JP6651173B1 - Credit judgment material providing system for construction industry - Google Patents

Credit judgment material providing system for construction industry Download PDF

Info

Publication number
JP6651173B1
JP6651173B1 JP2019020357A JP2019020357A JP6651173B1 JP 6651173 B1 JP6651173 B1 JP 6651173B1 JP 2019020357 A JP2019020357 A JP 2019020357A JP 2019020357 A JP2019020357 A JP 2019020357A JP 6651173 B1 JP6651173 B1 JP 6651173B1
Authority
JP
Japan
Prior art keywords
information
deposit
date
construction
payment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019020357A
Other languages
Japanese (ja)
Other versions
JP2020129168A (en
Inventor
年高 杉村
年高 杉村
延顕 小松
延顕 小松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Office Concierge
Original Assignee
Office Concierge
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Office Concierge filed Critical Office Concierge
Priority to JP2019020357A priority Critical patent/JP6651173B1/en
Application granted granted Critical
Publication of JP6651173B1 publication Critical patent/JP6651173B1/en
Publication of JP2020129168A publication Critical patent/JP2020129168A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Abstract

【課題】複数の工事が同時に並行する場合であっても、個別の入金や出金、及びそれらの予定を容易に管理することができ、金融機関が融資の可否を判断することが可能な資料提供システムを提供する。【解決手段】本発明の建築業向け与信判断材料提供システム1は、建築業者が担当する工事に関する顧客情報、見積書情報、請求書情報、売上情報、支払いに関する情報を含む工事台帳を作成する工事台帳作成手段と、所定の期間における入金及び出金の内容を、それぞれ入金情報及び出金情報としてまとめた入出金管理画面を表示する入出金管理表示手段とを備え、売上情報には、入金予定日に関する情報である入金予定日情報と、顧客からの実際の入金があった日付である入金確定日に関する情報である入金確定日情報とが含まれており、入出金管理画面には、入金予定日情報及び入金確定日情報が表示される。【選択図】図6BAn object of the present invention is to make it possible to easily manage individual payments and withdrawals and their schedules even when a plurality of works are performed in parallel, and to enable a financial institution to judge whether or not to lend. Provide a delivery system. A system for providing a credit judgment material for a building business according to the present invention includes a work for creating a work ledger including customer information, estimate information, invoice information, sales information, and information on payment related to work performed by a contractor. Ledger creation means, and a deposit and withdrawal management display means for displaying a deposit and withdrawal management screen that summarizes the contents of deposit and withdrawal during a predetermined period as deposit information and withdrawal information, respectively, and the sales information includes a scheduled deposit. Scheduled deposit date information, which is information on the date, and confirmed deposit date information, which is information on the confirmed deposit date, which is the date on which the actual deposit was made from the customer, is included in the deposit / withdrawal management screen. The date information and the payment confirmation date information are displayed. [Selection] Fig. 6B

Description

本発明は、与信判断材料提供システムに関し、特に、複数の工事を並行して進める工務店等、土木や建築業者が扱う工事台帳として利用可能であるとともに、金融機関が当該建築業者向けに行う融資の可否判断のための材料を提供するシステムとして有用なものである。   The present invention relates to a system for providing credit judgment material, and in particular, it can be used as a construction ledger handled by a civil engineer or a contractor such as a construction shop that performs a plurality of works in parallel, and a loan provided by a financial institution to the contractor. This is useful as a system that provides a material for judging whether or not it is possible.

従来、複数の工事を同時並行して実施する建築業者が各工事を管理するために、工事台帳が使用されている。   2. Description of the Related Art Conventionally, a construction ledger has been used in order for a contractor who performs a plurality of works at the same time to manage each work.

工事台帳には、それぞれの工事における納期や材料の調達等の費用等について詳細に記載されており、工事台帳を見ることにより、工事の進捗状況やお金の流れを把握することができる。   The construction ledger describes in detail the delivery time, material procurement costs, etc. in each construction, and by looking at the construction ledger, it is possible to grasp the progress of construction and the flow of money.

このような工事台帳をコンピュータ上で作成するためのサービスが提案されている(特許文献1)。   A service for creating such a construction ledger on a computer has been proposed (Patent Document 1).

特開2004−54662号公報JP-A-2004-54662

特許文献1では、個々の工事に関して工事台帳を作成し、工事台帳の中で入力される請求内容や原価に関する情報に基づいて、所定の期間における受注高・売上高・原価を一覧表として管理することができる。   In Patent Literature 1, a work ledger is created for each work, and orders, sales, and costs in a predetermined period are managed as a list based on billing content and cost information input in the work ledger. be able to.

ところで、建築工事や土木工事において、工事期間は数か月や場合によっては一年以上かかるものもあり、工事に対する報酬の支払いは、出来高に応じて順次入金されたり、竣工後に一括して入金されることが多く、通常の場合、買掛金としての取り扱いとなる。その場合、材料費や外注費等の経費が出金されるタイミングに対し、入金のタイミングが遅くなり、一時的に資金不足の状態となる。そのような資金不足の状態を避けるために、銀行等の金融機関から融資を受けることで、資金不足を解消している。   By the way, in construction work and civil engineering work, the construction period may take several months or even one year or more, and payment for construction work will be paid sequentially according to the work volume or collectively after completion. In most cases, it is usually treated as accounts payable. In this case, the timing of payment is later than the timing at which expenses such as material costs and outsourcing costs are dispensed, and the funds are temporarily in short supply. In order to avoid such a shortage of funds, the shortage of funds is resolved by receiving loans from financial institutions such as banks.

融資を実行する立場の金融機関としては、融資先の事業者が信頼のおける事業者であるかどうかを判断する必要があるとともに、どのくらいのお金が必要になるのか、つまり融資の額をどのようにして設定するのか、判断が難しかった。融資を受ける側の建築業者としても、それぞれの工事に関して、将来的な出金の予定や入金の予定を詳細まで把握していることは少なく、どのくらいの資金が必要であるかを金融機関に説明することは困難であった。   As a financial institution in the position of lending, it is necessary to determine whether or not the borrower is a reliable business, and how much money is needed, that is, It was difficult to judge whether to set. The builder who receives the loan does not know the details of future withdrawal plans and deposit plans for each construction, and explains to the financial institution how much money is needed It was difficult to do.

このような状況の中、多数の工事を同時に抱える建築業者の経営者は、金融機関への説明のために奔走せざるを得ない状況であった。また、金融機関に提示する資料も、個々の出金や入金に関して詳細に開示できるものではなく、大まかな数字のみを示して説明するものであり、個別の入金や出金、及びそれらの予定まで詳細に説明できるような資料の開示が望まれていた。   In such a situation, the owner of the builder, who has many works at the same time, had to work hard to explain to the financial institution. In addition, the materials presented to financial institutions cannot explain in detail the individual withdrawals and deposits, but only show rough figures and explain them. Disclosure of materials that can be explained in detail was desired.

本発明は、このような要望に鑑みてなされたものであり、複数の工事が同時に並行する場合であっても、個別の入金や出金、及びそれらの予定を容易に管理することができ、金融機関が融資の可否を判断することが可能な資料提供システムを提供することを目的とする。   The present invention has been made in view of such a demand, and even when a plurality of works are concurrently performed at the same time, it is possible to easily manage individual deposits and withdrawals and their schedules, It is an object of the present invention to provide a material providing system that allows a financial institution to determine whether a loan can be made.

本発明では、以下のような解決手段を提供する。   The present invention provides the following solutions.

第1の特徴に係る発明は、建築業者が金融機関に提供する資料をコンピュータ上で作成する建築業向け与信判断材料提供システムであって、建築業者が担当する工事に関する顧客情報、見積書情報、請求書情報、売上情報、支払いに関する情報を含む工事台帳を作成する工事台帳作成手段と、所定の期間における入金及び出金の内容を、それぞれ入金情報及び出金情報としてまとめた入出金管理画面を表示する入出金管理表示手段とを備え、売上情報には、入金予定日に関する情報である入金予定日情報と、顧客からの実際の入金があった日付である入金確定日に関する情報である入金確定日情報とが含まれており、入出金管理画面には、入金予定日情報及び入金確定日情報が表示される、建築業向け与信判断材料提供システムを提供する。   The invention according to the first feature is a credit judgment material providing system for the construction industry in which a material provided by a contractor to a financial institution is created on a computer, wherein customer information, estimate information, A construction ledger creating means for creating a construction ledger including billing information, sales information, and payment information, and a deposit / withdrawal management screen that summarizes the contents of deposit and withdrawal in a predetermined period as deposit information and withdrawal information, respectively. Means for displaying the deposit / withdrawal management display means, and the sales information includes scheduled deposit date information which is information on the scheduled deposit date, and a deposit confirmed date which is information on a deposit confirmed date which is the date when the actual deposit was received from the customer. The present invention provides a credit determination material providing system for the building industry, which includes date information and a deposit / withdrawal management screen on which scheduled payment date information and payment settlement date information are displayed.

第1の特徴に係る発明によれば、所定の期間における入金及び出金の内容をまとめた入出金管理画面に、入金予定日情報及び入金確定日情報が取引ごとに表示されるため、入金の予測が立ちやすくなるとともに、入金予定日情報及び入金確定日情報がそれぞれの工事台帳に含まれる売上情報に基づいているため、複数の工事が並行して行われている場合においても、ひと目でお金の流れを正確に把握することが可能であり、金融機関の信頼を得られやすいシステムを提供することが可能となる。   According to the invention of the first aspect, the scheduled payment date information and the payment confirmation date information are displayed for each transaction on the deposit / withdrawal management screen that summarizes the details of the deposit and withdrawal during the predetermined period. The forecasts are easy to make, and the scheduled payment date information and the payment confirmation date information are based on the sales information included in each construction ledger, so even if multiple works are being performed in parallel, the money at a glance Flow can be accurately grasped, and a system that can easily obtain the trust of financial institutions can be provided.

第2の特徴に係る発明は、第1の特徴に係る発明であって、工事台帳作成手段は、工事の発注者に対して工事に関する報酬を請求する請求書を作成する請求書作成手段と、請求書作成手段で作成された請求書に記載された請求内容を売上として計上する売上計上手段とを備え、入出金管理表示手段は、請求内容が売上計上手段によって売り上げとして計上されると、請求内容を入出金管理画面に入金情報として追加する、建築業向け与信判断材料提供システムを提供する。   The invention according to the second aspect is the invention according to the first aspect, wherein the construction ledger creating means is configured to create a bill for billing a contractor for a construction-related fee, Sales accounting means for accounting the contents of the invoice written in the invoice created by the invoice creating means as sales. Provide a credit judgment material providing system for the construction industry, which adds the contents as payment information to the payment management screen.

第2の特徴に係る発明によれば、請求内容が売上計上手段によって売り上げとして計上されることを条件として、請求内容が入金情報として入出金管理画面に追加されるため、、簡単な操作で入出金管理画面を正確にアップデートすることが可能なシステムを提供できる。   According to the invention according to the second aspect, the billing content is added to the deposit / withdrawal management screen as payment information on the condition that the billing content is recorded as sales by the sales recording means. A system capable of accurately updating the money management screen can be provided.

