JP6910101B1 - Formwork equipment for concrete structures and formwork methods for concrete structures - Google Patents

Formwork equipment for concrete structures and formwork methods for concrete structures Download PDF

Info

Publication number
JP6910101B1
JP6910101B1 JP2020094282A JP2020094282A JP6910101B1 JP 6910101 B1 JP6910101 B1 JP 6910101B1 JP 2020094282 A JP2020094282 A JP 2020094282A JP 2020094282 A JP2020094282 A JP 2020094282A JP 6910101 B1 JP6910101 B1 JP 6910101B1
Authority
JP
Japan
Prior art keywords
formwork
holding
pair
concrete
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020094282A
Other languages
Japanese (ja)
Other versions
JP2021188361A (en
Inventor
徹 高森
徹 高森
武夫 月折
武夫 月折
Original Assignee
株式会社高長建設
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社高長建設 filed Critical 株式会社高長建設
Priority to JP2020094282A priority Critical patent/JP6910101B1/en
Application granted granted Critical
Publication of JP6910101B1 publication Critical patent/JP6910101B1/en
Publication of JP2021188361A publication Critical patent/JP2021188361A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

【課題】セパレータを用いることなく型枠間の間隔を保持することができるコンクリート構造物用型枠装置の提供。【解決手段】一対の型枠1と、一対の型枠1のそれぞれの外側面に固定される支持部材2と、支持部材2のそれぞれの外側面に長手方向と直交するするように間隔を置いて配設される保持部材5とを備え、保持部材5は、支持部材2の外側に固定される垂直部6と、垂直部6の上端から支持部材2とは反対方向に延びる水平部7とから形成されるとともに、垂直部6と水平部7とが交叉するコーナーには、長手方向に間隔を置いて配設される複数の保持部材5を連結して保持するための連結部材8が配設されており、一対の型枠1をまたいで左右の保持部材5の水平部7の上面には一対の型枠1の間隔を保持するための間隔保持梁10が載置され、水平部7と間隔保持梁10とは締付金具11で一体に固定される。【選択図】図1PROBLEM TO BE SOLVED: To provide a formwork device for a concrete structure capable of maintaining a space between formwork without using a separator. SOLUTION: A pair of molds 1, a support member 2 fixed to each outer surface of the pair of molds 1, and each outer surface of the support member 2 are spaced so as to be orthogonal to the longitudinal direction. The holding member 5 includes a vertical portion 6 fixed to the outside of the support member 2, and a horizontal portion 7 extending from the upper end of the vertical portion 6 in the direction opposite to the support member 2. At the corner where the vertical portion 6 and the horizontal portion 7 intersect, a connecting member 8 for connecting and holding a plurality of holding members 5 arranged at intervals in the longitudinal direction is arranged. On the upper surface of the horizontal portion 7 of the left and right holding members 5 straddling the pair of molds 1, a spacing beam 10 for holding the spacing between the pair of molds 1 is placed, and the horizontal portion 7 is provided. And the interval holding beam 10 are integrally fixed by the tightening metal fitting 11. [Selection diagram] Fig. 1

Description

本発明は、例えば、地中梁等を築造するときに使用されるコンクリート構造物用型枠装置及びコンクリート構造物の型枠工法に関する。 The present invention relates to, for example, a formwork device for a concrete structure and a formwork method for a concrete structure used when constructing an underground beam or the like.

一般的に、建物の基礎間に設けられる地中梁等を築造するときは、根切りで溝を掘った後、ベース部分に捨コンクリートを打設し、その後、捨コンクリートの上に地中梁の配筋を行い、鉄筋工事後に木板等の型枠材をクレーン等で搬入して型枠の建て込みを行い、足場を組立後に、コンクリートを打設し、コンクリートが固まった後に型枠及び足場を解体し、現場から搬出するという順序で作業が行われる。 Generally, when constructing underground beams, etc. to be provided between the foundations of a building, after digging a groove by root cutting, waste concrete is poured into the base part, and then the underground beams are placed on the waste concrete. After the reinforcement work, the formwork material such as wooden boards is carried in by a crane etc. to build the formwork, and after assembling the scaffold, concrete is poured, and after the concrete is hardened, the formwork and scaffold are installed. The work is done in the order of disassembling and unloading from the site.

上記の地中梁等の築造に使用される型枠としては、従来、例えば、コンクリートを打設する側の面が平坦に形成された一対の型枠と、型枠間の間隔を設定するための複数のセパレータとを備え、セパレータにより型枠に作用するコンクリートの圧力を支持するものが知られている(以下、「従来技術1」という。例えば、特許文献1参照。)。 As the formwork used for the construction of the above-mentioned underground beam or the like, conventionally, for example, in order to set a pair of formwork in which the surface on the side where concrete is placed is formed flat and a space between the formwork. It is known that the separator is provided with a plurality of separators to support the pressure of concrete acting on the formwork by the separator (hereinafter, referred to as "conventional technique 1". For example, refer to Patent Document 1).

また、地中梁等の築造に使用される型枠として、一対の型枠と、型枠間の間隔を設定するための複数のセパレータとを備え、各型枠の外側に夫々一対の足場ブラケット及び設置桿を設け、各ブラケットの上部に設けられた水平方向の足場受け部材の上面に足場板を載置して、型枠の両側に型枠上端より高い位置に足場板を設置するものが知られている(以下、「従来技術2」という。例えば、特許文献2参照。)。 In addition, as formwork used for construction of underground beams, etc., a pair of formwork and a plurality of separators for setting the distance between the formwork are provided, and a pair of scaffolding brackets are provided on the outside of each formwork. And an installation rod is provided, the scaffolding plate is placed on the upper surface of the horizontal scaffolding receiving member provided on the upper part of each bracket, and the scaffolding plate is installed on both sides of the formwork at a position higher than the upper end of the formwork. It is known (hereinafter referred to as "conventional technique 2". For example, refer to Patent Document 2).

特開2005−330649号公報Japanese Unexamined Patent Publication No. 2005-330649 特開2005−256291号公報Japanese Unexamined Patent Publication No. 2005-256291

しかしながら、従来技術1においては、型枠間の間隔を設定するための複数のセパレータを備える必要があり、これらセパレータによる型枠間の間隔の設定が煩雑であるととともにセパレータの装着及び型枠の解体の作業に要する時間が多くなるいう問題があった。
また、従来技術2においては、型枠間の間隔を設定するための複数のセパレータを備えた型枠の外側に足場ブラケット及び設置桿を設けるため、セパレータの装着及び脱着する作業が大変であるとともに、セパレータの他に足場板を設置するための特別の部材を設ける必要であるという問題があった。
However, in the prior art 1, it is necessary to provide a plurality of separators for setting the spacing between the molds, and the setting of the spacing between the molds by these separators is complicated, and the separator is attached and the mold is attached. There was a problem that the time required for dismantling work increased.
Further, in the prior art 2, since the scaffolding bracket and the installation rod are provided on the outside of the formwork provided with a plurality of separators for setting the distance between the formwork, it is difficult to attach and detach the separators. In addition to the separator, there is a problem that it is necessary to provide a special member for installing the scaffolding plate.

本発明は、従来技術の問題を解決するためになされたもので、一対の型枠の上部にこれら一対の型枠の間隔を保持する間隔保持梁を設けることにより、セパレータを用いることなく型枠間の間隔を保持することができるコンクリート構造物用型枠装置及びコンクリート構造物の型枠工法を提供することを目的とする。
また、本発明は、前記間隔保持梁を利用して型枠の上方に足場を設置することにより、足場設置のための特別な部材を必要とすることなく足場の設置が可能であるコンクリート構造物用型枠装置及びコンクリート構造物の型枠工法を提供することを目的とする。
The present invention has been made to solve the problems of the prior art, and by providing a space-holding beam for holding the space between the pair of formwork on the upper part of the pair of formwork, the formwork without using a separator is provided. It is an object of the present invention to provide a formwork device for a concrete structure and a formwork method for a concrete structure capable of maintaining a space between them.
Further, according to the present invention, by installing the scaffolding above the formwork by using the space-holding beam, the scaffolding can be installed without requiring a special member for installing the scaffolding. It is an object of the present invention to provide a formwork device and a formwork method for concrete structures.

