくことが可能であり、前記作業の都度、必要な資材を鋳込床上から階段を通って運び上げなくてもよい。以上のことから、この連続鋳造設備は、作業者にとって利便性が高い。 Further, in this continuous casting facility, the operator can perform the first or first operation until the work at the casting position or the first and second standby positions occurs, and when the first and second tundish cars are moved. It is possible to stand by on two decks, and when the movement of the first and second tundish cars is completed and it becomes necessary to perform the above work, the adjacent portion at the time of casting the first deck or the adjacent portion at the time of waiting at the first deck It is possible to cross over to the first or second tundish deck from the part, the adjacent part at the time of casting the second deck, and the adjacent part at the time of waiting for the second deck. That is, there is no need to go up and down the stairs at this time. In addition, the materials required for the work can be placed on the first and second decks, and it is not necessary to carry the necessary materials from the cast floor through the stairs each time the work is performed. From the above, this continuous casting facility is highly convenient for workers.

前記鋳込装置は、前記鋳込口から下方に延びる成型空間を囲む鋳型であって前記鋳込口を通じて前記成型空間に注湯された溶鋼を前記鋳片に成型するものと、前記成型空間で成型された前記鋳片を前記成型空間から下方へ引き抜くとともにその鋳片を下流側へ送る送り装置と、を有し、前記連続鋳造設備は、前記成型空間への溶鋼の注湯の開始前に前記鋳込口を通じて前記成型空間に挿入されるダミーバーであって前記成型空間に注湯された溶鋼が前記成型空間から下方へ流出するのを阻止するように前記成型空間の下部の開口を塞ぐとともに、前記送り装置によって当該ダミーバーが下流側へ送られるのに伴って前記成型空間から前記鋳片が引き抜かれるように前記鋳片の下端に繋がるものと、前記送り装置によって送られた後、前記鋳片から切り離された前記ダミーバーを再び前記成型空間へ挿入可能な挿入位置へ搬送するために前記配置方向に沿って前記鋳込床上を移動するダミーバーカーと、をさらに備え、前記第1デッキと前記第2デッキは、前記ダミーバーカーが前記ダミーバーを前記挿入位置へ搬送するために進入するのを許容する進入スペースをそれらのデッキ間にあけるように互いに離間していることが好ましい。 The casting device is a mold that surrounds a molding space extending downward from the casting port, and molds molten steel poured into the molding space through the casting port into the slab, and in the molding space. It has a feeding device for pulling the molded slab downward from the molding space and feeding the slab to the downstream side, and the continuous casting facility has a continuous casting facility before the start of pouring of molten steel into the molding space. A dummy bar inserted into the molding space through the casting port, which closes the opening at the lower part of the molding space so as to prevent the molten steel poured into the molding space from flowing downward from the molding space. A device connected to the lower end of the slab so that the slab is pulled out from the molding space as the dummy bar is fed to the downstream side by the feeder, and the casting after being fed by the feeder. The first deck and the said The second decks are preferably spaced apart from each other so as to allow an entry space between the dummy barkers to allow the dummy barkers to enter to convey the dummy bar to the insertion position.

このようにすれば、第1及び第2デッキにより作業者の利便性を高めつつ、鋳片から切り離されたダミーバーを前記挿入位置に搬送して鋳型内の成型空間に上方から挿入可能な構成を実現できる。また、ダミーバーカーが進入スペースに進入していない状態において、その進入スペースを鋳込床の床下の送り装置にメンテナンス等のために上方からアクセスするためのスペースとして利用することができる。このため、例えば、送り装置の構成部材の交換のために天井クレーンにより上方から前記進入スペースを通って床下の送り装置にアクセスすることができる。 By doing so, the first and second decks enhance the convenience of the operator, and the dummy bar separated from the slab can be conveyed to the insertion position and inserted into the molding space in the mold from above. realizable. Further, when the dummy barker has not entered the approach space, the entry space can be used as a space for accessing the underfloor feeding device of the cast floor from above for maintenance or the like. Therefore, for example, the underfloor feeding device can be accessed from above through the approach space by an overhead crane for exchanging the components of the feeding device.

前記ダミーバー及び前記ダミーバーカーを備える構成において、前記第1タンディッシュデッキ、前記第2タンディッシュデッキ、前記第1デッキ及び前記第2デッキは、作業者がその上に乗る搭乗面をそれぞれ有し、前記第1タンディッシュデッキの搭乗面、前記第2タンディッシュデッキの搭乗面、前記第1デッキの搭乗面及び前記第2デッキの搭乗面は、同じ高さに位置することが好ましい。 In the configuration including the dummy bar and the dummy barker, the first tundish deck, the second tundish deck, the first deck, and the second deck each have a boarding surface on which an operator rides. It is preferable that the boarding surface of the first tundish deck, the boarding surface of the second tundish deck, the boarding surface of the first deck, and the boarding surface of the second deck are located at the same height.

このようにすれば、作業者が、第1タンディッシュデッキの搭乗面上と第1デッキの搭乗面上とを往来するとき、第1タンディッシュデッキの搭乗面上と第2デッキの搭乗面上とを往来するとき、第2タンディッシュデッキの搭乗面上と第2デッキの搭乗面上とを往来するとき、及び、第2タンディッシュデッキの搭乗面上と第1デッキの搭乗面上とを往来するときに、躓きにくくすることができる。なお、本発明において各デッキの搭乗面が同じ高さに位置するという概念は、各デッキの搭乗面同士が完全に同じ高さに位置することに必ずしも限定されず、作業者が通常の歩行により一方のデッキの搭乗面上からそのデッキに隣接するもう一方のデッキの搭乗面上へ支障なく移動できる程度の両デッキの搭乗面間の僅かな高さのずれは許容する概念である。 By doing so, when the worker goes back and forth between the boarding surface of the first tundish deck and the boarding surface of the first deck, the boarding surface of the first tundish deck and the boarding surface of the second deck When going back and forth between the boarding surface of the 2nd tundish deck and the boarding surface of the 2nd deck, and on the boarding surface of the 2nd tundish deck and the boarding surface of the 1st deck. You can make it harder to stumble when you come and go. In the present invention, the concept that the boarding surfaces of the decks are located at the same height is not necessarily limited to the boarding surfaces of the decks being located at exactly the same height, and the operator can walk normally. It is a concept that allows a slight height difference between the boarding surfaces of both decks so that it can move from the boarding surface of one deck to the boarding surface of the other deck adjacent to the deck without any trouble.

さらにこの場合において、前記第1タンディッシュ及び前記第2タンディッシュは、いずれも上側が開口し、前記連続鋳造設備は、前記第1タンディッシュの上側の開口を覆うように当該第1タンディッシュに被せられる第1タンディッシュカバーと、前記第2タンディッシュの上側の開口を覆うように当該第2タンディッシュに被せられる第2タンディッシュカバーと、をさらに備え、前記第1タンディッシュデッキの搭乗面は、前記第1タンディッシュカバーの上面と同じ高さに位置し、前記第2タンディッシュデッキの搭乗面は、前記第2タンディッシュカバーの上面と同じ高さに位置することが好ましい。 Further, in this case, both the first tundish and the second tundish have an opening on the upper side, and the continuous casting facility is applied to the first tundish so as to cover the opening on the upper side of the first tundish. The boarding surface of the first tundish deck is further provided with a first tundish cover to be covered and a second tundish cover to be covered on the second tundish so as to cover the upper opening of the second tundish. Is preferably located at the same height as the upper surface of the first tundish cover, and the boarding surface of the second tundish deck is preferably located at the same height as the upper surface of the second tundish cover.

第1タンディッシュが第1待機位置で待機しているときには第1タンディッシュカバー上で行う作業が生じるが、この構成によれば、作業者が、第1タンディッシュカバー上での作業のために第1デッキの搭乗面上から第1タンディッシュデッキの搭乗面上を経て第1タンディッシュカバーの上面上へ移動するとき、また、それとは逆に移動するときに、第1デッキと第1タンディッシュデッキとの間の境界に加えて第1タンディッシュデッキと第1タンディッシュカバーとの間の境界でも躓きにくくすることができる。また、同様に、第2タンディッシュが第2待機位置で待機しているときには第2タンディッシュカバー上で行う作業が生じるが、作業者が、第2タンディッシュカバー上での作業のために第2デッキの搭乗面上から第2タンディッシュデッキの搭乗面上を経て第2タンディッシュカバーの上面上へ移動するとき、また、それとは逆に移動するときに、第2デッキと第2タンディッシュデッキとの間の境界に加えて第2タンディッシュデッキと第2タンディッシュカバーとの間の境界でも躓きにくくすることができる。なお、本発明においてタンディッシュデッキの搭乗面がタンディッシュカバーの上面と同じ高さに位置するという概念は、タンディッシュデッキの搭乗面とタンディッシュカバーの上面とが完全に同じ高さに位置することに必ずしも限定されず、作業者が通常の歩行によりタンディッシュデッキの搭乗面上とタンディッシュカバーの上面上とのうちの一方から他方へ支障なく移動できる程度の当該搭乗面と当該上面との高さのずれは許容する概念である。 When the first tundish is waiting in the first standby position, the work to be performed on the first tundish cover occurs, but according to this configuration, the worker can work on the first tundish cover. When moving from the boarding surface of the first deck to the upper surface of the first tundish cover via the boarding surface of the first tundish deck, and vice versa, the first deck and the first tongue In addition to the boundary between the dish decks, the boundary between the first tundish deck and the first tundish cover can also make it difficult to stumble. Similarly, when the second tundish is waiting in the second standby position, the work to be performed on the second tundish cover occurs, but the worker is required to perform the work on the second tundish cover. When moving from the boarding surface of the 2 deck to the upper surface of the 2nd tundish cover via the boarding surface of the 2nd tundish deck, and vice versa, the 2nd deck and the 2nd tundish In addition to the boundary between the decks, the boundary between the second tundish deck and the second tundish cover can also make it difficult to stumble. In the present invention, the concept that the boarding surface of the tundish deck is located at the same height as the upper surface of the tundish cover is that the boarding surface of the tundish deck and the upper surface of the tundish cover are located at exactly the same height. The boarding surface and the upper surface thereof are not necessarily limited to the above, and the operator can move from one of the boarding surface of the tundish deck and the upper surface of the tundish cover to the other without any trouble by normal walking. Height deviation is an acceptable concept.

前記第1デッキは、作業者がその上に乗ることを許容する第1床板と、前記鋳込床上に立設されて前記第1床板を下から支える少なくとも1つの第1支柱とを有し、前記第2デッキは、作業者がその上に乗ることを許容する第2床板と、前記鋳込床上に立設されて前記第2床板を下から支える少なくとも1つの第2支柱とを有し、前記第1床板は、前記少なくとも1つの第1支柱のうち最も前記進入スペース寄りの第1支柱から前記進入スペース側へ張り出して前記第1デッキ鋳込時隣接部を構成する第1張出部を有し、前記第2床板は、前記少なくとも1つの第2支柱のうち最も前記進入スペース寄りの第2支柱から前記進入スペース側へ張り出して前記第2デッキ鋳込時隣接部を構成する第2張出部を有することが好ましい。 The first deck has a first floor board that allows an operator to ride on it, and at least one first support column that is erected on the cast floor and supports the first floor board from below. The second deck has a second floor board that allows an operator to ride on it, and at least one second support column that is erected on the cast floor and supports the second floor board from below. The first floor plate has a first overhanging portion that projects from the first strut closest to the entry space to the entry space side among the at least one first strut and constitutes an adjacent portion at the time of casting the first deck. The second floor plate has a second floor plate that projects from the second support column closest to the entry space among the at least one second support column toward the entry space side to form an adjacent portion when the second deck is cast. It is preferable to have a protrusion.

この構成によれば、第1張出部及び第2張出部により第1及び第2デッキ鋳込時隣接部を構成して鋳込場に第1タンディッシュカー又は第2タンディッシュカーがあるときのそのタンディッシュカー上のタンディッシュデッキと第1及び第2デッキとの間のアクセス経路を確保できるとともに、例えばダミーバーカーのうち第1張出部及び第2張出部よりも下側に位置する部分を台車部としてその台車部を前記進入スペースよりも幅広にすることによりダミーバーカーの安定性を確保しつつ、その台車部の幅方向の両側部を第1及び第2張出部の下方のスペースに進入させて第1及び第2デッキとの干渉を回避できる。さらに、この構成によれば、第1及び第2張出部よりも下側においてスペースの幅を大きく確保できるため、送り装置のメンテナンス時にそのスペースから鋳込床の床下の送り装置へのアクセスしやすさを向上できる。 According to this configuration, the first overhanging portion and the second overhanging portion form adjacent portions at the time of casting the first and second decks, and there is a first tundish car or a second tundish car at the casting site. The access route between the tundish deck on the tundish car and the first and second decks can be secured, and for example, in the dummy barker, below the first and second overhangs. The position of the bogie is used as a bogie, and the bogie is made wider than the entry space to ensure the stability of the dummy barker, while both sides of the bogie in the width direction are the first and second overhanging parts. It is possible to enter the space below and avoid interference with the first and second decks. Further, according to this configuration, a large space can be secured below the first and second overhangs, so that the space can be used to access the underfloor feeding device of the cast floor during maintenance of the feeding device. Ease can be improved.

前記連続鋳造設備は、前記第1デッキ及び前記第2デッキの少なくとも一方のデッキに取り付けられ、前記送り装置による前記鋳片の送り速度、前記第1タンディッシュから前記鋳込口への溶鋼の注湯流量及び前記第2タンディッシュから前記鋳込口への溶鋼の注湯流量のうちの少なくとも1つを調節するために操作される少なくとも1つの操作装置とをさらに備え、前記少なくとも1つの前記操作装置は、前記第1デッキと前記第2デッキとの間の前記ダミーバーカーの進入スペース内の位置であって当該操作装置が操作される操作位置と、前記ダミーバーカーの進入スペースから外れた位置であって当該操作装置と前記ダミーバーカーとの干渉が回避される退避位置との間で移動可能となるように前記少なくとも一方のデッキに取り付けられていることが好ましい。 The continuous casting facility is attached to at least one of the first deck and the second deck, and the feeding speed of the slab by the feeding device and the injection of molten steel from the first tundish to the casting port. It further comprises at least one operating device operated to regulate at least one of the hot water flow rate and the pouring flow rate of the molten steel from the second tundish to the casting port, the at least one said operation. The device is located at a position within the entry space of the dummy barker between the first deck and the second deck, at an operation position where the operation device is operated, and at a position outside the entry space of the dummy barker. It is preferable that the operating device is attached to at least one of the decks so as to be movable between the operating device and the retracted position where interference between the dummy barker is avoided.

作業者が操作装置を操作することにより前記送り装置による鋳片の送り速度、第1タンディッシュから鋳込口への溶鋼の注湯流量又は第2タンディッシュから鋳込口への溶鋼の注湯流量を調節する際には、鋳込口での溶鋼の状態を見ながらその調節を行う必要があるため、操作装置は鋳込口近傍にあることが望ましいが、鋳込口近傍はダミーバーカーの進入スペース内であるため、その鋳込口近傍に操作装置があるとダミーバーカーとの干渉が問題となる。これに対し、本構成によれば、作業者が前記送り装置による鋳片の送り速度、第1タンディッシュから鋳込口への溶鋼の注湯流量又は第2タンディッシュから鋳込口への溶鋼の注湯流量を調節するために操作装置を操作するときには、鋳造時であるので、ダミーバーカーが第1デッキと第2デッキとの間の進入スペースに進入しておらず、その状態で操作装置を前記操作位置に配置することによって鋳込口に近づけることができ、鋳込口での溶鋼の状態を見ながら前記の調節を行いやすくすることができる。また、ダミーバーカーがダミーバーを挿入位置に搬送するために前記進入スペースに進入するときには、操作装置を前記退避位置に配置することによって操作装置とダミーバーカーとの干渉を回避できる。従って、本構成では、操作装置とダミーバーカーとの干渉を回避しつつ、作業者が鋳込口での溶鋼の状態を見ながら鋳片の送り速度、第1タンディッシュから鋳込口への溶鋼の注湯流量又は第2タンディッシュから鋳込口への溶鋼の注湯流量を調節しやすくすることができる。 When the operator operates the operating device, the feeding speed of the slab by the feeding device, the flow rate of molten steel pouring from the first tundish to the casting port, or the pouring of molten steel from the second tundish to the casting port. When adjusting the flow rate, it is necessary to adjust it while observing the state of the molten steel at the casting port, so it is desirable that the operating device is near the casting port, but the vicinity of the casting port is a dummy barker. Since it is in the approach space, if there is an operating device near the casting port, interference with the dummy barker becomes a problem. On the other hand, according to this configuration, the operator can feed the slab by the feeding device, the pouring flow rate of the molten steel from the first tundish to the casting port, or the molten steel from the second tundish to the casting port. When operating the operating device to adjust the pouring flow rate, the dummy barker has not entered the entry space between the first deck and the second deck because it is during casting, and the operating device is in that state. Can be brought closer to the casting port by arranging the above-mentioned operating position, and the above-mentioned adjustment can be easily performed while observing the state of the molten steel at the casting port. Further, when the dummy barker enters the approach space in order to convey the dummy bar to the insertion position, the operation device can be arranged in the retracted position to avoid interference between the operation device and the dummy barker. Therefore, in this configuration, while avoiding interference between the operating device and the dummy barker, the operator observes the state of the molten steel at the casting port, the feed rate of the slab, and the molten steel from the first tundish to the casting port. It is possible to easily adjust the pouring flow rate of the molten steel or the pouring flow rate of the molten steel from the second tundish to the casting port.