第3の特徴に係る発明は、第1又は第2の特徴に係る発明であって、売上情報には、入金予定日情報及び入金確定日情報に加え、売上計上手段によって売り上げとして計上された日付に関する情報である売上計上日情報が含まれ、入金予定日情報は、売上計上日情報と顧客情報とに基づいて決定される、建築業向け与信判断材料提供システムを提供する。   The invention according to the third aspect is the invention according to the first or second aspect, wherein the sales information includes, in addition to the scheduled payment date information and the payment confirmation date information, a date recorded as sales by the sales recording means. The system provides a credit determination material providing system for the construction industry, which includes sales accounting date information that is information on the estimated payment date, and the expected payment date information is determined based on the sales accounting date information and customer information.

第3の特徴に係る発明によれば、入金予定日情報が売上計上日情報と顧客情報とに基づいて決定されるため、顧客に特有の締日や入金サイトに基づいて、各工事の項目ごとに入金予定日を決定することが可能となり、お金の出入りをより詳細に把握することが可能なシステムを提供できる。   According to the invention according to the third aspect, the scheduled payment date information is determined based on the sales accounting date information and the customer information. Therefore, each construction item is determined based on a customer-specific closing date and a payment site. , It is possible to determine the expected date of deposit, and it is possible to provide a system capable of grasping the incoming and outgoing of money in more detail.

本発明によれば、複数の工事が同時に並行する場合であっても、個別の入金や出金、及びそれらの予定を容易に管理することができ、金融機関が融資の可否を判断することが可能な建築業向け与信判断材料提供システムを提供できる。   Advantageous Effects of Invention According to the present invention, even when a plurality of works are simultaneously performed, individual payments and withdrawals and their schedules can be easily managed, and a financial institution can determine whether or not to lend. It is possible to provide a system for providing credit judgment materials for the building industry.

図1は、本実施形態における建築業向け与信判断材料提供システム1のハードウェア構成とソフトウェア機能を示すブロック図である。FIG. 1 is a block diagram illustrating a hardware configuration and software functions of a credit-determination-material providing system 1 for the building industry according to the present embodiment. 図2は、ホーム画面1000の一例を示す図である。FIG. 2 is a diagram illustrating an example of the home screen 1000. 図3は、顧客データベース32の一例を示す図である。FIG. 3 is a diagram illustrating an example of the customer database 32. 図4は、業者データベース33の一例を示す図である。FIG. 4 is a diagram illustrating an example of the trader database 33. 図5は、工事台帳一覧画面の一例を示す図である。FIG. 5 is a diagram illustrating an example of the construction ledger list screen. 図6Aは、工事台帳(その1)の一例を示す図である。FIG. 6A is a diagram illustrating an example of a construction ledger (part 1). 図6Bは、工事台帳(その2)の一例を示す図である。FIG. 6B is a diagram illustrating an example of a construction ledger (2). 図6Cは、工事台帳(その3)の一例を示す図である。FIG. 6C is a diagram illustrating an example of the construction ledger (No. 3). 図7は、入出金管理画面の一例を示す図である。FIG. 7 is a diagram showing an example of the deposit / withdrawal management screen. 図8Aは、資金繰年間実績予測表(その1)の一例を示す図である。FIG. 8A is a diagram illustrating an example of a cash flow annual result prediction table (part 1). 図8Bは、資金繰年間実績予測表(その2)の一例を示す図である。FIG. 8B is a diagram illustrating an example of a cash flow annual result prediction table (part 2). 図8Cは、資金繰年間実績予測表(その3)の一例を示す図である。FIG. 8C is a diagram illustrating an example of a cash flow annual result prediction table (3).

以下、本発明を実施するための形態について図を参照しながら説明する。なお、これはあくまでも一例であって、本発明の技術的範囲はこれに限られるものではない。   Hereinafter, embodiments for carrying out the present invention will be described with reference to the drawings. Note that this is merely an example, and the technical scope of the present invention is not limited to this.

[建築業向け与信判断材料提供システム1の構成]
図1は、本実施形態における建築業向け与信判断材料提供システム1のハードウェア構成とソフトウェア機能を説明するためのブロック図である。
[Configuration of Credit Determination Material Providing System 1 for Construction Industry]
FIG. 1 is a block diagram for explaining a hardware configuration and a software function of a credit determination material providing system 1 for the construction industry in the present embodiment.

建築業向け与信判断材料提供システム1は、データを制御する制御部10と、データを記憶する記憶部30と、ユーザや他の機器と通信を行う通信部40と、ユーザからの情報の入力を受け付ける入力部50と、制御部10で制御したデータや画像を出力する表示部60とを備える。   The credit judgment material providing system 1 for the building industry includes a control unit 10 that controls data, a storage unit 30 that stores data, a communication unit 40 that communicates with a user or another device, and inputs information from the user. The apparatus includes an input unit 50 for receiving data and a display unit 60 for outputting data and images controlled by the control unit 10.

制御部10は、CPU(Central Processing Unit)、RAM(Random Access Memory)、ROM(Read Only Memory)等を備える。   The control unit 10 includes a CPU (Central Processing Unit), a RAM (Random Access Memory), a ROM (Read Only Memory), and the like.

記憶部30は、データやファイルを記憶する装置であって、ハードディスクや半導体メモリ、記録媒体、メモリカード等による、データのストレージ部を備える。記憶部30は、後に説明する工事データベース31、顧客情報データベース32及び業者情報データベース33を記憶する。工事データベース31には、工事に関する情報を蓄積する工事案件データベース311、案件の入金に関する情報を蓄積する入金関係データベース312、及び、案件の支払いに関する情報を蓄積する支払関係データベース313が格納されている。   The storage unit 30 is a device that stores data and files, and includes a data storage unit such as a hard disk, a semiconductor memory, a recording medium, and a memory card. The storage unit 30 stores a construction database 31, a customer information database 32, and a trader information database 33 described later. The construction database 31 stores a construction case database 311, which stores information on construction, a payment-related database 312, which stores information on payment of a case, and a payment-related database 313, which stores information on payment of a case.

通信部40は、他の機器と通信可能にするためのデバイス、例えば、IEEE802.11に準拠したWi−Fi(Wireless Fidelity)対応デバイスを備える。   The communication unit 40 includes a device that enables communication with another device, for example, a device compatible with Wi-Fi (Wireless Fidelity) compliant with IEEE 802.11.

通信部40を備えることによって、金融機関の端末とインターネットを介して接続することができ、与信判断に必要な情報のやり取りをすることができる。   By providing the communication unit 40, it is possible to connect to a terminal of a financial institution via the Internet, and to exchange information necessary for credit determination.

制御部10は、所定のプログラムを読み込み、必要に応じて通信部40及び/又は記憶部30と協働することで、工事台帳作成部11と、顧客情報登録部12と、業者情報登録部13と、工事台帳一覧表示部14と、工事台帳表示部15と、入出金管理表示部16と、資金繰年間実績予測表示部17と、顧客変更部18と、予算確定部19と、見積書作成部20と、受注済金額登録部21と、請求書作成部22と、売上計上部23と、入出金確定部24と、売掛金入力部25と、買掛金入力部26と、当月実績確定部27とを実現する。   The control unit 10 reads a predetermined program, and cooperates with the communication unit 40 and / or the storage unit 30 as necessary, so that the work ledger creating unit 11, the customer information registering unit 12, the contractor information registering unit 13 Construction ledger list display part 14, construction ledger display part 15, deposit and withdrawal management display part 16, cash flow annual result prediction display part 17, customer change part 18, budget determination part 19, and estimate creation Unit 20, an ordered amount registering unit 21, an invoice creating unit 22, a sales accounting unit 23, a deposit / withdrawal determining unit 24, a receivable input unit 25, a payable input unit 26, and a current month actual determining unit 27. And realize.

入力部50の種類は、特に限定されない。入力部50として、例えば、キーボード、マウス、タッチパネル等が挙げられる。   The type of the input unit 50 is not particularly limited. Examples of the input unit 50 include a keyboard, a mouse, and a touch panel.

表示部60の種類は、特に限定されない。表示部60として、例えば、モニタ、タッチパネル等が挙げられる。   The type of the display unit 60 is not particularly limited. Examples of the display unit 60 include a monitor, a touch panel, and the like.

[建築業向け与信判断材料提供システム1の概要]
本実施形態における建築業向け与信判断材料提供システム1の概要について説明する。図2は建築業向け与信判断材料提供システム1を使用した際に表示部60に最初に表示されるホーム画面1000の一例を示す図である。
[Overview of Credit Judgment Material Providing System 1 for Construction Business]
The outline of the credit-determination-material providing system 1 for the building industry in the present embodiment will be described. FIG. 2 is a diagram illustrating an example of a home screen 1000 first displayed on the display unit 60 when the credit-determination-material providing system 1 for the construction industry is used.

ホーム画面1000には、工事台帳ボタン1100、入出金管理ボタン1300、資金繰年間予測ボタン1400、新規顧客登録ボタン1500及び新規業者登録ボタン1600の6つのボタンが表示され、システムを利用する建築業者は、いずれかのボタンをクリックないしタップすることで、6つのボタンに対応するそれぞれのメニューを表示する画面に進む。また、ホーム画面1000には、システムからの通信欄1200が表示され、例えば、メンテナンス情報やシステムのQ&A等、建築業向け与信判断材料提供システム1を利用するにあたって役に立つ情報や留意すべき情報を開示している。   On the home screen 1000, six buttons including a construction ledger button 1100, a deposit / withdrawal management button 1300, a cash flow annual prediction button 1400, a new customer registration button 1500, and a new contractor registration button 1600 are displayed. By clicking or tapping any of the buttons, the screen proceeds to a screen displaying menus corresponding to the six buttons. In addition, a communication column 1200 from the system is displayed on the home screen 1000, and information useful for using the credit judgment material providing system 1 for the construction industry, such as maintenance information and Q & A of the system, and information to be noted are disclosed. are doing.

詳細は後述するが、工事台帳ボタン1100をクリックないしタップすることで、これまでに作成された工事台帳が一覧表示され、入出金管理ボタン1300をクリックないしタップすることで、予定されていた支払いや入金の確定操作を行うことができ、資金繰年間予測ボタン1400をクリックないしタップすることで、選択される期間における収入、支出、財務調達等の内訳や財務収支の額を表示することができ、新規顧客登録ボタン1500をクリックまたはタップすることで、新たに顧客となった取引先の情報を登録することができ、新規業者登録ボタン1600をクリックまたはタップすることで、新たに取引を行うこととなった業者の情報を登録することができる。   Although details will be described later, by clicking or tapping the construction ledger button 1100, a list of the construction ledgers created so far is displayed, and by clicking or tapping the deposit / withdrawal management button 1300, the scheduled payment or Deposit confirmation operation can be performed, and by clicking or tapping the cash flow annual forecast button 1400, it is possible to display the breakdown of income, expenditure, financial procurement, etc., and the amount of financial balance in the selected period, By clicking or tapping a new customer registration button 1500, information on a business partner who has become a new customer can be registered. By clicking or tapping a new supplier registration button 1600, a new transaction can be performed. You can register the information of the company that has changed.