上記目的を達成するため本発明のコンクリート構造物用型枠装置は、第1に、コンクリート構造物を打設するための一対の型枠と、前記一対の型枠のそれぞれの外側面に固定される支持部材と、前記支持部材のそれぞれの外側面に長手方向と直交するするように間隔を置いて配設される保持部材とを備え、
前記保持部材は、前記支持部材の外側に固定される垂直部と、前記垂直部の上端から前記支持部材とは反対方向に延びる水平部とから形成されるとともに、前記垂直部と前記水平部とが交叉するコーナーには、長手方向に間隔を置いて配設される複数の前記保持部材を連結して保持するための連結部材が配設されており、
前記一対の型枠をまたいで前記左右の保持部材の水平部の上面には前記一対の型枠の間隔を保持するための間隔保持梁が載置され、前記水平部と前記間隔保持梁梁とは締付金具で一体に固定されることを特徴としている。
この特徴によれば、間隔保持梁を設けることにより、従来のセパレータを用いることなく型枠間の間隔を設定することができるとともに、間隔保持梁と保持部材とが協働して打設されるコンクリートの内圧に抗して型枠を強固に保持することができる。
In order to achieve the above object, the formwork device for a concrete structure of the present invention is firstly fixed to a pair of formwork for placing a concrete structure and the outer surfaces of the pair of formwork. Support members and holding members arranged at intervals on the outer surfaces of the support members so as to be orthogonal to the longitudinal direction.
The holding member is formed of a vertical portion fixed to the outside of the support member and a horizontal portion extending from the upper end of the vertical portion in a direction opposite to the support member, and the vertical portion and the horizontal portion. At the corners where the members intersect, a connecting member for connecting and holding a plurality of the holding members arranged at intervals in the longitudinal direction is arranged.
Spacing beams for holding the spacing between the pair of formwork are placed on the upper surface of the horizontal portion of the left and right holding members straddling the pair of formwork, and the horizontal portion and the spacing beam beam. Is characterized by being integrally fixed with a tightening bracket.
According to this feature, by providing the spacing beam, the spacing between the formwork can be set without using the conventional separator, and the spacing beam and the holding member are driven in cooperation with each other. The formwork can be firmly held against the internal pressure of concrete.

また、本発明のコンクリート構造物用型枠装置は、第2に、第1の特徴において、前記保持部材の前記垂直部の下部と前記水平部の外端部との間を結ぶ位置には前記垂直部と前記水平部となす角度を維持するための伸縮ジャッキが設けられることを特徴としている。
この特徴によれば、保持部材の垂直部と水平部7との間の角度を維持することができ、ひいては、型枠に作用するコンクリートの内圧に抗して型枠をより一層強固に保持することができる。
Secondly, in the first feature, the formwork device for a concrete structure of the present invention is located at a position connecting a lower portion of the vertical portion of the holding member and an outer end portion of the horizontal portion. It is characterized in that a telescopic jack for maintaining an angle between the vertical portion and the horizontal portion is provided.
According to this feature, the angle between the vertical portion and the horizontal portion 7 of the holding member can be maintained, and thus the formwork is held more firmly against the internal pressure of the concrete acting on the formwork. be able to.

また、本発明のコンクリート構造物用型枠装置は、第3に、第1または第2の特徴において、前記間隔保持梁の両端面には端部部材が固着され、これら端部部材のそれぞれには前記保持部材の前記水平部の外端面を押圧又は引っ張り可能なジャッキベースが装着されることを特徴としている。
この特徴によれば、保持部材を支持部材及び型枠に向けて押圧することができ、型枠に作用するコンクリートの内圧に抗して型枠をより一層強固に保持することができる。また、保持部材を反対方向に引っ張ることにより、コンクリート構造物から型枠を剥離することができる。
Further, in the formwork device for a concrete structure of the present invention, thirdly, in the first or second feature, end members are fixed to both end faces of the interval holding beam, and the end members are attached to each of the end members. Is characterized in that a jack base capable of pressing or pulling the outer end surface of the horizontal portion of the holding member is attached.
According to this feature, the holding member can be pressed toward the support member and the formwork, and the formwork can be held more firmly against the internal pressure of the concrete acting on the formwork. Further, the formwork can be peeled off from the concrete structure by pulling the holding member in the opposite direction.

また、本発明のコンクリート構造物用型枠装置は、第4に、第1ないし第3のいずれかの特徴において、前記間隔保持梁の上面には、コンクリート打設作業に使用するための仮設足場が設置されることを特徴としている。
この特徴によれば、足場設置のための特別な部材を必要とすることなく間隔保持梁を利用して足場の設置ができるため、装置の構成が簡単化できるとともに装置の組み立て作業を短時間で行うことができる。
Further, in the formwork device for a concrete structure of the present invention, fourthly, in any one of the first to third features, a temporary scaffold for use in concrete placing work is placed on the upper surface of the interval holding beam. Is characterized by being installed.
According to this feature, the scaffold can be installed by using the interval holding beam without the need for special members for scaffold installation, so that the configuration of the device can be simplified and the assembly work of the device can be completed in a short time. It can be carried out.

本発明のコンクリート構造物の型枠工法は、根切りで溝を掘った後、ベース部分に捨コンクリートを打設し、その後、捨コンクリートの上に地中梁の配筋を行い、鉄筋工事後に型枠装置を搬入して型枠装置の空間内へのコンクリートを打設と、型枠装置の次打設位置への移動とを交互に繰り返して長手方向に連続するコンクリート構造物を築造する工法において、
型枠の外側面に支持部材を固定し、前記支持部材の外側面に長手方向と直交するするように間隔を置いて複数の保持部材を固定し、前記複数の保持部材を連結部材より長手方向において連結することにより構成される半割型枠装置を一対形成しておき、前記一対の半割型枠装置を所定の間隔をもって対向配置させた状態で前記一対の半割型枠装置の上部をまたいで前記半割型枠装置のそれぞれの前記保持部材の上面に間隔保持梁を載置して前記保持部材と前記間隔保持梁とを締付金具で一体に固定して前記一対の半割枠装置を一体に組み立て、その後、前記間隔保持梁の上面に仮設足場を設置することにより型枠装置を形成し、コンクリート構造物を築造する現場に前記型枠装置を搬入してジャッキベースにより前記型枠装置の据え付けを行い、前記型枠の空間内にコンクリートを打設し、コンクリートの硬化後、前記型枠装置を次の打設位置に移動させることを特徴としている。
この特徴によれば、間隔保持梁を設けることにより、従来のセパレータを用いることがないため型枠装置の組み立てが簡単であるとともに、間隔保持梁を利用して足場の設置ができるため、足場設置のために特別な部材を設ける必要がなく、足場の設置装置の組み立て作業を短時間で行うことができる。
In the formwork method of the concrete structure of the present invention, after digging a groove by root cutting, waste concrete is placed in the base portion, and then underground beams are arranged on the waste concrete, and after the reinforcing bar construction. A method of constructing a concrete structure that is continuous in the longitudinal direction by alternately repeating the loading of the formwork device and placing concrete in the space of the formwork device and moving the formwork device to the next placement position. In
A support member is fixed to the outer surface of the formwork, a plurality of holding members are fixed to the outer surface of the support member at intervals so as to be orthogonal to the longitudinal direction, and the plurality of holding members are fixed in the longitudinal direction from the connecting member. A pair of half-split formwork devices are formed by connecting them in the above, and the upper part of the pair of half-split formwork devices is placed in a state where the pair of half-split formwork devices are arranged facing each other at a predetermined interval. Further, the spacing holding beam is placed on the upper surface of each of the holding members of the half-split formwork device, and the holding member and the spacing holding beam are integrally fixed by a tightening metal fitting to integrally fix the pair of half-split frames. The formwork device is formed by integrally assembling the device and then installing a temporary scaffold on the upper surface of the space holding beam, and the formwork device is carried to the site where the concrete structure is constructed and the formwork is carried by the jack base. The formwork device is installed, concrete is cast in the space of the formwork, and after the concrete is hardened, the formwork device is moved to the next casting position.
According to this feature, by providing the spacing beam, it is easy to assemble the formwork device because the conventional separator is not used, and the scaffolding can be installed by using the spacing beam, so that the scaffolding can be installed. Therefore, it is not necessary to provide a special member, and the scaffolding installation device can be assembled in a short time.

