JP6917237B2 - Payment / non-payment judgment device, payment / non-payment judgment method, and payment / non-payment judgment program - Google Patents

Payment / non-payment judgment device, payment / non-payment judgment method, and payment / non-payment judgment program Download PDF

Info

Publication number
JP6917237B2
JP6917237B2 JP2017150207A JP2017150207A JP6917237B2 JP 6917237 B2 JP6917237 B2 JP 6917237B2 JP 2017150207 A JP2017150207 A JP 2017150207A JP 2017150207 A JP2017150207 A JP 2017150207A JP 6917237 B2 JP6917237 B2 JP 6917237B2
Authority
JP
Japan
Prior art keywords
construction
payment
identification data
construction process
date
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017150207A
Other languages
Japanese (ja)
Other versions
JP2019028893A (en
Inventor
須藤 裕之
裕之 須藤
和彦 麻生
和彦 麻生
剛光 上野
剛光 上野
Original Assignee
株式会社オービック
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社オービック filed Critical 株式会社オービック
Priority to JP2017150207A priority Critical patent/JP6917237B2/en
Publication of JP2019028893A publication Critical patent/JP2019028893A/en
Application granted granted Critical
Publication of JP6917237B2 publication Critical patent/JP6917237B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、支払可否判定装置、支払可否判定方法および支払可否判定プログラムに関する。 The present invention relates to a payment acceptability determination device, a payment acceptability determination method, and a payment acceptability determination program.

特許文献1には、例えばマンション建設、住宅団地開発のように、開発事業主が金融機関から開発資金を借入れて、開発事業主が施工業者に施工を依頼すると共に、開発物件を購入者に売却することにより資金を回収して、借入れた開発資金を金融機関に返却する場合に用いて好適なプロジェクトリスク管理システム及び方法が開示されている(0001段落等参照)。 In Patent Document 1, for example, as in the case of condominium construction and housing complex development, the development business owner borrows development funds from a financial institution, the development business owner requests the contractor to perform the construction, and the development property is sold to the purchaser. The project risk management system and method suitable for collecting the funds by doing so and returning the borrowed development funds to the financial institution are disclosed (see paragraph 0001, etc.).

特開2004−234427号公報Japanese Unexamined Patent Publication No. 2004-234427

このような不動産業界や建設業界の分野においては、建物の建設に係る一連の工事工程のうちある工事工程(例えば、仮設工事等)に含まれる工事細目(例えば、仮設工事に含まれる工事細目である水杭、縄張りおよび水盛り・遣り方等)について担当業者への支払処理を行う場面において、これまでは、当該支払処理を行うタイミングに当該ある工事工程が完了しているか判断するための情報が一元管理されていなかったため、当該支払処理をスムースに行うことが困難であった。 In such fields of the real estate industry and the construction industry, the construction details included in a certain construction process (for example, temporary construction, etc.) in a series of construction processes related to building construction (for example, the construction details included in the temporary construction). Information for determining whether or not the construction process has been completed at the timing of the payment processing in the scene of payment processing to the contractor in charge for a certain water pile, rope tensioning, water filling, how to use, etc. Was not centrally managed, so it was difficult to process the payment smoothly.

本発明は、上記に鑑みてなされたものであって、支払処理の対象となる工事細目を含む工事工程が完了していない場合には警告情報を出力し、前記工事工程が完了している場合には前記支払処理を実行することにより、前記支払処理をスムースに行うことを可能とする支払可否判定装置、支払可否判定方法および支払可否判定プログラムを提供する。 The present invention has been made in view of the above, and when the construction process including the construction details to be paid is not completed, warning information is output and the construction process is completed. Provided is a payment acceptability determination device, a payment acceptability determination method, and a payment acceptability determination program that enable the payment process to be smoothly performed by executing the payment process.

上述した課題を解決し、目的を達成するために、本発明に係る支払可否判定装置は、制御部および記憶部を備える支払可否判定装置であって、前記記憶部には、工事細目識別データと工事工程識別データとを含む工事細目マスタと、工事工程識別データと当該工事工程識別データで特定される工事工程が完了している場合における当該工事工程の完了日付である実績終了日とを含む工程進捗管理データと、が格納されており、前記制御部は、前記工事細目マスタを参照して、支払処理を行うための画面で指定された工事細目識別データと紐付く工事工程識別データを特定する特定手段と、前記工程進捗管理データを参照して、前記特定手段で特定した工事工程識別データに関する実績終了日を取得する取得手段と、前記取得手段で前記実績終了日を取得できなかった場合、所定の警告情報を出力する警告手段と、前記取得手段で前記実績終了日を取得できた場合、前記指定された工事細目識別データで特定される工事細目についての前記支払処理を実行する支払手段と、を備えること、を特徴とする。 In order to solve the above-mentioned problems and achieve the object, the payability determination device according to the present invention is a payment approval / disapproval determination device including a control unit and a storage unit, and the storage unit contains construction detail identification data. A process including a construction detail master including construction process identification data and an actual end date which is a completion date of the construction process when the construction process specified by the construction process identification data and the construction process identification data is completed. The progress management data and the data are stored, and the control unit refers to the construction item master and specifies the construction process identification data associated with the construction item identification data specified on the screen for performing payment processing. When the acquisition means for acquiring the actual end date of the construction process identification data specified by the specific means and the acquisition means cannot acquire the actual end date by referring to the specific means and the process progress management data. A warning means that outputs predetermined warning information, and a payment means that executes the payment process for the construction item specified by the specified construction item identification data when the acquisition means can acquire the actual end date. , Is provided.

また、本発明に係る支払可否判定装置は、前記警告手段が、前記所定の警告情報の出力対象として予めチェックされた工事細目識別データと紐付く工事工程識別データに関する実績終了日を、前記取得手段で取得できなかった場合、前記所定の警告情報を出力すること、を特徴とする。 Further, in the payability determination device according to the present invention, the warning means obtains the actual end date of the construction process identification data associated with the construction detail identification data checked in advance as the output target of the predetermined warning information. When the data cannot be obtained in, the predetermined warning information is output.

また、本発明に係る支払可否判定装置は、前記所定の警告情報が、前記指定された工事細目識別データで特定される工事細目についての前記支払処理を行ってよいかをオペレータに確認させるためのダイアログボックスであること、を特徴とする。 Further, the payment acceptability determination device according to the present invention causes the operator to confirm whether the predetermined warning information may perform the payment processing for the construction item specified by the designated construction item identification data. It is characterized by being a dialog box.

また、本発明に係る支払可否判定方法は、制御部および記憶部を備える情報処理装置で実行される支払可否判定方法であって、前記記憶部には、工事細目識別データと工事工程識別データとを含む工事細目マスタと、工事工程識別データと当該工事工程識別データで特定される工事工程が完了している場合における当該工事工程の完了日付である実績終了日とを含む工程進捗管理データと、が格納されており、前記制御部で実行される、前記工事細目マスタを参照して、支払処理を行うための画面で指定された工事細目識別データと紐付く工事工程識別データを特定する特定ステップと、前記工程進捗管理データを参照して、前記特定ステップで特定した工事工程識別データに関する実績終了日を取得する取得ステップと、前記取得ステップで前記実績終了日を取得できなかった場合、所定の警告情報を出力する警告ステップと、前記取得ステップで前記実績終了日を取得できた場合、前記指定された工事細目識別データで特定される工事細目についての前記支払処理を実行する支払ステップと、を含むこと、を特徴とする。 Further, the payment availability determination method according to the present invention is a payment approval / disapproval determination method executed by an information processing device including a control unit and a storage unit, and the storage unit includes construction detail identification data and construction process identification data. Construction detail master including, process progress management data including construction process identification data and actual end date which is the completion date of the construction process when the construction process specified by the construction process identification data is completed. Is stored, and the specific step of identifying the construction process identification data associated with the construction detail identification data specified on the screen for performing payment processing with reference to the construction detail master executed by the control unit. With reference to the process progress management data, an acquisition step for acquiring the actual end date related to the construction process identification data specified in the specific step, and a predetermined acquisition step when the actual end date cannot be acquired in the acquisition step. A warning step for outputting warning information and a payment step for executing the payment process for the construction item specified by the specified construction item identification data when the actual end date can be acquired in the acquisition step. It is characterized by including.

また、本発明に係る支払可否判定プログラムは、制御部および記憶部を備える情報処理装置に実行させるための支払可否判定プログラムであって、前記記憶部には、工事細目識別データと工事工程識別データとを含む工事細目マスタと、工事工程識別データと当該工事工程識別データで特定される工事工程が完了している場合における当該工事工程の完了日付である実績終了日とを含む工程進捗管理データと、が格納されており、前記制御部に実行させるための、前記工事細目マスタを参照して、支払処理を行うための画面で指定された工事細目識別データと紐付く工事工程識別データを特定する特定ステップと、前記工程進捗管理データを参照して、前記特定ステップで特定した工事工程識別データに関する実績終了日を取得する取得ステップと、前記取得ステップで前記実績終了日を取得できなかった場合、所定の警告情報を出力する警告ステップと、前記取得ステップで前記実績終了日を取得できた場合、前記指定された工事細目識別データで特定される工事細目についての前記支払処理を実行する支払ステップと、を含むこと、を特徴とする。 Further, the payability determination program according to the present invention is a payment availability determination program for being executed by an information processing device including a control unit and a storage unit, and the storage unit contains construction detail identification data and construction process identification data. The construction detail master including the above, and the process progress management data including the construction process identification data and the actual end date which is the completion date of the construction process when the construction process specified by the construction process identification data is completed. , Is stored, and the construction process identification data associated with the construction detail identification data specified on the screen for performing payment processing is specified by referring to the construction detail master for execution by the control unit. When the acquisition step for acquiring the actual end date related to the construction process identification data specified in the specific step and the acquisition step by referring to the specific step and the process progress management data, and the actual end date cannot be acquired in the acquisition step. A warning step that outputs predetermined warning information, and a payment step that executes the payment process for the construction item specified by the specified construction item identification data when the actual end date can be acquired in the acquisition step. , Including.

本発明によれば、支払処理の対象となる工事細目を含む工事工程が完了していない場合には警告情報を出力し、前記工事工程が完了している場合には前記支払処理を実行することにより、前記支払処理をスムースに行うことを可能とするという効果を奏する。 According to the present invention, warning information is output when the construction process including the construction details to be paid is not completed, and the payment processing is executed when the construction process is completed. This has the effect of making it possible to smoothly perform the payment process.