[新規顧客情報の登録]
まず、建築業向け与信判断材料提供システム1を使用するに際して必要な情報である、新規顧客に関する情報を登録する手順について説明する。ホーム画面1000において、ユーザが新規顧客登録ボタン1500をクリックまたはタップすると、制御部10は顧客情報登録部12を実行し、新規顧客に関する情報を入力する画面を表示部60に表示させる。入力する情報としては、顧客の名称、住所、担当者名、連絡先等の情報に加え、請求書の必着日や入金サイトに関する情報も併せて入力される。ユーザが必要事項を入力すると、入力された情報は図3に一例を示すような顧客データベース32に蓄積される。
[Register new customer information]
First, a procedure for registering information relating to a new customer, which is necessary information when using the credit judgment material providing system 1 for the construction industry, will be described. When the user clicks or taps a new customer registration button 1500 on home screen 1000, control unit 10 executes customer information registration unit 12, and causes display unit 60 to display a screen for inputting information on the new customer. As information to be input, in addition to information such as a customer's name, address, name of a person in charge, and contact information, information on a required arrival date of a bill and a payment site is also input. When the user inputs necessary information, the input information is stored in a customer database 32 as shown in FIG.

[新規業者情報の登録]
次に、新規業者に関する情報を登録する手順について説明する。ホーム画面1000において、ユーザが新規業者登録ボタン1600をクリックまたはタップすると、制御部10は業者情報登録部13を実行し、新規業者に関する情報を入力する画面を表示部60に表示させる。入力する情報としては、業者の名称、住所、担当者名、連絡先等の情報に加え、請求書の送付日や入金サイトに関する情報も併せて入力される。ユーザが必要事項を入力すると、入力された情報は、図4に一例を示す業者データベース33に蓄積される。
[Registration of new trader information]
Next, a procedure for registering information on a new contractor will be described. When the user clicks or taps a new trader registration button 1600 on home screen 1000, control unit 10 executes trader information registration unit 13 and causes display unit 60 to display a screen for inputting information on the new trader. As information to be input, in addition to information such as the name, address, person in charge, and contact information of the trader, information on the date of sending the bill and the payment site is also input. When the user inputs necessary items, the input information is stored in a trader database 33 whose example is shown in FIG.

[工事台帳一覧100の概要]
本実施形態における建築業向け与信判断材料提供システム1を使用した工事台帳一覧100について、図5を使用して説明する。
[Overview of the construction ledger list 100]
A construction ledger list 100 using the credit judgment material providing system 1 for the construction industry in the present embodiment will be described with reference to FIG.

ユーザが工事台帳ボタン1100をクリックまたはタップすると、制御部10は工事台帳一覧表示部14を実行し、図5に一例を示す工事台帳一覧100を表示する。図5に示すように、工事台帳一覧100のページには、新規工事台帳作成ページで作成済みの工事台帳の概要が一覧表示される。また、一覧表の右上には、新規工事台帳作成ボタン140が表示される。   When the user clicks or taps on the work ledger button 1100, the control unit 10 executes the work ledger list display unit 14 and displays the work ledger list 100, an example of which is shown in FIG. As shown in FIG. 5, on the page of the work ledger list 100, a summary of the work ledgers created on the new work ledger creation page is displayed in a list. A new construction ledger creation button 140 is displayed at the upper right of the list.

検索メニュー110では、年度による検索を行うことができ、図では平成30年度に作成された工事台帳を表示するよう設定されている。さらに、「建築」「大型」等の工事の種別による検索や、「進行中」「竣工」等の進行状況による検索、取引先名による検索ができるようにしてもよい。   In the search menu 110, a search can be performed according to the year, and in the figure, the work ledger created in the 2018 fiscal year is set to be displayed. Further, a search by the type of construction such as "construction" or "large", a search by the progress status such as "in progress" or "completed", and a search by the name of the business partner may be made possible.

工事台帳一覧100を示す表は、進行状況111、受注区分112、受注番号113、工事件名114、工事概要115、取引先名116、受注日117、着工日118、竣工日119、修正日120、売上合計121、材料費122、社外の人件費123、外注費124、粗利125、粗利率126、社内の人件費127、諸経費128、交通費129、利益130、利益率131、利益予測132等の項目によって構成される。   The table showing the construction ledger list 100 includes a progress status 111, an order category 112, an order number 113, a construction subject 114, a construction outline 115, a supplier name 116, an order date 117, a construction start date 118, a completion date 119, a correction date 120, Total sales 121, material costs 122, external labor costs 123, outsourcing costs 124, gross profit 125, gross profit ratio 126, in-house labor costs 127, overhead costs 128, transportation costs 129, profit 130, profit ratio 131, profit forecast 132 And so on.

進行状況111には、「着工前」「進行中」「竣工」等の工事の進行状況が表示される。   In the progress status 111, the progress status of the construction such as “before construction”, “in progress”, “completion” and the like is displayed.

受注区分112には、「建築」「管理」「大型」等の工事の種別が表示される。   In the order category 112, types of construction such as "construction", "management", and "large" are displayed.

受注番号113には、工事ごとに割り当てられる記号及び/又は番号であって、社内において当該工事を管理するための管理番号が表示される。   The order number 113 is a symbol and / or number assigned to each construction, and displays a management number for managing the construction in the company.

工事件名114には、例えば、「○○マンション建築工事」「△△公園造園プロジェクト」等の工事の名称が表示される。   In the construction subject 114, for example, names of constructions such as “○ apartment building construction” and “△△ park landscaping project” are displayed.

工事概要115には、「植栽管理」「建築工事」「土木工事」「造園工事」等の工事の内容が概要表示される。   In the construction outline 115, the contents of the construction such as “planting management”, “construction work”, “civil work”, “landscaping work” and the like are displayed.

取引先名116には、当該工事の発注者の名称が表示される。当該工事が下請け工事の場合、元請の事業者の名称が表示されるようにしてもよい。   The supplier name 116 displays the name of the orderer of the construction. When the construction is subcontracting construction, the name of the main contractor may be displayed.

受注日117には、当該工事を受注した日付が表示される。   In the order receiving date 117, the date when the construction was ordered is displayed.

着工部118には、当該工事に着工した日付が表示される。   The start date of the start of the construction is displayed on the start part 118.

竣工日119は、当該工事が竣工した日付が表示される。工事が進行中であり、進行状況111が「進行中」となっている場合は、空欄となる。   The completion date 119 indicates the date when the construction was completed. When the construction is in progress and the progress status 111 is “in progress”, this is blank.

修正日120は、保存されているデータを修正した日付が表示される。   As the correction date 120, a date when the stored data is corrected is displayed.

売上合計121には、当該工事の売り上げの合計金額が表示される。   In the total sales 121, the total amount of sales of the construction is displayed.

材料費122には、コンクリート、鉄骨、フェンス等、当該工事に使用するための材料を購入するに際して支払った合計金額が表示される。   The material cost 122 displays the total amount paid when purchasing materials for the construction, such as concrete, steel frames, and fences.

人件費(外)123には、自社以外の人材を雇用する際にかかった費用が表示される。   The labor cost (outside) 123 displays the cost of hiring a human resource other than the company.

外注費124には、当該工事の一部を業者に委託する際にかかった費用が表示される。   The outsourcing cost 124 displays the cost required to outsource a part of the construction to a contractor.

粗利125には、売り上げの合計金額から材料費、人件費(外)及び外注費を除いた粗利益の額が表示される。   The gross profit 125 indicates the amount of gross profit obtained by subtracting material costs, personnel costs (external), and outsourcing costs from the total amount of sales.

粗利率126には、粗利益の売り上げに対する割合である粗利率が表示される。   The gross profit rate 126 displays a gross profit rate which is a ratio of gross profit to sales.

人件費(社)127には、自社の人材にかかった人件費の額が表示される。   In the labor cost (company) 127, the amount of labor cost required for the company's personnel is displayed.

諸経費128には、その他にかかった経費の額が表示される。   The various expenses 128 indicate the amount of other expenses.

交通費129には、現場への行き来にかかった交通費の額が表示される。   In the transportation expenses 129, the amount of transportation expenses required for traveling to the site is displayed.

利益130には、売り上げの合計金額から、社内の人件費や諸経費等を除いた純利益の額が表示される。   The profit 130 displays the net profit excluding the in-house personnel costs and various expenses from the total sales amount.

利益率131には、純利益の売り上げに対する割合である利益率が表示される。   The profit rate 131 is a profit rate which is a ratio of net profit to sales.

利益予測132には、当初計画から修正された額も含めた利益率の予測値が表示される。また、修正された利益が、当初計画から上昇したのか下降したのかを示す矢印が表示される。   In the profit prediction 132, a predicted value of the profit ratio including the amount corrected from the initial plan is displayed. Also, an arrow indicating whether the revised profit has risen or fallen from the original plan is displayed.

工事台帳一覧100における欄外のそれぞれの工事の行に対応する箇所には、「詳細」ボタン133が設置されており、一覧表示されているそれぞれの工事に関する工事台帳を詳細表示させることができる。   A "details" button 133 is provided at a location corresponding to each construction line outside the margin in the construction ledger list 100, and the construction ledger relating to each construction listed can be displayed in detail.

つまり、ユーザが詳細ボタンをクリックまたはタップすると、制御部10は工事台帳表示部15を実行し、表示部60に図6A〜図6Cに一例を示す、それぞれの工事に関する詳細な工事台帳200を表示する。工事台帳200は、本実施形態における建築業向け与信判断材料提供システム1を使用する建築業者が担当する工事に関する、顧客情報、見積書情報、請求書情報、売上情報、支払いに関する情報を含むものである。本実施形態においては、図6A工事台帳(その1)、図6B工事台帳(その2)、図6C工事台帳(その3)と分けて説明するが、実際の画面においては、一画面に集約されて表示される。   That is, when the user clicks or taps the details button, the control unit 10 executes the work ledger display unit 15 and displays the detailed work ledger 200 related to each work, as shown in FIGS. 6A to 6C, on the display unit 60. I do. The construction ledger 200 includes customer information, quotation information, billing information, sales information, and payment information related to the construction work performed by the contractor using the credit-determination-material providing system 1 for the construction industry in the present embodiment. In the present embodiment, the construction ledger (part 1), the construction ledger (part 2), and the construction ledger (part 3) of FIG. 6C will be described separately. However, in the actual screen, they are integrated into one screen. Is displayed.

図6Aに示す、工事台帳(その1)には、受注番号201、受注区分202、工事件名203、工事概要204、現場住所205、顧客名206、進行状況207、売上(税別)208、売上(税込)209、受注日210、着工日211、竣工予定日212、竣工日213、請求予定日214、完了日215等、工事の概要が示される。   The construction ledger (No. 1) shown in FIG. 6A includes an order number 201, an order category 202, a construction subject 203, a construction outline 204, a site address 205, a customer name 206, a progress status 207, a sales (excluding tax) 208, a sales ( A summary of the construction is shown, such as 209, an order receipt date 210, a construction start date 211, a scheduled completion date 212, a completion date 213, a scheduled billing date 214, and a completion date 215.

顧客名の欄には顧客変更ボタン216が表示され、顧客変更ボタン216をクリックまたはタップすることによって、当該工事に関する顧客情報を変更することができる。つまり、ユーザが顧客変更ボタン216をクリックまたはタップすると、制御部10は顧客データベース32と協働して顧客変更部18を実行し、顧客を変更させるためページに遷移させる。顧客の変更は、顧客データベース32に蓄積されている顧客の中から選択することもできるし、ユーザが直接入力することによって変更することもできる。ユーザの選択又は入力に基づいて、新たな顧客が特定される。   A customer change button 216 is displayed in the column of the customer name. By clicking or tapping the customer change button 216, customer information relating to the construction can be changed. That is, when the user clicks or taps the customer change button 216, the control unit 10 executes the customer change unit 18 in cooperation with the customer database 32, and transitions to a page for changing the customer. The change of the customer can be selected from the customers stored in the customer database 32, or can be changed by the user directly inputting. A new customer is identified based on the user's selection or input.