前記連続鋳造設備は、前記鋳込床上において前記第1待機場を挟んで前記第1デッキと反対側に設置され、前記第1タンディッシュが前記第1待機位置で待機しているときにその第1タンディッシュを加熱する第1加熱装置と、前記鋳込床上において前記第2待機場を挟んで前記第2デッキと反対側に設置され、前記第2タンディッシュが前記第2待機位置で待機しているときにその第2タンディッシュを加熱する第2加熱装置とをさらに備えることが好ましい。 The continuous casting facility is installed on the casting floor on the side opposite to the first deck with the first waiting area interposed therebetween, and when the first tundish is waiting at the first waiting position, the first The first heating device for heating one tundish and the second tundish are installed on the cast floor on the opposite side of the second waiting area with the second waiting area in between, and the second tundish stands by at the second waiting position. It is preferable to further include a second heating device that heats the second tundish while it is being used.

この構成によれば、第1待機位置で待機している第1タンディッシュを第1加熱装置によって加熱することができるとともに、第2待機位置で待機している第2タンディッシュを第2加熱装置によって加熱することができる。このため、第1待機位置から鋳込位置に第1タンディッシュを移動させてその第1タンディッシュに取鍋から溶鋼が注湯されたときにその溶鋼が第1タンディッシュ内で固まってしまうのを防ぐことができるとともに、第2待機位置から鋳込位置に第2タンディッシュを移動させてその第2タンディッシュに取鍋から溶鋼が注湯されたときにその溶鋼が第2タンディッシュ内で固まってしまうのを防ぐことができる。さらに、この構成では、第1加熱装置が第1待機場を挟んで第1デッキと反対側にあるので、作業場となる第1デッキ側のスペースが第1加熱装置によって占有されるのを防ぐことができる。また、仮に第1待機場から第1デッキを越えた先の場所に第1加熱装置を設置した場合には、第1加熱装置から第1待機位置の第1タンディッシュへ熱を供給するための例えばアーム状の供給手段を第1デッキの上を横断して第1タンディッシュへ届かせることになり、第1デッキ上の作業者の邪魔になる。これに対し、本構成では、第1加熱装置が第1待機場を挟んで第1デッキと反対側にあるので、前記のような熱の供給手段が第1デッキ上を横断するのを回避できる。また、本構成では、第2加熱装置が第2待機場を挟んで第2デッキと反対側にあるので、前記第1加熱装置の場合と同様の理由により、作業場となる第2デッキ側のスペースが第2加熱装置によって占有されるのを防ぐことができるとともに、熱の供給手段が第2デッキ上を横断するのを回避できる。 According to this configuration, the first tundish waiting in the first standby position can be heated by the first heating device, and the second tundish waiting in the second standby position can be heated by the second heating device. Can be heated by. Therefore, when the first tundish is moved from the first standby position to the casting position and the molten steel is poured into the first tundish from the ladle, the molten steel solidifies in the first tundish. When the second tundish is moved from the second standby position to the casting position and the molten steel is poured into the second tundish from the ladle, the molten steel is in the second tundish. You can prevent it from solidifying. Further, in this configuration, since the first heating device is on the opposite side of the first waiting area from the first deck, it is possible to prevent the space on the first deck side, which is the work place, from being occupied by the first heating device. Can be done. Further, if the first heating device is installed in a place beyond the first deck from the first waiting area, heat is supplied from the first heating device to the first tundish in the first standby position. For example, the arm-shaped supply means is crossed over the first deck to reach the first tundish, which interferes with the worker on the first deck. On the other hand, in this configuration, since the first heating device is on the opposite side of the first deck across the first waiting area, it is possible to avoid the heat supply means as described above crossing over the first deck. .. Further, in this configuration, since the second heating device is on the opposite side of the second waiting area with the second waiting area in between, the space on the second deck side, which is the work place, is used for the same reason as in the case of the first heating device. Can be prevented from being occupied by the second heating device, and the heat supply means can be prevented from crossing over the second deck.

以上説明したように、本発明によれば、鋳込位置においてタンディッシュから溶鋼が漏出した場合にタンディッシュカーのデッキ上から作業者が退避可能であり、且つ、作業者にとって利便性が高い連続鋳造設備を提供できる。 As described above, according to the present invention, when molten steel leaks from the tundish at the casting position, the worker can evacuate from the deck of the tundish car, and the continuous operation is highly convenient for the worker. Can provide casting equipment.

本発明の一実施形態による連続鋳造設備の概略的な縦断面図である。It is a schematic vertical sectional view of the continuous casting equipment by one Embodiment of this invention. 本発明の一実施形態による連続鋳造設備の概略的な平面図であって非鋳造時に第1及び第2タンディッシュカーが各々の待機場に位置して第1及び第2タンディッシュがそれぞれの待機位置に配置された状態の連続鋳造設備を示す図である。It is a schematic plan view of the continuous casting equipment according to one embodiment of the present invention, in which the first and second tundish cars are located in the respective waiting areas during non-casting, and the first and second tundish are in the respective waiting areas. It is a figure which shows the continuous casting equipment in the state which was arranged in a position. 図2中のIII−III線に沿った連続鋳造設備の断面図である。It is sectional drawing of the continuous casting facility along the line III-III in FIG. 図2に示した連続鋳造設備の第2デッキ側の側面図である。It is a side view of the 2nd deck side of the continuous casting facility shown in FIG. 第1タンディッシュカーが鋳込場に移動して第1タンディッシュが鋳込位置に配置されるとともに第2タンディッシュカーが第2待機場に位置して第2タンディッシュが第2待機位置で待機している状態の連続鋳造設備の概略的な平面図である。The first tundish car moves to the casting site and the first tundish is placed in the casting position, the second tundish car is located in the second waiting area, and the second tundish is in the second waiting position. It is a schematic plan view of the continuous casting facility in a standby state. 図5中のVI−VI線に沿った連続鋳造設備の断面図である。ただし、当該図6では第1操作装置及び第2操作装置は図略している。It is sectional drawing of the continuous casting facility along the VI-VI line in FIG. However, in FIG. 6, the first operating device and the second operating device are omitted. 図6中のVII−VII線に沿った連続鋳造設備の断面図である。It is sectional drawing of the continuous casting equipment along the line VII-VII in FIG. 第2タンディッシュカーが鋳込場に移動して第2タンディッシュが鋳込位置に配置されるとともに第1タンディッシュカーが第1待機場に位置して第1タンディッシュが第1待機位置で待機している状態の連続鋳造設備の概略的な平面図である。The second tundish car is moved to the casting site and the second tundish is placed in the casting position, the first tundish car is located in the first waiting area, and the first tundish is in the first waiting position. It is a schematic plan view of the continuous casting facility in a standby state. 図8中のIX−IX線に沿った連続鋳造設備の断面図である。ただし、当該図9では、第1及び第2タンディッシュカー、及び、それらのタンディッシュカーに載せられた第1及び第2タンディッシュは、図略している。It is sectional drawing of the continuous casting equipment along the IX-IX line in FIG. However, in FIG. 9, the first and second tundish cars and the first and second tundish mounted on those tundish cars are omitted. ダミーバーカーがダミーバーを挿入位置に搬送した状態の連続鋳造設備の概略的な平面図である。It is a schematic plan view of the continuous casting facility in the state where the dummy barker conveys the dummy bar to the insertion position. 図10中のXI−XI線に沿った連続鋳造設備の断面図である。It is sectional drawing of the continuous casting equipment along the XI-XI line in FIG. 連続鋳造設備において待機位置に配置されたタンディッシュを加熱する加熱装置の構成を説明するための図である。It is a figure for demonstrating the structure of the heating apparatus which heats a tundish arranged in a standby position in a continuous casting facility.

以下、本発明の一実施形態について図面を参照して説明する。 Hereinafter, an embodiment of the present invention will be described with reference to the drawings.

図1及び図2には、本発明の一実施形態による連続鋳造設備1の全体構成が示されている。本実施形態による連続鋳造設備1は、溶鋼から鋳片を連続的に鋳造する設備である。この連続鋳造設備1は、鋳込装置2と、複数の取鍋6と、レードルターレット8と、複数のタンディッシュ10と、第1タンディッシュカー12と、第1タンディッシュデッキ13と、第2タンディッシュカー14と、第2タンディッシュデッキ15と、ダミーバー16と、ダミーバーカー18と、第1デッキ20と、第2デッキ21と、を備える。 1 and 2 show the overall configuration of the continuous casting facility 1 according to the embodiment of the present invention. The continuous casting equipment 1 according to the present embodiment is an equipment for continuously casting slabs from molten steel. The continuous casting facility 1 includes a casting device 2, a plurality of ladle 6, a ladle turret 8, a plurality of tundish 10, a first tundish car 12, a first tundish deck 13, and a second. It includes a tundish car 14, a second tundish deck 15, a dummy bar 16, a dummy barker 18, a first deck 20, and a second deck 21.

鋳込装置2は、溶鋼から鋳片を形成する装置であり、鋳込床100の下に設置されている。この鋳込装置2は、鋳込床100に開口した鋳込口101を通じて受け入れた溶鋼から鋳片を連続的に形成する。この鋳込装置2は、鋳型3と、図略の冷却装置と、送り装置4とを有する。 The casting device 2 is a device for forming a slab from molten steel, and is installed under the casting floor 100. The casting device 2 continuously forms slabs from molten steel received through a casting port 101 opened in the casting floor 100. The casting device 2 has a mold 3, a cooling device (not shown), and a feeding device 4.

鋳型3は、溶鋼から鋳片を成型するための型である。鋳型3は、鋳込口101から下方に延びる成型空間を囲むように鋳込床100の床面(上面)近傍からその床下に亘って埋め込まれている。鋳型3は、その上端の開口である鋳込口101を通じて成型空間に注湯された溶鋼を鋳片に成型する。また、鋳型3は、当該鋳型3内の成型空間で成型された鋳片を当該鋳型3の下方へ抜き出せるように下端が開口している。 The mold 3 is a mold for molding slabs from molten steel. The mold 3 is embedded from the vicinity of the floor surface (upper surface) of the casting floor 100 to under the floor so as to surround the molding space extending downward from the casting port 101. The mold 3 molds molten steel poured into a molding space into a slab through a casting port 101 which is an opening at the upper end thereof. Further, the lower end of the mold 3 is open so that the slab molded in the molding space in the mold 3 can be pulled out below the mold 3.

図略の冷却装置は、鋳型3内に注湯された溶鋼を固化させるために鋳型3を冷却するものであり、鋳込床100下に設けられている。 The cooling device (not shown) cools the mold 3 in order to solidify the molten steel poured into the mold 3, and is provided under the casting floor 100.

送り装置4は、鋳込床100の床下に設置され、鋳型3内の成型空間で成型された鋳片をその成型空間から下方へ引き抜くとともにその鋳片を下流側へ送るための装置である。具体的に、鋳込床100の床下には、鋳型3内の成型空間に繋がる送り通路102が構成されており、送り装置4は、鋳型3内の成型空間から引き出した鋳片をこの送り通路102を通して下流側へ送る。 The feeding device 4 is installed under the floor of the casting floor 100, and is a device for pulling out the slabs molded in the molding space in the mold 3 downward from the molding space and feeding the slabs to the downstream side. Specifically, under the floor of the casting floor 100, a feed passage 102 connected to the molding space in the mold 3 is configured, and the feed device 4 draws the slabs drawn from the molding space in the mold 3 into the feed passage. It is sent to the downstream side through 102.

送り通路102は、鋳型3内の成型空間の下端から真下に延びる領域と、その領域の下端から下側へ向かいつつ徐々に水平方向に近づくように湾曲して延びる領域と、その湾曲した領域の後端から水平方向に沿って鋳型3から遠ざかるように延びる領域とを有する。送り装置4は、送り通路102を挟んでその両側に配置されるとともに送り通路102が延びる方向に沿って間隔を空けて配置された複数の送りローラ22を有する。また、送り装置4は、送りローラ22をその軸心回りに回転可能に支持する図略のロールスタンドと、当該送り装置4が有する前記複数の送りローラ22のうちのいくつかの送りローラ22を回転駆動する図略のローラ駆動装置を有する。送り装置4では、複数の送りローラ22によって鋳片を両側から挟み込むとともに、その鋳片を送り通路102の下流側(鋳型3から遠ざかる側)へ送るように前記ローラ駆動装置により送りローラ22を回転させる。 The feed passage 102 includes a region extending directly below from the lower end of the molding space in the mold 3, a region extending downward from the lower end of the region and gradually curved toward the horizontal direction, and a curved region thereof. It has a region extending horizontally from the rear end away from the mold 3. The feeding device 4 has a plurality of feeding rollers 22 arranged on both sides of the feeding passage 102 and arranged at intervals along the direction in which the feeding passage 102 extends. Further, the feed device 4 includes a roll stand (not shown) that rotatably supports the feed roller 22 around its axis, and some feed rollers 22 among the plurality of feed rollers 22 included in the feed device 4. It has a roller drive device (not shown) that is rotationally driven. In the feed device 4, the slab is sandwiched from both sides by a plurality of feed rollers 22, and the feed roller 22 is rotated by the roller drive device so as to feed the slab to the downstream side (the side away from the mold 3) of the feed passage 102. Let me.

取鍋6は、鋳造の材料の溶鋼が入れられる容器である。本実施形態の連続鋳造設備1は、この取鍋6内に満たされた溶鋼をタンディッシュ10へ注湯するための取鍋ノズル24と、その取鍋ノズル24を通じた取鍋6からの溶鋼の吐出の可否及び吐出流量を制御するために取鍋6に設けられた図略のスライドバルブとを備えている。取鍋ノズル24は、取鍋6の底部に着脱可能に取り付けられている。スライドバルブの開度は油圧によって制御されるため、当該スライドバルブには図略の油圧ホースが接続されるようになっている。 The ladle 6 is a container in which molten steel, which is a material for casting, is placed. In the continuous casting facility 1 of the present embodiment, the ladle nozzle 24 for pouring the molten steel filled in the ladle 6 into the tundish 10 and the molten steel from the ladle 6 through the ladle nozzle 24 are provided. It is provided with a slide valve (not shown) provided in the ladle 6 for controlling the availability of discharge and the discharge flow rate. The ladle nozzle 24 is detachably attached to the bottom of the ladle 6. Since the opening degree of the slide valve is controlled by the hydraulic pressure, a hydraulic hose (not shown) is connected to the slide valve.

レードルターレット8は、注湯位置A(図2参照)にある取鍋6と取鍋待機位置Bにある別の取鍋6とを入れ替えるための装置である。注湯位置Aは、取鍋ノズル24からタンディッシュ10へ溶鋼が注湯されるように取鍋6が配置される位置であり、鋳込口101の上方の位置である。この注湯位置Aは、後述する鋳込位置Dに配置されたタンディッシュ10の上方の位置である。取鍋待機位置Bは、タンディッシュ10へ溶鋼を注湯している取鍋6とは別の取鍋6であって溶鋼が満たされたものが待機する位置である。レードルターレット8は、注湯位置Aに配置された取鍋6内の溶鋼をタンディッシュ10へ注湯し切ってその取鍋6が空になったときに、その取鍋6を溶鋼が満たされて取鍋待機位置Bに配置された別の取鍋6と入れ替えるように構成されている。 The ladle turret 8 is a device for replacing the ladle 6 at the pouring position A (see FIG. 2) with another ladle 6 at the ladle standby position B. The pouring position A is a position where the ladle 6 is arranged so that the molten steel is poured from the ladle nozzle 24 to the tundish 10, and is a position above the casting port 101. This pouring position A is a position above the tundish 10 arranged at the casting position D described later. The ladle standby position B is a position where a ladle 6 different from the ladle 6 in which molten steel is poured into the tundish 10 and which is filled with molten steel stands by. The ladle turret 8 is filled with molten steel when the ladle 6 is emptied by pouring the molten steel in the ladle 6 arranged at the pouring position A into the tundish 10. It is configured to replace another ladle 6 arranged at the ladle standby position B.

具体的には、レードルターレット8は、水平方向に延びるとともに、その一端部と他端部とにそれぞれ取鍋6を保持する部分を有するアーム8aを備えている。アーム8aは、その一端部と他端部との間の中央の位置Cを通る縦軸回りに回転可能となっている。レードルターレット8は、アーム8aの一端部によって保持した取鍋6を注湯位置Aに配置するとともに、溶鋼が満たされた別の取鍋6をアーム8aの他端部によって取鍋待機位置Bで保持し、注湯位置Aの取鍋6が空になった時点でアーム8aを180度回転させることによって、空になった取鍋6を取鍋待機位置Bに移動させるとともに溶鋼が満たされた別の取鍋6を注湯位置Aに移動させる。このように、注湯位置Aの取鍋6が空になる毎に溶鋼が満たされた別の取鍋6と入れ替えることにより、鋳込位置Dのタンディッシュ10へ継続して溶鋼を注湯できるようになっている。 Specifically, the ladle turret 8 is provided with an arm 8a that extends in the horizontal direction and has a portion that holds a ladle 6 at one end and the other end, respectively. The arm 8a is rotatable about a vertical axis passing through a central position C between one end and the other end. The ladle turret 8 arranges the ladle 6 held by one end of the arm 8a at the pouring position A, and another ladle 6 filled with molten steel at the ladle standby position B by the other end of the arm 8a. By holding and rotating the arm 8a 180 degrees when the ladle 6 at the pouring position A is empty, the empty ladle 6 is moved to the ladle standby position B and the molten steel is filled. Another ladle 6 is moved to the pouring position A. In this way, every time the ladle 6 at the pouring position A is emptied, it is replaced with another ladle 6 filled with molten steel, so that the molten steel can be continuously poured into the tundish 10 at the casting position D. It has become like.