図1は、支払可否判定装置の構成の一例を示すブロック図である。FIG. 1 is a block diagram showing an example of the configuration of the payability determination device. 図2は、各工事工程の開始日および終了日の一例を示す図である。FIG. 2 is a diagram showing an example of a start date and an end date of each construction process. 図3は、工事工程パターンマスタにおけるデータの構成例を示す図である。FIG. 3 is a diagram showing a configuration example of data in the construction process pattern master. 図4は、工事工程他部門参照権限の区分の種類、工事工程変更権限の項目の種類およびこれら権限を設定するための画面の一例を示す図である。FIG. 4 is a diagram showing an example of a screen for setting the types of construction process and other department reference authority categories, the types of construction process change authority items, and these authorities. 図5は、各担当者の役割および制御可能な範囲の一例を示す図である。FIG. 5 is a diagram showing an example of the role of each person in charge and the controllable range. 図6は、担当者マスタ、部門マスタ、取引先マスタ、工事工程マスタおよび工事細目マスタにおけるデータの構成例を示す図である。FIG. 6 is a diagram showing an example of data configuration in a person in charge master, a department master, a business partner master, a construction process master, and a construction detail master. 図7は、工事工程パターンマスタにおけるデータの構成例を示す図である。FIG. 7 is a diagram showing a configuration example of data in the construction process pattern master. 図8は、Aさんが見る工程進捗入力画面(工程進捗管理データ)の一例を示す図である。FIG. 8 is a diagram showing an example of a process progress input screen (process progress management data) viewed by Mr. A. 図9は、Bさんが見る工程進捗入力画面(工程進捗管理データ)の一例を示す図である。FIG. 9 is a diagram showing an example of a process progress input screen (process progress management data) viewed by Mr. B. 図10は、Cさんが見る工程進捗入力画面(工程進捗管理データ)の一例を示す図である。FIG. 10 is a diagram showing an example of a process progress input screen (process progress management data) viewed by Mr. C. 図11は、Dさんが見る工程進捗入力画面(工程進捗管理データ)の一例を示す図である。FIG. 11 is a diagram showing an example of a process progress input screen (process progress management data) viewed by Mr. D. 図12は、Eさんが見る工程進捗入力画面(工程進捗管理データ)の一例を示す図である。FIG. 12 is a diagram showing an example of a process progress input screen (process progress management data) viewed by Mr. E. 図13は、発注書および請求書の一例を示す図である。FIG. 13 is a diagram showing an example of a purchase order and an invoice. 図14は、工程進捗入力画面(工程進捗管理データ)の一例を示す図である。FIG. 14 is a diagram showing an example of a process progress input screen (process progress management data). 図15は、仕入入力画面(支払入力画面)の一例を示す図である。FIG. 15 is a diagram showing an example of a purchase input screen (payment input screen). 図16は、支払処理を行ってよいかをオペレータに確認させるためのダイアログボックスの一例を示す図である。FIG. 16 is a diagram showing an example of a dialog box for asking the operator to confirm whether payment processing may be performed.

以下に、本発明に係る支払可否判定装置、支払可否判定方法および支払可否判定プログラムの実施形態を、図面に基づいて詳細に説明する。なお、本実施形態によりこの発明が限定されるものではない。 Hereinafter, embodiments of a payability determination device, a payment acceptance determination method, and a payment acceptance determination program according to the present invention will be described in detail with reference to the drawings. The present invention is not limited to this embodiment.

[1.概要]
不動産業界や建設業界においては、従来、ある工事細目についての担当業者への支払時に、当該ある工事細目を含む工事工程が完了しているかどうかを判断するための情報が一元管理されていなかったため、支払処理をスムースに行うことが困難であった。
[1. overview]
In the real estate industry and the construction industry, in the past, when paying a contractor for a certain construction item, information for determining whether or not the construction process including the certain construction item was completed was not centrally managed. It was difficult to process the payment smoothly.

そこで、本実施形態においては、工程進捗管理データによって、前記工事工程が完了しているかどうかを判断し、支払処理を行ってよいかどうかの制御をする方法を自動化した。具体的には、工事工程ごとに作業が完了しているかどうかをシステムにより管理し、支払処理を行う際に、該当工事工程の工事が完了しているかどうかを判断して、支払処理していいかどうかを制御する仕組みである。作業が完了していない場合は警告を表示することにより、作業完了前の支払処理を防ぐ。 Therefore, in the present embodiment, the method of determining whether or not the construction process has been completed and controlling whether or not payment processing may be performed is automated based on the process progress management data. Specifically, the system manages whether or not the work is completed for each construction process, and when performing payment processing, is it okay to judge whether or not the construction of the relevant construction process is completed and process the payment? It is a mechanism to control whether or not. If the work is not completed, a warning is displayed to prevent payment processing before the work is completed.

前記工事工程について詳細に説明する。建物が作られていく工程を工事工程というが、工事工程は、以下の段落で詳細に説明するように、「仮設工事」、「土工事および地業」、「基礎工事」、「主体(骨組み)工事」および「仕上工事」の5つの工事工程に大別することができる。様々な業種の業者が、自身の担当する工事工程の工事を行い、次の工事工程を担当する業者へと作業を繋いでいくこととなるが、各工事工程のどこかで遅れが発生すると、その後に続く工事工程に影響が発生する。このため、各工事工程のスケジュールを管理することが重要である。そこで、本実施形態においては、各工事工程の情報を一元管理して各工事工程のスケジュールを把握することによって、建物が作られていく工程を正確に管理し、また、支払業務に関して、工事工程が完了しているかどうかを判断して支払処理を行ってよいかどうかを制御できるようにした。以下、前記5つの工事工程について、詳細に説明する。 The construction process will be described in detail. The process of building a building is called the construction process, but as explained in detail in the following paragraphs, the construction process is "temporary work," "earthwork and groundwork," "foundation work," and "main body (framework). ) Construction and finishing work can be roughly divided into five construction processes. Contractors in various industries will carry out the construction of the construction process they are in charge of and connect the work to the contractor in charge of the next construction process, but if a delay occurs somewhere in each construction process, The subsequent construction process will be affected. Therefore, it is important to manage the schedule of each construction process. Therefore, in the present embodiment, by centrally managing the information of each construction process and grasping the schedule of each construction process, the process of building is accurately managed, and the construction process is related to the payment operation. It is now possible to control whether payment processing can be performed by determining whether or not is completed. Hereinafter, the above five construction processes will be described in detail.

仮設工事は、文字通り、仮に設ける工事である。工事をする際に、建物の周囲に設ける足場、その足場を覆う白いシート、工事用の電気、コンクリートおよび左官工事のための仮設の水などを用意する工事である。また、工事を始めるにあたって、建物の位置決めのために行う、水杭、縄張りおよび水盛り・遣り方等も仮設工事に入る。 Temporary work is literally temporary work. At the time of construction, scaffolding to be provided around the building, white sheets covering the scaffolding, electricity for construction, concrete and temporary water for plastering work, etc. are prepared. In addition, when starting the construction, water piles, territory, water filling, and how to use it for positioning the building will also be included in the temporary construction.

土工事は、建物の基礎を完成させるための敷地の地盤を掘ったり、掘った土を搬出したりする工事のことである。また、基礎工事が終わった後に、再び、掘った土を埋め戻ししたりする工事も土工事に入る。地業は、土工事で掘った部分に、砕石や土を入れて付き固めたりする工事のことである。地盤が悪い時に行う、杭を打ったり地盤改良のために行う工事も土工事に入る。土工事および地業は、後で検証のしがたい地中の目に見えない部分に関する工事であるため、次段落で説明する基礎工事と並んで、特に重要な工事工程である。 Earthworks is the work of digging the ground of the site to complete the foundation of the building and carrying out the excavated soil. In addition, after the foundation work is completed, the work of backfilling the excavated soil will also be included in the earthwork. Groundwork is the work of putting crushed stones and soil into the parts dug in the earthwork and hardening them. Construction work to be carried out when the ground is bad, such as staking or improving the ground, is also included in earthwork. Since earthwork and ground work are works related to invisible parts of the ground that are difficult to verify later, they are particularly important works along with the foundation work explained in the next paragraph.

基礎工事は、地業が終わるとその上に行う以下の工事である。すなわち、捨てモルタルといって、薄くモルタルを敷くと、その上に墨を打って建物の基礎の輪郭(位置)を出す。この墨に沿って鉄筋や型枠を作る。したがって、基礎工事には、鉄筋を組む鉄筋工事、その外にコンクリートを塞ぎ止める型枠工事、そしてその型枠の中にコンクリートを流し込むコンクリート工事がある。 The foundation work is the following work to be carried out on top of it when the ground work is completed. In other words, when a thin mortar is laid on the mortar, the outline (position) of the foundation of the building is drawn by putting ink on it. Reinforcing bars and formwork are made along this ink. Therefore, foundation work includes rebar work to assemble reinforcing bars, formwork work to block concrete outside, and concrete work to pour concrete into the formwork.

主体工事は、建物の骨格を形作る工事である。基礎の上に土台を這わせ、その上に通し柱や間柱を立てたり、梁を掛けたり、2、3階の床や屋根の骨格まで1〜2日以内で一気に組み立てる。こうした工事を建方工事という。昔は、現場で加工もしていたが、最近では、工場で加工した柱や梁を持ってきて組み立てる場合がほとんどである。骨格ができると、仕上工事のための下地取付が始まる。 The main construction is the construction that forms the skeleton of the building. Crawl the foundation on the foundation, erection pillars and studs on it, hang beams, and assemble the floor and roof skeletons on the second and third floors at once within 1 to 2 days. Such construction is called construction work. In the past, it was also processed on-site, but nowadays, in most cases, columns and beams processed at the factory are brought and assembled. Once the skeleton is completed, the base installation for finishing work begins.

仕上工事は、仕上げのために下地取付から進めるが、まず屋根工事を優先して進める(屋根がないと内部の仕上工事のための下地工事に入れないため)。屋根の次に、外壁工事が優先される(そうしないと、木の柱は雨に打たれてシミがついたり、反ったりするため。また、内部仕上が風や雨の影響を受けて出来ないため)。屋根工事および外壁工事は、防火防犯上においても重要である。また、屋根工事および外壁工事までは、雨の多い時期をはずすことが好ましいが、そのようなタイミングで建設できるとも限らないので、工程は十分余裕をとることが望ましい。以下、具体的な構成および動作について説明する。 The finishing work will proceed from the base installation for finishing, but the roof work will be prioritized first (because if there is no roof, it cannot be included in the base work for the internal finishing work). Next to the roof, exterior wall construction is prioritized (otherwise the wooden pillars will be struck by the rain and stain or warp, and the internal finish will not be affected by wind or rain. For). Roof construction and exterior wall construction are also important for fire prevention and crime prevention. In addition, it is preferable to remove the rainy season until roof construction and outer wall construction, but it is not always possible to construct at such timing, so it is desirable to allow sufficient margin for the process. Hereinafter, a specific configuration and operation will be described.