また、工事台帳(その1)には、入金に関する情報である、締日217及び入金サイト218や、請求書必着日219に関する情報も表示される。   Further, the construction ledger (part 1) also displays information relating to the payment, such as the closing date 217, the payment site 218, and the invoice required arrival date 219.

さらに、材料費220、社外の人件費221、外注費222、粗利223、粗利率224、社内の人件費225、諸経費226、交通費227、利益228、利益率229等、支払いや利益に関する項目が一覧表示される。   Further, payment and profits such as material costs 220, external labor costs 221, outsourcing costs 222, gross profits 223, gross profit rates 224, in-house labor costs 225, overhead costs 226, transportation costs 227, profits 228, profit ratios 229, etc. Items are listed.

そして、予算が確定した場合にクリックまたはタップする予算確定ボタン230、予算確定日231、及び利益率の変動度合232が表示される。利益率の変動度合を表示する欄の隣には、利益率が当初の計画に比してプラスかマイナスかがひと目で分かるよう、矢印233が表示されている。   Then, when the budget is confirmed, a budget confirmation button 230 to be clicked or tapped, a budget confirmation date 231, and a fluctuation rate 232 of the profit rate are displayed. An arrow 233 is displayed next to the column for displaying the degree of change in the profit rate so that the profit rate can be seen at a glance as to whether the profit rate is positive or negative compared to the original plan.

ユーザが予算確定ボタン230をクリックまたはタップすると、制御部10は予算確定部19を実行し、既に工事に紐づいて登録されている工事に関する予算を確定する。   When the user clicks or taps the budget determination button 230, the control unit 10 executes the budget determination unit 19, and determines the budget related to the work already registered in association with the work.

図6Bに示す工事台帳(その2)には、入金及び出金に関する詳細情報がタブごとに分かれて表示される。タブの種類としては「売上タブ234」「仕入(材料費)タブ235」「外注費タブ236」「人件費タブ237」等があり、図6Bにおいては、「売上タブ234」をクリックした際の画面が表示されている。また、図示はしていないが、タブとしては、上記の他に、「材料費+外注費」「特殊メモ」「人件費」「交通費・諸経費」「仕入(外注費)」「施工予算」「実績・予定」「工程」「作業員名簿」「報告書」「対応履歴」が用意される。   In the construction ledger (No. 2) shown in FIG. 6B, detailed information on deposits and withdrawals is displayed for each tab. The tab types include a “sales tab 234”, a “purchase (material cost) tab 235”, a “outsourcing cost tab 236”, and a “personnel cost tab 237”. In FIG. 6B, when the “sales tab 234” is clicked. Screen is displayed. In addition, although not shown, as tabs, in addition to the above, “material costs + outsourcing costs”, “special memos”, “personnel costs”, “traffic costs / overhead costs”, “purchase (outsourcing costs)”, “construction” "Budget", "Actual / Schedule", "Process", "List of workers", "Report" and "Response history" are prepared.

「売上タブ234」に示される情報は、見積書情報、請求書情報、売上情報からなる。   The information shown in the “sales tab 234” includes quote information, bill information, and sales information.

見積書情報を示す表には、作成された見積書に関する情報が見積書ごとに一覧表示されており、具体的には、ステータス238、見積発行日239、見積金額240、請求書発行241、詳細表示242が表示されている。請求書発行241の欄には、一覧表示される見積書ごとに、請求書発行ボタン243が表示される。同様に、詳細表示242の欄には、一覧表示される見積書ごとに、詳細表示ボタン244及び解除ボタンが表示される。   In the table showing the estimate information, information on the created estimate is listed for each estimate. Specifically, the status 238, the estimate issue date 239, the estimate amount 240, the invoice issue 241, the details The display 242 is displayed. In the column of invoicing 241, an invoicing button 243 is displayed for each quote displayed in the list. Similarly, in the column of the detail display 242, a detail display button 244 and a release button are displayed for each quotation displayed in the list.

請求書発行ボタン243をクリックまたはタップすることによって、対応する欄の見積書について請求書を発行することができる。また、詳細表示ボタン244をクリックまたはタップすることによって、対応する欄の見積書を詳細に表示することができる。   By clicking or tapping the bill issuing button 243, a bill can be issued for the quote in the corresponding column. Further, by clicking or tapping the detail display button 244, the quote in the corresponding column can be displayed in detail.

また、見積書情報を示す表に近接して、見積書新規作成ボタン245及び受注済金額登録ボタン246が配置される。見積書新規作成ボタン245をクリックまたはタップすることによって、当該工事に関する新たな見積書を作成し、工事台帳に登録することができる。新たに作成された見積書は、見積書情報を示す表に追加して表示される。また、受注済み金額登録ボタン246をクリックまたはタップすることによって、顧客に提示した見積りが受注に至った場合に受注額として計上することができる。   A new estimate button 245 and a received order amount registration button 246 are arranged near the table showing the estimate information. By clicking or tapping the new estimate button 245, a new estimate for the construction can be created and registered in the construction ledger. The newly created quotation is displayed in addition to a table showing quotation information. In addition, by clicking or tapping on the received order amount registration button 246, when the estimate presented to the customer has reached an order, it can be recorded as the order amount.

続いて、請求書情報を示す表には、作成された請求書に関する情報が請求書ごとに一覧表示されており、具体的には、請求書発行日247、請求金額248、売上計上249、詳細表示250が表示されている。売上計上249の欄には、一覧表示される請求書ごとに、売上計上ボタン251が表示される。同様に、詳細表示250の欄には、一覧表示される請求書ごとに、詳細表示ボタン252及び削除ボタン253が表示される。   Subsequently, in the table showing the invoice information, information on the created invoice is listed for each invoice. Specifically, the invoice date 247, the invoice amount 248, the sales account 249, the details The display 250 is displayed. In the column of sales accounting 249, a sales accounting button 251 is displayed for each bill displayed in the list. Similarly, in the column of the detailed display 250, a detailed display button 252 and a delete button 253 are displayed for each invoice displayed in a list.

売上計上ボタン251をクリックまたはタップすると、対応する欄の請求書の請求金額が売り上げとして計上され、売上計上249の欄に「済」と表示される。つまり、請求書に記載された請求内容が売上として計上された際に、ユーザが売上計上ボタン251をクリックまたはタップすると、制御部10は売上計上部23を実行し、請求金額を売上金額として台帳データベース31に登録して、当該請求内容が売上情報の表に追加される。   When the sales accounting button 251 is clicked or tapped, the billed amount of the invoice in the corresponding column is accounted for as sales, and “done” is displayed in the sales accounting 249 column. That is, when the billing content described in the invoice is booked as sales, when the user clicks or taps the sales book button 251, the control unit 10 executes the sales book unit 23, and uses the billing amount as the sales amount as a ledger. After registration in the database 31, the billing content is added to the sales information table.

また、請求書情報の表における詳細表示ボタン252をクリックまたはタップすることによって、対応する欄の請求書を詳細に表示することができる。さらに、削除ボタン253をクリックまたはタップすることによって、対応する欄の請求書を工事台帳200から削除することができる。   Further, by clicking or tapping the detail display button 252 in the bill information table, the bill in the corresponding column can be displayed in detail. Further, by clicking or tapping the delete button 253, the bill in the corresponding column can be deleted from the construction ledger 200.

また、請求書情報を示す表に近接して、請求書新規作成ボタン254が配置される。請求書新規作成ボタン254をクリックまたはタップすることによって、当該工事に関する新たな請求書を作成し、工事台帳200に登録することができる。新たに作成された請求書は、請求書情報を示す表に追加して表示される。   In addition, a new invoice creation button 254 is arranged near the table indicating the invoice information. By clicking or tapping the new bill creation button 254, a new bill related to the construction can be created and registered in the construction ledger 200. The newly created bill is displayed in addition to a table showing bill information.

売上情報を示す表には、売上に関する情報が一覧表示されており、具体的には、売上計上日255、入金予定日256、入金種別257、入金確定日258、入金金額259、請求確定260、削除ボタン261が表示される。   In the table showing the sales information, information on sales is displayed in a list. Specifically, the sales recording date 255, the expected payment date 256, the payment type 257, the payment confirmation date 258, the payment amount 259, the payment confirmation 260, A delete button 261 is displayed.

売上情報を示す表は、請求書新規作成ボタン254で作成した請求書及び売上計上ボタン251の操作に基づいて作成される。すなわち、請求書新規作成ボタン254をクリックまたはタップすることによって作成され請求書情報を示す表に表示された請求書に関して、売上計上ボタン251をクリックまたはタップすることによって、売上情報を示す表に追加して表示されるようになる。したがって、売上計上ボタン251をクリックまたはタップされた請求書情報が売上情報として一覧表示される。   The table showing the sales information is created based on the operation of the invoice created by the new invoice creation button 254 and the sales accounting button 251. That is, regarding the invoice created by clicking or tapping the new invoice button 254 and displayed in the table showing the invoice information, clicking or tapping the sales accounting button 251 adds it to the table showing the sales information. Will be displayed. Therefore, the bill information clicked or tapped on the sales accounting button 251 is displayed as a list of sales information.

売上情報を示す表における売上計上日255の欄には、請求書情報を示す表の請求書発行日の欄に示す日付けが、売上計上日情報として表示される。   In the column of the sales accounting date 255 in the table showing the sales information, the date shown in the column of the invoice issue date of the table showing the invoice information is displayed as the sales accounting date information.

入金予定日256の欄には、図6Aに示される、顧客に応じた入金サイト218に関する情報に基づいて算出される日付けが、入金予定日情報として表示される。例えば、図6Aを参照すると、この場合の入金サイトは、締日である末日が属する月の翌々月の15日であるので、2018年9月30日付けで発行された請求書については、2018年11月15日が入金予定日として算出される。   In the column of the expected payment date 256, a date calculated based on the information on the payment site 218 corresponding to the customer shown in FIG. 6A is displayed as expected payment date information. For example, referring to FIG. 6A, since the deposit site in this case is the 15th of the month following the month to which the last day of the closing day belongs, the invoice issued on September 30, 2018 November 15 is calculated as the scheduled payment date.

入金確定日258の欄には、後述する入出金管理画面300(図7)における操作に基づいて、入金があった場合に、その日付が、入金確定日情報として表示される。   In the column of the payment confirmation date 258, when a payment is made based on an operation on a payment management screen 300 (FIG. 7) described later, the date is displayed as payment confirmation date information.

入金金額259の欄には、請求書情報を示す表で表示される請求金額の欄に示す金額が表示される。   In the column of the deposit amount 259, the amount shown in the column of the amount of bill displayed in the table showing the bill information is displayed.

また、一覧表示される売上情報ごとに削除ボタン261が配置されており、削除ボタン261をクリックまたはタップすることによって、対応する欄の売上を工事台帳200から削除することができる。   Further, a delete button 261 is arranged for each sales information displayed in a list, and by clicking or tapping the delete button 261, the sales in the corresponding column can be deleted from the construction ledger 200.

