JP6692379B2 - dam - Google Patents

dam Download PDF

Info

Publication number
JP6692379B2
JP6692379B2 JP2018010569A JP2018010569A JP6692379B2 JP 6692379 B2 JP6692379 B2 JP 6692379B2 JP 2018010569 A JP2018010569 A JP 2018010569A JP 2018010569 A JP2018010569 A JP 2018010569A JP 6692379 B2 JP6692379 B2 JP 6692379B2
Authority
JP
Japan
Prior art keywords
dam
water passage
leg
upstream side
capturing body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018010569A
Other languages
Japanese (ja)
Other versions
JP2018127880A (en
Inventor
和田 浩
浩 和田
吉田 一雄
一雄 吉田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Metal Products and Engineering Inc
Original Assignee
JFE Metal Products and Engineering Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Metal Products and Engineering Inc filed Critical JFE Metal Products and Engineering Inc
Publication of JP2018127880A publication Critical patent/JP2018127880A/en
Application granted granted Critical
Publication of JP6692379B2 publication Critical patent/JP6692379B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Description

本発明は、河川等に設置される堰堤に関する。   The present invention relates to a dam installed in a river or the like.

山間部等の河川においては、台風や大雨による土砂災害を防止するため、堰堤が設置される(例えば、特許文献1参照)。堰堤は、水を通過させつつも土石流に含まれる岩石や流木が通過することを抑えるものであり、その壁部にて土石流の勢いを弱めると共に、岩石や流木を堰き止める働きをしている。近年では、水の通過を遮ることなく、岩石や流木だけを捕捉するため、堰堤の一部にスリットを形成し、このスリットに鋼管等で柵状に構築された捕捉体を設けた、いわゆる透過型堰堤が構築されている(例えば、特許文献2参照)。   In rivers such as mountains, dams are installed to prevent sediment-related disasters due to typhoons and heavy rains (see, for example, Patent Document 1). The dam prevents the rocks and driftwood contained in the debris flow from passing through while allowing water to pass through. The walls of the dam dam the debris flow and weaken the rocks and driftwood. In recent years, in order to capture only rocks and driftwood without blocking the passage of water, a slit is formed in a part of the dam, and this slit is provided with a trap-shaped trap body made of steel pipes, etc. A mold dam is constructed (see, for example, Patent Document 2).

近年、土砂災害による被害を抑えるため、捕捉体が設けられていない既存の堰堤についても水通し部に捕捉体を新たに設置する試みがなされている。図10に示すように、既存の堰堤100に対して捕捉体103を設けるには、水通し部104を確保するため、捕捉体103の周囲の袖部105を嵩上げする必要がある。捕捉体103の周囲を嵩上げすることにより、図11に示すように、捕捉体103で流木等106を捕捉しつつ、その上方に形成された空間を水通し部107として用いることができる。
また、図12に示すように、敷幅(河川の流れ方向に沿った幅)が短い既設の堰堤110に捕捉体111を設ける場合には、堰堤110の水通し部112における上流側又は下流側に腹付部113を設け、水通し部112の底部及び腹付部113を利用して捕捉体111を設ける。
In recent years, in order to suppress damage caused by sediment disasters, attempts have been made to newly install catchers in the water passage part even for existing dams that do not have catchers. As shown in FIG. 10, in order to provide the catching body 103 on the existing dam 100, it is necessary to raise the sleeve portion 105 around the catching body 103 in order to secure the water passage portion 104. By raising the circumference of the capturing body 103, as shown in FIG. 11, while capturing the driftwood or the like 106 with the capturing body 103, the space formed above it can be used as the water passage portion 107.
Further, as shown in FIG. 12, when the catching body 111 is provided on the existing dam 110 having a short floor width (width along the flow direction of the river), the upstream side or the downstream side of the water passage portion 112 of the dam 110. The belly portion 113 is provided at the bottom, and the catching body 111 is provided by utilizing the bottom of the water passage portion 112 and the belly portion 113.

特公平2−55566号公報Japanese Patent Publication No. 2-55566 特開2015−63840号公報JP, 2005-63840, A

しかし、堰堤を嵩上げすると、その壁部に作用する土石流の外力も大きくなるため、堰堤の強度が不足し、強度不足を解消するための改良工事にコストや時間がかかってしまう。
また、捕捉体が設けられていない、いわゆる不透過型堰堤においては、水の流れを制御するために水通し部の幅が狭いため、水通し部に設けられる捕捉体も小さくなり、すぐに目詰まりして堰堤の袖部から越流しやすくなる。その結果、流木等の捕捉機能を十分に発揮できないだけでなく、越流に備えて堰堤下流側の改良工事が必要となり、コストや時間がかかってしまう。一方で、水通し部の拡幅工事も考えられるが、こちらもコストや時間がかかってしまう。
また、堰堤に腹付部を設ける場合であっても、その工事にコストや時間がかかってしまう。
また、既設の堰堤に新たに捕捉体を固定するために、水通し部のコンクリートをはつってから捕捉体用のコンクリートを打設することになるため、足場の架設等、コストや時間がかかってしまう。
However, if the weir is raised, the external force of the debris flow that acts on the wall also becomes large, so the strength of the weir becomes insufficient, and cost and time are required for improvement work to eliminate the insufficient strength.
Also, in so-called impermeable dams that do not have traps, because the width of the water passage is narrow in order to control the flow of water, the traps that are provided in the water passage become smaller, and the It will become clogged and will easily overflow from the sleeve of the dam. As a result, not only the function of catching driftwood etc. cannot be fully exerted, but also improvement work on the downstream side of the dam is required in preparation for an overflow, resulting in cost and time. On the other hand, it may be possible to expand the water passage, but this also costs money and time.
In addition, even if a belly portion is provided on the dam, the construction work will be costly and time consuming.
Also, in order to newly fix the trapping body to the existing dam, it is necessary to put concrete for the water passage part and then to place concrete for the trapping body, which requires cost and time such as construction of scaffolding. Will end up.