本発明は、以下のような優れた効果を奏する。
(1)コンクリート構造物を打設するための一対の型枠と、前記一対の型枠のそれぞれの外側面に固定される支持部材と、前記支持部材のそれぞれの外側面に長手方向と直交するするように間隔を置いて配設される保持部材とを備え、
前記保持部材は、前記支持部材の外側に固定される垂直部と、前記垂直部の上端から前記支持部材とは反対方向に延びる水平部とから形成されるとともに、前記垂直部と前記水平部とが交叉するコーナーには、長手方向に間隔を置いて配設される複数の前記保持部材を連結して保持するための連結部材が配設されており、前記一対の型枠をまたいで前記左右の保持部材の水平部の上面には前記一対の型枠の間隔を保持するための間隔保持梁が載置され、前記水平部と前記間隔保持梁梁とは締付金具で一体に固定されることにより、従来のセパレータを用いることなく型枠間の間隔を設定することができるとともに、間隔保持梁と保持部材とが協働して打設されるコンクリートの内圧に抗して型枠を強固に保持することができる。
The present invention has the following excellent effects.
(1) A pair of formwork for placing a concrete structure, a support member fixed to each outer surface of the pair of formwork, and each outer surface of the support member orthogonal to the longitudinal direction. With holding members arranged at intervals so as to
The holding member is formed of a vertical portion fixed to the outside of the support member and a horizontal portion extending from the upper end of the vertical portion in a direction opposite to the support member, and the vertical portion and the horizontal portion. At the corners where the members intersect, connecting members for connecting and holding a plurality of the holding members arranged at intervals in the longitudinal direction are arranged, and the left and right sides straddle the pair of molds. A space-holding beam for holding the space between the pair of formwork is placed on the upper surface of the horizontal part of the holding member, and the horizontal part and the space-holding beam are integrally fixed by a tightening metal fitting. As a result, the distance between the formwork can be set without using a conventional separator, and the formwork is strengthened against the internal pressure of the concrete cast in which the space holding beam and the holding member cooperate with each other. Can be held in.

(2)前記保持部材の前記垂直部の下部と前記水平部の外端部との間を結ぶ位置には前記垂直部と前記水平部となす角度を維持するための伸縮ジャッキが設けられることにより、保持部材の垂直部と水平部との間の角度を維持することができ、ひいては、型枠に作用するコンクリートの内圧に抗して型枠をより一層強固に保持することができる。 (2) A telescopic jack for maintaining an angle between the vertical portion and the horizontal portion is provided at a position connecting the lower portion of the vertical portion of the holding member and the outer end portion of the horizontal portion. , The angle between the vertical portion and the horizontal portion of the holding member can be maintained, and the formwork can be held more firmly against the internal pressure of the concrete acting on the formwork.

(3)前記間隔保持梁の両端面には端部部材が固着され、これら端部部材のそれぞれには前記保持部材の前記水平部の外端面を押圧又は引っ張り可能なジャッキベースが装着されることにより、保持部材を支持部材及び型枠に向けて押圧することができ、型枠に作用するコンクリートの内圧に抗して型枠をより一層強固に保持することができる。また、保持部材を反対方向に引っ張ることにより、コンクリート構造物から型枠を剥離することができる。 (3) End members are fixed to both end faces of the spacing beam, and a jack base capable of pressing or pulling the outer end face of the horizontal portion of the holding member is attached to each of these end members. As a result, the holding member can be pressed toward the support member and the formwork, and the formwork can be held more firmly against the internal pressure of the concrete acting on the formwork. Further, the formwork can be peeled off from the concrete structure by pulling the holding member in the opposite direction.

(4)前記間隔保持梁の上面には、コンクリート打設作業に使用するための仮設足場が設置されることにより、足場設置のための特別な部材を必要とすることなく間隔保持梁を利用して足場の設置ができるため、装置の構成が簡単化できるとともに装置の組み立て作業を短時間で行うことができる。 (4) By installing a temporary scaffolding for use in concrete placing work on the upper surface of the spacing beam, the spacing beam can be used without the need for special members for scaffolding installation. Since the scaffolding can be installed, the configuration of the device can be simplified and the assembly work of the device can be performed in a short time.

(5)根切りで溝を掘った後、ベース部分に捨コンクリートを打設し、その後、捨コンクリートの上に地中梁の配筋を行い、鉄筋工事後に型枠装置を搬入して型枠装置の空間内へのコンクリートを打設と、型枠装置の次打設位置への移動とを交互に繰り返して長手方向に連続するコンクリート構造物を築造する工法において、
型枠の外側面に支持部材を固定し、前記支持部材の外側面に長手方向と直交するするように間隔を置いて複数の保持部材を固定し、前記複数の保持部材を連結部材より長手方向において連結することにより構成される半割型枠装置を一対形成しておき、前記一対の半割型枠装置を所定の間隔をもって対向配置させた状態で前記一対の半割型枠装置の上部をまたいで前記半割型枠装置のそれぞれの前記保持部材の上面に間隔保持梁を載置して前記保持部材と前記間隔保持梁とを締付金具で一体に固定して前記一対の半割枠装置を一体に組み立て、その後、前記間隔保持梁の上面に仮設足場を設置することにより型枠装置を形成し、コンクリート構造物を築造する現場に前記型枠装置を搬入してジャッキベースにより前記型枠装置の据え付けを行い、前記型枠の空間内にコンクリートを打設し、コンクリートの硬化後、前記型枠装置を次の打設位置に移動させることにより、間隔保持梁を設けることにより、従来のセパレータを用いることがないため型枠装置の組み立てが簡単であるとともに、間隔保持梁を利用して足場の設置ができるため、足場設置のために特別な部材を設ける必要がなく、足場の設置装置の組み立て作業を短時間で行うことができる。
(5) After digging a groove by root cutting, waste concrete is placed on the base part, then underground beams are arranged on the waste concrete, and formwork equipment is carried in after reinforcement work to form the formwork. In a construction method in which concrete is placed in the space of the equipment and the formwork equipment is moved to the next placement position alternately to construct a concrete structure that is continuous in the longitudinal direction.
A support member is fixed to the outer surface of the formwork, a plurality of holding members are fixed to the outer surface of the support member at intervals so as to be orthogonal to the longitudinal direction, and the plurality of holding members are fixed in the longitudinal direction from the connecting member. A pair of half-split formwork devices are formed by connecting them in the above, and the upper part of the pair of half-split formwork devices is placed in a state where the pair of half-split formwork devices are arranged facing each other at a predetermined interval. Further, the spacing holding beam is placed on the upper surface of each of the holding members of the half-split formwork device, and the holding member and the spacing holding beam are integrally fixed by a tightening metal fitting to integrally fix the pair of half-split frames. The formwork device is formed by integrally assembling the device and then installing a temporary scaffold on the upper surface of the space holding beam, and the formwork device is carried to the site where the concrete structure is constructed and the formwork is carried by the jack base. By installing the formwork, placing concrete in the space of the formwork, and after the concrete has hardened, the formwork device is moved to the next placework position to provide a space-holding beam. Since the formwork device is easy to assemble because no separator is used, and the scaffolding can be installed using the spacing beam, there is no need to install special members for scaffolding installation. The assembly work of the device can be performed in a short time.