また、売上情報を示す表に近接して、入出金管理ボタン262が配置される。ユーザが入出金管理ボタン262をクリックまたはタップすると、制御部10は入出金管理表示部16を実行し、表示部60に後述する入出金管理画面300(図7)を表示される。入出金管理画面300において、ユーザは、予定された入金や出金を確定する操作等を行うことができる。   Further, a deposit / withdrawal management button 262 is arranged close to the table indicating the sales information. When the user clicks or taps the deposit / withdrawal management button 262, the control unit 10 executes the deposit / withdrawal management display unit 16, and displays a deposit / withdrawal management screen 300 (FIG. 7) described later on the display unit 60. On the deposit / withdrawal management screen 300, the user can perform an operation for confirming the scheduled deposit or withdrawal.

図6Cに示す、工事台帳(その3)には、材料費の詳細情報と外注費の詳細情報が表示される。   In the construction ledger (No. 3) shown in FIG. 6C, detailed information on material costs and detailed information on outsourcing costs are displayed.

材料費の詳細情報には、支払先263、日付264、支払いの内容265、単価266、数量267、支払金額268、支払予定日269、支払確定日270が表示される。   The detailed information of the material cost displays a payee 263, a date 264, payment details 265, a unit price 266, a quantity 267, a payment amount 268, a scheduled payment date 269, and a payment confirmation date 270.

外注費の詳細情報に関しても、材料費の詳細情報と同様に、支払先271、日付272、支払いの内容273、単価274、数量275、支払金額276、支払予定日277、支払確定日278が表示される。   As for the detailed information on the outsourcing cost, the payee 271, the date 272, the details of the payment 273, the unit price 274, the quantity 275, the payment amount 276, the expected payment date 277, and the payment confirmation date 278 are displayed in the same manner as the detailed information on the material cost. Is done.

材料費、外注費ともに支払確定日270、278については、支払いが確定していない場合には空欄となる。   Both the material costs and the outsourcing costs are blank on the payment settlement dates 270 and 278 if the payment is not fixed.

図6A〜図6Cに示す工事台帳200を作成するにあたって、ユーザたる建築業者は、まず、ホーム画面1000における工事台帳ボタン1100をクリックまたはタップする。工事台帳ボタン1100がクリックまたはタップされると、制御部10は工事台帳一覧表示部14を実行し、図5に一例を示す工事台帳一覧100を表示する。そして、工事台帳の一覧表の右上に表示される新規工事台帳作成ボタン140がユーザによってクリックまたはタップされると、制御部10は工事台帳作成部11を実行し、表示部60に図示しない新規工事台帳作成ページを表示する。ユーザは表示された新規工事台帳作成ページにおいて必要な情報を入力することによって、新規の工事台帳200が作成される。   When creating the construction ledger 200 shown in FIGS. 6A to 6C, the builder who is the user first clicks or taps the construction ledger button 1100 on the home screen 1000. When the construction ledger button 1100 is clicked or tapped, the control unit 10 executes the construction ledger list display unit 14 and displays the construction ledger list 100 shown in FIG. Then, when the user clicks or taps a new construction ledger creation button 140 displayed on the upper right of the construction ledger list, the control unit 10 executes the construction ledger creation unit 11 and displays new construction not shown on the display unit 60. Display the ledger creation page. The user inputs necessary information on the displayed new construction ledger creation page, whereby a new construction ledger 200 is created.

つまり、図示は省略するが、ホーム画面1000における工事台帳ボタン1100をクリックまたはタップすると、工事台帳一覧100が表示され、工事台帳一覧100における新規工事台帳作成ボタン140をクリックまたはタップすると、工事台帳200を新規に作成する画面が表示される。   That is, though not shown, when the construction ledger button 1100 on the home screen 1000 is clicked or tapped, the construction ledger list 100 is displayed. When the new construction ledger creation button 140 in the construction ledger list 100 is clicked or tapped, the construction ledger 200 is displayed. Is displayed.

工事台帳200を新規に作成する画面において、まず、工事に関する基本情報である、受注区分、工事件名、工事概要、現場住所、顧客名を入力する。また、必要に応じて、受注日、着工日、竣工予定日に関する情報を入力する。これによって、図6Aに示す工事台帳200を形成する基本的な情報が登録され、図6A〜図6Cに示す工事台帳200が表示部60に表示される。   On the screen for newly creating the construction ledger 200, first, the order information, the construction subject, the construction outline, the site address, and the customer name, which are basic information related to the construction, are input. In addition, information on an order receiving date, a construction start date, and a scheduled completion date is input as necessary. As a result, basic information forming the construction ledger 200 shown in FIG. 6A is registered, and the construction ledger 200 shown in FIGS. 6A to 6C is displayed on the display unit 60.

次に、ユーザが図6Bに示される見積書情報の見積書新規作成ボタン245をクリックまたはタップすると、制御部10は見積書作成部20を実行し、表示部60に図示しない見積書作成ページを表示する。ユーザは見積書作成ページにおいて必要事項を入力することで、見積書が新たに作成され、工事台帳に登録される。作成された見積書は、工事に紐づいた見積書情報として工事データベース31に保管される。   Next, when the user clicks or taps the new estimate button 245 of the estimate information shown in FIG. 6B, the control unit 10 executes the estimate creation unit 20 and displays the estimate creation page (not shown) on the display unit 60. indicate. The user inputs necessary items on the estimate creation page, and a new estimate is created and registered in the construction ledger. The created estimate is stored in the construction database 31 as estimate information linked to the construction.

工事が受注に至った場合において、ユーザが見積書情報における受注済金額登録ボタン246をクリックまたはタップすると、制御部10は受注済金額登録部21を実行し、見積金額を受注済み金額として計上する。なお、見積書を作成していない場合においても、受注済金額登録ボタン246をクリックまたはタップすることで、受注済金額を登録することができる。   If the user clicks or taps the received amount registration button 246 in the estimate information when the construction has been ordered, the control unit 10 executes the received amount registration unit 21 and records the estimated amount as the received amount. . Note that, even when an estimate has not been prepared, the received amount can be registered by clicking or tapping the received amount registration button 246.

また、ユーザが請求書情報における請求書新規作成ボタン254をクリックまたはタップすると、制御部10は請求書作成部22を実行し、表示部60に図示しない請求書作成ページを表示する。ユーザは請求書作成ページにおいて必要事項を入力することで、工事の発注者に対して工事に関する報酬を請求する請求書が新規に作成され、工事台帳200に登録される。出来高に応じた入金である場合には、複数の段階に応じた複数の請求書を作成する。   When the user clicks or taps the new bill creation button 254 in the bill information, the control unit 10 executes the bill creation unit 22 and displays a bill creation page (not shown) on the display unit 60. By inputting necessary information on the bill creation page, the user newly creates a bill for requesting a contractor for a construction-related fee, and registers the bill in the construction ledger 200. If the payment is based on the volume, a plurality of bills are prepared according to a plurality of stages.

そして、これら見積もりや請求に関する情報は、受注時の入金計画として、入金関係データベース312に登録される。   Then, the information related to the estimation and the billing is registered in the payment-related database 312 as a payment plan at the time of receiving an order.

また、詳細は省略するが、外注費や材料費等の支払い情報に関しても、同様に、支払金額、支払予定日及び取引先等の情報を登録することにより、図6Cに示すような表を作成することができる。そして、これらの支払いに関する情報は、受注時の出金計画として、支払関係データベース313に登録される。   Although details are omitted, a table as shown in FIG. 6C is also created for payment information such as outsourcing costs and material costs by similarly registering information such as the amount of money to be paid, the scheduled payment date, and business partners. can do. Information on these payments is registered in the payment-related database 313 as a withdrawal plan at the time of receiving an order.

新たに作成された工事台帳に関するすべての情報は、工事データベース31に登録される。つまり、工事に関する情報は工事案件データベース311に、案件の入金に関する情報は入金関係データベース312に、そして、案件の支払いに関する情報は支払関係データベース313に、それぞれ登録される。   All the information on the newly created construction ledger is registered in the construction database 31. That is, information on the construction is registered in the construction case database 311, information on the payment of the case is registered in the payment relation database 312, and information on the payment of the case is registered in the payment relation database 313.

そして、受注時に入力された、当初の計画に基づく情報は、毎月の実績と比較され、必要に応じて修正される。   Then, the information based on the initial plan, which was input at the time of receiving the order, is compared with the actual results of each month, and is corrected as necessary.

[入出金管理画面300の概要]
次に、図7に示される入出金管理画面の一例を用いて、ホーム画面1000において表示される入出金管理ボタン1300をクリックまたはタップした場合に表示される入出金管理画面300について説明する。入出金管理画面300は、所定の期間における入金及び出金の内容を、それぞれ入金情報及び出金情報としてまとめたものである。
[Overview of Deposit and Withdrawal Management Screen 300]
Next, with reference to an example of the deposit / withdrawal management screen shown in FIG. 7, the deposit / withdrawal management screen 300 displayed when the deposit / withdrawal management button 1300 displayed on the home screen 1000 is clicked or tapped will be described. The deposit and withdrawal management screen 300 summarizes the contents of deposit and withdrawal during a predetermined period as deposit information and withdrawal information, respectively.

ユーザが入出金管理ボタン1300をクリックまたはタップすると、制御部10は入出金管理表示部16を実行し、図7に示す入出金管理画面300を表示部60に表示する。図7に示す入出金管理画面300には、入出金の内容301、顧客名/支払先名302、工事件名303、取引日304、予定日305、確定日306、入金額(税込)307、出金額(税込)308、内容(任意)309を一覧にした表が表示される。また、表示させる期間を指定するための期間指定ボタン310も表示される。この表は、期間指定ボタン310をクリックまたはタップして表示させる期間を指定することによって作成される。一度、表示された表であっても、表示させる期間を変更することで、変更された期間に対応する入出金管理画面300が表示される。また、詳細は省略するが、期間だけでなく、顧客名/支払先名302、工事件名303、取引日304、予定日305、確定日306などの項目別に入出金管理画面300に表示させる条件を設定することも可能である。   When the user clicks or taps the deposit / withdrawal management button 1300, the control unit 10 executes the deposit / withdrawal management display unit 16 and displays the deposit / withdrawal management screen 300 shown in FIG. The deposit / withdrawal management screen 300 shown in FIG. 7 includes deposit / withdrawal contents 301, customer name / payee name 302, construction subject 303, transaction date 304, scheduled date 305, fixed date 306, deposit amount (including tax) 307, A table listing amounts (tax included) 308 and contents (arbitrary) 309 is displayed. Further, a period designation button 310 for designating a period to be displayed is also displayed. This table is created by specifying a period to be displayed by clicking or tapping the period specification button 310. Even if the table is displayed once, by changing the display period, the deposit / withdrawal management screen 300 corresponding to the changed period is displayed. Although not described in detail, not only the period but also the conditions to be displayed on the deposit / withdrawal management screen 300 for each item such as the customer name / payee name 302, the construction subject 303, the transaction date 304, the scheduled date 305, and the fixed date 306. It is also possible to set.