そこで、本発明は、上記課題に鑑みてなされたものであり、従来よりも簡単に捕捉体を設置でき、工事にかかるコストや時間を抑えることができる堰堤を提供することを目的とする。   Then, this invention is made | formed in view of the said subject, and an object of this invention is to provide the dam which can install a capture body more easily than before and can suppress the cost and time required for construction.

上記の課題を解決するため、本発明は、水通し部を有する堰堤であって、前記堰堤の上流側の壁面に設けられ、上流から流れてくる流木を捕捉して流水を通す捕捉体を備え、前記捕捉体の少なくとも一部は、前記水通し部の上流側で前記水通し部から離間して対向する位置に設けられていることを特徴とする。   In order to solve the above-mentioned problems, the present invention is a dam having a water passage part, which is provided on a wall surface on the upstream side of the dam, and includes a trap body that traps driftwood flowing from upstream and allows the running water to pass. At least a part of the trapping body is provided at a position facing away from the water passage portion on the upstream side of the water passage portion.

また、前記捕捉体は、上方に向かうにつれて上流側に傾斜していることが好ましい。   Further, it is preferable that the capturing body is inclined toward the upstream side as it goes upward.

また、前記捕捉体は、一端が前記堰堤の上流側の壁面に固定された第1の脚部と、一端が前記堰堤の上流側の壁面に固定され、他端が前記第1の脚部に連結された第2の脚部と、を有する複数の柱部と、各柱部同士を連結する梁部と、を備えることが好ましい。   Further, the capturing body has a first leg portion having one end fixed to an upstream wall surface of the dam, one end fixed to an upstream wall surface of the dam, and the other end to the first leg portion. It is preferable to provide a plurality of pillars having the connected second legs and a beam connecting the pillars.

また、前記第1の脚部は、一端から他端に向かうにつれて上流側に傾斜していることが好ましい。   Further, it is preferable that the first leg portion inclines toward the upstream side from one end toward the other end.

また、前記第2の脚部は、前記堰堤が設置される地盤の傾斜に沿って配置されていることが好ましい。   Further, it is preferable that the second leg portion is arranged along an inclination of the ground where the dam is installed.

また、前記第1の脚部の他端は、前記水通し部の底面よりも上方にあることが好ましい。   Further, it is preferable that the other end of the first leg portion is above the bottom surface of the water passage portion.

また、前記捕捉体の長さは、前記水通し部の幅よりも長いことが好ましい。   Further, it is preferable that the length of the capturing body is longer than the width of the water passage portion.

また、各柱部は、最大流木長の1/2、又は、最大礫径に相当する間隔で配置されていることが好ましい。   Further, it is preferable that the pillars are arranged at a distance corresponding to ½ of the maximum driftwood length or the maximum gravel diameter.

本発明によれば、従来よりも簡単に捕捉体を設置でき、工事にかかるコストや時間を抑えることができる。   According to the present invention, the capturing body can be installed more easily than before, and the cost and time required for construction can be suppressed.

(a)は堰堤の正面図であり、(b)は堰堤の側面図である。(A) is a front view of the dam, and (b) is a side view of the dam. 堰堤を上流から見た正面図である。It is the front view which looked at the dam from the upstream. 堰堤を右側上方から見た斜視図である。It is the perspective view which looked at a dam from the upper right side. 堰堤を右側下方から見た斜視図である。It is the perspective view which looked at a dam from the lower right side. 堰堤の平面図である。It is a top view of a dam. 堰堤の上流側に土砂が堆積したときの捕捉体の状態を説明する堰堤の側面図である。It is a side view of a dam for explaining the state of a trap when sediment is deposited on the upstream side of the dam. 河川の掃流区間において、(a)は流木を捕捉して水を通過させる状態を説明する堰堤の正面図であり、(b)はその堰堤の側面図であり、(c)はその堰堤の平面図である。In a river sweep section, (a) is a front view of a weir for explaining the state of capturing driftwood and allowing water to pass, (b) is a side view of the weir, and (c) is a side view of the weir. It is a top view. 河川の土石流区間において、(a)は流木及び土砂を捕捉して水を通過させる状態を説明する堰堤の正面図であり、(b)はその堰堤の側面図であり、(c)はその堰堤の平面図である。In the debris flow section of a river, (a) is a front view of a dam for explaining the state of capturing driftwood and sediment and allowing water to pass through, (b) is a side view of the dam, and (c) is the dam. FIG. (a)は変形例に係る堰堤を上流から見た正面図であり、(b)は変形例に係る堰堤を右側上方から見た斜視図である。(A) is the front view which looked at the dam which concerns on a modification from the upstream, (b) is the perspective view which looked at the dam which concerns on a modification from the upper right side. 従来技術において、(a)は捕捉体を設けるために堰堤を嵩上げする方法を説明する堰堤の正面図であり、(b)はその堰堤の側面図である。In the prior art, (a) is a front view of a dam for explaining a method of raising the dam to provide a trap body, and (b) is a side view of the dam. 従来技術において、(a)は図9の堰堤において流木を捕捉して水を通過させる状態を説明する堰堤の正面図であり、(b)はその堰堤の側面図である。In the prior art, (a) is a front view of a weir for explaining a state in which driftwood is captured and water is allowed to pass through the weir of FIG. 9, and (b) is a side view of the weir. 従来技術において、堰堤に捕捉体を設けるための腹付部を設けた状態を説明する堰堤の側面図である。FIG. 9 is a side view of a dam for explaining a state in which a belly portion for providing a catching body is provided on the dam in the related art.