[2.構成]
本実施形態に係る支払可否判定装置100の構成について、図1を用いて説明する。図1は、支払可否判定装置100の構成の一例を示すブロック図である。
[2. Constitution]
The configuration of the payability determination device 100 according to the present embodiment will be described with reference to FIG. FIG. 1 is a block diagram showing an example of the configuration of the payability determination device 100.

支払可否判定装置100は、市販のデスクトップ型パーソナルコンピュータである。なお、支払可否判定装置100は、デスクトップ型パーソナルコンピュータのような据置型情報処理装置に限らず、市販されているノート型パーソナルコンピュータ、PDA(Personal Digital Assistants)、スマートフォン、タブレット型パーソナルコンピュータなどの携帯型情報処理装置であってもよい。 The payability determination device 100 is a commercially available desktop personal computer. The payment acceptance determination device 100 is not limited to a stationary information processing device such as a desktop personal computer, but is a portable personal computer, a PDA (Personal Digital Assistants), a smartphone, a tablet personal computer, or the like on the market. It may be a type information processing device.

支払可否判定装置100は、図1に示すように、制御部102と通信インターフェース部104と記憶部106と入出力インターフェース部108と、を備えている。支払可否判定装置100が備えている各部は、任意の通信路を介して通信可能に接続されている。 As shown in FIG. 1, the payability determination device 100 includes a control unit 102, a communication interface unit 104, a storage unit 106, and an input / output interface unit 108. Each part of the payability determination device 100 is communicably connected via an arbitrary communication path.

通信インターフェース部104は、ルータ等の通信装置および専用線等の有線または無線の通信回線を介して、支払可否判定装置100をネットワーク300に通信可能に接続する。通信インターフェース部104は、他の装置と通信回線を介してデータを通信する機能を有する。ここで、ネットワーク300は、支払可否判定装置100とサーバ200とを相互に通信可能に接続する機能を有し、例えばインターネットやLAN(Local Area Network)等である。なお、後述する記憶部106に格納されるデータは、サーバ200に格納されてもよい。 The communication interface unit 104 connects the payability determination device 100 to the network 300 so as to be communicable via a communication device such as a router and a wired or wireless communication line such as a dedicated line. The communication interface unit 104 has a function of communicating data with another device via a communication line. Here, the network 300 has a function of connecting the payability determination device 100 and the server 200 so as to be able to communicate with each other, and is, for example, the Internet, a LAN (Local Area Network), or the like. The data stored in the storage unit 106, which will be described later, may be stored in the server 200.

入出力インターフェース部108には、入力装置112および出力装置114が接続されている。出力装置114には、モニタ(家庭用テレビを含む)の他、スピーカやプリンタを用いることができる。入力装置112には、キーボード、マウス、およびマイクの他、マウスと協働してポインティングデバイス機能を実現するモニタを用いることができる。なお、以下では、出力装置114を、表示部としてのモニタ114とし、入力装置112をキーボード112またはマウス112として記載する場合がある。 An input device 112 and an output device 114 are connected to the input / output interface unit 108. As the output device 114, a speaker or a printer can be used in addition to a monitor (including a home television). As the input device 112, in addition to a keyboard, a mouse, and a microphone, a monitor that cooperates with the mouse to realize a pointing device function can be used. In the following, the output device 114 may be described as a monitor 114 as a display unit, and the input device 112 may be described as a keyboard 112 or a mouse 112.

記憶部106には、各種のデータベース、テーブル、およびファイルなどが格納される。記憶部106には、OS(Operating System)と協働してCPU(Central Processing Unit)に命令を与えて各種処理を行うためのコンピュータプログラムが記録される。記憶部106として、例えば、RAM(Random Access Memory)・ROM(Read Only Memory)等のメモリ装置、ハードディスクのような固定ディスク装置、フレキシブルディスク、および光ディスク等を用いることができる。 Various databases, tables, files, and the like are stored in the storage unit 106. In the storage unit 106, a computer program for giving a command to a CPU (Central Processing Unit) in cooperation with an OS (Operating System) to perform various processes is recorded. As the storage unit 106, for example, a memory device such as a RAM (Random Access Memory) or a ROM (Read Only Memory), a fixed disk device such as a hard disk, a flexible disk, an optical disk, or the like can be used.

記憶部106は、担当者マスタ106aと、部門マスタ106bと、取引先マスタ106cと、工事工程マスタ106dと、工事細目マスタ106eと、工事工程パターンマスタ106fと、工程進捗管理データ106gと、を備えている。これらのうち、工事細目マスタ106eおよび工程進捗管理データ106g以外は、任意の構成要素であり、記憶部106に含まれていても含まれていなくてもよい。 The storage unit 106 includes a person in charge master 106a, a department master 106b, a business partner master 106c, a construction process master 106d, a construction detail master 106e, a construction process pattern master 106f, and process progress management data 106g. ing. Of these, except for the construction detail master 106e and the process progress management data 106g, they are arbitrary components and may or may not be included in the storage unit 106.

以下の説明においては、デベロッパーである○○社(企画部、設計部および工事部からなる)が、○○建設に工事を依頼し、工事を完了した○○建設からの請求書に対して支払処理を行う場面を想定して説明をする。 In the following explanation, the developer XX company (consisting of the planning department, the design department and the construction department) requested the construction to XX construction and paid for the invoice from XX construction that completed the construction. The explanation will be given assuming the situation where processing is performed.

担当者マスタ106aは、デベロッパーである○○社の担当者に関する権限情報を管理するためのマスタである。担当者マスタ106aは、図6に示すように、例えば、担当者コード、担当者名、部門、工事工程変更権限および工事工程他部門参照権限等を含む。 The person in charge master 106a is a master for managing the authority information about the person in charge of the developer XX company. As shown in FIG. 6, the person in charge master 106a includes, for example, a person in charge code, a person in charge name, a department, a construction process change authority, a construction process other department reference authority, and the like.

工事工程変更権限は、図4に示すように、各担当者が、工事工程の予定日、見直日および実績日を変更できるか否かに関する権限である。図4に示すように、予定日(当初予定日)、見直日(見直予定日)および実績日という3種類の日付それぞれに対して、「変更可能」または「変更不可」を設定することにより、当該3種類の日付をユーザが変更できるか否かを制御することができる。 As shown in FIG. 4, the construction process change authority is an authority regarding whether or not each person in charge can change the scheduled date, review date, and actual date of the construction process. As shown in Fig. 4, set "changeable" or "unchangeable" for each of the three types of dates: scheduled date (initial scheduled date), review date (scheduled review date), and actual date. Therefore, it is possible to control whether or not the user can change the three types of dates.

予定日、見直日および実績日について説明する。工事工程では、各工程のスケジュールを把握することが重要であるため、日付の厳密な管理が必要不可欠である。このため、日付として、これら3つの予定日、見直日および実績日それぞれについて、開始日および終了日を管理する。すなわち、予定日としては、当初想定していた予定を管理するために、各工事工程の予定開始日および予定終了日を管理する。見直日としては、スケジュールの見直し等によってリスケジュールがあった際の見直しを行うために、見直開始日(見直し後の各工事工程の予定開始日)および見直終了日(見直し後の各工事工程の予定終了日)を管理する。実績日としては、実際に工事工程を行った実績を管理するために、実績開始日(実際に各工事工程を開始した日)および実績終了日(実際に各工事工程を完了した日)を管理する。なお、以下においては、実績開始日を実開始日ということがあり、実績終了日を実終了日ということがあるが、意味する所は同じである。 Explain the scheduled date, review date, and actual date. In the construction process, it is important to know the schedule of each process, so strict date control is indispensable. Therefore, as dates, the start date and end date are managed for each of these three scheduled dates, review dates, and actual dates. That is, as the scheduled date, the scheduled start date and the scheduled end date of each construction process are managed in order to manage the originally assumed schedule. As the review date, the review start date (scheduled start date of each construction process after the review) and the review end date (each after the review) are to be reviewed when there is a reschedule due to the review of the schedule, etc. Manage the scheduled end date of the construction process). As the actual date, in order to manage the actual result of performing the construction process, the actual start date (the date when each construction process is actually started) and the actual end date (the date when each construction process is actually completed) are managed. do. In the following, the actual start date may be referred to as the actual start date, and the actual end date may be referred to as the actual end date, but the meanings are the same.

このように、当初予定していた日付から何かしらの理由で遅延が発生した際に、見直日および実績日を入力することによって、スケジュールを見える化することが可能である。なお、見直日については、最新の情報のみを管理し、また、見直日の変更履歴については、リストとして表示することで管理できる。見直日の変更については、誰が変更したかを表示することも可能である。 In this way, when a delay occurs for some reason from the originally scheduled date, it is possible to visualize the schedule by inputting the review date and the actual date. The review date can be managed by managing only the latest information, and the change history of the review date can be managed by displaying it as a list. For changes in the review date, it is also possible to display who changed it.

ここで、開始日および終了日の管理方法としては、例えば、以下の2つの方法が存在する。一つ目の方法は、開始日および終了日を別々の工程として管理するという方法(すなわち、1つの日付のみを管理するという方法)である。例えば、基礎工事開始日と基礎工事終了日とを別々の工程として管理するという方法である。二つ目の方法は、開始日および終了日を同じ工程として管理するという方法(すなわち、2つの日付を管理するという方法)である。例えば、基礎工事開始日と基礎工事終了日とを1つの工程として管理するという方法である。これら2つの方法のいずれによっても開始日および終了日を管理することは可能であるが、一つ目の方法では、1つの工程内における開始日および終了日を直感的に把握することができず、これに対して、二つ目の方法によれば、1つの工程内における開始日および終了日を横に並べて表示することによって、ユーザに開始日から終了日までの期間を意識させることが可能となるため、二つ目の方法で開始日および終了日を管理することが好ましい。二つ目の方法によれば、例えば、「A工程 開始日2016/01/01 終了日2016/01/10」という様に開始日および終了日を管理することができる。 Here, as the management method of the start date and the end date, for example, there are the following two methods. The first method is to manage the start date and the end date as separate processes (that is, to manage only one date). For example, it is a method of managing the foundation work start date and the foundation work end date as separate processes. The second method is a method of managing the start date and the end date as the same process (that is, a method of managing two dates). For example, it is a method of managing the foundation work start date and the foundation work end date as one process. It is possible to manage the start date and end date by either of these two methods, but in the first method, it is not possible to intuitively grasp the start date and end date in one process. On the other hand, according to the second method, by displaying the start date and the end date in one process side by side, it is possible to make the user aware of the period from the start date to the end date. Therefore, it is preferable to manage the start date and the end date by the second method. According to the second method, the start date and the end date can be managed, for example, "Process A start date 2016/01/01 end date 2016/01/10".