本発明の実施例に係るコンクリート構造物用型枠装置の正面図である。It is a front view of the formwork device for a concrete structure which concerns on embodiment of this invention. 図1のA−A矢視図である。It is the AA arrow view of FIG. 本発明の実施例に係るコンクリート構造物用型枠装置の平面図である。It is a top view of the formwork device for a concrete structure which concerns on embodiment of this invention. 本発明の実施例に係るコンクリート構造物の型枠工法を説明するための斜視図であって、一対の半割枠装置の一方が組み立てられた状態を示したものである。It is a perspective view for demonstrating the formwork construction method of the concrete structure which concerns on embodiment of this invention, and shows the state which one of a pair of half-split frame devices is assembled. 本発明の実施例に係るコンクリート構造物の型枠工法を説明するための斜視図であって、一対の半割枠装置が所定の間隔で対向して配設された状態を示したものである。It is a perspective view for demonstrating the formwork construction method of the concrete structure which concerns on embodiment of this invention, and shows the state which a pair of half-split frame devices are arranged facing each other at a predetermined interval. .. 本発明の実施例に係るコンクリート構造物の型枠工法を説明するための斜視図であって、一対の半割枠装置が間隔保持梁により一体に固定された状態を示したものである。It is a perspective view for demonstrating the formwork construction method of the concrete structure which concerns on embodiment of this invention, and shows the state which a pair of half-split frame devices are integrally fixed by a space-holding beam. 本発明の実施例に係るコンクリート構造物の型枠工法を説明するための斜視図であって、間隔保持梁の上面に仮設足場が設置された状態を示したものである。It is a perspective view for demonstrating the formwork construction method of the concrete structure which concerns on embodiment of this invention, and shows the state which the temporary scaffolding is installed on the upper surface of the interval holding beam. 本発明の実施例に係るコンクリート構造物の型枠工法を説明するための斜視図であって、型枠装置がコンクリート構造物を築造する現場に搬入されて据え付けが行われる状態を示したものである。It is a perspective view for demonstrating the formwork construction method of the concrete structure which concerns on embodiment of this invention, and shows the state which the formwork device is carried to the site which constructs a concrete structure, and is installed. be.

本発明に係るコンクリート構造物用型枠装置及びコンクリート構造物の型枠工法を実施するための形態を図面を参照しながら詳細に説明するが、本発明はこれに限定されて解釈されるものではなく、本発明の範囲を逸脱しない限りにおいて、当業者の知識に基づいて、種々の変更、修正、改良を加えうるものである。 The formwork device for concrete structures and the form for carrying out the formwork method for concrete structures according to the present invention will be described in detail with reference to the drawings, but the present invention is not construed as being limited to this. Without deviating from the scope of the present invention, various changes, modifications and improvements can be made based on the knowledge of those skilled in the art.

図1ないし図3を参照しながら、地中梁等のコンクリート構造物を築造するのに適したコンクリート構造物用型枠装置を例にして説明する。 With reference to FIGS. 1 to 3, a formwork device for a concrete structure suitable for constructing a concrete structure such as an underground beam will be described as an example.

図1は、コンクリート構造物用型枠装置30の正面図であって、地中梁等を築造するための溝の底部に打設された捨コンクリート50の上にコンクリート構造物用型枠装置30が据え付けられた状態が示されている。
なお、地中梁の配筋は省略してあり、符号51で示す部材は位置出し用の桟木である。
コンクリート構造物用型枠装置30は、コンクリート構造物を打設するための一対の型枠1、1を備えている。
一対の型枠1、1は、それぞれ、所定の高さ(地面に対して縦方向の高さ)及び所定の長さ(地面に対して横方向の長さ)を有するベニア合板等からなる平板状の板材である。
一対の型枠1、1のそれぞれの外側面には、支持部材2、2が型枠1、1の長手方向に沿って高さ方向に所定間隔で配設されている。支持部材2は、2つの木製の角材3、3の間を長手方向にトラスを組むようにして配設されたトラス材4で一体化されたトラス構造に形成されており、内側の角材3が型枠1の外側面にビス等の固着金具で固定されている。支持部材2が型枠1のコンクリートの打設される面と反対の外側に装着されることで、型枠1がコンクリートの内圧で外側に膨出するのを防止することができる。
FIG. 1 is a front view of the concrete structure formwork device 30. The concrete structure formwork device 30 is placed on a waste concrete 50 cast at the bottom of a groove for constructing an underground beam or the like. Is shown in the installed state.
The reinforcement of the underground beam is omitted, and the member indicated by reference numeral 51 is a pier for positioning.
The formwork device 30 for a concrete structure includes a pair of formwork 1, 1 for placing a concrete structure.
The pair of formwork 1, 1 is a flat plate made of veneer plywood or the like having a predetermined height (height in the vertical direction with respect to the ground) and a predetermined length (length in the horizontal direction with respect to the ground), respectively. It is a shaped plate material.
Support members 2 and 2 are arranged on the outer surfaces of the pair of formwork 1 and 1 at predetermined intervals in the height direction along the longitudinal direction of the formwork 1 and 1. The support member 2 is formed in a truss structure integrated with truss members 4 arranged so as to form a truss in the longitudinal direction between two wooden square timbers 3 and 3, and the inner square timber 3 is a formwork. It is fixed to the outer surface of 1 with a fixing bracket such as a screw. By mounting the support member 2 on the outside of the formwork 1 opposite to the concrete casting surface, it is possible to prevent the formwork 1 from bulging outward due to the internal pressure of the concrete.

左右の支持部材2、2のそれぞれの外側面には、高さ方向に保持部材5が固定されている。図2に示すように、本実施例においては、3本の保持部材5が長手方向に間隔を置いて配設されている。
保持部材5は、図1に示すように、支持部材2の外側に接合される垂直部6と、垂直部6の上端から支持部材2とは反対方向(外側方向)に延びる水平部7とから形成され、略L字状をしている。保持部材5は、例えば、H形鋼等の鋼材から形成され、垂直部6と水平部7との間は溶接により固定されて一体構造をしている。保持部材5の垂直部6と支持部材2の角材3とは、図示しないが、公知のボルト等の固定金具で固定される。
また、保持部材5の垂直部6の下部と水平部7の外側部との間を直線的に結ぶようにして伸縮ジャッキ9が設けられている。伸縮ジャッキ9を伸長するように操作することにより、型枠1及び支持部材2を介して垂直部6に作用するコンクリートの内圧に抗して垂直部6と水平部7との間の角度(約90°)を維持し、ひいては型枠1の膨らみを防止することができる。
A holding member 5 is fixed in the height direction on the outer surfaces of the left and right supporting members 2 and 2, respectively. As shown in FIG. 2, in this embodiment, three holding members 5 are arranged at intervals in the longitudinal direction.
As shown in FIG. 1, the holding member 5 is composed of a vertical portion 6 joined to the outside of the support member 2 and a horizontal portion 7 extending from the upper end of the vertical portion 6 in the direction opposite to the support member 2 (outward direction). It is formed and has a substantially L-shape. The holding member 5 is formed of, for example, a steel material such as H-shaped steel, and the vertical portion 6 and the horizontal portion 7 are fixed by welding to form an integral structure. Although not shown, the vertical portion 6 of the holding member 5 and the square lumber 3 of the supporting member 2 are fixed by a known fixing bracket such as a bolt.
Further, the telescopic jack 9 is provided so as to linearly connect the lower portion of the vertical portion 6 of the holding member 5 and the outer portion of the horizontal portion 7. By operating the telescopic jack 9 so as to extend, the angle between the vertical portion 6 and the horizontal portion 7 (about) against the internal pressure of the concrete acting on the vertical portion 6 via the formwork 1 and the support member 2. 90 °) can be maintained, and thus the swelling of the mold 1 can be prevented.