図7に示す入出金に関する情報は、図6B及び図6Cに示される工事台帳において登録された請求書情報や支払情報に基づいて作成される。すなわち、制御部10の入出金管理表示部16は、工事データベース31に蓄積されている請求書情報や支払情報を抽出し、表の形に並べ替えて表示部60に表示させる。具体的には、請求書情報の売上計上ボタン249をクリックまたはタップすることで、請求内容が売上として計上されるが、同様に、売上計上ボタン249がクリックまたはタップされると、制御部10の入出金管理表示部16が、請求内容を入出金管理画面300に入金情報として追加する。なお、説明は省略するが、出金情報に関しても、同様にして入出金管理画面300に追加される。   The information on deposits and withdrawals shown in FIG. 7 is created based on bill information and payment information registered in the construction ledger shown in FIGS. 6B and 6C. That is, the deposit / withdrawal management display unit 16 of the control unit 10 extracts the bill information and the payment information stored in the construction database 31, sorts them into a table, and displays them on the display unit 60. Specifically, by clicking or tapping the sales accounting button 249 of the bill information, the billing content is accounted for as sales. Similarly, when the sales accounting button 249 is clicked or tapped, the control unit 10 The deposit and withdrawal management display unit 16 adds the content of the request to the deposit and withdrawal management screen 300 as deposit information. Although description is omitted, withdrawal information is similarly added to the deposit / withdrawal management screen 300.

図7に示す入出金管理画面300において、入出金の内容301の欄には、「売上」又は「外注費」「材料費」「現場経費」などの情報が、入金や出金の内訳として表示される。   In the deposit / withdrawal management screen 300 shown in FIG. 7, information such as “sales” or “outsourcing costs”, “material costs”, and “on-site expenses” is displayed as a breakdown of deposits and withdrawals in the column of deposit / withdrawal contents 301. Is done.

顧客名/支払先名302の欄には、当該入出金の相手となっている顧客又は支払先の業者の名称が表示される。   In the column of customer name / payee name 302, the name of the customer or payee trader with whom the deposit / withdrawal is made is displayed.

工事件名303の欄には、その取引が行われる工事件名であって、図3の工事台帳一覧に示した工事件名114が表示される。   In the column of the construction subject 303, the construction subject in which the transaction is performed, that is, the construction subject 114 shown in the construction ledger list of FIG. 3 is displayed.

取引日304の欄には、受注又は発注した日の日付け、言い換えると、売上又は支払として計上した日付けが取引日情報として表示される。または、取引の内容を工事台帳に登録した日付を表示するようにしてもよい。   In the column of the transaction date 304, the date of the order or order, in other words, the date recorded as sales or payment, is displayed as transaction date information. Alternatively, the date when the content of the transaction is registered in the work ledger may be displayed.

予定日305の欄には、入金又は出金が予定されている日付けが、入金予定日情報又は出金予定日情報として表示される。   In the column of the scheduled date 305, the date when payment or payment is scheduled is displayed as scheduled payment date information or scheduled payment date information.

確定日306の欄には、入金又は出金が確定した日付けが、入金確定日情報又は出金確定日情報として表示される。欄内にはチェックボックス311が配置されており、ユーザが当該チェックボックス311をクリックまたはタップすると、制御部10は入出金確定部24を実行し、台帳に登録されている入金予定の情報又は出金予定の情報を確定したものとすることができる。つまり、入金の欄のチェックボックス311をクリックまたはタップすることで、台帳内において入金が確定し、図6Bに示した売上情報の表における入金確定日258の欄に入金が確定した日付が表示される。また、出金の欄のチェックボックス311をクリックまたはタップすることで、台帳内において出金が確定し、図6Cに示した外注費や材料費等の支払情報の表における支払確定日270、278の欄に出金が確定した日付が表示される。   In the column of the fixed date 306, the date when the payment or the payment is fixed is displayed as payment fixed date information or payment fixed date information. A check box 311 is arranged in the column, and when the user clicks or taps the check box 311, the control unit 10 executes the deposit / withdrawal determination unit 24, and displays information on the deposit schedule or withdrawal registered in the ledger. The information of the money schedule can be determined. That is, by clicking or tapping the check box 311 in the payment column, the payment is confirmed in the ledger, and the date of payment confirmation is displayed in the column of the payment confirmation date 258 in the sales information table shown in FIG. 6B. You. Also, by clicking or tapping the check box 311 in the withdrawal column, the withdrawal is confirmed in the ledger, and the payment confirmation dates 270 and 278 in the payment information table such as the outsourcing cost and the material cost shown in FIG. 6C. The date when the withdrawal is confirmed is displayed in the column.

入金額(税込)307の欄には、予定されている又は確定している入金額が、入金額情報として税込み価格で表示される。内容の欄が出金に関する記載の場合、入金額(税込)の欄には0が表示される。また、出金額(税込)308の欄には、予定されている又は確定している出金額が、出金額情報として税込み価格で表示される。内容の欄が入金に関する記載の場合、出金額(税込)の欄には0が表示される。また、表示を省略するが、それぞれの取引に対して、消費税率を表示させるよう構成することもできる。   In the column of the deposit amount (including tax) 307, the scheduled or fixed deposit amount is displayed as the deposit amount information with the price including tax. In the case where the content column is a description related to withdrawal, 0 is displayed in the deposit amount (tax included) column. In the column of the amount to be paid (including tax) 308, the planned or fixed amount to be paid is displayed as the amount of money to be paid with tax-included price. In the case where the content column is a description relating to payment, 0 is displayed in the column of withdrawal amount (including tax). Although not shown, the consumption tax rate may be displayed for each transaction.

内容(任意)309の欄には、閲覧者の理解を助けるために、取引の内容が任意表示される。例えば、外注費の欄に関する内容であれば、「出来高」という内容が表示される。   In the column of contents (optional) 309, contents of the transaction are arbitrarily displayed in order to help the reader understand. For example, if the content is related to the subcontracting cost column, the content "volume" is displayed.

図7に示す入出金管理画面の表は、図6A〜図6Cに示す工事台帳に基づいて作成される。すなわち、図6Bに示すように、工事台帳の売上タブにおいて、請求書新規作成ボタン254をクリックまたはタップすることによって、工事台帳を閲覧している工事に紐づいた請求書を新規に作成することができる。作成された請求書をシステムに登録することによって、当該請求書が請求書情報に新たに追加される。その状態で、表中の売上計上ボタン249をクリックまたはタップすると、売上として計上され、図6Bに表示される売上情報の表に新たに追加される。同時に、入出金管理表示部16によって抽出されるデータとして、新たに追加される。   The table of the deposit / withdrawal management screen shown in FIG. 7 is created based on the construction ledger shown in FIGS. 6A to 6C. That is, as shown in FIG. 6B, by clicking or tapping the new bill creation button 254 in the sales tab of the construction ledger, a new bill associated with the construction viewing the construction ledger is newly created. Can be. By registering the created bill in the system, the bill is newly added to the bill information. In this state, when the sales accounting button 249 in the table is clicked or tapped, it is counted as sales, and is newly added to the sales information table displayed in FIG. 6B. At the same time, it is newly added as data extracted by the deposit / withdrawal management display unit 16.

詳細は省略するが、出金に関する情報についても同様に、工事台帳200の外注費タブ236や仕入れ(材料費)タブ235において、支払伝票を新たに作成し登録することによって、入出金管理の表に反映される。   Although details are omitted, the payment management table is similarly created and registered in the outsourcing expense tab 236 and the purchase (material cost) tab 235 of the construction ledger 200 by newly creating and registering a payment slip. Is reflected in

このようにして、工事台帳に新たに追加された情報に基づいて、入出金管理の表が作成される。   In this way, a payment management table is created based on the information newly added to the construction ledger.

[資金繰年間実績予測400の概要]
次に、図8に示される資金繰年間実績予測表詳細画面の一例を用いて、ホーム画面1000において表示される資金繰年間実績予測ボタン1400をクリックまたはタップした場合に表示される資金繰年間実績予測表詳細画面400について説明する。資金繰年間実績予測表は、会計年度における資金繰りの実績及び予測を月ごとに表示するものである。図8においては、図8A資金繰年間実績予測表詳細(その1)、図8B資金繰年間実績予測表詳細(その2)、図8C資金繰年間実績予測表詳細(その3)と分けて説明するが、実際の画面においては、一画面に集約されて表示される。
[Overview of annual cash flow forecast 400]
Next, by using an example of the cash flow annual result prediction table detail screen shown in FIG. 8, the cash flow annual result forecast button 1400 displayed on the home screen 1000 is clicked or tapped and displayed. The prediction table detail screen 400 will be described. The cash flow annual performance forecast table shows the cash flow performance and forecast in the fiscal year for each month. In FIG. 8, description is made separately from FIG. 8A, the details of the cash flow annual results forecast table (part 1), FIG. 8B, the details of the cash flow annual results forecast table (part 2), and FIG. 8C, the details of the cash flow annual results forecast table (part 3). However, on an actual screen, they are displayed collectively on one screen.

ホーム画面1000において、ユーザが資金繰年間実績予測ボタン1400をクリックまたはタップすると、制御部10は資金繰年間実績予測表示部17を実行し、表示部60に、会計年度における資金繰りの実績及び予測を示す資金繰年間実績予測表詳細画面400を表示する。   When the user clicks or taps on the funding annual result prediction button 1400 on the home screen 1000, the control unit 10 executes the funding annual result prediction display unit 17, and the display unit 60 displays the funding result and prediction in the fiscal year. The funding annual performance forecast table detailed screen 400 shown is displayed.

資金繰年間実績予測表詳細画面400は、大きく分けて、図8Aに示される前月繰越420、収入430、図8Bに示される支出440、図8Cに示される当月収支450、財務調達460、債務返済470、財務収支480、翌月繰越490、公共工事前途金残高491、定期・積金492の項目からなる。これらの項目が、表示開始年月410で指定された月を基準とした12か月間の一覧表として表示される。   The cash flow annual performance forecast table detail screen 400 is roughly divided into the previous month carry-over 420 shown in FIG. 8A, the income 430, the expenditure 440 shown in FIG. 8B, the current month balance 450 shown in FIG. 470, financial balance 480, carry-over 490 for the following month, public works upfront balance 491, and periodic / reserved money 492. These items are displayed as a 12-month list based on the month designated by the display start date 410.

図8Aに示される収入430の欄は、売上回収431及び売掛金回収432の中項目からなり、売掛金回収432は台帳案件、建設案件、他区案件、元請案件及びEPS案件の小項目からなる。売掛金回収432の台帳案件の項目に関しては、台帳データベース31の入金関係データベース312より算出され、その他の項目については、任意で予測値を入力できるようになっている。そして、これらの売上が合計されたものが収入の合計(2)433として表示される。   The column of income 430 shown in FIG. 8A includes middle items of sales collection 431 and accounts receivable 432, and accounts receivable 432 includes small items of ledger cases, construction cases, other ward cases, prime contract cases, and EPS cases. The items of the ledger case of the accounts receivable collection 432 are calculated from the payment-related database 312 of the ledger database 31, and the other items can be arbitrarily input with predicted values. The sum of these sales is displayed as the total income (2) 433.

上記の通り、資金繰年間実績予測表詳細画面400に示される売掛金回収432の台帳案件の欄には、図6A〜図6Cに示した工事台帳200に登録された工事の売掛金のうち、当該月に回収があった売掛金が、上記入金関係データベース312に基づいて計上される。また、図8Aに示す例においては、過去の月についての金額を修正するための入力ボタン434があり、入力ボタン434をクリックまたはタップすることによって、金額を表に直接入力して修正することができる。   As described above, the column of the ledger case of the accounts receivable 432 shown in the cash flow annual result forecast table detail screen 400 includes, among the accounts receivable for the construction registered in the construction ledger 200 shown in FIGS. Accounts receivable that has been collected are recorded based on the payment-related database 312. Also, in the example shown in FIG. 8A, there is an input button 434 for correcting the amount for the past month, and by clicking or tapping the input button 434, the amount can be directly input to the table and corrected. it can.