ここで、本実施形態においては、予定開始日、予定終了日および見直開始日について、基準日を超えても実績が反映されてない場合には、該当日に印をつけて表示(いわゆる日付遅延によるアラート表示)することができる。表示のルールは、以下の1〜3のとおりである。
1.当初日付(予定開始日および予定終了日)と実日付(実績開始日および実績終了日)とを比較し、実日付未入力時には、印がつく。
2.見直日付(見直開始日および見直終了日)が入力されている場合には、見直日付と実日付を比較する。
3.基準日は、画面上にセットする。基準日の初期値は、今日日付とする。
Here, in the present embodiment, if the actual results are not reflected even after the reference date is exceeded, the scheduled start date, the scheduled end date, and the review start date are marked and displayed (so-called date). Alert display due to delay) can be displayed. The display rules are as follows.
1. 1. The initial date (scheduled start date and scheduled end date) is compared with the actual date (actual start date and actual end date), and if the actual date is not entered, a mark is added.
2. If the review date (review start date and review end date) has been entered, the review date and the actual date are compared.
3. 3. Set the base date on the screen. The initial value of the base date is today's date.

日付遅延によるアラート表示の具体例を、図2に示す。図2のA工程では、基準日(2016/01/21)が予定終了日(2016/01/10)を過ぎているが、実開始日および実終了日が入力されていないため、予定開始日および予定終了日に印(ハッチング)がつく。図2のB工程では、基準日(2016/01/21)が予定終了日(2016/01/10)を過ぎているが、見直しを行った結果、見直開始日(2016/01/30)については期日がまだ到来していないため、印はつかない。図2のC工程では、基準日(2016/01/21)が見直開始日(2016/01/20)を過ぎており、実開始日および実終了日が入力されていないため、見直開始日に印(ハッチング)がつく。図2のD工程では、基準日(2016/01/21)が予定終了日(2016/01/10)を過ぎており、実終了日が入力されていないため、予定終了日に印(ハッチング)がつく。図2のE工程では、実開始日および実終了日が入力されているため(すなわち、工事が完了しているため)、印はつかない。 A specific example of alert display due to date delay is shown in FIG. In step A of FIG. 2, the reference date (2016/01/21) has passed the scheduled end date (2016/01/10), but since the actual start date and the actual end date have not been entered, the scheduled start date has not been entered. And a mark (hatching) is attached to the scheduled end date. In step B of FIG. 2, the reference date (2016/01/21) has passed the scheduled end date (2016/01/10), but as a result of the review, the review start date (2016/01/30) Is not marked because the deadline has not yet arrived. In step C of FIG. 2, since the reference date (2016/01/21) has passed the review start date (2016/01/20) and the actual start date and the actual end date have not been entered, the review start. There is a date mark (hatching). In step D of FIG. 2, since the reference date (2016/01/21) has passed the scheduled end date (2016/01/10) and the actual end date has not been entered, the scheduled end date is marked (hatched). Is attached. In step E of FIG. 2, since the actual start date and the actual end date are input (that is, the construction is completed), no mark is attached.

なお、図2に示す予定開始日〜実終了日を管理する際には、なぜ見直しをしたのか、また、実作業がなぜ遅れたのか等の理由を、備考情報として管理してもよい。これは、変更後の日付の管理のみでは、なぜそのような日付に変更されたのかという理由を把握できないためである。また、各工程の作業管理後にチェック処理を行い、その指摘点を点数化して、指摘数として管理してもよい。各工程が完了した際に、監査がある場合、その指摘数を管理する。 When managing the scheduled start date to the actual end date shown in FIG. 2, the reasons such as why the review was made and why the actual work was delayed may be managed as remarks information. This is because it is not possible to understand the reason why the date was changed to such a date only by managing the date after the change. Further, a check process may be performed after the work management of each process, and the pointed out points may be scored and managed as the number of pointed out points. When each process is completed, if there is an audit, manage the number of indications.

担当者マスタ106aの説明に戻り、工事工程他部門参照権限は、図4に示すように、各担当者が、どの範囲まで参照できるかに関する権限(担当者の所属部門とは異なる工程の入力参照権限を制御する)である。工事工程他部門参照権限の区分としては、図4に示すように、「0:制御なし」、「1:参照表示」および「2:自部門のみ」の3つの区分が存在する。「0:制御なし」の区分を設定されたユーザは、自部門および他部門の両方について情報の入力および参照が可能であり、この区分は、例えば、プロジェクトリーダー等のプロジェクト全体を通してのスケジュールを管理するユーザに対して設定される。「1:参照表示」の区分を設定されたユーザは、他部門については情報の参照のみ可能であり、自部門については情報の入力および参照が可能であり、この区分は、例えば、各部門の上長(リーダー)に対して設定される。「2:自部門のみ」の区分を設定されたユーザは、他部門については情報の入力および参照ができず、自部門については情報の入力および参照が可能であり、この区分は、例えば、各部門のオペレータに対して設定される。 Returning to the explanation of the person in charge master 106a, as shown in FIG. Control permissions). As shown in FIG. 4, there are three categories of construction process other department reference authority: "0: no control", "1: reference display", and "2: own department only". Users who are set to the "0: No control" category can enter and refer to information for both their own department and other departments, and this category manages the schedule throughout the project, for example, the project leader. It is set for the user who does. A user who has set the category of "1: Reference display" can only refer to information for other departments, and can input and refer to information for his / her own department. It is set for the superior (leader). A user who has set the category of "2: own department only" cannot input and refer to information for other departments, and can input and refer to information for his own department. Set for department operators.

ここで、具体例として、担当者A〜Eのそれぞれに対して、工事工程変更権限および工事工程他部門参照権限が図6の担当者マスタ106aに示すように設定された場合に、担当者A〜E(担当者A〜Eの担当業務および制御設定の概要は、図5に示す)それぞれが、どの範囲の情報までを入力および参照できるのかについて詳細に説明する。なお、工事工程変更権限および工事工程他部門参照権限は、図4に示すように、担当者マスタメンテの画面を通して設定することができる。 Here, as a specific example, when the construction process change authority and the construction process other department reference authority are set for each of the persons in charge A to E as shown in the person in charge master 106a in FIG. 6, the person in charge A ~ E (The outline of the work in charge and the control settings of the persons in charge A to E is shown in FIG. 5) Explains in detail to what range of information each of them can input and refer to. As shown in FIG. 4, the construction process change authority and the construction process other department reference authority can be set through the screen of the person in charge master maintenance.

まず、担当者A(企画部に所属するプロジェクトリーダー)が入力および参照できる範囲について、図6および図8を用いて説明する。図6の担当者マスタ106aを参照すると、担当者Aについての工事工程他部門参照権限は、「0:制御なし」と設定されている。このため、担当者Aは、図8に示すように、自部門(企画部)および他部門(設計部および工事部)の両方について情報の入力および参照ができる。また、図6の担当者マスタ106aを参照すると、担当者Aについての工事工程変更権限は、「予定日:変更可能、見直日:変更可能、実績日:変更可能」と設定されている。このため、担当者Aは、図8に示すように、自部門(企画部)および他部門(設計部および工事部)の両方について、予定開始日、予定終了日、見直開始日、見直終了日、実績開始日および実績終了日を入力および変更することができる。ただし、担当者Aは、図8に示すように、監査の工事工程である009、011および013に関する日付については、入力および変更をすることができない。 First, the range that can be input and referenced by the person in charge A (project leader belonging to the planning department) will be described with reference to FIGS. 6 and 8. With reference to the person in charge master 106a in FIG. 6, the authority to refer to the construction process and other departments for the person in charge A is set to "0: No control". Therefore, as shown in FIG. 8, the person in charge A can input and refer to information about both his / her own department (planning department) and other departments (design department and construction department). Further, referring to the person in charge master 106a in FIG. 6, the authority to change the construction process for the person in charge A is set as "scheduled date: changeable, review date: changeable, actual date: changeable". Therefore, as shown in FIG. 8, the person in charge A has a scheduled start date, a scheduled end date, a review start date, and a review for both his / her own department (planning department) and other departments (design department and construction department). You can enter and change the end date, actual start date, and actual end date. However, as shown in FIG. 8, the person in charge A cannot input or change the dates related to the audit construction processes 009, 011 and 013.

次に、担当者B(設計部の上長)および担当者D(工事部の上長)が入力および参照できる範囲について、図6、図9および図11を用いて説明する。図6の担当者マスタ106aを参照すると、担当者BおよびDについての工事工程他部門参照権限は、「1:参照表示」と設定されている。このため、担当者Bは、図9に示すように、他部門(企画部および工事部)については情報の参照のみ可能であり、自部門(設計部)については情報の入力および参照が可能であり、また、担当者Dは、図11に示すように、他部門(企画部および設計部)については情報の参照のみ可能であり、自部門(工事部)については情報の入力および参照が可能である。また、図6の担当者マスタ106aを参照すると、担当者BおよびDについての工事工程変更権限は、「予定日:変更可能、見直日:変更可能、実績日:変更不可」と設定されている。このため、担当者Bは、図9に示すように、自部門(設計部)について、予定開始日、予定終了日、見直開始日および見直終了日を入力および変更することができ、また、担当者Dは、図11に示すように、自部門(工事部)について、予定開始日、予定終了日、見直開始日および見直終了日を入力および変更することができる。 Next, the range that can be input and referenced by the person in charge B (supervisor of the design department) and the person in charge D (supervisor of the construction department) will be described with reference to FIGS. 6, 9 and 11. With reference to the person in charge master 106a in FIG. 6, the reference authority for the construction process and other departments for the persons in charge B and D is set to "1: reference display". Therefore, as shown in FIG. 9, the person in charge B can only refer to the information for other departments (planning department and construction department), and can input and refer to the information for his own department (design department). As shown in FIG. 11, the person in charge D can only refer to information for other departments (planning department and design department), and can input and refer to information for his own department (construction department). Is. Further, referring to the person in charge master 106a in FIG. 6, the authority to change the construction process for the persons in charge B and D is set as "scheduled date: changeable, review date: changeable, actual date: not changeable". There is. Therefore, as shown in FIG. 9, the person in charge B can input and change the scheduled start date, scheduled end date, review start date, and review end date for his / her department (design department). As shown in FIG. 11, the person in charge D can input and change the scheduled start date, the scheduled end date, the review start date, and the review end date for the own department (construction department).