保持部材5の垂直部6と水平部7とが交叉するコーナーには、長手方向に間隔を置いて配設される複数の保持部材5を連結して保持するための連結部材8が配設されている。連結部材8は、例えば、角形パイプから形成され、保持部材5の垂直部6に対してボルト等の固定金具22で固定される。図2に示すように、連結部材8の長さは型枠1の長さとほぼ同じであり、3本の保持部材5が連結部材8により連結して固定される。これにより、型枠装置30を構成する一対の半割型枠装置31、31の一方が形成される。同様にして、他方の半割型枠装置31も形成され、これら一対の半割型枠装置31、31を図1に示すように対向して配置する。 At the corner where the vertical portion 6 and the horizontal portion 7 of the holding member 5 intersect, a connecting member 8 for connecting and holding a plurality of holding members 5 arranged at intervals in the longitudinal direction is arranged. ing. The connecting member 8 is formed of, for example, a square pipe, and is fixed to the vertical portion 6 of the holding member 5 with a fixing bracket 22 such as a bolt. As shown in FIG. 2, the length of the connecting member 8 is substantially the same as the length of the mold 1, and the three holding members 5 are connected and fixed by the connecting member 8. As a result, one of the pair of half-split formwork devices 31 and 31 constituting the formwork device 30 is formed. Similarly, the other half-split formwork device 31 is also formed, and the pair of half-split formwork devices 31 and 31 are arranged to face each other as shown in FIG.

一対の型枠1、1をまたいで左右の保持部材5、5の水平部7、7の上面には一対の半割型枠装置31、31の間隔を保持するための間隔保持梁10が載置される。間隔保持梁10は、例えば、H形鋼等の鋼材から形成され、地中梁等を築造するための溝の両側の地盤に達する程度の長さを有する。また、図2に示すように、本実施例の型枠1には、3本の保持部材5が配設されているから、3本の保持部材5に対応して間隔保持梁10も3本配設される。
間隔保持梁10は、保持部材5の水平部7と締付金具11で一体に固定される。締付金具11としては、特に限定されるものではないが、本実施例においては、保持部材5の水平部7及び間隔保持梁10の断面の外郭を包み込める断面略U字状の形状を有し(図2参照。)、かつ、図1に示すように所定の幅を有するバンド部材12と、該バンド部材12の上端の内側に開口する断面コ字状をした挟着部13、13の間に挿入される板状の係止部材14と、バンド部材12と係止部材14とを一体に締め付け固定するボルト21等とから形成される。バンド部材12のU字部の高さ寸法は、間隔保持梁10と水平部7との合計の高さよりも小さく設定され、ボルト21が締め付けられた場合に間隔保持梁10と水平部7とが強固に締め付けられるようになっている。
なお、締付金具11は、両側に2個ずつ配設されているが、これに限定されるものではなく、一個以上ずつであればよい。
間隔保持梁10が保持部材5と一体に固定されることにより、一対の半割型枠装置31、31は一体化される。
Spacing beams 10 for holding the spacing between the pair of half-split formwork devices 31 and 31 are mounted on the upper surfaces of the horizontal portions 7, 7 of the left and right holding members 5, 5 straddling the pair of formwork 1, 1. Placed. The spacing beam 10 is formed of, for example, a steel material such as H-shaped steel, and has a length that reaches the ground on both sides of the groove for constructing an underground beam or the like. Further, as shown in FIG. 2, since three holding members 5 are arranged in the formwork 1 of this embodiment, three spacing holding beams 10 are also provided corresponding to the three holding members 5. Arranged.
The interval holding beam 10 is integrally fixed to the horizontal portion 7 of the holding member 5 by the tightening metal fitting 11. The tightening metal fitting 11 is not particularly limited, but in the present embodiment, it has a substantially U-shaped cross section that encloses the outer shell of the cross section of the horizontal portion 7 of the holding member 5 and the space holding beam 10. (See FIG. 2) And between the band member 12 having a predetermined width as shown in FIG. 1 and the sandwiching portions 13 and 13 having a U-shaped cross section that opens inside the upper end of the band member 12. It is formed of a plate-shaped locking member 14 to be inserted into the band member 12 and a bolt 21 or the like for integrally tightening and fixing the band member 12 and the locking member 14. The height dimension of the U-shaped portion of the band member 12 is set to be smaller than the total height of the spacing beam 10 and the horizontal portion 7, and when the bolt 21 is tightened, the spacing beam 10 and the horizontal portion 7 are brought together. It is designed to be tightened firmly.
Two tightening metal fittings 11 are arranged on each side, but the present invention is not limited to this, and one or more tightening metal fittings 11 may be provided.
By fixing the interval holding beam 10 integrally with the holding member 5, the pair of half-split formwork devices 31 and 31 are integrated.

また、間隔保持梁10の両端面には端部部材15、15が溶接等により固着され、これら端部部材15、15のそれぞれに水平方向にジャッキベース16、16が装着されている。
ジャッキベース16は、金属製で、ベース板23からネジ棒24が立設され、ネジ棒24にナット付きのハンドル部材25が螺合されたものであり、足場の高さ調節などに使用されている公知のものである。
ジャッキベース16、16のベース板23は保持部材5の水平部7の端面に当接して固定されており、端部部材15の内側のハンドル部材25を操作することにより保持部材5を型枠1及び支持部材2に向けて押圧することができ、型枠1及び支持部材2を介して保持部材5に作用するコンクリートの内圧に対抗できる。このため、一対の半割型枠装置31、31を所定の間隔で保持することができる。また、端部部材15の外側のハンドル部材25を操作することにより保持部材5を型枠1及び支持部材2と反対方向に引っ張ることにより、コンクリート構造物から型枠を剥離することができる。
Further, the end members 15 and 15 are fixed to both end faces of the interval holding beam 10 by welding or the like, and the jack bases 16 and 16 are attached to the end members 15 and 15 in the horizontal direction, respectively.
The jack base 16 is made of metal, and a screw rod 24 is erected from the base plate 23, and a handle member 25 with a nut is screwed onto the screw rod 24, and is used for adjusting the height of a scaffold or the like. It is a known one.
The base plates 23 of the jack bases 16 and 16 are fixed in contact with the end surface of the horizontal portion 7 of the holding member 5, and the holding member 5 is formed into the formwork 1 by operating the handle member 25 inside the end member 15. And can be pressed toward the support member 2, and can counter the internal pressure of the concrete acting on the holding member 5 via the formwork 1 and the support member 2. Therefore, the pair of half-split formwork devices 31 and 31 can be held at predetermined intervals. Further, the formwork can be peeled off from the concrete structure by pulling the holding member 5 in the direction opposite to the formwork 1 and the support member 2 by operating the handle member 25 outside the end member 15.