タンディッシュ10は、鋳込位置Dにおいて取鍋6から注湯された溶鋼を受け、その溶鋼を一時的に滞留させることによってその溶鋼中の介在物を析出させて除去するための容器である。また、タンディッシュ10は、受けた溶鋼を鋳込口101へ注湯するように構成されている。このタンディッシュ10は、上側が開口して溶鋼を受けるタンディッシュ本体30と、そのタンディッシュ本体30の上側の開口を覆うように当該タンディッシュ本体30を覆うタンディッシュカバー31とを有する。タンディッシュカバー31には、貫通孔が設けられている。前記取鍋ノズル24は、この貫通孔を通してタンディッシュ10内の空間に挿入される。 The tundish 10 is a container for receiving the molten steel poured from the ladle 6 at the casting position D and temporarily retaining the molten steel to precipitate and remove inclusions in the molten steel. Further, the tundish 10 is configured to pour the received molten steel into the casting port 101. The tundish 10 has a tundish main body 30 having an opening on the upper side to receive molten steel, and a tundish cover 31 covering the tundish main body 30 so as to cover the upper opening of the tundish main body 30. The tundish cover 31 is provided with a through hole. The ladle nozzle 24 is inserted into the space inside the tundish 10 through this through hole.

また、本実施形態の連続鋳造設備1は、タンディッシュ10が受けた溶鋼をそのタンディッシュ10から鋳込口101を通して鋳型3内の成型空間へ注湯するためのタンディッシュノズル26と、そのタンディッシュノズル26を通じた溶鋼の注湯の可否及び注湯流量を制御するためにタンディッシュ10に設けられた図略のスライドバルブとを備えている。タンディッシュノズル26は、タンディッシュ10の底部に着脱可能に取り付けられている。 Further, the continuous casting facility 1 of the present embodiment has a tundish nozzle 26 for pouring molten steel received by the tundish 10 from the tundish 10 into a molding space in the mold 3 through a casting port 101, and a tongue thereof. It is provided with a slide valve (not shown) provided in the tundish 10 for controlling the pouring ability of molten steel and the pouring flow rate through the dish nozzle 26. The tundish nozzle 26 is detachably attached to the bottom of the tundish 10.

前記鋳込位置Dは、前記注湯位置Aに配置された取鍋6の下方で且つ鋳型3の上方(鋳込口101の上方)の位置である。より具体的には、前記鋳込位置Dは、前記注湯位置Aに配置された取鍋6のノズル24がタンディッシュ10内の空間に挿入されるとともにそのタンディッシュ10のノズル26が鋳込口101を通って鋳型3内の成型空間に挿入される位置である。 The casting position D is a position below the ladle 6 arranged at the pouring position A and above the mold 3 (above the casting port 101). More specifically, at the casting position D, the nozzle 24 of the ladle 6 arranged at the pouring position A is inserted into the space inside the tundish 10, and the nozzle 26 of the tundish 10 is cast. This is the position where the mold 3 is inserted into the molding space through the mouth 101.

タンディッシュ10は、鋳込位置Dにおいてある程度の期間に亘って鋳造に使用されると、タンディッシュノズル26の損傷やその他の不具合が生じるため、定期的なメンテナンスを必要とする。このタンディッシュ10のメンテナンス時には、鋳込位置Dにあるタンディッシュ10を別のタンディッシュ10と交換する。また、連続鋳造設備の操業では、鋳造する鋼種を途中で変更する場合がある。鋼種の変更時には、その変更前に鋳込位置Dにおいて鋳造に使用されていたタンディッシュ10を別のタンディッシュ10と交換する。 If the tundish 10 is used for casting at the casting position D for a certain period of time, the tundish nozzle 26 may be damaged or other problems may occur, so that regular maintenance is required. At the time of maintenance of the tundish 10, the tundish 10 at the casting position D is replaced with another tundish 10. In addition, in the operation of continuous casting equipment, the type of steel to be cast may be changed on the way. When the steel type is changed, the tundish 10 used for casting at the casting position D before the change is replaced with another tundish 10.

従って、本実施形態の連続鋳造設備1は、複数のタンディッシュ10を備えている。そして、鋳込位置Dにおいて鋳造に使用されているタンディッシュ10のメンテナンス時期が来れば、そのタンディッシュ10を鋳込位置Dから移動させてメンテナンスを行う一方、そのタンディッシュ10の替わりにメンテナンス済みの別のタンディッシュ10を鋳込位置Dに配置して鋳造を続けるようになっている。また、鋳造する鋼種の変更時には、それまでの鋼種の鋳造を停止するとともにそれまで鋳込位置Dにおいて鋳造に使用されていたタンディッシュ10を鋳込位置Dから移動させる一方、別のタンディッシュ10を鋳込位置Dに配置して変更後の鋼種の鋳造を開始するようになっている。連続鋳造設備1が備える複数のタンディッシュ10には、図2に示すように、第1タンディッシュカー12に搭載される第1タンディッシュ10aと、第2タンディッシュカー14に搭載される第2タンディッシュ10bとが含まれる。 Therefore, the continuous casting facility 1 of the present embodiment includes a plurality of tundish 10. Then, when the maintenance time of the tundish 10 used for casting at the casting position D comes, the tundish 10 is moved from the casting position D for maintenance, and the maintenance has been completed in place of the tundish 10. Another tundish 10 is placed at the casting position D to continue casting. Further, when the steel type to be cast is changed, the casting of the steel type up to that point is stopped, and the tundish 10 used for casting at the casting position D is moved from the casting position D, while another tundish 10 is used. Is placed at the casting position D to start casting the changed steel grade. As shown in FIG. 2, the plurality of tundish 10s included in the continuous casting facility 1 include a first tundish 10a mounted on the first tundish car 12 and a second tundish 10 mounted on the second tundish car 14. Tundish 10b and the like are included.

第1タンディッシュカー12は、搭載した第1タンディッシュ10aを鋳込位置Dと第1待機位置Eとの間で搬送するための装置である。第1待機位置Eは、鋳込位置Dに配置される前の第1タンディッシュ10aが待機する位置である。この第1待機位置Eは、鋳込床100の上面に沿う特定の移動方向D1に沿って鋳込位置Dから離れた位置である。 The first tundish car 12 is a device for transporting the mounted first tundish 10a between the casting position D and the first standby position E. The first standby position E is a position where the first tundish 10a before being arranged at the casting position D waits. The first standby position E is a position away from the casting position D along a specific moving direction D1 along the upper surface of the casting floor 100.

鋳込位置Dにおいて鋳造に使用されている第1タンディッシュ10aのメンテナンス時期が来たときには、その第1タンディッシュ10aを第1タンディッシュカー12によって鋳込位置Dから第1待機位置Eへ搬送し、その第1待機位置Eからメンテナンス作業を行うための作業場へクレーン等によってさらに搬送するようになっている。また、メンテナンス済みの第1タンディッシュ10aは、第1待機位置Eにおいて第1タンディッシュカー12に搭載されて待機し、鋳造に使用されるときに第1タンディッシュカー12によって鋳込位置Dへ搬送されるようになっている。 When the maintenance time of the first tundish 10a used for casting at the casting position D comes, the first tundish 10a is transported from the casting position D to the first standby position E by the first tundish car 12. However, it is further transported from the first standby position E to the work place for performing maintenance work by a crane or the like. Further, the maintained first tundish 10a is mounted on the first tundish car 12 in the first standby position E and stands by, and when used for casting, the first tundish car 12 moves to the casting position D. It is designed to be transported.

第1タンディッシュカー12は、第1タンディッシュ10aを搭載して鋳込場104と第1待機場106との間で鋳込床100の上面に沿う特定の移動方向D1に沿って鋳込床100上を移動する。鋳込場104は、鋳込口101(鋳型3)が設けられた鋳込床100上の場所であり、第1タンディッシュ10aを搭載した第1タンディッシュカー12がこの鋳込場104上に位置することによって第1タンディッシュ10aが鋳込位置Dに配置される。 The first tundish car 12 is equipped with the first tundish 10a and is a casting floor along a specific moving direction D1 along the upper surface of the casting floor 100 between the casting site 104 and the first waiting area 106. Move over 100. The casting place 104 is a place on the casting floor 100 provided with the casting port 101 (mold 3), and the first tundish car 12 equipped with the first tundish 10a is placed on the casting place 104. By locating, the first tundish 10a is arranged at the casting position D.

第1待機場106は、その上に位置する第1タンディッシュカー12に搭載された第1タンディッシュ10aが第1待機位置Eに配置される鋳込床100上の場所である。第1タンディッシュカー12は、鋳込場104と第1待機場106との間で移動することにより第1タンディッシュ10aを鋳込位置Dと第1待機位置Eとの間で搬送する。 The first waiting area 106 is a place on the cast floor 100 in which the first tundish 10a mounted on the first tundish car 12 located above the first waiting area 106 is arranged at the first waiting position E. The first tundish car 12 conveys the first tundish 10a between the casting position D and the first waiting position E by moving between the casting place 104 and the first waiting place 106.

第2タンディッシュカー14は、搭載した第2タンディッシュ10bを鋳込位置Dと第2待機位置Fとの間で搬送するための装置である。第2待機位置Fは、鋳込位置Dに配置される前の第2タンディッシュ10bが待機する位置である。この第2待機位置Fは、鋳込床100の上面に沿う前記移動方向D1に沿って鋳込位置Dから前記第1待機位置Eと反対側へ離れた位置である。 The second tundish car 14 is a device for transporting the mounted second tundish 10b between the casting position D and the second standby position F. The second standby position F is a position where the second tundish 10b before being arranged at the casting position D waits. The second standby position F is a position separated from the casting position D on the side opposite to the first standby position E along the movement direction D1 along the upper surface of the casting floor 100.

鋳込位置Dにおいて鋳造に使用されている第2タンディッシュ10bのメンテナンス時期が来たときには、その第2タンディッシュ10bを第2タンディッシュカー14によって鋳込位置Dから第2待機位置Fへ搬送し、その第2待機位置Fからメンテナンス作業を行うための作業場へクレーン等によってさらに搬送するようになっている。また、メンテナンス済みの第2タンディッシュ10bは、第2待機位置Fにおいて第2タンディッシュカー14に搭載されて待機し、鋳造に使用されるときに第2タンディッシュカー14によって鋳込位置Dへ搬送されるようになっている。本実施形態では、第1タンディッシュ10aが鋳込位置Dに配置されて鋳造に使用されているとき(図5参照)には、第2タンディッシュ10bが第2待機位置Fにおいて待機し、逆に、第2タンディッシュ10bが鋳込位置Dに配置されて鋳造に使用されているとき(図8参照)には、第1タンディッシュ10aが第1待機位置Eにおいて待機するようになっている。 When the maintenance time of the second tundish 10b used for casting at the casting position D comes, the second tundish 10b is transported from the casting position D to the second standby position F by the second tundish car 14. Then, it is further transported from the second standby position F to the work place for performing maintenance work by a crane or the like. Further, the maintained second tundish 10b is mounted on the second tundish car 14 in the second standby position F and stands by, and when used for casting, the second tundish car 14 moves to the casting position D. It is designed to be transported. In the present embodiment, when the first tundish 10a is arranged at the casting position D and used for casting (see FIG. 5), the second tundish 10b stands by at the second standby position F, and vice versa. Further, when the second tundish 10b is arranged at the casting position D and used for casting (see FIG. 8), the first tundish 10a stands by at the first standby position E. ..

第2タンディッシュカー14は、第2タンディッシュ10bを搭載して前記鋳込場104と第2待機場108との間で前記移動方向D1に沿って鋳込床100上を移動する。第2タンディッシュ10bを搭載した第2タンディッシュカー14が鋳込場104上に位置することによって第2タンディッシュ10bが鋳込位置Dに配置される。第2待機場108は、その上に位置する第2タンディッシュカー12に搭載された第2タンディッシュ10bが第2待機位置Fに配置される鋳込床100上の場所である。第2タンディッシュカー14は、鋳込場104と第2待機場108との間で移動することにより第2タンディッシュ10bを鋳込位置Dと第2待機位置Fとの間で搬送する。 The second tundish car 14 mounts the second tundish 10b and moves on the casting floor 100 along the moving direction D1 between the casting field 104 and the second waiting area 108. The second tundish car 14 equipped with the second tundish 10b is located on the casting site 104, so that the second tundish 10b is arranged at the casting position D. The second waiting area 108 is a place on the cast floor 100 in which the second tundish 10b mounted on the second tundish car 12 located above the second waiting area 108 is arranged at the second waiting position F. The second tundish car 14 conveys the second tundish 10b between the casting position D and the second waiting position F by moving between the casting place 104 and the second waiting place 108.

第1待機場106、鋳込場104及び第2待機場108を通る鋳込床100上には、第1及び第2タンディッシュカー12,14がその上に乗る一対のレール110が敷設されている。一対のレール110は、前記移動方向D1、換言すれば第1待機位置Eと鋳込位置Dと第2待機位置Fとを結ぶ方向に直線的に延びている。 On the cast floor 100 passing through the first waiting area 106, the casting site 104, and the second waiting area 108, a pair of rails 110 on which the first and second tundish cars 12 and 14 ride are laid. There is. The pair of rails 110 extend linearly in the moving direction D1, in other words, in the direction connecting the first standby position E, the casting position D, and the second standby position F.

第1及び第2タンディッシュカー12,14は、同様に構成されており、図1に示すように、タンディッシュカー本体32と、複数の車輪33とをそれぞれ有する。タンディッシュカー本体32は、その上にタンディッシュ10が載置されてそのタンディッシュ10を保持するものである。車輪33は、タンディッシュカー本体32の底部に設けられ、一対のレール110上に乗っている。タンディッシュカー本体32には、各車輪33を回転駆動させる図略の駆動装置が設けられている。この駆動装置によって回転させられた各車輪33がレール110上を転動することにより、第1及び第2タンディッシュカー12,14は、一対のレール110に沿って前記移動方向D1に移動し、タンディッシュ10を搬送するようになっている。 The first and second tundish cars 12 and 14 have the same configuration, and as shown in FIG. 1, have a tundish car main body 32 and a plurality of wheels 33, respectively. The tundish car main body 32 is for holding the tundish 10 on which the tundish 10 is placed. The wheels 33 are provided on the bottom of the tundish car body 32 and are mounted on a pair of rails 110. The tundish car main body 32 is provided with a drive device (not shown) for rotationally driving each wheel 33. As each wheel 33 rotated by this drive device rolls on the rail 110, the first and second tundish cars 12 and 14 move in the moving direction D1 along the pair of rails 110. The tundish 10 is to be transported.

第1タンディッシュデッキ13は、作業者がその上に乗って第1タンディッシュ10a及び取鍋6に関する各種作業を行うためのものである。第1タンディッシュデッキ13上で行われる作業は、例えば、取鍋ノズル24の開口作業、第1タンディッシュ10a内の溶鋼の検温作業、取鍋6に対する取鍋ノズル24の着脱作業、取鍋6に設けられたスライドバルブへの油圧ホースの接続作業などである。第1タンディッシュデッキ13は、第1タンディッシュカー12のタンディッシュカー本体32上に設置されており、第1タンディッシュカー12が移動するのに伴ってその第1タンディッシュカー12とともに移動する。 The first tundish deck 13 is for an operator to ride on the first tundish deck 13 and perform various operations related to the first tundish 10a and the ladle 6. The work performed on the first tundish deck 13 is, for example, opening work of the ladle nozzle 24, temperature measurement work of molten steel in the first tundish 10a, attachment / detachment work of the ladle nozzle 24 to the ladle 6, and ladle 6 It is the work of connecting the hydraulic hose to the slide valve provided in. The first tundish deck 13 is installed on the tundish car main body 32 of the first tundish car 12, and moves together with the first tundish car 12 as the first tundish car 12 moves. ..