つまり、売掛金回収432の台帳案件の項目に関しては、工事台帳200に登録された工事の売掛金のうち、当該月に回収があった売掛金が、上記入金関係データベース312に基づいて計上されるが、過去の月の金額について修正する必要が生じた場合には、売掛金回収の欄に表示される入力ボタン434をユーザがクリックまたはタップすると、制御部10は売掛金入力部25を実行し、ユーザに売掛金を入力させる画面を表示部60に表示させる。ユーザが金額を入力すると、売掛金入力部25は、入力された金額を当月に回収した売掛金として修正して計上する。   That is, with respect to the item of the ledger case of the receivable collection 432, the receivable collected in the month out of the receivables of the construction registered in the construction ledger 200 is recorded based on the payment-related database 312. When it is necessary to correct the amount of the month of the month, when the user clicks or taps the input button 434 displayed in the column of the accounts receivable, the control unit 10 executes the accounts receivable input unit 25 and gives the user the accounts receivable. The screen to be input is displayed on the display unit 60. When the user inputs the amount, the receivable input unit 25 corrects the input amount as the receivable collected in the current month and records the amount.

図8Bに示される支出は、仕入支払441、買掛金支払(1)442、買掛金支払(2)443、人件費444、諸経費445、税金・配当446、支払利息447、納税の中項目からなる。買掛金支払(1)442及び買掛金支払(2)443は、支払いサイクルの異なる買掛金の支払いに関する項目であり、その他の中項目及び買掛金支払の小項目については、使用する業者ごとに任意に設定することができる。図8Bに示す例では、買掛金支払(1)は建設関係及び土木関係の小項目からなり、買掛金支払(2)はEPS関係の小項目からなる。そして、これらの支出が合計されたものが支出の合計(3)448として表示される。   The expenditures shown in FIG. 8B include purchase payment 441, accounts payable payment (1) 442, accounts payable payment (2) 443, personnel expenses 444, expenses 445, taxes and dividends 446, interest paid 447, and tax payment. Consists of Accounts payable (1) 442 and accounts payable (2) 443 are items related to the payment of accounts payable having different payment cycles. Other medium items and small items of accounts payable are optional depending on the trader used. Can be set to In the example shown in FIG. 8B, the accounts payable (1) is composed of small items related to construction and civil engineering, and the accounts payable (2) is composed of small items related to EPS. The sum of these expenditures is displayed as the total expenditure (3) 448.

資金繰年間実績予測表に示される買掛金支払(1)442及び買掛金支払(2)443の欄には、図6A〜図6Cに示した工事台帳200に登録された工事の買掛金のうち、当該月に支払いがあった買掛金が、工事データベース31の支払関係データベース313に基づいて計上される。また、図6Bに示す例においては、買掛金支払(1)の欄、及び、買掛金支払(2)の欄に、過去の月についての金額を修正するための入力ボタン449があり、入力ボタン449をクリックまたはタップすることによって、過去の月の金額について修正後の金額を表に直接入力することができる。   In the columns of accounts payable (1) 442 and accounts payable (2) 443 shown in the cash flow annual result forecast table, of the accounts payable of the work registered in the work ledger 200 shown in FIGS. 6A to 6C. The accounts payable that was paid in the month is recorded based on the payment-related database 313 of the construction database 31. In the example shown in FIG. 6B, an input button 449 for correcting the amount of money in the past month is provided in the field of accounts payable (1) and the field of accounts payable (2). By clicking or tapping 449, the amount corrected in the past month can be directly input to the table.

つまり、買掛金支払(1)442及び買掛金支払(2)443の項目に関しては、工事台帳200に登録された工事の買掛金のうち、当該月に支払いがあった買掛金が、上記支払関係データベース313に基づいて計上されるが、過去の月の金額について修正する必要が生じた場合には、買掛金支払(1)又は買掛金支払(2)の欄に表示される入力ボタン449をユーザがクリックまたはタップすると、制御部10は買掛金入力部26を実行し、ユーザに買掛金を入力させる画面を表示部60に表示させる。ユーザが金額を入力すると、買掛金入力部26は、入力された金額を当月の支払った買掛金として修正して計上する。   In other words, regarding the items of the accounts payable payment (1) 442 and the accounts payable payment (2) 443, among the accounts payable of the work registered in the The account is calculated based on the database 313, but if it is necessary to correct the amount in the past month, the input button 449 displayed in the column of the accounts payable (1) or the accounts payable (2) is changed by the user. When the user clicks or taps, the control unit 10 executes the accounts payable input unit 26 and causes the display unit 60 to display a screen for allowing the user to input the accounts payable. When the user inputs the amount, the accounts payable input unit 26 corrects the input amount as the accounts payable paid in the current month and records the corrected amount.

図8Cに一例として示される財務調達460及び債券返済470は、ユーザによって設定可能な任意の項目である。本実施形態において、財務調達460は、短期及び長期・ABL・社債の中項目からなり、これらの調達額が合計されたものが財務調達の合計(5)として表示される。また、債券返済470に関する項目は、短期及び長期・私募債の中項目からなり、これらの返済額が合計されたものが債券返済の合計(6)として表示される。また、財務調達の合計(5)から債券返済の合計(6)を減算したものが財務収支(7)480として表示される。   The financial procurement 460 and bond repayment 470 shown as examples in FIG. 8C are arbitrary items that can be set by the user. In this embodiment, the financial procurement 460 includes short-term, long-term, ABL, and corporate bonds, and the sum of these procurement amounts is displayed as the total (5) of the financial procurement. The items related to bond repayment 470 consist of short-term and long-term private placement bonds, and the sum of these repayments is displayed as the total (6) of bond repayments. Further, a value obtained by subtracting the total (6) of bond repayments from the total (5) of financial procurement is displayed as a financial balance (7) 480.

図8Cに示すように、図8Aに示した収入の合計額(2)433から図68に示した支出の合計額(3)448を減算したものが当月収支(4)450として表示され、当該当月収支(4)450に、前記財務収支(7)480、及び、図8Aに示した前月繰越(1)420を加算したものが、翌月繰越額490として表示される。   As shown in FIG. 8C, a result obtained by subtracting the total amount of expenditure (3) 448 shown in FIG. 68 from the total amount of income (2) 433 shown in FIG. 8A is displayed as the current month balance (4) 450. The financial balance (7) 480 and the previous month's carry-over (1) 420 shown in FIG. 8A are added to the current month's balance (4) 450, and the result is displayed as the carry-over amount 490 for the next month.

資金繰年間実績予測表の各月には確定ボタン493が配置されており、確定ボタン493をクリックまたはタップすることによって、当月の予算を確定することができ、確定ボタン493に隣接して配置されたチェックボックス494にチェックが入るようになっている。   A confirm button 493 is arranged in each month of the funding annual result forecast table. By clicking or tapping the confirm button 493, the budget for the current month can be confirmed, and is arranged adjacent to the confirm button 493. The check box 494 is checked.

すなわち、ユーザが確定ボタン493をクリックまたはタップすると、制御部10は当月実績確定部27を実行し、入力され表示された実績予測を確定したものとする。   That is, when the user clicks or taps the confirmation button 493, it is assumed that the control unit 10 executes the result confirmation unit 27 for the current month and confirms the input and displayed result prediction.

このようにして、資金繰年間実績予測表詳細画面400を作成し、管理することができる。本実施形態に係る建築業向け与信判断材料提供システム1による資金繰年間実績予測表詳細表示画面400によると、受注済みではあるもののシステムに登録されていない項目を細かく入力することで、より正確な資金繰り予測表の作成が可能となる。すなわち、収入の項目の中には、これから受注する予定の案件についての収入額が含まれており、支出の項目の中には、これから受注する予定の案件にかかる工事原価等の支出及び、販管費や給与等、毎月ほぼ同額の支出が含まれている。受注済みとなった場合に、これらの項目を細かく入力することにより、正確な資金繰りの予測が可能となる。   In this manner, the funding annual performance forecast table detail screen 400 can be created and managed. According to the detailed display screen 400 of the cash flow annual result prediction table by the credit judgment material providing system 1 for the building industry according to the present embodiment, it is possible to more accurately input items that have been received but have not been registered in the system. A cash flow forecast table can be created. In other words, the income item includes the amount of income for the project to be ordered, and the expenditure item includes the expenditures such as the cost of Each month includes almost the same amount of expenditures and salaries. When the order has been received, by accurately inputting these items, accurate cash flow prediction can be performed.

本実施形態に係る建築業向け与信判断材料提供システム1によれば、所定の期間における入金及び出金の内容をまとめた入出金管理画面300に、入金予定日情報及び入金確定日情報が取引ごとに表示されるため、入金の予測が立ちやすくなるとともに、入金予定日情報及び入金確定日情報がそれぞれの工事台帳200に含まれる売上情報に基づいているため、複数の工事が並行して行われている場合においても、ひと目でお金の流れを正確に把握することが可能であり、金融機関の信頼を得られやすいシステムを提供することが可能となる。   According to the credit-determination-material providing system 1 for the building industry according to the present embodiment, the expected payment date information and the payment confirmation date information are displayed for each transaction on the deposit / withdrawal management screen 300 that summarizes the contents of deposits and withdrawals in a predetermined period. , It is easy to make a prediction of payment, and since the scheduled payment date information and the payment confirmation date information are based on the sales information included in each construction ledger 200, a plurality of works are performed in parallel. Even in such a case, it is possible to accurately grasp the flow of money at a glance, and it is possible to provide a system that can easily obtain the trust of financial institutions.

また、請求内容が売上計上手段によって売り上げとして計上されることを条件として、請求内容が入金情報として入出金管理画面300に追加されるため、簡単な操作で入出金管理画面300を正確にアップデートすることが可能となる。   Further, on the condition that the billing content is recorded as sales by the sales accounting means, the billing content is added to the deposit / withdrawal management screen 300 as deposit information, so that the deposit / withdrawal management screen 300 is accurately updated by a simple operation. It becomes possible.

さらに、入金予定日情報が売上計上日情報と顧客情報とに基づいて決定されるため、顧客に特有の締日や入金サイトに基づいて、各工事の項目ごとに入金予定日を決定することが可能となり、お金の出入りをより詳細に把握することが可能となる。すなわち、本実施形態に係る建築業向け与信判断材料提供システム1は、受注時にシステムにその案件ごとの入金計画及び出金計画が、入金関係データベース312及び支払関係データベース313にそれぞれインプットされ、実際に毎月の経過ごとに計画の数字を実際の数字に置き換え、経過月以降の予定を修正入力していくシステムとなっている。このような、実績と予定とを毎月確認し逐一修正していくことで、非常に正確な工事案件収支予測と、長期にわたる資金繰り予測を可能にしている。これによって、金融機関からも工事案件ごと、工事案件一覧及び資金繰り予測実績詳細表を閲覧可能な仕組みを構築することができ、建築業者と金融機関との信頼関係の構築につながるシステムとなる。   Furthermore, since the expected payment date information is determined based on the sales accounting date information and the customer information, it is possible to determine the expected payment date for each construction item based on a customer-specific closing date and a payment site. It becomes possible, and it becomes possible to grasp in and out of money in more detail. That is, in the system 1 for providing credit judgment material for the building industry according to the present embodiment, a payment plan and a withdrawal plan for each case are input to the payment-related database 312 and the payment-related database 313, respectively, when the order is received. The system replaces the plan figures with actual figures every month, and corrects and inputs the schedule after the month. By checking the results and schedules every month and correcting them one by one, it is possible to make a very accurate forecast of construction project income and expenditure and a long-term cash flow forecast. As a result, it is possible to construct a system that allows a financial institution to view a construction project list and a detailed table of financing forecast results for each construction project, and the system leads to the establishment of a trusting relationship between the contractor and the financial institution.