本発明の好ましい実施の形態について、図面を参照しながら説明する。なお、以下に示す実施の形態は一つの例示であり、本発明の範囲において、種々の形態をとり得る。   A preferred embodiment of the present invention will be described with reference to the drawings. It should be noted that the embodiment described below is merely an example, and various embodiments can be adopted within the scope of the present invention.

<堰堤の構成>
図1に示すように、堰堤1は、本体2と、捕捉体3とを備えている。堰堤1は、河川に既に設置された既存の本体2に捕捉体3を新たに設置して流木や岩石の捕捉機能を高めたものである。
<Structure of dam>
As shown in FIG. 1, the dam 1 includes a main body 2 and a capturing body 3. The dam 1 has a catcher 3 newly installed on an existing main body 2 already installed in a river to enhance the function of catching driftwood and rocks.

(本体)
図1に示すように、本体2は、その底部が地盤に埋設されており、河川を横切るように河川の幅方向に沿って延在するように構築されている。本体2は、例えば、コンクリート又はソイルセメントによって構築されている。なお、本体2において、河川の上流側又は下流側に面する壁面を、複数の鋼製セグメントを連結することにより形成された鋼板壁とし、その内部にコンクリートやソイルセメントを充填してもよい。
本体2における河川の幅方向に沿った中央近傍の上端部には、周囲よりも上端部が低くなるように切り欠かれた(凹んだ)水通し部21が形成されている。水通し部21は、上流から流れてくる流水を本体2の中央近傍に集約して下流に流すために形成されている。
本体2は、河川の上流側に面する上流壁部22と、河川の下流側に面する下流壁部23とを備えている。上流壁部22は、水通し部21の底面から下方に向かうにつれて上流側に向けて傾斜している。下流壁部23は、水通し部21の底面から下方に向かうにつれて下流側に向けて傾斜している。
(Body)
As shown in FIG. 1, the main body 2 has its bottom portion buried in the ground and is constructed so as to extend along the width direction of the river so as to cross the river. The main body 2 is constructed of, for example, concrete or soil cement. In the main body 2, the wall surface facing the upstream or downstream side of the river may be a steel plate wall formed by connecting a plurality of steel segments, and the inside thereof may be filled with concrete or soil cement.
At the upper end near the center of the main body 2 along the width direction of the river, a water passage portion 21 is formed so as to be cut (recessed) so that the upper end is lower than the surroundings. The water passage portion 21 is formed so as to collect the flowing water flowing from the upstream in the vicinity of the center of the main body 2 and flow it to the downstream.
The main body 2 includes an upstream wall portion 22 facing the upstream side of the river and a downstream wall portion 23 facing the downstream side of the river. The upstream wall portion 22 inclines toward the upstream side as it goes downward from the bottom surface of the water passage portion 21. The downstream wall portion 23 inclines toward the downstream side as it goes downward from the bottom surface of the water passage portion 21.

(捕捉体)
図1から図5に示すように、捕捉体3は、河川の上流から流れてくる流木を捕捉して流水を通すものであり、本体2の上流壁部22に設けられている。捕捉体3は、本体2の延在方向、すなわち、河川の幅方向に沿って設けられている。捕捉体3の少なくとも一部は、水通し部21の上流側で水通し部21から離間し、水通し部21に対向する位置に設けられている。捕捉体3は、上方に向かうにつれて上流側に傾斜している。捕捉体3は、幅方向の長さLが水通し部21の幅Wよりも長くなるように構築されている。捕捉体3は、少なくとも一部が本体2の水通し部21の底面よりも上方に位置するように本体2に設けられている。
(Catcher)
As shown in FIGS. 1 to 5, the trap 3 traps the driftwood flowing from the upstream of the river and allows the running water to pass through, and is provided on the upstream wall portion 22 of the main body 2. The capturing body 3 is provided along the extending direction of the main body 2, that is, along the width direction of the river. At least a part of the capturing body 3 is provided on the upstream side of the water passage portion 21 so as to be separated from the water passage portion 21 and to face the water passage portion 21. The capturing body 3 inclines toward the upstream side as it goes upward. The capturing body 3 is constructed such that the length L in the width direction is longer than the width W of the water passage portion 21. The capturing body 3 is provided in the main body 2 so that at least a part thereof is located above the bottom surface of the water passage portion 21 of the main body 2.