最後に、担当者C(設計部のオペレータ)および担当者E(工事部のオペレータ)が入力および参照できる範囲について、図6、図10および図12を用いて説明する。図6の担当者マスタ106aを参照すると、担当者CおよびEについての工事工程他部門参照権限は、「2:自部門のみ」と設定されている。このため、担当者Cは、図10に示すように、自部門(設計部)については情報の入力および参照が可能であり、また、担当者Eは、図12に示すように、自部門(工事部)については情報の入力および参照が可能である。また、図6の担当者マスタ106aを参照すると、担当者CおよびEについての工事工程変更権限は、「予定日:変更不可、見直日:変更不可、実績日:変更可能」と設定されている。このため、担当者Cは、図10に示すように、自部門(設計部)について、実績開始日および実績終了日を入力および変更することができ、また、担当者Eは、図12に示すように、自部門(工事部)について、実績開始日および実績終了日を入力および変更することができる。 Finally, the range that can be input and referenced by the person in charge C (operator of the design department) and the person in charge E (operator of the construction department) will be described with reference to FIGS. 6, 10 and 12. With reference to the person in charge master 106a in FIG. 6, the authority to refer to the construction process and other departments for the persons in charge C and E is set to "2: own department only". Therefore, the person in charge C can input and refer to the information about the own department (design department) as shown in FIG. 10, and the person in charge E can input and refer to the own department (design department) as shown in FIG. Information can be entered and referenced for the Construction Department). Further, referring to the person in charge master 106a in FIG. 6, the authority to change the construction process for the persons in charge C and E is set as "scheduled date: cannot be changed, review date: cannot be changed, actual date: can be changed". There is. Therefore, as shown in FIG. 10, the person in charge C can input and change the actual start date and the actual end date for his / her department (design department), and the person in charge E can input and change the actual result end date, and the person in charge E shows in FIG. As described above, it is possible to input and change the actual start date and the actual end date for the own department (construction department).

図6に戻り、部門マスタ106bは、デベロッパーである○○社の担当者に関する部門情報を管理するためのマスタである。部門マスタ106bは、図6に示すように、例えば、部門コードおよび部門名等を含む。 Returning to FIG. 6, the department master 106b is a master for managing department information related to the person in charge of the developer XX company. As shown in FIG. 6, the department master 106b includes, for example, a department code and a department name.

取引先マスタ106cは、デベロッパーである○○社の取引先を管理するためのマスタである。取引先マスタ106cは、図6に示すように、例えば、取引先コードおよび取引先名等を含む。 The business partner master 106c is a master for managing the business partners of the developer XX company. As shown in FIG. 6, the business partner master 106c includes, for example, a business partner code, a business partner name, and the like.

工事工程マスタ106dは、工事工程を管理するためのマスタである。工事工程マスタ106dは、図6に示すように、例えば、工事工程識別データ(工程コードおよび工程名)および担当部門等を含む。 The construction process master 106d is a master for managing the construction process. As shown in FIG. 6, the construction process master 106d includes, for example, construction process identification data (process code and process name), a department in charge, and the like.

工事細目マスタ106eは、工事細目を管理するためのマスタである。工事細目マスタ106eは、図6に示すように、例えば、工事細目識別データ(工事細目コードおよび工事細目名)および工事工程識別データ(工程コード)等を含む。ここで、工事細目とは、工事工程中に含まれる作業の種類のことであり、例えば、図6の工事細目マスタ106eに示すように、工事工程「008:仮設工事」中には、「水杭」、「縄張り」および「水盛り・遣り方」という3つの工事細目が含まれる。 The construction item master 106e is a master for managing the construction item. As shown in FIG. 6, the construction detail master 106e includes, for example, construction detail identification data (construction detail code and construction detail name), construction process identification data (process code), and the like. Here, the construction detail is a type of work included in the construction process. For example, as shown in the construction detail master 106e of FIG. 6, during the construction process “008: temporary construction”, “water” is used. It includes three construction details: "pile," "territory," and "filling and using."

工事工程パターンマスタ106fは、各工事工程の予定開始日および予定終了日を自動セットするための情報を管理するためのマスタである。各工事工程の種類や各工事工程の完了に要する日数等は、会社毎または部門ごとにパターン化されていることが多い。このため、このパターンを管理することによって、各工事工程の管理漏れや設定漏れを防ぐことができる。また、工事工程パターンマスタ106fによって、直前の工事工程から何日後にスタートする工程なのかという情報および該当工事工程の完了に要する日数情報を管理することによって、予定開始日および予定終了日の初期値セットを行うことができる。 The construction process pattern master 106f is a master for managing information for automatically setting the scheduled start date and scheduled end date of each construction process. The type of each construction process and the number of days required to complete each construction process are often patterned for each company or department. Therefore, by managing this pattern, it is possible to prevent omission of management and omission of setting of each construction process. In addition, the construction process pattern master 106f manages information on how many days after the immediately preceding construction process will start and information on the number of days required to complete the construction process, so that the initial values of the scheduled start date and scheduled end date can be obtained. You can set.

工事工程パターンマスタ106fは、図3および図7に示すように、例えば、パターンコード、パターン名、工事工程識別データ(工程コード)、参照元となる工事工程識別データ(参照元となる工程)、セット日数、開始終了日数および予定不要か否かのチェックボックス等を含む。参照元となる工程とは、予定開始日および予定終了日をセットする元となる工程(すなわち、直前の工程)のことである。セット日数とは、参照元となる工程から何日後を予定開始日にするかという日数のことである。開始終了日数とは、予定開始日から何日後を予定終了日にするかという日数のことである。予定不要か否かのチェックボックスは、チェックをONにした場合、工程進捗入力画面で日付を入力することを不可能とし、指摘数とメモのみを入力できるようにする。 As shown in FIGS. 3 and 7, for example, the construction process pattern master 106f includes a pattern code, a pattern name, construction process identification data (process code), construction process identification data as a reference source (process as a reference source), and the like. Includes the number of set days, the number of start and end days, and check boxes for whether or not a schedule is required. The reference source process is a process that is a source for setting the scheduled start date and the scheduled end date (that is, the immediately preceding process). The number of set days is the number of days after the process that is the reference source as the scheduled start date. The number of start / end days is the number of days after the scheduled start date to set the scheduled end date. When the check box for whether or not the schedule is unnecessary is turned on, it is impossible to input the date on the process progress input screen, and only the number of indications and the memo can be input.

具体例として、工事工程パターンマスタ106fが図3に示すように設定された場合に、「情報入手」、「部内承認」および「本部会議」という3つの工事工程それぞれにおける予定開始日および予定終了日が、どのように自動セットされるかについて説明する。なお、工事工程のスタートは、2016/04/01であると仮定する。
1.まず、情報入手について説明する。図3を参照すると、情報入手のセット日数は0であるため、2016/04/01が情報入手の予定開始日として自動セットされる。また、図3を参照すると、情報入手の開始終了日数は0日であるため、2016/04/01から0日後の2016/04/01が情報入手の予定終了日として自動セットされる。
2.次に、部内承認について説明する。図3を参照すると、部内承認の参照元となる工程が情報入手であり、セット日数は3日であるため、情報入手の予定終了日である2016/04/01から3日後の2016/04/04が部内承認の予定開始日として自動セットされる。また、図3を参照すると、部内承認の開始終了日数は1日であるため、2016/04/04から1日後の2016/04/05が部内承認の予定終了日として自動セットされる。
3.最後に、本部会議について説明する。図3を参照すると、本部会議の参照元となる工程が部内承認であり、セット日数は2日であるため、部内承認の予定終了日である2016/04/05から2日後の2016/04/07が本部会議の予定開始日として自動セットされる。また、図3を参照すると、本部会議の開始終了日数は0日であるため、2016/04/07から0日後の2016/04/07が本部会議の予定終了日として自動セットされる。
As a specific example, when the construction process pattern master 106f is set as shown in FIG. 3, the scheduled start date and scheduled end date in each of the three construction processes of "information acquisition", "internal approval", and "headquarters meeting". Explains how it is automatically set. It is assumed that the start of the construction process is 2016/04/01.
1. 1. First, information acquisition will be described. Referring to FIG. 3, since the number of set days for information acquisition is 0, 2016/04/01 is automatically set as the scheduled start date for information acquisition. Further, referring to FIG. 3, since the number of start and end days for information acquisition is 0 days, 2016/04/01 0 days after 2016/04/01 is automatically set as the scheduled end date for information acquisition.
2. Next, internal approval will be described. Referring to FIG. 3, since the process that is the reference source for internal approval is information acquisition and the set number of days is 3 days, 2016/04/01, which is 3 days after the scheduled end date of information acquisition, 2016/04/ 04 is automatically set as the scheduled start date for internal approval. Further, referring to FIG. 3, since the number of start and end days for internal approval is one day, 2016/04/05, which is one day after 2016/04/04, is automatically set as the scheduled end date for internal approval.
3. 3. Finally, the headquarters meeting will be described. Referring to FIG. 3, since the process that is the reference source of the headquarters meeting is internal approval and the set number of days is 2 days, 2016/04/05, which is 2 days after the scheduled end date of internal approval, 2016/04/05 / 07 is automatically set as the scheduled start date of the headquarters meeting. Further, referring to FIG. 3, since the start / end date of the headquarters meeting is 0 days, 2016/04/07, which is 0 days after 2016/04/07, is automatically set as the scheduled end date of the headquarters meeting.

工程進捗管理データ106gは、工事工程の進捗を管理するためのデータである。工程進捗管理データ106gは、図14に示すように、例えば、工程パターン、工事工程識別データ(工程)、予定開始日、予定終了日、見直開始日、見直終了日、実績開始日、実績終了日、指摘数および備考等を含む。実績終了日は、工事工程識別データで特定される工事工程が完了している場合における当該工事工程の完了日付である。図14の工程進捗管理データ106gでは、「008:仮設工事」の工事工程まで完了しているため、「008:仮設工事」についての実績終了日(2017/01/01)は入力されているが、「010:土工事」の工事工程はまだ完了していないため、「010:土工事」についての実績終了日は、図14に楕円で囲んで示すように、未だ入力されず空欄となっている。 The process progress management data 106g is data for managing the progress of the construction process. As shown in FIG. 14, the process progress management data 106g includes, for example, a process pattern, construction process identification data (process), scheduled start date, scheduled end date, review start date, review end date, actual start date, and actual result. Includes end date, number of indications, remarks, etc. The actual end date is the completion date of the construction process when the construction process specified by the construction process identification data is completed. In the process progress management data 106g of FIG. 14, since the construction process of "008: temporary construction" has been completed, the actual end date (2017/01/01) for "008: temporary construction" is input. , Since the construction process of "010: earthwork" has not been completed yet, the actual end date of "010: earthwork" has not been entered yet and is blank as shown by enclosing it in an ellipse in Fig. 14. There is.

制御部102は、支払可否判定装置100を統括的に制御するCPU等である。制御部102は、OS等の制御プログラム・各種の処理手順等を規定したプログラム・所要データなどを格納するための内部メモリを有し、格納されているこれらのプログラムに基づいて種々の情報処理を実行する。 The control unit 102 is a CPU or the like that collectively controls the payability determination device 100. The control unit 102 has an internal memory for storing a control program such as an OS, a program that defines various processing procedures, required data, and the like, and performs various information processing based on these stored programs. Execute.