第1タンディッシュデッキ13は、第1タンディッシュカー12に搭載された第1タンディッシュ10aの周囲を概ね囲むように構成されている。また、第1タンディッシュデッキ13は、作業者がその上に乗る搭乗面を有する。具体的には、第1タンディッシュデッキ13は、略水平に配置された床板13a(図1参照)を有し、この床板13aの上面が搭乗面となっている。床板13aの上面(搭乗面)は、第1タンディッシュカー12に搭載された第1タンディッシュ10aのタンディッシュカバー31の上面と同じ高さに位置する。床板13aは、その上面上と第1タンディッシュ10aのタンディッシュカバー31の上面上との間を作業者が往来可能となるようにタンディッシュカバー31に隣接して配置されている。なお、作業者が躓くのを防止するためには、床板13aの上面がタンディッシュカバー31の上面と完全に同じ高さに位置することが好ましいが、作業者が通常の歩行により床板13aの上面上とタンディッシュカバー31の上面上とのうちの一方から他方へ支障なく移動できる程度の僅かな高さのずれは許容される。 The first tundish deck 13 is configured to substantially surround the periphery of the first tundish 10a mounted on the first tundish car 12. Further, the first tundish deck 13 has a boarding surface on which the worker rides. Specifically, the first tundish deck 13 has a floor plate 13a (see FIG. 1) arranged substantially horizontally, and the upper surface of the floor plate 13a is a boarding surface. The upper surface (boarding surface) of the floor plate 13a is located at the same height as the upper surface of the tundish cover 31 of the first tundish 10a mounted on the first tundish car 12. The floor plate 13a is arranged adjacent to the tundish cover 31 so that an operator can come and go between the upper surface thereof and the upper surface of the tundish cover 31 of the first tundish 10a. In order to prevent the operator from stumbling, it is preferable that the upper surface of the floor plate 13a is located at exactly the same height as the upper surface of the tundish cover 31, but the upper surface of the floor plate 13a is preferably located by the operator during normal walking. A slight height deviation is allowed so that the top and the top surface of the tundish cover 31 can be moved from one of them to the other without any trouble.

また、第1タンディッシュデッキ13は、床板13a上からの作業者の転落等を防止するための複数の手摺柵13bを有する。この複数の手摺柵13bには、第1タンディッシュカー12の移動方向D1における床板13aの両端部のそれぞれに設けられた一対の端部手摺柵13cと、第1タンディッシュカー12が鋳込場104に配置されたときに後述のダミーバーカー18の進入スペース120側を向く端部に設けられた進入スペース側手摺柵13dとが含まれる。これらの各手摺柵13c,13dは、それらが設けられた床板13aの端部の端縁に沿って延びている。進入スペース側手摺柵13dは、第1タンディッシュカー12が鋳込場104に配置されたときに第1タンディッシュデッキ10aの進入スペース120側にはデッキがないため、床板13aの進入スペース120側の端部上を閉鎖することによって床板13aから進入スペース120側への転落を防止する。 Further, the first tundish deck 13 has a plurality of handrail fences 13b for preventing the worker from falling from the floor plate 13a. A pair of end handrail fences 13c provided at both ends of the floor plate 13a in the moving direction D1 of the first tundish car 12 and a first tundish car 12 are cast in the plurality of handrail fences 13b. The entry space side handrail fence 13d provided at the end of the dummy barker 18 which will be described later facing the approach space 120 side when arranged at 104 is included. Each of these handrail fences 13c and 13d extends along the edge of the end of the floor plate 13a on which they are provided. The handrail fence 13d on the approach space side has no deck on the approach space 120 side of the first tundish deck 10a when the first tundish car 12 is arranged at the casting site 104, so that the approach space 120 side of the floor plate 13a By closing on the end of the floor plate 13a, the floor plate 13a is prevented from falling to the approach space 120 side.

第1タンディッシュカー12の移動方向D1に沿う方向における進入スペース側手摺柵13dの一端部とその一端部側に位置する一方の端部手摺柵13cとの間には、作業者が通ることが可能なスペースが設けられている。また、同様に、第1タンディッシュカー12の移動方向D1に沿う方向における進入スペース側手摺柵13dの他端部とその他端部側に位置する他方の端部手摺柵13cとの間にも、作業者が通ることが可能なスペースが設けられている。 An operator may pass between one end of the approach space side handrail fence 13d in the direction along the moving direction D1 of the first tundish car 12 and one end handrail fence 13c located on the one end side thereof. There is a possible space. Similarly, between the other end of the approach space side handrail fence 13d in the direction along the moving direction D1 of the first tundish car 12 and the other end handrail fence 13c located on the other end side. There is a space that workers can pass through.

第2タンディッシュデッキ15は、作業者がその上に乗って第2タンディッシュ10b及び取鍋6に関する各種作業を行うためのものである。第2タンディッシュデッキ15上で行われる作業は、第1タンディッシュデッキ13上で行われる作業と同様の作業である。第2タンディッシュデッキ15は、第2タンディッシュカー14のタンディッシュカー本体32上に設置されており、第2タンディッシュカー14が移動するのに伴ってその第2タンディッシュカー14とともに移動する。 The second tundish deck 15 is for an operator to get on the second tundish deck 15 and perform various operations related to the second tundish 10b and the ladle 6. The work performed on the second tundish deck 15 is the same as the work performed on the first tundish deck 13. The second tundish deck 15 is installed on the tundish car main body 32 of the second tundish car 14, and moves together with the second tundish car 14 as the second tundish car 14 moves. ..

第2タンディッシュデッキ15は、第2タンディッシュカー14に搭載された第2タンディッシュ10bの周囲を概ね囲むように構成されている。第2タンディッシュデッキ15の構成は、第1タンディッシュデッキ13の構成と同様である。第2タンディッシュデッキ15は、略水平に配置された床板15aを有し、この床板15aの上面に作業者が乗るようになっている。すなわち、この床板15aの上面が作業者の搭乗面となっている。床板15aの上面は、第2タンディッシュカー14に搭載された第2タンディッシュ10bのタンディッシュカバー31の上面と実質的に同じ高さに位置する。 The second tundish deck 15 is configured to substantially surround the periphery of the second tundish 10b mounted on the second tundish car 14. The configuration of the second tundish deck 15 is the same as the configuration of the first tundish deck 13. The second tundish deck 15 has a floor plate 15a arranged substantially horizontally, and an operator can ride on the upper surface of the floor plate 15a. That is, the upper surface of the floor plate 15a is the boarding surface of the worker. The upper surface of the floor plate 15a is located at substantially the same height as the upper surface of the tundish cover 31 of the second tundish 10b mounted on the second tundish car 14.

また、第2タンディッシュデッキ15は、第1タンディッシュデッキ13の複数の手摺柵13bと同様の複数の手摺柵15bを有する。この複数の手摺柵15bには、第1タンディッシュデッキ13の一対の端部手摺柵13c及び進入スペース側手摺柵13dと同様に構成及び配置された一対の端部手摺柵15c及び進入スペース側手摺柵15dが含まれる。 Further, the second tundish deck 15 has a plurality of handrail fences 15b similar to the plurality of handrail fences 13b of the first tundish deck 13. The plurality of handrail fences 15b include a pair of end handrail fences 15c and an entry space side handrail that are configured and arranged in the same manner as the pair of end handrail fences 13c and the entry space side handrail fence 13d of the first tundish deck 13. The fence 15d is included.

ダミーバー16(図1及び図10参照)は、鋳型3内の成型空間への溶鋼の注湯開始前に鋳込口101を通じて上方から前記成型空間に挿入され、前記成型空間に溶鋼が注湯されたときにその溶鋼が前記成型空間から下方へ流出するのを阻止するように前記成型空間の下部の開口を塞ぐ。また、このダミーバー16は、前記成型空間において溶鋼から成型された鋳片の下端に繋がり、その状態で送り装置4によって下流側へ送られることにより、鋳片を前記成型空間から下方へ引き抜くために寄与する。ダミーバー16は、一連となるように連結された多数のセグメントからなり、互いに連結されたセグメント同士が曲折可能となっていることにより送り通路102内においてその送り通路102の湾曲した形状に沿うようになっている。ダミーバー16は、送り通路102の下流側の端部から送り出された後、鋳片から切り離される。 The dummy bar 16 (see FIGS. 1 and 10) is inserted into the molding space from above through the casting port 101 before the start of pouring the molten steel into the molding space in the mold 3, and the molten steel is poured into the molding space. At that time, the opening at the lower part of the molding space is closed so as to prevent the molten steel from flowing downward from the molding space. Further, the dummy bar 16 is connected to the lower end of a slab molded from molten steel in the molding space, and is fed downstream by the feeding device 4 in that state in order to pull the slab downward from the molding space. Contribute. The dummy bar 16 is composed of a large number of segments connected in a series, and the segments connected to each other are bendable so as to follow the curved shape of the feed passage 102 in the feed passage 102. It has become. The dummy bar 16 is fed from the downstream end of the feed passage 102 and then separated from the slab.

ダミーバーカー18は、鋳片から切り離されたダミーバー16を再び鋳型3内の前記成型空間へ上方から挿入可能な挿入位置116(図10参照)へ搬送する装置である。このダミーバーカー18は、鋳片から切り離されたダミーバー16を搭載して、第1及び第2タンディッシュカー12,14の移動方向D1に対して直交する後述の配置方向D2に沿って鋳込床100上を移動する。ダミーバーカー18は、当該ダミーバーカー18にダミーバー16が搭載される位置からダミーバー16の前端が鋳込口101上に配置される挿入位置116に当該ダミーバー16が配置される鋳込位置D近傍の位置まで移動する。 The dummy barker 18 is a device that conveys the dummy bar 16 separated from the slab to the insertion position 116 (see FIG. 10) that can be inserted into the molding space in the mold 3 from above again. The dummy barker 18 is equipped with a dummy bar 16 separated from the slab, and is a cast floor along the arrangement direction D2 described later, which is orthogonal to the moving direction D1 of the first and second tundish cars 12 and 14. Move over 100. The dummy barker 18 is located near the casting position D where the dummy bar 16 is arranged at the insertion position 116 where the front end of the dummy bar 16 is arranged on the casting port 101 from the position where the dummy bar 16 is mounted on the dummy barker 18. Move to.

鋳込床100上には、第1及び第2タンディッシュカー12,14の移動方向D1と直交する方向に沿ってダミーバーカー18用の一対のレール112が敷設されている。ダミーバーカー18は、この一対のレール112上に乗った車輪18aを有する台車部18bと、その台車部18b上に設けられていてダミーバー16を保持する保持部18cとを有する。台車部18bの車輪18aがレール112上を転動することにより、ダミーバーカー18は、レール112に沿って移動し、前記のようにダミーバー16を搬送する。台車部18bは、前記移動方向D1に沿う方向において前記保持部18cよりも広い幅を有する。このため、台車部18bは、保持部18cよりも両側に突出している。台車部18bが前記のように広い幅を有することにより、当該台車部18bの幅方向における車輪18a間の間隔を拡大するとともにそれらの車輪18aが乗る一対のレール112間の間隔を拡大することができる。その結果、前記送り装置4の直上にレール112やそのレール112を受ける梁等の障害物が配置されるのが回避されている。 On the cast floor 100, a pair of rails 112 for the dummy barker 18 are laid along a direction orthogonal to the moving direction D1 of the first and second tundish cars 12 and 14. The dummy barker 18 has a carriage portion 18b having wheels 18a mounted on the pair of rails 112, and a holding portion 18c provided on the carriage portion 18b to hold the dummy bar 16. As the wheels 18a of the carriage portion 18b roll on the rail 112, the dummy barker 18 moves along the rail 112 and conveys the dummy bar 16 as described above. The carriage portion 18b has a wider width than the holding portion 18c in the direction along the moving direction D1. Therefore, the bogie portion 18b protrudes from the holding portion 18c on both sides. Since the bogie portion 18b has a wide width as described above, the distance between the wheels 18a in the width direction of the bogie portion 18b can be increased, and the distance between the pair of rails 112 on which the wheels 18a ride can be increased. can. As a result, it is avoided that an obstacle such as a rail 112 or a beam that receives the rail 112 is arranged directly above the feed device 4.

第1デッキ20と第2デッキ21は、作業者がその上で待機したり、鋳造時に鋳込場104にある第1タンディッシュカー12の第1タンディッシュデッキ13上からの退避経路又は鋳込場104にある第2タンディッシュカー14の第2タンディッシュデッキ15上からの退避経路を構成したりするものである。第1デッキ20と第2デッキ21は、第1及び第2タンディッシュカー12,14の移動領域に対してレードルターレット8と反対側に配置され、第1及び第2タンディッシュカー12,14の移動領域に近接するように配置されている。第1デッキ20と第2デッキ21は、第1及び第2タンディッシュカー12,14の移動方向D1に沿って並んで鋳込床100上に設置されている。また、第1デッキ20と第2デッキ21は、図2及び図10に示すように、ダミーバーカー18の進入スペース120をそれらの間にあけるように第1及び第2タンディッシュカー12,14の移動方向D1に沿う方向において互いに離間して配置されている。 In the first deck 20 and the second deck 21, the worker waits on the deck, or the evacuation route or the casting of the first tundish car 12 in the casting place 104 from the first tundish deck 13 at the time of casting. It constitutes an evacuation route from the second tundish deck 15 of the second tundish car 14 in the field 104. The first deck 20 and the second deck 21 are arranged on the opposite side of the ladle turret 8 with respect to the moving area of the first and second tundish cars 12, 14, and the first and second tundish cars 12, 14 It is arranged so as to be close to the moving area. The first deck 20 and the second deck 21 are installed side by side on the cast floor 100 along the moving direction D1 of the first and second tundish cars 12 and 14. Further, as shown in FIGS. 2 and 10, the first deck 20 and the second deck 21 of the first and second tundish cars 12 and 14 so as to have an entry space 120 of the dummy barker 18 between them. They are arranged apart from each other in the direction along the moving direction D1.

第1デッキ20は、第1タンディッシュカー12の移動領域に対してその第1タンディッシュカー12の移動方向D1と直交する配置方向D2における一方側の位置で鋳込床100上に設置されている。第1デッキ20は、第1デッキ鋳込時隣接部42(図5及び図8参照)と、第1デッキ待機時隣接部44とを有する。 The first deck 20 is installed on the cast floor 100 at a position on one side in the arrangement direction D2 orthogonal to the moving direction D1 of the first tundish car 12 with respect to the moving area of the first tundish car 12. There is. The first deck 20 has a first deck casting adjacent portion 42 (see FIGS. 5 and 8) and a first deck standby adjacent portion 44.

第1デッキ鋳込時隣接部42は、第1タンディッシュカー12が鋳込場104にあるとき(図5参照)に第1タンディッシュデッキ13上と第1デッキ20上との間の作業者の往来を許容するように前記配置方向D2において第1タンディッシュデッキ13に隣接する。また、第1デッキ鋳込時隣接部42は、第2タンディッシュカー12が鋳込場104にあるとき(図8参照)に第2タンディッシュデッキ15上と第1デッキ20上との間の作業者の往来を許容するように前記配置方向D2において第2タンディッシュデッキ15に隣接する。具体的には、この第1デッキ鋳込時隣接部42は、第1タンディッシュカー12が鋳込場104にあるときに前記配置方向D2において第1タンディッシュデッキ13の進入スペース側手摺柵13dの第1待機場106側の端部と第1待機場106側の端部手摺柵13cとの間の部分に隣接する。また、この第1デッキ鋳込時隣接部42は、第2タンディッシュカー14が鋳込場104にあるときに前記配置方向D2において第2タンディッシュデッキ15の進入スペース側手摺柵15dの第2待機場108側の端部と第2待機場108側の端部手摺柵15cとの間の部分に隣接する。 The adjacent portion 42 at the time of casting the first deck is a worker between the first tundish deck 13 and the first deck 20 when the first tundish car 12 is in the casting place 104 (see FIG. 5). Adjacent to the first tundish deck 13 in the arrangement direction D2 so as to allow the traffic of the above. Further, the adjacent portion 42 at the time of casting the first deck is located between the top of the second tundish deck 15 and the top of the first deck 20 when the second tundish car 12 is in the casting field 104 (see FIG. 8). It is adjacent to the second tundish deck 15 in the arrangement direction D2 so as to allow the traffic of workers. Specifically, the adjacent portion 42 at the time of casting the first deck is the handrail fence 13d on the entry space side of the first tundish deck 13 in the arrangement direction D2 when the first tundish car 12 is in the casting field 104. Adjacent to the portion between the end of the first waiting area 106 side and the end handrail fence 13c on the first waiting area 106 side. Further, the adjacent portion 42 at the time of casting the first deck is the second of the handrail fence 15d on the entry space side of the second tundish deck 15 in the arrangement direction D2 when the second tundish car 14 is in the casting place 104. It is adjacent to the portion between the end on the waiting area 108 side and the end handrail fence 15c on the second waiting area 108 side.

第1デッキ待機時隣接部44は、第1タンディッシュカー12が第1待機場106にあるときに第1タンディッシュデッキ13上と第1デッキ20上との間の作業者の往来を許容するように前記配置方向D2において第1タンディッシュデッキ13に隣接する部分である。この第1デッキ待機時隣接部44は、第1タンディッシュカー12の移動方向D1に沿う方向において互いに離れた2か所に設けられている。具体的には、この2か所の第1デッキ待機時隣接部44は、第1タンディッシュカー12が第1待機場106にあるときに第1タンディッシュデッキ13のうち進入スペース側手摺柵13dの一端部とその一端部側の一方の端部手摺柵13cとの間の部分と進入スペース側手摺柵13dの他端部とその他端部側の他方の端部手摺柵13cとの間の部分とにそれぞれ隣接する。 The first deck standby adjoining portion 44 allows workers to come and go between the first tundish deck 13 and the first deck 20 when the first tundish car 12 is in the first waiting area 106. As described above, it is a portion adjacent to the first tundish deck 13 in the arrangement direction D2. The first deck standby adjacent portions 44 are provided at two locations separated from each other in the direction along the moving direction D1 of the first tundish car 12. Specifically, these two places adjacent to the first deck during standby 44 are the handrail fence 13d on the approach space side of the first tundish deck 13 when the first tundish car 12 is in the first waiting area 106. The part between one end of the handrail and the one end handrail fence 13c on the one end side, the other end of the entry space side handrail fence 13d, and the other end handrail fence 13c on the other end side. Adjacent to each.