捕捉体3は、本体2の幅方向(河川の幅方向)に沿って延在する1本の梁部31と、この梁部31の延在方向に沿って所定間隔おきに連結された複数の柱部32と、を備えている。
梁部31と柱部32は、例えば、鋼管によって形成されている。柱部32は、第1の脚部32aと、第2の脚部32bとを備えている。
第1の脚部32aは、一端(下端)が本体2の上流壁部22にアンカーボルト及びナットによって固定されている。第1の脚部32aは、他端(上端)において、梁部31に連結されている。これにより、各柱部32は梁部31によって連結されることになる。第1の脚部32aは、上流壁部22に固定された一端から他端に向かうにつれて上流側に傾斜するように上流壁部22に設けられている。
第2の脚部32bは、一端が本体2の上流壁部22にアンカーボルト及びナットによって固定されている。第2の脚部32bは、他端において、第1の脚部32aの長手方向中央部に連結されている。ここで、第2の脚部32bは、上流側の川底の傾斜に沿うように配置されていると、土石流の力を第2の脚部32bの軸線方向に沿って受けることができるので、第2の脚部32bが本体2の上流壁部22から引き剥がそうとする力を小さく抑えることができるので好ましい。これにより、柱部32は、側面視略λ字状に構築されており、第1の脚部32aは、第2の脚部32bよりも長くなっている。
隣接する柱部32の間隔Sは、河川を流れてくると想定される最大の流木の長さの半分の長さ、または、河川を流れてくると想定される最大の礫径に相当する長さであることが好ましい。
The capturing body 3 includes one beam portion 31 extending along the width direction of the main body 2 (width direction of the river) and a plurality of beam portions 31 connected at predetermined intervals along the extending direction of the beam portion 31. And a column portion 32.
The beam part 31 and the column part 32 are formed of, for example, a steel pipe. The column portion 32 includes a first leg portion 32a and a second leg portion 32b.
One end (lower end) of the first leg portion 32a is fixed to the upstream wall portion 22 of the main body 2 with anchor bolts and nuts. The first leg portion 32a is connected to the beam portion 31 at the other end (upper end). As a result, the pillar portions 32 are connected by the beam portion 31. The first leg portion 32a is provided on the upstream wall portion 22 so as to incline toward the upstream side from one end fixed to the upstream wall portion 22 toward the other end.
One end of the second leg portion 32b is fixed to the upstream wall portion 22 of the main body 2 by an anchor bolt and a nut. The second leg 32b is connected at the other end to the central portion in the longitudinal direction of the first leg 32a. Here, if the second leg portion 32b is arranged along the slope of the riverbed on the upstream side, the force of the debris flow can be received along the axial direction of the second leg portion 32b. The second leg portion 32b is preferable because it can suppress the force of peeling off the second leg portion 32b from the upstream wall portion 22 of the main body 2. As a result, the pillar portion 32 is constructed in a substantially λ shape in a side view, and the first leg portion 32a is longer than the second leg portion 32b.
The interval S between the adjacent pillars 32 is half the length of the maximum driftwood that is assumed to flow through the river, or the length corresponding to the maximum gravel diameter that is assumed to flow through the river. Is preferably

<捕捉体の設置方法>
次に、既存の堰堤の本体2に捕捉体3を設けて堰堤1を構築する際の捕捉体3の設置方法について説明する。
最初に、本体2の上流壁部22における捕捉体3の設置位置を削孔し、形成した孔にアンカーボルトを埋設し、モルタル等を孔に充填して固定する。
次に、アンカーボルトに第1の脚部32a及び第2の脚部32bの一端に設けられているフランジ部を通し、ナットで固定する。ここで、捕捉体3は、それぞれ鋼管からなる梁部31と柱部32とを予め溶接等にて接合しておき、クレーン等で吊しながらナットで固定する。ここで、捕捉体3の長さ(梁部31の長さ)は、少なくとも本体2の水通し部21の幅よりも長くなるように構築することが好ましい。
なお、捕捉体3を本体2に設ける際には、捕捉体3の一部が本体2の水通し部21の底面よりも上方に位置するように本体2に取り付ける。
以上の工程をもって、既設の堰堤の本体2に捕捉体3を設置することができ、既設の堰堤の流木等の捕捉機能を強化した堰堤1が構築される。
<How to install the capturing body>
Next, a method of installing the trap 3 when the trap 3 is provided on the main body 2 of the existing dam to construct the dam 1.
First, the installation position of the capturing body 3 in the upstream wall portion 22 of the main body 2 is drilled, an anchor bolt is embedded in the formed hole, and mortar or the like is filled in the hole and fixed.
Next, the anchor bolt is passed through a flange portion provided at one end of the first leg portion 32a and the second leg portion 32b, and fixed with a nut. Here, in the capturing body 3, the beam portion 31 and the column portion 32 each made of a steel pipe are joined in advance by welding or the like, and are fixed by nuts while being suspended by a crane or the like. Here, the length of the capturing body 3 (the length of the beam portion 31) is preferably constructed to be at least longer than the width of the water passage portion 21 of the main body 2.
When the capturing body 3 is provided on the main body 2, the capturing body 3 is attached to the main body 2 so that a part of the capturing body 3 is located above the bottom surface of the water passage portion 21 of the main body 2.
Through the above steps, the trap 3 can be installed in the main body 2 of the existing dam, and the dam 1 having an enhanced function of catching driftwood of the existing dam is constructed.