制御部102は、機能概念的に、(1)前記工事細目マスタを参照して、支払処理を行うための画面で指定された工事細目識別データと紐付く工事工程識別データを特定する特定手段としての特定部102aと、(2)前記工程進捗管理データを参照して、前記特定手段で特定した工事工程識別データに関する実績終了日を取得する取得手段としての取得部102bと、(3)前記取得手段で前記実績終了日を取得できなかった場合、所定の警告情報を出力する警告手段としての警告部102cと、(4)前記取得手段で前記実績終了日を取得できた場合、前記指定された工事細目識別データで特定される工事細目についての前記支払処理を実行する支払手段としての支払部102dと、を備えている。なお、各部が実行する処理の詳細については、以下の[3.処理の具体例]で説明する。 The control unit 102 functionally conceptually refers to (1) as a specific means for identifying the construction process identification data associated with the construction detail identification data specified on the screen for performing payment processing by referring to the construction detail master. 102a, (2) an acquisition unit 102b as an acquisition means for acquiring the actual end date of the construction process identification data specified by the specific means by referring to the process progress management data, and (3) the acquisition. When the achievement end date cannot be acquired by the means, the warning unit 102c as a warning means for outputting predetermined warning information, and (4) when the acquisition means can acquire the achievement end date, the designated It includes a payment unit 102d as a payment means for executing the payment processing for the construction item specified by the construction item identification data. For details of the processing executed by each part, see the following [3. Specific example of processing] will be described.

[3.処理の具体例]
以下、本実施形態に係る処理の具体例について説明する。本例においては、デベロッパーである○○社が、○○建設に対して工事を発注した後、○○建設から工事金額100,000円の請求が来た際に、前記100,000円について支払処理を行ってよいかの判定を行う場面を想定して説明を進める。なお、前提条件として、発注書および請求書の内容は図13に示すとおりであり、工事細目マスタ106eのデータ構成は図6に示すとおりであり、工程進捗管理データ106gのデータ構成は図14に示すとおりであるとする。
[3. Specific example of processing]
Hereinafter, specific examples of the processing according to the present embodiment will be described. In this example, when the developer, Company XX, places an order for construction work with XX Construction and then receives a request for construction amount of 100,000 yen from XX Construction, the payment is made for the above 100,000 yen. The explanation will proceed assuming a situation in which it is determined whether or not the processing can be performed. As preconditions, the contents of the purchase order and the invoice are as shown in FIG. 13, the data structure of the construction detail master 106e is as shown in FIG. 6, and the data structure of the process progress management data 106 g is shown in FIG. As shown.

(特定処理)
特定部102aは、工事細目マスタ106eを参照して、支払処理を行うための画面で指定された工事細目識別データ(工事細目コード)と紐付く工事工程識別データ(工程コード)を特定する。
(Specific processing)
The identification unit 102a refers to the construction item master 106e and specifies the construction process identification data (process code) associated with the construction item identification data (construction item code) specified on the screen for performing payment processing.

具体的には、図15に示すように、支払処理を行うための画面(仕入入力画面)で、請求番号「0000000001」が指定されたとする。この場合、この請求番号を有する図13の請求書を参照すると、当該請求書には、「S001水杭」、「S002縄張り」、「S003水盛り・遣り方」および「S004割りぐり地業」という4つの工事細目が記載されているため、前記支払処理を行うための画面を通して、間接的に、当該4つの工事細目が指定されたこととなる。なお、当該4つの工事細目は、前記支払処理を行うための画面に直接入力されてもよい。 Specifically, as shown in FIG. 15, it is assumed that the billing number "0000000001" is specified on the screen for performing payment processing (purchase input screen). In this case, referring to the invoice of FIG. 13 having this invoice number, the invoice includes "S001 water stake", "S002 territory", "S003 water filling / how to use" and "S004 split ground business". Since the four construction items are described, it means that the four construction items are indirectly specified through the screen for performing the payment processing. The four construction details may be directly input to the screen for performing the payment processing.

特定部102aは、図6の工事細目マスタ106eを参照して、「S001水杭」、「S002縄張り」および「S003水盛り・遣り方」と紐付く工程コードとして「008:仮設工事」を特定し、一方、「S004割りぐり地業」と紐付く工程コードとして「010:土工事」を特定する。 The specific unit 102a specifies "008: temporary construction" as a process code associated with "S001 water pile", "S002 territory" and "S003 water filling / how to use" with reference to the construction detail master 106e of FIG. On the other hand, "010: earthwork" is specified as the process code associated with "S004 split territory".

(取得処理)
取得部102bは、工程進捗管理データ106gを参照して、特定部102aで特定した工事工程識別データ(工程コード)に関する実績終了日を取得する。
(Acquisition process)
The acquisition unit 102b acquires the actual end date of the construction process identification data (process code) specified by the specific unit 102a with reference to the process progress management data 106g.

具体的には、図14に示す工程進捗管理データ106gを参照すると、「008:仮設工事」に関する実績終了日として、「2017/01/01」が入力されている(すなわち、工事が完了している)。しかしながら、図14に示す工程進捗管理データ106gを参照すると、楕円で囲んで示すように、「010:土工事」に関する実績終了日は未だ入力されておらず、空欄となっている(すなわち、工事が完了していない)。このように、実績終了日が未だ入力されていない工程コードが1つでも存在する場合には、取得部102bは、全体としては、「実績終了日を取得できなかった」こととなる。 Specifically, referring to the process progress management data 106g shown in FIG. 14, "2017/01/01" is input as the actual end date for "008: temporary construction" (that is, the construction is completed). There is). However, referring to the process progress management data 106g shown in FIG. 14, as shown by enclosing it in an ellipse, the actual end date for "010: earthwork" has not yet been entered and is blank (that is, construction). Is not completed). As described above, when there is even one process code for which the actual end date has not yet been input, the acquisition unit 102b as a whole means that the actual end date could not be acquired.

(警告処理)
警告部102cは、取得部102bで実績終了日を取得できなかった場合(すなわち、支払が「否」であると判定した場合)、所定の警告情報を出力する。
(Warning process)
The warning unit 102c outputs predetermined warning information when the acquisition unit 102b cannot acquire the actual end date (that is, when it is determined that the payment is "no").

具体的には、前記(取得処理)の項目で説明したように、本例においては、取得部102bは実績終了日を取得できなかったため、警告部102cは所定の警告情報を出力する。前記所定の警告情報は、特に限定されないが、例えば、図16に示すように、指定された工事細目識別データ(工事細目コード)で特定される工事細目(水杭、縄張り、水盛り・遣り方および割りぐり地業)についての支払処理を行ってよいかをオペレータに確認させるためのダイアログボックスである。 Specifically, as described in the item (acquisition process) above, in this example, since the acquisition unit 102b could not acquire the actual end date, the warning unit 102c outputs predetermined warning information. The predetermined warning information is not particularly limited, but for example, as shown in FIG. 16, the construction details (water pile, territory, water filling / usage) specified by the designated construction detail identification data (construction detail code). This is a dialog box for asking the operator to confirm whether or not to process the payment for the split land business.

なお、警告部102cは、前記所定の警告情報の出力対象として予めチェックされた工事細目識別データ(工事細目コード)と紐付く工事工程識別データ(工程コード)に関する実績終了日を、取得部102bで取得できなかった場合に、前記所定の警告情報を出力することとしてもよい。すなわち、図15の仕入入力画面で「消込」ボタンを押下し、消込ダイアログ画面起動後に、「水杭」、「縄張り」および「水盛り・遣り方」の項目にチェックを付けた際には、前記(特定処理)および前記(取得処理)で説明したように取得部102bがこれらの項目についての実績終了日を取得できているため、警告部102cは前記所定の警告情報を出力しない。これに対して、図15の仕入入力画面で「消込」ボタンを押下し、消込ダイアログ画面起動後に、「割りぐり地業」の項目にチェックを付けた際には、前記(特定処理)および前記(取得処理)で説明したように取得部102bがこの項目についての実績終了日を取得できていないため、警告部102cは前記所定の警告情報を出力する。 In addition, the warning unit 102c uses the acquisition unit 102b to obtain the actual end date of the construction process identification data (process code) associated with the construction detail identification data (construction detail code) checked in advance as the output target of the predetermined warning information. If it cannot be acquired, the predetermined warning information may be output. That is, when the "Apply" button is pressed on the purchase input screen of FIG. 15 and the items of "Water pile", "Territory" and "Water filling / how to use" are checked after the application dialog screen is started. The warning unit 102c does not output the predetermined warning information because the acquisition unit 102b can acquire the actual end date for these items as described in the above (specific processing) and the above (acquisition processing). .. On the other hand, when the "Apply" button is pressed on the purchase input screen of FIG. 15 and the item of "Distribution land business" is checked after the application dialog screen is started, the above (specific processing) is performed. ) And the above (acquisition process), since the acquisition unit 102b has not acquired the actual end date for this item, the warning unit 102c outputs the predetermined warning information.

(支払処理)
支払部102dは、取得部102bで実績終了日を取得できた場合(すなわち、支払が「可」であると判定した場合)、指定された工事細目識別データ(工事細目コード)で特定される工事細目についての支払処理を実行する。
(Payment processing)
When the payment unit 102d can acquire the actual end date by the acquisition unit 102b (that is, when it is determined that the payment is "acceptable"), the construction specified by the designated construction detail identification data (construction detail code). Perform payment processing for the item.

具体的には、本例では示していないが、仮に、図14に示す工程進捗管理データ106gにおいて、「008:仮設工事」に関する実績終了日だけではなく、「010:土工事」に関する実績終了日も入力されている場合には、取得部102bは、全体として、「実績終了日を取得できた」こととなる。この場合、図15の仕入入力画面において、ユーザが「消込」ボタンを選択すると、支払部102dは、指定された工事細目コード(S001、S002、S003およびS004)でそれぞれ特定される工事細目(水杭、縄張り、水盛り・遣り方および割りぐり地業)についての支払処理を実行し、支払金額100,000円の消込処理を実行する。 Specifically, although not shown in this example, in the process progress management data 106g shown in FIG. 14, not only the actual end date related to "008: temporary construction" but also the actual end date related to "010: earthwork". If is also entered, the acquisition unit 102b will be "acquired the actual end date" as a whole. In this case, when the user selects the "Apply" button on the purchase input screen of FIG. 15, the payment unit 102d uses the specified construction item code (S001, S002, S003, S004) to specify the construction item, respectively. Execute the payment process for (water pile, territory, water filling / how to use and split land business), and execute the application process for the payment amount of 100,000 yen.

以上説明したように、本実施形態に係る支払可否判定装置100によれば、支払処理の対象となる工事細目を含む工事工程が完了していない場合には警告情報を出力し、前記工事工程が完了している場合には前記支払処理を実行することにより、前記支払処理をスムースに行うことを可能とする。 As described above, according to the payment acceptability determination device 100 according to the present embodiment, when the construction process including the construction details to be paid is not completed, warning information is output and the construction process is performed. By executing the payment process when it is completed, it is possible to smoothly perform the payment process.