第1デッキ20は、第1床板32と、2つの第1支柱34と、を有する。 The first deck 20 has a first floor plate 32 and two first columns 34.

第1床板32は、その上に作業者が乗るものであり、鋳込床100から上方へ離れた位置で略水平に配置されている。第1床板32は、第1及び第2タンディッシュカー12,14の移動方向D1に沿って延びている。前記第1デッキ鋳込時隣接部42及び前記第1デッキ待機時隣接部44は、それぞれ、この第1床板32上の部分である。第1床板32は、作業者が乗る上面(床面)を有している。この第1床板32の上面は、第1デッキ20の搭乗面に相当する。当該第1床板32の上面は、第1タンディッシュデッキ13の床板13aの上面と実質的に同じ高さに位置する(図6及び図7参照)。 The first floor plate 32 is on which an operator rides, and is arranged substantially horizontally at a position upward away from the cast floor 100. The first floor plate 32 extends along the moving direction D1 of the first and second tundish cars 12, 14. The first deck casting adjacent portion 42 and the first deck standby adjacent portion 44 are portions on the first floor plate 32, respectively. The first floor plate 32 has an upper surface (floor surface) on which an operator rides. The upper surface of the first floor plate 32 corresponds to the boarding surface of the first deck 20. The upper surface of the first floor plate 32 is located at substantially the same height as the upper surface of the floor plate 13a of the first tundish deck 13 (see FIGS. 6 and 7).

2つの第1支柱34は、鋳込床100上に立設されて第1床板32を下から支えるものである。2つの第1支柱34は、第1タンディッシュカー12の移動方向D1に沿って互いに離間して配置され、鋳込床100上に立設されている。 The two first columns 34 are erected on the cast floor 100 and support the first floor plate 32 from below. The two first columns 34 are arranged apart from each other along the moving direction D1 of the first tundish car 12 and are erected on the cast floor 100.

また、前記第1床板32は、2つの第1支柱34のうち最もダミーバーカー18の進入スペース120寄りの第1支柱34から進入スペース120側へ張り出す第1張出部32aを有する。この第1張出部32aが前記第1デッキ鋳込時隣接部42を構成する。最も進入スペース120寄りの第1支柱34の進入スペース120側で且つ第1張出部32aの下方はスペースになっている。このスペースにダミーバーカー18の台車部18bの幅方向において保持部18cよりも第1支柱34側に突出した部分が進入するようになっている。 Further, the first floor plate 32 has a first overhanging portion 32a that projects from the first strut 34 closest to the approach space 120 of the dummy barker 18 to the approach space 120 side among the two first strut 34s. The first overhanging portion 32a constitutes the adjacent portion 42 at the time of casting the first deck. The space is located on the approach space 120 side of the first support column 34 closest to the entry space 120 and below the first overhanging portion 32a. A portion of the dummy barker 18 protruding toward the first support column 34 from the holding portion 18c in the width direction of the carriage portion 18b of the dummy barker 18 enters this space.

また、本実施形態の連続鋳造設備1は、第1デッキ20に設けられた手摺柵35と第1階段36を備えている。 Further, the continuous casting facility 1 of the present embodiment includes a handrail fence 35 and a first staircase 36 provided on the first deck 20.

手摺柵35は、第1デッキ20の第1床板32上からの作業者の転落等を防止するためのものである。この手摺柵35は、第1床板32の周縁部にその縁部が延びる方向に沿って設けられている。この手摺柵35は、第1デッキ鋳込時隣接部42上のスペース、2か所の第1デッキ待機時隣接部44上のスペース及び第1階段36が接続されるスペースは空け、それ以外の第1床板32の周縁部上に設けられている。 The handrail fence 35 is for preventing the worker from falling from the first floor plate 32 of the first deck 20. The handrail fence 35 is provided on the peripheral edge of the first floor plate 32 along the direction in which the edge thereof extends. This handrail fence 35 has a space on the adjacent portion 42 when casting the first deck, a space on the adjacent portion 44 when waiting for the first deck at two places, and a space to which the first stairs 36 are connected, and other than that. It is provided on the peripheral edge of the first floor plate 32.

第1階段36は、第1デッキ20の第1床板32と鋳込床100との間を上り下りするためのものである。この第1階段36は、第1タンディッシュカー12の移動方向D1に沿う方向における第1床板32の両端部のうち鋳込場104から遠い方の端部に設けられ、その端部から第1タンディッシュカー12の移動領域と反対側(第1待機場106と反対側)へ下りられるようになっている。 The first staircase 36 is for going up and down between the first floor plate 32 of the first deck 20 and the cast floor 100. The first staircase 36 is provided at the end of both ends of the first floor plate 32 in the direction along the moving direction D1 of the first tundish car 12, which is far from the casting site 104, and is the first from the end. It is possible to descend to the side opposite to the moving area of the tundish car 12 (the side opposite to the first waiting area 106).

第2デッキ21は、第2タンディッシュカー14の移動領域に対して、第1デッキ20が第1タンディッシュカー12の移動領域に対して設けられた一方側と同じ側の位置に配置され、鋳込床100上に設置されている。第2デッキ21は、第2デッキ鋳込時隣接部46と、第2デッキ待機時隣接部48とを有する。 The second deck 21 is arranged at a position on the same side as the one side where the first deck 20 is provided with respect to the moving area of the first tundish car 12 with respect to the moving area of the second tundish car 14. It is installed on the cast floor 100. The second deck 21 has a second deck casting adjacent portion 46 and a second deck standby adjacent portion 48.

第2デッキ鋳込時隣接部46は、第2タンディッシュカー14が鋳込場104にあるときに第2タンディッシュデッキ15上と第2デッキ21上との間の作業者の往来を許容するように前記配置方向D2において第2タンディッシュデッキ15に隣接する。また、第2デッキ鋳込時隣接部46は、第1タンディッシュカー12が鋳込場104にあるときに第1タンディッシュデッキ13上と第2デッキ21上との間の作業者の往来を許容するように前記配置方向D2において第1タンディッシュデッキ13に隣接する。具体的には、この第2デッキ鋳込時隣接部46は、第2タンディッシュカー14が鋳込場104にあるときに前記配置方向D2において第2タンディッシュデッキ15の進入スペース側手摺柵15dの第2待機場108側の端部と第2待機場108側の端部手摺柵15cとの間の部分に隣接する。また、この第2デッキ鋳込時隣接部46は、第1タンディッシュカー12が鋳込場104にあるときに前記配置方向D2において第1タンディッシュデッキ13の進入スペース側手摺柵13dの第2待機場108側の端部と第2待機場108側の端部手摺柵13cとの間の部分に隣接する。 The second deck casting adjacent portion 46 allows workers to move between the second tundish deck 15 and the second deck 21 when the second tundish car 14 is at the casting site 104. As described above, it is adjacent to the second tundish deck 15 in the arrangement direction D2. Further, the adjacent portion 46 at the time of casting the second deck allows a worker to come and go between the first tundish deck 13 and the second deck 21 when the first tundish car 12 is in the casting place 104. Adjacent to the first tundish deck 13 in the arrangement direction D2 as permissible. Specifically, the adjacent portion 46 at the time of casting the second deck is the handrail fence 15d on the entry space side of the second tundish deck 15 in the arrangement direction D2 when the second tundish car 14 is in the casting field 104. Adjacent to the portion between the end of the second waiting area 108 side and the end handrail fence 15c on the second waiting area 108 side. Further, when the first tundish car 12 is in the casting place 104, the second deck adjacent portion 46 at the time of casting is the second of the handrail fence 13d on the entry space side of the first tundish deck 13 in the arrangement direction D2. It is adjacent to the portion between the end on the waiting area 108 side and the end handrail fence 13c on the second waiting area 108 side.

第2デッキ待機時隣接部48は、第2タンディッシュカー14が第2待機場108にあるときに第2タンディッシュデッキ15上と第2デッキ21上との間の作業者の往来を許容するように前記配置方向D2において第2タンディッシュデッキ15に隣接する部分である。この第2デッキ待機時隣接部48は、第2タンディッシュカー14の移動方向D1に沿う方向において互いに離れた2か所に設けられている。具体的には、この2か所の第2デッキ待機時隣接部48は、第2タンディッシュカー14が第2待機場108にあるときに第2タンディッシュデッキ15のうち進入スペース側手摺柵15dの一端部とその一端部側の一方の端部手摺柵15cとの間の部分と進入スペース側手摺柵15dの他端部とその他端部側の他方の端部手摺柵15cとの間の部分とにそれぞれ隣接する。 The second deck standby adjoining portion 48 allows workers to come and go between the second tundish deck 15 and the second deck 21 when the second tundish car 14 is in the second waiting area 108. As described above, it is a portion adjacent to the second tundish deck 15 in the arrangement direction D2. The second deck standby adjacent portions 48 are provided at two locations separated from each other in the direction along the moving direction D1 of the second tundish car 14. Specifically, these two places adjacent to the second deck during standby 48 are the handrail fence 15d on the approach space side of the second tundish deck 15 when the second tundish car 14 is in the second waiting area 108. The part between one end of the handrail and the one end handrail fence 15c on the one end side, the other end of the entry space side handrail fence 15d, and the other end handrail fence 15c on the other end side. Adjacent to each.

第2デッキ21は、前記配置方向D2に沿って鋳込位置Dに向かって第1デッキ20と左右対称となるように構成されている(図2及び図3参照)。第2デッキ21は、第2床板37と、2つの第2支柱38とを有する。この第2床板37と2つの第2支柱38の配置及び構成は、第1デッキ20の第1床板32と2つの第1支柱34を左右反転させたものの配置及び構成に相当する。第2床板37は、作業者が乗る上面(床面)を有している。この第2床板37の上面は、第2デッキ21の搭乗面に相当する。この第2床板37の上面は、第2タンディッシュデッキ15の床板15aの上面と実質的に同じ高さに位置する(図4参照)。第2床板37は、2つの第2支柱38のうち最もダミーバーカー18の進入スペース120寄りの第2支柱38から進入スペース120側へ張り出す第2張出部37aを有する。この第2張出部37aが前記第2デッキ鋳込時隣接部46を構成する。 The second deck 21 is configured to be symmetrical with the first deck 20 toward the casting position D along the arrangement direction D2 (see FIGS. 2 and 3). The second deck 21 has a second floor plate 37 and two second columns 38. The arrangement and configuration of the second floor plate 37 and the two second columns 38 correspond to the arrangement and configuration of the first floor plate 32 and the two first columns 34 of the first deck 20 inverted left and right. The second floor plate 37 has an upper surface (floor surface) on which an operator rides. The upper surface of the second floor plate 37 corresponds to the boarding surface of the second deck 21. The upper surface of the second floor plate 37 is located at substantially the same height as the upper surface of the floor plate 15a of the second tundish deck 15 (see FIG. 4). The second floor plate 37 has a second overhanging portion 37a that projects from the second strut 38 closest to the approach space 120 of the dummy barker 18 toward the approach space 120 side of the two second columns 38. The second overhanging portion 37a constitutes the adjacent portion 46 when the second deck is cast.

第2張出部37aの進入スペース120側の端縁が第2デッキ21の進入スペース120側の端縁になっている。この第2張出部37aの端縁と第1張出部32aの進入スペース120側の端縁との間のスペースが、ダミーバーカー18の保持部18cの進入スペースとなっている。 The edge of the second overhanging portion 37a on the approach space 120 side is the edge of the second deck 21 on the approach space 120 side. The space between the end edge of the second overhanging portion 37a and the end edge of the first overhanging portion 32a on the entry space 120 side is the entry space of the holding portion 18c of the dummy barker 18.

最も進入スペース120寄りの第2支柱38の進入スペース120側で且つ第2張出部37aの下方はスペースになっている。このスペースにダミーバーカー18の台車部18bの幅方向において保持部18cよりも第2支柱38側に突出した部分が進入するようになっている。 The space is located on the approach space 120 side of the second support column 38 closest to the entry space 120 and below the second overhanging portion 37a. A portion of the dummy barker 18 protruding toward the second support column 38 from the holding portion 18c in the width direction of the carriage portion 18b of the dummy barker 18 enters this space.

また、本実施形態の連続鋳造設備1は、第2デッキ21に設けられた手摺柵39と第2階段40を備えている。 Further, the continuous casting facility 1 of the present embodiment includes a handrail fence 39 and a second staircase 40 provided on the second deck 21.

手摺柵39は、第1デッキ20に設けられた手摺柵35と対称となるように配置及び構成されている。 The handrail fence 39 is arranged and configured so as to be symmetrical with the handrail fence 35 provided on the first deck 20.

第2階段40は、第2デッキ21の第2床板37と鋳込床100との間を上り下りするためのものである。この第2階段40は、第2タンディッシュカー14の移動方向D1に沿う方向における第2床板37の両端部のうち鋳込場104から遠い方の端部に設けられ、その端部から第2タンディッシュカー14の移動領域と反対側(第2待機場108と反対側)へ下りられるようになっている。 The second staircase 40 is for going up and down between the second floor plate 37 of the second deck 21 and the cast floor 100. The second staircase 40 is provided at the end of both ends of the second floor plate 37 in the direction along the moving direction D1 of the second tundish car 14, which is far from the casting site 104, and is the second from the end. It is possible to descend to the side opposite to the moving area of the tundish car 14 (the side opposite to the second waiting area 108).

また、本実施形態の連続鋳造設備1は、図2に示すように、第1待機位置Eで待機している第1タンディッシュ10aを加熱するための第1加熱装置52と、第2待機位置Fで待機している第2タンディッシュ10bを加熱するための第2加熱装置54とをさらに備える。冷えたタンディッシュ10が鋳込位置Dに配置された場合には、取鍋6から注湯される溶鋼がそのタンディッシュ10内で固まり、タンディッシュ10から鋳型3へ溶鋼を注湯できなくなる。このため、第1タンディッシュ10aが第1待機位置Eで待機しているときには、その第1タンディッシュ10aを第1加熱装置52によって加熱しておき、その後、その第1タンディッシュ10aが鋳込位置Dに配置されたときに溶鋼が固まるのを防止している。同様の理由により、第2タンディッシュ10bが第2待機位置Fで待機しているときには、その第2タンディッシュ10bを第2加熱装置54によって加熱する。 Further, as shown in FIG. 2, the continuous casting facility 1 of the present embodiment has a first heating device 52 for heating the first tundish 10a waiting at the first standby position E and a second standby position. Further, a second heating device 54 for heating the second tundish 10b waiting at F is provided. When the cold tundish 10 is arranged at the casting position D, the molten steel poured from the ladle 6 hardens in the tundish 10, and the molten steel cannot be poured from the tundish 10 into the mold 3. Therefore, when the first tundish 10a is waiting at the first standby position E, the first tundish 10a is heated by the first heating device 52, and then the first tundish 10a is cast. It prevents the molten steel from solidifying when it is placed at position D. For the same reason, when the second tundish 10b is waiting at the second standby position F, the second tundish 10b is heated by the second heating device 54.

第1加熱装置52は、鋳込床100上において第1待機場106を挟んで第1デッキ20と反対側に設置され、第1待機場106に隣接して配置されている。また、第2加熱装置54は、鋳込床100上において第2待機場108を挟んで第2デッキ21と反対側に設置され、第2待機場108に隣接して配置されている。 The first heating device 52 is installed on the cast floor 100 on the opposite side of the first waiting area 106 with the first waiting area 106 interposed therebetween, and is arranged adjacent to the first waiting area 106. Further, the second heating device 54 is installed on the cast floor 100 on the opposite side of the second waiting area 108 with the second waiting area 108 interposed therebetween, and is arranged adjacent to the second waiting area 108.

第1加熱装置52は、図12に示すように、第1待機場106に隣接して鋳込床100上に立設された加熱装置本体52aと、その加熱装置本体52aに水平軸回りに回動可能となるように取り付けられたアーム状のノズル52bとを有する。この第1加熱装置52は、ノズル52bから火炎を噴き出すように構成されており、そのノズル52bから噴き出した火炎を第1待機位置Eで待機している第1タンディッシュ10a内の空間へ吹き入れることによって当該第1タンディッシュ10aを加熱する。ノズル52bは、加熱装置本体52aから第1待機場106へ向かって略水平に延びて第1タンディッシュ10a内の空間へ火炎を吹き入れる吹入姿勢P1と、その吹入姿勢P1から上方へ回動した退避姿勢P2とを取り得る。 As shown in FIG. 12, the first heating device 52 rotates around a horizontal axis with the heating device main body 52a erected on the cast floor 100 adjacent to the first waiting area 106 and the heating device main body 52a. It has an arm-shaped nozzle 52b attached so as to be movable. The first heating device 52 is configured to eject a flame from the nozzle 52b, and blows the flame ejected from the nozzle 52b into the space in the first tundish 10a waiting at the first standby position E. This heats the first tundish 10a. The nozzle 52b extends substantially horizontally from the heating device main body 52a toward the first waiting area 106, and blows a flame into the space in the first tundish 10a, and turns upward from the blowing posture P1. It is possible to take the moved retracted posture P2.