以上のように、既設の堰堤の本体2の上流壁部22に捕捉体3を設けることにより、流木や土砂等を捕捉する機能を付加することができ、堰堤1としての機能を向上させ、土砂災害を抑えることができる。
また、台風や大雨による土石流の発生を想定して事前に捕捉体3を本体2に設けることができるので、土砂災害を未然に防止することができる。
また、捕捉体3の第1の脚部32aは、上方に向かうにつれて上流側に傾斜しているので、流れてきた流木や巨礫は、第1の脚部32aに沿って堰堤1の下方に向かうように案内され、流木等の越流の防止効果をより高めることができる。
また、捕捉体3は、水通し部21の底面よりも上方に突出するように配置されているので、図6に示すように、長い年月が経過して堰堤1の上流側に土砂が堆積していても流木等の捕捉機能を維持することができる。
また、捕捉体3は、水通し部21との対向部分が水通し部21から離間して設けられているので、水通し部21に流木等が流れ込む前で流木等を捕捉することができる。
また、第2の脚部32bは、堰堤1が設置される地盤(川底)の傾斜に沿って配置されているので、第1の脚部32aから伝わる流木等の衝突エネルギーを軸線方向に沿って受けることができるので、第2の脚部32bが本体2から剥がれようとする力を最小限に抑えることができる。
また、捕捉体3の長さは、水通し部21の幅よりも長いので、水通し部21に流木等が流れ込む前でほとんどの流木等を捕捉することができる。
As described above, by providing the catching body 3 on the upstream wall portion 22 of the main body 2 of the existing dam, the function of catching driftwood, earth and sand, etc. can be added, and the function as the dam 1 can be improved. Can reduce disasters.
Further, since the capturing body 3 can be provided in advance in the main body 2 in consideration of the occurrence of a debris flow due to a typhoon or heavy rain, a sediment disaster can be prevented in advance.
Moreover, since the 1st leg part 32a of the capture | acquisition body 3 inclines toward an upstream side as it goes to an upper part, the driftwood and the boulder which flowed in go down below the dam 1 along the 1st leg part 32a. Thus, the effect of preventing overflow of driftwood and the like can be further enhanced.
Further, since the capturing body 3 is arranged so as to project above the bottom surface of the water passage portion 21, as shown in FIG. 6, after a long time has passed, earth and sand accumulate on the upstream side of the dam 1. Even if it does, the function of capturing driftwood can be maintained.
Further, since the capturing body 3 is provided so that the portion facing the water passage portion 21 is separated from the water passage portion 21, it is possible to capture the driftwood or the like before the driftwood or the like flows into the water passage portion 21.
Moreover, since the 2nd leg part 32b is arrange | positioned along the slope of the ground (river bottom) where the dam 1 is installed, the collision energy of the driftwood etc. which are transmitted from the 1st leg part 32a is set along an axial direction. Since the second leg 32b can be received, the force of the second leg 32b attempting to separate from the main body 2 can be minimized.
In addition, since the length of the capturing body 3 is longer than the width of the water passing portion 21, most of the drift wood or the like can be captured before the driftwood or the like flows into the water passing portion 21.

ここで、捕捉体3を既存の水通し部21に設けると、新たな水通し部を設けるために堰堤本体を嵩上げする必要があるが、堰堤1においては、捕捉体3は、上流壁部22に水通し部21から離間させて設けられているので、本体2を嵩上げする必要がなく、堰堤1の強度不足を解消するための改良工事が不要となる。
また、本体2からの越流に備えて堰堤1の下流側の改良工事や、水通し部21の拡幅工事、腹付工事を行う必要がないので、施工コストの削減、工期の短縮を図ることができる。
また、本体2の嵩上げや捕捉体3の設置のために、水通し部21のコンクリートをはつってから捕捉体3の固定用のコンクリートを打設することもなく、既設の本体2を大幅に改良する必要がない。
よって、従来よりも簡単に捕捉体3を本体2に設置でき、施工コストの削減、工期の短縮を図ることができる。
Here, when the trap body 3 is provided in the existing water passage portion 21, it is necessary to raise the main body of the dam in order to provide a new water passage portion. Since it is provided separately from the water passage portion 21, it is not necessary to raise the main body 2 and the improvement work for eliminating the insufficient strength of the dam 1 is unnecessary.
In addition, in order to prepare for overflow from the main body 2, it is not necessary to perform improvement work on the downstream side of the dam 1, widening work of the water passage part 21, and belly work, so it is possible to reduce the construction cost and the construction period. You can
Further, in order to raise the main body 2 and install the capturing body 3, it is not necessary to install concrete for fixing the capturing body 3 after the concrete of the water passage portion 21 is set up, and the existing main body 2 can be greatly expanded. No need to improve.
Therefore, the capturing body 3 can be installed on the main body 2 more easily than before, and the construction cost and the construction period can be shortened.