また、従来は、例えば、ある工事細目について支払処理を行う際には、当該工事細目を含む工事工程が完了したか否かを、工事工程ごとに異なる部署に問い合わせて確認する等の方法をとっていたため、非常に時間と手間がかかっていた。しかしながら、本実施形態に係る支払可否判定装置100によれば、前記[2.構成]で説明したように、工程進捗管理データ106gによって、各工事工程が完了したか否かという情報を一元管理することができるため、担当者は、前記ある工事細目についての支払処理をスムースに行うことができる。 In addition, conventionally, for example, when paying for a certain construction item, a method such as inquiring to a different department for each construction process to confirm whether or not the construction process including the construction item has been completed has been adopted. Because it was, it took a lot of time and effort. However, according to the payability determination device 100 according to the present embodiment, the above [2. As explained in [Structure], the process progress management data 106g can centrally manage the information as to whether or not each construction process has been completed, so that the person in charge can smoothly process the payment for a certain construction item. It can be carried out.

そして、本実施形態に係る支払可否判定装置100によれば、例えば、前記[2.構成]で説明したように、工事工程スケジュールにおける日付遅延が生じた際にアラート表示をすることができるため、工事工程スケジュールの正確かつ厳密な把握および管理を行うことができる。 Then, according to the payability determination device 100 according to the present embodiment, for example, the above [2. As described in [Structure], an alert can be displayed when a date delay occurs in the construction process schedule, so that the construction process schedule can be accurately and strictly grasped and managed.

更に、本実施形態に係る支払可否判定装置100が工事工程パターンマスタ106fを備えれば、前記[2.構成]で説明したように、各工事工程の予定開始日および予定終了日を自動セットすることができるため、各工事工程の管理漏れや設定漏れ等を防ぐことができる。 Further, if the payability determination device 100 according to the present embodiment includes the construction process pattern master 106f, the above [2. As described in [Structure], since the scheduled start date and scheduled end date of each construction process can be automatically set, it is possible to prevent management omissions and setting omissions of each construction process.

更に、本実施形態に係る支払可否判定装置100が担当者マスタ106aを備えれば、前記[2.構成]で説明したように、工程進捗管理データ106gにおける入力および参照可能範囲を担当者に応じて変えることが可能であるため、セキュリティの観点においても非常に優れている。 Further, if the payability determination device 100 according to the present embodiment includes the person in charge master 106a, the above [2. As described in [Structure], the input and reference range of the process progress management data 106g can be changed according to the person in charge, which is very excellent from the viewpoint of security.

[4.他の実施形態]
本発明は、上述した実施形態以外にも、特許請求の範囲に記載した技術的思想の範囲内において種々の異なる実施形態にて実施されてよいものである。
[4. Other embodiments]
In addition to the above-described embodiments, the present invention may be implemented in various different embodiments within the scope of the technical ideas described in the claims.

例えば、実施形態において説明した各処理のうち、自動的に行われるものとして説明した処理の全部または一部を手動的に行うこともでき、あるいは、手動的に行われるものとして説明した処理の全部または一部を公知の方法で自動的に行うこともできる。 For example, of each of the processes described in the embodiments, all or part of the processes described as being automatically performed may be manually performed, or all of the processes described as being performed manually. Alternatively, a part thereof can be automatically performed by a known method.

また、本明細書中や図面中で示した処理手順、制御手順、具体的名称、各処理の登録データや検索条件等のパラメータを含む情報、画面例、データベース構成については、特記する場合を除いて任意に変更することができる。 In addition, the processing procedure, control procedure, specific name, information including parameters such as registration data and search conditions of each processing, screen examples, and database configuration shown in the present specification and drawings are not specified unless otherwise specified. Can be changed arbitrarily.

また、支払可否判定装置100に関して、図示の各構成要素は機能概念的なものであり、必ずしも物理的に図示の如く構成されていることを要しない。 Further, with respect to the payability determination device 100, each component shown in the figure is a functional concept and does not necessarily have to be physically configured as shown in the figure.

例えば、支払可否判定装置100が備える処理機能、特に制御部102にて行われる各処理機能については、その全部または任意の一部を、CPUおよび当該CPUにて解釈実行されるプログラムにて実現してもよく、また、ワイヤードロジックによるハードウェアとして実現してもよい。尚、プログラムは、本実施形態で説明した処理を情報処理装置に実行させるためのプログラム化された命令を含む一時的でないコンピュータ読み取り可能な記録媒体に記録されており、必要に応じて支払可否判定装置100に機械的に読み取られる。すなわち、ROMまたはHDD(Hard Disk Drive)などの記憶部などには、OSと協働してCPUに命令を与え、各種処理を行うためのコンピュータプログラムが記録されている。このコンピュータプログラムは、RAMにロードされることによって実行され、CPUと協働して制御部を構成する。 For example, with respect to the processing functions included in the payability determination device 100, particularly each processing function performed by the control unit 102, all or any part thereof is realized by the CPU and a program interpreted and executed by the CPU. It may be realized as hardware by wired logic. The program is recorded on a non-temporary computer-readable recording medium including a programmed instruction for causing the information processing apparatus to execute the process described in the present embodiment, and a payment approval / disapproval determination is made as necessary. It is read mechanically by the device 100. That is, a computer program for giving instructions to the CPU in cooperation with the OS and performing various processes is recorded in a storage unit such as a ROM or an HDD (Hard Disk Drive). This computer program is executed by being loaded into RAM, and cooperates with a CPU to form a control unit.

また、このコンピュータプログラムは、支払可否判定装置100に対して任意のネットワークを介して接続されたアプリケーションプログラムサーバに記憶されていてもよく、必要に応じてその全部または一部をダウンロードすることも可能である。 Further, this computer program may be stored in an application program server connected to the payability determination device 100 via an arbitrary network, and all or a part thereof can be downloaded as needed. Is.

また、本実施形態で説明した処理を実行するためのプログラムを、一時的でないコンピュータ読み取り可能な記録媒体に格納してもよく、また、プログラム商品として構成することもできる。ここで、この「記録媒体」とは、メモリーカード、USB(Universal Serial Bus)メモリ、SD(Secure Digital)カード、フレキシブルディスク、光磁気ディスク、ROM、EPROM(Erasable Programmable Read Only Memory)、EEPROM(登録商標)(Electrically Erasable and Programmable Read Only Memory)、CD−ROM(Compact Disk Read Only Memory)、MO(Magneto−Optical disk)、DVD(Digital Versatile Disk)、および、Blu−ray(登録商標) Disc等の任意の「可搬用の物理媒体」を含むものとする。したがって、本明細書で説明したような処理又は処理方法を実行するためのプログラムを格納した記録媒体もまた本発明を構成することとなる。 Further, the program for executing the process described in the present embodiment may be stored in a non-temporary computer-readable recording medium, or may be configured as a program product. Here, the "recording medium" includes a memory card, a USB (Universal Serial Bus) memory, an SD (Secure Digital) card, a flexible disk, a magneto-optical disk, a ROM, an EPROM (Erasable Programmable Read Only Memory), and an EEPROM (registration). Trademarks) (Electrically Erasable and Programmable Read Only Memory), CD-ROM (Compact Disk Read Only Memory), MO (Magnet-Optical Disk), MO (Magnet-Optical Disk), MO (Magnet-Optical Disc), DVD (Digital), DVD (Digital) It shall include any "portable physical medium". Therefore, a recording medium containing a program for executing a process or a process method as described herein also constitutes the present invention.

また、「プログラム」とは、任意の言語または記述方法にて記述されたデータ処理方法であり、ソースコードまたはバイナリコード等の形式を問わない。なお、「プログラム」は必ずしも単一的に構成されるものに限られず、複数のモジュールやライブラリとして分散構成されるものや、OSに代表される別個のプログラムと協働してその機能を達成するものをも含む。なお、実施形態に示した各装置において記録媒体を読み取るための具体的な構成および読み取り手順ならびに読み取り後のインストール手順等については、周知の構成や手順を用いることができる。 The "program" is a data processing method described in any language or description method, regardless of the format such as source code or binary code. The "program" is not necessarily limited to a single program, but is distributed as a plurality of modules or libraries, or cooperates with a separate program represented by the OS to achieve its function. Including things. It should be noted that well-known configurations and procedures can be used for the specific configuration and reading procedure for reading the recording medium in each device shown in the embodiment, the installation procedure after reading, and the like.

記憶部106に格納される各種のデータベース等は、RAM、ROM等のメモリ装置、ハードディスク等の固定ディスク装置、フレキシブルディスク、および、光ディスク等のストレージ手段であり、各種処理やウェブサイト提供に用いる各種のプログラム、テーブル、データベース、および、ウェブページ用ファイル等を格納する。 Various databases and the like stored in the storage unit 106 are memory devices such as RAM and ROM, fixed disk devices such as hard disks, flexible disks, and storage means such as optical disks, and are used for various processes and website provision. Stores programs, tables, databases, files for web pages, etc.

また、支払可否判定装置100は、既知のパーソナルコンピュータまたはワークステーション等の情報処理装置として構成してもよく、また、任意の周辺装置が接続された当該情報処理装置として構成してもよい。また、支払可否判定装置100は、当該装置に本実施形態で説明した処理を実現させるソフトウェア(プログラムまたはデータ等を含む)を実装することにより実現してもよい。 Further, the payment acceptability determination device 100 may be configured as an information processing device such as a known personal computer or workstation, or may be configured as the information processing device to which an arbitrary peripheral device is connected. Further, the payability determination device 100 may be realized by mounting software (including a program or data) that realizes the processing described in the present embodiment on the device.

更に、装置の分散・統合の具体的形態は図示するものに限られず、その全部または一部を、各種の付加等に応じてまたは機能負荷に応じて、任意の単位で機能的または物理的に分散・統合して構成することができる。すなわち、上述した実施形態を任意に組み合わせて実施してもよく、実施形態を選択的に実施してもよい。 Further, the specific form of distribution / integration of the device is not limited to the one shown in the drawing, and all or a part thereof may be functionally or physically in an arbitrary unit according to various additions or functional loads. It can be distributed and integrated. That is, the above-described embodiments may be arbitrarily combined and implemented, or the embodiments may be selectively implemented.

本発明は、特に、不動産業界や建設業界において有用である。 The present invention is particularly useful in the real estate industry and the construction industry.