また、第2加熱装置54の構成は、第1加熱装置52の構成と同様である。 Further, the configuration of the second heating device 54 is the same as the configuration of the first heating device 52.

また、本実施形態の連続鋳造設備1は、送り装置4による鋳片の送り速度、第1タンディッシュ10aに設けられたスライドバルブにより制御される第1タンディッシュ10aから鋳込口101への溶鋼の注湯流量、及び、第2タンディッシュ10bに設けられたスライドバルブにより制御される第2タンディッシュ10bから鋳込口101への溶鋼の注湯流量のうちの少なくとも1つを調節するために操作される第1操作装置62及び第2操作装置64をさらに備える。この第1及び第2操作装置62,64は、いわゆるペンダントスイッチである。 Further, in the continuous casting facility 1 of the present embodiment, the feed rate of the slab by the feed device 4 and the molten steel from the first tundish 10a controlled by the slide valve provided in the first tundish 10a to the casting port 101 To adjust at least one of the pouring flow rate of the molten steel and the pouring flow rate of the molten steel from the second tundish 10b controlled by the slide valve provided in the second tundish 10b to the casting port 101. Further includes a first operating device 62 and a second operating device 64 to be operated. The first and second operating devices 62 and 64 are so-called pendant switches.

第1操作装置62は、操作位置(図8及び図9参照)と退避位置(図10及び図11参照)との間で移動可能となるように第1デッキ20の第1張出部32aに取り付けられている。操作位置は、第1操作装置62が作業者によって操作される位置であり、第1デッキ20と第2デッキ21との間のダミーバーカー18の進入スペース内で鋳込位置Dに隣接した位置である。退避位置は、第1操作装置62とダミーバーカー18との干渉が回避される位置であり、ダミーバーカー18の進入スペースから外れた位置である。 The first operating device 62 is attached to the first overhanging portion 32a of the first deck 20 so as to be movable between the operating position (see FIGS. 8 and 9) and the retracted position (see FIGS. 10 and 11). It is installed. The operation position is a position where the first operation device 62 is operated by an operator, and is a position adjacent to the casting position D in the entry space of the dummy barker 18 between the first deck 20 and the second deck 21. be. The retracted position is a position where interference between the first operating device 62 and the dummy barker 18 is avoided, and is a position outside the entry space of the dummy barker 18.

この第1操作装置62は、操作スイッチを有するボックス状の操作装置本体62aと、その操作装置本体62aを第1デッキ20の第1張出部32aから吊り下げる吊下部62bとを有する。 The first operation device 62 has a box-shaped operation device main body 62a having an operation switch, and a suspension lower portion 62b for suspending the operation device main body 62a from the first overhanging portion 32a of the first deck 20.

吊下部62bは、第1張出部32aから下方に延びるようにその第1張出部32aに取り付けられた部分と、その部分の下端から水平方向に延びる部分と、その部分からさらに下方に延びて操作装置本体62aに接続された部分とを有する。吊下部62bのうち第1張出部32aに取り付けられた部分は、第1張出部32aに対して縦軸回りに旋回可能となっている。この吊下部62bが旋回することにより、第1操作装置62は、図5のようにダミーバーカー18の進入スペース内に張り出して作業者が鋳込位置Dの近傍において操作装置本体62aの操作スイッチを操作可能な操作位置と、前記進入スペースの外側でダミーバーカー18と干渉しない退避位置との間で移動可能となっている。 The hanging lower portion 62b has a portion attached to the first overhanging portion 32a so as to extend downward from the first overhanging portion 32a, a portion extending horizontally from the lower end of the portion, and further extending downward from the portion. It has a portion connected to the operation device main body 62a. The portion of the suspended lower portion 62b attached to the first overhanging portion 32a can be swiveled around the vertical axis with respect to the first overhanging portion 32a. When the suspended lower portion 62b rotates, the first operating device 62 projects into the entry space of the dummy barker 18 as shown in FIG. 5, and the operator operates the operation switch of the operating device main body 62a in the vicinity of the casting position D. It is possible to move between an operable operating position and a retracting position that does not interfere with the dummy barker 18 outside the approach space.

第2操作装置64は、第1操作装置62と同様、第1デッキ20と第2デッキ21との間のダミーバーカー18の進入スペース内の操作位置とその進入スペースの外側の退避位置との間で移動可能となるように第2デッキ21の第2張出部37aに取り付けられている。この第2操作装置64の構成は、第1操作装置62の構成と同様である。 Similar to the first operating device 62, the second operating device 64 is located between the operating position in the approach space of the dummy barker 18 between the first deck 20 and the second deck 21 and the evacuation position outside the approach space. It is attached to the second overhanging portion 37a of the second deck 21 so that it can be moved by. The configuration of the second operating device 64 is the same as the configuration of the first operating device 62.

本実施形態では、第1デッキ20と第2デッキ21が、第1タンディッシュカー12が鋳込場104にあるときに第1タンディッシュデッキ13と隣接するとともに第2タンディッシュカー14が鋳込場104にあるときに第2タンディッシュデッキ15と隣接する鋳込時隣接部42,46をそれぞれ有し、この第1デッキ20に鋳込床100と当該第1デッキ20との間を上り下りするための第1階段36が設けられているとともに、第2デッキ21に鋳込床100と当該第2デッキ21との間を上り下りするための第2階段40が設けられている。このため、鋳込位置Dにおいて第1タンディッシュ10aからその鋳込位置D近傍の鋳込床100上に溶鋼が漏出した場合には、第1タンディッシュデッキ13上の作業者は、第1デッキ20上を経由して第1階段36を下りるか、もしくは、第2デッキ21上を経由して第2階段40を下りることにより、漏出した溶鋼による影響が及ばない鋳込位置Dから離れた鋳込床100上へ退避することができる。 In the present embodiment, the first deck 20 and the second deck 21 are adjacent to the first tundish deck 13 when the first tundish car 12 is in the casting place 104, and the second tundish car 14 is cast. When it is in the field 104, it has the second tundish deck 15 and the adjacent casting portions 42 and 46, respectively, and goes up and down between the casting floor 100 and the first deck 20 on the first deck 20. A first staircase 36 is provided for this purpose, and a second staircase 40 for going up and down between the cast floor 100 and the second deck 21 is provided on the second deck 21. Therefore, if molten steel leaks from the first tundish 10a to the casting floor 100 in the vicinity of the casting position D at the casting position D, the worker on the first tundish deck 13 can use the first deck. Casting away from the casting position D, which is not affected by the leaked molten steel, by going down the first staircase 36 via the top of 20 or going down the second staircase 40 via the top of the second deck 21. It can be evacuated to the built-in floor 100.

また、本実施形態では、作業者は、鋳込位置Dや第1及び第2待機位置E,Fでの作業が生じるまでの間、また、第1及び第2タンディッシュカー12,14の移動時に、第1デッキ20上又は第2デッキ21上で待機することができる。第1及び第2待機位置E,Fでの作業としては、例えば第1及び第2加熱装置52,54による第1及び第2タンディッシュ10a,10bの加熱を消火した後、タンディッシュカバー31の加熱口への保温カバーの装着作業等がある。鋳込位置Dでの作業としては、取鍋6のスライドバルブへの油圧ホースの接続や取鍋ノズル24の開口作業、タンディッシュ10内の空間への保温材の投入作業などがある。 Further, in the present embodiment, the operator moves the first and second tundish cars 12 and 14 until the work at the casting position D and the first and second standby positions E and F occurs. Occasionally, you can stand by on the first deck 20 or the second deck 21. As the work in the first and second standby positions E and F, for example, after extinguishing the heating of the first and second tundish 10a and 10b by the first and second heating devices 52 and 54, the tundish cover 31 There is work such as attaching a heat insulating cover to the heating port. The work at the casting position D includes connecting a hydraulic hose to the slide valve of the ladle 6, opening the ladle nozzle 24, and putting a heat insulating material into the space inside the tundish 10.

作業者は、第1及び第2待機位置E,Fで加熱されたタンディッシュ10の温度低下を防止するため、そのタンディッシュ10が鋳込位置Dへ配置されたら鋳造を開始できるようにするための準備を迅速に行う必要がある。このため、作業者は、第1待機位置E及び第2待機位置Fから迅速に鋳込位置Dへ移動する必要があるが、本実施形態では、第1待機位置Eでの作業後、第1タンディッシュデッキ13上から鋳込床100に降りることなく第1デッキ20へ渡り、第1タンディッシュカー12が鋳込場104へ移動した後、第1デッキ20上から第1タンディッシュデッキ13上に再び渡ることができる。また、第2待機位置Fでの作業後、第2タンディッシュ15上から鋳込床100に降りることなく第2デッキ21上へ渡り、第2タンディッシュカー14が鋳込場104へ移動した後、第2デッキ21上から第2タンディッシュデッキ15上に再び渡ることができる。従って、作業者は、迅速に鋳込位置Dへ移動できる。また、階段の上り下りの回数を削減でき、その階段の上り下りに費やす労力を削減できる。 In order to prevent the temperature of the tundish 10 heated in the first and second standby positions E and F from dropping, the operator can start casting when the tundish 10 is placed in the casting position D. You need to get ready quickly. Therefore, the worker needs to quickly move from the first standby position E and the second standby position F to the casting position D, but in the present embodiment, after the work at the first standby position E, the first is performed. From the top of the tundish deck 13 to the first deck 20 without descending to the casting floor 100, after the first tundish car 12 moves to the casting site 104, from the top of the first deck 20 to the top of the first tundish deck 13. You can cross over again. Further, after the work at the second standby position F, the second tundish car 14 moves to the casting place 104 after crossing over to the second deck 21 without descending from the second tundish 15 to the casting floor 100. , You can cross from the 2nd deck 21 to the 2nd tundish deck 15 again. Therefore, the operator can quickly move to the casting position D. In addition, the number of times of going up and down the stairs can be reduced, and the labor spent on going up and down the stairs can be reduced.

また、本実施形態では、前記作業に必要な資材、例えば取鍋ノズル24、取鍋ノズル24の開口作業に用いる酸素開口パイプ、保温材、検温装置等を第1及び第2デッキ20,21上に置いておくことが可能であり、前記作業の都度、必要な資材を鋳込床100上から階段を通って運び上げなくてもよい。従って、作業者にとって利便性が高い。 Further, in the present embodiment, materials necessary for the above work, such as a ladle nozzle 24, an oxygen opening pipe used for opening the ladle nozzle 24, a heat insulating material, a temperature measuring device, and the like are placed on the first and second decks 20 and 21. It is possible to put it in the room, and it is not necessary to carry the necessary materials from the cast floor 100 through the stairs each time the work is performed. Therefore, it is highly convenient for the worker.

また、本実施形態では、第1デッキ20と第2デッキ21は、ダミーバーカー18がダミーバー16を鋳型3内の成型空間へ上方から挿入するための挿入位置116へ搬送するための進入スペースをそれらのデッキ20,21間にあけるように互いに離間して配置されている。このため、第1及び第2デッキ20,21により作業者の利便性を高めつつ、ダミーバーカー18と第1及び第2デッキ20,21との干渉を生じることなく当該ダミーバーカー18によりダミーバー16を前記挿入位置116へ搬送して鋳型3内の成型空間に上方から挿入可能な構成を実現できる。 Further, in the present embodiment, the first deck 20 and the second deck 21 provide an entry space for the dummy barker 18 to convey the dummy bar 16 to the insertion position 116 for inserting the dummy bar 16 into the molding space in the mold 3 from above. They are arranged apart from each other so as to be open between the decks 20 and 21 of the above. Therefore, the dummy bar 16 is provided by the dummy barker 18 without causing interference between the dummy barker 18 and the first and second decks 20, 21 while enhancing the convenience of the operator by the first and second decks 20, 21. It is possible to realize a configuration that can be conveyed to the insertion position 116 and inserted into the molding space in the mold 3 from above.

また、第1デッキ20と第2デッキ21との間に前記進入スペース120が確保されていることにより、第1及び第2デッキ20,21との干渉回避のためにダミーバーカー18のうちダミーバー16を保持する保持部18cの高さが制約を受けない。このため、前記配置方向D2に沿う方向における保持部18cの長さを拡大する替わりに保持部18cの高さを拡大して、長さの大きいダミーバー16を保持するために必要な保持部18c上の距離を確保することができる。仮に前記配置方向D2に沿う方向における保持部18cの長さを拡大する場合には、同方向におけるダミーバーカー18の長さが拡大するので、それに応じて同方向における鋳込床100の全長を増大せざるを得ない。しかしながら、本実施形態では保持部18cの長さを拡大しなくても、保持部18cの高さを大きくすることにより長さの大きいダミーバー16を保持できるので、鋳込床100の全長の増大を抑制できる。 Further, since the entry space 120 is secured between the first deck 20 and the second deck 21, the dummy bar 16 of the dummy barkers 18 is used to avoid interference with the first and second decks 20, 21. The height of the holding portion 18c for holding the is not restricted. Therefore, instead of increasing the length of the holding portion 18c in the direction along the arrangement direction D2, the height of the holding portion 18c is increased on the holding portion 18c necessary for holding the dummy bar 16 having a large length. The distance can be secured. If the length of the holding portion 18c in the direction along the arrangement direction D2 is increased, the length of the dummy barker 18 in the same direction is increased, so that the total length of the cast floor 100 in the same direction is increased accordingly. I have no choice but to do it. However, in the present embodiment, the dummy bar 16 having a large length can be held by increasing the height of the holding portion 18c without increasing the length of the holding portion 18c, so that the total length of the cast floor 100 can be increased. It can be suppressed.

また、ダミーバーカー18が進入スペース120に進入していない状態において、その進入スペース120を、鋳込床100の床下の送り装置4にメンテナンス等のために上方からアクセスするためのスペースとして利用することができる。このため、例えば、送り装置4の構成部材であるロールスタンドの交換のために天井クレーンにより上方から前記進入スペース120を通って床下の送り装置4にアクセスすることができる。すなわち、天井クレーンにより進入スペース120を通って床下の送り装置4からのロールスタンドの吊り上げ及び床下の送り装置4へのロールスタンドの吊り下しを行うことができる。 Further, when the dummy barker 18 has not entered the approach space 120, the entry space 120 is used as a space for accessing the underfloor feeding device 4 of the cast floor 100 from above for maintenance or the like. Can be done. Therefore, for example, the underfloor feeding device 4 can be accessed from above through the approach space 120 by an overhead crane for replacing the roll stand which is a component of the feeding device 4. That is, the roll stand can be lifted from the underfloor feeding device 4 and the roll stand can be lifted from the underfloor feeding device 4 through the approach space 120 by an overhead crane.

また、本実施形態では、第1デッキ20と第2デッキ21との間にダミーバーカー18の保持部18cの進入スペースが確保されているので、ダミーバーカー18との干渉を回避するために第1及び第2デッキ20,21の高さを増大させる必要がない。このため、第1タンディッシュデッキ13の搭乗面、第2タンディッシュデッキ15の搭乗面、第1デッキ20の搭乗面及び第2デッキ21の搭乗面を、同じ高さの位置にすることが可能となっている。このため、作業者が、第1タンディッシュデッキ13の搭乗面上と第1デッキ20の搭乗面上とを往来するとき、第1タンディッシュデッキ13の搭乗面上と第2デッキ21の搭乗面上とを往来するとき、第2タンディッシュデッキ15の搭乗面上と第2デッキ21の搭乗面上とを往来するとき、及び、第2タンディッシュデッキ15の搭乗面上と第1デッキ20の搭乗面上とを往来するときに、躓きにくくすることができる。 Further, in the present embodiment, since the entry space of the holding portion 18c of the dummy barker 18 is secured between the first deck 20 and the second deck 21, the first is to avoid interference with the dummy barker 18. And it is not necessary to increase the height of the second decks 20 and 21. Therefore, the boarding surface of the first tundish deck 13, the boarding surface of the second tundish deck 15, the boarding surface of the first deck 20, and the boarding surface of the second deck 21 can be positioned at the same height. It has become. Therefore, when the worker goes back and forth between the boarding surface of the first tundish deck 13 and the boarding surface of the first deck 20, the boarding surface of the first tundish deck 13 and the boarding surface of the second deck 21 When going back and forth between the boarding surface of the 2nd tundish deck 15 and the boarding surface of the 2nd deck 21, and when going back and forth between the boarding surface of the 2nd tundish deck 15 and the boarding surface of the 1st deck 20 It is possible to prevent stumbling when going back and forth on the boarding surface.