ここで、堰堤1の設置箇所が河川の掃流区間であれば、図7に示すように、捕捉体3で流木41のみを捕捉し、流水42は捕捉体3を通過して水通し部21に導かれる。これにより、流木41が水通し部21の開口部に堆積して水の流れを阻害し、水嵩の上昇による本体2の袖部からの越流を防止することができ、堰堤1を嵩上げする必要がなくなる。よって、既設の堰堤に手を加えることなく、流木41を効果的に捕捉できるよう、捕捉体3を設置することができ、工事にかかるコストや時間を抑えることができる。   Here, if the installation location of the dam 1 is a river sweep section, as shown in FIG. 7, only the driftwood 41 is captured by the capturing body 3, and the running water 42 passes through the capturing body 3 and the water passage portion 21. Be led to. As a result, the driftwood 41 accumulates in the opening of the water passage portion 21 and obstructs the flow of water, and it is possible to prevent overflow from the sleeve portion of the main body 2 due to an increase in water volume, and the dam 1 needs to be raised. Disappears. Therefore, the capturing body 3 can be installed so that the driftwood 41 can be effectively captured without modifying the existing dam, and the cost and time required for the construction can be suppressed.

一方、堰堤1の設置箇所が河川の土石流区間であれば、図8に示すように、捕捉体3で流木41及び土砂43を捕捉し、流水42は捕捉体3を通過して水通し部21に導かれる。これにより、流木41及び土砂43が水通し部21の開口部に堆積して水の流れを阻害し、水嵩の上昇による本体2の袖部からの越流を防止することができ、堰堤1を嵩上げする必要がなくなる。よって、既設の堰堤に手を加えることなく、流木41及び土砂43を効果的に捕捉できるよう、捕捉体3を設置することができ、工事にかかるコストや時間を抑えることができる。   On the other hand, if the location where the dam 1 is installed is in the debris flow section of the river, as shown in FIG. Be led to. As a result, the driftwood 41 and the earth and sand 43 are accumulated in the opening of the water passage portion 21 to obstruct the flow of water, and it is possible to prevent overflow from the sleeve portion of the main body 2 due to an increase in the volume of water, so that the dam 1 is closed. There is no need to raise it. Therefore, the capturing body 3 can be installed so that the driftwood 41 and the sand 43 can be effectively captured without modifying the existing dam, and the cost and time required for the construction can be suppressed.

<その他>
なお、本発明は、上記の実施の形態に限られるものではない。例えば、捕捉体の構造は、流木や巨礫を捕捉できる機能を有していれば自由に変更可能である。また、捕捉体を本体に固定する方法も自由に変更可能であり、上述した条件を満たす位置に配置されていればよい。
また、捕捉体は、既存の堰堤に取り付ける場合に限らず、堰堤の施工時に本体と共に構築してもよい。
<Other>
The present invention is not limited to the above embodiment. For example, the structure of the capturing body can be freely changed as long as it has a function of capturing driftwood and boulders. In addition, the method of fixing the capturing body to the main body can be freely changed as long as it is arranged at a position satisfying the above-mentioned conditions.
Further, the capturing body is not limited to being attached to an existing dam, and may be constructed together with the main body when constructing the dam.

<変形例>
次に、図9を用いて変形例に係る堰堤1Aを説明する。なお、以下の説明においては、上記の実施の形態に係る堰堤1と異なる部分、特に捕捉体5についてのみ説明する。
捕捉体5は、本体2の幅方向(河川の幅方向)に沿って延在する1本の梁部51と、この梁部51の延在方向に沿って所定間隔おきに連結された複数の柱部52と、を備えている。
梁部51と柱部52は、例えば、鋼管によって形成されている。柱部52は、第1の脚部52aと、第2の脚部52bとを備えている。隣接する柱部52の間隔S1は、上記の実施の形態における柱部32間の間隔Sと同様に、河川を流れてくると想定される最大の流木の長さの半分の長さ、または、河川を流れてくると想定される最大の礫径に相当する長さであることが好ましい。
捕捉体5の梁部51及び柱部52(第1の脚部52a、第2の脚部52b)は、捕捉体3の梁部31及び柱部32と同じ構成を有しているので具体的な構成については説明を省く。
捕捉体5は、水通し部21の幅よりも長くなるように構築されており、つまり、捕捉体5の幅方向(河川の幅方向)における両端部に設けられた柱部52が、少なくとも本体2に上流壁部22の側で対向する位置に配置されている。具体的には、捕捉体5は、幅方向において両端部側の柱部52のうち3本の柱部52が、幅方向において水通し部21の側方で本体2に対向する(かぶる)ように設置されている。換言すると、柱部52と柱部52との間隔S1を1スパンとした場合、捕捉体5は、2スパン分だけ本体2に対向するように構築されている。なお、本体2に対向する各2スパンのうち、水通し部21側における1スパンは、少なくとも一部が本体2に対向しているだけでもよい。
また、本体2に対向する捕捉体5の範囲は、例えば、河川を流れてくると想定される最大の流木の長さ、最大の礫径、または設置する堰堤1の規模等に応じて、1スパン分、3スパン分又はそれ以上のスパン分だけ本体2に対向するように、適宜、変更することができる。
以上のような、水通し部21に対して幅方向において本体2に対向する位置にまで延在する捕捉体5により、流れてきた流木や巨礫を捕捉する範囲が幅方向に広がり、流木や巨礫が捕捉体5の側方から回り込むことを効果的に防止することができる。
<Modification>
Next, a dam 1A according to a modification will be described with reference to FIG. In the following description, only the portion different from the dam 1 according to the above-described embodiment, particularly the capturing body 5, will be described.
The capturing body 5 includes one beam portion 51 extending along the width direction of the main body 2 (width direction of the river) and a plurality of beam portions connected along the extending direction of the beam portion 51 at predetermined intervals. And a column portion 52.
The beam portion 51 and the column portion 52 are formed of, for example, a steel pipe. The column portion 52 includes a first leg portion 52a and a second leg portion 52b. The distance S1 between the adjacent pillars 52 is half the length of the maximum length of driftwood assumed to flow through the river, as in the distance S between the pillars 32 in the above-described embodiment, or It is preferable that the length is equivalent to the maximum gravel diameter expected to flow through the river.
The beam portion 51 and the column portion 52 (the first leg portion 52a and the second leg portion 52b) of the capturing body 5 have the same configuration as the beam portion 31 and the column portion 32 of the capturing body 3 and therefore are specifically described. The description of the detailed configuration is omitted.
The capturing body 5 is constructed so as to be longer than the width of the water passing portion 21, that is, the pillar portions 52 provided at both end portions in the width direction (river width direction) of the capturing body 5 are at least the main body. 2 is disposed on the upstream wall 22 side. Specifically, in the capturing body 5, three pillars 52 of the pillars 52 on both end sides in the width direction face (cover) the main body 2 on the side of the water passage portion 21 in the width direction. It is installed in. In other words, when the interval S1 between the pillar portions 52 and the pillar portions 52 is 1 span, the capturing body 5 is constructed so as to face the main body 2 by 2 spans. Of the two spans facing the main body 2, one span on the water passing portion 21 side may be at least partially facing the main body 2.
Further, the range of the capturing body 5 facing the main body 2 is, for example, 1 depending on the maximum length of driftwood, the maximum gravel diameter, the scale of the dam 1 to be installed, etc. It can be appropriately changed so as to face the main body 2 by a span, a span of 3 or more.
As described above, the catching body 5 extending to the position facing the main body 2 in the width direction with respect to the water passage portion 21 widens the range in which the driftwood and boulders that have flowed are captured in the width direction, and driftwood and boulders are present. Can be effectively prevented from wrapping around from the side of the capturing body 5.