間隔保持梁10と保持部材5とが締付金具11で一体に固定されているため、型枠1及び支持部材2がコンクリートの内圧で外側に膨出する力を受けても、保持部材5の垂直部6で型枠1及び支持部材2の膨出を防止することができる。このため、従来用いられていたセパレータを省略することができる。
また、間隔保持梁10の両側の端部部材15、15に設けられたジャッキベース16、16により、保持部材5、5の受ける外側方向の力と対向して保持部材5、5を中心側に押し戻すことができる。したがって、締付金具11に加えてジャッキベース16を設けることで、二重の安全を得ることができる。
Since the space holding beam 10 and the holding member 5 are integrally fixed by the tightening metal fitting 11, even if the formwork 1 and the support member 2 receive a force to bulge outward due to the internal pressure of the concrete, the holding member 5 The vertical portion 6 can prevent the formwork 1 and the support member 2 from bulging. Therefore, the conventionally used separator can be omitted.
Further, the jack bases 16 and 16 provided on the end members 15 and 15 on both sides of the interval holding beam 10 move the holding members 5 and 5 toward the center side so as to face the outward force received by the holding members 5 and 5. Can be pushed back. Therefore, by providing the jack base 16 in addition to the tightening metal fitting 11, double safety can be obtained.

図1に示すように、間隔保持梁10の両端には型枠装置30の高さを調節するとともに荷重を支持するためのジャッキベース17、17が装着される。ジャッキベース17は、地中梁等を築造するための溝の両側の地盤の上に据え付けられる。また、図示は省略するが、保持部材5の垂直部6の下端部にもジャッキベースを装着して、上記ジャッキベース17、17と協働して型枠装置30の高さ調節及び荷重支持を行わせることで、二重の安全及び精度を得ることができる。 As shown in FIG. 1, jack bases 17 and 17 for adjusting the height of the formwork device 30 and supporting the load are mounted on both ends of the spacing beam 10. The jack base 17 is installed on the ground on both sides of the groove for constructing an underground beam or the like. Although not shown, a jack base is also attached to the lower end of the vertical portion 6 of the holding member 5 to adjust the height of the form device 30 and support the load in cooperation with the jack bases 17 and 17. By doing so, double safety and accuracy can be obtained.

図1及び図3に示すように、間隔保持梁10の上面、すなわち、3本の間隔保持梁10、10、10の上面に載置されるようにして、コンクリート打設作業に使用するための仮設足場18が設置される。本実施例において、仮設足場18は、型枠1、1の真上を除いて左右対称に形成され、長さ方向には、型枠1の長さとほぼ同じ長さを有する。したがって、コンクリートの打設される上方は開口され、打設作業を行う作業者は左右いずれか一方あるいは両方の仮設足場18で作業を行うことができる。仮設足場18は、足場板19及び手すり20を備え、これらの足場板19及び手すり20は、固定金具(図示は省略)により間隔保持梁10に直接固定される。したがって、仮設足場18を支持するための特別な部材を設ける必要がない。足場板19としては、例えば、公知の足場板が用いられ、同じく、手すり20としては、例えば、公知のパイプが用いられる。
また、図3に示すように、内側に位置する締付金具11と足場板19とが重複しているため、締付金具11のボルト21を緩めたり、締め付けたりの操作を行うための操作孔26が足場板19に設けられている。操作孔26は左右の足場板19、19のいずれか一方に設けられればよい。図3の場合、右側の足場板19に操作孔26が設けられているため、左側の足場板19においては、締付金具11の調整は不要であるため、操作孔は設けられていない。
As shown in FIGS. 1 and 3, the space holding beams 10 are placed on the upper surface of the space holding beams 10, that is, the upper surfaces of the three space holding beams 10, 10 and 10, and are used for concrete placing work. Temporary scaffolding 18 is installed. In this embodiment, the temporary scaffold 18 is formed symmetrically except for directly above the formwork 1 and 1, and has substantially the same length as the length of the formwork 1 in the length direction. Therefore, the upper part where the concrete is cast is opened, and the worker performing the casting work can perform the work on the temporary scaffold 18 on either the left or right side or both. The temporary scaffolding 18 includes a scaffolding plate 19 and a handrail 20, and these scaffolding plates 19 and the handrail 20 are directly fixed to the spacing beam 10 by a fixing metal fitting (not shown). Therefore, it is not necessary to provide a special member for supporting the temporary scaffold 18. As the scaffolding plate 19, for example, a known scaffolding plate is used, and similarly, as the handrail 20, for example, a known pipe is used.
Further, as shown in FIG. 3, since the tightening metal fitting 11 located inside and the scaffolding plate 19 overlap each other, an operation hole for loosening or tightening the bolt 21 of the tightening metal fitting 11 is performed. 26 is provided on the scaffolding board 19. The operation hole 26 may be provided on either the left or right scaffolding plate 19 or 19. In the case of FIG. 3, since the operation hole 26 is provided in the scaffolding plate 19 on the right side, the scaffolding plate 19 on the left side does not need to adjust the tightening metal fitting 11, so that the operation hole is not provided.

次に、図4ないし図8を参照しながら、コンクリート構造物の型枠工法について説明する。
(1)まず、図4に示すように、工場のヤード等において、次の手順で1組の半割型枠装置31を製作する。
(a)型枠1の外側面に型枠1の長手方向に沿って、高さ方向において所定間隔をもって支持部材2を配設し、型枠1とビス等の固定金具を用いて固定する。
(b)支持部材2の外側面に長手方向に間隔を置いて垂直部6と水平部7とからなる保持部材5を高さ方向に配設し、保持部材5の垂直部6と支持部材2の角材3とをボルト等の固定金具で固定する。
(c)長手方向に間隔を置いて配設される3本の保持部材5の垂直部6と水平部7とが交叉するコーナーに連結部材8をボルト等の固定金具で固定し、3本の保持部材5を連結して保持する。これにより、半割型枠装置31が形成される。
Next, the formwork method for the concrete structure will be described with reference to FIGS. 4 to 8.
(1) First, as shown in FIG. 4, a set of half-split formwork devices 31 is manufactured by the following procedure in a factory yard or the like.
(A) Support members 2 are arranged on the outer surface of the formwork 1 along the longitudinal direction of the formwork 1 at predetermined intervals in the height direction, and are fixed to the formwork 1 by using fixing metal fittings such as screws.
(B) A holding member 5 composed of a vertical portion 6 and a horizontal portion 7 is arranged in the height direction on the outer surface of the supporting member 2 at intervals in the longitudinal direction, and the vertical portion 6 and the supporting member 2 of the holding member 5 are arranged. Fix the square lumber 3 and the square lumber 3 with a fixing bracket such as a bolt.
(C) The connecting member 8 is fixed to a corner where the vertical portion 6 and the horizontal portion 7 of the three holding members 5 arranged at intervals in the longitudinal direction intersect with a fixing bracket such as a bolt, and the three holding members 5 are fixed. The holding member 5 is connected and held. As a result, the half-split formwork device 31 is formed.

(2)同様に、上記(1)〜(3)の手順でもう1つの半割型枠装置31を製作し、半割型枠装置31の状態でトラック等にて現場に搬送する。 (2) Similarly, another half-split formwork device 31 is manufactured by the procedure of (1) to (3) above, and is transported to the site by a truck or the like in the state of the half-split formwork device 31.