以上のように構成することで、複数の工事が同時に並行する場合であっても、個別の入金や出金、及びそれらの予定を容易に管理することができ、金融機関が融資の可否を判断することが可能な建築業向け与信判断材料提供システムを提供することができる。   By configuring as described above, even when multiple works are performed in parallel, it is possible to easily manage individual deposits and withdrawals and their schedules, and the financial institution determines whether or not to lend. It is possible to provide a credit-determination-material providing system for the building industry that can perform the above.

以上、本発明の実施形態について説明したが、本発明は上述したこれらの実施形態に限るものではない。また、本発明の実施形態に記載された効果は、本発明から生じる最も好適な効果を列挙したに過ぎず、本発明による効果は、本発明の実施形態に記載されたものに限定されるものではない。   As described above, the embodiments of the present invention have been described, but the present invention is not limited to these embodiments. In addition, the effects described in the embodiments of the present invention merely enumerate the most preferable effects resulting from the present invention, and the effects of the present invention are limited to those described in the embodiments of the present invention. is not.

また、上記した実施の形態は本発明を分かりやすく説明するために詳細に説明したものであり、必ずしも説明した全ての構成を備えるものに限定されるものではない。また、ある実施の形態の構成の一部を他の実施の形態の構成に置き換えることが可能であり、また、ある実施の形態の構成に他の実施の形態の構成を加えることも可能である。また、各実施の形態の構成の一部について、他の構成の追加、削除、置換しても良い。   In addition, the above-described embodiments have been described in detail in order to easily explain the present invention, and are not necessarily limited to those having all the configurations described above. In addition, part of the configuration of one embodiment can be replaced with the configuration of another embodiment, and the configuration of one embodiment can be added to the configuration of another embodiment. . In addition, a part of the configuration of each embodiment may be added, deleted, or replaced with another configuration.

また、上記の各構成、機能、処理部は、それらの一部又は全部を、ハードウェア(例えば、集積回路)で実現してもよい。また、上記の各構成、機能、処理部は、プロセッサがそれぞれの機能を実現するプログラムを解釈し、実行することによりソフトウェアで実現してもよい。各機能を実現するプログラム、テーブル、ファイル等の情報は、メモリや、ハードディスク、SSD(Solid State Drive)等の記録装置、または、ICカード、SDカード、DVD等の記録媒体に置くことができる。   In addition, a part or all of the above-described configurations, functions, and processing units may be realized by hardware (for example, an integrated circuit). Further, each of the above configurations, functions, and processing units may be realized by software by a processor interpreting and executing a program for realizing each function. Information such as programs, tables, and files for realizing each function can be stored in a memory, a hard disk, a recording device such as an SSD (Solid State Drive), or a recording medium such as an IC card, an SD card, or a DVD.

1 建築業向け与信判断材料提供システム
10 制御部
11 工事台帳作成部
12 顧客情報登録登録部
13 業者情報登録部
30 記憶部
31 工事データベース
311 工事案件データベース
312 入金関係データベース
313 支払関係データベース
32 顧客データベース
33 業者データベース
40 通信部
50 入力部
60 表示部
DESCRIPTION OF SYMBOLS 1 Credit judgment material provision system for construction industry 10 Control part 11 Construction ledger creation part 12 Customer information registration registration part 13 Contractor information registration part 30 Storage part 31 Construction database 311 Construction case database 312 Payment relation database 313 Payment relation database 32 Customer database 33 Trader database 40 Communication unit 50 Input unit 60 Display unit

Claims (3)

建築業者が金融機関に提供する資料をコンピュータ上で作成する建築業向け与信判断材料提供システムであって、
前記建築業者が担当する工事に関する顧客情報、見積書情報、請求書情報、売上情報、支払いに関する情報を含む工事台帳を作成する工事台帳作成手段と、
所定の期間における入金及び出金の内容を、それぞれ入金情報及び出金情報としてまとめた入出金管理画面を表示する入出金管理表示手段とを備え、
前記売上情報には、入金予定日に関する情報である入金予定日情報と、前記顧客からの実際の入金があった日付である入金確定日に関する情報である入金確定日情報とが含まれており、
前記入出金管理画面には、売上計上日情報と顧客情報とに基づいて決定される前記入金予定日情報とともに前記入金確定日情報が同時に表示され、
会計年度における資金繰りの実績とともに予測を同時に月ごとに表示する資金繰年間実績予測表を含む資金繰年間実績予測表詳細画面を表示する、資金繰年間実績予測表示手段をさらに備え、
前記資金繰年間実績予測表詳細画面には、これから受注する予定の案件についての収入額と、これから受注する予定の案件にかかる工事原価等の支出及び、販管費や給与等の毎月の支出と、が同時に表示され、
受注時に案件ごとの入金計画及び出金計画が、それぞれインプットされ、毎月の経過ごとに計画の数字を実際の数字に置き換え、経過月以降の予定を修正入力され、前記資金繰年間実績予測表詳細画面に含まれ同時に表示される前記実績と前記予測とが毎月確認され逐一修正される、
建築業向け与信判断材料提供システム。
A credit judgment material providing system for a building industry in which a material provided by a contractor to a financial institution is created on a computer,
Construction ledger creating means for creating a construction ledger including customer information, quote information, invoice information, sales information, and information on payment relating to the construction in charge of the builder,
Deposit and withdrawal management display means for displaying a deposit and withdrawal management screen that summarizes the contents of deposit and withdrawal during a predetermined period as deposit information and withdrawal information, respectively.
The sales information includes scheduled payment date information that is information about a scheduled payment date, and payment confirmed date information that is information about a payment confirmed date that is a date when the actual payment from the customer was made,
On the deposit / withdrawal management screen, the deposit confirmation date information is displayed simultaneously with the estimated deposit date information determined based on the sales accounting date information and the customer information ,
It further comprises a cash flow annual result forecast display means for displaying a cash flow annual result forecast table detail screen including a cash flow annual result forecast table which simultaneously displays the forecast together with the cash flow results in the fiscal year for each month,
On the cash flow annual performance forecast table details screen, the income amount for the project to be ordered from now on, the expenditure such as construction cost related to the project to be ordered from now on, the monthly expenditure such as SG & A expenses and salary, Are displayed at the same time,
The payment plan and the withdrawal plan for each project are input at the time of receiving an order, the figures of the plan are replaced with the actual figures every month, the schedule after the month is corrected and input, and the cash flow annual result forecast table details The results and the forecasts that are included and displayed simultaneously on the screen are checked monthly and corrected one by one,
Credit judgment material providing system for the construction industry.
前記工事台帳作成手段は、前記工事の発注者に対して前記工事に関する報酬を請求する請求書を作成する請求書作成手段と、前記請求書作成手段で作成された前記請求書に記載された請求内容を売上として計上する売上計上手段とを備え、
前記入出金管理表示手段は、前記請求内容が前記売上計上手段によって売り上げとして計上されると、前記請求内容を前記入出金管理画面に前記入金情報として追加する、
請求項1に記載の建築業向け与信判断材料提供システム。
The construction ledger creating means includes: a bill creating means for creating a bill for claiming a fee for the construction to the orderer of the construction; and a bill described in the bill created by the bill creating means. A sales accounting means for accounting the content as sales,
The deposit and withdrawal management display means, when the billing content is recorded as sales by the sales accounting means, adds the billing content to the deposit and withdrawal management screen as the deposit information;
The credit judgment material providing system for the construction industry according to claim 1.
前記売上情報には、前記入金予定日情報及び前記入金確定日情報に加え、前記売上計上手段によって売り上げとして計上された日付に関する情報である売上計上日情報が含まれ、
前記入金予定日情報は、前記売上計上日情報と顧客情報とに基づいて決定される、
請求項2に記載の建築業向け与信判断材料提供システム。
The sales information includes, in addition to the expected payment date information and the payment confirmation date information, sales accounting date information that is information on a date that has been accounted for as sales by the sales accounting unit,
The expected payment date information is determined based on the sales accounting date information and customer information,
The credit judgment material providing system for the construction industry according to claim 2.
JP2019020357A 2019-02-07 2019-02-07 Credit judgment material providing system for construction industry Active JP6651173B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019020357A JP6651173B1 (en) 2019-02-07 2019-02-07 Credit judgment material providing system for construction industry

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019020357A JP6651173B1 (en) 2019-02-07 2019-02-07 Credit judgment material providing system for construction industry

Publications (2)

Publication Number Publication Date
JP6651173B1 true JP6651173B1 (en) 2020-02-19
JP2020129168A JP2020129168A (en) 2020-08-27

Family

ID=69568427

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019020357A Active JP6651173B1 (en) 2019-02-07 2019-02-07 Credit judgment material providing system for construction industry

Country Status (1)

Country Link
JP (1) JP6651173B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2023051227A (en) * 2021-09-30 2023-04-11 昭和電線ホールディングス株式会社 Case management system

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08147356A (en) * 1994-11-21 1996-06-07 Toshiba Corp Maintenance management device
JP2004054662A (en) * 2002-07-22 2004-02-19 Kanouta Kensetsu Kogyo:Kk Work ledger creation device, and program for executing work ledger creation on computer
JP5347304B2 (en) * 2008-03-31 2013-11-20 弘孝 加藤 Construction ledger and cash flow system based on business management system

Also Published As

Publication number Publication date
JP2020129168A (en) 2020-08-27

Similar Documents

Publication Publication Date Title
JP4119473B2 (en) Method and server for managing transactions and settlements
US8341089B2 (en) Real estate management system and method
US20080071600A1 (en) Systems and methods for automating business services
US20100153239A1 (en) Providing accounting software application as enterprise services
US20210327001A1 (en) Error control in multicomputer data processing
US20160203570A1 (en) Information management system
JP4285765B1 (en) Budget management accounting computer system and computer program
JPH10187823A (en) Order reception management system, credit sale management system, and order reception and credit sale management system
JP2009176121A (en) Business management system
JP4741930B2 (en) Account management system
JP2004192564A (en) Account item automatic classification method and its program
JP2014093041A (en) Inheritance management program and inheritance management system
JP6651173B1 (en) Credit judgment material providing system for construction industry
KR101878261B1 (en) Apparatus and the method for managing rental or lease
JP2017107468A (en) Geometric accounting sheet and accounting processing method using the same
JP4843213B2 (en) Construction industry accounting equipment
JP2005174033A (en) Payment system for credit
TW511019B (en) System and method of managing jobs, managing financing, and/or providing materials
JPH113376A (en) Enterprise fund plan simulation system
JP2017182798A (en) Debt Recording Device, Debt Recording Method, and Debt Recording Program
JP2003167985A (en) Cash flow management system and management method
US8341043B2 (en) Dynamic prepayment risk management
JP2001014384A (en) Cash flow management system, managing method, and computer-readable recording medium
Patel Discover SAP ERP Financials
JP2003316935A (en) Management support device, management support method, and computer-readable recording medium

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190412

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20190412

A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20190516

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190819

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20191009

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200106

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200109

R150 Certificate of patent or registration of utility model

Ref document number: 6651173

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250