1,1A 堰堤
2 本体
3,5 捕捉体
21 水通し部
31,51 梁部
32,52 柱部
32a,52a 第1の脚部
32b,52b 第2の脚部
1, 1A Dam 2 Main body 3, 5 Capture body 21 Water passage part 31, 51 Beam part 32, 52 Column part 32a, 52a First leg part 32b, 52b Second leg part

Claims (11)

水通し部を有する堰堤であって、
前記堰堤の上流側の壁面に設けられ、上流から流れてくる流木を捕捉して流水を通す捕捉体を備え、
前記捕捉体の少なくとも一部は、前記水通し部の上流側で前記水通し部から離間して対向する位置に設けられており、
前記捕捉体は、上方に向かうにつれて上流側に傾斜していることを特徴とする堰堤。
A dam having a water passage,
Provided on the wall surface on the upstream side of the dam, and equipped with a trap body for trapping the driftwood flowing from the upstream and passing the running water,
At least a part of the capturing body is provided at a position facing away from the water passage portion on the upstream side of the water passage portion ,
The dam is characterized in that the capturing body is inclined toward the upstream side as it goes upward .
前記捕捉体は、
一端が前記堰堤の上流側の壁面に固定された第1の脚部と、一端が前記堰堤の上流側の壁面に固定され、他端が前記第1の脚部に連結された第2の脚部と、を有する複数の柱部と、
各柱部同士を連結する梁部と、
を備えることを特徴とする請求項1に記載の堰堤。
The capturing body is
A first leg having one end fixed to the upstream wall of the dam, and a second leg having one end fixed to the upstream wall of the dam and the other end connected to the first leg. A plurality of pillars having a section,
A beam connecting the pillars to each other,
The dam is provided with the dam according to claim 1 .
前記第1の脚部は、一端から他端に向かうにつれて上流側に傾斜していることを特徴とする請求項に記載の堰堤。 The dam according to claim 2 , wherein the first leg portion is inclined toward the upstream side from one end toward the other end. 前記第2の脚部は、前記堰堤が設置される地盤の傾斜に沿って配置されていることを特徴とする請求項又はに記載の堰堤。 The dam according to claim 2 or 3 , wherein the second leg is arranged along an inclination of the ground on which the dam is installed. 前記第1の脚部の他端は、前記水通し部の底面よりも上方にあることを特徴とする請求項からまでのいずれか一項に記載の堰堤。 The other end of the said 1st leg part is above the bottom face of the said water passage part, The dam bank as described in any one of Claim 2 to 4 characterized by the above-mentioned. 水通し部を有する堰堤であって
前記堰堤の上流側の壁面に設けられ、上流から流れてくる流木を捕捉して流水を通す捕捉体を備え、
前記捕捉体の少なくとも一部は、前記水通し部の上流側で前記水通し部から離間して対向する位置に設けられており、
前記捕捉体は、
一端が前記堰堤の上流側の壁面に固定された脚部を有し、
前記脚部の他端は、前記水通し部の底面よりも上方にあることを特徴とする堰堤。
A dam having a water passage ,
Provided on the wall surface on the upstream side of the dam, and equipped with a trap body for trapping the driftwood flowing from the upstream and passing the running water,
At least a part of the capturing body is provided at a position facing away from the water passage portion on the upstream side of the water passage portion,
The capturing body is
One end has a leg portion fixed to the wall surface on the upstream side of the dam,
The other end of the leg portion is above the bottom surface of the water passage portion.
前記捕捉体は、The capturing body is
前記脚部と、一端が前記堰堤の上流側の壁面に固定され、他端が前記脚部に連結された第2の脚部と、を含む複数の柱部と、A plurality of pillar portions including the leg portion and a second leg portion having one end fixed to a wall surface on the upstream side of the dam and the other end connected to the leg portion;
各柱部同士を連結する梁部と、A beam connecting the pillars to each other,
を備えるEquipped with
ことを特徴とする請求項6に記載の堰堤。The embankment according to claim 6, which is characterized in that.
前記脚部は、一端から他端に向かうにつれて上流側に傾斜していることを特徴とする請求項6又は7に記載の堰堤。The dam according to claim 6 or 7, wherein the leg portion is inclined toward the upstream side from one end toward the other end. 前記第2の脚部は、前記堰堤が設置される地盤の傾斜に沿って配置されていることを特徴とする請求項7又は請求項7を引用する請求項8に記載の堰堤。The dam according to claim 7, wherein the second leg portion is arranged along an inclination of the ground on which the dam is installed. 前記捕捉体は、上方に向かうにつれて上流側に傾斜していることを特徴とする請求項6から9までのいずれか一項に記載の堰堤。 The dam body according to any one of claims 6 to 9 , wherein the capturing body is inclined toward the upstream side as it goes upward. 前記捕捉体の長さは、前記水通し部の幅よりも長いことを特徴とする請求項1から10までのいずれか一項に記載の堰堤。 The dam according to any one of claims 1 to 10 , wherein a length of the capturing body is longer than a width of the water passage portion.
JP2018010569A 2017-02-07 2018-01-25 dam Active JP6692379B2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2017020335 2017-02-07
JP2017020335 2017-02-07