(3)図5に示すように、工事現場のヤード等において、一対の半割型枠装置31、31を対向して配置する。
(4)図6に示すように、一対の半割型枠装置31、31を対向配置させた状態で一対の半割型枠装置31、31の上方をまたいで左右の保持部材5、5の水平部7、7の上面に間隔保持梁10を載置し、水平部7、7と間隔保持梁10とを締付金具11で一体に固定して一対の半割枠装置31、31を一体に組み立てる。さらに、保持部材5の垂直部6の下部と水平部7の外側端部との間を直線的に結ぶようにして伸縮ジャッキ9を装着する。また、間隔保持梁10の両端面には端部部材15、15を溶接等により固着し、これら端部部材15、15のそれぞれに水平方向にジャッキベース16、16を装着する。ジャッキベース16、16のベース板23を保持部材5の水平部7の端面に当接して固定し、ジャッキベース16、16操作して保持部材5を型枠1及び支持部材2に向けて押圧又は引っ張りして調節する。
(3) As shown in FIG. 5, a pair of half-split formwork devices 31 and 31 are arranged to face each other in a yard or the like at a construction site.
(4) As shown in FIG. 6, in a state where the pair of half-split formwork devices 31 and 31 are arranged to face each other, the left and right holding members 5 and 5 straddle the upper part of the pair of half-split formwork devices 31 and 31. The spacing beam 10 is placed on the upper surfaces of the horizontal portions 7 and 7, and the horizontal portions 7 and 7 and the spacing beam 10 are integrally fixed by the tightening metal fittings 11 to integrally integrate the pair of half-split frame devices 31 and 31. Assemble to. Further, the telescopic jack 9 is mounted so as to linearly connect the lower portion of the vertical portion 6 of the holding member 5 and the outer end portion of the horizontal portion 7. Further, the end members 15 and 15 are fixed to both end faces of the spacing beam 10 by welding or the like, and the jack bases 16 and 16 are attached to the end members 15 and 15 in the horizontal direction, respectively. The base plate 23 of the jack bases 16 and 16 is brought into contact with and fixed to the end surface of the horizontal portion 7 of the holding member 5, and the jack bases 16 and 16 are operated to press the holding member 5 toward the form 1 and the support member 2. Pull to adjust.

(5)図7に示すように、間隔保持梁10の上面、すなわち、3本の間隔保持梁10、10、10の上面に載置されるようにして、コンクリート打設作業に使用するための仮設足場18を設置する。仮設足場18は、一対の型枠1、1で形成される空間の真上を除いて左右対称に形成される。
以上で、工事現場のヤード等における型枠装置30の組み立て作業は完了する。
(5) As shown in FIG. 7, the space-holding beam 10 is placed on the upper surface of the space-holding beam 10, that is, the three space-holding beams 10, 10 and 10, and is used for concrete placing work. Temporary scaffolding 18 is installed. The temporary scaffold 18 is formed symmetrically except directly above the space formed by the pair of formwork 1, 1.
This completes the assembly work of the formwork device 30 in the yard or the like at the construction site.

(6)図8に示すように、コンクリート構造物を築造する現場にクレーン装置52等を用いて型枠装置30を搬入して捨コンクリート50の上に型枠装置30の据え付けを行う。その際、間隔保持梁10の両端に型枠装置30の高さを調節するとともに荷重を支持するためのジャッキベース17、17を装着する。ジャッキベース17は、地中梁等を築造するための溝の両側の地盤の上に据え付けられる。なお、保持部材5の垂直部6の下端部にもジャッキベースを装着して、上記ジャッキベース17、17と協働して型枠装置30の高さ調節及び荷重支持を行わせることができる。
(7)型枠1、1の空間内にコンクリートを打設し、コンクリートの硬化後、型枠装置30を分解することなく次の打設位置に移動させる。
(6) As shown in FIG. 8, the formwork device 30 is carried into the site where the concrete structure is constructed by using a crane device 52 or the like, and the formwork device 30 is installed on the waste concrete 50. At that time, jack bases 17 and 17 for adjusting the height of the formwork device 30 and supporting the load are attached to both ends of the spacing beam 10. The jack base 17 is installed on the ground on both sides of the groove for constructing an underground beam or the like. A jack base can also be attached to the lower end of the vertical portion 6 of the holding member 5 to adjust the height of the form device 30 and support the load in cooperation with the jack bases 17 and 17.
(7) Concrete is cast in the space of the formwork 1 and 1, and after the concrete is hardened, the formwork device 30 is moved to the next casting position without being disassembled.

以上、本発明の実施例を図面により説明してきたが、具体的な構成はこれら実施例に限られるものではなく、本発明の要旨を逸脱しない範囲における変更や追加があっても本発明に含まれる。 Although examples of the present invention have been described above with reference to the drawings, the specific configuration is not limited to these examples, and any changes or additions within the scope of the gist of the present invention are included in the present invention. Is done.

例えば、前記実施例では、支持部材2の外側面に長手方向に間隔を置いて配設される保持部材5が3本用いられる例について説明したが、本発明はこれに限定されることなく、型枠の横方向の長さ及び打設されるコンクリートから受ける内圧等の条件に応じて、適宜、設計的に決定されるものである。少なくとも、2本以上であればよい。 For example, in the above-described embodiment, an example in which three holding members 5 arranged at intervals in the longitudinal direction are used on the outer surface of the support member 2 has been described, but the present invention is not limited thereto. It is appropriately determined by design according to conditions such as the lateral length of the formwork and the internal pressure received from the concrete to be cast. At least two or more may be used.

また、例えば、前記実施例では、締付金具11としては図2に示すようなバンド部材12と係止部材14とをボルト21で一体に締め付け固定する構造のものを説明したが、これに限定されることなく、間隔保持梁10と保持部材5とが分解可能に強固に固定されるものであればよい。 Further, for example, in the above embodiment, the tightening metal fitting 11 has been described as having a structure in which the band member 12 and the locking member 14 are integrally tightened and fixed by bolts 21 as shown in FIG. 2, but the present invention is limited to this. It suffices that the space-holding beam 10 and the holding member 5 are firmly fixed so as to be disassembled without being disassembled.

1 型枠
2 支持部材
3 角材
4 トラス材
5 保持部材
6 垂直部
7 水平部
8 連結部材
9 伸縮ジャッキ
10 間隔保持梁
11 締付金具
12 バンド部材
13 挟着部
14 係止部材
15 端部部材
16 ジャッキベース
17 ジャッキベース
18 仮設足場
19 足場板
20 手すり
21 ボルト
22 固定金具
23 ベース板
24 ネジ棒
25 ハンドル部材
26 操作孔
30 型枠装置
31 半割型枠装置
50 捨コンクリート
51 位置出し用の桟木






















1 formwork
2 Support member 3 Square lumber
4 Truss material 5 Holding member 6 Vertical part 7 Horizontal part 8 Connecting member 9 Telescopic jack 10 Spacing holding beam 11 Tightening bracket 12 Band member
13 Sanding part 14 Locking member 15 End member
16 Jack base 17 Jack base 18 Temporary scaffolding 19 Scaffolding board 20 Handrail 21 Bolt 22 Fixing bracket 23 Base board 24 Screw rod 25 Handle member 26 Operation hole
30 formwork device
31 Half-split formwork device 50 Waste concrete 51 Positioning crosspiece






















Claims (5)