100 支払可否判定装置
102 制御部
102a 特定部
102b 取得部
102c 警告部
102d 支払部
104 通信インターフェース部
106 記憶部
106a 担当者マスタ
106b 部門マスタ
106c 取引先マスタ
106d 工事工程マスタ
106e 工事細目マスタ
106f 工事工程パターンマスタ
106g 工程進捗管理データ
108 入出力インターフェース部
112 入力装置
114 出力装置
200 サーバ
300 ネットワーク
100 Payability judgment device
102 Control unit
102a Specific part
102b acquisition unit
102c Warning section
102d payment department
104 Communication interface section
106 Storage
106a Person in charge master
106b Department Master
106c Account Master
106d Construction process master
106e Construction details master
106f Construction process pattern master
106g Process progress management data
108 Input / output interface section
112 Input device
114 Output device 200 Server 300 Network

Claims (5)

制御部および記憶部を備える支払可否判定装置であって、
前記記憶部には、
工事細目識別データと工事工程識別データとを含む工事細目マスタと、
工事工程識別データと当該工事工程識別データで特定される工事工程が完了している場合における当該工事工程の完了日付である実績終了日とを含む工程進捗管理データと、
が格納されており、
前記制御部は、
前記工事細目マスタを参照して、支払処理を行うための画面で指定された工事細目識別データと紐付く工事工程識別データを特定する特定手段と、
前記工程進捗管理データを参照して、前記特定手段で特定した工事工程識別データに関する実績終了日を取得する取得手段と、
前記取得手段で前記実績終了日を取得できなかった場合、所定の警告情報を出力する警告手段と、
前記取得手段で前記実績終了日を取得できた場合、前記指定された工事細目識別データで特定される工事細目についての前記支払処理を実行する支払手段と、
を備えること、
を特徴とする支払可否判定装置。
A payability determination device including a control unit and a storage unit.
In the storage unit
A construction detail master that includes construction detail identification data and construction process identification data,
Process progress management data including the construction process identification data and the actual end date, which is the completion date of the construction process when the construction process specified by the construction process identification data is completed,
Is stored,
The control unit
With reference to the construction item master, a specific means for identifying the construction process identification data associated with the construction item identification data specified on the screen for performing payment processing, and
With reference to the process progress management data, an acquisition means for acquiring the actual end date of the construction process identification data specified by the specific means, and
When the achievement end date cannot be acquired by the acquisition means, a warning means for outputting predetermined warning information and a warning means.
When the actual end date can be acquired by the acquisition means, the payment means for executing the payment process for the construction item specified by the designated construction item identification data and the payment means.
To prepare
A payment acceptance determination device characterized by.
前記警告手段は、
前記所定の警告情報の出力対象として予めチェックされた工事細目識別データと紐付く工事工程識別データに関する実績終了日を、前記取得手段で取得できなかった場合、前記所定の警告情報を出力すること、
を特徴とする請求項1に記載の支払可否判定装置。
The warning means
If the actual end date related to the construction process identification data associated with the construction detail identification data checked in advance as the output target of the predetermined warning information cannot be acquired by the acquisition means, the predetermined warning information is output.
The payment acceptability determination device according to claim 1.
前記所定の警告情報が、
前記指定された工事細目識別データで特定される工事細目についての前記支払処理を行ってよいかをオペレータに確認させるためのダイアログボックスであること、
を特徴とする請求項1または2に記載の支払可否判定装置。
The predetermined warning information
A dialog box for asking the operator to confirm whether or not to perform the payment processing for the construction item specified by the specified construction item identification data.
The payment acceptability determination device according to claim 1 or 2.
制御部および記憶部を備える情報処理装置で実行される支払可否判定方法であって、
前記記憶部には、
工事細目識別データと工事工程識別データとを含む工事細目マスタと、
工事工程識別データと当該工事工程識別データで特定される工事工程が完了している場合における当該工事工程の完了日付である実績終了日とを含む工程進捗管理データと、
が格納されており、
前記制御部で実行される、
前記工事細目マスタを参照して、支払処理を行うための画面で指定された工事細目識別データと紐付く工事工程識別データを特定する特定ステップと、
前記工程進捗管理データを参照して、前記特定ステップで特定した工事工程識別データに関する実績終了日を取得する取得ステップと、
前記取得ステップで前記実績終了日を取得できなかった場合、所定の警告情報を出力する警告ステップと、
前記取得ステップで前記実績終了日を取得できた場合、前記指定された工事細目識別データで特定される工事細目についての前記支払処理を実行する支払ステップと、
を含むこと、
を特徴とする支払可否判定方法。
A paymentability determination method executed by an information processing device including a control unit and a storage unit.
In the storage unit
A construction detail master that includes construction detail identification data and construction process identification data,
Process progress management data including the construction process identification data and the actual end date, which is the completion date of the construction process when the construction process specified by the construction process identification data is completed,
Is stored,
Executed by the control unit,
With reference to the construction item master, a specific step for identifying the construction process identification data associated with the construction item identification data specified on the screen for performing payment processing, and
With reference to the process progress management data, an acquisition step for acquiring the actual end date of the construction process identification data specified in the specific step, and
When the achievement end date cannot be acquired in the acquisition step, a warning step for outputting predetermined warning information and a warning step
When the actual end date can be acquired in the acquisition step, the payment step for executing the payment process for the construction item specified by the specified construction item identification data, and the payment step.
Including,
A method for determining whether or not payment can be made.
制御部および記憶部を備える情報処理装置に実行させるための支払可否判定プログラムであって、
前記記憶部には、
工事細目識別データと工事工程識別データとを含む工事細目マスタと、
工事工程識別データと当該工事工程識別データで特定される工事工程が完了している場合における当該工事工程の完了日付である実績終了日とを含む工程進捗管理データと、
が格納されており、
前記制御部に実行させるための、
前記工事細目マスタを参照して、支払処理を行うための画面で指定された工事細目識別データと紐付く工事工程識別データを特定する特定ステップと、
前記工程進捗管理データを参照して、前記特定ステップで特定した工事工程識別データに関する実績終了日を取得する取得ステップと、
前記取得ステップで前記実績終了日を取得できなかった場合、所定の警告情報を出力する警告ステップと、
前記取得ステップで前記実績終了日を取得できた場合、前記指定された工事細目識別データで特定される工事細目についての前記支払処理を実行する支払ステップと、
を含むこと、
を特徴とする支払可否判定プログラム。
It is a payment approval / disapproval determination program to be executed by an information processing device including a control unit and a storage unit.
In the storage unit
A construction detail master that includes construction detail identification data and construction process identification data,
Process progress management data including the construction process identification data and the actual end date, which is the completion date of the construction process when the construction process specified by the construction process identification data is completed,
Is stored,
To make the control unit execute
With reference to the construction item master, a specific step for identifying the construction process identification data associated with the construction item identification data specified on the screen for performing payment processing, and
With reference to the process progress management data, an acquisition step for acquiring the actual end date of the construction process identification data specified in the specific step, and
When the achievement end date cannot be acquired in the acquisition step, a warning step for outputting predetermined warning information and a warning step
When the actual end date can be acquired in the acquisition step, the payment step for executing the payment process for the construction item specified by the specified construction item identification data, and the payment step.
Including,
A payment acceptance judgment program characterized by.
JP2017150207A 2017-08-02 2017-08-02 Payment / non-payment judgment device, payment / non-payment judgment method, and payment / non-payment judgment program Active JP6917237B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017150207A JP6917237B2 (en) 2017-08-02 2017-08-02 Payment / non-payment judgment device, payment / non-payment judgment method, and payment / non-payment judgment program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017150207A JP6917237B2 (en) 2017-08-02 2017-08-02 Payment / non-payment judgment device, payment / non-payment judgment method, and payment / non-payment judgment program

Publications (2)

Publication Number Publication Date
JP2019028893A JP2019028893A (en) 2019-02-21
JP6917237B2 true JP6917237B2 (en) 2021-08-11

Family

ID=65478770

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017150207A Active JP6917237B2 (en) 2017-08-02 2017-08-02 Payment / non-payment judgment device, payment / non-payment judgment method, and payment / non-payment judgment program

Country Status (1)

Country Link
JP (1) JP6917237B2 (en)

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002117099A (en) * 2000-10-10 2002-04-19 Kensuke Tomori Method and server for managing progress of construction work
JP2003150669A (en) * 2001-11-12 2003-05-23 Tokyo Electric Power Co Inc:The Managing method for building construction
JP2003288457A (en) * 2002-03-27 2003-10-10 Web I Laboratories Inc Data management system and object repository server available for the same system
JP2010267219A (en) * 2009-05-18 2010-11-25 Kandenko Co Ltd Work information management system
JP5959578B2 (en) * 2014-07-03 2016-08-02 株式会社三井住友銀行 Proxy payment system, management server, program, and method thereof
JP5905146B2 (en) * 2014-07-30 2016-04-20 明豊ファシリティワークス株式会社 Project progress management system and computer program
US10402792B2 (en) * 2015-08-13 2019-09-03 The Toronto-Dominion Bank Systems and method for tracking enterprise events using hybrid public-private blockchain ledgers

Also Published As

Publication number Publication date
JP2019028893A (en) 2019-02-21

Similar Documents

Publication Publication Date Title
JP2023524043A (en) Model, cost and schedule mapping system for large capital projects
Chan et al. Materials handling system simulation in precast viaduct construction: Modeling, analysis, and implementation
JP4602819B2 (en) Pile construction management method, pile construction management system, and management server for pile construction management system
JP6917237B2 (en) Payment / non-payment judgment device, payment / non-payment judgment method, and payment / non-payment judgment program
Ottesen et al. Bare facts and benefits of resource-loaded CPM schedules
Collins Incorporating BIM into architectural precast concrete fabrication
Shirole et al. BrIM for project delivery and the life-cycle: state of the art
Pheng Project Management for the Built Environment
JP5414601B2 (en) Construction plan creation device and program
Funtík et al. Site plan development: Tower crane placement based on data obtained from IFC file
Pheng et al. Project Scope Management
WO2021064877A1 (en) Work management device, work management method, and recording medium
Pheng et al. Project management processes
Marchini et al. Building information modeling (BIM) application in civil constructions intending the increase of service life
Chua et al. Application of component state model for identifying constructability conflicts in a merged construction schedule
JP2016177720A (en) Workflow device, control method thereof, and program
EP2590119A1 (en) Project report generator
KR20060097410A (en) Supervisor information system and it's control method for supervision of construction work
Hu et al. Applications of configuration management in BIM Models management during the construction phase
Aibinu et al. Project and regulatory control strategies for minimizing and resolving defects and conflicts in the low-rise residential home-building process
Pheng et al. Project Time Management
Pheng et al. Project integration management
Onuorah et al. Cost Management and Control of Building Projects in Nigeria; The Role of The Architect
Meyer Development and testing of an automated time-motion detector for construction activities
JP2020095401A (en) Automatic inspection processing device, automatic inspection processing method, and automatic inspection processing program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200730

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210414

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210622

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210719

R150 Certificate of patent or registration of utility model

Ref document number: 6917237

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150