また、本実施形態では、第1タンディッシュデッキ13の搭乗面は、第1タンディッシュ10aのタンディッシュカバー31の上面と同じ高さに位置し、第2タンディッシュデッキ15の搭乗面は、第2タンディッシュ10bのタンディッシュカバー31の搭乗面と同じ高さに位置する。このため、第1タンディッシュ10aが第1待機位置Eで待機しているとき及び第2タンディッシュ10bが第2待機位置Fで待機しているときに第1タンディッシュ10a及び第2タンディッシュ10bのタンディッシュカバー31上で行う作業のために作業者がそのタンディッシュカバー31上へ移動するときに躓きにくくすることができる。すなわち、作業者が、第1デッキ20と第1タンディッシュデッキ13との間の境界に加えて第1タンディッシュ10aのタンディッシュカバー31と第1タンディッシュデッキ13との間の境界でも躓きにくくすることができる。また、作業者が、第2デッキ21と第2タンディッシュデッキ15との間の境界に加えて第2タンディッシュデッキ10bのタンディッシュカバー31と第2タンディッシュデッキ15との間の境界でも躓きにくくすることができる。 Further, in the present embodiment, the boarding surface of the first tundish deck 13 is located at the same height as the upper surface of the tundish cover 31 of the first tundish 10a, and the boarding surface of the second tundish deck 15 is the first. 2 It is located at the same height as the boarding surface of the tundish cover 31 of the tundish 10b. Therefore, when the first tundish 10a is waiting at the first standby position E and when the second tundish 10b is waiting at the second standby position F, the first tundish 10a and the second tundish 10b are waiting. It is possible to prevent the operator from stumbling when moving onto the tundish cover 31 due to the work performed on the tundish cover 31. That is, it is difficult for the worker to stumble at the boundary between the first tundish cover 31 and the first tundish deck 13 in addition to the boundary between the first deck 20 and the first tundish deck 13. can do. In addition to the boundary between the second deck 21 and the second tundish deck 15, the worker also stumbles at the boundary between the tundish cover 31 and the second tundish deck 15 of the second tundish deck 10b. It can be made difficult.

また、本実施形態では、第1デッキ20の第1床板32がダミーバーカー18の進入スペース120寄りの第1支柱34から進入スペース120側へ張り出して第1デッキ鋳込時隣接部42を構成する第1張出部32aを有する。また、第2デッキ21の第2床板37が前記進入スペース120寄りの第2支柱38から進入スペース120側へ張り出して第2デッキ鋳込時隣接部46を構成する第2張出部37aを有する。このため、鋳込場104に第1タンディッシュカー12又は第2タンディッシュカー14があるときのそのタンディッシュカー上のタンディッシュデッキと第1及び第2デッキ20,21との間のアクセス経路を確保できる。しかも、ダミーバーカー18のうち第1張出部32a及び第2張出部37aよりも下側に位置する台車部18bを前記進入スペース120よりも幅広にすることによりダミーバーカー18の安定性を確保しつつ、その台車部18bの幅方向の両側部を第1及び第2張出部32a,37aの下方のスペースに進入させて第1及び第2デッキ20,21との干渉を回避できる。 Further, in the present embodiment, the first floor plate 32 of the first deck 20 projects from the first support column 34 near the entry space 120 of the dummy barker 18 toward the entry space 120 to form the adjacent portion 42 when the first deck is cast. It has a first overhanging portion 32a. Further, the second floor plate 37 of the second deck 21 has a second overhanging portion 37a that projects from the second support column 38 near the approaching space 120 toward the approaching space 120 and constitutes an adjacent portion 46 when the second deck is cast. .. Therefore, when there is a first tundish car 12 or a second tundish car 14 in the casting site 104, an access route between the tundish deck on the tundish car and the first and second decks 20, 21 Can be secured. Moreover, the stability of the dummy barker 18 is ensured by making the bogie portion 18b located below the first overhanging portion 32a and the second overhanging portion 37a of the dummy barker 18 wider than the entry space 120. While doing so, it is possible to avoid interference with the first and second decks 20 and 21 by allowing both side portions of the carriage portion 18b in the width direction to enter the spaces below the first and second overhanging portions 32a and 37a.

さらに、第1及び第2張出部32a,37aよりも下側においてスペースの幅を大きく確保できるため、送り装置4のメンテナンス時にそのスペースから鋳込床100の床下の送り装置4へのアクセスしやすさを向上できる。具体的には、このスペースの幅を大きく確保できることにより、ダミーバーカー18の移動用の一対のレール112間の間隔を広げることが可能になる。仮に一対のレール112間の間隔が小さい場合には、これらのレール112を支持するための梁を送り装置4の上方でその近傍の位置に配置せざるを得ず、この梁及び一対のレール112は、鋳込床100の床下の送り装置4へ上方からアクセスするとき、例えば送り装置4のロールスタンドを交換するために天井クレーンにより鋳込床100の床下からロールスタンドを搬出し、新しいロールスタンドを床下に搬入するときの障害になる。これに対し、前記のように一対のレール112間の間隔を広げることが可能であることにより、鋳込床100の床下からのロールスタンドの搬出及び床下へのロールスタンドの搬入のための領域を一対のレール112間に大きく確保できるとともに、それらのレール112を支持する梁を天井クレーンによるロールスタンドの搬出及び搬入の障害にならない位置に配置することが可能になる。よって、本実施形態では、送り装置4へのアクセスしやすさ、具体的には送り装置4のロールスタンドを交換するために天井クレーンで鋳込床100の床下からロールスタンドを搬出し、新しいロールスタンドを床下に搬入する作業のしやすさを向上できる。 Further, since a large space width can be secured below the first and second overhanging portions 32a and 37a, the space is used to access the underfloor feeding device 4 of the cast floor 100 during maintenance of the feeding device 4. Ease can be improved. Specifically, by ensuring a large width of this space, it is possible to widen the distance between the pair of rails 112 for moving the dummy barker 18. If the distance between the pair of rails 112 is small, a beam for supporting these rails 112 must be placed above the feeding device 4 at a position in the vicinity thereof, and the beam and the pair of rails 112 must be arranged in the vicinity thereof. When accessing the underfloor feeding device 4 of the cast floor 100 from above, for example, in order to replace the roll stand of the feeding device 4, the roll stand is carried out from under the floor of the cast floor 100 by an overhead crane, and a new roll stand is used. It becomes an obstacle when carrying under the floor. On the other hand, since the distance between the pair of rails 112 can be widened as described above, the area for carrying out the roll stand from under the floor of the cast floor 100 and carrying in the roll stand under the floor is provided. A large amount can be secured between the pair of rails 112, and the beams supporting the rails 112 can be arranged at positions that do not hinder the loading and unloading of the roll stand by the overhead crane. Therefore, in the present embodiment, in order to easily access the feeding device 4, specifically, in order to replace the roll stand of the feeding device 4, the roll stand is carried out from under the floor of the cast floor 100 by an overhead crane, and a new roll is used. The ease of carrying the stand under the floor can be improved.

また、本実施形態では、第1及び第2操作装置62,64が第1デッキ20と第2デッキ21との間のダミーバーカー18の進入スペース内の操作位置と、ダミーバーカー18の進入スペースから外れた退避位置との間で移動可能となるように対応するデッキ20,21に取り付けられている。よって、作業者が、送り装置4による鋳片の送り速度、第1タンディッシュ10aから鋳込口101への溶鋼の注湯流量又は第2タンディッシュ10bから鋳込口101への溶鋼の注湯流量を調節するために第1及び第2操作装置62,64を操作するときには、鋳造時であるので、ダミーバーカー18が第1デッキ20と第2デッキ21との間の進入スペースに進入しておらず、その状態で第1及び第2操作装置62,64を前記操作位置に配置することによって鋳込口101に近づけることができる。このため、鋳込口101での溶鋼の状態を見ながら送り速度を調節しやすくすることができる。また、ダミーバーカー18がダミーバー16を挿入位置116に搬送するために前記進入スペースに進入するときには、第1及び第2操作装置62,64を前記退避位置に配置することによって第1及び第2操作装置62,64とダミーバーカー18との干渉を回避できる。 Further, in the present embodiment, the first and second operating devices 62 and 64 are located from the operating position in the approach space of the dummy barker 18 between the first deck 20 and the second deck 21 and from the entry space of the dummy barker 18. It is attached to the corresponding decks 20 and 21 so as to be movable to and from the detached retract position. Therefore, the operator can feed the slab by the feeding device 4, the flow rate of molten steel pouring from the first tundish 10a to the casting port 101, or the pouring of molten steel from the second tundish 10b to the casting port 101. When operating the first and second operating devices 62 and 64 to adjust the flow rate, since it is during casting, the dummy barker 18 enters the entry space between the first deck 20 and the second deck 21. In that state, the first and second operating devices 62 and 64 can be brought closer to the casting port 101 by arranging the first and second operating devices 62 and 64 at the operating positions. Therefore, it is possible to easily adjust the feed rate while observing the state of the molten steel at the casting port 101. Further, when the dummy barker 18 enters the approach space in order to convey the dummy bar 16 to the insertion position 116, the first and second operations are performed by arranging the first and second operating devices 62 and 64 at the retracted positions. Interference between the devices 62 and 64 and the dummy barker 18 can be avoided.

また、本実施形態では、第1待機位置Eで待機している第1タンディッシュ10aを第1加熱装置52によって加熱することができるとともに、第2待機位置Fで待機している第2タンディッシュ10bを第2加熱装置54によって加熱することができる。このため、第1待機位置Eから鋳込位置Dに第1タンディッシュ10aを移動させてその第1タンディッシュ10aに取鍋6から溶鋼が注湯されたときにその溶鋼が第1タンディッシュ10a内で固まってしまうのを防ぐことができるとともに、第2待機位置Fから鋳込位置Dに第2タンディッシュ10bを移動させてその第2タンディッシュ10bに取鍋6から溶鋼が注湯されたときにその溶鋼が第2タンディッシュ10b内で固まってしまうのを防ぐことができる。 Further, in the present embodiment, the first tundish 10a waiting at the first standby position E can be heated by the first heating device 52, and the second tundish waiting at the second standby position F can be heated. 10b can be heated by the second heating device 54. Therefore, when the first tundish 10a is moved from the first standby position E to the casting position D and the molten steel is poured into the first tundish 10a from the ladle 6, the molten steel becomes the first tundish 10a. In addition to being able to prevent it from solidifying inside, the second tundish 10b was moved from the second standby position F to the casting position D, and molten steel was poured into the second tundish 10b from the ladle 6. Occasionally, it is possible to prevent the molten steel from solidifying in the second tundish 10b.

さらに、本実施形態では、第1加熱装置52が第1待機場106を挟んで第1デッキ20と反対側にあるので、作業場となる第1デッキ20側のスペースが第1加熱装置52によって占有されるのを防ぐことができる。また、仮に第1待機場106から第1デッキ20を越えた先の場所に第1加熱装置52を設置した場合には、第1加熱装置52から第1待機位置Eの第1タンディッシュ10aへ熱を供給するためのアーム状のノズル52bを第1デッキ20の上を横断して第1タンディッシュ10aへ届かせることになり、第1デッキ20上の通行を阻害する。これに対し、本実施形態では、第1加熱装置52が第1待機場106を挟んで第1デッキ20と反対側にあるので、ノズル52bが第1デッキ20上を横断するのを回避できる。また、第2加熱装置54が第2待機場108を挟んで第2デッキ21と反対側にあるので、第1加熱装置52の場合と同様の理由により、作業場となる第2デッキ21側のスペースが第2加熱装置54によって占有されるのを防ぐことができるとともに、第2タンディッシュ10bへ熱を供給するためのノズルが第2デッキ21上を横断するのを回避できる。 Further, in the present embodiment, since the first heating device 52 is on the side opposite to the first deck 20 with the first waiting area 106 in between, the space on the first deck 20 side, which is the work place, is occupied by the first heating device 52. It can be prevented from being done. If the first heating device 52 is installed at a location beyond the first deck 20 from the first waiting area 106, the first heating device 52 moves to the first tundish 10a at the first standby position E. An arm-shaped nozzle 52b for supplying heat crosses over the first deck 20 and reaches the first tundish 10a, obstructing the passage on the first deck 20. On the other hand, in the present embodiment, since the first heating device 52 is on the opposite side of the first deck 20 with the first waiting area 106 interposed therebetween, it is possible to prevent the nozzle 52b from crossing the first deck 20. Further, since the second heating device 54 is on the opposite side of the second waiting area 108 from the second deck 21, the space on the second deck 21 side that serves as a work place is the same as in the case of the first heating device 52. Can be prevented from being occupied by the second heating device 54, and the nozzle for supplying heat to the second tundish 10b can be prevented from crossing over the second deck 21.

本発明による連続鋳造設備は、前記のような構成のものに必ずしも限定されない。例えば、本発明による連続鋳造設備に以下のような構成を採用可能である。 The continuous casting equipment according to the present invention is not necessarily limited to the above-mentioned configuration. For example, the following configuration can be adopted for the continuous casting equipment according to the present invention.

第1タンディッシュカーの移動方向に沿う方向における第1階段の位置及び第2タンディッシュカーの移動方向に沿う方向における第2階段の位置は、必ずしも前記のような位置に限定されない。すなわち、第1階段及び第2階段は、ダミーバーカーに干渉しない範囲で、もっと鋳込場寄りの位置に設置されてもよい。 The position of the first staircase in the direction along the moving direction of the first tundish car and the position of the second staircase in the direction along the moving direction of the second tundish car are not necessarily limited to the above-mentioned positions. That is, the first staircase and the second staircase may be installed at a position closer to the casting site as long as they do not interfere with the dummy barker.

第1タンディッシュデッキは、第1タンディッシュカーに搭載された第1タンディッシュの周囲を概ね囲むように構成されたものに必ずしも限定されず、第2タンディッシュデッキは、第1タンディッシュカーに搭載された第2タンディッシュの周囲を概ね囲むように構成されたものに必ずしも限定されない。例えば、第1タンディッシュデッキは、第1タンディッシュに対して第1デッキ側に隣接する領域のみに設けられてもよい。同様に、第2タンディッシュは、第1タンディッシュに対して第2デッキ側に隣接する領域のみに設けられてもよい。 The first tundish deck is not necessarily limited to the one configured to substantially surround the first tundish mounted on the first tundish car, and the second tundish deck is the first tundish car. It is not necessarily limited to the one configured to substantially surround the circumference of the mounted second tundish. For example, the first tundish deck may be provided only in the area adjacent to the first deck side with respect to the first tundish. Similarly, the second tundish may be provided only in the area adjacent to the second deck side with respect to the first tundish.

また、本発明における操作装置は、必ずしも第1デッキと第2デッキの両方に設けられている必要はなく、第1デッキと第2デッキのいずれか一方のみに操作装置が取り付けられていてもよい。 Further, the operating device in the present invention does not necessarily have to be provided on both the first deck and the second deck, and the operating device may be attached to only one of the first deck and the second deck. ..

また、操作装置は、前記のような旋回式のものではなく、スライドすることによってダミーバーカーの進入スペース内の操作位置と進入スペース外の退避位置とを取り得るように第1デッキ及び/又は第2デッキに取り付けられるものであってもよい。 Further, the operating device is not a swivel type as described above, but the first deck and / or the first deck so that the operating position in the approach space of the dummy barker and the evacuation position outside the approach space can be obtained by sliding. It may be attached to two decks.

また、連続鋳造設備は、ダミーバーカーを必ずしも備えていなくてもよい。すなわち、本発明による連続鋳造設備は、鋳片から切り離されたダミーバーを挿入位置に搬送して鋳型内の空間に上方から挿入する形態のものに必ずしも限定されず、鋳型内の空間に下方からダミーバーを挿入する形態のものも含む。 Further, the continuous casting facility does not necessarily have to be equipped with a dummy barker. That is, the continuous casting equipment according to the present invention is not necessarily limited to the form in which the dummy bar separated from the slab is conveyed to the insertion position and inserted into the space inside the mold from above, and the dummy bar is inserted into the space inside the mold from below. Including the form of inserting.

ダミーバーカーを備えていない形態の連続鋳造設備では、第1デッキと第2デッキは互いに繋がっていてもよい。すなわち、第1デッキと第2デッキとの間にダミーバーカーの進入スペースが設けられていなくてもよい。 In a continuous casting facility without a dummy barker, the first deck and the second deck may be connected to each other. That is, the entry space for the dummy barker may not be provided between the first deck and the second deck.

また、第1及び第2タンディッシュデッキ上の進入スペース側手摺柵の一端部とその一端部側の一方の端部手摺柵との間及び進入スペース側手摺柵の他端部とその他端部側の他方の端部手摺柵との間には、それぞれ、それらの手摺柵間のスペースを閉鎖するためのチェーンを架設してもよい。また、第1デッキの第1デッキ鋳込時隣接部上のスペースを閉鎖するためのチェーンをそのスペースの両側の手摺柵間に架設するとともに、第1デッキ待機時隣接部上のスペースを閉鎖するためチェーンをそのスペースの両側の手摺柵間に架設してもよい。また、同様に、第2デッキの第2デッキ鋳込時隣接部上のスペースを閉鎖するためのチェーンをそのスペースの両側の手摺柵間に架設するとともに、第2デッキ待機時隣接部上のスペースを閉鎖するためのチェーンをそのスペースの両側の手摺柵間に架設してもよい。これらのチェーンは、それが閉鎖するスペースを通る必要がある状況のときには、取り外してそのスペースを通行可能とし、通る必要がないときにはそのスペースを当該チェーンによって閉鎖するようにする。このようにすることが安全上の観点から好ましい。 Further, between one end of the entry space side handrail fence on the first and second tundish decks and one end handrail fence on the one end side, and the other end and the other end side of the entry space side handrail fence. A chain may be erected between the other end handrail fence and the railing fence to close the space between the handrail fences. In addition, a chain for closing the space on the adjacent portion of the first deck when casting the first deck is erected between the handrail fences on both sides of the space, and the space on the adjacent portion on the standby portion of the first deck is closed. Therefore, the chain may be erected between the handrail fences on both sides of the space. Similarly, a chain for closing the space on the adjacent portion of the second deck when casting the second deck is erected between the handrail fences on both sides of the space, and the space on the adjacent portion on the standby portion of the second deck is installed. A chain for closing the space may be erected between the handrail fences on both sides of the space. These chains are removed to allow passage of the space when it is necessary to pass through the space to be closed, and the space is closed by the chain when it is not necessary. This is preferable from the viewpoint of safety.