コンクリート構造物を打設するための一対の型枠と、前記一対の型枠のそれぞれの外側面に固定される支持部材と、前記支持部材のそれぞれの外側面に長手方向と直交するように間隔を置いて配設される保持部材とを備え、
前記保持部材は、前記支持部材の外側に固定される垂直部と、前記垂直部の上端から前記支持部材とは反対方向に延びる水平部とから形成され、前記垂直部と前記水平部とは固定されて一体構造をしているとともに、前記垂直部と前記水平部とが交叉するコーナーには、長手方向に間隔を置いて配設される複数の前記保持部材を連結して保持するための連結部材が配設されており、前記連結部材は前記保持部材に固定金具で固定されるものであり、前記一対の型枠をまたいで前記左右の保持部材の水平部の上面には前記一対の型枠の間隔を保持するための間隔保持梁が載置され、前記水平部と前記間隔保持梁とは締付金具で一体に固定されることを特徴とするコンクリート構造物用型枠装置。
A pair of formwork for placing a concrete structure, a support member fixed to each outer surface of the pair of formwork, and an interval so as to be orthogonal to the longitudinal direction of each outer surface of the support member. With a holding member that is placed and arranged
The holding member is formed of a vertical portion fixed to the outside of the support member and a horizontal portion extending from the upper end of the vertical portion in a direction opposite to the support member, and the vertical portion and the horizontal portion are fixed. In addition to having an integral structure, the corners where the vertical portion and the horizontal portion intersect are connected to connect and hold a plurality of the holding members arranged at intervals in the longitudinal direction. Members are arranged, and the connecting member is fixed to the holding member with a fixing bracket, and the pair of molds is placed on the upper surface of the horizontal portion of the left and right holding members across the pair of molds. A mold device for a concrete structure, wherein a space-holding beam for holding a space between frames is placed, and the horizontal portion and the space-holding beam are integrally fixed by a tightening metal fitting.
前記保持部材の前記垂直部の下部と前記水平部の外端部との間を結ぶ位置には前記垂直部と前記水平部となす角度を維持するための伸縮ジャッキが設けられることを特徴とする請求項1に記載のコンクリート構造物用型枠装置。 A telescopic jack for maintaining an angle between the vertical portion and the horizontal portion is provided at a position connecting the lower portion of the vertical portion of the holding member and the outer end portion of the horizontal portion. The formwork device for a concrete structure according to claim 1. 前記間隔保持梁の両端面には端部部材が固着され、これら端部部材のそれぞれには前記保持部材の前記水平部の外端面を押圧又は引っ張り可能なジャッキベースが装着されることを特徴とする請求項1又は請求項2に記載のコンクリート構造物用型枠装置。 An end member is fixed to both end faces of the spacing beam, and a jack base capable of pressing or pulling the outer end face of the horizontal portion of the holding member is attached to each of these end members. The formwork device for a concrete structure according to claim 1 or 2. 前記間隔保持梁の上面には、コンクリート打設作業に使用するための仮設足場が設置されることを特徴とする請求項1または請求項2に記載のコンクリート構造物用型枠装置。 The formwork device for a concrete structure according to claim 1 or 2, wherein a temporary scaffolding for use in concrete placing work is installed on the upper surface of the space-holding beam. 根切りで溝を掘った後、ベース部分に捨コンクリートを打設し、その後、捨コンクリートの上に地中梁の配筋を行い、鉄筋工事後に型枠装置を搬入して型枠装置の空間内へのコンクリート打設と、型枠装置の次打設位置への移動とを交互に繰り返して長手方向に連続するコンクリート構造物を築造する工法において、
型枠の外側面に支持部材を固定し、前記支持部材の外側面に長手方向と直交するように間隔を置いて複数の保持部材を固定し、前記複数の保持部材を連結部材より長手方向において連結することにより構成される半割型枠装置を一対形成しておき、前記一対の半割型枠装置を所定の間隔をもって対向配置させた状態で前記一対の半割型枠装置の上部をまたいで前記半割型枠装置のそれぞれの前記保持部材の上面に間隔保持梁を載置して前記保持部材と前記間隔保持梁とを締付金具で一体に固定して前記一対の半割枠装置を一体に組み立て、その後、前記間隔保持梁の上面に仮設足場を設置することにより型枠装置を形成し、コンクリート構造物を築造する現場に前記型枠装置を搬入してジャッキベースにより前記型枠装置の据え付けを行い、前記型枠の空間内にコンクリートを打設し、コンクリートの硬化後、前記型枠装置を次の打設位置に移動させることを特徴とするコンクリート構造物の型枠工法。
After digging a groove by root cutting, waste concrete is placed on the base part, then underground beams are arranged on the waste concrete, and the formwork equipment is carried in after the reinforcement work to create the space for the formwork equipment. and pouring concrete into the inner, the method of construction of the concrete structure longitudinally continuous alternately repeated movement and the next droplet installation position of the formwork device,
A support member is fixed to the outer surface of the formwork, a plurality of holding members are fixed to the outer surface of the support member at intervals so as to be orthogonal to the longitudinal direction, and the plurality of holding members are fixed in the longitudinal direction from the connecting member. A pair of half-split formwork devices configured by connecting are formed, and the pair of half-split formwork devices are arranged to face each other at predetermined intervals and straddle the upper part of the pair of half-split formwork devices. A space-holding beam is placed on the upper surface of each of the holding members of the half-split formwork device, and the holding member and the space-holding beam are integrally fixed by a tightening metal fitting to integrally fix the pair of half-split frame devices. After that, a formwork device is formed by installing a temporary scaffold on the upper surface of the space holding beam, and the formwork device is carried to the site where the concrete structure is constructed and the formwork is carried by the jack base. A formwork method for a concrete structure, characterized in that the device is installed, concrete is cast in the space of the formwork, and after the concrete is hardened, the formwork device is moved to the next casting position.
JP2020094282A 2020-05-29 2020-05-29 Formwork equipment for concrete structures and formwork methods for concrete structures Active JP6910101B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020094282A JP6910101B1 (en) 2020-05-29 2020-05-29 Formwork equipment for concrete structures and formwork methods for concrete structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020094282A JP6910101B1 (en) 2020-05-29 2020-05-29 Formwork equipment for concrete structures and formwork methods for concrete structures

Publications (2)

Publication Number Publication Date
JP6910101B1 true JP6910101B1 (en) 2021-07-28
JP2021188361A JP2021188361A (en) 2021-12-13

Family

ID=76967505

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020094282A Active JP6910101B1 (en) 2020-05-29 2020-05-29 Formwork equipment for concrete structures and formwork methods for concrete structures

Country Status (1)

Country Link
JP (1) JP6910101B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114856177A (en) * 2022-06-20 2022-08-05 中建一局集团第五建筑有限公司 Theatre stage platform opening beam template and theatre stage platform opening beam construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114856177A (en) * 2022-06-20 2022-08-05 中建一局集团第五建筑有限公司 Theatre stage platform opening beam template and theatre stage platform opening beam construction method

Also Published As

Publication number Publication date
JP2021188361A (en) 2021-12-13

Similar Documents

Publication Publication Date Title
EP3169857B1 (en) A method for erecting a shuttering framework
CA2217124C (en) Apparatus and method for a modular support and lifting system
CN109707173B (en) Construction method of assembly type laminated beam plate installation auxiliary device
US7775500B1 (en) Concrete forming system with interacting brackets connecting stacked form panels
JP6910101B1 (en) Formwork equipment for concrete structures and formwork methods for concrete structures
CN107842195B (en) Beam formwork support reinforcing system
JP2015101823A (en) Positioning member and erection method
KR200213539Y1 (en) Frame of safety workbench
KR100336713B1 (en) Steel form to be constructed inside of cross beam which is to connect precast concrete beam of pir using reinforced concrete
JP4382599B2 (en) Tension jack
KR20210004289A (en) Transfer Structure Construction Method Using U-shaped Steel Girder
KR200253550Y1 (en) Hydraulic support structure of pier copping of a concrete construction
CN215859089U (en) Steel bar truss plate and aluminum mould splicing node structure
JP7265909B2 (en) Construction methods for deck plate units, joint members and floor slabs
JPH06280382A (en) Prefabricated scaffolding unit
CN218540997U (en) Steel column hoisting connection structure
KR102402326B1 (en) Detachable support bracket of cantilever bridge and construction method of cantilever bridge using the same
KR102516906B1 (en) Pre-fabricated beam-column junction formwork
JP6875120B2 (en) Floor panels, floor structures, floor construction methods and building skeleton reuse methods
KR200340007Y1 (en) Connecting structure for construction mold
JP2023100566A (en) Support
JPH09287287A (en) Assembling method for concrete form, level adjusting member, form fixing tool, and positioning tool for level adjusting member
JP2611917B2 (en) Pillar formwork equipment
JP2022175380A (en) Steel frame structure construction method, column, steel frame structure
JP2023074188A (en) Panel type buried mold, concrete structural body and construction method thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200601

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210510

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210604

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210702

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210705

R150 Certificate of patent or registration of utility model

Ref document number: 6910101

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: R3D02