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2020072067A Division JP6997250B2 (en) 2017-02-07 2020-04-14 dam

Publications (2)

Publication Number Publication Date
JP2018127880A JP2018127880A (en) 2018-08-16
JP6692379B2 true JP6692379B2 (en) 2020-05-13

Family

ID=63173614

Family Applications (2)

Application Number Title Priority Date Filing Date
JP2018010569A Active JP6692379B2 (en) 2017-02-07 2018-01-25 dam
JP2020072067A Active JP6997250B2 (en) 2017-02-07 2020-04-14 dam

Family Applications After (1)

Application Number Title Priority Date Filing Date
JP2020072067A Active JP6997250B2 (en) 2017-02-07 2020-04-14 dam

Country Status (1)

Country Link
JP (2) JP6692379B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7370147B2 (en) * 2019-03-08 2023-10-27 Jfe建材株式会社 Weirs and methods of constructing them

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006274575A (en) * 2005-03-28 2006-10-12 Sumitomo Metal Steel Products Inc Permeable debris dam
JP5650030B2 (en) * 2011-03-29 2015-01-07 日鐵住金建材株式会社 Steel slit dam
KR102055233B1 (en) * 2012-11-30 2019-12-12 윈텍이앤씨 주식회사 Debris barrier and method for installing the same
JP6072570B2 (en) * 2013-03-06 2017-02-01 Jfe建材株式会社 Transmission type sabo dam
JP6068244B2 (en) * 2013-04-22 2017-01-25 日鐵住金建材株式会社 Sabo dam and steel pipe wall mounting method
JP6595891B2 (en) * 2015-12-04 2019-10-23 日鉄建材株式会社 Steel slit dam

Also Published As

Publication number Publication date
JP2020112027A (en) 2020-07-27
JP6997250B2 (en) 2022-01-17
JP2018127880A (en) 2018-08-16

Similar Documents

Publication Publication Date Title
JP6785056B2 (en) Installation method of capture body and dam structure
JP7118710B2 (en) Dam structure
JP4999657B2 (en) Driftwood capture structure
JP4486585B2 (en) Groundwater drain method
JP7118709B2 (en) Weirs and traps
JP2007056488A (en) Permeable check dam and its sediment capture member
JP2007177467A (en) Debris flow blocking work and its construction method
JP6692379B2 (en) dam
CN207904879U (en) A kind of Debris Flow on Slope Surface improvement integration engineering structure
JP2006274575A (en) Permeable debris dam
JP2006052540A (en) Permeable debris barrier and method for capturing gravel
JP7112875B2 (en) Weirs and traps
JP7214904B2 (en) Weirs and traps
JP3196277U (en) Drainage device for earth and sand
JP4663403B2 (en) Transmission type sabo dam
JP2017040081A (en) Steel slit dam
CN108560503A (en) A kind of mud-rock flow is blocked structure and method of blocking
KR102351049B1 (en) Debris barrier with integrated side wall
JP7235940B2 (en) Earth and sand fall protection work and its construction method
JP2018044337A (en) Structure and method for reinforcing embankment
JP4997424B2 (en) Reservoir wall structure
JP2022117850A (en) Dam, capturing body, and method for installing capturing body
KR102186118B1 (en) Debris barrier having protection cover for fixing portion
KR100965522B1 (en) Reinforcement material for slope ditch and slope ditch structure using the same
JP7421835B1 (en) protective fence

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190903

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20190903

A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20190906

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20191203

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200128

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200323

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200414

R150 Certificate of patent or registration of utility model

Ref document number: 6692379

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250