1 連続鋳造設備
3 鋳型
6 取鍋
10a 第1タンディッシュ
10b 第2タンディッシュ
12 第1タンディッシュカー
13 第1タンディッシュデッキ
14 第2タンディッシュカー
15 第2タンディッシュデッキ
16 ダミーバー
18 ダミーバーカー
20 第1デッキ
21 第2デッキ
52 第1加熱装置
54 第2加熱装置
62 第1操作装置
64 第2操作装置
D 鋳込装置
E 第1待機位置
F 第2待機位置
1 Continuous casting equipment 3 Mold 6 Ladle 10a 1st tundish 10b 2nd tundish 12 1st tundish car 13 1st tundish deck 14 2nd tundish car 15 2nd tundish deck 16 Dummy bar 18 Dummy bar car 20th 1 deck 21 2nd deck 52 1st heating device 54 2nd heating device 62 1st operation device 64 2nd operation device D Casting device E 1st standby position F 2nd standby position

Claims (7)

鋳片を連続的に鋳造する連続鋳造設備であって、
鋳込床の下に設置され、前記鋳込床に開口した鋳込口を通じて受け入れた溶鋼から前記鋳片を連続的に形成する鋳込装置と、
溶鋼が入れられて前記鋳込口の上方に配置される取鍋と、
前記鋳込口の上方で且つ前記取鍋の下方の鋳込位置にいずれか一方が配置されて前記取鍋から溶鋼を受けるとともにその受けた溶鋼を前記鋳込口へ注湯する第1タンディッシュ及び第2タンディッシュと、
前記第1タンディッシュを搭載し、その搭載した第1タンディッシュが前記鋳込位置に配置される鋳込場と当該第1タンディッシュが前記鋳込位置から離れた第1待機位置に配置される第1待機場との間で前記鋳込床上を特定の移動方向に沿って移動することにより前記第1タンディッシュを前記鋳込位置と前記第1待機位置との間で搬送する第1タンディッシュカーと、
前記第2タンディッシュを搭載し、その搭載した第2タンディッシュが前記鋳込位置に配置される前記鋳込場と当該第2タンディッシュが前記鋳込位置から前記第1待機位置と反対側へ離れた第2待機位置に配置される第2待機場との間で前記鋳込床上を前記移動方向に沿って移動することにより前記第2タンディッシュを前記鋳込位置と前記第2待機位置との間で搬送する第2タンディッシュカーと、
前記第1タンディッシュカー上に設置されていてその上で作業者が作業を行うことを許容する第1タンディッシュデッキと、
前記第2タンディッシュカー上に設置されていてその上で作業者が作業を行うことを許容する第2タンディッシュデッキと、
前記第1タンディッシュカーの移動領域に対して前記移動方向と直交する配置方向における一方側の位置で前記鋳込床上に設置された第1デッキと、
前記第1デッキに設けられ、その第1デッキと前記鋳込床との間を作業者が上り下りすることを許容する第1階段と、
前記第2タンディッシュカーの移動領域に対して前記配置方向における前記一方側の位置で前記鋳込床上に設置された第2デッキと、
前記第2デッキに設けられ、その第2デッキと前記鋳込床との間を作業者が上り下りすることを許容する第2階段と、を備え、
前記第1デッキは、前記第1タンディッシュカーが前記鋳込場にあるときに前記配置方向において前記第1タンディッシュデッキに隣接するとともに前記第2タンディッシュカーが前記鋳込場にあるときに前記配置方向において前記第2タンディッシュデッキに隣接する第1デッキ鋳込時隣接部と、前記第1タンディッシュカーが前記第1待機場にあるときに前記配置方向において前記第1タンディッシュデッキに隣接する第1デッキ待機時隣接部とを有し、
前記第2デッキは、前記第2タンディッシュカーが前記鋳込場にあるときに前記配置方向において前記第2タンディッシュデッキに隣接するとともに前記第1タンディッシュカーが前記鋳込場にあるときに前記配置方向において当該第1タンディッシュデッキに隣接する第2デッキ鋳込時隣接部と、前記第2タンディッシュカーが前記第2待機場にあるときに前記配置方向において前記第2タンディッシュデッキに隣接する第2デッキ待機時隣接部とを有する、連続鋳造設備。
It is a continuous casting facility that continuously casts slabs.
A casting device installed under the casting floor and continuously forming the slab from molten steel received through a casting port opened in the casting floor.
A ladle in which molten steel is placed and placed above the casting port,
A first tundish in which one of them is arranged at a casting position above the casting port and below the ladle to receive molten steel from the ladle and pour the received molten steel into the casting port. And the second tundish,
The first tundish is mounted, and the mounted first tundish is arranged at the casting position where the casting position is arranged, and the first tundish is arranged at the first standby position away from the casting position. A first tundish that transports the first tundish between the casting position and the first waiting position by moving on the casting floor with the first waiting area along a specific moving direction. With a car
The casting site where the second tundish is mounted and the mounted second tundish is arranged at the casting position and the second tundish from the casting position to the side opposite to the first standby position. The second tundish is moved to the casting position and the second standby position by moving along the movement direction on the casting floor with and from the second waiting place arranged at the second standby position away from each other. The second tundish car to be transported between
A first tundish deck installed on the first tundish car and allowing workers to work on it, and a first tundish deck.
A second tundish deck installed on the second tundish car and allowing workers to work on it, and a second tundish deck.
The first deck installed on the cast floor at a position on one side in the arrangement direction orthogonal to the moving direction with respect to the moving area of the first tundish car, and the first deck.
A first staircase provided on the first deck and allowing an operator to go up and down between the first deck and the cast floor.
A second deck installed on the cast floor at a position on one side of the second tundish car in the arrangement direction with respect to the moving area of the second tundish car.
A second staircase provided on the second deck and allowing an operator to go up and down between the second deck and the cast floor is provided.
The first deck is adjacent to the first tundish deck in the arrangement direction when the first tundish car is in the casting place and when the second tundish car is in the casting place. The first deck adjacent portion adjacent to the second tundish deck in the arrangement direction at the time of casting, and the first tundish deck in the arrangement direction when the first tundish car is in the first waiting area. It has an adjacent 1st deck standby adjacent part,
The second deck is adjacent to the second tundish deck in the arrangement direction when the second tundish car is in the casting place and when the first tundish car is in the casting place. The second deck adjacent to the first tundish deck in the arrangement direction at the time of casting, and the second tundish deck in the arrangement direction when the second tundish car is in the second waiting area. A continuous casting facility having an adjacent second deck standby adjacent portion.
前記鋳込装置は、前記鋳込口から下方に延びる成型空間を囲む鋳型であって前記鋳込口を通じて前記成型空間に注湯された溶鋼を前記鋳片に成型するものと、前記成型空間で成型された前記鋳片を前記成型空間から下方へ引き抜くとともにその鋳片を下流側へ送る送り装置と、を有し、
前記連続鋳造設備は、前記成型空間への溶鋼の注湯の開始前に前記鋳込口を通じて前記成型空間に挿入されるダミーバーであって前記成型空間に注湯された溶鋼が前記成型空間から下方へ流出するのを阻止するように前記成型空間の下部の開口を塞ぐとともに、前記送り装置によって当該ダミーバーが下流側へ送られるのに伴って前記成型空間から前記鋳片が引き抜かれるように前記鋳片の下端に繋がるものと、前記送り装置によって送られた後、前記鋳片から切り離された前記ダミーバーを再び前記成型空間へ挿入可能な挿入位置へ搬送するために前記配置方向に沿って前記鋳込床上を移動するダミーバーカーと、をさらに備え、
前記第1デッキと前記第2デッキは、前記ダミーバーカーが前記ダミーバーを前記挿入位置へ搬送するために進入するのを許容する進入スペースをそれらのデッキ間にあけるように互いに離間している、請求項1に記載の連続鋳造設備。
The casting device is a mold that surrounds a molding space extending downward from the casting port, and molds molten steel poured into the molding space through the casting port into the slab, and in the molding space. It has a feeding device for pulling out the molded slab downward from the molding space and feeding the slab to the downstream side.
The continuous casting facility is a dummy bar that is inserted into the molding space through the casting port before the start of pouring the molten steel into the molding space, and the molten steel poured into the molding space is downward from the molding space. The casting is closed so as to prevent the slab from flowing out to the molding space, and the slab is pulled out from the molding space as the dummy bar is fed downstream by the feeding device. The casting along the arrangement direction to connect to the lower end of the piece and to convey the dummy bar separated from the slab to an insertion position that can be inserted into the molding space again after being fed by the feeding device. Further equipped with a dummy barker that moves on the embedded floor,
The first deck and the second deck are separated from each other so as to allow an entry space between the decks to allow the dummy barker to enter to carry the dummy bar to the insertion position. Item 1. The continuous casting equipment according to item 1.
前記第1タンディッシュデッキ、前記第2タンディッシュデッキ、前記第1デッキ及び前記第2デッキは、作業者がその上に乗る搭乗面をそれぞれ有し、
前記第1タンディッシュデッキの搭乗面、前記第2タンディッシュデッキの搭乗面、前記第1デッキの搭乗面及び前記第2デッキの搭乗面は、同じ高さに位置する、請求項2に記載の連続鋳造設備。
The first tundish deck, the second tundish deck, the first deck, and the second deck each have a boarding surface on which a worker rides.
The boarding surface of the first tundish deck, the boarding surface of the second tundish deck, the boarding surface of the first deck and the boarding surface of the second deck are located at the same height, according to claim 2. Continuous casting equipment.
前記第1タンディッシュ及び前記第2タンディッシュは、いずれも上側が開口し、
前記連続鋳造設備は、前記第1タンディッシュの上側の開口を覆うように当該第1タンディッシュに被せられる第1タンディッシュカバーと、前記第2タンディッシュの上側の開口を覆うように当該第2タンディッシュに被せられる第2タンディッシュカバーと、をさらに備え、
前記第1タンディッシュデッキの搭乗面は、前記第1タンディッシュカバーの上面と同じ高さに位置し、
前記第2タンディッシュデッキの搭乗面は、前記第2タンディッシュカバーの上面と同じ高さに位置する、請求項3に記載の連続鋳造設備。
Both the first tundish and the second tundish have an opening on the upper side.
The continuous casting facility has a first tundish cover that covers the first tundish so as to cover the upper opening of the first tundish, and the second tundish cover that covers the upper opening of the second tundish. Further equipped with a second tundish cover that can be put on the tundish,
The boarding surface of the first tundish deck is located at the same height as the upper surface of the first tundish cover.
The continuous casting facility according to claim 3, wherein the boarding surface of the second tundish deck is located at the same height as the upper surface of the second tundish cover.
前記第1デッキは、作業者がその上に乗ることを許容する第1床板と、前記鋳込床上に立設されて前記第1床板を下から支える少なくとも1つの第1支柱とを有し、
前記第2デッキは、作業者がその上に乗ることを許容する第2床板と、前記鋳込床上に立設されて前記第2床板を下から支える少なくとも1つの第2支柱とを有し、
前記第1床板は、前記少なくとも1つの第1支柱のうち最も前記進入スペース寄りの第1支柱から前記進入スペース側へ張り出して前記第1デッキ鋳込時隣接部を構成する第1張出部を有し、
前記第2床板は、前記少なくとも1つの第2支柱のうち最も前記進入スペース寄りの第2支柱から前記進入スペース側へ張り出して前記第2デッキ鋳込時隣接部を構成する第2張出部を有する、請求項2〜4のいずれか1項に記載の連続鋳造設備。
The first deck has a first floor board that allows an operator to ride on it, and at least one first strut that is erected on the cast floor and supports the first floor board from below.
The second deck has a second floorboard that allows an operator to ride on it, and at least one second strut that is erected on the cast floor and supports the second floorboard from below.
The first floor plate has a first overhanging portion that projects from the first strut closest to the entry space to the entry space side of the at least one first strut and constitutes an adjacent portion at the time of casting the first deck. Have and
The second floor plate projects from the second column closest to the entry space among the at least one second column toward the entry space, and forms a second overhanging portion that constitutes an adjacent portion when the second deck is cast. The continuous casting facility according to any one of claims 2 to 4.
前記第1デッキ及び前記第2デッキの少なくとも一方のデッキに取り付けられ、前記送り装置による前記鋳片の送り速度、前記第1タンディッシュから前記鋳込口への溶鋼の注湯流量及び前記第2タンディッシュから前記鋳込口への溶鋼の注湯流量のうちの少なくとも1つを調節するために操作される少なくとも1つの操作装置とをさらに備え、
前記少なくとも1つの前記操作装置は、前記第1デッキと前記第2デッキとの間の前記ダミーバーカーの進入スペース内の位置であって当該操作装置が操作される操作位置と、前記ダミーバーカーの進入スペースから外れた位置であって当該操作装置と前記ダミーバーカーとの干渉が回避される退避位置との間で移動可能となるように前記少なくとも一方のデッキに取り付けられている、請求項2〜5のいずれか1項に記載の連続鋳造設備。
Attached to at least one of the first deck and the second deck, the feeding speed of the slab by the feeding device, the pouring flow rate of the molten steel from the first tundish to the casting port, and the second. Further equipped with at least one operating device operated to regulate at least one of the molten steel pouring flow rates from the tundish to the casting port.
The at least one operation device is a position in the entry space of the dummy barker between the first deck and the second deck, and the operation position where the operation device is operated and the entry of the dummy barker. Claims 2-5, which are attached to at least one of the decks so as to be movable between a position outside the space and a retracted position where interference between the operating device and the dummy barker is avoided. The continuous casting equipment according to any one of the above items.
前記鋳込床上において前記第1待機場を挟んで前記第1デッキと反対側に設置され、前記第1タンディッシュが前記第1待機位置で待機しているときにその第1タンディッシュを加熱する第1加熱装置と、
前記鋳込床上において前記第2待機場を挟んで前記第2デッキと反対側に設置され、前記第2タンディッシュが前記第2待機位置で待機しているときにその第2タンディッシュを加熱する第2加熱装置とをさらに備える、請求項1〜6のいずれか1項に記載の連続鋳造設備。
It is installed on the cast floor on the opposite side of the first deck with the first waiting area in between, and heats the first tundish when the first tundish is waiting at the first waiting position. The first heating device and
It is installed on the cast floor on the opposite side of the second deck with the second waiting area in between, and heats the second tundish when the second tundish is waiting at the second waiting position. The continuous casting facility according to any one of claims 1 to 6, further comprising a second heating device.
JP2018127608A 2018-07-04 2018-07-04 Continuous casting equipment Active JP6966386B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018127608A JP6966386B2 (en) 2018-07-04 2018-07-04 Continuous casting equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018127608A JP6966386B2 (en) 2018-07-04 2018-07-04 Continuous casting equipment

Publications (2)

Publication Number Publication Date
JP2020006385A JP2020006385A (en) 2020-01-16
JP6966386B2 true JP6966386B2 (en) 2021-11-17

Family

ID=69149944

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018127608A Active JP6966386B2 (en) 2018-07-04 2018-07-04 Continuous casting equipment

Country Status (1)

Country Link
JP (1) JP6966386B2 (en)

Also Published As

Publication number Publication date
JP2020006385A (en) 2020-01-16

Similar Documents

Publication Publication Date Title
US5277243A (en) Strip casting
JP5593421B2 (en) Strip casting equipment for quick set-up and replacement of casting rolls
EP0876232B1 (en) Metal delivery system for continuous caster
JP6995709B2 (en) Cast steel casting manufacturing system
CN103240409B (en) The conveyer device of cast casting ladle
JP6966386B2 (en) Continuous casting equipment
JP3684201B2 (en) Method of dismantling the bottom of the blast furnace furnace
US3218682A (en) Apparatus for molten metal supply changeover during casting
JP2009285689A (en) Ladle lid carrying apparatus
KR20180020732A (en) Protecive device and truck having the same
JP6466231B2 (en) Continuous casting apparatus and operation method thereof
EP0192866B1 (en) Apparatus for a continuous casting facility
US3974874A (en) Continuous casting plant
JPS629749A (en) Casting mold exchanging device for continuous casting installation
KR101018897B1 (en) Device for continuously casting molten metals
KR100405854B1 (en) The gate tube changer of tundish
JP3170116B2 (en) Nozzle hole opening device for ladle in continuous casting equipment
KR100868504B1 (en) Device for protecting splash of hot-steel in mold of continuous casting line
JPH0323262B2 (en)
JPH0750044Y2 (en) Continuous casting equipment
US238110A (en) Bessemer plant and apparatus
KR20220029716A (en) Device for manipulating the casting tube of a replacement device in the spout of a metallurgical vessel
RU2397043C2 (en) Method for semicontinuous casting of billets and machine for its realisation
AU710986B2 (en) Metal delivery system for continuous caster
KR20200075641A (en) Apparatus for eliminating slag in ladle

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20201130

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20211006

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20211019

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20211021

R150 Certificate of patent or registration of utility model

Ref document number: 6966386

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150